{"id":105343,"date":"2026-10-21T21:17:22","date_gmt":"2026-10-21T21:17:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105343"},"modified":"2026-10-21T21:19:24","modified_gmt":"2026-10-21T21:19:24","slug":"abc-stok-analizi","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/","title":{"rendered":"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>ABC stok analizi, stok kalemlerini y\u0131ll\u0131k t\u00fcketim de\u011ferine g\u00f6re grupland\u0131r\u0131r. Bu de\u011fer, bir y\u0131lda kullan\u0131lan miktar\u0131n birim maliyetle \u00e7arp\u0131lmas\u0131yla bulunur. A s\u0131n\u0131f\u0131ndaki kalemler bu de\u011ferin en b\u00fcy\u00fck pay\u0131n\u0131, B s\u0131n\u0131f\u0131ndakiler sonraki pay\u0131n\u0131, C s\u0131n\u0131f\u0131ndakiler ise kalan\u0131n\u0131 olu\u015fturur. Ama\u00e7, stok kontrol\u00fcne ay\u0131rd\u0131\u011f\u0131n\u0131z eme\u011fi finansal etkisinin en y\u00fcksek oldu\u011fu kalemlere y\u00f6neltmektir.<\/p>\n\n\n<p>\u00dcreticiler i\u00e7in \u00f6nemli bir soru daha vard\u0131r: Hangi kalemin eksikli\u011fi bir sipari\u015fin \u00fcretimini durdurabilir? D\u00fc\u015f\u00fck maliyetli bir c\u0131vata C s\u0131n\u0131f\u0131nda yer alsa da t\u00fcm montaj\u0131 bekletebilir. ABC analizi, paran\u0131n nereye harcand\u0131\u011f\u0131n\u0131 g\u00f6sterir; hangi i\u015flere sorunsuz ba\u015flanabilece\u011fini g\u00f6stermez.<\/p>\n\n\n<p>Bu s\u0131n\u0131fland\u0131rmay\u0131, uygun sat\u0131n alma ve stok kontrol politikalar\u0131 belirlemek i\u00e7in kullan\u0131n. Ard\u0131ndan SkyPlanner APS ile malzeme bulunabilirli\u011fini \u00fcretim \u00e7izelgesine ba\u011flay\u0131n. B\u00f6ylece eksik olan ucuz bir bile\u015fen, yaln\u0131zca y\u0131ll\u0131k harcamas\u0131 y\u00fcksek oldu\u011funda de\u011fil, teslimat\u0131 riske att\u0131\u011f\u0131nda da dikkate al\u0131n\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A, B ve C ger\u00e7ekte ne anlama gelir?<\/h2>\n\n\n<p>T\u00fcketim de\u011ferine dayal\u0131 bir analizde s\u0131n\u0131flar; kaliteyi, k\u00e2r marj\u0131n\u0131 veya \u00fcretim \u00f6nceli\u011fini de\u011fil, maliyetin hangi kalemlerde yo\u011funla\u015ft\u0131\u011f\u0131n\u0131 g\u00f6sterir.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>A s\u0131n\u0131f\u0131ndaki kalemler<\/strong>, y\u0131ll\u0131k t\u00fcketim de\u011ferinin ilk ve en b\u00fcy\u00fck pay\u0131n\u0131 olu\u015fturur. Bu kalemlerde stok kay\u0131tlar\u0131n\u0131n do\u011frulu\u011fu, sat\u0131n alma taahh\u00fctleri ve stok fazlas\u0131 yak\u0131ndan takip edilmelidir.<\/li><li><strong>B s\u0131n\u0131f\u0131ndaki kalemler<\/strong> sonraki pay\u0131 olu\u015fturur. Genellikle standart kontroller uygulamak ve d\u00fczenli de\u011ferlendirme yapmak, her birini istisna olarak ele almaktan daha uygundur.<\/li><li><strong>C s\u0131n\u0131f\u0131ndaki kalemler<\/strong>, t\u00fcketim de\u011ferinin geriye kalan daha k\u00fc\u00e7\u00fck pay\u0131n\u0131 olu\u015fturur. Bu grupta \u00e7o\u011fu zaman, \u00fcretimi \u00f6nlenebilir malzeme eksikliklerine maruz b\u0131rakmadan rutin stok ikmalini ve idari i\u015fleri basitle\u015ftirmek m\u00fcmk\u00fcnd\u00fcr.<\/li><\/ul>\n\n\n<p>Yayg\u0131n bir ba\u015flang\u0131\u00e7 yakla\u015f\u0131m\u0131, t\u00fcketim de\u011ferinin yakla\u015f\u0131k %80&#8217;ini A, sonraki %15&#8217;ini B, kalan %5&#8217;ini ise C s\u0131n\u0131f\u0131na almakt\u0131r. Bunlar evrensel kurallar de\u011fil, stok politikan\u0131z i\u00e7in se\u00e7ilen s\u0131n\u0131rlard\u0131r. Ger\u00e7ek da\u011f\u0131l\u0131m\u0131n\u0131z farkl\u0131 olabilir.<\/p>\n\n\n<p>Bilinen 80\/20 yakla\u015f\u0131m\u0131, toplam de\u011ferin nispeten az say\u0131da kalemde yo\u011funla\u015fabilece\u011fini anlat\u0131r. Stok kodlar\u0131n\u0131z\u0131n tam olarak %20&#8217;sinin A s\u0131n\u0131f\u0131nda olmas\u0131n\u0131 gerektirmez. Kalem say\u0131s\u0131n\u0131 \u00f6nceden belirlenmi\u015f bir kal\u0131ba uydurmak yerine, \u00f6nce da\u011f\u0131l\u0131m\u0131 hesaplay\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">ABC stok s\u0131n\u0131flar\u0131 nas\u0131l hesaplan\u0131r?<\/h2>\n\n\n<p>\u00d6nce analiz edece\u011finiz grubu net bi\u00e7imde tan\u0131mlay\u0131n; \u00f6rne\u011fin bir fabrikan\u0131n kulland\u0131\u011f\u0131, sat\u0131n al\u0131nan malzeme ve bile\u015fenleri ele al\u0131n. T\u00fcm kalemler i\u00e7in ayn\u0131 on iki ayl\u0131k d\u00f6nemi ve ayn\u0131 maliyet esas\u0131n\u0131 kullan\u0131n. Ham madde t\u00fcketimini ve bitmi\u015f \u00fcr\u00fcnlerin tam de\u011ferini, aralar\u0131ndaki \u00f6rt\u00fc\u015fmeyi hesaba katmadan ayn\u0131 s\u0131ralamaya dahil etmeyin. Aksi takdirde ayn\u0131 malzeme de\u011feri iki kez say\u0131labilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. T\u00fcketim miktar\u0131 ve birim maliyet verilerini toplay\u0131n<\/h3>\n\n\n<p>Her stok kodu i\u00e7in d\u00f6nem i\u00e7inde t\u00fcketilen miktar\u0131 ve birim maliyeti kaydedin. \u00d6l\u00e7\u00fc birimlerini e\u015fle\u015ftirin: Miktar adet olarak kaydedilmi\u015fse kutu ba\u015f\u0131na de\u011fil, adet ba\u015f\u0131na maliyet kullan\u0131lmal\u0131d\u0131r. Listenin tamam\u0131nda ayn\u0131 para birimini ve tutarl\u0131 bir de\u011ferleme esas\u0131n\u0131 kullan\u0131n.<\/p>\n\n\n<p>Ge\u00e7mi\u015f t\u00fcketim verileri pratik bir ba\u015flang\u0131\u00e7 noktas\u0131d\u0131r, ancak \u00f6n\u00fcn\u00fczdeki \u00fcretimi yans\u0131t\u0131p yans\u0131tmad\u0131\u011f\u0131n\u0131 kontrol edin. \u00dcretimden kald\u0131r\u0131lan bir \u00fcr\u00fcn, yeni bir s\u00f6zle\u015fme veya malzeme eksikli\u011fi nedeniyle t\u00fcketimin d\u00fc\u015ft\u00fc\u011f\u00fc bir d\u00f6nem, ge\u00e7mi\u015f y\u0131l\u0131n verilerini yan\u0131lt\u0131c\u0131 h\u00e2le getirebilir. Bunun yerine tahmini y\u0131ll\u0131k t\u00fcketimi kullan\u0131yorsan\u0131z bunu a\u00e7\u0131k\u00e7a belirtin ve t\u00fcm kalemlerde ayn\u0131 yakla\u015f\u0131m\u0131 uygulay\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Y\u0131ll\u0131k t\u00fcketim de\u011ferini hesaplay\u0131n<\/h3>\n\n\n<p><strong>Y\u0131ll\u0131k t\u00fcketim de\u011feri = y\u0131ll\u0131k t\u00fcketilen miktar \u00d7 birim maliyet<\/strong><\/p>\n\n\n<p>Bu de\u011fer, bug\u00fcnk\u00fc stok bakiyesini de\u011fil, bir y\u0131l boyunca ger\u00e7ekle\u015fen t\u00fcketimi ifade eder. S\u0131k s\u0131k ikmal etti\u011finiz bir kalemin raftaki miktar\u0131 az olsa da y\u0131ll\u0131k harcamas\u0131 y\u00fcksek olabilir.<\/p>\n\n\n<p>Bu de\u011fer sat\u0131\u015f fiyat\u0131 veya sat\u0131\u015f geliri de de\u011fildir. \u00dcretimde kullan\u0131lan malzemelere y\u00f6nelik bu analizde, kalemleri \u00fcretimde t\u00fcketilen miktarlar\u0131n maliyetine g\u00f6re s\u0131ralars\u0131n\u0131z.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. De\u011fere g\u00f6re b\u00fcy\u00fckten k\u00fc\u00e7\u00fc\u011fe s\u0131ralay\u0131n<\/h3>\n\n\n<p>Y\u0131ll\u0131k t\u00fcketim de\u011ferlerini toplayarak toplam de\u011feri bulun, ard\u0131ndan kalemleri bu de\u011fere g\u00f6re b\u00fcy\u00fckten k\u00fc\u00e7\u00fc\u011fe s\u0131ralay\u0131n. S\u0131ralamay\u0131 yaln\u0131zca birim fiyata g\u00f6re yapmay\u0131n. \u00c7ok y\u00fcksek miktarlarda kullan\u0131lan ucuz bir malzeme, yaln\u0131zca ara s\u0131ra kullan\u0131lan pahal\u0131 bir par\u00e7an\u0131n \u00f6n\u00fcne ge\u00e7ebilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Her kalemin pay\u0131n\u0131 ve k\u00fcm\u00fclatif pay\u0131 hesaplay\u0131n<\/h3>\n\n\n<p><strong>Kalemin de\u011fer pay\u0131 = kalemin y\u0131ll\u0131k t\u00fcketim de\u011feri \u00f7 toplam y\u0131ll\u0131k t\u00fcketim de\u011feri \u00d7 %100<\/strong><\/p>\n\n\n<p>K\u00fcm\u00fclatif pay, s\u0131ralanm\u0131\u015f listede a\u015fa\u011f\u0131 indik\u00e7e kalemlerin paylar\u0131n\u0131n birikimli toplam\u0131d\u0131r. Bu toplam, s\u0131n\u0131f s\u0131n\u0131rlar\u0131n\u0131 nerede belirleyece\u011finizi g\u00f6sterir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. S\u0131n\u0131flar\u0131 a\u00e7\u0131k\u00e7a tan\u0131mlanm\u0131\u015f bir s\u0131n\u0131r kural\u0131yla atay\u0131n<\/h3>\n\n\n<p>80\/15\/5 politikas\u0131nda, k\u00fcm\u00fclatif de\u011fer %80&#8217;e ula\u015fana veya bu oran\u0131 a\u015fana kadar kalemleri A s\u0131n\u0131f\u0131na al\u0131n. Ard\u0131ndan %95&#8217;e ula\u015fana veya bu oran\u0131 a\u015fana kadar B s\u0131n\u0131f\u0131na devam edin. Kalan kalemler C s\u0131n\u0131f\u0131na girer. Bir stok kodunu b\u00f6lmeden tek bir s\u0131n\u0131fta tutun.<\/p>\n\n\n<p>Bu y\u00f6ntemde s\u0131n\u0131r\u0131 a\u015fan kalem, o s\u0131rada olu\u015fturulan s\u0131n\u0131fa dahil edilir. \u00d6rne\u011fin bir sonraki kalemle A s\u0131n\u0131f\u0131n\u0131n k\u00fcm\u00fclatif pay\u0131 %79&#8217;dan %83&#8217;e \u00e7\u0131k\u0131yorsa bu kalem A&#8217;da kal\u0131r; B s\u0131n\u0131f\u0131 bir sonraki sat\u0131rdan ba\u015flar. Tutarl\u0131 olmak kayd\u0131yla ba\u015fka bir y\u00f6ntem de kullan\u0131labilir. Sonraki analistin ayn\u0131 sonucu elde edebilmesi i\u00e7in kulland\u0131\u011f\u0131n\u0131z y\u00f6ntemi kaydedin. E\u015fit de\u011ferdeki kalemlere de tutarl\u0131 davran\u0131n; s\u0131ralaman\u0131n de\u011fi\u015fmesi, a\u00e7\u0131klanamayan s\u0131n\u0131f de\u011fi\u015fikliklerine yol a\u00e7mas\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hesaplama \u00f6rne\u011fi: C s\u0131n\u0131f\u0131ndaki bir kalem binlerce kez kullan\u0131labilir<\/h2>\n\n\n<p>Bir \u00fcreticinin sat\u0131n ald\u0131\u011f\u0131 alt\u0131 malzemeyi analiz etti\u011fini d\u00fc\u015f\u00fcn\u00fcn. A\u015fa\u011f\u0131daki rakamlar \u00f6rnek ama\u00e7l\u0131d\u0131r, m\u00fc\u015fteri sonu\u00e7lar\u0131 de\u011fildir. Toplam y\u0131ll\u0131k t\u00fcketim de\u011feri <strong>$100.000<\/strong> tutar\u0131ndad\u0131r. Sat\u0131rlar bu de\u011fere g\u00f6re s\u0131ralanm\u0131\u015ft\u0131r; e\u015fit de\u011ferdeki iki sat\u0131rda, ilk malzeme listesindeki s\u0131ra korunmu\u015ftur.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Malzeme<\/th><th>Y\u0131ll\u0131k t\u00fcketim miktar\u0131<\/th><th>Birim maliyet<\/th><th>Y\u0131ll\u0131k t\u00fcketim de\u011feri<\/th><th>Toplam i\u00e7indeki pay<\/th><th>K\u00fcm\u00fclatif pay<\/th><th>S\u0131n\u0131f<\/th><\/tr><\/thead><tbody><tr><td>Motorlar<\/td><td>200<\/td><td>$300,00<\/td><td>$60.000<\/td><td>%60<\/td><td>%60<\/td><td>A<\/td><\/tr><tr><td>G\u00f6vdeler<\/td><td>400<\/td><td>$50,00<\/td><td>$20.000<\/td><td>%20<\/td><td>%80<\/td><td>A<\/td><\/tr><tr><td>Miller<\/td><td>600<\/td><td>$20,00<\/td><td>$12.000<\/td><td>%12<\/td><td>%92<\/td><td>B<\/td><\/tr><tr><td>S\u0131zd\u0131rmazl\u0131k elemanlar\u0131<\/td><td>6.000<\/td><td>$0,50<\/td><td>$3.000<\/td><td>%3<\/td><td>%95<\/td><td>B<\/td><\/tr><tr><td>C\u0131vatalar<\/td><td>30.000<\/td><td>$0,10<\/td><td>$3.000<\/td><td>%3<\/td><td>%98<\/td><td>C<\/td><\/tr><tr><td>Etiketler<\/td><td>100.000<\/td><td>$0,02<\/td><td>$2.000<\/td><td>%2<\/td><td>%100<\/td><td>C<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>G\u00f6vdeler i\u00e7in hesaplama 400 \u00d7 $50 = $20.000 \u015feklindedir. Bu de\u011feri $100.000&#8217;e b\u00f6ld\u00fc\u011f\u00fcm\u00fczde %20 pay elde ederiz. Motorlar\u0131n %60&#8217;l\u0131k pay\u0131na eklendi\u011finde k\u00fcm\u00fclatif pay %80&#8217;e ula\u015f\u0131r ve A s\u0131n\u0131f\u0131 tamamlan\u0131r.<\/p>\n\n\n<p>Miller ve s\u0131zd\u0131rmazl\u0131k elemanlar\u0131 %15 daha ekleyerek B s\u0131n\u0131f\u0131n\u0131 %95&#8217;te tamamlar. C\u0131vatalar ve etiketler son %5&#8217;i olu\u015fturur; dolay\u0131s\u0131yla bu politikaya g\u00f6re C s\u0131n\u0131f\u0131ndad\u0131r.<\/p>\n\n\n<p>Bu hesaplaman\u0131n neyi s\u00f6ylemedi\u011fine dikkat edin. \u00dcretici 30.000 c\u0131vata t\u00fcketir, ancak y\u0131ll\u0131k maliyetleri nispeten d\u00fc\u015f\u00fck oldu\u011fu i\u00e7in c\u0131vatalar C s\u0131n\u0131f\u0131nda kal\u0131r. C s\u0131n\u0131f\u0131; nadiren kullan\u0131lan, art\u0131k ihtiya\u00e7 duyulmayan veya stoku t\u00fckense de sorun yaratmayacak kalemler demek de\u011fildir. Ayn\u0131 \u015fekilde A s\u0131n\u0131f\u0131nda olmas\u0131, motorlara makinedeki i\u015f kuyru\u011funda otomatik olarak \u00f6ncelik verilmesi gerekti\u011fi anlam\u0131na gelmez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Her s\u0131n\u0131f i\u00e7in farkl\u0131 kontrol kurallar\u0131 belirleyin<\/h2>\n\n\n<p>S\u0131n\u0131fland\u0131rma, \u00e7al\u0131\u015fma bi\u00e7iminizi de\u011fi\u015ftirdi\u011finde de\u011fer yarat\u0131r. Stok kart\u0131na yaln\u0131zca bir harf eklemekle yetinmeyin; her s\u0131n\u0131f i\u00e7in bir kontrol politikas\u0131, bir sorumlu ve d\u00fczenli bir g\u00f6zden ge\u00e7irme s\u00fcreci belirleyin.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>S\u0131n\u0131f<\/th><th>Uygulamada odaklan\u0131lacak kontroller<\/th><th>Ka\u00e7\u0131n\u0131lmas\u0131 gerekenler<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>Sat\u0131n alma taahh\u00fctlerini ve stok fazlas\u0131n\u0131 yak\u0131ndan inceleyin. Hatalar\u0131n ciddi finansal risk yaratt\u0131\u011f\u0131 kalemlerde stok kay\u0131tlar\u0131n\u0131n do\u011frulu\u011funu s\u0131k s\u0131k kontrol edin. Talep ve maliyet de\u011fi\u015fimlerini takip edin.<\/td><td>Bir kalem s\u0131rf A s\u0131n\u0131f\u0131nda diye fazladan stok almak veya sto\u011fu, tedarikin g\u00fcvenilirli\u011fini bozacak \u00f6l\u00e7\u00fcde azaltmak.<\/td><\/tr><tr><td>B<\/td><td>Standart bir stok yenileme politikas\u0131 uygulay\u0131n ve istisnalar\u0131 d\u00fczenli olarak g\u00f6zden ge\u00e7irin. De\u011feri veya tedarik ko\u015fullar\u0131 de\u011fi\u015fen kalemleri inceleyin.<\/td><td>Orta grubu, A s\u0131n\u0131f\u0131n\u0131n s\u0131k\u0131 kontrolleri ile C s\u0131n\u0131f\u0131n\u0131n basit rutinleri aras\u0131nda denetimsiz b\u0131rakmak.<\/td><\/tr><tr><td>C<\/td><td>Uygun ambalaj miktarlar\u0131, \u00e7ift kutulu stok yenileme sistemi veya tedarik\u00e7i anla\u015fmalar\u0131yla i\u015flem y\u00fck\u00fcn\u00fc azalt\u0131n. Ger\u00e7ek tedarik riskine kar\u015f\u0131 yeterli korumay\u0131 s\u00fcrd\u00fcr\u00fcn.<\/td><td>Y\u0131ll\u0131k harcaman\u0131n d\u00fc\u015f\u00fck olmas\u0131n\u0131, malzeme eksikliklerini, raf \u00f6mr\u00fcn\u00fc veya \u00fcretimin bu malzemeye ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 g\u00f6z ard\u0131 etmek i\u00e7in gerek\u00e7e saymak.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Stok say\u0131mlar\u0131n\u0131n ve sat\u0131n alma kararlar\u0131n\u0131 g\u00f6zden ge\u00e7irmenin hangi s\u0131kl\u0131kta yap\u0131laca\u011f\u0131, i\u015fletmenizin ko\u015fullar\u0131na ba\u011fl\u0131d\u0131r. Ayn\u0131 s\u0131n\u0131fta olsalar bile, kay\u0131tlar\u0131 g\u00fcvenilir ve hareketleri istikrarl\u0131 bir kalem ile s\u00fcrekli stok fark\u0131 \u00e7\u0131kan bir kalemin takip ihtiyac\u0131 ayn\u0131 de\u011fildir.<\/p>\n\n\n<p>Benzer \u015fekilde, C s\u0131n\u0131f\u0131 bir kalemi daha b\u00fcy\u00fck miktarda sipari\u015f etmek, tekrarlanan sat\u0131n alma ve elle\u00e7leme i\u015flerini azalt\u0131yorsa ekonomik olabilir. Ancak malzemenin raf \u00f6mr\u00fc doluyor veya kullan\u0131m alan\u0131 ortadan kalk\u0131yorsa bu avantaj kaybolur. ABC, hangi kalemlere daha fazla odaklanaca\u011f\u0131n\u0131z\u0131 belirlemenize yard\u0131mc\u0131 olur; en uygun sipari\u015f miktar\u0131n\u0131 veya ihtiyac\u0131n\u0131z olan g\u00fcvenlik sto\u011funu hesaplamaz.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/guvenlik-stogu\/\">G\u00fcvenlik sto\u011fu karar\u0131n\u0131<\/a> ayr\u0131 de\u011ferlendirin. Her A, B veya C kalemine ayn\u0131 stok y\u00fczdesini uygulamak yerine tampon sto\u011fu belirsizli\u011fe, tedarik s\u00fcresine ve malzeme eksikli\u011finin sonu\u00e7lar\u0131na g\u00f6re belirleyin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Stok politikas\u0131n\u0131 de\u011fi\u015ftirmeden \u00f6nce \u00fcretim a\u00e7\u0131s\u0131ndan kritikli\u011fi de\u011ferlendirin<\/h2>\n\n\n<p>C s\u0131n\u0131f\u0131 kalemlerin kontrol\u00fcn\u00fc azaltmadan \u00f6nce, her biri bulunamad\u0131\u011f\u0131nda ne olaca\u011f\u0131n\u0131 sorgulay\u0131n. Onayl\u0131 bir alternatifinin olup olmad\u0131\u011f\u0131n\u0131, yerine gelecek malzemenin ne kadar s\u00fcrede tedarik edilebilece\u011fini ve hangi m\u00fc\u015fteri sipari\u015flerinin bu kaleme ba\u011fl\u0131 oldu\u011funu kontrol edin.<\/p>\n\n\n<p>ABC s\u0131n\u0131f\u0131n\u0131n yan\u0131nda \u00fcretim a\u00e7\u0131s\u0131ndan kritikli\u011fi de g\u00f6r\u00fcn\u00fcr tutun. Onayl\u0131 alternatifi olmayan C s\u0131n\u0131f\u0131 bir c\u0131vata, sat\u0131n alma a\u00e7\u0131s\u0131ndan A s\u0131n\u0131f\u0131 bir motor kadar ayr\u0131nt\u0131l\u0131 inceleme gerektirmese de eksikli\u011finde acil m\u00fcdahale gerektirebilir. Bu riski fark etmek i\u00e7in onu A s\u0131n\u0131f\u0131na ta\u015f\u0131man\u0131z gerekmez.<\/p>\n\n\n<p>Talep de\u011fi\u015fkenli\u011fi de ayr\u0131 bir boyuttur. Y\u0131ll\u0131k t\u00fcketim de\u011feri ayn\u0131 olan iki kalemin kullan\u0131m bi\u00e7imleri \u00e7ok farkl\u0131 olabilir: biri d\u00fczenli t\u00fcketilirken di\u011ferine zaman zaman b\u00fcy\u00fck miktarlarda ihtiya\u00e7 duyulabilir. \u0130kisine ayn\u0131 stok yenileme rutinini uygulamadan \u00f6nce bu kullan\u0131m d\u00fczenini kontrol edin.<\/p>\n\n\n<p>Bir montaj sipari\u015fi i\u00e7in motorlar\u0131n ve g\u00f6vdelerin haz\u0131r oldu\u011funu, ancak gerekli c\u0131vatan\u0131n eksik oldu\u011funu d\u00fc\u015f\u00fcn\u00fcn. Parasal de\u011fer a\u00e7\u0131s\u0131ndan bak\u0131ld\u0131\u011f\u0131nda sipari\u015fin malzeme ihtiyac\u0131 b\u00fcy\u00fck \u00f6l\u00e7\u00fcde kar\u015f\u0131lanm\u0131\u015f g\u00f6r\u00fcn\u00fcr. Ancak bu par\u00e7a olmadan montaj tamamlanamaz. \u0130\u015fe erken ba\u015flamak yaln\u0131zca yar\u0131m kalm\u0131\u015f montajlara, ek elle\u00e7lemeye ve takip edilmesi gereken yeni bir kuyru\u011fa yol a\u00e7abilir.<\/p>\n\n\n<p>Bu noktada sorulmas\u0131 gereken soru \u201cC\u0131vata hangi s\u0131n\u0131fta?\u201d de\u011fil, \u201cBu sipari\u015f ger\u00e7ekten ne zaman \u00fcretime al\u0131nabilir ve ekip o zamana kadar ne yapabilir?\u201d olmal\u0131d\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner ile her malzeme s\u0131n\u0131f\u0131n\u0131 \u00fcretim \u00e7izelgesine ba\u011flay\u0131n<\/h2>\n\n\n<p>SkyPlanner APS, malzeme kullan\u0131labilirli\u011fini i\u015f istasyonlar\u0131, vardiyalar, operasyon ba\u011f\u0131ml\u0131l\u0131klar\u0131 ve \u00f6nceliklerle birlikte ayn\u0131 \u00e7izelgeleme hesab\u0131na dahil eder. Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde Arcturus, i\u015flerin ba\u015flang\u0131\u00e7 zamanlar\u0131n\u0131 hesaplarken mevcut malzemeleri ve beklenen teslimatlar\u0131 g\u00f6z \u00f6n\u00fcnde bulundurur. Bu kurallar kapsam\u0131nda, gerekli malzemeler haz\u0131r olmadan bir i\u015fin ba\u015flamas\u0131 planlanmaz.<\/p>\n\n\n<p>B\u00f6ylece eksik c\u0131vata, stok raporunda yaln\u0131zca d\u00fc\u015f\u00fck de\u011ferli bir sat\u0131r olarak de\u011fil, bir \u00e7izelgeleme k\u0131s\u0131t\u0131 olarak da de\u011ferlendirilir. Stok bakiyelerini ayr\u0131 makine kuyruklar\u0131yla elle kar\u015f\u0131la\u015ft\u0131rmak yerine, planlanan operasyonlar\u0131 ve tamamlanma zamanlar\u0131n\u0131 Gantt g\u00f6r\u00fcn\u00fcm\u00fcnde inceleyebilirsiniz. Bunun sonucunda, malzeme yetersizli\u011fine ra\u011fmen planlanan i\u015f ba\u015flang\u0131\u00e7lar\u0131 azal\u0131r ve teslimat sorunlar\u0131 daha erken g\u00f6r\u00fcn\u00fcr h\u00e2le gelir.<\/p>\n\n\n<p>Sat\u0131n alma sipari\u015flerindeki teslimat tarihleri, malzemenin ne zaman kullan\u0131labilir olmas\u0131n\u0131n beklendi\u011fini g\u00f6sterir. Bir sat\u0131n alma sipari\u015finin teslim al\u0131nd\u0131\u011f\u0131n\u0131 onaylamak sto\u011fu g\u00fcnceller; beklenen bir mal kabul\u00fc, malzemenin h\u00e2lihaz\u0131rda stokta oldu\u011fu anlam\u0131na gelmez. Tedarik\u00e7i beklenen tarihi de\u011fi\u015ftirirse bilgiyi g\u00fcncelleyin ve i\u015flere etkisini g\u00f6rmek i\u00e7in \u00e7izelgeyi yeniden hesaplay\u0131n.<\/p>\n\n\n<p>\u00d6ncelikleri yine siz belirlersiniz. Arcturus, tan\u0131mlad\u0131\u011f\u0131n\u0131z kurallar ve kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde i\u015f s\u0131ras\u0131n\u0131 hesaplar. B\u00f6ylece her operasyonun yerini kendiniz de\u011fi\u015ftirmek yerine, hangi teslimat taahh\u00fctlerinin etkilendi\u011fini de\u011ferlendirebilirsiniz. SkyPlanner bu nedenle ABC kontrol\u00fcn\u00fc tamamlar: mali a\u00e7\u0131dan \u00f6nemli kalemlere odaklanmay\u0131 s\u00fcrd\u00fcr\u00fcrken, \u00fcretime haz\u0131r olma de\u011ferlendirmesinde her i\u015fin ger\u00e7ekten ihtiya\u00e7 duydu\u011fu bile\u015fenler dikkate al\u0131n\u0131r.<\/p>\n\n\n<p>SkyPlanner, <a href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/\">a\u00e7\u0131k REST API<\/a> arac\u0131l\u0131\u011f\u0131yla her ERP veya MES sistemiyle entegre olur. Sat\u0131n alma ve malzeme kart\u0131 verilerinizi tuttu\u011funuz sistemi koruyabilir, bu sistemi <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">malzeme kullan\u0131labilirli\u011fini yans\u0131tan bir \u00fcretim \u00e7izelgesine<\/a> ba\u011flayabilirsiniz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Malzeme durumunun daha net g\u00f6r\u00fclmesi Eskomatic&#8217;te neleri de\u011fi\u015ftirdi?<\/h3>\n\n\n<p>Fason tala\u015fl\u0131 imalat yapan Eskomatic, daha \u00f6nce eski bir ERP ve \u00fcretim kontrol\u00fc ortam\u0131nda, b\u00fcy\u00fck \u00f6l\u00e7\u00fcde elle y\u00f6netilen i\u015f kuyruklar\u0131yla \u00e7al\u0131\u015f\u0131yordu. Genel durumu g\u00f6rmek \u00e7aba gerektiriyordu. Malzeme kullan\u0131labilirli\u011finin yeterince g\u00f6r\u00fcn\u00fcr olmamas\u0131 nedeniyle bir eksiklik, i\u015fin planlanan ba\u015flang\u0131c\u0131na \u00e7ok az zaman kala ortaya \u00e7\u0131kabiliyordu.<\/p>\n\n\n<p>SkyPlanner mevcut ERP sistemine ba\u011fland\u0131\u011f\u0131nda ekip, Gantt \u00fczerinde g\u00f6rsel bir i\u015f kuyru\u011funa, i\u015f y\u00fck\u00fcn\u00fcn otomatik \u00e7izelgelenmesine ve malzeme eksikliklerini daha net g\u00f6rme imk\u00e2n\u0131na kavu\u015ftu. Eskomatic, <a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/eskomatic\/\">SkyPlanner m\u00fc\u015fteri hik\u00e2yesinde<\/a>, eksik malzemelerden kaynaklanan \u00fcretim duru\u015flar\u0131n\u0131n azald\u0131\u011f\u0131n\u0131 ve teslimat tarihlerini daha do\u011fru belirleyebildiklerini bildiriyor.<\/p>\n\n\n<p>Bu deneyim, s\u0131n\u0131fland\u0131rman\u0131n \u00f6tesindeki operasyonel iyile\u015fmeyi g\u00f6steriyor: planlamac\u0131, malzeme sorununu etkiledi\u011fi i\u015flerle birlikte g\u00f6rebiliyor. Bu da, bir ABC etiketinin tek ba\u015f\u0131na teslimat\u0131 g\u00fcvence alt\u0131na almas\u0131n\u0131 beklemek yerine stok kontrol\u00fcn\u00fc \u00e7izelgelemeye ba\u011flamak i\u00e7in bir neden sunuyor.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bir malzeme grubu ve ya\u015fanm\u0131\u015f bir malzeme eksikli\u011fiyle ba\u015flay\u0131n<\/h2>\n\n\n<p>Kapsam\u0131 net bir malzeme grubu se\u00e7in, t\u00fcketim de\u011ferlerini hesaplay\u0131n ve s\u0131n\u0131f s\u0131n\u0131rlar\u0131 \u00fczerinde mutab\u0131k kal\u0131n. Ortaya \u00e7\u0131kan kontrol politikalar\u0131n\u0131 uygulay\u0131n; ard\u0131ndan C s\u0131n\u0131f\u0131 kalemlerin stok yenileme s\u00fcre\u00e7lerini basitle\u015ftirmeden \u00f6nce \u00fcretim a\u00e7\u0131s\u0131ndan kritikliklerini de\u011ferlendirin. Talep, maliyetler veya \u00fcr\u00fcn karmas\u0131 de\u011fi\u015fti\u011finde s\u0131n\u0131fland\u0131rmay\u0131 yeniden g\u00f6zden ge\u00e7irin. Ge\u00e7mi\u015f t\u00fcketimin her \u015feyi a\u00e7\u0131klad\u0131\u011f\u0131n\u0131 varsaymak yerine, yeni ve t\u00fcketimi olmayan kalemleri ayr\u0131ca inceleyin.<\/p>\n\n\n<p>Mali a\u00e7\u0131dan do\u011fru kalemlere odaklanmak i\u00e7in ABC&#8217;yi kullan\u0131n. Malzemelerin haz\u0131r olma durumunu ve kapasiteyi dikkate alarak \u00fcretim sahas\u0131nda uygulanabilecek bir plan olu\u015fturmak i\u00e7in SkyPlanner&#8217;\u0131 kullan\u0131n.<\/p>\n\n\n<p>Yak\u0131n zamanda eksik bir bile\u015fen y\u00fcz\u00fcnden geciken bir montaj sipari\u015fini ele almak \u00fczere <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>. Malzeme ihtiya\u00e7lar\u0131n\u0131, beklenen mal kabul tarihini ve \u00fcretim rotas\u0131n\u0131 yan\u0131n\u0131zda getirin; eksikli\u011fin, di\u011fer i\u015flerinizle birlikte de\u011ferlendirildi\u011finde planlanan ba\u015flang\u0131\u00e7 ve tamamlanma zamanlar\u0131n\u0131 nas\u0131l de\u011fi\u015ftirdi\u011fini g\u00f6r\u00fcn. \u00d6nce kendiniz ke\u015ffetmeyi tercih ederseniz <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun Ana Sayfa &raquo; Kaynaklar &raquo; ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun ABC stok analizi, stok kalemlerini y\u0131ll\u0131k t\u00fcketim de\u011ferine g\u00f6re grupland\u0131r\u0131r. Bu de\u011fer, bir y\u0131lda kullan\u0131lan miktar\u0131n birim maliyetle \u00e7arp\u0131lmas\u0131yla bulunur. A s\u0131n\u0131f\u0131ndaki kalemler bu de\u011ferin en b\u00fcy\u00fck pay\u0131n\u0131, B s\u0131n\u0131f\u0131ndakiler sonraki pay\u0131n\u0131, C s\u0131n\u0131f\u0131ndakiler &#8230; <a title=\"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/\" aria-label=\"Read more about ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105353,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-105343","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun<\/title>\n<meta name=\"description\" content=\"Stok kontrol\u00fcn\u00fc maliyetin yo\u011funla\u015ft\u0131\u011f\u0131 yere odaklay\u0131n; ucuz par\u00e7a \u00fcretimi durdurmas\u0131n. ABC s\u0131n\u0131flar\u0131n\u0131 hesaplay\u0131p pratik kontrol kurallar\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun\" \/>\n<meta property=\"og:description\" content=\"Stok kontrol\u00fcn\u00fc maliyetin yo\u011funla\u015ft\u0131\u011f\u0131 yere odaklay\u0131n; ucuz par\u00e7a \u00fcretimi durdurmas\u0131n. ABC s\u0131n\u0131flar\u0131n\u0131 hesaplay\u0131p pratik kontrol kurallar\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T21:17:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T21:19:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun\",\"datePublished\":\"2026-10-21T21:17:22+00:00\",\"dateModified\":\"2026-10-21T21:19:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/\"},\"wordCount\":2902,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/\",\"name\":\"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"datePublished\":\"2026-10-21T21:17:22+00:00\",\"dateModified\":\"2026-10-21T21:19:24+00:00\",\"description\":\"Stok kontrol\u00fcn\u00fc maliyetin yo\u011funla\u015ft\u0131\u011f\u0131 yere odaklay\u0131n; ucuz par\u00e7a \u00fcretimi durdurmas\u0131n. ABC s\u0131n\u0131flar\u0131n\u0131 hesaplay\u0131p pratik kontrol kurallar\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Motors, shafts and bolts in separate trays beside an assembly awaiting a small bolt.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/abc-stok-analizi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun","description":"Stok kontrol\u00fcn\u00fc maliyetin yo\u011funla\u015ft\u0131\u011f\u0131 yere odaklay\u0131n; ucuz par\u00e7a \u00fcretimi durdurmas\u0131n. ABC s\u0131n\u0131flar\u0131n\u0131 hesaplay\u0131p pratik kontrol kurallar\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/","og_locale":"tr_TR","og_type":"article","og_title":"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun","og_description":"Stok kontrol\u00fcn\u00fc maliyetin yo\u011funla\u015ft\u0131\u011f\u0131 yere odaklay\u0131n; ucuz par\u00e7a \u00fcretimi durdurmas\u0131n. ABC s\u0131n\u0131flar\u0131n\u0131 hesaplay\u0131p pratik kontrol kurallar\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T21:17:22+00:00","article_modified_time":"2026-10-21T21:19:24+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun","datePublished":"2026-10-21T21:17:22+00:00","dateModified":"2026-10-21T21:19:24+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/"},"wordCount":2902,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/","name":"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","datePublished":"2026-10-21T21:17:22+00:00","dateModified":"2026-10-21T21:19:24+00:00","description":"Stok kontrol\u00fcn\u00fc maliyetin yo\u011funla\u015ft\u0131\u011f\u0131 yere odaklay\u0131n; ucuz par\u00e7a \u00fcretimi durdurmas\u0131n. ABC s\u0131n\u0131flar\u0131n\u0131 hesaplay\u0131p pratik kontrol kurallar\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","width":1774,"height":887,"caption":"Motors, shafts and bolts in separate trays beside an assembly awaiting a small bolt."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun Ana Sayfa &raquo; Kaynaklar &raquo; ABC stok analizi: \u0130\u015fe yarayan stok s\u0131n\u0131flar\u0131 olu\u015fturun ABC stok analizi, stok kalemlerini y\u0131ll\u0131k t\u00fcketim de\u011ferine g\u00f6re grupland\u0131r\u0131r. Bu de\u011fer, bir y\u0131lda kullan\u0131lan miktar\u0131n birim maliyetle \u00e7arp\u0131lmas\u0131yla bulunur. A s\u0131n\u0131f\u0131ndaki kalemler bu de\u011ferin en b\u00fcy\u00fck pay\u0131n\u0131, B s\u0131n\u0131f\u0131ndakiler sonraki pay\u0131n\u0131, C s\u0131n\u0131f\u0131ndakiler&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/105343","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=105343"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/105343\/revisions"}],"predecessor-version":[{"id":105408,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/105343\/revisions\/105408"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/105353"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=105343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=105343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=105343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}