{"id":104579,"date":"2026-10-20T19:34:39","date_gmt":"2026-10-20T19:34:39","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104579"},"modified":"2026-10-20T19:36:25","modified_gmt":"2026-10-20T19:36:25","slug":"ilk-seferde-dogru-verim","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/","title":{"rendered":"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; \u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\u0130lk seferde do\u011fru verim (FPY), tan\u0131mlanm\u0131\u015f bir s\u00fcre\u00e7te belirlenen kalite \u015fartlar\u0131n\u0131 ilk denemede kar\u015f\u0131layan par\u00e7alar\u0131n y\u00fczdesidir. Bu par\u00e7alar onar\u0131m, yeniden i\u015fleme veya ba\u015far\u0131s\u0131z bir testin ard\u0131ndan tekrar test gerektirmeden kabul edilir. FPY, \u00fcretimin ne kadar\u0131n\u0131n sonunda kabul edilebilir h\u00e2le geldi\u011fini de\u011fil, ne kadar\u0131n\u0131n ilk seferde do\u011fru yap\u0131ld\u0131\u011f\u0131n\u0131 g\u00f6sterir.<\/p>\n\n\n<p>Tamamlanan \u00fcretim miktar\u0131 iyi g\u00f6r\u00fcnmesine ra\u011fmen fabrika sipari\u015flere yeti\u015fmekte zorlan\u0131yorsa bu ayr\u0131m \u00f6nem kazan\u0131r. Onar\u0131lan par\u00e7alar yine de sevk edilebilir; ancak onlar\u0131 sevke haz\u0131r h\u00e2le getirmek, di\u011fer sipari\u015flerin ihtiya\u00e7 duydu\u011fu zaman\u0131 t\u00fcketmi\u015ftir. FPY ile birlikte par\u00e7alar\u0131 kurtarmak i\u00e7in harcanan eme\u011fi ve zaman\u0131 izlemek, toplam sa\u011flam \u00fcr\u00fcn miktar\u0131n\u0131n gizledi\u011fi y\u00fck\u00fc ortaya \u00e7\u0131kar\u0131r. Bu \u00e7al\u0131\u015fmalar\u0131 SkyPlanner&#8217;daki \u00fcretim kay\u0131tlar\u0131 ve \u00e7izelgeleme ile ili\u015fkilendirmek, kapasite ve teslimatlar \u00fczerindeki etkilerini g\u00f6rmenize yard\u0131mc\u0131 olur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130lk seferde do\u011fru verim nas\u0131l hesaplan\u0131r?<\/h2>\n\n\n<p>\u015eu form\u00fcl\u00fc kullan\u0131n:<\/p>\n\n\n<p><strong>\u0130lk seferde do\u011fru verim (%) = \u0130lk denemede kabul edilen par\u00e7a say\u0131s\u0131 \u00f7 Tan\u0131mlanm\u0131\u015f s\u00fcrece giren par\u00e7a say\u0131s\u0131 \u00d7 100<\/strong><\/p>\n\n\n<p>Kontrol i\u015flemlerini veya tek tek kusurlar\u0131 de\u011fil, her par\u00e7ay\u0131 yaln\u0131zca bir kez say\u0131n. Kontrolden ge\u00e7emeyen, d\u00fczeltildikten sonra kabul edilen bir par\u00e7a, nihai sa\u011flam \u00fcr\u00fcn miktar\u0131na d\u00e2hildir; ancak ilk denemede ba\u015far\u0131l\u0131 say\u0131lmaz. Bir par\u00e7ada birden fazla kusur bulunsa da bu hesaplamada o par\u00e7a tek bir ba\u015far\u0131s\u0131z par\u00e7a olarak say\u0131l\u0131r.<\/p>\n\n\n<p>Verileri toplamadan \u00f6nce s\u00fcrecin s\u0131n\u0131rlar\u0131n\u0131 belirleyin. Bir tala\u015fl\u0131 imalat operasyonunu, bir test istasyonunu veya \u00fcretim rotas\u0131n\u0131n tamam\u0131n\u0131 \u00f6l\u00e7ebilirsiniz. Pay ve payda, belirledi\u011finiz s\u00fcre\u00e7 s\u0131n\u0131rlar\u0131 i\u00e7indeki ayn\u0131 par\u00e7a grubunu kapsamal\u0131d\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00d6rnek: %90 ilk seferde do\u011fru verim, %96 nihai verim<\/h3>\n\n\n<p>\u0130lk kontrol sonu\u00e7lar\u0131 tamamlanm\u0131\u015f, tala\u015fl\u0131 imalatla \u00fcretilen 500 par\u00e7al\u0131k bir parti d\u00fc\u015f\u00fcn\u00fcn:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u0130lk denemenin sonucu<\/th><th>Par\u00e7a say\u0131s\u0131<\/th><th>Sonraki durum<\/th><\/tr><\/thead><tbody><tr><td>D\u00fczeltme gerektirmeden kabul edildi<\/td><td>450<\/td><td>Sonraki operasyona haz\u0131r<\/td><\/tr><tr><td>Yeniden i\u015flemeye g\u00f6nderildi<\/td><td>40<\/td><td>30 par\u00e7a daha sonra kabul edilir; 10 par\u00e7a ise sonunda hurdaya ayr\u0131l\u0131r<\/td><\/tr><tr><td>Do\u011frudan hurdaya ayr\u0131ld\u0131<\/td><td>10<\/td><td>Sonraki a\u015famaya ge\u00e7emez<\/td><\/tr><tr><td>Operasyona giren toplam par\u00e7a<\/td><td>500<\/td><td>Her par\u00e7an\u0131n ilk denemesine ait tek bir sonu\u00e7 vard\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0130lk seferde do\u011fru verim \u015f\u00f6yle hesaplan\u0131r:<\/p>\n\n\n<p><strong>450 \u00f7 500 \u00d7 100 = %90<\/strong><\/p>\n\n\n<p>Yeniden i\u015fleme sonras\u0131nda kabul edilen par\u00e7a say\u0131s\u0131 480 olur: ilk denemede kabul edilen 450 par\u00e7aya kurtar\u0131lan 30 par\u00e7a eklenir. Dolay\u0131s\u0131yla bu partinin nihai verimi \u015f\u00f6yledir:<\/p>\n\n\n<p><strong>480 \u00f7 500 \u00d7 100 = %96<\/strong><\/p>\n\n\n<p>Her iki oran da yararl\u0131d\u0131r. FPY, ilk denemedeki performans\u0131 g\u00f6sterir. Nihai verim ise ba\u015far\u0131yla yeniden i\u015flenenler de d\u00e2hil olmak \u00fczere, sonunda kabul edilen par\u00e7alar\u0131n oran\u0131n\u0131 g\u00f6sterir. Yaln\u0131zca %96&#8217;y\u0131 raporlamak, bu 30 par\u00e7ay\u0131 kurtarmak i\u00e7in gereken d\u00fczeltme \u00e7al\u0131\u015fmalar\u0131n\u0131 gizler.<\/p>\n\n\n<p>FPY hesab\u0131nda geriye kalan %10 da hurda oran\u0131 de\u011fildir. Bu \u00f6rnekte toplam 20 par\u00e7a sonunda hurdaya ayr\u0131l\u0131r; dolay\u0131s\u0131yla nihai hurda oran\u0131 %4&#8217;t\u00fcr. Ba\u015flang\u0131\u00e7taki partinin di\u011fer %6&#8217;s\u0131 ise ek i\u015flemle kurtar\u0131lm\u0131\u015ft\u0131r. Yaln\u0131zca hurda oran\u0131n\u0131 \u00e7\u0131karmak, ilk seferde do\u011fru verimi de\u011fil, nihai verimi verir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Orana g\u00fcvenmeden \u00f6nce say\u0131m kurallar\u0131n\u0131 netle\u015ftirin<\/h2>\n\n\n<p>Hesaplama kolayd\u0131r. Ancak \u00f6zellikle \u00fcretim ve kontrol kay\u0131tlar\u0131 farkl\u0131 sistemlerden geliyorsa, \u201cilk deneme\u201d kavram\u0131n\u0131n anlam\u0131n\u0131 korumak daha fazla \u00f6zen gerektirir.<\/p>\n\n\n<p>1. <strong>Tek bir proses ve kar\u015f\u0131la\u015ft\u0131r\u0131labilir bir \u00fcr\u00fcn grubu se\u00e7in.<\/strong> Bir par\u00e7an\u0131n tala\u015fl\u0131 imalatta ilk denemede kabul edilmesi, montaj\u0131n tamam\u0131n\u0131n nihai kabul ald\u0131\u011f\u0131 anlam\u0131na gelmez. \u00dcr\u00fcn karmas\u0131ndaki bir de\u011fi\u015fimin kalite iyile\u015fmesi gibi g\u00f6r\u00fcnmemesi i\u00e7in rotalar\u0131 ve kabul ko\u015fullar\u0131n\u0131 netle\u015ftirin.<\/p>\n\n\n<p>2. <strong>Prosese giren par\u00e7alar\u0131 kendi sonu\u00e7lar\u0131yla e\u015fle\u015ftirin.<\/strong> \u0130lk deneme sonu\u00e7lar\u0131 bilinen bir partiyle veya izlenebilir ba\u015fka bir par\u00e7a grubuyla ba\u015flay\u0131n. Bug\u00fcn tamamlan\u0131p kabul edilen par\u00e7a say\u0131s\u0131n\u0131 bug\u00fcn \u00fcretime al\u0131nan par\u00e7a say\u0131s\u0131na b\u00f6lmek, \u00f6zellikle i\u015fler birden fazla vardiyaya yay\u0131ld\u0131\u011f\u0131nda, farkl\u0131 par\u00e7alar\u0131 ayn\u0131 hesapta kar\u0131\u015ft\u0131rman\u0131za yol a\u00e7abilir.<\/p>\n\n\n<p>3. <strong>\u0130lk sonucu koruyun.<\/strong> \u0130lk denemede kabul\u00fc, d\u00fczeltme veya tekrar testinden sonra al\u0131nan kabulden ayr\u0131 tutun. Onar\u0131lan bir par\u00e7a testi ge\u00e7ti\u011finde ba\u015far\u0131s\u0131z ilk sonucun \u00fczerine yazmak, ger\u00e7ekte ya\u015fananlar\u0131 de\u011fi\u015ftirmeden kay\u0131tlar\u0131 daha iyi g\u00f6sterir.<\/p>\n\n\n<p>4. <strong>Her par\u00e7ay\u0131, \u00f6l\u00e7\u00fcm i\u00e7in belirlenen noktada yaln\u0131zca bir kez say\u0131n.<\/strong> Birden fazla kusur, tekrarlanan testler ve yinelenen zaman kay\u0131tlar\u0131, ba\u015flang\u0131\u00e7taki par\u00e7a say\u0131s\u0131n\u0131 art\u0131rmaz. Par\u00e7a kimliklerini veya miktarlar\u0131n tutarl\u0131l\u0131\u011f\u0131 kontrol edilmi\u015f, yeniden i\u015fleme ge\u00e7mi\u015fini koruyan bir parti kayd\u0131n\u0131 kullan\u0131n.<\/p>\n\n\n<p>5. <strong>Hen\u00fcz sonu\u00e7lanmam\u0131\u015f par\u00e7alar\u0131 g\u00f6r\u00fcn\u00fcr k\u0131l\u0131n.<\/strong> Muayene bekleyen par\u00e7alar kendili\u011finden kabul veya ret say\u0131lmaz. Sorunlu par\u00e7alar\u0131 sessizce say\u0131m d\u0131\u015f\u0131 b\u0131rakmak yerine, sonucu beklenen miktar\u0131 g\u00f6sterin ve grubun FPY de\u011ferini ilk deneme sonu\u00e7lar\u0131n\u0131n tamam\u0131 belli oldu\u011funda kesinle\u015ftirin.<\/p>\n\n\n<p>Bir operasyonun normal rotas\u0131nda birden fazla planl\u0131 muayene bulunabilir. Belirlenmi\u015f bu s\u0131ray\u0131 ilk seferde do\u011fru bi\u00e7imde tamamlamak, ba\u015far\u0131s\u0131z bir testi tekrarlamaktan veya bir kusuru d\u00fczeltmekten farkl\u0131d\u0131r. \u00d6l\u00e7\u00fcm tan\u0131m\u0131nda bu ayr\u0131m\u0131 belirtin ve tutarl\u0131 bi\u00e7imde uygulay\u0131n.<\/p>\n\n\n<p>Raporunuz yaln\u0131zca <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-raporu\/\">toplam tamamlanan ve hatal\u0131 par\u00e7a miktarlar\u0131n\u0131<\/a> i\u00e7eriyorsa, bunlar\u0131 FPY hesab\u0131nda kullanmadan \u00f6nce ilgili alanlar\u0131n ne anlama geldi\u011fini kontrol edin. Kabul edilen miktara onar\u0131lan par\u00e7alar\u0131n dahil olup olmad\u0131\u011f\u0131n\u0131 ve tekrarlanan i\u015flemler nedeniyle ayn\u0131 par\u00e7an\u0131n birden fazla kez say\u0131l\u0131p say\u0131lmad\u0131\u011f\u0131n\u0131 bilmeniz gerekir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130lk seferde do\u011fru verim ile toplam s\u00fcre\u00e7 verimi aras\u0131ndaki fark<\/h2>\n\n\n<p>Tek bir operasyon ba\u015far\u0131l\u0131 g\u00f6r\u00fcnebilirken rotan\u0131n tamam\u0131nda \u00f6nemli miktarda d\u00fczeltme gerekebilir. Toplam s\u00fcre\u00e7 verimi (RTY), ard\u0131\u015f\u0131k proses ad\u0131mlar\u0131ndaki ilk seferde do\u011fru verim de\u011ferlerinin birle\u015fik etkisini g\u00f6sterir.<\/p>\n\n\n<p>Tutarl\u0131 bir i\u015flem s\u0131ras\u0131 i\u00e7in ad\u0131mlar\u0131n verimlerini ondal\u0131k bi\u00e7imde \u00e7arp\u0131n:<\/p>\n\n\n<p><strong>RTY (%) = 1. ad\u0131mdaki ilk seferde do\u011fru verim \u00d7 2. ad\u0131mdaki ilk seferde do\u011fru verim \u00d7 \u2026 \u00d7 100<\/strong><\/p>\n\n\n<p>1.000 par\u00e7ay\u0131 \u00fc\u00e7 operasyon boyunca izledi\u011finizi d\u00fc\u015f\u00fcn\u00fcn. Bu \u00f6rnekte, izlenen grupta yaln\u0131zca her ad\u0131m\u0131 ilk denemede ge\u00e7en par\u00e7alar kal\u0131r; onar\u0131lan par\u00e7alar gruba yeniden dahil edilmez.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Operasyon<\/th><th>\u0130zlenen grupta operasyona giren par\u00e7a say\u0131s\u0131<\/th><th>\u0130lk denemede kabul edilen par\u00e7a say\u0131s\u0131<\/th><th>Ad\u0131m verimi<\/th><\/tr><\/thead><tbody><tr><td>Tala\u015fl\u0131 imalat<\/td><td>1.000<\/td><td>900<\/td><td>%90<\/td><\/tr><tr><td>Son i\u015flem<\/td><td>900<\/td><td>810<\/td><td>%90<\/td><\/tr><tr><td>Test<\/td><td>810<\/td><td>729<\/td><td>%90<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>0,90 \u00d7 0,90 \u00d7 0,90 \u00d7 100 = %72,9 RTY<\/strong><\/p>\n\n\n<p>Her operasyonun ad\u0131m verimi %90 olsa da ba\u015flang\u0131\u00e7taki 1.000 par\u00e7an\u0131n yaln\u0131zca 729&#8217;u \u00fc\u00e7 operasyonun tamam\u0131n\u0131 ba\u015far\u0131s\u0131zl\u0131k ya\u015famadan ge\u00e7er. \u00dc\u00e7 y\u00fczdenin ortalamas\u0131n\u0131 almak %90 sonucunu verir ve birikimli etkiyi gizler.<\/p>\n\n\n<p>Ger\u00e7ek \u00fcretimde onar\u0131lan par\u00e7alar ak\u0131\u015fa yeniden kat\u0131labilir ve \u00fcr\u00fcnler farkl\u0131 rotalardan ge\u00e7ebilir. Ayn\u0131 rotaya ve tutarl\u0131 bir say\u0131m esas\u0131na dayanan ad\u0131m verimlerini kullan\u0131n; birbiriyle ilgisiz departman ortalamalar\u0131n\u0131 \u00e7arp\u0131p sonucu g\u00f6zlemlenen u\u00e7tan uca ba\u015far\u0131 oran\u0131 olarak sunmay\u0131n. Her par\u00e7an\u0131n ilk deneme ge\u00e7mi\u015fini korumak, ba\u015flang\u0131\u00e7taki par\u00e7alardan ka\u00e7\u0131n\u0131n t\u00fcm rotay\u0131 ger\u00e7ekten d\u00fczeltme gerektirmeden ge\u00e7ti\u011fini kontrol etmenizi sa\u011flar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130lk seferde do\u011fru verim i\u00e7in iyi bir oran nedir?<\/h2>\n\n\n<p>\u0130\u015fe yarar bir hedef; \u00fcr\u00fcn\u00fc, prosesi, kalite gereksinimlerini ve ba\u015far\u0131s\u0131zl\u0131\u011f\u0131n sonu\u00e7lar\u0131n\u0131 dikkate al\u0131r. Genel bir referans de\u011fer, kendi operasyonunuzun iyi performans g\u00f6sterip g\u00f6stermedi\u011fini de\u011ferlendirmek i\u00e7in yeterli de\u011fildir.<\/p>\n\n\n<p>\u00d6nce kar\u015f\u0131la\u015ft\u0131r\u0131labilir i\u015flerdeki e\u011filime bak\u0131n. Y\u00fczdeyi; \u00f6l\u00e7\u00fclen par\u00e7a say\u0131s\u0131, ba\u015far\u0131s\u0131zl\u0131k nedenleri ve d\u00fczeltme i\u015flerinin miktar\u0131yla birlikte de\u011ferlendirin. FPY art\u0131\u015f\u0131, ayn\u0131 kabul kurallar\u0131 uyguland\u0131\u011f\u0131nda anlaml\u0131d\u0131r. Ekip yaln\u0131zca muayene kriterlerini gev\u015fetmi\u015f veya sorunlu par\u00e7alar\u0131 paydadan \u00e7\u0131karm\u0131\u015fsa bu bir iyile\u015fme de\u011fildir.<\/p>\n\n\n<p>\u0130yile\u015ftirme i\u00e7in m\u00fcdahale edebilece\u011finiz, tekrarlayan bir sorun aray\u0131n. \u0130lk denemedeki ba\u015far\u0131s\u0131zl\u0131klar\u0131 operasyona ve do\u011frulanm\u0131\u015f nedene g\u00f6re gruplay\u0131n. Bir \u00fcr\u00fcnde tekrarlayan \u00f6l\u00e7\u00fc sorunu; kesici tak\u0131ma, fikst\u00fcre, malzemeye veya y\u00f6nteme i\u015faret edebilir, ancak yaln\u0131zca y\u00fczdeye bakarak hangisinin sorumlu oldu\u011funu anlayamazs\u0131n\u0131z. Bulgular\u0131 i\u015fi yapanlarla birlikte kontrol edin, nedeni giderin ve kar\u015f\u0131la\u015ft\u0131r\u0131labilir \u00fcretimde yeniden \u00f6l\u00e7\u00fcm yap\u0131n.<\/p>\n\n\n<p>Par\u00e7alar\u0131 yeniden uygun hale getirmenin getirdi\u011fi y\u00fck\u00fc de hesaba kat\u0131n. Ayn\u0131 FPY de\u011ferine sahip iki operasyondan biri h\u0131zl\u0131 bir d\u00fczeltme gerektirirken di\u011feri ortak kullan\u0131lan bir makineyi saatlerce me\u015fgul ediyorsa sonu\u00e7lar\u0131 \u00e7ok farkl\u0131 olabilir. Kalite sonucunun bir planlama karar\u0131na d\u00f6n\u00fc\u015ft\u00fc\u011f\u00fc nokta budur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">FPY&#8217;nin arkas\u0131ndaki yeniden i\u015fleme y\u00fck\u00fcn\u00fc ger\u00e7ek\u00e7i bir kapasite ihtiyac\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn<\/h2>\n\n\n<p>500 par\u00e7al\u0131k partiye d\u00f6nelim. 40 yeniden i\u015fleme denemesinin her birinin, par\u00e7a sonunda ister kabul edilsin ister hurdaya ayr\u0131ls\u0131n, ayn\u0131 i\u015fleme merkezinde ilave 12 dakika s\u00fcrd\u00fc\u011f\u00fcn\u00fc varsayal\u0131m.<\/p>\n\n\n<p><strong>40 deneme \u00d7 12 dakika = 480 dakika = 8 makine saati<\/strong><\/p>\n\n\n<p>Nihai verim raporu, kabul edilen 480 par\u00e7a g\u00f6sterir. \u00dcretim plan\u0131nda bu sekiz ek saatin de hesaba kat\u0131lmas\u0131 gerekir. \u0130lave haz\u0131rl\u0131k, kontrol veya elle\u00e7leme i\u015fleri, ba\u015fka kaynaklarda da ek s\u00fcre gerektirebilir.<\/p>\n\n\n<p>\u0130lk denemede %10 ba\u015far\u0131s\u0131zl\u0131k oran\u0131n\u0131n tam olarak %10 kapasite kayb\u0131 anlam\u0131na geldi\u011fini varsaymay\u0131n. D\u00fczeltme rotalar\u0131 ve s\u00fcreleri farkl\u0131l\u0131k g\u00f6sterir. Gereken ger\u00e7ek i\u015f y\u00fck\u00fcn\u00fc, bu i\u015fi yapacak kaynaklar i\u00e7in hesaplay\u0131n. Farkl\u0131 k\u0131s\u0131tlar\u0131 ifade ettiklerinde makine saatleri ile operat\u00f6r saatleri de ayr\u0131 tutulmal\u0131d\u0131r.<\/p>\n\n\n<p>\u00d6nemli bir sevkiyat \u00f6ncesinde bu i\u015fleme merkezinin kapasitesi zaten doluysa, yeniden i\u015fleme i\u015flerini ayr\u0131 bir kuyru\u011fa s\u0131k\u0131\u015ft\u0131rmak ek kapasite yaratmaz. Yaln\u0131zca hangi sipari\u015fin \u00f6nce tamamlanabilece\u011fini de\u011fi\u015ftirir. \u00c7ak\u0131\u015fmay\u0131 erken g\u00f6rmek; \u00f6ncelikleri belirlemek, uygun ba\u015fka bir kaynak kullanmak veya son dakika s\u00fcrpriziyle kar\u015f\u0131la\u015fmadan \u00f6nce taahh\u00fct edilen teslim tarihini yeniden de\u011ferlendirmek i\u00e7in size zaman kazand\u0131r\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaydedilen yeniden i\u015fleme i\u015flerini SkyPlanner ile bir sonraki \u00fcretim plan\u0131na dahil edin<\/h2>\n\n\n<p>SkyPlanner; \u00fcretim s\u00fcrelerinin kayd\u0131n\u0131, ayr\u0131nt\u0131l\u0131 raporlar\u0131 ve yapay zek\u00e2 destekli \u00e7izelgelemeyi bir araya getirir. Yeniden i\u015flemenin teslimatlar\u0131 s\u00fcrekli aksatt\u0131\u011f\u0131 bir fabrikada at\u0131lacak yararl\u0131 bir sonraki ad\u0131m budur: par\u00e7alar\u0131 kabul edilebilir duruma getirmek i\u00e7in harcanan eme\u011fi g\u00f6r\u00fcn\u00fcr k\u0131lmak ve onaylanm\u0131\u015f d\u00fczeltme i\u015flerine m\u00fc\u015fteri sipari\u015flerinin yan\u0131nda planda ger\u00e7ek\u00e7i bir yer ay\u0131rmak.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131n Timer arac\u0131, \u00e7al\u0131\u015fma s\u00fcresini ve \u00fcretilen ya da hatal\u0131 par\u00e7a miktarlar\u0131n\u0131 kaydeder. All Timelogs Report, bu kay\u0131tlar\u0131 i\u015f, proses ad\u0131m\u0131, i\u015f merkezi, ki\u015fi, ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131, tamamlanan ve hatal\u0131 par\u00e7alar, kaydedilen s\u00fcre ve notlarla ili\u015fkilendiren ayr\u0131nt\u0131l\u0131 bir rapordur. Kay\u0131tlar bu raporda incelenebilir, d\u00fczenlenebilir ve onaylanabilir.<\/p>\n\n\n<p>D\u00fczeltme i\u015fleri, i\u015f kay\u0131tlar\u0131nda ve zaman kay\u0131tlar\u0131nda a\u00e7\u0131k\u00e7a belirtildi\u011finde, bunlara ayr\u0131lan s\u00fcrenin ayr\u0131nt\u0131lar\u0131n\u0131 inceleyebilirsiniz; bu s\u00fcreler ayr\u0131\u015ft\u0131r\u0131lmam\u0131\u015f bir g\u00fcnl\u00fck toplam\u0131n i\u00e7inde kaybolmaz. FPY hesab\u0131 i\u00e7in kalite veya MES kay\u0131tlar\u0131n\u0131zdaki ilk denemede kabul ve yeniden i\u015fleme ge\u00e7mi\u015fini koruyun. Bu kay\u0131tlar kalite sonucunu, ilgili zaman kay\u0131tlar\u0131 ise par\u00e7alar\u0131 kabul edilebilir duruma getirmek i\u00e7in harcanan eme\u011fi a\u00e7\u0131klar.<\/p>\n\n\n<p>Ard\u0131ndan <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-emri\/\">onaylanm\u0131\u015f d\u00fczeltme operasyonlar\u0131n\u0131<\/a>, s\u00fcrelerini ve kullan\u0131labilecek kaynaklar\u0131 \u00e7izelgeye dahil edin. SkyPlanner&#8217;\u0131n \u00e7izelgeleme yapay zek\u00e2s\u0131 Arcturus, i\u015fleri tan\u0131mlanm\u0131\u015f kapasiteye, operasyonlar aras\u0131 ba\u011f\u0131ml\u0131l\u0131klara ve \u00f6nceliklere g\u00f6re \u00e7izelgeler. Gantt zaman \u00e7izelgesi, ortaya \u00e7\u0131kan s\u0131ralamay\u0131 ve tamamlanma tarihlerini g\u00f6sterir. \u00d6ncelikleri ve korunmas\u0131 gereken kararlar\u0131 siz belirlersiniz; Arcturus ise bunlarla ba\u011flant\u0131l\u0131 \u00e7izelgeleme hesaplamalar\u0131n\u0131 y\u00fcr\u00fct\u00fcr.<\/p>\n\n\n<p>Varsay\u0131msal partimiz i\u00e7in soru art\u0131k somuttur: sekiz saatlik ek i\u015fleme s\u00fcresi plana nereye s\u0131\u011fabilir ve o kayna\u011f\u0131 zaten kullanan sipari\u015fler bundan nas\u0131l etkilenir? <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">Ortak plan\u0131<\/a> yeniden hesaplamak, etkilenen her i\u015f merkezinin ayr\u0131 kuyru\u011funu elle d\u00fczeltmeye gerek kalmadan hangi i\u015fin hangi i\u015ften \u00f6nce yap\u0131laca\u011f\u0131n\u0131 ve bunun etkilerini g\u00f6r\u00fcn\u00fcr k\u0131lar.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden herhangi bir ERP veya MES ile entegre olur. Sipari\u015flerinizi ve kalite ge\u00e7mi\u015finizi tuttu\u011funuz sistemleri kullanmaya devam ederken bu sistemlerin olu\u015fturdu\u011fu i\u015fleri sonlu kapasite \u00e7izelgelemeyle ili\u015fkilendirebilirsiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130lk denemedeki kay\u0131plar\u0131n\u0131z\u0131n teslimatlara etkisini g\u00f6r\u00fcn<\/h2>\n\n\n<p>Nihai kabul miktar\u0131n\u0131n ek i\u015f y\u00fck\u00fcn\u00fc d\u00fczenli olarak gizledi\u011fi bir operasyon se\u00e7in. SkyPlanner demosuna bu operasyonun ilk deneme sonu\u00e7lar\u0131n\u0131, yayg\u0131n olarak kulland\u0131\u011f\u0131n\u0131z onayl\u0131 bir d\u00fczeltme rotas\u0131n\u0131 ve etkilenen bir m\u00fc\u015fteri sipari\u015fini getirin.<\/p>\n\n\n<p>B\u00f6ylece \u00fcretim kay\u0131tlar\u0131n\u0131n ve ortak bir \u00e7izelgenin ekibinizin harekete ge\u00e7mesine nas\u0131l yard\u0131mc\u0131 olabilece\u011fini g\u00f6rmek i\u00e7in somut bir ba\u015flang\u0131\u00e7 noktan\u0131z olur: par\u00e7alar\u0131 kabul edilebilir duruma getirmek i\u00e7in gereken i\u015f y\u00fck\u00fcn\u00fc anlay\u0131n, kapasite \u00e7ak\u0131\u015fmas\u0131n\u0131 de\u011ferlendirin ve kalan i\u015fleri de i\u00e7eren bir planla bir sonraki teslimat karar\u0131n\u0131 verin. S\u00fcrecinizi birlikte incelemek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demo randevusu al\u0131n<\/a> veya \u00f6nce <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme Ana Sayfa &raquo; Kaynaklar &raquo; \u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme \u0130lk seferde do\u011fru verim (FPY), tan\u0131mlanm\u0131\u015f bir s\u00fcre\u00e7te belirlenen kalite \u015fartlar\u0131n\u0131 ilk denemede kar\u015f\u0131layan par\u00e7alar\u0131n y\u00fczdesidir. Bu par\u00e7alar onar\u0131m, yeniden i\u015fleme veya ba\u015far\u0131s\u0131z bir testin ard\u0131ndan tekrar test gerektirmeden kabul &#8230; <a title=\"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/\" aria-label=\"Read more about \u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":104594,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-104579","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme<\/title>\n<meta name=\"description\" content=\"Onar\u0131lanlar\u0131 ilk denemede ge\u00e7mi\u015f saymadan ilk seferde do\u011fru verimi hesaplay\u0131n. Yeniden i\u015flemenin kapasite y\u00fck\u00fcn\u00fc ve SkyPlanner ile planlanmas\u0131n\u0131 g\u00f6r\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme\" \/>\n<meta property=\"og:description\" content=\"Onar\u0131lanlar\u0131 ilk denemede ge\u00e7mi\u015f saymadan ilk seferde do\u011fru verimi hesaplay\u0131n. Yeniden i\u015flemenin kapasite y\u00fck\u00fcn\u00fc ve SkyPlanner ile planlanmas\u0131n\u0131 g\u00f6r\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T19:34:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T19:36:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:36:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/\"},\"wordCount\":2386,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/\",\"name\":\"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:36:25+00:00\",\"description\":\"Onar\u0131lanlar\u0131 ilk denemede ge\u00e7mi\u015f saymadan ilk seferde do\u011fru verimi hesaplay\u0131n. Yeniden i\u015flemenin kapasite y\u00fck\u00fcn\u00fc ve SkyPlanner ile planlanmas\u0131n\u0131 g\u00f6r\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ilk-seferde-dogru-verim\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme","description":"Onar\u0131lanlar\u0131 ilk denemede ge\u00e7mi\u015f saymadan ilk seferde do\u011fru verimi hesaplay\u0131n. Yeniden i\u015flemenin kapasite y\u00fck\u00fcn\u00fc ve SkyPlanner ile planlanmas\u0131n\u0131 g\u00f6r\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/","og_locale":"tr_TR","og_type":"article","og_title":"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme","og_description":"Onar\u0131lanlar\u0131 ilk denemede ge\u00e7mi\u015f saymadan ilk seferde do\u011fru verimi hesaplay\u0131n. Yeniden i\u015flemenin kapasite y\u00fck\u00fcn\u00fc ve SkyPlanner ile planlanmas\u0131n\u0131 g\u00f6r\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T19:34:39+00:00","article_modified_time":"2026-10-20T19:36:25+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"12 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:36:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/"},"wordCount":2386,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/","name":"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:36:25+00:00","description":"Onar\u0131lanlar\u0131 ilk denemede ge\u00e7mi\u015f saymadan ilk seferde do\u011fru verimi hesaplay\u0131n. Yeniden i\u015flemenin kapasite y\u00fck\u00fcn\u00fc ve SkyPlanner ile planlanmas\u0131n\u0131 g\u00f6r\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","width":1672,"height":941,"caption":"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme Ana Sayfa &raquo; Kaynaklar &raquo; \u0130lk Seferde Do\u011fru Verim: Form\u00fcl, \u00d6rnek ve Gizli Yeniden \u0130\u015fleme \u0130lk seferde do\u011fru verim (FPY), tan\u0131mlanm\u0131\u015f bir s\u00fcre\u00e7te belirlenen kalite \u015fartlar\u0131n\u0131 ilk denemede kar\u015f\u0131layan par\u00e7alar\u0131n y\u00fczdesidir. Bu par\u00e7alar onar\u0131m, yeniden i\u015fleme veya ba\u015far\u0131s\u0131z bir testin ard\u0131ndan tekrar test gerektirmeden kabul&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/104579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=104579"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/104579\/revisions"}],"predecessor-version":[{"id":104641,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/104579\/revisions\/104641"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/104594"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=104579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=104579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=104579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}