{"id":104456,"date":"2026-10-20T17:47:49","date_gmt":"2026-10-20T17:47:49","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104456"},"modified":"2026-10-20T17:49:41","modified_gmt":"2026-10-20T17:49:41","slug":"ekonomik-uretim-miktari","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/","title":{"rendered":"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Ekonomik \u00fcretim miktar\u0131 (EPQ), talep devam ederken \u00fcr\u00fcnlerin kademeli olarak \u00fcretildi\u011fi bir modelde, haz\u0131rl\u0131k ve stok bulundurma maliyetlerinin toplam\u0131n\u0131 en aza indiren parti miktar\u0131d\u0131r. \u00dcretim planlamada s\u0131k kar\u015f\u0131la\u015f\u0131lan \u015fu soruya yan\u0131t verir: <strong>\u00dcretimi durdurup yeniden haz\u0131rl\u0131k yapmadan \u00f6nce ne kadar \u00fcretmeliyiz?<\/strong><\/p>\n\n\n<p>B\u00fcy\u00fck partiler, daha az haz\u0131rl\u0131k yap\u0131lmas\u0131n\u0131 sa\u011flar ancak elde tutulan stok miktar\u0131n\u0131 art\u0131r\u0131r. K\u00fc\u00e7\u00fck partiler ise stoku azalt\u0131r, fakat haz\u0131rl\u0131\u011f\u0131n daha s\u0131k tekrarlanmas\u0131n\u0131 gerektirir. EPQ, ko\u015fullar\u0131n istikrarl\u0131 ve \u00f6ng\u00f6r\u00fclebilir oldu\u011fu durumlarda bu dengeyi say\u0131sal olarak ortaya koyar.<\/p>\n\n\n<p>Sonraki soru, bu miktar\u0131n fabrikan\u0131z\u0131n ko\u015fullar\u0131na uygun olup olmad\u0131\u011f\u0131d\u0131r. Matematiksel olarak ekonomik g\u00f6r\u00fcnen bir parti, ortak kullan\u0131lan bir makinede ba\u015fka bir \u00fcr\u00fcn\u00fcn \u00fcretimini yine de geciktirebilir. SkyPlanner APS, se\u00e7ti\u011finiz miktarlar\u0131 malzeme, kapasite ve teslimat \u00f6ncelikleriyle birlikte ele al\u0131r. B\u00f6ylece her makinenin i\u015f s\u0131ras\u0131n\u0131 elle yeniden olu\u015fturmadan \u00e7izelge \u00fczerindeki etkileri de\u011ferlendirebilirsiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EPQ ile EOQ aras\u0131ndaki fark nedir?<\/h2>\n\n\n<p>Temel ekonomik sipari\u015f miktar\u0131 (EOQ) modeli, stok yenileme miktar\u0131n\u0131n tamam\u0131n\u0131n tek seferde kullan\u0131ma haz\u0131r oldu\u011funu varsayar. Teslimat geldi\u011finde stok bir anda artar, ard\u0131ndan t\u00fcketildik\u00e7e azal\u0131r.<\/p>\n\n\n<p>EPQ, bu anl\u0131k stok giri\u015finin yerine sonlu bir \u00fcretim h\u0131z\u0131n\u0131 esas al\u0131r. \u00dcretim s\u00fcrerken \u00fcretilenlerin bir k\u0131sm\u0131 da t\u00fcketilir. Bu nedenle stok, \u00fcretim h\u0131z\u0131n\u0131n tamam\u0131 kadar de\u011fil, \u00fcretim h\u0131z\u0131 ile talep h\u0131z\u0131 aras\u0131ndaki fark kadar artar. Parti \u00fcretimi sona erdi\u011finde ise bir sonraki stok yenileme \u00e7evrimine kadar talep, biriken stoktan kar\u015f\u0131lan\u0131r.<\/p>\n\n\n<p>Bu \u00f6zellik, d\u00fczenli olarak \u00fcretilen ve kademeli bi\u00e7imde sto\u011fa ya da sonraki operasyona aktar\u0131labilen bile\u015fenler i\u00e7in EPQ&#8217;yu yararl\u0131 k\u0131lar. Bu ba\u011flamda ekonomik imalat miktar\u0131 veya ekonomik parti miktar\u0131 olarak da adland\u0131r\u0131l\u0131r. Temel EOQ modelinden belirleyici fark\u0131, yaln\u0131zca sipari\u015fin i\u00e7 veya d\u0131\u015f kaynakl\u0131 olarak tan\u0131mlanmas\u0131 de\u011fil, \u00fcr\u00fcnlerin kademeli olarak kullan\u0131ma haz\u0131r h\u00e2le gelmesidir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ekonomik \u00fcretim miktar\u0131 form\u00fcl\u00fc<\/h2>\n\n\n<p>Y\u0131ll\u0131k talep ve y\u0131ll\u0131k stok bulundurma maliyetini kullanarak \u015fu \u015fekilde hesaplay\u0131n:<\/p>\n\n\n<p><strong>EPQ = \u221a[2 \u00d7 D \u00d7 S \/ (H \u00d7 (1 \u2212 d\/p))]<\/strong><\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Sembol<\/th><th>Anlam\u0131<\/th><th>Burada kullan\u0131lan birim<\/th><\/tr><\/thead><tbody><tr><td>D<\/td><td>Y\u0131ll\u0131k toplam talep<\/td><td>Adet\/y\u0131l<\/td><\/tr><tr><td>S<\/td><td>Bir \u00fcretim partisi i\u00e7in sabit haz\u0131rl\u0131k maliyeti<\/td><td>Para birimi\/parti<\/td><\/tr><tr><td>H<\/td><td>Bir adet \u00fcr\u00fcn\u00fc bir y\u0131l stokta bulundurma maliyeti<\/td><td>Para birimi\/adet\/y\u0131l<\/td><\/tr><tr><td>d<\/td><td>Talep veya t\u00fcketim h\u0131z\u0131<\/td><td>Adet\/i\u015f g\u00fcn\u00fc<\/td><\/tr><tr><td>p<\/td><td>\u00dcr\u00fcn\u00fcn \u00fcretildi\u011fi s\u0131radaki \u00fcretim h\u0131z\u0131<\/td><td>Adet\/i\u015f g\u00fcn\u00fc<\/td><\/tr><tr><td>Q<\/td><td>Bir partide \u00fcretilen miktar<\/td><td>Adet<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Zaman birimlerini tutarl\u0131 kullan\u0131n.<\/strong> D ve H ayn\u0131 y\u0131ll\u0131k d\u00f6nemi esas al\u0131r; d ve p de birbirleriyle ayn\u0131 zaman biriminde ifade edilmelidir. \u00dcretim i\u015f g\u00fcn\u00fc ba\u015f\u0131na \u00f6l\u00e7\u00fcl\u00fcyorsa d de\u011ferini bulmak i\u00e7in y\u0131ll\u0131k talebi takvim g\u00fcn\u00fc say\u0131s\u0131na de\u011fil, i\u015f g\u00fcn\u00fc say\u0131s\u0131na b\u00f6l\u00fcn.<\/p>\n\n\n<p>p i\u00e7in \u00fcr\u00fcn\u00fcn fiilen \u00fcretildi\u011fi s\u0131radaki \u00fcretim h\u0131z\u0131n\u0131 kullan\u0131n. Makinenin ba\u015fka \u00fcr\u00fcnler \u00fcretti\u011fi haftalar\u0131 da kapsayan y\u0131ll\u0131k ortalama \u00fcretim h\u0131z\u0131n\u0131 kullanmay\u0131n. Modelin ge\u00e7erli olmas\u0131 i\u00e7in p, d de\u011ferinden b\u00fcy\u00fck olmal\u0131d\u0131r.<\/p>\n\n\n<p>S bir s\u00fcre de\u011fil, maliyettir. Partideki \u00fcr\u00fcn say\u0131s\u0131ndan ba\u011f\u0131ms\u0131z olarak, \u00fcretime haz\u0131rl\u0131k i\u00e7in katlan\u0131lan sabit maliyeti ifade eder. H ise tek ba\u015f\u0131na bir stok bulundurma oran\u0131 de\u011fil, adet ba\u015f\u0131na y\u0131ll\u0131k parasal tutard\u0131r. Stok bulundurma maliyetini y\u00fczde olarak kullan\u0131yorsan\u0131z ilgili birim de\u011feri ve maliyet tan\u0131m\u0131n\u0131 esas alarak parasal tutara d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sonlu \u00fcretim h\u0131z\u0131 katsay\u0131s\u0131 neden \u00f6nemlidir?<\/h3>\n\n\n<p>Q adetlik bir partinin \u00fcretimi Q\/p i\u015f g\u00fcn\u00fc s\u00fcrer. Bu s\u00fcre boyunca talep devam etti\u011finden, en y\u00fcksek \u00e7evrim stoku seviyesi \u015f\u00f6yle hesaplan\u0131r:<\/p>\n\n\n<p><strong>En y\u00fcksek stok = Q \u00d7 (1 \u2212 d\/p)<\/strong><\/p>\n\n\n<p>Temel modelde ortalama \u00e7evrim stoku, bu en y\u00fcksek seviyenin yar\u0131s\u0131d\u0131r. Dolay\u0131s\u0131yla parti miktar\u0131na ba\u011fl\u0131 olarak de\u011fi\u015fen y\u0131ll\u0131k maliyetler \u015funlard\u0131r:<\/p>\n\n\n<p><strong>Y\u0131ll\u0131k haz\u0131rl\u0131k maliyeti = (D\/Q) \u00d7 S<\/strong><\/p>\n\n\n<p><strong>Y\u0131ll\u0131k stok bulundurma maliyeti = (Q\/2) \u00d7 (1 \u2212 d\/p) \u00d7 H<\/strong><\/p>\n\n\n<p>Bu iki maliyet topland\u0131\u011f\u0131nda, de\u011ferlendirilen Q miktar\u0131 i\u00e7in ilgili y\u0131ll\u0131k maliyet elde edilir. EPQ bu toplam\u0131 en aza indirir. Hesaplanan optimum noktada bu iki maliyet birbirine e\u015fittir.<\/p>\n\n\n<p>Bu tutar, \u00fcreticinin y\u0131ll\u0131k \u00fcretim maliyetinin tamam\u0131 de\u011fildir. Miktarla de\u011fi\u015fmeyen birim \u00fcretim maliyeti, en uygun Q de\u011ferini etkilemedi\u011fi i\u00e7in bu kar\u015f\u0131la\u015ft\u0131rman\u0131n d\u0131\u015f\u0131nda b\u0131rak\u0131labilir. Miktar indirimleri, fazla mesai ek \u00f6demeleri veya miktara ba\u011fl\u0131 di\u011fer maliyetler ise problemi de\u011fi\u015ftirir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EPQ hesaplama \u00f6rne\u011fi: Parti miktar\u0131, en y\u00fcksek stok de\u011fildir<\/h2>\n\n\n<p>Azim Abbas ve Seyed Goosheh&#8217;in <em>Operasyon Y\u00f6netiminin Temelleri<\/em> adl\u0131 eserindeki <a href=\"https:\/\/biz.libretexts.org\/@go\/page\/129023\">e\u011fitim ama\u00e7l\u0131 di\u015fli kutusu \u00f6rne\u011finde<\/a> \u015fu veriler kullan\u0131l\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Y\u0131ll\u0131k talep D: 48.000 di\u015fli kutusu.<\/li><li>\u00dcretim h\u0131z\u0131 p: \u0130\u015f g\u00fcn\u00fc ba\u015f\u0131na 800 di\u015fli kutusu.<\/li><li>\u0130\u015f g\u00fcn\u00fc say\u0131s\u0131: Y\u0131lda 240.<\/li><li>Haz\u0131rl\u0131k maliyeti S: Parti ba\u015f\u0131na $45.<\/li><li>Y\u0131ll\u0131k stok bulundurma maliyeti H: Di\u015fli kutusu ba\u015f\u0131na $1.<\/li><\/ul>\n\n\n<p>Bu veriler e\u011fitim ama\u00e7l\u0131d\u0131r; \u00fcretim maliyetleri i\u00e7in referans de\u011ferler veya bir SkyPlanner m\u00fc\u015fterisinin elde etti\u011fi sonu\u00e7lar de\u011fildir.<\/p>\n\n\n<p>G\u00fcnl\u00fck talep 48.000 \u00f7 240 = <strong>200 di\u015fli kutusudur<\/strong>. Sonlu \u00fcretim h\u0131z\u0131 katsay\u0131s\u0131 ise 1 \u2212 200\/800 = <strong>0,75<\/strong> olur.<\/p>\n\n\n<p><strong>EPQ = \u221a[(2 \u00d7 48.000 \u00d7 45) \/ (1 \u00d7 0,75)] = 2.400 di\u015fli kutusu<\/strong><\/p>\n\n\n<p>Bu miktarda y\u0131ll\u0131k haz\u0131rl\u0131k maliyeti (48.000 \/ 2.400) \u00d7 $45 = <strong>$900<\/strong> olur. Y\u0131ll\u0131k stok bulundurma maliyeti de (2.400 \/ 2) \u00d7 0,75 \u00d7 $1 = <strong>$900<\/strong> oldu\u011fundan, modeldeki toplam maliyet <strong>y\u0131lda $1.800<\/strong> olarak hesaplan\u0131r.<\/p>\n\n\n<p>Partinin \u00fcretimi, haz\u0131rl\u0131k hari\u00e7 <strong>3 i\u015f g\u00fcn\u00fc<\/strong> s\u00fcrer: 2.400 \/ 800. Stok yenileme \u00e7evriminin tamam\u0131 ise <strong>12 i\u015f g\u00fcn\u00fcd\u00fcr<\/strong>: 2.400 \/ 200. Kalan dokuz i\u015f g\u00fcn\u00fcnde \u00fcretim yap\u0131lmaz ve talep stoktan kar\u015f\u0131lan\u0131r.<\/p>\n\n\n<p>En y\u00fcksek stok 2.400 de\u011fil, <strong>1.800 di\u015fli kutusudur<\/strong>. \u00dc\u00e7 g\u00fcnl\u00fck \u00fcretim s\u0131ras\u0131nda talebi kar\u015f\u0131lamak i\u00e7in 600 adet zaten t\u00fcketilmi\u015ftir. Ortalama \u00e7evrim stoku 900 adettir.<\/p>\n\n\n<p>Ayn\u0131 verilerle alternatif parti miktarlar\u0131n\u0131 kar\u015f\u0131la\u015ft\u0131rabiliriz:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Parti miktar\u0131<\/th><th>Y\u0131ll\u0131k haz\u0131rl\u0131k maliyeti<\/th><th>Y\u0131ll\u0131k stok bulundurma maliyeti<\/th><th>Toplam y\u0131ll\u0131k maliyet<\/th><\/tr><\/thead><tbody><tr><td>1.200<\/td><td>$1.800<\/td><td>$450<\/td><td>$2.250<\/td><\/tr><tr><td>2.400<\/td><td>$900<\/td><td>$900<\/td><td>$1.800<\/td><\/tr><tr><td>4.800<\/td><td>$450<\/td><td>$1.800<\/td><td>$2.250<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Tablo, yaln\u0131zca haz\u0131rl\u0131k say\u0131s\u0131n\u0131 azaltman\u0131n neden yeterli olmad\u0131\u011f\u0131n\u0131 g\u00f6sterir. Ekonomik parti miktar\u0131n\u0131 iki kat\u0131na \u00e7\u0131karmak, haz\u0131rl\u0131k maliyetini yar\u0131ya indirirken stok bulundurma maliyetini iki kat\u0131na \u00e7\u0131kar\u0131r. Ayr\u0131ca ba\u015fka bir teslimat\u0131 kar\u015f\u0131lamak i\u00e7in daha k\u00fc\u00e7\u00fck bir parti gerekti\u011finde planlamac\u0131n\u0131n neyi kar\u015f\u0131la\u015ft\u0131rd\u0131\u011f\u0131n\u0131 da ortaya koyar: Bu, model kapsam\u0131nda maliyetler aras\u0131nda kurulan bir dengedir; her fabrikan\u0131n her zaman 2.400 adet \u00fcretmesini gerektiren bir kural de\u011fildir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Temel EPQ modeli ne zaman yararl\u0131d\u0131r?<\/h2>\n\n\n<p>Bir \u00fcr\u00fcne y\u00f6nelik talep d\u00fczenli olarak tekrarlan\u0131yorsa, stok kademeli olarak yenileniyorsa ve miktar karar\u0131nda as\u0131l belirleyici unsur sabit haz\u0131rl\u0131k maliyeti ile \u00e7evrim stokunu bulundurma maliyeti aras\u0131ndaki dengeyse EPQ yararl\u0131 bir referans noktas\u0131d\u0131r.<\/p>\n\n\n<p>Hesaplanan sonucu kullanmadan \u00f6nce \u015fu ko\u015fullar\u0131 kontrol edin:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Talep biliniyor ve makul \u00f6l\u00e7\u00fcde sabit kal\u0131yor olmal\u0131d\u0131r.<\/strong> Tek bir y\u0131ll\u0131k toplam, mevsimsel talep art\u0131\u015flar\u0131n\u0131 veya belirli projelerin ihtiya\u00e7lar\u0131n\u0131 gizleyebilir. D\u00fczg\u00fcn g\u00f6r\u00fcnen bir y\u0131ll\u0131k ortalama, bu sipari\u015flerin ne zaman teslim edilmesi gerekti\u011fini g\u00f6stermez.<\/li><li><strong>\u00dcretim h\u0131z\u0131 sabit ve t\u00fcketim h\u0131z\u0131ndan y\u00fcksek olmal\u0131d\u0131r.<\/strong> p, d de\u011ferinden b\u00fcy\u00fck de\u011filse bu modelde, partiler aras\u0131ndaki s\u00fcrede talebi kar\u015f\u0131layacak stok biriktirilemez.<\/li><li><strong>Haz\u0131rl\u0131k ve stok bulundurma maliyetleri istikrarl\u0131 olmal\u0131d\u0131r.<\/strong> Maliyet tan\u0131mlar\u0131n\u0131 tutarl\u0131 kullan\u0131n. S\u0131ralamaya ba\u011fl\u0131 tip de\u011fi\u015fimlerini veya miktara ba\u011fl\u0131 \u00fcretim maliyetlerini hesaba katmak i\u00e7in tek bir sabit haz\u0131rl\u0131k maliyeti yeterli de\u011fildir.<\/li><li><strong>\u00dcretilen miktar kademeli olarak kullan\u0131ma haz\u0131r h\u00e2le gelmelidir.<\/strong> Herhangi bir \u00fcr\u00fcn\u00fcn kullan\u0131labilmesi i\u00e7in partinin tamam\u0131n\u0131n k\u00fcrleme, muayene veya kalite onay\u0131 s\u00fcrecini bitirmesi gerekiyorsa varsay\u0131lan stok birikimi, bu aktar\u0131m s\u00fcrecini yans\u0131tmaz.<\/li><li><strong>Temel \u00e7evrimde stok yetersizli\u011fi ya\u015fanmaz.<\/strong> Yukar\u0131daki form\u00fcl, stok yetersizli\u011fi nedeniyle bekleyen sipari\u015flerin maliyetini veya talep ve tedarik belirsizli\u011fi i\u00e7in gerekli g\u00fcvenlik sto\u011funu hesaplamaz.<\/li><li><strong>\u00d6nerilen miktar\u0131 s\u0131n\u0131rlayan ba\u011flay\u0131c\u0131 bir uygulama k\u0131s\u0131t\u0131 yoktur.<\/strong> Depolama alan\u0131, raf \u00f6mr\u00fc, kap boyutlar\u0131, prosesin gerektirdi\u011fi asgari y\u00fckler ve ortak kullan\u0131lan ekipmanlar, k\u0131s\u0131tlar hesaba kat\u0131lmadan bulunan sonucu uygulanamaz h\u00e2le getirebilir.<\/li><\/ul>\n\n\n<p>\u00dcretim h\u0131z\u0131n\u0131n sonlu olmas\u0131, modelin fabrikan\u0131z\u0131n s\u0131n\u0131rl\u0131 kapasitesini \u00e7izelgeledi\u011fi anlam\u0131na gelmez. Model yaln\u0131zca tek bir \u00fcr\u00fcn\u00fcn stok yenileme \u00e7evrimini ele al\u0131r. T\u00fcm \u00fcr\u00fcnlerin \u00fcretim partilerini, haz\u0131rl\u0131klar\u0131n\u0131 ve sonraki operasyonlar\u0131n\u0131 ayn\u0131 makine takvimine yerle\u015ftirmez.<\/p>\n\n\n<p>D\u00fczensiz talep veya m\u00fc\u015fteriye \u00f6zel i\u015fler s\u00f6z konusuysa, bunlar\u0131 bir EPQ \u00e7evrimine uydurmaya \u00e7al\u0131\u015fmak yerine ger\u00e7ek ihtiya\u00e7lar\u0131 ve bunlar\u0131n kar\u015f\u0131lanmas\u0131 gereken tarihleri esas al\u0131n. Modelin uygun oldu\u011fu durumlarda ise sonucu bir referans olarak kullan\u0131n ve bu de\u011fere yak\u0131n, uygulanabilir miktarlar\u0131 ger\u00e7ek k\u0131s\u0131tlara g\u00f6re de\u011ferlendirin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Haz\u0131rl\u0131k maliyeti d\u00fc\u015ft\u00fck\u00e7e ekonomik parti b\u00fcy\u00fckl\u00fc\u011f\u00fc de\u011fi\u015fir<\/h2>\n\n\n<p>Haz\u0131rl\u0131k i\u00e7in harcanan eme\u011fi daha fazla \u00fcr\u00fcne yayman\u0131n tek yolu parti b\u00fcy\u00fckl\u00fc\u011f\u00fcn\u00fc art\u0131rmak de\u011fildir. Sabit haz\u0131rl\u0131k maliyetini d\u00fc\u015f\u00fcrmek, modelde daha k\u00fc\u00e7\u00fck partilerle daha s\u0131k \u00fcretim yapmay\u0131 ekonomik h\u00e2le getirir. EPQ, S&#8217;nin karek\u00f6k\u00fcne ba\u011fl\u0131 oldu\u011fundan, di\u011fer girdiler de\u011fi\u015fmeden S yar\u0131ya indirildi\u011finde hesaplanan miktar \u00f6nceki de\u011ferinin yakla\u015f\u0131k %71&#8217;ine d\u00fc\u015fer.<\/p>\n\n\n<p>Bu nedenle haz\u0131rl\u0131klar\u0131n azalt\u0131lmas\u0131 ile parti b\u00fcy\u00fckl\u00fc\u011f\u00fc politikas\u0131 birlikte ele al\u0131nmal\u0131d\u0131r. <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/\">SMED<\/a>, tip de\u011fi\u015fiminin kendisini iyile\u015ftirmeye yard\u0131mc\u0131 olur; EPQ ise bunun sonucunda haz\u0131rl\u0131k maliyeti ile stok maliyeti aras\u0131nda olu\u015fan dengeyi yorumlamay\u0131 sa\u011flar. Bir iyile\u015ftirme haz\u0131rl\u0131k s\u00fcresini azalt\u0131yor ancak haz\u0131rl\u0131kla ilgili t\u00fcm maliyetleri azaltm\u0131yorsa, ikisinin de ayn\u0131 oranda d\u00fc\u015ft\u00fc\u011f\u00fcn\u00fc varsaymak yerine maliyet girdisini buna g\u00f6re g\u00fcncelleyin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Se\u00e7ti\u011finiz parti b\u00fcy\u00fckl\u00fc\u011f\u00fcn\u00fc SkyPlanner ile uygulanabilir bir plana d\u00f6n\u00fc\u015ft\u00fcr\u00fcn<\/h2>\n\n\n<p>Di\u015fli kutusu \u00fcretiminin, montaj\u0131n acilen ihtiya\u00e7 duydu\u011fu ba\u015fka bir par\u00e7ayla ayn\u0131 makineyi kulland\u0131\u011f\u0131n\u0131 d\u00fc\u015f\u00fcn\u00fcn. EPQ hesab\u0131 daha b\u00fcy\u00fck partiyi destekleyebilir; ancak di\u011fer par\u00e7an\u0131n teslim tarihini veya bir sonraki operasyon i\u00e7in malzemelerin haz\u0131r olup olmad\u0131\u011f\u0131n\u0131 kontrol etmi\u015f de\u011fildir. Makineyi bu i\u015fe ay\u0131rmadan \u00f6nce, ayn\u0131 kapasiteye ihtiya\u00e7 duyan bu i\u015fleri birlikte g\u00f6rmeniz gerekir.<\/p>\n\n\n<p>SkyPlanner bu ba\u011flant\u0131lar\u0131 <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">ortak bir \u00fcretim \u00e7izelgesinde<\/a> bir araya getirir. \u00dcr\u00fcn\u00fcn i\u015flem ad\u0131mlar\u0131n\u0131, s\u00fcrelerini, kullan\u0131labilecek i\u015f istasyonlar\u0131n\u0131, malzemelerini ve \u00fcr\u00fcn a\u011fac\u0131n\u0131 bir kez tan\u0131mlay\u0131n. Ard\u0131ndan sipari\u015flerde \u00fcr\u00fcn, miktar ve teslim tarihi bilgileri yer al\u0131r. SkyPlanner&#8217;\u0131n \u00e7izelgeleme yapay zek\u00e2s\u0131 Arcturus, her \u00fcr\u00fcn i\u00e7in ayr\u0131 ayr\u0131 haz\u0131rlanan planlar\u0131 birbiriyle uyumlu h\u00e2le getirme i\u015fini size b\u0131rakmak yerine sipari\u015fleri birlikte \u00e7izelgeler.<\/p>\n\n\n<p>Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde, malzeme bulunabilirli\u011fi de bu hesab\u0131 etkiler. Gantt \u015femas\u0131, i\u015f istasyonlar\u0131ndaki i\u015fleri zaman ekseninde g\u00f6stererek se\u00e7ilen miktar\u0131n di\u011fer i\u015fleri ve teslimat taahh\u00fctlerini nas\u0131l etkiledi\u011fini g\u00f6rmeyi kolayla\u015ft\u0131r\u0131r. \u00d6ncelikleri siz belirlersiniz; Arcturus \u00e7izelgeleme hesab\u0131n\u0131 bu talimatlar do\u011frultusunda yapar.<\/p>\n\n\n<p>B\u00f6ylece miktar karar\u0131n\u0131 daha net verebilir, i\u015f s\u0131ralar\u0131n\u0131 elle d\u00fczenlemek i\u00e7in daha az \u00e7aba harcars\u0131n\u0131z. Se\u00e7ilen parti ba\u015fka bir taahh\u00fcd\u00fc aksatt\u0131\u011f\u0131nda miktar\u0131 de\u011fi\u015ftirmeye, \u00f6ncelikleri d\u00fczenlemeye veya ek kapasite sa\u011flamaya karar verebilir, ard\u0131ndan \u00e7izelgeyi bu karara g\u00f6re yeniden hesaplayabilirsiniz. SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her t\u00fcrl\u00fc ERP veya MES ile entegre olur; b\u00f6ylece \u00e7izelgelemede mevcut sipari\u015fleriniz ve \u00fcretim verileriniz temel al\u0131nabilir.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp&#8217;un deneyimi<\/a>, i\u015fleri ortak bir g\u00f6r\u00fcn\u00fcmde izlemenin neden \u00f6nemli oldu\u011funu g\u00f6steriyor. Sac metal alan\u0131nda fason \u00fcretim yapan \u015firket, daha \u00f6nce kabaca hesaplanan haftal\u0131k y\u00fcklere ve g\u00fcnl\u00fck makine atamalar\u0131n\u0131n elle yap\u0131lmas\u0131na dayan\u0131yordu. SkyPlanner ile \u00fcretim sorumlusu, ortak kullan\u0131lan bir b\u00fck\u00fcm makinesindeki a\u015f\u0131r\u0131 y\u00fck\u00fc g\u00f6r\u00fcp m\u00fcdahale edebiliyor. \u015eirket ayr\u0131ca ayn\u0131 tak\u0131mlar\u0131 ve ayn\u0131 malzeme kal\u0131nl\u0131\u011f\u0131n\u0131 kullanan i\u015fleri art arda s\u0131ralad\u0131\u011f\u0131n\u0131, bunu yaparken teslim tarihi daha ileride olan i\u015flerin daha erken teslim edilmesi gereken i\u015flerin \u00f6n\u00fcne ge\u00e7mesini \u00f6nledi\u011fini belirtiyor. B\u00f6ylece haz\u0131rl\u0131k verimlili\u011fi ve teslimat \u00f6ncelikleri, birbiriyle \u00e7eli\u015fen listeler yerine ayn\u0131 plan i\u00e7inde de\u011ferlendirilebiliyor.<\/p>\n\n\n<p>\u00dcretim partileri ile transfer partilerini koordine etmenin uygulamaya d\u00f6n\u00fck ayr\u0131nt\u0131lar\u0131 i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/parti-tipi-uretim\/\">parti tipi \u00fcretim rehberine<\/a> ge\u00e7ebilirsiniz. Buradaki temel ayr\u0131m ise daha basittir: <strong>EPQ, belirtilen varsay\u0131mlar alt\u0131nda ekonomik bir miktar tahmin eder; \u00fcretim \u00e7izelgesi ise se\u00e7ti\u011finiz miktar\u0131n taahh\u00fct etti\u011finiz i\u015flere nas\u0131l uydu\u011funu g\u00f6sterir.<\/strong><\/p>\n\n\n<p>Bu ba\u011flant\u0131y\u0131 kendi \u00fcretiminizde g\u00f6rmek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>; d\u00fczenli \u00fcretti\u011finiz bir \u00fcr\u00fcn\u00fc, de\u011ferlendirdi\u011finiz parti b\u00fcy\u00fckl\u00fc\u011f\u00fcn\u00fc ve bu \u00fcr\u00fcn\u00fcn di\u011fer i\u015flerle ortak kulland\u0131\u011f\u0131 makineyi g\u00f6r\u00fc\u015fmeye temel al\u0131n. Bir sonraki teslimat taahh\u00fcd\u00fcn\u00fc vermeden \u00f6nce bu gereksinimlerin birlikte nas\u0131l kar\u015f\u0131lanabilece\u011fini inceleyin. \u00d6nce kendiniz ke\u015ffetmeyi tercih ederseniz <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar Ana Sayfa &raquo; Kaynaklar &raquo; Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar Ekonomik \u00fcretim miktar\u0131 (EPQ), talep devam ederken \u00fcr\u00fcnlerin kademeli olarak \u00fcretildi\u011fi bir modelde, haz\u0131rl\u0131k ve stok bulundurma maliyetlerinin toplam\u0131n\u0131 en aza indiren parti miktar\u0131d\u0131r. \u00dcretim planlamada s\u0131k kar\u015f\u0131la\u015f\u0131lan \u015fu soruya yan\u0131t verir: \u00dcretimi durdurup yeniden haz\u0131rl\u0131k &#8230; <a title=\"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/\" aria-label=\"Read more about Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":104472,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-104456","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar<\/title>\n<meta name=\"description\" content=\"EPQ ile uygun parti miktar\u0131n\u0131 bulun, varsay\u0131mlar\u0131n ne zaman ge\u00e7erli oldu\u011funu anlay\u0131n. Se\u00e7ti\u011finiz miktar\u0131n di\u011fer sipari\u015flere etkisini SkyPlanner ile g\u00f6r\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar\" \/>\n<meta property=\"og:description\" content=\"EPQ ile uygun parti miktar\u0131n\u0131 bulun, varsay\u0131mlar\u0131n ne zaman ge\u00e7erli oldu\u011funu anlay\u0131n. Se\u00e7ti\u011finiz miktar\u0131n di\u011fer sipari\u015flere etkisini SkyPlanner ile g\u00f6r\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T17:47:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T17:49:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar\",\"datePublished\":\"2026-10-20T17:47:49+00:00\",\"dateModified\":\"2026-10-20T17:49:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/\"},\"wordCount\":2432,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/\",\"name\":\"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"datePublished\":\"2026-10-20T17:47:49+00:00\",\"dateModified\":\"2026-10-20T17:49:41+00:00\",\"description\":\"EPQ ile uygun parti miktar\u0131n\u0131 bulun, varsay\u0131mlar\u0131n ne zaman ge\u00e7erli oldu\u011funu anlay\u0131n. Se\u00e7ti\u011finiz miktar\u0131n di\u011fer sipari\u015flere etkisini SkyPlanner ile g\u00f6r\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Gears move from production through a stock buffer to assembly, illustrating gradual replenishment and consumption.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-uretim-miktari\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar","description":"EPQ ile uygun parti miktar\u0131n\u0131 bulun, varsay\u0131mlar\u0131n ne zaman ge\u00e7erli oldu\u011funu anlay\u0131n. Se\u00e7ti\u011finiz miktar\u0131n di\u011fer sipari\u015flere etkisini SkyPlanner ile g\u00f6r\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/","og_locale":"tr_TR","og_type":"article","og_title":"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar","og_description":"EPQ ile uygun parti miktar\u0131n\u0131 bulun, varsay\u0131mlar\u0131n ne zaman ge\u00e7erli oldu\u011funu anlay\u0131n. Se\u00e7ti\u011finiz miktar\u0131n di\u011fer sipari\u015flere etkisini SkyPlanner ile g\u00f6r\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T17:47:49+00:00","article_modified_time":"2026-10-20T17:49:41+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"12 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar","datePublished":"2026-10-20T17:47:49+00:00","dateModified":"2026-10-20T17:49:41+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/"},"wordCount":2432,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/","name":"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","datePublished":"2026-10-20T17:47:49+00:00","dateModified":"2026-10-20T17:49:41+00:00","description":"EPQ ile uygun parti miktar\u0131n\u0131 bulun, varsay\u0131mlar\u0131n ne zaman ge\u00e7erli oldu\u011funu anlay\u0131n. Se\u00e7ti\u011finiz miktar\u0131n di\u011fer sipari\u015flere etkisini SkyPlanner ile g\u00f6r\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","width":1672,"height":941,"caption":"Gears move from production through a stock buffer to assembly, illustrating gradual replenishment and consumption."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar Ana Sayfa &raquo; Kaynaklar &raquo; Ekonomik \u00dcretim Miktar\u0131: Form\u00fcl, \u00d6rnek ve S\u0131n\u0131rlar Ekonomik \u00fcretim miktar\u0131 (EPQ), talep devam ederken \u00fcr\u00fcnlerin kademeli olarak \u00fcretildi\u011fi bir modelde, haz\u0131rl\u0131k ve stok bulundurma maliyetlerinin toplam\u0131n\u0131 en aza indiren parti miktar\u0131d\u0131r. \u00dcretim planlamada s\u0131k kar\u015f\u0131la\u015f\u0131lan \u015fu soruya yan\u0131t verir: \u00dcretimi durdurup yeniden haz\u0131rl\u0131k&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/104456","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=104456"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/104456\/revisions"}],"predecessor-version":[{"id":104550,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/104456\/revisions\/104550"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/104472"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=104456"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=104456"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=104456"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}