{"id":102536,"date":"2026-10-20T13:56:48","date_gmt":"2026-10-20T13:56:48","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102536"},"modified":"2026-10-20T13:58:14","modified_gmt":"2026-10-20T13:58:14","slug":"yari-mamul-stoku","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/","title":{"rendered":"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Yar\u0131 mamul stoku (WIP), \u00fcretime girmi\u015f ancak hen\u00fcz tamamlanmam\u0131\u015f \u00fcr\u00fcnlerden olu\u015fur. Hem i\u015flem g\u00f6ren par\u00e7alar\u0131 hem de operasyonlar aras\u0131nda bekleyen, hen\u00fcz tamamlanmam\u0131\u015f \u00fcr\u00fcnleri kapsar. Muhasebede WIP, bu \u00fcr\u00fcnlerde o ana kadar birikmi\u015f \u00fcretim maliyetlerini de ifade eder.<\/p>\n\n\n<p>Bu iki bak\u0131\u015f a\u00e7\u0131s\u0131 farkl\u0131 sorular\u0131 yan\u0131tlar. Say\u0131m, ne kadar \u00fcr\u00fcn\u00fcn hen\u00fcz tamamlanmad\u0131\u011f\u0131n\u0131; maliyet tutar\u0131 ise bu \u00fcr\u00fcnlere ne kadar \u00fcretim maliyeti y\u00fcklendi\u011fini g\u00f6sterir. Ancak bunlar\u0131n hi\u00e7biri tek ba\u015f\u0131na bir partinin neden pazartesiden beri bekledi\u011fini veya \u00fcretimden ne zaman \u00e7\u0131kabilece\u011fini s\u00f6ylemez.<\/p>\n\n\n<p>\u00dcretim m\u00fcd\u00fcr\u00fcn\u00fcn bir sonraki ad\u0131mda yan\u0131t aramas\u0131 gereken soru budur. SkyPlanner APS, kalan operasyonlar\u0131 kapasite, malzemelerin haz\u0131r olma durumu ve \u00f6nceliklerle birlikte ele al\u0131r. B\u00f6ylece s\u00fcrekli kuyruklara yeni i\u015fler eklemek yerine elinizdeki i\u015fleri tamamlaman\u0131za yard\u0131mc\u0131 olur. Daha iyi zamanlama, gereksiz yar\u0131 mamul stokunu ve bu stoka ba\u011flanan sermayeyi azalt\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Yar\u0131 mamul stokuna neler dahildir?<\/h2>\n\n\n<p>Stoklar\u0131 \u00fcretim ak\u0131\u015f\u0131ndaki \u00fc\u00e7 a\u015famada ele alabilirsiniz:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Hammadde:<\/strong> \u00fcretimde kullan\u0131lmay\u0131 bekleyen malzemeler ve sat\u0131n al\u0131nm\u0131\u015f bile\u015fenler.<\/li><li><strong>Yar\u0131 mamul:<\/strong> \u00fcretimine ba\u015flanm\u0131\u015f ancak h\u00e2l\u00e2 imalat, montaj veya zorunlu son kontroller gerektiren \u00fcr\u00fcnler.<\/li><li><strong>Mamul:<\/strong> hen\u00fcz sat\u0131lmam\u0131\u015f veya sevk edilmemi\u015f olsa da \u00fcretimi tamamlanm\u0131\u015f \u00fcr\u00fcnler.<\/li><\/ul>\n\n\n<p>Tala\u015fl\u0131 i\u015fleme sonras\u0131nda kaplama bekleyen bir g\u00f6vde, yar\u0131 mamuld\u00fcr. Montaj\u0131 yap\u0131lm\u0131\u015f ancak tamamlanm\u0131\u015f say\u0131lmas\u0131 i\u00e7in gereken son kontrol\u00fc bekleyen bir \u00fcr\u00fcn de \u00f6yledir. \u00dcretimi tamamlanm\u0131\u015f, kabul\u00fc yap\u0131lm\u0131\u015f ve sevkiyat arac\u0131n\u0131 bekleyen bir \u00fcr\u00fcn ise yar\u0131 mamul de\u011fil, mamuld\u00fcr.<\/p>\n\n\n<p>Hen\u00fcz tamamlanmam\u0131\u015f bir \u00fcr\u00fcn\u00fcn bekliyor olmas\u0131, onu say\u0131m\u0131n d\u0131\u015f\u0131nda b\u0131rakmaz. \u00dcr\u00fcn o anda hi\u00e7bir makinede i\u015flenmiyor olsa bile kuyrukta bekleme, ta\u015f\u0131ma ve bloke edilme s\u00fcreleri, \u00fcr\u00fcn\u00fcn \u00fcretimde ge\u00e7irdi\u011fi toplam s\u00fcrenin b\u00fcy\u00fck b\u00f6l\u00fcm\u00fcn\u00fc olu\u015fturabilir.<\/p>\n\n\n<p><strong>Devam eden i\u015fler<\/strong> ifadesiyle de kar\u015f\u0131la\u015fabilirsiniz. Kullan\u0131m, i\u015fletmelere ve sekt\u00f6rlere g\u00f6re de\u011fi\u015fir. Bu rehberde WIP, bir proje hakedi\u015f hesab\u0131n\u0131 veya yaz\u0131l\u0131m ekibinin panosundaki g\u00f6rev say\u0131s\u0131n\u0131 de\u011fil, \u00fcretimi hen\u00fcz tamamlanmam\u0131\u015f \u00fcr\u00fcnlerin stokunu ifade eder.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Yar\u0131 mamul stokunun fiziksel miktar\u0131 nas\u0131l \u00f6l\u00e7\u00fcl\u00fcr?<\/h2>\n\n\n<p>\u00d6nce kapsam\u0131 netle\u015ftirin: \u00f6rne\u011fin bir \u00fcr\u00fcn ailesinin ilk \u00fcretim operasyonundan nihai kabule kadar ge\u00e7ti\u011fi s\u00fcreci esas al\u0131n. Belirli bir anda bu kapsam i\u00e7indeki tamamlanmam\u0131\u015f par\u00e7alar\u0131 say\u0131n. D\u00f6kme \u00fcr\u00fcnlerin \u00fcretiminde uygun \u00f6l\u00e7\u00fc birimi adet yerine kilogram veya litre olabilir.<\/p>\n\n\n<p>Ayn\u0131 tip g\u00f6vdelerden olu\u015fan bir \u00fcr\u00fcn ailesini izleyen bir fabrika d\u00fc\u015f\u00fcn\u00fcn. Cuma g\u00fcn\u00fc vardiya sonunda \u015fu tabloyla kar\u015f\u0131la\u015f\u0131yor:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Mevcut a\u015fama<\/th><th>Tamamlanmam\u0131\u015f g\u00f6vde say\u0131s\u0131<\/th><th>Kalan i\u015flemler<\/th><\/tr><\/thead><tbody><tr><td>Tala\u015fl\u0131 i\u015flemede<\/td><td>20<\/td><td>Tala\u015fl\u0131 i\u015flemenin tamamlanmas\u0131, y\u00fczey i\u015flemi ve kontrol<\/td><\/tr><tr><td>Y\u00fczey i\u015flemi bekliyor<\/td><td>60<\/td><td>Y\u00fczey i\u015flemi ve kontrol<\/td><\/tr><tr><td>Son kontrol\u00fc bekliyor<\/td><td>20<\/td><td>Kontrol ve kabul<\/td><\/tr><tr><td><strong>Toplam yar\u0131 mamul<\/strong><\/td><td><strong>100<\/strong><\/td><td><strong>Kalan i\u015f miktarlar\u0131 farkl\u0131d\u0131r<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Her g\u00f6vdeyi bulundu\u011fu a\u015famada yaln\u0131zca bir kez say\u0131n. Ayn\u0131 partiyi, rotas\u0131nda kalan her operasyon i\u00e7in yeniden saymay\u0131n.<\/p>\n\n\n<p>Belirledi\u011finiz kapsama giren ve kapsamdan \u00e7\u0131kan miktarlar\u0131n hesab\u0131n\u0131 da kontrol edebilirsiniz. Haftaya 120 tamamlanmam\u0131\u015f g\u00f6vdeyle ba\u015fland\u0131\u011f\u0131n\u0131, 480 g\u00f6vdenin daha \u00fcretime girdi\u011fini ve 500 g\u00f6vdenin mamul haline geldi\u011fini varsayal\u0131m. Hurda veya ba\u015fka bir stok hareketi yoksa:<\/p>\n\n\n<p><strong>D\u00f6nem sonu yar\u0131 mamul stoku = 120 + 480 \u2212 500 = 100 g\u00f6vde<\/strong><\/p>\n\n\n<p>Bu sonu\u00e7 fiziksel say\u0131mla uyu\u015fmuyorsa \u00fcretim performans\u0131 hakk\u0131nda bir sonuca varmadan \u00f6nce tamamlanan \u00fcretime ili\u015fkin eksik kay\u0131tlar\u0131, kaydedilmemi\u015f transferleri, hurday\u0131 veya hesaplamada hangi saatin esas al\u0131nd\u0131\u011f\u0131n\u0131 ara\u015ft\u0131r\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Par\u00e7a say\u0131s\u0131 ile kalan i\u015f y\u00fck\u00fc ayn\u0131 \u015fey de\u011fildir<\/h3>\n\n\n<p>Tabloda tamamlanmam\u0131\u015f 100 par\u00e7a var. Ancak kontrol bekleyen 20 par\u00e7a, h\u00e2l\u00e2 tala\u015fl\u0131 i\u015flemede olan 20 par\u00e7aya g\u00f6re \u00e7ok daha az i\u015f gerektiriyor. Bu nedenle ayn\u0131 say\u0131da par\u00e7a i\u00e7eren iki kuyru\u011fun kapasite ihtiyac\u0131 \u00e7ok farkl\u0131 olabilir.<\/p>\n\n\n<p>Farkl\u0131 \u00fcr\u00fcnler \u00fcreten bir fabrikada i\u015f emri say\u0131s\u0131 daha da az \u015fey anlat\u0131r: bir i\u015f emri k\u0131sa bir kontrol gerektirirken di\u011feri birden fazla kaynakta g\u00fcnler s\u00fcrebilir. Miktarlar\u0131 \u00fcr\u00fcn baz\u0131nda veya anlaml\u0131 \u00fcr\u00fcn ailelerine g\u00f6re takip edin; y\u00fck\u00fc de\u011ferlendirmek i\u00e7in kalan operasyonlar\u0131n s\u00fcrelerini kullan\u0131n. Bu y\u00fck\u00fc saat cinsinden belirtin; i\u015f y\u00fck\u00fc, yar\u0131 mamul adedinin veya de\u011ferinin ba\u015fka bir ad\u0131 de\u011fildir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Yar\u0131 mamul stok maliyeti form\u00fcl\u00fc<\/h2>\n\n\n<p>Bir d\u00f6nemin maliyet hareketleri basitle\u015ftirilmi\u015f olarak \u015f\u00f6yle hesaplan\u0131r:<\/p>\n\n\n<p><strong>D\u00f6nem sonu yar\u0131 mamul maliyeti = d\u00f6nem ba\u015f\u0131 yar\u0131 mamul maliyeti + eklenen \u00fcretim maliyetleri \u2212 \u00fcretilen mamullerin maliyeti<\/strong><\/p>\n\n\n<p>Eklenen \u00fcretim maliyetleri; kullan\u0131lan direkt malzemeyi, direkt i\u015f\u00e7ili\u011fi ve da\u011f\u0131t\u0131lan genel \u00fcretim giderlerini kapsar. <strong>\u00dcretilen mamullerin maliyeti (COGM)<\/strong>, \u00fcretim tamamland\u0131\u011f\u0131nda yar\u0131 mamul stokundan aktar\u0131lan maliyettir. Sat\u0131\u015f fiyat\u0131 veya d\u00f6nem i\u00e7inde sat\u0131lan mamullerin maliyeti de\u011fildir.<\/p>\n\n\n<p>\u015eimdi ayr\u0131 bir ayl\u0131k maliyet \u00f6rne\u011fi d\u00fc\u015f\u00fcn\u00fcn. D\u00f6nem ba\u015f\u0131 yar\u0131 mamul maliyeti $18.000 olsun. \u00dcretimde $72.000 maliyet eklensin ve maliyeti $65.000 olan tamamlanm\u0131\u015f \u00fcr\u00fcnler mamul stokuna aktar\u0131ls\u0131n. Ba\u015fka bir d\u00fczeltme yoksa:<\/p>\n\n\n<p><strong>$18.000 + $72.000 \u2212 $65.000 = $25.000 d\u00f6nem sonu yar\u0131 mamul maliyeti<\/strong><\/p>\n\n\n<p>Bu tutar bir maliyet bakiyesidir; 25.000 adet \u00fcr\u00fcn\u00fc veya gelecekte elde edilecek $25.000 k\u00e2r\u0131 ifade etmez. Bu \u00f6rnek, yukar\u0131daki g\u00f6vde say\u0131m\u0131ndan ba\u011f\u0131ms\u0131zd\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Adet say\u0131s\u0131 neden stok de\u011ferini g\u00f6stermez?<\/h3>\n\n\n<p>Tamamlanmam\u0131\u015f bir \u00fcr\u00fcnde yaln\u0131zca o ana kadar \u00fcr\u00fcne y\u00fcklenen maliyetler birikmi\u015ftir. Tamamlanmam\u0131\u015f par\u00e7a say\u0131s\u0131n\u0131 mamul\u00fcn tam birim maliyetiyle \u00e7arpmak, bakiyeyi oldu\u011fundan y\u00fcksek g\u00f6sterebilir. \u00dcretim rotas\u0131n\u0131n yar\u0131s\u0131na gelinmi\u015f olmas\u0131 da mutlaka toplam maliyetin yar\u0131s\u0131n\u0131n olu\u015ftu\u011fu anlam\u0131na gelmez: pahal\u0131 malzeme ilk a\u015famalarda kullan\u0131labilir, i\u015f\u00e7ilik ve i\u015flem maliyetleri ise daha sonra birikebilir.<\/p>\n\n\n<p>Finans ekibinizin kulland\u0131\u011f\u0131 maliyet kay\u0131tlar\u0131n\u0131 ve uygulad\u0131\u011f\u0131 muhasebe politikas\u0131n\u0131 esas al\u0131n. D\u00f6nem ba\u015f\u0131ndan d\u00f6nem sonuna yap\u0131lan bu hesaplama maliyet hareketini a\u00e7\u0131klar; finansal raporlama i\u00e7in ge\u00e7erli muhasebe \u00e7er\u00e7evesine g\u00f6re de\u011ferleme d\u00fczeltmeleri de gerekebilir.<\/p>\n\n\n<p>\u00dcretim kararlar\u0131 a\u00e7\u0131s\u0131ndan temel ayr\u0131m daha basittir: birikmi\u015f maliyet, i\u015fe \u015fimdiye kadar ne kadar maliyet y\u00fcklendi\u011fini g\u00f6sterir. Rotan\u0131n kalan k\u0131sm\u0131 ise tamamlanmas\u0131 i\u00e7in daha neler gerekti\u011fini g\u00f6sterir. Birini di\u011ferinin yerine kullanmak de\u011fil, her iki bak\u0131\u015f a\u00e7\u0131s\u0131ndan da yararlanmak gerekir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Y\u00fcksek veya d\u00fc\u015f\u00fck yar\u0131 mamul stoku ger\u00e7ekte ne anlat\u0131r?<\/h2>\n\n\n<p>Y\u00fcksek yar\u0131 mamul stoku, ara\u015ft\u0131rma yapmak i\u00e7in bir nedendir; tek ba\u015f\u0131na eksiksiz bir te\u015fhis de\u011fildir. Artan talebi, de\u011fi\u015fen \u00fcr\u00fcn karmas\u0131n\u0131, bilin\u00e7li olarak korunan kapasiteyi veya bir kesinti nedeniyle biriken i\u015fleri yans\u0131tabilir. D\u00fc\u015f\u00fck bir miktar ak\u0131\u015f\u0131n sorunsuz oldu\u011funu g\u00f6sterebilir, ancak kritik bir kaynak i\u00e7in i\u015flenmeye haz\u0131r i\u015fin yetersiz oldu\u011fu anlam\u0131na da gelebilir.<\/p>\n\n\n<p>Ama\u00e7, \u00fcretimdeki tamamlanmam\u0131\u015f \u00fcr\u00fcn miktar\u0131n\u0131 s\u0131f\u0131ra indirmek de\u011fildir. Ama\u00e7, gereksiz erken ba\u015flang\u0131\u00e7lara, beklemelere ve ta\u015f\u0131malara yol a\u00e7madan, i\u015flerin g\u00fcvenilir bi\u00e7imde tamamlanmas\u0131n\u0131 destekleyecek uygun i\u015fleri yeterli miktarda \u00fcretimde tutmakt\u0131r.<\/p>\n\n\n<p>Y\u00fczey i\u015flemi bekleyen 60 g\u00f6vdeye d\u00f6nelim. Bu \u00f6\u011fleden sonra i\u00e7in planlanan y\u00fczey i\u015flemi zaman\u0131na yeti\u015fmek \u00fczere bu sabah i\u015flendilerse, kuyruk tamamen makul olabilir. Ancak y\u00fczey i\u015flemi kayna\u011f\u0131 ba\u015fka sipari\u015flerle u\u011fra\u015f\u0131rken bir haftad\u0131r orada bekliyorlarsa, ayn\u0131 say\u0131 farkl\u0131 bir soruna i\u015faret eder.<\/p>\n\n\n<p>Bu kuyru\u011fu de\u011ferlendirmek i\u00e7in \u015funlar\u0131 belirleyin:<\/p>\n\n\n<p>1. <strong>Ge\u00e7en s\u00fcre:<\/strong> Parti ne zaman \u00fcretime girdi ve burada ne kadar s\u00fcredir bekliyor?<\/p>\n\n\n<p>2. <strong>Sonraki operasyon:<\/strong> Devam edebilmesi i\u00e7in hangi kaynak, malzeme veya onay gerekiyor?<\/p>\n\n\n<p>3. <strong>Planlanan tamamlanma:<\/strong> Kalan operasyonlar \u00e7izelgeye ne zaman yerle\u015ftirilebilir ve bu zamanlama sipari\u015f i\u00e7in verilen taahh\u00fcd\u00fc kar\u015f\u0131l\u0131yor mu?<\/p>\n\n\n<p>4. <strong>Bekleme nedeni:<\/strong> Bu, planl\u0131 bir tampon mu; yoksa ayn\u0131 kapasiteye ihtiya\u00e7 duyan i\u015fler, eksik malzeme, kalite nedeniyle bloke edilme veya ba\u015fka bir kesinti mi s\u00f6z konusu?<\/p>\n\n\n<p>B\u00f6ylece \u201cyar\u0131 mamul stokumuz \u00e7ok fazla\u201d tespiti, somut ad\u0131m at\u0131labilecek bir karara d\u00f6n\u00fc\u015f\u00fcr. Sat\u0131n al\u0131nan bir bile\u015fenin eksik olmas\u0131 ile y\u00fczey i\u015flemi istasyonunun a\u015f\u0131r\u0131 y\u00fckl\u00fc olmas\u0131 farkl\u0131 m\u00fcdahaleler gerektirir. Tala\u015fl\u0131 i\u015flemeden bir parti daha ge\u00e7irmek, bu sorunlar\u0131n hi\u00e7birini \u00e7\u00f6zmez.<\/p>\n\n\n<p>Yar\u0131 mamul stokunu <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-hizi\/\">tamamlanan \u00fcretim miktar\u0131<\/a> ve teslimat performans\u0131yla birlikte de\u011ferlendirin. Ba\u015fka bir \u00e7\u0131k\u0131\u015f yokken \u00fcretime giren miktar, mamul olarak \u00e7\u0131kan miktardan fazlaysa yar\u0131 mamul stoku birikiyor demektir. Yar\u0131 mamul stoku yaln\u0131zca \u00fcretime yeni sipari\u015f gelmedi\u011fi i\u00e7in d\u00fc\u015f\u00fcyorsa bu, s\u00fcrecin iyile\u015fti\u011fini kan\u0131tlamaz. \u00dcr\u00fcn karmas\u0131ndaki bir de\u011fi\u015fimi iyile\u015fme sanmamak i\u00e7in benzer d\u00f6nemleri ve \u00fcr\u00fcn ailelerini kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Yar\u0131m kalan i\u015flerin nas\u0131l tamamlanaca\u011f\u0131n\u0131 SkyPlanner ile planlay\u0131n<\/h2>\n\n\n<p>\u0130\u015flerin nerede bekledi\u011fini \u00f6\u011frendi\u011finizde \u00e7izelgeleme sorusu somutla\u015f\u0131r: Bu i\u015flerin kalan operasyonlar\u0131, fabrikan\u0131n tamamlamas\u0131 gereken di\u011fer t\u00fcm i\u015flerle birlikte \u00e7izelgeye nas\u0131l yerle\u015ftirilecek?<\/p>\n\n\n<p>SkyPlanner; i\u015f istasyonlar\u0131n\u0131, vardiyalar\u0131, operat\u00f6rleri, i\u015flem ad\u0131mlar\u0131n\u0131 ve s\u00fcreleri <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">ortak bir \u00fcretim \u00e7izelgesinde<\/a> bir araya getirir. \u00c7izelgeleme i\u00e7in kullan\u0131lan yapay zek\u00e2 motoru Arcturus, operasyonlar\u0131 tan\u0131mlanan kapasiteye, ba\u011f\u0131ml\u0131l\u0131klara ve \u00f6nceliklere g\u00f6re yerle\u015ftirir. Her departman\u0131n kendi kuyru\u011funu ayr\u0131 ayr\u0131 y\u00f6netmesi yerine Gantt g\u00f6r\u00fcn\u00fcm\u00fc, kaynaklar genelinde ortaya \u00e7\u0131kan i\u015f s\u0131ras\u0131n\u0131 g\u00f6sterir.<\/p>\n\n\n<p>Bekleyen g\u00f6vdelerin y\u00fczey i\u015flemi operasyonunu, \u00f6ncesindeki ve sonras\u0131ndaki i\u015flerle birlikte inceleyebilirsiniz. Kaynak, daha \u00f6nce verilmi\u015f bir taahh\u00fct nedeniyle dolu mu? Kontrol ad\u0131m\u0131 y\u00fczey i\u015fleminden sonraya yerle\u015ftirilebiliyor mu? \u015eimdi yeni bir g\u00f6vde partisine ba\u015flamak yaln\u0131zca bekleyen i\u015f miktar\u0131n\u0131 m\u0131 art\u0131r\u0131r?<\/p>\n\n\n<p>Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde Arcturus, mevcut stoklar\u0131 ve gelecek malzemelerin ne zaman kullan\u0131labilir olaca\u011f\u0131n\u0131 da hesaba katar. Sonraki bir operasyonda sat\u0131n al\u0131nan bir bile\u015fene ihtiya\u00e7 duyuldu\u011funda bu \u00f6nemlidir: i\u015f emri montaj a\u015famas\u0131nda ilerleyemeyecekse ilk makinenin bo\u015f olmas\u0131 yeterli de\u011fildir.<\/p>\n\n\n<p>\u0130lerleme bilgileri, plan\u0131n i\u015fe yarar kalmas\u0131n\u0131 sa\u011flar. SkyPlanner&#8217;\u0131n Timer \u00f6zelli\u011fi i\u015flerin ba\u015flang\u0131\u00e7 ve duru\u015flar\u0131n\u0131, ayr\u0131ca \u00fcretilen miktarlar\u0131 kaydeder; a\u00e7\u0131k REST API ise her t\u00fcrl\u00fc ERP veya MES ile ba\u011flant\u0131 kurar. \u0130\u015flerin ilerleme durumu, kaynaklar\u0131n kullan\u0131labilirli\u011fi veya \u00f6ncelikler de\u011fi\u015fti\u011finde Arcturus, \u00e7izelgeyi g\u00fcncel bilgilere g\u00f6re yeniden hesaplayabilir. \u00d6ncelikleri siz belirlersiniz; \u00e7izelgeleme hesaplamalar\u0131n\u0131 yapay zek\u00e2 yapar.<\/p>\n\n\n<p>B\u00f6ylece her makinenin i\u015f kuyru\u011funu ayr\u0131 ayr\u0131 d\u00fczeltmek i\u00e7in harcanan g\u00fcnl\u00fck emek azal\u0131r ve hangi i\u015fin ilerlemesi gerekti\u011fine daha sa\u011flam bir temelde karar verilir. Teslimat i\u00e7in tamamlanmas\u0131 gereken i\u015flere odaklan\u0131rken sipari\u015flere gere\u011finden erken daha fazla malzeme ve emek ay\u0131rmaktan ka\u00e7\u0131nabilirsiniz.<\/p>\n\n\n<p>\u00dcretimin tamamlanmas\u0131 tek ba\u015f\u0131na nakdi serbest b\u0131rakmaz: \u00fcr\u00fcnlerin yar\u0131 mamul stokundan mamul stokuna ge\u00e7mesi stat\u00fclerini de\u011fi\u015ftirir, ancak \u00fcr\u00fcnler h\u00e2l\u00e2 stoktad\u0131r. Finansal fayda, yaln\u0131zca yar\u0131 mamul stoku kalemini k\u00fc\u00e7\u00fcltmekten de\u011fil, gereksiz stoku azaltmaktan ve m\u00fc\u015fteri talebini kar\u015f\u0131layacak i\u015fleri tamamlanana kadar ilerletmekten do\u011far.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Daha iyi zamanlama Mamec&#8217;te neleri de\u011fi\u015ftirdi?<\/h2>\n\n\n<p>End\u00fcstriyel kar\u0131\u015ft\u0131rma ekipmanlar\u0131 \u00fcreten ve s\u00f6zle\u015fmeli olarak y\u00fcksek teknolojili \u00fcr\u00fcn imalat\u0131 yapan Finlandiyal\u0131 Mamec, daha \u00f6nce birbirine ba\u011fl\u0131 binlerce i\u015f emrini k\u00e2\u011f\u0131t \u00fczerindeki teslim tarihlerine g\u00f6re \u00f6nceliklendiriyordu. ERP \u00fczerinden yap\u0131lan planlama, \u00fcretimin b\u00fct\u00fcn\u00fcn\u00fc g\u00f6stermiyor; y\u00f6netimin \u00fcretim y\u00fck\u00fcne ili\u015fkin de\u011ferlendirmeleri \u00f6znel tahminlere dayan\u0131yordu.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131n Oscar ERP ortam\u0131na entegre edilmesiyle Mamec, sonlu kapasite \u00e7izelgeleme olana\u011f\u0131na kavu\u015ftu. Sipari\u015flerin hangi a\u015famada oldu\u011fu ve nas\u0131l \u00e7izelgelendi\u011fi herkesin g\u00f6rebildi\u011fi ortak bir g\u00f6r\u00fcn\u00fcmde izlenebilir h\u00e2le geldi. \u00c7al\u0131\u015fanlar, duruma ili\u015fkin farkl\u0131 yorumlara bel ba\u011flamak yerine sipari\u015f bilgilerine do\u011frudan bakabiliyordu.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/mamec\/\">Mamec&#8217;in aktard\u0131\u011f\u0131na g\u00f6re<\/a> i\u015fler do\u011fru zamanda ba\u015flad\u0131\u011f\u0131 i\u00e7in teslim s\u00fcreleri daha makul h\u00e2le geldi, planlaman\u0131n i\u015f y\u00fck\u00fc hafifledi ve yar\u0131 mamul stokuna gereksiz yere ba\u011flanan i\u015fletme sermayesi azald\u0131. Yar\u0131 mamul stoku ile \u00e7izelgeleme aras\u0131ndaki pratik ba\u011flant\u0131 budur: fabrikada h\u00e2l\u00e2 \u00fcretimi devam eden i\u015fler vard\u0131r, ancak bu i\u015flerin ne zaman \u00fcretimde olmas\u0131 gerekti\u011fine art\u0131k daha sa\u011flam bir temelde karar verilir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Gere\u011finden uzun s\u00fcredir bekleyen bir partiyle ba\u015flay\u0131n<\/h2>\n\n\n<p>Ekibinizin gecikmesini yak\u0131ndan bildi\u011fi, hen\u00fcz tamamlanmam\u0131\u015f bir sipari\u015f se\u00e7in. SkyPlanner demosuna bu sipari\u015fin mevcut a\u015famas\u0131, rotas\u0131nda kalan operasyonlar, malzeme ihtiya\u00e7lar\u0131 ve taahh\u00fct edilen teslim tarihiyle gelin. As\u0131l s\u0131nanmas\u0131 gereken, ayn\u0131 kaynaklar i\u00e7in yar\u0131\u015fan di\u011fer sipari\u015fleri de hesaba katan, bu sipari\u015fi tamamlamaya y\u00f6nelik b\u00fct\u00fcnl\u00fckl\u00fc bir plan\u0131 g\u00f6r\u00fcp g\u00f6remedi\u011finizdir.<\/p>\n\n\n<p>Bu plan\u0131 kendi \u00fcretim ko\u015fullar\u0131n\u0131z \u00fczerinden incelemek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a> veya \u00f6nce <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>. Yar\u0131 mamul stokunu daha iyi bir d\u00fczeye getirmek, tamamlanmam\u0131\u015f i\u015fleri anlamakla ba\u015flar. Daha iyi bir \u00fcretim \u00e7izelgesi ise bu konuda ad\u0131m atman\u0131za yard\u0131mc\u0131 olur.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol Ana Sayfa &raquo; Kaynaklar &raquo; Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol Yar\u0131 mamul stoku (WIP), \u00fcretime girmi\u015f ancak hen\u00fcz tamamlanmam\u0131\u015f \u00fcr\u00fcnlerden olu\u015fur. Hem i\u015flem g\u00f6ren par\u00e7alar\u0131 hem de operasyonlar aras\u0131nda bekleyen, hen\u00fcz tamamlanmam\u0131\u015f \u00fcr\u00fcnleri kapsar. Muhasebede WIP, bu \u00fcr\u00fcnlerde o ana kadar birikmi\u015f \u00fcretim maliyetlerini de ifade &#8230; <a title=\"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/\" aria-label=\"Read more about Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":102580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-102536","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol<\/title>\n<meta name=\"description\" content=\"Yar\u0131 mamul stokunuzu tan\u0131y\u0131n, maliyetini hesaplay\u0131n, gecikme nedenini bulun. SkyPlanner&#039;\u0131n gereksiz yar\u0131 mamul stokunu azaltmaya nas\u0131l yard\u0131mc\u0131 oldu\u011funu g\u00f6r\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol\" \/>\n<meta property=\"og:description\" content=\"Yar\u0131 mamul stokunuzu tan\u0131y\u0131n, maliyetini hesaplay\u0131n, gecikme nedenini bulun. SkyPlanner&#039;\u0131n gereksiz yar\u0131 mamul stokunu azaltmaya nas\u0131l yard\u0131mc\u0131 oldu\u011funu g\u00f6r\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T13:56:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T13:58:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1984\" \/>\n\t<meta property=\"og:image:height\" content=\"1116\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/\"},\"wordCount\":2318,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/\",\"name\":\"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:14+00:00\",\"description\":\"Yar\u0131 mamul stokunuzu tan\u0131y\u0131n, maliyetini hesaplay\u0131n, gecikme nedenini bulun. SkyPlanner'\u0131n gereksiz yar\u0131 mamul stokunu azaltmaya nas\u0131l yard\u0131mc\u0131 oldu\u011funu g\u00f6r\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"width\":1984,\"height\":1116,\"caption\":\"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/yari-mamul-stoku\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol","description":"Yar\u0131 mamul stokunuzu tan\u0131y\u0131n, maliyetini hesaplay\u0131n, gecikme nedenini bulun. SkyPlanner'\u0131n gereksiz yar\u0131 mamul stokunu azaltmaya nas\u0131l yard\u0131mc\u0131 oldu\u011funu g\u00f6r\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/","og_locale":"tr_TR","og_type":"article","og_title":"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol","og_description":"Yar\u0131 mamul stokunuzu tan\u0131y\u0131n, maliyetini hesaplay\u0131n, gecikme nedenini bulun. SkyPlanner'\u0131n gereksiz yar\u0131 mamul stokunu azaltmaya nas\u0131l yard\u0131mc\u0131 oldu\u011funu g\u00f6r\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T13:56:48+00:00","article_modified_time":"2026-10-20T13:58:14+00:00","og_image":[{"width":1984,"height":1116,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"12 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:14+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/"},"wordCount":2318,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/","name":"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:14+00:00","description":"Yar\u0131 mamul stokunuzu tan\u0131y\u0131n, maliyetini hesaplay\u0131n, gecikme nedenini bulun. SkyPlanner'\u0131n gereksiz yar\u0131 mamul stokunu azaltmaya nas\u0131l yard\u0131mc\u0131 oldu\u011funu g\u00f6r\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","width":1984,"height":1116,"caption":"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol Ana Sayfa &raquo; Kaynaklar &raquo; Yar\u0131 Mamul Stoku: Miktar, Maliyet ve Kontrol Yar\u0131 mamul stoku (WIP), \u00fcretime girmi\u015f ancak hen\u00fcz tamamlanmam\u0131\u015f \u00fcr\u00fcnlerden olu\u015fur. Hem i\u015flem g\u00f6ren par\u00e7alar\u0131 hem de operasyonlar aras\u0131nda bekleyen, hen\u00fcz tamamlanmam\u0131\u015f \u00fcr\u00fcnleri kapsar. Muhasebede WIP, bu \u00fcr\u00fcnlerde o ana kadar birikmi\u015f \u00fcretim maliyetlerini de ifade&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/102536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=102536"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/102536\/revisions"}],"predecessor-version":[{"id":102655,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/102536\/revisions\/102655"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/102580"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=102536"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=102536"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=102536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}