{"id":100444,"date":"2026-10-16T22:47:32","date_gmt":"2026-10-16T22:47:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100444"},"modified":"2026-10-16T22:49:06","modified_gmt":"2026-10-16T22:49:06","slug":"zamaninda-teslimat","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/","title":{"rendered":"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; \u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Zaman\u0131nda teslimat (OTD), m\u00fc\u015fterilerle mutab\u0131k kald\u0131\u011f\u0131n\u0131z teslimat tarihlerine ne \u00f6l\u00e7\u00fcde uydu\u011funuzu g\u00f6sterir.<\/strong> \u00dcretimde bu oran\u0131 iyile\u015ftirmek, \u00f6ncelik verilmesi gereken sipari\u015flerin \u00fcretim a\u015famalar\u0131ndan ge\u00e7ip tamamlanmas\u0131n\u0131 ve kararla\u015ft\u0131r\u0131lan teslimat noktas\u0131na zaman\u0131nda ula\u015fmas\u0131n\u0131 sa\u011flamak demektir.<\/p>\n\n\n<p>Bu, her makineyi s\u00fcrekli \u00e7al\u0131\u015f\u0131r durumda tutmakla ayn\u0131 \u015fey de\u011fildir. Kesim i\u015fleri plan\u0131n \u00f6n\u00fcnde giderken, yar\u0131n sevk edilecek bir sipari\u015fin kaynakl\u0131 par\u00e7alar\u0131ndan biri h\u00e2l\u00e2 eksik olabilir. Fabrika verimli g\u00f6r\u00fcn\u00fcr ama m\u00fc\u015fterinin teslimat\u0131 yine de gecikir.<\/p>\n\n\n<p>As\u0131l sorulmas\u0131 gereken \u015fudur: <strong>Mevcut \u00fcretim \u00e7izelgeniz, s\u00f6z verdi\u011finiz tarihleri kar\u015f\u0131laman\u0131za h\u00e2l\u00e2 olanak tan\u0131yor mu?<\/strong> SkyPlanner APS, birbirine ba\u011fl\u0131 i\u015fleri kapasiteye, malzemelere ve \u00f6nceliklere g\u00f6re \u00e7izelgeleyip \u00fcretimde de\u011fi\u015fiklik oldu\u011funda plan\u0131 yeniden hesaplayarak bu soruyu yan\u0131tlaman\u0131za yard\u0131mc\u0131 olur. B\u00f6ylece makine kuyruklar\u0131n\u0131 yeniden d\u00fczenlemeye daha az, m\u00fcdahale gerektiren sipari\u015flerin zaman\u0131nda tamamlanmas\u0131n\u0131 sa\u011flamaya daha fazla zaman ay\u0131r\u0131rs\u0131n\u0131z.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zaman\u0131nda teslimat oran\u0131 nas\u0131l hesaplan\u0131r?<\/h2>\n\n\n<p>Anlaml\u0131 bir OTD \u00f6l\u00e7\u00fcm\u00fc i\u00e7in \u00f6nce neyin zaman\u0131nda teslimat say\u0131laca\u011f\u0131 konusunda anla\u015fmak gerekir. Verilen s\u00f6z, \u00fcr\u00fcnleri sevk etmek mi, m\u00fc\u015fterinin tesisine teslim etmek mi, yoksa teslim al\u0131nmaya haz\u0131r h\u00e2le getirmek mi? Bir \u00fcretim emrinin tamamlanmas\u0131, m\u00fc\u015fteriye teslimat\u0131n da zaman\u0131nda yap\u0131ld\u0131\u011f\u0131 anlam\u0131na gelmez.<\/p>\n\n\n<p>Sipari\u015f baz\u0131nda \u00f6l\u00e7\u00fcm i\u00e7in \u015fu form\u00fcl\u00fc kullan\u0131n:<\/p>\n\n\n<p><strong>Zaman\u0131nda teslimat (%) = D\u00f6nemde teslim edilmesi gereken ve kararla\u015ft\u0131r\u0131lan teslimat aral\u0131\u011f\u0131nda teslim edilen sipari\u015f say\u0131s\u0131 \u00f7 D\u00f6nemde teslim edilmesi gereken toplam sipari\u015f say\u0131s\u0131 \u00d7 100<\/strong><\/p>\n\n\n<p>Bu ay teslim edilmesi gereken 50 sipari\u015f oldu\u011funu varsayal\u0131m. Bunlar\u0131n 44 tanesi, kabul edilen zaman aral\u0131\u011f\u0131nda kararla\u015ft\u0131r\u0131lan teslimat noktas\u0131na ula\u015fm\u0131\u015f olsun. Bu durumda OTD oran\u0131n\u0131z %88 olur. Teslim tarihi geldi\u011fi h\u00e2lde hen\u00fcz teslim edilmemi\u015f sipari\u015fler paydada kalmal\u0131d\u0131r; aksi takdirde en ciddi gecikmeler hesaplaman\u0131n d\u0131\u015f\u0131nda kalabilir.<\/p>\n\n\n<p>Bu g\u00f6stergeyi kullanan ki\u015filerle a\u015fa\u011f\u0131daki kurallar \u00fczerinde anla\u015f\u0131n:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Say\u0131m birimi:<\/strong> Sipari\u015flerin tamam\u0131, sipari\u015f kalemleri veya planlanm\u0131\u015f teslimatlar. Her \u00f6l\u00e7\u00fcmde ayn\u0131 birimi kullan\u0131n.<\/li><li><strong>Tarih ve zaman aral\u0131\u011f\u0131:<\/strong> Kararla\u015ft\u0131r\u0131lan teslimat tarihi ile kabul edilen erken veya ge\u00e7 teslimat toleranslar\u0131. M\u00fc\u015fteri \u00fcr\u00fcnleri teslim alam\u0131yor ya da depolayam\u0131yorsa erken teslimat her zaman kabul edilebilir de\u011fildir.<\/li><li><strong>K\u0131smi teslimatlar:<\/strong> \u0130lk sevkiyat\u0131 sipari\u015fin tamamlanmas\u0131 olarak kabul etmek yerine, sipari\u015fin hangi ko\u015fullarda teslim edilmi\u015f say\u0131laca\u011f\u0131n\u0131 tan\u0131mlay\u0131n.<\/li><li><strong>De\u011fi\u015fen taahh\u00fctler:<\/strong> Revize edilen tarihlerin yan\u0131nda ilk kararla\u015ft\u0131r\u0131lan tarihi de saklay\u0131n. B\u00f6ylece tarihin \u00f6telenmesi, teslimat taahh\u00fcd\u00fcn\u00fcn kar\u015f\u0131lanamad\u0131\u011f\u0131n\u0131 gizlemez.<\/li><\/ul>\n\n\n<p>OTD, teslimat\u0131n zamanlamas\u0131na odaklan\u0131r. <strong>Zaman\u0131nda ve eksiksiz teslimat (OTIF)<\/strong> ise zamanlaman\u0131n yan\u0131 s\u0131ra kararla\u015ft\u0131r\u0131lan miktar\u0131n tamam\u0131n\u0131n teslim edilmesini de kapsar. <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/\">\u00dcretim plan\u0131na uyum<\/a> farkl\u0131 bir soruya yan\u0131t verir: \u00dcretimdeki operasyonlar planlanan zamanlarda ger\u00e7ekle\u015fti mi? Bir at\u00f6lye, geciken bir operasyonun ard\u0131ndan aray\u0131 kapat\u0131p yine de zaman\u0131nda teslimat yapabilir. Ya da ger\u00e7ek\u00e7i olmayan bir \u00fcretim plan\u0131na uydu\u011fu h\u00e2lde m\u00fc\u015fteriye verdi\u011fi s\u00f6z\u00fc tutamayabilir.<\/p>\n\n\n<p>M\u00fc\u015fteriye yans\u0131yan sonucu de\u011ferlendirmek i\u00e7in OTD&#8217;yi, bu sonucun nedenlerini anlamak i\u00e7inse \u00fcretim i\u00e7i g\u00f6stergeleri kullan\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Yo\u011fun \u00e7al\u0131\u015fan bir fabrikada teslimatlar neden yine de gecikir?<\/h2>\n\n\n<p>Teslimat sorunlar\u0131 \u00e7o\u011fu zaman yaln\u0131zca i\u015fi ge\u00e7 bitiren makinede de\u011fil, operasyonlar aras\u0131ndaki ge\u00e7i\u015flerde ortaya \u00e7\u0131kar. Bir par\u00e7a \u00f6nce malzeme bekler, ard\u0131ndan b\u00fck\u00fcm i\u00e7in ayr\u0131lan zaman\u0131n\u0131 ka\u00e7\u0131r\u0131r ve montaja geldi\u011finde birlikte kullan\u0131laca\u011f\u0131 di\u011fer par\u00e7alar \u00e7oktan oraya ula\u015fm\u0131\u015f olur.<\/p>\n\n\n<p>Her b\u00f6l\u00fcm\u00fcn i\u015f kuyru\u011fu kendi i\u00e7inde makul g\u00f6r\u00fcnebilir. Sorun, bu kuyruklar\u0131n ortak kapasiteyi kullanmak i\u00e7in birbiriyle yar\u0131\u015fmas\u0131 ve birbirine ba\u011f\u0131ml\u0131 olmas\u0131d\u0131r. Bir makinede acil bir i\u015fi \u00f6ne almak, sonraki operasyonlar\u0131 i\u00e7in daha az zaman\u0131 kalan ba\u015fka bir sipari\u015fi geriye itebilir.<\/p>\n\n\n<p>\u0130\u015fleri partiler h\u00e2linde y\u00fcr\u00fctmek de ayr\u0131 bir denge gerektirir. Benzer i\u015fleri bir arada yapmak haz\u0131rl\u0131k s\u00fcresinden tasarruf sa\u011flayabilir. Ancak uzun ve verimli bir parti, bug\u00fcn sevk edilmesi gereken bir sipari\u015fi geciktiriyorsa do\u011fru tercih de\u011fildir. Ama\u00e7, her i\u015f merkezini olabildi\u011fince me\u015fgul tutmak de\u011fil, do\u011fru sipari\u015fleri tamamlarken kapasiteyi verimli kullanmakt\u0131r.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">Teslimat odakl\u0131 bir \u00e7izelge<\/a>, bu ili\u015fkileri g\u00f6r\u00fcn\u00fcr k\u0131lar. Yaln\u0131zca belirli bir noktada hangi i\u015fin daha acil oldu\u011funu sormak yerine, hangi i\u015f s\u0131ras\u0131n\u0131n bekleyen t\u00fcm sipari\u015flerin uygulanabilir bir planla tamamlanmas\u0131n\u0131 sa\u011flayaca\u011f\u0131n\u0131 de\u011ferlendirebilirsiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Teslimat taahh\u00fcd\u00fcn\u00fc \u00fcretim hedefine d\u00f6n\u00fc\u015ft\u00fcr\u00fcn<\/h2>\n\n\n<p>M\u00fc\u015fterinin bekledi\u011fi teslimat noktas\u0131ndan ba\u015flay\u0131p geriye do\u011fru giderek \u00fcretimin ne zaman bitmesi gerekti\u011fini belirleyin. Sipari\u015fin gerektirdi\u011fi \u00f6l\u00e7\u00fcde, bu iki a\u015fama aras\u0131ndaki i\u015fleri de hesaba kat\u0131n: son kontrol, paketleme, sevkiyat i\u00e7in son saatler ve nakliye.<\/p>\n\n\n<p>\u00dcr\u00fcnlerin cuma g\u00fcn\u00fc m\u00fc\u015fteride olmas\u0131 ve per\u015fembe g\u00fcn\u00fc tesisinizden \u00e7\u0131kmas\u0131 gerekiyorsa \u00fcretimin tamamlanmas\u0131 i\u00e7in hedef tarih cuma olamaz. \u00dcretim, per\u015fembe g\u00fcnk\u00fc sevkiyat haz\u0131rl\u0131klar\u0131na zaman b\u0131rakacak kadar erken bitmelidir.<\/p>\n\n\n<p>SkyPlanner&#8217;da bir sipari\u015fin <strong>Teslimat g\u00fcn\u00fc<\/strong>, o sipari\u015fin tamamlanm\u0131\u015f ve sevke haz\u0131r olmas\u0131 gereken tarihtir. M\u00fc\u015fteriye verdi\u011finiz s\u00f6z\u00fc \u00e7izelgeye aktar\u0131rken bu \u00fcretim hedefini kullan\u0131n. B\u00f6ylece \u00fcretimin tamamlanmas\u0131n\u0131 m\u00fc\u015fterinin \u00fcr\u00fcn\u00fc teslim almas\u0131yla kar\u0131\u015ft\u0131rmadan, fabrikan\u0131n son tamamlanma tarihini teslimat anla\u015fmas\u0131yla ili\u015fkilendirirsiniz.<\/p>\n\n\n<p>Yeni bir teslimat taahh\u00fcd\u00fc vermeden \u00f6nce mevcut i\u015f y\u00fck\u00fcyle uyumlu olup olmad\u0131\u011f\u0131n\u0131 kontrol edin. Sipari\u015f kabul edildikten sonra da de\u011fi\u015fen \u00e7izelgeye g\u00f6re bu taahh\u00fcd\u00fcn kar\u015f\u0131lanabilirli\u011fini d\u00fczenli olarak kontrol etmeyi s\u00fcrd\u00fcr\u00fcn. Ge\u00e7en hafta m\u00fcmk\u00fcn olan bir tarih, ar\u0131za veya tedarik\u00e7i gecikmesi sonras\u0131nda art\u0131k m\u00fcmk\u00fcn olmayabilir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">G\u00fcnl\u00fck \u00fcretim \u00e7izelgesinde teslimat taahh\u00fctlerini koruyun<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Her sipari\u015fi mevcut kapasiteyle tamamlanabilecek \u015fekilde planlay\u0131n<\/h3>\n\n\n<p>Kalan operasyonlar\u0131; gerekli makineleri, vardiyalar\u0131, \u00e7al\u0131\u015fanlar\u0131 ve s\u00fcre\u00e7 ba\u011f\u0131ml\u0131l\u0131klar\u0131n\u0131 dikkate alarak birlikte \u00e7izelgeleyin. Kesimde bo\u015f bir zaman dilimi olmas\u0131, ancak sonraki operasyonlar da zaman\u0131nda tamamlanabiliyorsa i\u015fe yarar.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131n yapay zek\u00e2 destekli \u00e7izelgeleme motoru Arcturus, \u00fcretim kaynaklar\u0131n\u0131z\u0131 ve kurallar\u0131n\u0131z\u0131 kullanarak \u00e7izelgeyi hesaplar. Gantt zaman \u00e7izelgesi, i\u015flerin hangi zamanlara yerle\u015ftirildi\u011fini g\u00f6sterir. B\u00f6ylece birbirinden ayr\u0131 kuyruk hesaplamalar\u0131 yerine, sipari\u015flerin mevcut s\u00fcreyi nas\u0131l payla\u015ft\u0131\u011f\u0131n\u0131 bir b\u00fct\u00fcn olarak g\u00f6rebilirsiniz.<\/p>\n\n\n<p>\u0130\u015f y\u00fck\u00fc mevcut kapasiteye s\u0131\u011fmad\u0131\u011f\u0131nda \u00e7izelge, alaca\u011f\u0131n\u0131z kararlar i\u00e7in temel olu\u015fturur: Gerekli personelin de sa\u011fland\u0131\u011f\u0131 ek kapasiteyi, i\u015fe uygun alternatif bir i\u015f merkezini veya farkl\u0131 bir i\u015f s\u0131ras\u0131n\u0131 de\u011ferlendirin. Bunlar\u0131n hi\u00e7biri taahh\u00fcd\u00fc kar\u015f\u0131lamaya yetmiyorsa m\u00fc\u015fteri hen\u00fcz harekete ge\u00e7ebilecek zamana sahipken teslimat \u00e7ak\u0131\u015fmas\u0131n\u0131 ele al\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Malzemenin haz\u0131r olup olmad\u0131\u011f\u0131n\u0131 planlamada dikkate al\u0131n<\/h3>\n\n\n<p>Bir makinenin bo\u015f olmas\u0131, sipari\u015fin \u00fcretime haz\u0131r oldu\u011fu anlam\u0131na gelmez. Kapasite uygun olsa bile eksik ham madde veya sat\u0131n al\u0131nan bir bile\u015fen, \u00fcretim rotas\u0131ndaki ilerlemeyi durdurabilir.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131n malzemeyi dikkate alan \u00e7izelgelemesi, ilgili kural etkinle\u015ftirildi\u011finde stoklar\u0131 ve gelecek malzemeleri hesaba katar. B\u00f6ylece malzeme durumu, planlamac\u0131n\u0131n kuyruklar\u0131 yeniden d\u00fczenlerken akl\u0131nda tutmas\u0131 gereken ayr\u0131 bir not olarak kalmaz; i\u015flerin \u00e7izelgelenmesini do\u011frudan etkiler.<\/p>\n\n\n<p>Sat\u0131n alma bilgilerindeki g\u00fcncellemelerin planlamaya da yans\u0131mas\u0131n\u0131 sa\u011flay\u0131n. Malzemenin geli\u015f tarihi de\u011fi\u015fti\u011finde yaln\u0131zca ne zaman gelece\u011fini de\u011fil, taahh\u00fct edilmi\u015f hangi teslimatlar i\u00e7in art\u0131k farkl\u0131 bir \u00fcretim plan\u0131 gerekti\u011fini de sorgulay\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00d6ncelikleri son gelen telefonla de\u011fil, bilin\u00e7li kararlarla belirleyin<\/h3>\n\n\n<p>Acil bir talep hakk\u0131nda karar verirken sonu\u00e7lar\u0131n\u0131 da de\u011ferlendirmek gerekir. Bu talebi \u00f6ne almak, teslimat\u0131 taahh\u00fct edilmi\u015f ba\u015fka bir sipari\u015fin ihtiya\u00e7 duydu\u011fu kapasiteyi t\u00fcketebilir.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131n dinamik \u00f6ncelikleri, tamamlanma tarihlerinin ve di\u011fer i\u015f \u00f6nceliklerinin \u00e7izelgeleme s\u0131ras\u0131n\u0131 etkilemesini sa\u011flar. \u00d6ncelikleri ve kurallar\u0131 planlamac\u0131lar belirler; Arcturus bunlar\u0131 hesaplamada uygular. B\u00f6ylece etkilenen her operasyonu tekrar tekrar elle ta\u015f\u0131madan \u00f6nemli taahh\u00fctlerinizi koruyabilirsiniz.<\/p>\n\n\n<p>Her sipari\u015fi en y\u00fcksek \u00f6nceli\u011fe atamay\u0131n. Ger\u00e7ek bir kapasite \u00e7ak\u0131\u015fmas\u0131 varsa etiketleri de\u011fi\u015ftirmek bunu ortadan kald\u0131rmaz. K\u0131s\u0131tl\u0131 s\u00fcrenin hangi i\u015flere ayr\u0131laca\u011f\u0131na \u00f6nceliklerle karar verin, ard\u0131ndan bunun di\u011fer taahh\u00fctler \u00fczerindeki etkisini inceleyin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00dcretim sahas\u0131ndaki ko\u015fullar de\u011fi\u015ftik\u00e7e plan\u0131 g\u00fcncelleyin<\/h3>\n\n\n<p>Tamamlanan i\u015fleri, revize edilen s\u00fcreleri, duru\u015flar\u0131 ve kapasite de\u011fi\u015fikliklerini gecikmeden kaydedin. D\u00fcn\u00fcn ilerleme bilgilerine dayanan bir \u00e7izelge, bug\u00fcnk\u00fc teslimat de\u011ferlendirmesini yanl\u0131\u015f bir temele oturtabilir.<\/p>\n\n\n<p>Autopilot etkinle\u015ftirildi\u011finde SkyPlanner, belirledi\u011finiz olaylar ger\u00e7ekle\u015fti\u011finde veya zamanlay\u0131c\u0131ya g\u00f6re, kurallar\u0131n\u0131z\u0131 ve kilitlerinizi koruyarak \u00e7izelgeyi yeniden hesaplayabilir. Gantt \u00fczerinde geciken i\u015flerin vurgulanmas\u0131, incelenmesi gereken i\u015flere dikkat \u00e7eker. B\u00f6ylece her de\u011fi\u015fiklikten sonra kuyruklar\u0131 yeniden elle d\u00fczenlemek yerine, karar al\u0131p uygulayabilece\u011finiz g\u00fcncel bir plan\u0131n\u0131z olur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Teslimat riskine sevkiyat g\u00fcn\u00fcnden \u00f6nce m\u00fcdahale edin<\/h2>\n\n\n<p>Per\u015fembe g\u00fcn\u00fc sevke haz\u0131r olmas\u0131 gereken, kabul edilmi\u015f bir sipari\u015f d\u00fc\u015f\u00fcn\u00fcn. Kesim tamamlanm\u0131\u015f, ancak montaj i\u00e7in sat\u0131n al\u0131nan bir bile\u015fenin planlanandan ge\u00e7 gelece\u011fi belli olmu\u015f olsun. \u00dcstelik montaj ekibi, ertesi hafta teslim edilmesi gereken ba\u015fka bir sipari\u015f \u00fczerinde de \u00e7al\u0131\u015f\u0131yor.<\/p>\n\n\n<p>\u0130lk sipari\u015fi yaln\u0131zca acil olarak i\u015faretlemek, eksik bile\u015feni temin etmez. Ba\u011flant\u0131s\u0131z i\u015flere erken ba\u015flamak \u00e7al\u0131\u015fanlar\u0131 me\u015fgul tutabilir; ancak bile\u015fen geldi\u011finde montaj i\u00e7in yeterli kapasite kalmamas\u0131na yol a\u00e7abilir.<\/p>\n\n\n<p>Malzemenin g\u00fcncellenen geli\u015f tarihini kullanarak birbiriyle ba\u011flant\u0131l\u0131 i\u015fleri \u00e7izelge \u00fczerinde inceleyin. Kalan montaj ve kontrol i\u015fleri sevkiyattan \u00f6nce h\u00e2l\u00e2 tamamlanabilir mi? Daha sonra teslim edilecek sipari\u015fin i\u015fleri, kendi taahh\u00fcd\u00fc aksat\u0131lmadan kayd\u0131r\u0131labilir mi? Personelin \u00e7al\u0131\u015fma s\u00fcresini art\u0131rmak \u00e7ak\u0131\u015fmay\u0131 \u00e7\u00f6zer mi, yoksa malzemenin geli\u015f tarihi zaten \u00e7ok mu ge\u00e7?<\/p>\n\n\n<p>SkyPlanner; malzeme, kapasite ve \u00f6ncelik verilerini \u00e7izelgeleme hesab\u0131nda bir araya getirir. Bu, planlamac\u0131ya gecikmeyi telafi edecek ad\u0131m\u0131 se\u00e7mek i\u00e7in daha net bir temel sunar. Uygulanabilir bir yol kalmad\u0131ysa plan\u0131n zaten g\u00f6sterdi\u011fi durumun per\u015fembe g\u00fcn\u00fc kesinle\u015fmesini beklemeyin; sorunu iletin ve sonraki ad\u0131m \u00fczerinde anla\u015f\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">KJH-Comp&#8217;ta neler de\u011fi\u015fti?<\/h2>\n\n\n<p>Finlandiyal\u0131 fason sac metal \u00fcreticisi KJH-Comp, haftal\u0131k \u00fcretim g\u00f6r\u00fcn\u00fcm\u00fc ile belirli g\u00fcnler i\u00e7in verilen teslimat s\u00f6zleri aras\u0131ndaki uyumsuzlu\u011fu ya\u015f\u0131yordu. C9000 ERP sistemi ve elektronik tablolar haftal\u0131k y\u00fcklemeyi genel hatlar\u0131yla g\u00f6sterirken, \u00fcretim sorumlular\u0131 i\u015fleri makinelere elle at\u0131yordu.<\/p>\n\n\n<p>SkyPlanner ile <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">sonlu kapasite \u00e7izelgeleme<\/a> ve makine atamas\u0131 otomatik h\u00e2le geldi. \u015eirketin kaynak \u00f6ncesi haz\u0131rl\u0131k kontrol\u00fc de i\u015f kuyru\u011fa girmeden \u00f6nce, sat\u0131n al\u0131nan bile\u015fenler d\u00e2hil gerekli par\u00e7alar\u0131n bir araya getirilmesini sa\u011fl\u0131yor. Bu de\u011fi\u015fiklik, \u00fcretime haz\u0131r i\u015fleri ihtiya\u00e7 duyulan kapasite ve tarihlerle ili\u015fkilendiriyor.<\/p>\n\n\n<p>KJH-Comp, teslimat performans\u0131n\u0131n 2026&#8217;da yakla\u015f\u0131k %50 seviyesinden %98&#8217;e varan oranlara y\u00fckseldi\u011fini bildiriyor. Di\u011fer \u00fcreticiler i\u00e7in \u00e7\u0131kar\u0131lacak ders, bu sonucun arkas\u0131ndaki planlama de\u011fi\u015fikli\u011fidir: M\u00fc\u015fteriler sipari\u015flerini belirli bir g\u00fcnde bekliyorsa toplam haftal\u0131k y\u00fck\u00fc bilmek yeterli de\u011fildir.<\/p>\n\n\n<p>Devreye alma s\u00fcrecinin ve sonu\u00e7lar\u0131n t\u00fcm ayr\u0131nt\u0131lar\u0131 i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp&#8217;un SkyPlanner deneyimini<\/a> okuyun.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Teslimat riskini gecikmeye d\u00f6n\u00fc\u015fmeden de\u011ferlendirin<\/h2>\n\n\n<p>G\u00fcnl\u00fck planlama toplant\u0131s\u0131nda, kabul edilmi\u015f ancak hedeflenen zamanda tamamlanmas\u0131 risk alt\u0131nda olan sipari\u015flere odaklan\u0131n. Her biri i\u00e7in k\u0131s\u0131t olu\u015fturan malzemeyi, operasyonu veya kayna\u011f\u0131 belirleyin, bir \u00f6nlem se\u00e7in ve bu \u00f6nlemin di\u011fer hangi teslimat taahh\u00fctlerini etkiledi\u011fini kontrol edin. Ortaya \u00e7\u0131kan i\u015f s\u0131ras\u0131n\u0131 i\u015fi yapanlar\u0131n g\u00f6rebilmesini sa\u011flay\u0131n.<\/p>\n\n\n<p>OTD ile birlikte, zaman\u0131nda yap\u0131lamayan teslimatlar\u0131n ne kadar gecikti\u011fini ve tekrarlayan gecikme nedenlerini de inceleyin. Malzemenin haz\u0131r olmamas\u0131 ile ayn\u0131 i\u015f merkezinin s\u00fcrekli a\u015f\u0131r\u0131 y\u00fcklenmesi farkl\u0131 \u00e7\u00f6z\u00fcmler gerektirir. Performans\u0131 hem ilk teslimat taahh\u00fctlerine hem de sonradan revize edilen taahh\u00fctlere g\u00f6re takip edin. B\u00f6ylece iyile\u015fme yaln\u0131zca tarihleri de\u011fi\u015ftirmekten ibaret kalmas\u0131n, teslimatlara da yans\u0131s\u0131n.<\/p>\n\n\n<p>Bu de\u011ferlendirmeden sonra h\u00e2l\u00e2 birinin birka\u00e7 makinenin i\u015f s\u0131ras\u0131n\u0131 elle d\u00fczeltmesi gerekiyorsa, bir sonraki ad\u0131m olarak SkyPlanner&#8217;\u0131 kullanmak pratik bir \u00e7\u00f6z\u00fcmd\u00fcr. A\u00e7\u0131k REST API arac\u0131l\u0131\u011f\u0131yla <a href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/\">her t\u00fcrl\u00fc ERP veya MES ile entegre olur<\/a> ve \u00fcretim verilerinizi, i\u015fler de\u011fi\u015ftik\u00e7e g\u00fcncelli\u011fini koruyabilen bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcr.<\/p>\n\n\n<p>Kabul edilmi\u015f bir sipari\u015f ve fabrikan\u0131zda ya\u015fanan ger\u00e7ek bir aksakl\u0131k \u00fczerinden <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">demo randevusu al\u0131n<\/a>. \u00dcretim rotas\u0131n\u0131n kalan ad\u0131mlar\u0131n\u0131n, ayn\u0131 kapasiteyi kullanmas\u0131 gereken di\u011fer i\u015flerin ve teslimat hedefinin nas\u0131l bir arada planland\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcn. Ya da SkyPlanner\u2019\u0131n ekibinizin bir sonraki taahh\u00fcd\u00fcn\u00fc yerine getirmesine nas\u0131l yard\u0131mc\u0131 olabilece\u011fini ke\u015ffetmek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">demo verileriyle denemeye ba\u015flay\u0131n<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun Zaman\u0131nda teslimat (OTD), m\u00fc\u015fterilerle mutab\u0131k kald\u0131\u011f\u0131n\u0131z teslimat tarihlerine ne \u00f6l\u00e7\u00fcde uydu\u011funuzu g\u00f6sterir. \u00dcretimde bu oran\u0131 iyile\u015ftirmek, \u00f6ncelik verilmesi gereken sipari\u015flerin \u00fcretim a\u015famalar\u0131ndan ge\u00e7ip tamamlanmas\u0131n\u0131 ve kararla\u015ft\u0131r\u0131lan teslimat noktas\u0131na zaman\u0131nda ula\u015fmas\u0131n\u0131 sa\u011flamak demektir. Bu, her makineyi s\u00fcrekli \u00e7al\u0131\u015f\u0131r durumda &#8230; <a title=\"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/\" aria-label=\"Read more about \u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":100454,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-100444","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun<\/title>\n<meta name=\"description\" content=\"Fabrika yo\u011fun ama sipari\u015fler gecikiyor mu? Zaman\u0131nda teslimat \u00f6l\u00e7\u00fcm\u00fcn\u00fc \u00f6\u011frenin; SkyPlanner ile \u00fcretimi s\u00f6z verdi\u011finiz tarihlere uygun planlay\u0131n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun\" \/>\n<meta property=\"og:description\" content=\"Fabrika yo\u011fun ama sipari\u015fler gecikiyor mu? Zaman\u0131nda teslimat \u00f6l\u00e7\u00fcm\u00fcn\u00fc \u00f6\u011frenin; SkyPlanner ile \u00fcretimi s\u00f6z verdi\u011finiz tarihlere uygun planlay\u0131n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T22:47:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T22:49:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:49:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/\"},\"wordCount\":2347,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/\",\"name\":\"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:49:06+00:00\",\"description\":\"Fabrika yo\u011fun ama sipari\u015fler gecikiyor mu? Zaman\u0131nda teslimat \u00f6l\u00e7\u00fcm\u00fcn\u00fc \u00f6\u011frenin; SkyPlanner ile \u00fcretimi s\u00f6z verdi\u011finiz tarihlere uygun planlay\u0131n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Manufactured components converge into a complete shipping carton beside a waiting delivery truck.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/zamaninda-teslimat\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun","description":"Fabrika yo\u011fun ama sipari\u015fler gecikiyor mu? Zaman\u0131nda teslimat \u00f6l\u00e7\u00fcm\u00fcn\u00fc \u00f6\u011frenin; SkyPlanner ile \u00fcretimi s\u00f6z verdi\u011finiz tarihlere uygun planlay\u0131n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/","og_locale":"tr_TR","og_type":"article","og_title":"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun","og_description":"Fabrika yo\u011fun ama sipari\u015fler gecikiyor mu? Zaman\u0131nda teslimat \u00f6l\u00e7\u00fcm\u00fcn\u00fc \u00f6\u011frenin; SkyPlanner ile \u00fcretimi s\u00f6z verdi\u011finiz tarihlere uygun planlay\u0131n.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T22:47:32+00:00","article_modified_time":"2026-10-16T22:49:06+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"12 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:49:06+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/"},"wordCount":2347,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/","name":"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:49:06+00:00","description":"Fabrika yo\u011fun ama sipari\u015fler gecikiyor mu? Zaman\u0131nda teslimat \u00f6l\u00e7\u00fcm\u00fcn\u00fc \u00f6\u011frenin; SkyPlanner ile \u00fcretimi s\u00f6z verdi\u011finiz tarihlere uygun planlay\u0131n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","width":1672,"height":941,"caption":"Manufactured components converge into a complete shipping carton beside a waiting delivery truck."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/zamaninda-teslimat\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretimde Zaman\u0131nda Teslimat: Verdi\u011finiz S\u00f6zleri Tutun Zaman\u0131nda teslimat (OTD), m\u00fc\u015fterilerle mutab\u0131k kald\u0131\u011f\u0131n\u0131z teslimat tarihlerine ne \u00f6l\u00e7\u00fcde uydu\u011funuzu g\u00f6sterir. \u00dcretimde bu oran\u0131 iyile\u015ftirmek, \u00f6ncelik verilmesi gereken sipari\u015flerin \u00fcretim a\u015famalar\u0131ndan ge\u00e7ip tamamlanmas\u0131n\u0131 ve kararla\u015ft\u0131r\u0131lan teslimat noktas\u0131na zaman\u0131nda ula\u015fmas\u0131n\u0131 sa\u011flamak demektir. Bu, her makineyi s\u00fcrekli \u00e7al\u0131\u015f\u0131r durumda&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/100444","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=100444"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/100444\/revisions"}],"predecessor-version":[{"id":100503,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/100444\/revisions\/100503"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/100454"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=100444"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=100444"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=100444"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}