{"id":98834,"date":"2026-10-15T09:08:34","date_gmt":"2026-10-15T09:08:34","guid":{"rendered":"https:\/\/skyplanner.ai\/metal-imalat-uretim-cizelgeleme-yazilimi\/"},"modified":"2026-10-21T14:18:40","modified_gmt":"2026-10-21T14:18:40","slug":"metal-imalat-uretim-cizelgeleme-yazilimi","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/metal-imalat-uretim-cizelgeleme-yazilimi\/","title":{"rendered":"Metal imalat \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow\">Sac metal ve \u00e7elik imalat\u0131nda \u00fcretim \u00e7izelgeleme<\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Metal imalat <span class=\"hl\">\u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS; sipari\u015flerinizi, rotalar\u0131n\u0131z\u0131, makinelerinizi, malzemelerinizi ve vardiyalar\u0131n\u0131z\u0131 tek bir sonlu kapasite \u00e7izelgesine d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. Lazer kesim ve b\u00fck\u00fcmden kaynak, boya ve montaja kadar her i\u015fi planlar, bir kaynakl\u0131 yap\u0131ya ba\u015flanmadan \u00f6nce t\u00fcm par\u00e7alar\u0131n haz\u0131r olmas\u0131n\u0131 sa\u011flar; acil bir sipari\u015f geldi\u011finde ya da bir makine durdu\u011funda plan\u0131 saniyeler i\u00e7inde yeniden olu\u015fturur. A\u00e7\u0131k REST API\u2019si sayesinde her ERP veya MES ile entegre olur.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt zaman \u00e7izelgesi: lazer, b\u00fck\u00fcm, kaynak ve boya i\u015f merkezlerine yerle\u015ftirilmi\u015f i\u015fler ve altta bir sipari\u015f listesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<ul class=\"wp-block-list fx-micro\">\n\n<li>Lazerden boyaya tek planda<\/li>\n\n\n<li>Sonlu kapasiteli \u00e7izelgeleme<\/li>\n\n\n<li>REST API ile her ERP veya MES<\/li>\n\n\n<li>Ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group fxv-proof\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-proof__row\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-proof__item\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fxv-proof__big\"><span data-countup=\"\" data-to=\"98\" data-suffix=\"%\">98%<\/span><\/p>\n\n\n<p class=\"fxv-proof__lab\">teslimat performans\u0131; daha \u00f6nce yakla\u015f\u0131k %50 idi, KJH-Comp<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-proof__item\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fxv-proof__big\">2 \u2192 1<\/p>\n\n\n<p class=\"fxv-proof__lab\">\u00e7izelgeleme i\u00e7in gereken amir say\u0131s\u0131, KJH-Comp<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-proof__item\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fxv-proof__big\">%99,2<\/p>\n\n\n<p class=\"fxv-proof__lab\">bu y\u0131l teslimat performans\u0131, Piristeel<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-proof__item\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fxv-proof__big\">g\u00fcnde 4 saat<\/p>\n\n\n<p class=\"fxv-proof__lab\">eski y\u00f6nteme k\u0131yasla kazan\u0131lan planlama s\u00fcresi, Piristeel<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<p class=\"fxv-proof__note\">Sonu\u00e7lar, SkyPlanner m\u00fc\u015fterileri <a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp<\/a> ve <a href=\"\/tr\/musteri-hikayeleri\/piristeel\/\">Piristeel<\/a> taraf\u0131ndan bildirilmi\u015ftir. <a href=\"\/tr\/musteri-hikayeleri\/\">T\u00fcm SkyPlanner APS yorumlar\u0131n\u0131 okuyun<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"why\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow\">Metal imalatta \u00e7izelgeleme neden zordur<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00c7ok say\u0131da rota, ortak kullan\u0131lan makineler, tek kaynak alan\u0131<\/h2>\n\n\n<p class=\"fx-head__lead\">Bir imalat at\u00f6lyesi y\u00fczlerce farkl\u0131 par\u00e7ay\u0131 ayn\u0131 lazerden, abkant preslerden, kaynak h\u00fccrelerinden ve boya hatt\u0131ndan ge\u00e7irir; her sipari\u015fin de kendi rotas\u0131 vard\u0131r.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M7 4v16M7 20l-3-3M7 20l3-3M17 20V4M17 4l-3 3M17 4l3 3\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Her sipari\u015fin kendi rotas\u0131 vard\u0131r<\/p>\n\n\n<p class=\"fx-pain__b\">Bir par\u00e7a lazer, b\u00fck\u00fcm, kaynak, boya s\u0131ras\u0131n\u0131 izler. Sonraki par\u00e7a z\u0131mba, \u00e7apak alma, b\u00fck\u00fcm, montaj s\u0131ras\u0131yla ilerler. Hepsine ayn\u0131 makineler hizmet eder, \u00fcstelik her g\u00fcn farkl\u0131 bir s\u0131rayla.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"5\" cy=\"6\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><circle cx=\"19\" cy=\"18\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M7.5 6H14a3 3 0 013 3v6.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Par\u00e7alar kaynaktan \u00f6nce bir araya gelmelidir<\/p>\n\n\n<p class=\"fx-pain__b\">Kesilmi\u015f ve b\u00fck\u00fclm\u00fc\u015f her par\u00e7a ile sat\u0131n al\u0131nan her bile\u015fen yerinde olmadan kaynakl\u0131 yap\u0131ya ba\u015flanamaz. Eksik tek bir braket b\u00fct\u00fcn montaj\u0131 durdurur.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M6 21V3m0 0l11 3.5L6 10\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Tempoyu kaynak ve boya belirler<\/p>\n\n\n<p class=\"fx-pain__b\">Kesim h\u0131zl\u0131d\u0131r. Kuyruklar kaynakta, toz boyada ve montajda birikir; geciken bir i\u015f de teslimat\u0131n gecikmesine tam burada d\u00f6n\u00fc\u015f\u00fcr.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M7 7h12l-3-3M17 17H5l3 3\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Tip de\u011fi\u015fimi malzemeye ve tak\u0131ma ba\u011fl\u0131d\u0131r<\/p>\n\n\n<p class=\"fx-pain__b\">Lazerde sac kalitesi ve kal\u0131nl\u0131\u011f\u0131, abkant preste tak\u0131m, boya hatt\u0131nda renk: tip de\u011fi\u015fimine ne kadar zaman gidece\u011fini bunlar belirler.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M13 2L4.5 13.5H11l-1 8.5L19.5 10H13z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Acil sipari\u015fler ve m\u00fc\u015fteri de\u011fi\u015fiklikleri<\/p>\n\n\n<p class=\"fx-pain__b\">M\u00fc\u015fteriye \u00f6zel \u00fcr\u00fcnler, revize edilen \u00e7izimler ve acil sipari\u015fler her hafta gelir; plan bunlar\u0131, verilmi\u015f di\u011fer s\u00f6zleri bozmadan kar\u015f\u0131layabilmelidir.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><rect x=\"3\" y=\"3\" width=\"18\" height=\"18\" rx=\"2\" stroke=\"currentColor\" stroke-width=\"2\"><\/rect><path d=\"M3 9h18M9 3v18\" stroke=\"currentColor\" stroke-width=\"2\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">B\u00f6l\u00fcm y\u00fckleri ger\u00e7ek termini gizler<\/p>\n\n\n<p class=\"fx-pain__b\">Kaynak i\u00e7in haftal\u0131k toplam saat, hangi \u00e7er\u00e7evenin per\u015fembe g\u00fcn\u00fc sevk edilece\u011fini s\u00f6ylemez. Elektronik tablolar ve ERP sonsuz kapasiteye g\u00f6re y\u00fckleme yapar; bu y\u00fczden a\u015f\u0131r\u0131 y\u00fck ancak shop floor\u2019da ortaya \u00e7\u0131kar.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain__foot\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__foot-ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M12 2a10 10 0 100 20 10 10 0 000-20zm0 6v5m0 3h.01\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p><b>SkyPlanner at\u00f6lyeyi, par\u00e7alar\u0131n ger\u00e7ekte akt\u0131\u011f\u0131 \u015fekilde \u00e7izelgeler.<\/b> Her lazer, abkant pres, kaynak h\u00fccresi ve boya hatt\u0131 ger\u00e7ek kapasiteye g\u00f6re planlan\u0131r, her rota ad\u0131m ad\u0131m izlenir; ar\u0131za ya da acil i\u015f saniyeler i\u00e7inde plana yedirilir.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"assembly\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow\">Alt montajlar, rotalar ve darbo\u011fazlar<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaynak ba\u015flamadan \u00f6nce her par\u00e7a haz\u0131r<\/h2>\n\n\n<p class=\"fx-head__lead\">Tek bir eksik par\u00e7ay\u0131 bekleyen kaynak h\u00fccresi, at\u00f6lyenin en pahal\u0131 noktas\u0131nda kaybedilmi\u015f kapasitedir. SkyPlanner par\u00e7alar\u0131, alt montajlar\u0131 ve kayna\u011f\u0131 birbirine ba\u011fl\u0131 tek bir yap\u0131 olarak \u00e7izelgeler.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-shift__points ind-points\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-shift__pt\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"5\" cy=\"6\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><circle cx=\"19\" cy=\"18\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M7.5 6H14a3 3 0 013 3v6.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-shift__pt-t\">Alt \u00fcr\u00fcnler ana \u00fcr\u00fcnde birle\u015fir<\/p>\n\n\n<p class=\"fx-shift__pt-b\">Kaynakl\u0131 yap\u0131y\u0131 <a href=\"\/tr\/ozellikler\/#routing\">\u00e7ok seviyeli \u00fcr\u00fcn a\u011fac\u0131<\/a> olarak modelleyin: kesilen ve b\u00fck\u00fclen par\u00e7alar alt montajlara, alt montajlar da kaynakl\u0131 \u00e7er\u00e7eveye d\u00f6n\u00fc\u015f\u00fcr. Her rota ad\u0131m\u0131, kendi i\u015f merkezinde <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">sonlu kapasiteye<\/a> g\u00f6re \u00e7izelgelenir.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-shift__pt\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M3 8l9-5 9 5v8l-9 5-9-5z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><path d=\"M3 8l9 5 9-5M12 13v8\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-shift__pt-t\">Malzemeler ve sat\u0131n al\u0131nan par\u00e7alar kontrol edilir<\/p>\n\n\n<p class=\"fx-shift__pt-b\">Malzemeye dayal\u0131 \u00e7izelgeleme a\u00e7\u0131kken bir i\u015fe, ancak sac\u0131, profilleri ve sat\u0131n al\u0131nan bile\u015fenleri haz\u0131r olacaksa ba\u015flan\u0131r. Eksikler kaynak h\u00fccresinde de\u011fil, planlama a\u015famas\u0131nda g\u00f6r\u00fcn\u00fcr.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-shift__pt\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ic\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 20V10m5 10V4m5 16v-7m5 7V8\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-shift__pt-t\">Darbo\u011fazlar sorun \u00e7\u0131karmadan \u00f6nce g\u00f6r\u00fcn\u00fcr<\/p>\n\n\n<p class=\"fx-shift__pt-b\">SkyPlanner kaynak, b\u00fck\u00fcm veya boya kapasitesinin nerede yetmedi\u011fini g\u00f6sterir; planlay\u0131c\u0131 da i\u015fi kayd\u0131rabilir, vardiya ekleyebilir veya sat\u0131\u015f\u0131 zaman\u0131nda bilgilendirebilir.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rota edit\u00f6r\u00fc<\/span><\/div><img decoding=\"async\" loading=\"lazy\" width=\"1280\" height=\"586\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/21-5c990f2c-7c1f-4d7d-9980-ad09b5003c75.png\" alt=\"SkyPlanner rota edit\u00f6r\u00fc: kesilmi\u015f ve b\u00fck\u00fclm\u00fc\u015f alt \u00fcr\u00fcnlerin kaynakl\u0131 bir \u00fcr\u00fcn i\u00e7inde birle\u015fmesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"capacity\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow\">SkyPlanner bir imalat at\u00f6lyesini nas\u0131l \u00e7izelgeler<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sacdan sevk edilen \u00e7er\u00e7eveye, tek \u00e7izelge<\/h2>\n\n\n<p class=\"fx-head__lead\">SkyPlanner, ger\u00e7ekte sahip oldu\u011funuz kapasiteye ve ger\u00e7ekte elinizde bulunan malzemelere g\u00f6re \u00e7izelgeler; ayn\u0131 plan\u0131 her makinede g\u00f6sterir.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-deliver ind-split ind-block\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-deliver__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">Makine, vardiya ve \u00e7al\u0131\u015fanlar genelinde sonlu kapasite<\/h3>\n\n\n<p>Her lazerin, abkant presin, kaynak h\u00fccresinin ve boya hatt\u0131n\u0131n kendi vardiya takvimi vard\u0131r; planl\u0131 bak\u0131mlar ve ar\u0131zalar istisna olarak girilebilir. Personel \u00e7izelgeleme, \u00e7al\u0131\u015fanlar\u0131 vardiyalara ve i\u015f merkezlerine atar; b\u00f6ylece plan, ba\u015f\u0131nda kimsenin olmad\u0131\u011f\u0131 bir makineye asla i\u015f koymaz.<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u0130\u015fler otomatik olarak do\u011fru makineye atan\u0131r<\/li>\n\n\n<li>Birden fazla tesis birlikte \u00e7izelgelenir, tesisler aras\u0131 transfer s\u00fcreleri hesaba kat\u0131l\u0131r<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-deliver__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-photo\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"900\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/industry\/metal-fabrication\/hero.webp\" alt=\"Bir sac metal imalat at\u00f6lyesinde kaynak h\u00fccrelerinin yan\u0131nda tablet tutan \u00fcretim sorumlusu\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-deliver ind-split ind-block ind-split--flip\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-deliver__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">Malzemeye, kal\u0131nl\u0131\u011fa ve tak\u0131ma g\u00f6re gruplama<\/h3>\n\n\n<p>\u00dcr\u00fcnlere malzeme kalitesi, sac kal\u0131nl\u0131\u011f\u0131, abkant pres tak\u0131m\u0131 veya boya rengi gibi \u00f6zellikler verin ve her i\u015f merkezi i\u00e7in bir tip de\u011fi\u015fimi matrisi tan\u0131mlay\u0131n. SkyPlanner <a href=\"\/tr\/ozellikler\/#similar-jobs\">benzer i\u015fleri<\/a> arka arkaya gruplar; b\u00f6ylece lazer ayn\u0131 sac kalitesini ve kal\u0131nl\u0131\u011f\u0131n\u0131 bir arada keser, b\u00fck\u00fcm ayn\u0131 tak\u0131m kurulumlar\u0131n\u0131 payla\u015f\u0131r, boya hatt\u0131 daha seyrek renk de\u011fi\u015ftirir, teslim tarihleri de yine tutturulur.<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Tip de\u011fi\u015fimi s\u00fcreleri her i\u015f merkezi i\u00e7in, her iki y\u00f6nde ayr\u0131 ayr\u0131 tan\u0131mlan\u0131r<\/li>\n\n\n<li>Tek tek proses ad\u0131mlar\u0131 i\u00e7in termin tarihleri; b\u00f6ylece par\u00e7alar kayna\u011fa, kayna\u011f\u0131n ihtiya\u00e7 duydu\u011fu anda ula\u015f\u0131r<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-deliver__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-photo\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"900\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/industry\/metal-fabrication\/materials.webp\" alt=\"Abkant presin yan\u0131nda arabalara istiflenmi\u015f, lazerle kesilmi\u015f ve b\u00fck\u00fclm\u00fc\u015f sac par\u00e7alar; kayna\u011fa haz\u0131r\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-deliver ind-split ind-block\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-deliver__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">Kesim, b\u00fck\u00fcm ve kaynak i\u015fleri tek plandan<\/h3>\n\n\n<p>Operat\u00f6rler kendi i\u015f kuyruklar\u0131n\u0131 basit bir operat\u00f6r g\u00f6r\u00fcn\u00fcm\u00fcnde ya da SkyPlanner <a href=\"\/tr\/ozellikler\/#mobile\">shop floor uygulamas\u0131nda<\/a> g\u00f6r\u00fcr. \u0130\u015fleri ba\u015flat\u0131r, duraklat\u0131r ve tamamlar; miktarlar\u0131 ve hurday\u0131 \u00e7al\u0131\u015f\u0131rken bildirir. B\u00f6ylece \u00e7izelge, her makinede ger\u00e7ekte olan\u0131 her zaman yans\u0131t\u0131r.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-deliver__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-photo\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"900\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/industry\/metal-fabrication\/shopfloor.webp\" alt=\"Abkant pres operat\u00f6r\u00fc, shop floor\u2019daki bir terminalde i\u015f kuyru\u011funu kontrol ediyor\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"delivery\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow\">Acil i\u015fler, geciken \u00e7elik, revize \u00e7izimler<\/p>\n\n\n<h2 class=\"wp-block-heading\">Acil sipari\u015fi al\u0131n, gerisini de yine zaman\u0131nda sevk edin<\/h2>\n\n\n<p class=\"fx-head__lead\">Acil bir sipari\u015f eklendi\u011finde, bir makine durdu\u011funda ya da \u00e7elik teslimat\u0131 gecikti\u011finde <a href=\"\/tr\/ozellikler\/#autopilot\">Arcturus AI motoru<\/a> \u00e7izelgeyi saniyeler i\u00e7inde yeniden olu\u015fturur. Yerinden oynamamas\u0131 gereken i\u015fleri kilitleyin, \u00f6ncelikleri y\u00fckseltin ya da acil sipari\u015fi \u00f6ne al\u0131n.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-deliver\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-deliver__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Bir sat\u0131\u015f f\u0131rsat\u0131n\u0131 sim\u00fcle edilmi\u015f sipari\u015f olarak ekleyin ve onayl\u0131 sipari\u015fleri bozmadan <a href=\"\/tr\/ozellikler\/#delivery\">ula\u015f\u0131labilecek en erken ger\u00e7ek\u00e7i teslim tarihini<\/a> g\u00f6r\u00fcn.<\/li>\n\n\n<li>Acil sipari\u015fi kabul etmenin, daha \u00f6nce s\u00f6z verilmi\u015f her kaynakl\u0131 yap\u0131y\u0131 nas\u0131l etkiledi\u011fini, evet demeden \u00f6nce g\u00f6r\u00fcn.<\/li>\n\n\n<li>\u0130\u015fler termin tarihlerine g\u00f6re zamanlan\u0131r; b\u00f6ylece iki hafta sonra teslim edilecek bir i\u015f, yar\u0131n sevk edilecek i\u015fin yerini art\u0131k almaz.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-deliver__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Sat\u0131\u015f f\u0131rsat\u0131 \u00e7izelgeleme<\/span><\/div><img decoding=\"async\" loading=\"lazy\" width=\"2056\" height=\"890\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/32-08986976-4342-44ff-a97f-fa730beb26c8.png\" alt=\"SkyPlanner zaman \u00e7izelgesi: mevcut y\u00fcke kar\u015f\u0131 sim\u00fcle edilmi\u015f sipari\u015f olarak \u00e7izelgelenen bir sat\u0131\u015f f\u0131rsat\u0131.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-quote\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-quote__mark\" aria-hidden=\"true\">\u201c<\/div>\n\n\n<p class=\"fxv-quote__txt\">Sonlu kapasite \u00e7izelgelemeyi ve her i\u015fin hangi makineye gidece\u011fini SkyPlanner halleder. Tamamen otomatik \u00e7al\u0131\u015f\u0131r.<\/p>\n\n\n<p class=\"fxv-quote__who\"><b>Hannu Lahtinen<\/b>, Genel M\u00fcd\u00fcr, KJH-Comp Oy<\/p>\n\n\n<p class=\"fxv-quote__ctx\">Sac metal fason \u00fcreticisi; lazer kesimden kayna\u011fa ve montaja \u00b7 <a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp\u2019un SkyPlanner APS yorumu<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integrations\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow fx-eyebrow--center\">Her ERP veya MES ile entegre olur<\/p>\n\n\n<h2 class=\"wp-block-heading\">ERP\u2019niz sipari\u015fleri ve \u00fcr\u00fcn a\u011fa\u00e7lar\u0131n\u0131 tutar. SkyPlanner her kesimi, b\u00fck\u00fcm\u00fc ve kayna\u011f\u0131 \u00e7izelger.<\/h2>\n\n\n<p class=\"fx-head__lead\">SkyPlanner, \u015firket i\u00e7i geli\u015ftirilmi\u015f sistemler dahil t\u00fcm ERP ve MES sistemlerine a\u00e7\u0131k REST API\u2019si \u00fczerinden ba\u011flan\u0131r. Sipari\u015fler, \u00fcr\u00fcnler ve rotalar i\u00e7eri akar; planlanan s\u00fcreler ve malzeme ihtiya\u00e7 tarihleri geri d\u00f6ner. Ayr\u0131ca tek ba\u015f\u0131na da \u00e7al\u0131\u015f\u0131r; bu sayede entegrasyon kurulmadan \u00e7izelgelemeye ba\u015flayabilirsiniz.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-data\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-data__col\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-data__lab\">ERP\u2019nizden<\/p>\n\n\n<h3 class=\"wp-block-heading\">ERP \u00b7 MES \u00b7 CSV \u00b7 Manuel<\/h3>\n\n\n<ul class=\"wp-block-list fx-data__items\">\n\n<li>Sat\u0131\u015f sipari\u015fleri ve talep<\/li>\n\n\n<li>\u00dcr\u00fcnler, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131 ve rotalar<\/li>\n\n\n<li>Sac, profil ve stok<\/li>\n\n\n<li>M\u00fc\u015fteriler ve termin tarihleri<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-data__col fx-data__col--mid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-data__lab\">SkyPlanner APS<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00dcretimi \u00e7izelgeler<\/h3>\n\n\n<ul class=\"wp-block-list fx-data__chips\">\n\n<li>Makineler<\/li>\n\n\n<li>Vardiyalar<\/li>\n\n\n<li>Rotalar<\/li>\n\n\n<li>Alt montajlar<\/li>\n\n\n<li>Malzemeler<\/li>\n\n\n<li>\u00d6ncelikler<\/li>\n\n\n<li>\u00c7izelge<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-data__col\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-data__lab\">ERP&#8217;nize geri<\/p>\n\n\n<h3 class=\"wp-block-heading\">ERP \u00b7 Raporlar \u00b7 Y\u00f6netim<\/h3>\n\n\n<ul class=\"wp-block-list fx-data__items\">\n\n<li>Planlanan ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131<\/li>\n\n\n<li>Malzeme ihtiya\u00e7 tarihleri<\/li>\n\n\n<li>\u0130lerleme ve miktarlar<\/li>\n\n\n<li>Teslim tarihleri<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<ul class=\"wp-block-list ind-names\">\n\n<li><a href=\"\/tr\/entegrasyonlar\/erp\/sap-s4hana\/\">SAP S\/4HANA<\/a><\/li>\n\n\n<li><a href=\"\/tr\/entegrasyonlar\/erp\/business-central\/\">Microsoft Dynamics 365 Business Central<\/a><\/li>\n\n\n<li><a href=\"\/tr\/entegrasyonlar\/erp\/netsuite\/\">Oracle NetSuite<\/a><\/li>\n\n\n<li>Infor<\/li>\n\n\n<li><a href=\"\/tr\/entegrasyonlar\/erp\/epicor-kinetic\/\">Epicor<\/a><\/li>\n\n\n<li><a href=\"\/tr\/entegrasyonlar\/erp\/ifs-cloud\/\">IFS Cloud<\/a><\/li>\n\n\n<li><a href=\"\/tr\/entegrasyonlar\/erp\/sage-x3\/\">Sage X3<\/a><\/li>\n\n\n<li><a href=\"\/tr\/entegrasyonlar\/erp\/odoo\/\">Odoo<\/a><\/li>\n\n\n<li><a href=\"\/tr\/entegrasyonlar\/erp\/jobboss\/\">JobBOSS\u00b2<\/a><\/li>\n\n\n<li>Lantek Integra<\/li>\n\n<\/ul>\n\n\n<div class=\"wp-block-buttons ind-cta-center is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--blue\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar\u0131 inceleyin<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"segments\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow\">SkyPlanner&#8217;\u0131n yeri<\/p>\n\n\n<h2 class=\"wp-block-heading\">Her \u00f6l\u00e7ekten metal imalat\u00e7\u0131s\u0131 taraf\u0131ndan kullan\u0131l\u0131r<\/h2>\n\n\n<p class=\"fx-head__lead\">Tek bir at\u00f6lyeden birden fazla tesisi olan imalat gruplar\u0131na kadar. SkyPlanner, kesilen ve b\u00fck\u00fclen par\u00e7alar\u0131n ayn\u0131 makineler i\u00e7in yar\u0131\u015ft\u0131\u011f\u0131 ve kaynakta yeniden bulu\u015ftu\u011fu her yerde uygundur.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-deliver ind-split ind-block\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-deliver__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">Metal imalat alanlar\u0131<\/h3>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Sac metal fason imalat\u0131<\/li>\n\n\n<li>Kaynakl\u0131 \u00e7elik yap\u0131lar ve \u015fasiler<\/li>\n\n\n<li>Kasalar, panolar ve muhafazalar<\/li>\n\n\n<li>\u00c7at\u0131, cephe ve yap\u0131 \u00fcr\u00fcnleri<\/li>\n\n\n<li>Makine g\u00f6vdeleri ve end\u00fcstriyel ekipman par\u00e7alar\u0131<\/li>\n\n\n<li>Raf, istif ve depolama sistemleri<\/li>\n\n\n<li>Treyler, ara\u00e7 ve tar\u0131m makinesi par\u00e7alar\u0131<\/li>\n\n\n<li>Toz boya ve y\u00fczey i\u015fleme<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-deliver__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-photo\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"900\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/industry\/metal-fabrication\/changeover.webp\" alt=\"Fiber lazer kesim makinesi, abkant presler ve boyaya do\u011fru ilerleyen kaynakl\u0131 \u00e7elik \u00e7er\u00e7evelerin bulundu\u011fu imalat salonu\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"why-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow\">\u0130malat\u00e7\u0131lar neden SkyPlanner\u2019\u0131 se\u00e7iyor<\/p>\n\n\n<h2 class=\"wp-block-heading\">Metal imalat at\u00f6lyeleri neden SkyPlanner\u2019\u0131 se\u00e7iyor<\/h2>\n\n\n<p class=\"fx-head__lead\">SkyPlanner APS, lazer kesimden kayna\u011fa, boyaya ve montaja kadar her i\u015fi tek bir sonlu kapasite \u00e7izelgesinde g\u00f6rmek isteyen ve kaynakl\u0131 montajlara ancak t\u00fcm par\u00e7alar haz\u0131r oldu\u011funda ba\u015flamak isteyen metal imalat \u00fcreticileri i\u00e7in yapay zek\u00e2 destekli <a href=\"\/tr\/\">\u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131d\u0131r<\/a>. \u0130lk g\u00fcnden kendi ba\u015f\u0131na \u00e7al\u0131\u015f\u0131r ve a\u00e7\u0131k REST API\u2019si \u00fczerinden her ERP veya MES\u2019e ba\u011flan\u0131r.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"5\" cy=\"6\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><circle cx=\"19\" cy=\"18\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M7.5 6H14a3 3 0 013 3v6.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Kaynakl\u0131 montajlar i\u00e7in tasarland\u0131<\/p>\n\n\n<p class=\"fx-pain__b\">\u00c7ok seviyeli \u00fcr\u00fcn a\u011fa\u00e7lar\u0131 (BOM) ve alt \u00fcr\u00fcnler, kesilmi\u015f ve b\u00fck\u00fclm\u00fc\u015f par\u00e7alar\u0131 kaynakl\u0131 yap\u0131ya ba\u011flar. Malzemeye dayal\u0131 \u00e7izelgeleme de kayna\u011f\u0131 ancak t\u00fcm par\u00e7alar ve sat\u0131n al\u0131nan bile\u015fenler haz\u0131r olaca\u011f\u0131 zaman ba\u015flat\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M13 2L4.5 13.5H11l-1 8.5L19.5 10H13z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Acil sipari\u015fler saniyeler i\u00e7inde plana girer<\/p>\n\n\n<p class=\"fx-pain__b\">Arcturus AI motoru, acil bir i\u015f geldi\u011finde, bir makine durdu\u011funda ya da \u00e7elik gecikti\u011finde sonlu kapasite \u00e7izelgesinin tamam\u0131n\u0131 saniyeler i\u00e7inde yeniden kurar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M6 21V3m0 0l11 3.5L6 10\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Sat\u0131\u015f\u0131n arkas\u0131nda durabilece\u011fi sevkiyat tarihleri<\/p>\n\n\n<p class=\"fx-pain__b\">Bir potansiyel sipari\u015fi (prospect) sim\u00fcle edilmi\u015f sipari\u015f olarak \u00e7izelgeleyin; onayl\u0131 tek bir i\u015fi bile kayd\u0131rmadan ger\u00e7ek kapasiteye dayanan ger\u00e7ek\u00e7i bir teslim tarihi elde edin.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M17 6.5A7 7 0 1 0 17 17.5M4 10.5h9M4 13.5h9\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Yay\u0131mlanm\u0131\u015f fiyat, 30 g\u00fcn \u00fccretsiz deneme<\/p>\n\n\n<p class=\"fx-pain__b\">Ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla 5 i\u015f merkezi dahildir, her ek i\u015f merkezi i\u00e7in ayda 20 \u20ac \u00f6dersiniz. Deneme s\u00fcr\u00fcm\u00fc 20 i\u015f merkezine kadar kapsar, kredi kart\u0131 gerekmez.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"12\" r=\"3\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M12 2v3M12 19v3M2 12h3M19 12h3M4.9 4.9l2.1 2.1M17 17l2.1 2.1M4.9 19.1L7 17M17 7l2.1-2.1\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u00d6nce \u00e7izelgeleyin, haz\u0131r olunca entegre edin<\/p>\n\n\n<p class=\"fx-pain__b\">\u0130lk \u00e7izelgenizi herhangi bir entegrasyon yapmadan \u00f6nce demo verileri veya CSV i\u00e7e aktar\u0131m\u0131yla olu\u015fturun. A\u00e7\u0131k REST API daha sonra \u015firket i\u00e7i geli\u015ftirilmi\u015f sistemler dahil herhangi bir ERP veya MES&#8217;e ba\u011flan\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"9\" cy=\"8\" r=\"3.2\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M3 20c0-3.3 2.7-5.5 6-5.5s6 2.2 6 5.5M16 4.8a3.2 3.2 0 010 6.4M18 14.8c1.9.6 3 2.4 3 5.2\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Her tesis ve her operat\u00f6r i\u00e7in tek plan<\/p>\n\n\n<p class=\"fx-pain__b\">Birden fazla tesis, lokasyonlar aras\u0131 transfer s\u00fcreleriyle birlikte tek planda \u00e7izelgelenir. 29 dilli aray\u00fcz sayesinde her at\u00f6lye ve her operat\u00f6r kendi dilinde \u00e7al\u0131\u015f\u0131r.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-twocard ind-twocard--spaced\" id=\"pricing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M12 3l8 3v6c0 4.5-3.4 8.2-8 9-4.6-.8-8-4.5-8-9V6z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><path d=\"M8.5 12l2.5 2.5 4.5-5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">G\u00fcvenlik ve veriler<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, AWS \u00fczerinde bulutta \u00e7al\u0131\u015f\u0131r. Verilerinizin belirli bir \u00fclkede kalmas\u0131 gerekiyorsa, anla\u015fma kapsam\u0131nda o \u00fclkede ayr\u0131lm\u0131\u015f bir sunucu sa\u011flanabilir. Veriler her g\u00fcn yedeklenir ve yedekler 30 g\u00fcn saklan\u0131r. Kullan\u0131c\u0131lar Google veya Microsoft hesaplar\u0131yla ve iki fakt\u00f6rl\u00fc kimlik do\u011frulamayla oturum a\u00e7abilir. Veri i\u015fleme s\u00f6zle\u015fmesi mevcuttur ve <b>m\u00fc\u015fteri verileri yapay zek\u00e2 modellerini e\u011fitmek i\u00e7in asla kullan\u0131lmaz<\/b>.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M17 6.5A7 7 0 1 0 17 17.5M4 10.5h9M4 13.5h9\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Fiyatland\u0131rma<\/p>\n\n\n<p class=\"ind-price\">Ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla<\/p>\n\n\n<p class=\"fx-pain__b\">5 i\u015f merkezi dahildir. Her ek i\u015f merkezi ayda 20 \u20ac&#8217;dur. \u00dccretsiz deneme sunulmaktad\u0131r; makineleri, rotalar\u0131 ve tip de\u011fi\u015fimi matrislerini kurarken yard\u0131m isterseniz rehberli devreye alma paketleri de mevcuttur.<\/p>\n\n\n<div class=\"wp-block-buttons ind-price__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/fiyatlandirma\/\">Fiyatlar\u0131 g\u00f6r\u00fcn<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"company-size\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow fx-eyebrow--center\">Her \u00f6l\u00e7ekteki \u015firket i\u00e7in<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130\u015fletmenizin \u00f6l\u00e7e\u011fine uygun \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131<\/h2>\n\n\n<p class=\"fx-head__lead\">\u0130ster tek bir k\u00fc\u00e7\u00fck tesis ister birden fazla tesis y\u00f6netin, SkyPlanner hepsinin \u00fcretimini \u00e7izelgeler. \u0130\u015fletmenizin \u00f6l\u00e7e\u011fine nas\u0131l uyum sa\u011flad\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcn.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-links\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-pain__card ind-link\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M3 8l9-5 9 5v8l-9 5-9-5z\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><path d=\"M3 8l9 5 9-5M12 13v8\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\"><a href=\"\/tr\/kucuk-ureticiler-icin-uretim-cizelgeleme-yazilimi\/\">K\u00fc\u00e7\u00fck \u00f6l\u00e7ekli \u00fcreticiler<\/a><\/p>\n\n\n<p class=\"fx-pain__b\">Excel yerine ger\u00e7ek makine ve personel kapasitesini dikkate alan \u00fcretim \u00e7izelgelemeye ge\u00e7in. \u00dccretsiz denemeye kendi ba\u015f\u0131n\u0131za ba\u015flay\u0131n, i\u015f merkezi ba\u015f\u0131na \u00f6deme yap\u0131n.<\/p>\n\n\n<span class=\"ind-link__go\" aria-hidden=\"true\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain__card ind-link\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"12\" r=\"3\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M12 2v3M12 19v3M2 12h3M19 12h3M4.9 4.9l2.1 2.1M17 17l2.1 2.1M4.9 19.1L7 17M17 7l2.1-2.1\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\"><a href=\"\/tr\/orta-olcekli-ureticiler-icin-uretim-cizelgeleme-yazilimi\/\">Orta \u00f6l\u00e7ekli \u00fcreticiler<\/a><\/p>\n\n\n<p class=\"fx-pain__b\">Mevcut ERP sisteminizle birlikte, ger\u00e7ek makine ve personel kapasitesini dikkate alan \u00fcretim \u00e7izelgelemeyi kullan\u0131n. Her planlamac\u0131 i\u00e7in roller sunulur; kullan\u0131ma ge\u00e7i\u015f s\u00fcrecine ERP entegrasyonunun tasar\u0131m\u0131 da dahildir.<\/p>\n\n\n<span class=\"ind-link__go\" aria-hidden=\"true\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain__card ind-link\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 20V10m5 10V4m5 16v-7m5 7V8\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\"><a href=\"\/tr\/buyuk-isletmeler-icin-uretim-cizelgeleme-yazilimi\/\">B\u00fcy\u00fck \u00f6l\u00e7ekli \u00fcreticiler<\/a><\/p>\n\n\n<p class=\"fx-pain__b\">ERP sisteminizin ve S&amp;OP ara\u00e7lar\u0131n\u0131z\u0131n yan\u0131nda, REST API entegrasyonu ve rol tabanl\u0131 eri\u015fimle ileri planlama ve \u00e7izelgeleme yap\u0131n.<\/p>\n\n\n<span class=\"ind-link__go\" aria-hidden=\"true\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain__card ind-link\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico\"><svg viewBox=\"0 0 24 24\" fill=\"none\" aria-hidden=\"true\"><circle cx=\"5\" cy=\"6\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><circle cx=\"19\" cy=\"18\" r=\"2.5\" stroke=\"currentColor\" stroke-width=\"2\"><\/circle><path d=\"M7.5 6H14a3 3 0 013 3v6.5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\"><\/path><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\"><a href=\"\/tr\/cok-fabrikali-uretim-cizelgeleme-yazilimi\/\">Birden fazla tesisi olan \u00fcreticiler<\/a><\/p>\n\n\n<p class=\"fx-pain__b\">Her tesiste ayn\u0131 \u00e7izelgeleme arac\u0131n\u0131 kullan\u0131n. Her tesis kendi planlamac\u0131lar\u0131 ve kendi ERP sistemiyle \u00e7al\u0131\u015f\u0131rken t\u00fcm tesisleri tek bir g\u00f6r\u00fcn\u00fcmde izleyin.<\/p>\n\n\n<span class=\"ind-link__go\" aria-hidden=\"true\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons ind-cta-center is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--blue\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/her-olcekteki-isletme-icin-uretim-cizelgeleme-yazilimi\/\">Her \u00f6l\u00e7ekteki i\u015fletme i\u00e7in<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow fx-eyebrow--center\">Metal imalat\u00e7\u0131lar\u0131n\u0131n s\u0131k sordu\u011fu sorular<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Metal imalat\u0131 i\u00e7in en iyi \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131 hangisidir?<\/summary>\n<p class=\"sp-faq__a\">Metal imalat\u0131nda her sipari\u015f i\u00e7in farkl\u0131 bir rotay\u0131 izleyen, kaynak ba\u015flamadan \u00f6nce kesilmi\u015f ve b\u00fck\u00fclm\u00fc\u015f t\u00fcm par\u00e7alar\u0131n haz\u0131r olmas\u0131n\u0131 sa\u011flayan ve acil bir i\u015f geldi\u011finde plan\u0131 hemen yeniden kuran bir \u00e7izelgeleme gerekir. SkyPlanner APS bu \u00fc\u00e7\u00fcn\u00fc de yapar: lazer, b\u00fckme, kaynak ve boya operasyonlar\u0131n\u0131 sonlu kapasiteye g\u00f6re \u00e7izelgeler, kaynakl\u0131 yap\u0131lar\u0131 \u00e7ok seviyeli \u00fcr\u00fcn a\u011fa\u00e7lar\u0131 olarak modeller ve plan\u0131 saniyeler i\u00e7inde yeniden kurar. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayarak yay\u0131mlanm\u0131\u015ft\u0131r, 30 g\u00fcnl\u00fck \u00fccretsiz deneme vard\u0131r ve a\u00e7\u0131k REST API \u00fczerinden herhangi bir ERP veya MES ile entegre olur.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, sac metal ve \u00e7elik imalat at\u00f6lyeleri i\u00e7in sonlu kapasite \u00e7izelgeleme yapan bir \u00e7\u00f6z\u00fcm m\u00fc?<\/summary>\n<p class=\"sp-faq__a\">Evet. SkyPlanner APS bir \u0130leri Planlama ve \u00c7izelgeleme sistemidir. Her lazeri, punch presi, abkant presi, kaynak h\u00fccresini ve boya hatt\u0131n\u0131, ERP&#8217;nin \u00fcretti\u011fi sonsuz kapasiteli y\u00fcklemeler yerine yaln\u0131zca kendi vardiya takviminin izin verdi\u011fi saatler kadar y\u00fckler. Arcturus AI motoru her rota ad\u0131m\u0131n\u0131 do\u011fru i\u015f merkezine yerle\u015ftirir ve i\u015fleri, termin tarihleri tutarken kaynak ve boya kuyruklar\u0131 kontrol alt\u0131nda kalacak \u015fekilde s\u0131ralar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00e7ok say\u0131da par\u00e7adan olu\u015fan kaynakl\u0131 montajlar\u0131 \u00e7izelgeleyebilir mi?<\/summary>\n<p class=\"sp-faq__a\">Evet. \u00c7ok seviyeli \u00fcr\u00fcn a\u011fa\u00e7lar\u0131 ve alt \u00fcr\u00fcnlerle kesilmi\u015f ve b\u00fck\u00fclm\u00fc\u015f par\u00e7alar\u0131, alt montajlar\u0131 ve nihai kaynakl\u0131 yap\u0131y\u0131 modelleyebilirsiniz. SkyPlanner her rota ad\u0131m\u0131n\u0131 sonlu kapasiteye g\u00f6re \u00e7izelgeler; malzemeye dayal\u0131 \u00e7izelgeleme a\u00e7\u0131kken de bir i\u015fi ancak par\u00e7alar\u0131 ve malzemeleri haz\u0131r olaca\u011f\u0131 zaman ba\u015flat\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, SAP veya Epicor ile imalat sipari\u015flerini, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131n\u0131 ve rotalar\u0131 nas\u0131l al\u0131p verir?<\/summary>\n<p class=\"sp-faq__a\">Sat\u0131\u015f sipari\u015fleri, \u00fcr\u00fcnler, \u00e7ok seviyeli \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, rotalar, sac ve profil stoklar\u0131 ile m\u00fc\u015fteri termin tarihleri; SAP, Epicor ya da ba\u015fka herhangi bir ERP veya MES&#8217;ten, \u015firket i\u00e7i sistemler dahil, <a href=\"\/tr\/entegrasyonlar\/\">a\u00e7\u0131k REST API<\/a> \u00fczerinden i\u00e7eri akar. Planlanan ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131, malzeme ihtiya\u00e7 tarihleri, raporlanan ilerleme ve miktarlar ile teslimat tarihleri de geri akar; b\u00f6ylece sat\u0131n alma, lazerde \u00e7eli\u011fe tam olarak ne zaman ihtiya\u00e7 duyuldu\u011funu g\u00f6r\u00fcr. Entegrasyonu sizin i\u00e7in Skycode kurar ya da kendi geli\u015ftiricileriniz herkese a\u00e7\u0131k API dok\u00fcmantasyonunu kullan\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bir imalat at\u00f6lyesi SkyPlanner ile \u00e7izelgeleme yapt\u0131\u011f\u0131nda ERP&#8217;de ne kal\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Sipari\u015fler, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, stok, sat\u0131n alma ve maliyetlendirme ERP&#8217;nizde kal\u0131r; ERP i\u015fletmenin kay\u0131t sistemi olmaya devam eder. SkyPlanner her kesme, b\u00fckme, kaynak ve boya i\u015fleminin ayr\u0131nt\u0131l\u0131 s\u0131ralamas\u0131n\u0131 \u00fcstlenir. Operat\u00f6rler miktarlar\u0131 ve fireyi \u00e7al\u0131\u015fan g\u00f6r\u00fcn\u00fcm\u00fcnden veya shop floor uygulamas\u0131ndan bildirir; b\u00f6ylece ERP, tahminler yerine her makineden gelen ger\u00e7ek ilerlemeyi al\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bir imalat at\u00f6lyesi ilk \u00e7izelgesini ne kadar h\u0131zl\u0131 \u00e7al\u0131\u015ft\u0131rabilir?<\/summary>\n<p class=\"sp-faq__a\">Bug\u00fcn. 20 i\u015f merkezine kadar ve kredi kart\u0131 gerektirmeden 30 g\u00fcnl\u00fck \u00fccretsiz denemeyi ba\u015flat\u0131n, lazerlerinizi, abkant preslerinizi, kaynak h\u00fccrelerinizi ve boya hatt\u0131n\u0131z\u0131 vardiyalar\u0131yla birlikte girin, bir haftal\u0131k sipari\u015f ve rotay\u0131 CSV ile ya da elle aktar\u0131n; isterseniz \u00f6nce demo verilerini inceleyin. \u0130lk sonlu kapasite \u00e7izelgeniz herhangi bir entegrasyon olmadan tek ba\u015f\u0131na \u00e7al\u0131\u015f\u0131r. Ard\u0131ndan devreye alma \u00e7al\u0131\u015ftaylar\u0131 tip de\u011fi\u015fimi matrislerini ve alt montajlar\u0131 at\u00f6lyenize g\u00f6re ayarlar; ERP ba\u011flant\u0131s\u0131n\u0131 ise Skycode veya kendi geli\u015ftiricileriniz kurar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner tek lazerli bir at\u00f6lyeye de, \u00e7ok tesisli bir imalat grubuna da uygun mu?<\/summary>\n<p class=\"sp-faq__a\">Evet, her \u00f6l\u00e7ekten metal imalat\u00e7\u0131s\u0131 kullan\u0131yor. Bir lazeri, birka\u00e7 abkant presi ve bir kaynak b\u00f6lmesi olan bir at\u00f6lye ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar, 5 i\u015f merkezi dahildir ve ek i\u015f merkezlerini tanesi ayda 20 \u20ac ile ekler. \u0130malat gruplar\u0131 birden fazla tesisi, tesisler aras\u0131 transfer s\u00fcreleriyle birlikte \u00e7izelgeler ve her tesis, aray\u00fcz\u00fcn sundu\u011fu 29 dilden kendi dilinde \u00e7al\u0131\u015f\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner lazerlerde, abkant preslerde ve boya hatt\u0131nda haz\u0131rl\u0131klar\u0131 nas\u0131l azalt\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Her \u00fcr\u00fcne malzeme kalitesi, sac kal\u0131nl\u0131\u011f\u0131, abkant kal\u0131b\u0131 veya boya rengi gibi \u00f6zellikler verin ve her i\u015f merkezi i\u00e7in iki y\u00f6ndeki s\u00fcreleriyle bir tip de\u011fi\u015fimi matrisi tan\u0131mlay\u0131n. SkyPlanner da lazerde ayn\u0131 sac kalitesi ve kal\u0131nl\u0131\u011f\u0131ndaki i\u015fleri arka arkaya \u00e7al\u0131\u015ft\u0131r\u0131r, ayn\u0131 tak\u0131m\u0131 payla\u015fan b\u00fck\u00fcmleri gruplar ve boya hatt\u0131nda renk de\u011fi\u015fimlerini azalt\u0131r. Tek tek proses ad\u0131mlar\u0131n\u0131n termin tarihleri de par\u00e7alar\u0131n kayna\u011fa tam ihtiya\u00e7 duyuldu\u011fu anda ula\u015fmas\u0131n\u0131 sa\u011flar.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"related-industries\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow fx-eyebrow--center\">Di\u011fer sekt\u00f6rler<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130lgili sekt\u00f6rlerde \u00fcretim \u00e7izelgeleme<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-links\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-pain__card ind-link\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico ind-ico\"><img decoding=\"async\" loading=\"lazy\" width=\"48\" height=\"48\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/industry\/icons\/machine-shop.webp\" alt=\"\"><\/span>\n\n\n<p class=\"fx-pain__t\"><a href=\"\/tr\/talasli-imalat-uretim-cizelgeleme\/\">Tala\u015fl\u0131 imalat at\u00f6lyeleri<\/a><\/p>\n\n\n<p class=\"fx-pain__b\">CNC rotalar\u0131n\u0131 ger\u00e7ek kapasiteye g\u00f6re planlay\u0131n, haz\u0131rl\u0131k s\u00fcrelerini azalt\u0131n ve g\u00fcvenilir teslim tarihleri verin.<\/p>\n\n\n<span class=\"ind-link__go\" aria-hidden=\"true\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain__card ind-link\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico ind-ico\"><img decoding=\"async\" loading=\"lazy\" width=\"48\" height=\"48\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/industry\/icons\/surface-treatment.webp\" alt=\"\"><\/span>\n\n\n<p class=\"fx-pain__t\"><a href=\"\/tr\/yuzey-islem-icin-uretim-cizelgeleme-yazilimi\/\">Y\u00fczey i\u015flem<\/a><\/p>\n\n\n<p class=\"fx-pain__b\">Renkleri, f\u0131r\u0131n ve banyo partilerini, ask\u0131lar\u0131 ve d\u00f6n\u00fc\u015f tarihlerini planlay\u0131n.<\/p>\n\n\n<span class=\"ind-link__go\" aria-hidden=\"true\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain__card ind-link\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico ind-ico\"><img decoding=\"async\" loading=\"lazy\" width=\"48\" height=\"48\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/industry\/icons\/machinery-manufacturing.webp\" alt=\"\"><\/span>\n\n\n<p class=\"fx-pain__t\"><a href=\"\/tr\/makine-imalati-uretim-cizelgeleme-yazilimi\/\">Makine imalat\u0131<\/a><\/p>\n\n\n<p class=\"fx-pain__b\">M\u00fchendis sipari\u015fine g\u00f6re \u00fcretim projelerini, alt montajlar\u0131 ve sat\u0131n al\u0131nan par\u00e7alar\u0131 planlay\u0131n.<\/p>\n\n\n<span class=\"ind-link__go\" aria-hidden=\"true\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain__card ind-link\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"fx-pain__ico ind-ico\"><img decoding=\"async\" loading=\"lazy\" width=\"48\" height=\"48\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/industry\/icons\/foundry-metal-forming.webp\" alt=\"\"><\/span>\n\n\n<p class=\"fx-pain__t\"><a href=\"\/tr\/dokum-metal-sekillendirme-cizelgeleme\/\">D\u00f6k\u00fcm ve metal \u015fekillendirme<\/a><\/p>\n\n\n<p class=\"fx-pain__b\">D\u00f6k\u00fcmhaneler, d\u00f6vme at\u00f6lyeleri ve pres tesisleri i\u00e7in f\u0131r\u0131nlar\u0131, kal\u0131plar\u0131 ve ala\u015f\u0131mlar\u0131 planlay\u0131n.<\/p>\n\n\n<span class=\"ind-link__go\" aria-hidden=\"true\"><svg viewBox=\"0 0 20 20\" fill=\"none\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons ind-cta-center is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--blue\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/her-uretim-sektoru-icin-skyplanner-aps\/\">T\u00fcm sekt\u00f6rleri g\u00f6r\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--final\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-final\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-final__body\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gelecek haftan\u0131n kaynakl\u0131 yap\u0131lar\u0131n\u0131 ger\u00e7ek bir \u00e7izelgeye oturtun<\/h2>\n\n\n<p>Bir haftal\u0131k sipari\u015finizi ve rotalar\u0131n\u0131z\u0131 getirin. Bunlar\u0131 lazerleriniz, abkant presleriniz, kaynak h\u00fccreleriniz ve boya hatt\u0131n\u0131z aras\u0131nda \u00e7izelgeleyelim ve hangi sevkiyat tarihlerinin tutaca\u011f\u0131n\u0131 g\u00f6sterelim.<\/p>\n\n\n<div class=\"wp-block-buttons fx-final__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--white sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-final__media\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/34-5e9142a1-876e-46ad-a3e8-eb31a25e2093.png\" alt=\"Sipari\u015f listesiyle birlikte SkyPlanner \u00fcretim \u00e7izelgeleme zaman \u00e7izelgesi.\">\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Sac metal ve \u00e7elik imalat\u0131nda \u00fcretim \u00e7izelgeleme Metal imalat \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131 SkyPlanner APS; sipari\u015flerinizi, rotalar\u0131n\u0131z\u0131, makinelerinizi, malzemelerinizi ve vardiyalar\u0131n\u0131z\u0131 tek bir sonlu kapasite \u00e7izelgesine d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. Lazer kesim ve b\u00fck\u00fcmden kaynak, boya ve montaja kadar her i\u015fi planlar, bir kaynakl\u0131 yap\u0131ya ba\u015flanmadan \u00f6nce t\u00fcm par\u00e7alar\u0131n haz\u0131r olmas\u0131n\u0131 sa\u011flar; acil bir sipari\u015f geldi\u011finde ya da bir &#8230; <a title=\"Metal imalat \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/metal-imalat-uretim-cizelgeleme-yazilimi\/\" aria-label=\"Read more about Metal imalat \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-98834","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Metal \u0130malat \u00dcretim \u00c7izelgeleme Yaz\u0131l\u0131m\u0131 | SkyPlanner APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS, metal imalat i\u00e7in \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131d\u0131r. Lazer, b\u00fck\u00fcm, kaynak ve boya i\u015flerini ger\u00e7ek kapasiteye g\u00f6re planlay\u0131n. Ayl\u0131k 199 \u20ac\u2019dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/metal-imalat-uretim-cizelgeleme-yazilimi\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Metal imalat \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS, metal imalat i\u00e7in \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131d\u0131r. Lazer, b\u00fck\u00fcm, kaynak ve boya i\u015flerini ger\u00e7ek kapasiteye g\u00f6re planlay\u0131n. Ayl\u0131k 199 \u20ac\u2019dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/metal-imalat-uretim-cizelgeleme-yazilimi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T14:18:40+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/metal-imalat-uretim-cizelgeleme-yazilimi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/metal-imalat-uretim-cizelgeleme-yazilimi\\\/\",\"name\":\"Metal \u0130malat \u00dcretim \u00c7izelgeleme Yaz\u0131l\u0131m\u0131 | SkyPlanner APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-15T09:08:34+00:00\",\"dateModified\":\"2026-10-21T14:18:40+00:00\",\"description\":\"SkyPlanner APS, metal imalat i\u00e7in \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131d\u0131r. Lazer, b\u00fck\u00fcm, kaynak ve boya i\u015flerini ger\u00e7ek kapasiteye g\u00f6re planlay\u0131n. Ayl\u0131k 199 \u20ac\u2019dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/metal-imalat-uretim-cizelgeleme-yazilimi\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/metal-imalat-uretim-cizelgeleme-yazilimi\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/metal-imalat-uretim-cizelgeleme-yazilimi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Metal imalat \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Metal \u0130malat \u00dcretim \u00c7izelgeleme Yaz\u0131l\u0131m\u0131 | SkyPlanner APS","description":"SkyPlanner APS, metal imalat i\u00e7in \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131d\u0131r. Lazer, b\u00fck\u00fcm, kaynak ve boya i\u015flerini ger\u00e7ek kapasiteye g\u00f6re planlay\u0131n. Ayl\u0131k 199 \u20ac\u2019dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/metal-imalat-uretim-cizelgeleme-yazilimi\/","og_locale":"tr_TR","og_type":"article","og_title":"Metal imalat \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131","og_description":"SkyPlanner APS, metal imalat i\u00e7in \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131d\u0131r. Lazer, b\u00fck\u00fcm, kaynak ve boya i\u015flerini ger\u00e7ek kapasiteye g\u00f6re planlay\u0131n. Ayl\u0131k 199 \u20ac\u2019dan.","og_url":"https:\/\/skyplanner.ai\/tr\/metal-imalat-uretim-cizelgeleme-yazilimi\/","og_site_name":"SkyPlanner","article_modified_time":"2026-10-21T14:18:40+00:00","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"15 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/metal-imalat-uretim-cizelgeleme-yazilimi\/","url":"https:\/\/skyplanner.ai\/tr\/metal-imalat-uretim-cizelgeleme-yazilimi\/","name":"Metal \u0130malat \u00dcretim \u00c7izelgeleme Yaz\u0131l\u0131m\u0131 | SkyPlanner APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-15T09:08:34+00:00","dateModified":"2026-10-21T14:18:40+00:00","description":"SkyPlanner APS, metal imalat i\u00e7in \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131d\u0131r. Lazer, b\u00fck\u00fcm, kaynak ve boya i\u015flerini ger\u00e7ek kapasiteye g\u00f6re planlay\u0131n. Ayl\u0131k 199 \u20ac\u2019dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/metal-imalat-uretim-cizelgeleme-yazilimi\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/metal-imalat-uretim-cizelgeleme-yazilimi\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/metal-imalat-uretim-cizelgeleme-yazilimi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Metal imalat \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Sac metal ve \u00e7elik imalat\u0131nda \u00fcretim \u00e7izelgeleme Metal imalat \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131 SkyPlanner APS; sipari\u015flerinizi, rotalar\u0131n\u0131z\u0131, makinelerinizi, malzemelerinizi ve vardiyalar\u0131n\u0131z\u0131 tek bir sonlu kapasite \u00e7izelgesine d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. Lazer kesim ve b\u00fck\u00fcmden kaynak, boya ve montaja kadar her i\u015fi planlar, bir kaynakl\u0131 yap\u0131ya ba\u015flanmadan \u00f6nce t\u00fcm par\u00e7alar\u0131n haz\u0131r olmas\u0131n\u0131 sa\u011flar; acil bir sipari\u015f geldi\u011finde ya da bir&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/98834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=98834"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/98834\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=98834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}