{"id":107729,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"uretim-cizelgeleme","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/","title":{"rendered":"SAP ByDesign Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Load Leveling ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ SAP Business ByDesign<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SAP ByDesign Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? <span class=\"hl\">Load Leveling ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Makine d\u00fczeyinde yapmaz. SAP Business ByDesign s\u0131n\u0131rs\u0131z kapasite varsay\u0131m\u0131yla planlama yapar, kapasiteyi zaman dilimleri baz\u0131nda kabaca kontrol eder ve Load Leveling&#8217;i etkile\u015fimli bir ad\u0131m olarak sunar. SAP&#8217;nin kendi yard\u0131m belgeleri de operasyonlar\u0131n kaynaklara da\u011f\u0131t\u0131m\u0131n\u0131 shop floor&#8217;a b\u0131rak\u0131r. Her makine, operat\u00f6r, tak\u0131m ve malzemenin <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">ger\u00e7ek kapasite k\u0131s\u0131tlar\u0131 g\u00f6zetilerek \u00e7izelgelenmesine<\/a> ihtiya\u00e7 duyan \u015firketler, ByDesign&#8217;\u0131n yan\u0131nda SkyPlanner APS kullan\u0131r.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Bu makale, 2608 (A\u011fustos 2026) yard\u0131m s\u00fcr\u00fcm\u00fcn\u00fc esas alarak SAP Business ByDesign&#8217;\u0131 ele al\u0131r. ByDesign \u00fc\u00e7 ayda bir yeni s\u00fcr\u00fcm yay\u0131mlar. Bu nedenle bir ekran\u0131 referans almadan \u00f6nce s\u00fcr\u00fcm numaras\u0131n\u0131 kontrol edin.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-sap-bydesign-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP ByDesign&#8217;da ad\u0131m ad\u0131m kapasite planlama<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Kaynaklar ve \u00e7al\u0131\u015fma s\u00fcreleri<\/h3>\n\n\n<p>Kaynaklar; &#8220;a machine or tool&#8221; (bir makine veya tak\u0131m) gibi ekipman kaynaklar\u0131ndan, i\u015f g\u00fcc\u00fc kaynaklar\u0131ndan ve kaynak gruplar\u0131ndan olu\u015fur. \u00c7al\u0131\u015fma s\u00fcreleri vardiya program\u0131ndan al\u0131n\u0131r ve bir kaynak planlamayla ilgili olarak i\u015faretlenebilir. SAP, planlamayla ilgili olmayan bir kaynak i\u00e7in &#8220;will most likely never become a constraint from a capacity perspective&#8221; (b\u00fcy\u00fck olas\u0131l\u0131kla kapasite a\u00e7\u0131s\u0131ndan hi\u00e7bir zaman k\u0131s\u0131t olu\u015fturmaz) a\u00e7\u0131klamas\u0131n\u0131 yapar (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2ccade5f722d101481c3ac147d2afd79.html\">SAP yard\u0131m\u0131, Kaynaklar<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Bills of Operations ve Production Models<\/h3>\n\n\n<p>Production Bill of Operations, Setup, Produce, Move, Check ve Tear down aktivitelerini i\u00e7eren operasyonlar\u0131 bar\u0131nd\u0131r\u0131r. Her \u00fcretim veya kontrol operasyonunun bir ana kayna\u011f\u0131 vard\u0131r; aktivitelere ekipman, ara\u00e7 ve i\u015f g\u00fcc\u00fc kaynaklar\u0131 da eklenebilir. Production Model, Bill of Material ile Bill of Operations&#8217;\u0131 bir araya getirir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Planlama s\u00fcreci: tasar\u0131m gere\u011fi s\u0131n\u0131rs\u0131z kapasite<\/h3>\n\n\n<p>Malzeme planlama s\u00fcreci \u00fcretim \u00f6nerileri olu\u015fturur. &#8220;The system creates production proposals based on infinite capacities, but taking the requirement date of the demand into account. This can, of course, result in resource overload situations&#8221; (Sistem, talebin ihtiya\u00e7 tarihini dikkate alarak s\u0131n\u0131rs\u0131z kapasite varsay\u0131m\u0131yla \u00fcretim \u00f6nerileri olu\u015fturur. Bu da elbette kaynaklarda a\u015f\u0131r\u0131 y\u00fcklenmeye yol a\u00e7abilir) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2ced3f24722d1014a2bfd9f5624be9f5.html\">SAP yard\u0131m\u0131, Material Planning Run<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Capacity Planning: zaman dilimleri baz\u0131nda kaba planlama<\/h3>\n\n\n<p>\u00d6neriler, planlama operasyonlar\u0131n\u0131 i\u00e7erir. SAP bu yakla\u015f\u0131m\u0131 &#8220;rough-cut scheduling&#8221; (kaba \u00e7izelgeleme) olarak adland\u0131r\u0131r ve &#8220;capacity is typically checked in buckets, such as days, weeks, or months.&#8221; (kapasite genellikle g\u00fcn, hafta veya ay gibi zaman dilimlerinde kontrol edilir) der. Bir planlama operasyonunun s\u00fcresine yaln\u0131zca ilk haz\u0131rl\u0131k ve son s\u00f6k\u00fcm dahil edilir. Kapasite ihtiyac\u0131 da ba\u015flang\u0131\u00e7tan biti\u015fe e\u015fit olarak da\u011f\u0131t\u0131l\u0131r (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2cb65fd0722d1014b0658b613e1bd8b3.html\">SAP yard\u0131m\u0131, Kapasite Planlama<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Load Leveling: planlamac\u0131n\u0131n arac\u0131<\/h3>\n\n\n<p>Planlamac\u0131, Load Leveling&#8217;i \u015fu konumdan \u00e7al\u0131\u015ft\u0131r\u0131r: &#8220;from the Resource Planning Details screen within the Resource Load view of the Supply Planning work center.&#8221; (Supply Planning i\u015f merkezindeki Resource Load g\u00f6r\u00fcn\u00fcm\u00fcn\u00fcn Resource Planning Details ekran\u0131ndan). Sabitlenmi\u015f \u00f6neriler yerinde kal\u0131r. &#8220;If the available capacity is not sufficient, the planning operation is infinitely scheduled in the first bucket after the load leveling horizon&#8221; (Kullan\u0131labilir kapasite yetersizse planlama operasyonu, y\u00fck dengeleme ufkundan sonraki ilk zaman dilimine s\u0131n\u0131rs\u0131z kapasite varsay\u0131m\u0131yla \u00e7izelgelenir) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2ceab4f1722d10149ffdbd617d89688f.html\">SAP yard\u0131m\u0131, Y\u00fck Dengeleme<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. \u00dcretim emirleri: yaln\u0131zca ana kaynaklar<\/h3>\n\n\n<p>\u00dcretim talebi, en erken ve en ge\u00e7 tarihlerle \u00e7izelgelenen bir \u00fcretim emrine d\u00f6n\u00fc\u015f\u00fcr. &#8220;The availability of main resources is considered for scheduling&#8221; (\u00c7izelgelemede ana kaynaklar\u0131n kullan\u0131labilirli\u011fi dikkate al\u0131n\u0131r) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2cc8cd4c722d101484e1917e19a9e2cd.html\">SAP yard\u0131m\u0131, \u00dcretim Emirleri<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. Serbest b\u0131rakma ve shop floor&#8217;da i\u015f da\u011f\u0131t\u0131m\u0131<\/h3>\n\n\n<p>Serbest b\u0131rak\u0131lan bir emir, \u00fcretim partisi ve \u00fcretim g\u00f6revleri olu\u015fturur. Task Control g\u00f6r\u00fcn\u00fcm\u00fcnde \u015fu olanak sunulur: &#8220;You can define rules for automatic dispatch of tasks to specific workers or resources. Alternatively, you can dispatch tasks manually&#8221; (G\u00f6revlerin belirli \u00e7al\u0131\u015fanlara veya kaynaklara otomatik da\u011f\u0131t\u0131m\u0131 i\u00e7in kurallar tan\u0131mlayabilirsiniz. Alternatif olarak g\u00f6revleri elle da\u011f\u0131tabilirsiniz) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2ced5aba722d1014bb07e3be53a8d13b.html\">SAP yard\u0131m\u0131, \u00dcretim Emri Y\u00fcr\u00fctme<\/a>). SAP bunu \u015f\u00f6yle \u00f6zetler: &#8220;The dispatching of operations on resources to fulfill several production orders is normally determined on the shop floor.&#8221; (Birden fazla \u00fcretim emrini kar\u015f\u0131lamak i\u00e7in operasyonlar\u0131n kaynaklara da\u011f\u0131t\u0131m\u0131 normalde shop floor&#8217;da belirlenir).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hangi kararlar planlamac\u0131ya kal\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ByDesign, planlamac\u0131ya malzeme \u00f6nerileri ve zaman dilimlerine g\u00f6re y\u00fck g\u00f6r\u00fcn\u00fcm\u00fc sunar. \u015eu kararlar h\u00e2l\u00e2 insanlara kal\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Her makinedeki i\u015f s\u0131ras\u0131.<\/strong> \u0130\u015f da\u011f\u0131t\u0131m\u0131 shop floor&#8217;da, kurallarla veya elle belirlenir.<\/li>\n\n\n<li><strong>Planlama ufkunun \u00f6tesindeki a\u015f\u0131r\u0131 y\u00fckler.<\/strong> Load Leveling, kapasiteye s\u0131\u011fmayan i\u015fleri bir sonraki zaman dilimine aktar\u0131r ve s\u0131n\u0131rs\u0131z kapasite varsay\u0131m\u0131yla \u00e7izelgeler.<\/li>\n\n\n<li><strong>Operat\u00f6rler ve tak\u0131mlar.<\/strong> \u00dcretim emri \u00e7izelgelemesinde ana kaynaklar\u0131n takvimdeki kullan\u0131labilirli\u011fi ve planlanan s\u00fcre dikkate al\u0131n\u0131r.<\/li>\n\n\n<li><strong>Tip de\u011fi\u015fimleri.<\/strong> Haz\u0131rl\u0131k, her operasyonda planlanan bir aktivitedir. Haz\u0131rl\u0131k s\u00fcrelerini k\u0131sa tutacak s\u0131ralama ise shop floor&#8217;daki i\u015f da\u011f\u0131t\u0131m\u0131na b\u0131rak\u0131l\u0131r.<\/li>\n\n\n<li><strong>Malzemenin makinede haz\u0131r olaca\u011f\u0131 zaman.<\/strong> Planlama s\u00fcreci \u00f6nerileri talebe g\u00f6re zamanlar; makinedeki i\u015f s\u0131ras\u0131 ise daha sonra shop floor&#8217;da belirlenir.<\/li>\n\n\n<li><strong>Yeniden planlama.<\/strong> Bir ar\u0131za veya acil sipari\u015f sonras\u0131nda birinin planlamay\u0131 yeniden \u00e7al\u0131\u015ft\u0131rmas\u0131, y\u00fck\u00fc tekrar dengelemesi ve g\u00f6revleri yeniden da\u011f\u0131tmas\u0131 gerekir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-sap-bydesign-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP ByDesign&#8217;\u0131n kendi planlamas\u0131 ne zaman yeterli?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Yerle\u015fik ara\u00e7lar \u015fu ko\u015fullarda iyi \u00e7al\u0131\u015f\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Her \u00fcr\u00fcn, istikrarl\u0131 \u00e7evrim s\u00fcreleriyle tek bir ana kaynakta \u00fcretilir.<\/li>\n\n\n<li>Teslim tarihi taahh\u00fct etmek i\u00e7in haftal\u0131k zaman dilimleriyle g\u00f6sterilen y\u00fck g\u00f6r\u00fcn\u00fcm\u00fc yeterlidir.<\/li>\n\n\n<li>Tip de\u011fi\u015fimleri k\u0131sad\u0131r ve i\u015f s\u0131ras\u0131na ba\u011fl\u0131 de\u011fildir.<\/li>\n\n\n<li>Her makinenin ekibi sabittir ve ekipler \u00fcretim miktar\u0131n\u0131 nadiren s\u0131n\u0131rlar.<\/li>\n\n\n<li>Plan g\u00fcnde birka\u00e7 kez de\u011fil, haftada bir kez de\u011fi\u015fir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kapasite k\u0131s\u0131tlar\u0131n\u0131 g\u00f6zeten bir \u00fcretim \u00e7izelgeleme arac\u0131 ne zaman gerekir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A\u015fa\u011f\u0131dakilerden birka\u00e7\u0131 sizin i\u00e7in ge\u00e7erliyse yerle\u015fik ara\u00e7lar art\u0131k ihtiya\u00e7lar\u0131n\u0131z\u0131 kar\u015f\u0131lam\u0131yor demektir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Resource Load g\u00f6r\u00fcn\u00fcm\u00fcnde haftal\u0131k kapasite yeterli g\u00f6r\u00fcnmesine ra\u011fmen teslimatlar gecikir.<\/li>\n\n\n<li>\u00dcretim sorumlular\u0131 g\u00fcnl\u00fck i\u015f s\u0131ras\u0131n\u0131 elektronik tablolarda olu\u015fturur.<\/li>\n\n\n<li>Tip de\u011fi\u015fimi s\u00fcresi, \u00f6ncesinde hangi \u00fcr\u00fcn\u00fcn \u00fcretildi\u011fine ba\u011fl\u0131d\u0131r.<\/li>\n\n\n<li>Operat\u00f6rler, vardiyalar ve devams\u0131zl\u0131klar \u00fcretim miktar\u0131n\u0131 makineler kadar s\u0131n\u0131rlar.<\/li>\n\n\n<li>Fikst\u00fcrler, kal\u0131plar veya tak\u0131mlar makineler aras\u0131nda ta\u015f\u0131n\u0131r.<\/li>\n\n\n<li>Geciken malzemeler, hangi emrin ba\u015flayabilece\u011fini belirler.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Hangi \u00f6zellikleri aramal\u0131s\u0131n\u0131z?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>T\u00fcm kaynak k\u0131s\u0131tlar\u0131n\u0131n ayn\u0131 anda dikkate al\u0131nmas\u0131:<\/strong> makineler, insanlar, tak\u0131mlar ve malzemeler i\u00e7in ger\u00e7ek saatlere g\u00f6re \u00e7izelgeleme.<\/li>\n\n\n<li>Zaman dilimleri yerine \u00f6nceliklere ve teslim tarihlerine g\u00f6re <strong>operasyon d\u00fczeyinde s\u0131ralama<\/strong>.<\/li>\n\n\n<li>S\u0131raya ve ge\u00e7i\u015f y\u00f6n\u00fcne ba\u011fl\u0131 tip de\u011fi\u015fimi s\u00fcrelerini i\u00e7eren <strong>haz\u0131rl\u0131k s\u00fcresi matrisi<\/strong>.<\/li>\n\n\n<li><strong>Tak\u0131mlar\u0131n kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklar olarak ele al\u0131nmas\u0131<\/strong> ve <strong>birden fazla operat\u00f6r gerektiren i\u015fler<\/strong>.<\/li>\n\n\n<li>Stoklar\u0131 ve gelecek sat\u0131n alma sipari\u015flerini kontrol eden <strong>malzemeyi dikkate alan \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li>\u00dcretimin ilerleyi\u015fi veya sipari\u015fler de\u011fi\u015fti\u011finde <strong>otomatik yeniden \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li><strong>ByDesign ile sorunsuz veri ak\u0131\u015f\u0131.<\/strong> Query web servisleri veya \u00f6zel OData \u00fczerinden okuma, Manage Production Orders ve Manage Production Lots \u00fczerinden yazma. Her tedarik\u00e7iye tarihlerin \u00fcretim emirlerinize nas\u0131l aktar\u0131laca\u011f\u0131n\u0131 ve canl\u0131ya ge\u00e7i\u015ften sonra deste\u011fi kimin verece\u011fini sorun.<\/li>\n\n<\/ul>\n\n\n<p>Se\u00e7enekler d\u00f6rt gruba ayr\u0131l\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>ByDesign Supply Planning<\/strong>, ByDesign i\u00e7inde \u00f6neriler olu\u015fturur ve zaman dilimlerindeki y\u00fck\u00fc dengeler.<\/li>\n\n\n<li><strong>APS paketleri<\/strong>, bir uygulama projesiyle sisteme ba\u011flan\u0131r ve planlama ekibi taraf\u0131ndan kullan\u0131l\u0131r.<\/li>\n\n\n<li><strong>Talep odakl\u0131 planlama platformlar\u0131<\/strong>, makinedeki i\u015f s\u0131ralar\u0131 yerine tamponlar\u0131 ve kontrol noktalar\u0131n\u0131 y\u00f6netir.<\/li>\n\n\n<li>SkyPlanner&#8217;\u0131n da yer ald\u0131\u011f\u0131 <strong>shop floor&#8217;da \u00fcretimin y\u00fcr\u00fct\u00fclmesini destekleyen bulut APS \u00e7\u00f6z\u00fcmleri<\/strong>, ByDesign&#8217;\u0131n yan\u0131nda t\u00fcm kaynaklar\u0131 otomatik olarak \u00e7izelgeler ve plan\u0131 operat\u00f6rlere ula\u015ft\u0131r\u0131r.<\/li>\n\n<\/ul>\n\n\n<p>Bu yakla\u015f\u0131m\u0131n y\u00f6ntemini \u00f6\u011frenmek i\u00e7in <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">kapasite k\u0131s\u0131tlar\u0131na g\u00f6re \u00fcretim \u00e7izelgeleme rehberini<\/a> ve <a href=\"\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">\u00fcretim \u00e7izelgeleme rehberini<\/a> okuyun.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner nerede devreye girer?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS, yukar\u0131da s\u0131ralanan t\u00fcm kararlar\u0131 devral\u0131r. Her makinenin, ki\u015finin ve tak\u0131m\u0131n kapasitesi s\u0131n\u0131rl\u0131 kabul edilir. Arcturus; sipari\u015f \u00f6nceli\u011fi, tamamlanma tarihi, m\u00fc\u015fteri \u00f6nceli\u011fi, Fast Track ve Dynamic Priorities&#8217;e g\u00f6re i\u015fleri s\u0131ralayarak t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder.<\/p>\n\n\n<p>Haz\u0131rl\u0131k s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcresini her iki y\u00f6n i\u00e7in de tutar. Maviden k\u0131rm\u0131z\u0131ya ge\u00e7i\u015f 30 dakika, k\u0131rm\u0131z\u0131dan maviye ge\u00e7i\u015f 60 dakika s\u00fcrer; motor toplam haz\u0131rl\u0131k s\u00fcresi en k\u0131sa olan s\u0131ray\u0131 se\u00e7er. Tak\u0131mlar, kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklard\u0131r. \u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe, vardiyas\u0131nda uygun zaman\u0131 olan \u00fc\u00e7 ki\u015fi atan\u0131r. \u0130lk tercih me\u015fgulse i\u015f alternatif makinelere veya personele aktar\u0131l\u0131r.<\/p>\n\n\n<p>Malzeme odakl\u0131 \u00e7izelgeleme, mevcut stoklar\u0131 ve gelecek sat\u0131n alma sipari\u015flerini kullanarak gelecekteki stok durumunu sim\u00fcle eder. B\u00f6ylece operasyon, malzemesi haz\u0131r oldu\u011funda yap\u0131lacak \u015fekilde planlan\u0131r. Autopilot, \u00fcretimde de\u011fi\u015fiklik oldu\u011funda \u00e7izelgeyi otomatik olarak yeniler. Running Time Lock ise shop floor&#8217;daki d\u00fczenin bozulmamas\u0131 i\u00e7in \u00f6n\u00fcm\u00fczdeki saatlerde yap\u0131lacak i\u015fleri sabitler. Operat\u00f6rler, Mobile Confirmations, Production Timer ve Quick Log Mode ile telefon veya tabletten i\u015f kayd\u0131 girer. Kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r.<\/p>\n\n\n<p><strong>\u015eu durumlarda ByDesign Load Leveling yerine SkyPlanner&#8217;\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Zaman dilimleri de\u011fil, kesin saatler gerekir.<\/strong> ByDesign kapasiteyi vardiya, g\u00fcn, hafta veya ay baz\u0131nda kontrol eder. Arcturus, her operasyonu belirli bir saatte belirli bir makineye yerle\u015ftirir.<\/li>\n\n\n<li><strong>Plan kendili\u011finden g\u00fcncel kalmal\u0131d\u0131r.<\/strong> Load Leveling, planlamac\u0131 ba\u015flatt\u0131\u011f\u0131nda \u00e7al\u0131\u015f\u0131r. Autopilot ise her \u00f6nemli de\u011fi\u015fiklikte yeniden planlar.<\/li>\n\n\n<li><strong>S\u0131ray\u0131 operat\u00f6rler, tak\u0131mlar ve tip de\u011fi\u015fimleri belirler.<\/strong> T\u00fcm kaynaklar\u0131n kapasite s\u0131n\u0131rlar\u0131 tek bir \u00e7izelgede dikkate al\u0131n\u0131r; haz\u0131rl\u0131klar i\u00e7in haz\u0131rl\u0131k s\u00fcresi matrisi kullan\u0131l\u0131r.<\/li>\n\n\n<li><strong>Her operat\u00f6r plan\u0131 g\u00f6rmelidir.<\/strong> Mobile Confirmations, i\u015f kuyru\u011funu her telefon veya tablete ta\u015f\u0131r; i\u015f bildirimleri de \u00fcretim partilerine geri aktar\u0131l\u0131r.<\/li>\n\n<\/ul>\n\n\n<p>A\u00e7\u0131k ByDesign \u00fcretim emirlerinizi Excel&#8217;e aktararak <a href=\"\/tr\/deneme\/\">30 g\u00fcnl\u00fck \u00fccretsiz denemeye<\/a> ba\u015flay\u0131n (20 i\u015f istasyonuna kadar, t\u00fcm Basic \u00f6zellikleri dahil, kredi kart\u0131 gerekmez). Sonras\u0131nda fiyatlar, 5 i\u015f istasyonu dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. Entegrasyon i\u00e7in s\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan teklif, plan\u0131n\u0131zla birlikte ba\u015ftan sunulur.<\/p>\n\n\n<p>SkyPlanner, SAP&#8217;nin yay\u0131mlad\u0131\u011f\u0131 web servisleri \u00fczerinden SAP Business ByDesign ile \u00e7ift y\u00f6nl\u00fc entegre olur. SkyPlanner ekibi entegrasyonu devreye alma s\u0131ras\u0131nda yap\u0131land\u0131r\u0131r. \u0130\u015f orta\u011f\u0131n\u0131z veya geli\u015ftiricileriniz de belgelenmi\u015f <a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">REST API<\/a> ile \u00e7al\u0131\u015fabilir. <a href=\"\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/\">SAP Business ByDesign i\u00e7in SkyPlanner<\/a> sayfas\u0131n\u0131, <a href=\"\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/entegrasyon-kilavuzu\/\">ByDesign entegrasyon rehberini<\/a> veya t\u00fcm <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131n\u0131<\/a> inceleyin. Ba\u015fka bir SAP ERP mi kullan\u0131yorsunuz? <a href=\"\/tr\/entegrasyonlar\/erp\/sap-business-one\/\">SAP Business One<\/a> veya <a href=\"\/tr\/entegrasyonlar\/erp\/sap-s4hana\/\">SAP S\/4HANA<\/a> sayfalar\u0131na bak\u0131n.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo i\u00e7in randevu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretiminin yap\u0131ld\u0131\u011f\u0131 shop floor&#x27;da\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 sa.<\/b><span>her hafta kazan\u0131lan zaman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sayesinde \u00fcretim planlamam\u0131z Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ge\u00e7ti.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf sa\u011flan\u0131yor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, Bilgi Teknolojileri M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f istasyonlar\u0131n\u0131 kapsayan, optimize edilmi\u015f \u00fc\u00e7 ayl\u0131k plan\u0131n haz\u0131rlanmas\u0131 30 dakikadan az s\u00fcr\u00fcyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations \u00dcretim M\u00fcd\u00fcr\u00fc Anu J\u00e4rvinen, Rauma&#x27;da robotlu paletleme h\u00fccresinin yan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 ayl\u0131k<\/b><span>bo\u015f kapasite sat\u0131\u015f ekibince g\u00f6r\u00fclebiliyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, t\u00fcm \u00fcretim planlamas\u0131 i\u00e7in g\u00fcvenilir bir temel olu\u015fturuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Fredman Operations \u00b7 G\u0131dayla temasa uygun ambalaj k\u00e2\u011f\u0131tlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">Sat\u0131\u015f ekibi bo\u015f kapasiteyi alt\u0131 ay \u00f6nceden g\u00f6rebiliyor. \u00d6nceden yan\u0131tlanmas\u0131 bir saat veya daha uzun s\u00fcren \u00e7izelge de\u011fi\u015fikli\u011fi talepleri art\u0131k saniyeler i\u00e7inde yan\u0131tlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/fredman-operations\/\">Fredman Operations&#8217;\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec CEO&#x27;su Hannu Ryyn\u00e4nen, \u015firketin Lohja&#x27;daki \u00fcretim tesisinde\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000&#8217;lerce<\/b><span>i\u015f emri otomatik \u00e7izelgeleniyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimi art\u0131k bamba\u015fka bir \u015fekilde kontrol alt\u0131nda tutuyoruz ve kapasitemizi \u00e7ok daha iyi anl\u0131yoruz.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 End\u00fcstriyel kar\u0131\u015ft\u0131r\u0131c\u0131lar, pompalar ve y\u00fcksek teknolojili fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Binlerce i\u015f emri otomatik olarak \u00e7izelgeleniyor ve t\u00fcm kurulu\u015f \u00fcretimi ger\u00e7ek zamanl\u0131 olarak g\u00f6rebiliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/mamec\/\">Mamec&#8217;in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SAP ByDesign planlama \u00e7al\u0131\u015ft\u0131rmas\u0131nda kapasite k\u0131s\u0131tlar\u0131 dikkate al\u0131n\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r, kapasite s\u0131n\u0131rs\u0131z kabul edilir. SAP yard\u0131m belgelerine g\u00f6re planlama \u00e7al\u0131\u015ft\u0131rmas\u0131, \u00fcretim \u00f6nerilerini &#8220;based on infinite resources using the location calendar.&#8221; (konum takvimini kullanarak, kaynaklar\u0131 s\u0131n\u0131rs\u0131z kabul edip) \u00e7izelgeler. Ard\u0131ndan kapasite, kaba planlama d\u00f6nemleri baz\u0131nda kontrol edilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>ByDesign&#8217;da Load Leveling ne yapar?<\/summary>\n<p class=\"sp-faq__a\">Belirli bir planlama ufku i\u00e7inde, planlama operasyonlar\u0131n\u0131 kayna\u011f\u0131n bo\u015f kapasitesi olan d\u00f6nemlerine ta\u015f\u0131r. Planlamac\u0131 bu i\u015flemi Resource Load g\u00f6r\u00fcn\u00fcm\u00fcnden \u00e7al\u0131\u015ft\u0131r\u0131r. Bu ufka s\u0131\u011fmayan i\u015fler, ufuktan sonraki ilk d\u00f6neme kapasite k\u0131s\u0131t\u0131 g\u00f6zetilmeden \u00e7izelgelenir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SAP ByDesign&#8217;da operasyonlar\u0131 kim s\u0131ralar?<\/summary>\n<p class=\"sp-faq__a\">Shop floor ekibi. SAP yard\u0131m belgelerine g\u00f6re operasyonlar\u0131n kaynaklarda hangi s\u0131rayla y\u00fcr\u00fct\u00fclece\u011fi normalde burada, i\u015f sevk kurallar\u0131yla veya Task Control \u00fczerinden elle belirlenir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>ByDesign Load Leveling mi yoksa SkyPlanner m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Her makine i\u00e7in i\u015f s\u0131ras\u0131n\u0131 belirlemeniz ve operat\u00f6rleri, tak\u0131mlar\u0131, tip de\u011fi\u015fimlerini ve malzemeyi kendini g\u00fcncel tutan tek bir planda ele alman\u0131z gerekiyorsa SkyPlanner&#8217;\u0131 kullan\u0131n. Malzeme \u00f6nerileri i\u00e7in ByDesign Supply Planning&#8217;i kullanmaya devam edin, operasyon \u00e7izelgesini ise SkyPlanner&#8217;a b\u0131rak\u0131n. \u00dccretsiz denemede kendi \u00fcretim emirlerinizle test edin.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, SAP ByDesign&#8217;\u0131n yerini mi al\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. Malzemeler, Production Models, planlama, sat\u0131n alma, stok ve finans ByDesign&#8217;da kal\u0131r. SkyPlanner, serbest b\u0131rak\u0131lm\u0131\u015f \u00fcretim emirlerini \u00e7izelgeler; ba\u015flang\u0131\u00e7 tarihlerini, ana kaynaklar\u0131 ve teyitleri ByDesign&#8217;a geri g\u00f6nderir.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ SAP Business ByDesign SAP ByDesign Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Load Leveling ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131 Makine d\u00fczeyinde yapmaz. SAP Business ByDesign s\u0131n\u0131rs\u0131z kapasite varsay\u0131m\u0131yla planlama yapar, kapasiteyi zaman dilimleri baz\u0131nda kabaca kontrol eder ve Load Leveling&#8217;i etkile\u015fimli bir ad\u0131m olarak sunar. SAP&#8217;nin kendi yard\u0131m belgeleri de operasyonlar\u0131n kaynaklara &#8230; <a title=\"SAP ByDesign Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Load Leveling ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/\" aria-label=\"Read more about SAP ByDesign Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Load Leveling ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106596,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107729","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP ByDesign Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?<\/title>\n<meta name=\"description\" content=\"SAP Business ByDesign s\u0131n\u0131rs\u0131z kapasiteyle planlar, kapasiteyi d\u00f6nem baz\u0131nda kabaca kontrol eder; i\u015f da\u011f\u0131t\u0131m\u0131 shop floor&#039;a kal\u0131r. Ne sunar, ne zaman APS gerekir?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SAP ByDesign Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Load Leveling ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\" \/>\n<meta property=\"og:description\" content=\"SAP Business ByDesign s\u0131n\u0131rs\u0131z kapasiteyle planlar, kapasiteyi d\u00f6nem baz\u0131nda kabaca kontrol eder; i\u015f da\u011f\u0131t\u0131m\u0131 shop floor&#039;a kal\u0131r. Ne sunar, ne zaman APS gerekir?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-business-bydesign\\\/uretim-cizelgeleme\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-business-bydesign\\\/uretim-cizelgeleme\\\/\",\"name\":\"SAP ByDesign Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SAP Business ByDesign s\u0131n\u0131rs\u0131z kapasiteyle planlar, kapasiteyi d\u00f6nem baz\u0131nda kabaca kontrol eder; i\u015f da\u011f\u0131t\u0131m\u0131 shop floor'a kal\u0131r. Ne sunar, ne zaman APS gerekir?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-business-bydesign\\\/uretim-cizelgeleme\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-business-bydesign\\\/uretim-cizelgeleme\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-business-bydesign\\\/uretim-cizelgeleme\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SAP Business ByDesign i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-business-bydesign\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SAP ByDesign Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Load Leveling ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP ByDesign Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?","description":"SAP Business ByDesign s\u0131n\u0131rs\u0131z kapasiteyle planlar, kapasiteyi d\u00f6nem baz\u0131nda kabaca kontrol eder; i\u015f da\u011f\u0131t\u0131m\u0131 shop floor'a kal\u0131r. Ne sunar, ne zaman APS gerekir?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/","og_locale":"tr_TR","og_type":"article","og_title":"SAP ByDesign Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Load Leveling ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131","og_description":"SAP Business ByDesign s\u0131n\u0131rs\u0131z kapasiteyle planlar, kapasiteyi d\u00f6nem baz\u0131nda kabaca kontrol eder; i\u015f da\u011f\u0131t\u0131m\u0131 shop floor'a kal\u0131r. Ne sunar, ne zaman APS gerekir?","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"13 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/","name":"SAP ByDesign Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SAP Business ByDesign s\u0131n\u0131rs\u0131z kapasiteyle planlar, kapasiteyi d\u00f6nem baz\u0131nda kabaca kontrol eder; i\u015f da\u011f\u0131t\u0131m\u0131 shop floor'a kal\u0131r. Ne sunar, ne zaman APS gerekir?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"SAP Business ByDesign i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/"},{"@type":"ListItem","position":5,"name":"SAP ByDesign Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Load Leveling ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ SAP Business ByDesign SAP ByDesign Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Load Leveling ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131 Makine d\u00fczeyinde yapmaz. SAP Business ByDesign s\u0131n\u0131rs\u0131z kapasite varsay\u0131m\u0131yla planlama yapar, kapasiteyi zaman dilimleri baz\u0131nda kabaca kontrol eder ve Load Leveling&#8217;i etkile\u015fimli bir ad\u0131m olarak sunar. SAP&#8217;nin kendi yard\u0131m belgeleri de operasyonlar\u0131n kaynaklara&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/107729","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=107729"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/107729\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106596"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=107729"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}