{"id":107613,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"uretim-cizelgeleme","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/","title":{"rendered":"Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu? Production Management ve Sage 100 Produktion nas\u0131l \u00e7al\u0131\u015f\u0131r?"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Sage 100<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu? <span class=\"hl\">Production Management ve Sage 100 Produktion nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Her operasyonu kapasitenin bo\u015f oldu\u011fu zamana yerle\u015ftiren bir \u00fcretim \u00e7izelgeleme arac\u0131 anlam\u0131nda hay\u0131r. Bu ad\u0131 ta\u015f\u0131yan iki farkl\u0131 \u00fcr\u00fcn var. ABD\u2019deki Sage 100 Production Management, her i\u015f fi\u015fini Sage\u2019in &#8220;infinite&#8221; (s\u0131n\u0131rs\u0131z) dedi\u011fi y\u00fckleme tekni\u011fiyle \u00e7izelgeler; a\u015f\u0131r\u0131 y\u00fcklenen i\u015f merkezlerini dengeleme i\u015fi planlamac\u0131ya kal\u0131r. Almanya\u2019daki Sage 100 Produktion ise y\u00fck\u00fc ve darbo\u011fazlar\u0131 g\u00f6sterir. \u0130ste\u011fe ba\u011fl\u0131 Plantafel eklentisiyle planlamac\u0131, g\u00f6revleri pano \u00fczerinde s\u00fcr\u00fckleyerek ta\u015f\u0131yabilir. Her makine, \u00e7al\u0131\u015fan, tak\u0131m ve malzemenin <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 g\u00f6zetilerek \u00e7izelgelenmesine<\/a> ihtiya\u00e7 duyan fabrikalar, Sage 100 ile birlikte SkyPlanner APS kullan\u0131r.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"first-which-sage-100-do-you-run\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00d6nce \u015fu soruyu yan\u0131tlayal\u0131m: Hangi Sage 100\u2019\u00fc kullan\u0131yorsunuz?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>ABD ve Kanada\u2019daki Sage 100<\/strong>, eski MAS 90 ve MAS 200\u2019d\u00fcr. \u00dcretim s\u00fcre\u00e7leri; i\u015f fi\u015fleri, \u015fablonlar, faaliyet kodlar\u0131 ve i\u015f merkezleri \u00fczerine kurulu Production Management mod\u00fcl\u00fcnde y\u00fcr\u00fct\u00fcl\u00fcr. Production Management, eski Work Order mod\u00fcl\u00fcn\u00fcn yerini alm\u0131\u015ft\u0131r.<\/p>\n\n\n<p><strong>Almanya ve Avusturya\u2019daki Sage 100<\/strong>, Sage Office Line ve Sage New Classic\u2019in devam\u0131d\u0131r. \u00dcretim s\u00fcre\u00e7leri; Ressourcenlisten, Fertigungsauftr\u00e4ge ve Arbeitspl\u00e4tze \u00fczerine kurulu Sage 100 Produktion mod\u00fcl\u00fcnde y\u00fcr\u00fct\u00fcl\u00fcr. Sage bu \u00fcr\u00fcn\u00fc Basic, Professional ve Enterprise paketleriyle sunar (<a href=\"https:\/\/www.sage.com\/de-de\/produkte\/sage-100\/produktion\/\">Sage 100 Produktion<\/a>).<\/p>\n\n\n<p>Bu iki \u00fcr\u00fcn\u00fcn ad\u0131 ve tedarik\u00e7isi ortakt\u0131r, kod taban\u0131 de\u011fil. A\u015fa\u011f\u0131da her birini kendi terimleriyle ele al\u0131yoruz.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-us-sage-100-production-management-schedules\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">ABD\u2019deki Sage 100 Production Management ad\u0131m ad\u0131m nas\u0131l \u00e7izelgeleme yapar?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. \u0130\u015f merkezleri<\/h3>\n\n\n<p>Work Center Maintenance ekran\u0131nda kuyruk s\u00fcresini, verimlilik y\u00fczdesini, \u00e7al\u0131\u015fan veya makine say\u0131s\u0131n\u0131, haftan\u0131n her g\u00fcn\u00fc i\u00e7in kullan\u0131labilir saatleri ve \u00e7al\u0131\u015f\u0131lmayan d\u00f6nemleri belirlersiniz. Sage, i\u015f merkezini &#8220;one or more persons or machines&#8221; (bir veya daha fazla ki\u015fi ya da makine) olarak tan\u0131mlar ve \u015funu belirtir: &#8220;they are considered a single unit for capacity planning and detailed work assignments.&#8221; (Kapasite planlama ve ayr\u0131nt\u0131l\u0131 i\u015f atamalar\u0131 i\u00e7in tek bir birim olarak de\u011ferlendirilirler.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2023\/Subsystems\/PM\/PMSetup\/Work_Center_Maint.htm\">kaynak<\/a>)<\/p>\n\n\n<p>Kapasite, g\u00fcnl\u00fck saat say\u0131s\u0131d\u0131r. &#8220;Each work center has a capacity, expressed in hours, that it can perform on a given day.&#8221; (Her i\u015f merkezinin belirli bir g\u00fcnde ger\u00e7ekle\u015ftirebilece\u011fi, saat cinsinden ifade edilen bir kapasitesi vard\u0131r.) Sage bunu, o g\u00fcn\u00fcn standart \u00e7al\u0131\u015fma saatlerini verimlilik y\u00fczdesiyle \u00e7arparak hesaplar. (<a href=\"https:\/\/help-sage100.na.sage.com\/2023\/Subsystems\/PM\/PMConcepts\/Determine_Work_Ctr_Cap.htm\">kaynak<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. \u015eablonlar ve i\u015f fi\u015fleri<\/h3>\n\n\n<p>\u0130\u015f fi\u015fi \u015fablonu, her biri bir faaliyet koduyla bir i\u015f merkezine ba\u011flanan ad\u0131mlar\u0131 i\u00e7erir. \u0130\u015f fi\u015fi, bu \u015fablondan olu\u015fturulan \u00fcretim sipari\u015fidir. Sage\u2019in Work Order kullan\u0131c\u0131lar\u0131 i\u00e7in haz\u0131rlad\u0131\u011f\u0131 k\u0131lavuz, eski terimlerin yeni kar\u015f\u0131l\u0131klar\u0131n\u0131 verir: \u00fcretim emri i\u015f fi\u015fine, rota \u015fablona, operasyon kodu ise faaliyet koduna d\u00f6n\u00fc\u015f\u00fcr. (<a href=\"https:\/\/docs.sage.com\/docs\/en\/customer\/100erp\/2022\/open\/SwitchingFromWOtoPM.pdf\">kaynak<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Enhanced Scheduling<\/h3>\n\n\n<p>Enhanced Scheduling kullan\u0131lmad\u0131\u011f\u0131nda ad\u0131m tarihleri, i\u015f fi\u015fine girdi\u011finiz tarihlerden al\u0131n\u0131r. Bu tarihleri hesaplatmak i\u00e7in Production Management Options ekran\u0131n\u0131 a\u00e7ar, Schedule sekmesinde \u015fu i\u015flemi yapars\u0131n\u0131z: &#8220;select the Enable Enhanced Scheduling check box.&#8221; (Enable Enhanced Scheduling onay kutusunu i\u015faretleyin.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2024\/Subsystems\/PM\/PMSetupProcedures\/Set_Up_Enhanced_Scheduling.htm\">kaynak<\/a>)<\/p>\n\n\n<p>Enhanced Scheduling i\u00e7in a\u00e7\u0131klama \u015f\u00f6yledir: &#8220;uses the forward or backward scheduling method to determine when each step of a work ticket should be started and how long each step takes to complete.&#8221; (\u0130\u015f fi\u015findeki her ad\u0131m\u0131n ne zaman ba\u015flamas\u0131 gerekti\u011fini ve tamamlanmas\u0131n\u0131n ne kadar s\u00fcrece\u011fini belirlemek i\u00e7in ileriye veya geriye do\u011fru \u00e7izelgeleme y\u00f6ntemini kullan\u0131r.) \u0130leriye do\u011fru \u00e7izelgeleme, \u00fcretim ba\u015flang\u0131\u00e7 tarihinden ba\u015flar. Geriye do\u011fru \u00e7izelgeleme ise teslim tarihinden ba\u015flar.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. S\u0131n\u0131rs\u0131z y\u00fckleme<\/h3>\n\n\n<p>Temel tasar\u0131m tercihi budur. Sage\u2019in yard\u0131m dok\u00fcman\u0131nda \u015f\u00f6yle a\u00e7\u0131klan\u0131r: &#8220;The &#8220;infinite&#8221; loading technique is used to allow each work ticket to be scheduled independently.&#8221; (Her i\u015f fi\u015finin ba\u011f\u0131ms\u0131z olarak \u00e7izelgelenebilmesi i\u00e7in &#8220;s\u0131n\u0131rs\u0131z&#8221; y\u00fckleme tekni\u011fi kullan\u0131l\u0131r.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2025\/Subsystems\/PM\/PMConcepts\/Enhanced_Scheduling.htm\">kaynak<\/a>) Eski Work Order yard\u0131m dok\u00fcman\u0131 bunu &#8220;each work order as if it were the only work order in the shop,&#8221; (her \u00fcretim emrini, at\u00f6lyedeki tek \u00fcretim emriymi\u015f gibi \u00e7izelgeleme) \u015feklinde a\u00e7\u0131klar ve \u015fu uyar\u0131y\u0131 ekler: &#8220;care must be taken not to overload the work centers.&#8221; (\u0130\u015f merkezlerinin a\u015f\u0131r\u0131 y\u00fcklenmemesine dikkat edilmelidir.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2022\/Subsystems\/WO\/ConceptTopics\/Infinite_Loading.htm\">kaynak<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Y\u00fck\u00fc inceleme ve a\u015f\u0131r\u0131 y\u00fckleri giderme<\/h3>\n\n\n<p>Work Center Capacity Inquiry ekran\u0131 \u015fu bilgiyi g\u00f6sterir: &#8220;commitments against work centers in three formats: daily, weekly, and detail.&#8221; (\u0130\u015f merkezlerine atanm\u0131\u015f y\u00fckler; g\u00fcnl\u00fck, haftal\u0131k ve ayr\u0131nt\u0131l\u0131 olmak \u00fczere \u00fc\u00e7 bi\u00e7imde g\u00f6sterilir.) (<a href=\"https:\/\/docs.sage.com\/docs\/en\/customer\/100erp\/2023\/open\/WhatsNew_2023.pdf\">2023 Yenilikleri<\/a>) Bir i\u015f merkezine kapasitesinin \u00fczerinde y\u00fck atand\u0131\u011f\u0131nda Sage\u2019in \u00e7\u00f6z\u00fcm\u00fc manuel m\u00fcdahaledir: &#8220;Individual work orders can be rescheduled or the queue time can be increased to relieve overcommitted work centers.&#8221; (A\u015f\u0131r\u0131 y\u00fcklenen i\u015f merkezlerini rahatlatmak i\u00e7in \u00fcretim emirleri tek tek yeniden \u00e7izelgelenebilir veya kuyruk s\u00fcresi art\u0131r\u0131labilir.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-german-sage-100-produktion-plans-step-by-ste\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Almanya\u2019daki Sage 100 Produktion ad\u0131m ad\u0131m nas\u0131l planlama yapar?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Ressourcenliste<\/h3>\n\n\n<p>Merkezde Ressourcenliste nesnesi yer al\u0131r. Sage\u2019in ifadesiyle &#8220;alle f\u00fcr die Herstellung eines Artikels notwendigen Ressourcen und Arbeitsabl\u00e4ufe&#8221; (bir \u00fcr\u00fcn\u00fcn \u00fcretimi i\u00e7in gereken t\u00fcm kaynaklar\u0131 ve i\u015f ak\u0131\u015flar\u0131n\u0131) i\u00e7erir: St\u00fcckliste, Arbeitsplan, tak\u0131m listesi ve fason i\u015flemler. Arbeitsg\u00e4nge \u00fczerinde haz\u0131rl\u0131k ve birim s\u00fcreleri, miktar katsay\u0131lar\u0131, tampon s\u00fcreler ve bekleme s\u00fcreleri bulunur. (<a href=\"https:\/\/onlinehilfe.sage.de\/onlinehilfe\/ol\/80\/abf\/leistungsumfang_produktion_doku.htm\">Sage yard\u0131m\u0131<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Fertigungssteuerung<\/h3>\n\n\n<p>Standart mod\u00fcl; ileriye ve geriye do\u011fru \u00e7izelgeleme, tam zaman\u0131nda \u00e7izelgeleme, \u00e7izelgeleme sim\u00fclasyonu, \u00fcretim \u00f6nerileri, sipari\u015fleri birle\u015ftirme veya b\u00f6lme ve entegre malzeme planlama i\u015flevlerini kapsar. Ayr\u0131ca &#8220;Anzeige von Engpass-Positionen (Material und Kapazit\u00e4t)&#8221; (malzeme ve kapasite darbo\u011fazlar\u0131n\u0131n g\u00f6sterimi) ile yap\u0131labilirlik kontrol\u00fc sunar.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Arbeitsplatz baz\u0131nda y\u00fck<\/h3>\n\n\n<p>&#8220;Mit der integrierten Arbeitsplatzauslastung k\u00f6nnen Sie unter Einbeziehung flexibler Zeitr\u00e4ume die aktuelle Belastung Ihrer Arbeitspl\u00e4tze und Maschinen grafisch und tabellarisch einsehen.&#8221; (Entegre i\u015f merkezi doluluk g\u00f6r\u00fcn\u00fcm\u00fcyle, esnek zaman aral\u0131klar\u0131 se\u00e7erek i\u015f merkezlerinizin ve makinelerinizin mevcut y\u00fck\u00fcn\u00fc grafik ve tablo bi\u00e7iminde g\u00f6rebilirsiniz.) \u0130\u015f merkezlerinin ve makinelerin mevcut y\u00fck\u00fcn\u00fc grafik veya tablo olarak g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Plantafel<\/h3>\n\n\n<p>Grafik planlama panosu, ek paket olarak sunulan &#8220;Grafische Ressourcenplanung (Zusatzpaket)&#8221; (grafik kaynak planlama ek paketi) i\u00e7indedir. \u00c7al\u0131\u015fan, makine veya fason \u00fcretici gibi her kaynak i\u00e7in bir Gantt g\u00f6r\u00fcn\u00fcm\u00fc sunar. &#8220;Mittels Drag &amp; Drop k\u00f6nnen Sie die T\u00e4tigkeiten verschieben, und in Sekundenschnelle werden die Auftr\u00e4ge und der Materialbedarf neu terminiert.&#8221; (G\u00f6revleri s\u00fcr\u00fckleyip b\u0131rakarak ta\u015f\u0131yabilirsiniz; sipari\u015fler ve malzeme ihtiyac\u0131 saniyeler i\u00e7inde yeniden tarihlendirilir.) Planlamac\u0131 g\u00f6revleri ta\u015f\u0131r, Sage 100 ise sipari\u015flerin ve malzeme ihtiyac\u0131n\u0131n tarihlerini g\u00fcnceller. Sage\u2019in Produktion sayfas\u0131nda Grafische Ressourcenplanung\/Leitstand, t\u00fcm paketlerde iste\u011fe ba\u011fl\u0131 olarak listelenir (<a href=\"https:\/\/www.sage.com\/de-de\/produkte\/sage-100\/produktion\/\">kaynak<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Planlamac\u0131ya hangi i\u015fler kal\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>ABD: Her i\u015f fi\u015fi tek ba\u015f\u0131na \u00e7izelgelenir.<\/strong> S\u0131n\u0131rs\u0131z y\u00fckleme, ayn\u0131 i\u015f merkezindeki di\u011fer fi\u015fleri dikkate almaz.<\/li>\n\n\n<li><strong>ABD: A\u015f\u0131r\u0131 y\u00fckler elle giderilir.<\/strong> Sage\u2019in \u00e7\u00f6z\u00fcm\u00fc, fi\u015fleri yeniden \u00e7izelgelemek veya kuyruk s\u00fcresini art\u0131rmakt\u0131r.<\/li>\n\n\n<li><strong>ABD: Her i\u015f merkezi i\u00e7in saat cinsinden tek bir g\u00fcnl\u00fck kapasite de\u011feri vard\u0131r.<\/strong> Bir i\u015f merkezindeki birden fazla makine ve \u00e7al\u0131\u015fan, bu toplam kapasiteyi payla\u015f\u0131r. Sage\u2019in yard\u0131m dok\u00fcman\u0131nda makine baz\u0131nda zaman \u00e7izelgesi, haz\u0131rl\u0131k matrisi veya tak\u0131m k\u0131s\u0131t\u0131 tan\u0131mlanmaz.<\/li>\n\n\n<li><strong>Almanya: Pano s\u00fcr\u00fckle ve b\u0131rak y\u00f6ntemiyle \u00e7al\u0131\u015f\u0131r.<\/strong> Planlamac\u0131 bir g\u00f6revi ta\u015f\u0131d\u0131ktan sonra Plantafel sipari\u015fleri yeniden tarihlendirir. Sage, otomatik s\u0131ralama i\u015flevi tan\u0131mlamaz.<\/li>\n\n\n<li><strong>Almanya: Pano ek paket olarak sunulur.<\/strong> Grafische Ressourcenplanung bir Zusatzpaket oldu\u011fundan, temel mod\u00fcl y\u00fck\u00fc ve darbo\u011fazlar\u0131 pano olmadan g\u00f6sterir.<\/li>\n\n\n<li><strong>Her ikisi: Tip de\u011fi\u015fimi s\u00fcreleri ad\u0131m baz\u0131nda tan\u0131mlan\u0131r.<\/strong> Haz\u0131rl\u0131k s\u00fcreleri ad\u0131m veya Arbeitsgang \u00fczerinde yer al\u0131r. Sage, \u00fcr\u00fcnler aras\u0131nda s\u0131raya ba\u011fl\u0131 tip de\u011fi\u015fimini dok\u00fcmanlar\u0131nda tan\u0131mlamaz.<\/li>\n\n\n<li><strong>Her ikisi: Her de\u011fi\u015fiklik yeniden dengeleme gerektirir.<\/strong> Acil bir sipari\u015f veya ar\u0131za sonras\u0131nda planlamac\u0131 y\u00fck\u00fc yeniden g\u00f6zden ge\u00e7irip d\u00fczenler.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-sage-100-s-own-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage 100\u2019\u00fcn kendi planlamas\u0131 ne zaman yeterli olur?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sage 100\u2019\u00fcn \u00e7izelgelemesi \u015fu durumlarda ihtiyac\u0131 kar\u015f\u0131lar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Plan\u0131, darbo\u011faz olu\u015fturan bir veya iki i\u015f merkezi belirler; at\u00f6lyenin geri kalan\u0131nda bo\u015f kapasite vard\u0131r.<\/li>\n\n\n<li>Termin s\u00fcreleri uzundur ve karar vermek i\u00e7in i\u015f merkezi baz\u0131nda g\u00fcnl\u00fck veya haftal\u0131k y\u00fck bilgisi yeterlidir.<\/li>\n\n\n<li>Makinedeki i\u015f s\u0131ras\u0131n\u0131 bir ustaba\u015f\u0131 belirler.<\/li>\n\n\n<li>Tip de\u011fi\u015fimleri, \u00f6ncesinde hangi \u00fcr\u00fcn\u00fcn \u00fcretildi\u011fine ba\u011fl\u0131 de\u011fildir.<\/li>\n\n\n<li>\u00c7al\u0131\u015fanlar, tak\u0131mlar ve malzeme geli\u015f tarihleri i\u015f s\u0131ras\u0131n\u0131 de\u011fi\u015ftirmez.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kapasite s\u0131n\u0131rlar\u0131n\u0131 g\u00f6zeten bir \u00fcretim \u00e7izelgeleme arac\u0131 ne zaman gerekir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A\u015fa\u011f\u0131daki durumlardan birka\u00e7\u0131 sizin i\u00e7in ge\u00e7erliyse Sage 100\u2019\u00fcn planlamas\u0131 art\u0131k ihtiyac\u0131n\u0131z\u0131 kar\u015f\u0131lam\u0131yor demektir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Planlamac\u0131, her hafta saatlerini i\u015f fi\u015flerini yeniden \u00e7izelgelemeye veya Plantafel \u00fczerinde g\u00f6revleri s\u00fcr\u00fckleyerek ta\u015f\u0131maya harcar.<\/li>\n\n\n<li>\u0130\u015f merkezi baz\u0131nda g\u00fcnl\u00fck y\u00fck uygun g\u00f6r\u00fcnmesine ra\u011fmen teslimatlar gecikir.<\/li>\n\n\n<li>Tip de\u011fi\u015fimi s\u00fcresi, \u00f6ncesinde \u00fcretilen \u00fcr\u00fcne ba\u011fl\u0131d\u0131r.<\/li>\n\n\n<li>Operat\u00f6rler, vardiyalar ve devams\u0131zl\u0131klar plan\u0131 makineler kadar k\u0131s\u0131tlar.<\/li>\n\n\n<li>Pres kal\u0131plar\u0131, di\u011fer kal\u0131plar veya fikst\u00fcrler makineler aras\u0131nda ortak kullan\u0131l\u0131r.<\/li>\n\n\n<li>Hangi i\u015fin ba\u015flayabilece\u011fini malzeme bulunabilirli\u011fi belirler.<\/li>\n\n\n<li>Acil sipari\u015fler ve ar\u0131zalar haftada birka\u00e7 kez yeniden planlama gerektirir.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Hangi \u00f6zellikleri aramal\u0131s\u0131n\u0131z?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Operasyon d\u00fczeyinde \u00e7izelgeleme:<\/strong> Her ad\u0131m veya Arbeitsgang i\u00e7in ba\u015flang\u0131\u00e7, biti\u015f ve i\u015f merkezi belirlenmelidir.<\/li>\n\n\n<li><strong>T\u00fcm kaynaklar\u0131n kapasite s\u0131n\u0131rlar\u0131n\u0131 ayn\u0131 anda g\u00f6zetme:<\/strong> Makineler, \u00e7al\u0131\u015fanlar ve tak\u0131mlar birlikte ele al\u0131nmal\u0131d\u0131r.<\/li>\n\n\n<li><strong>A\u015f\u0131r\u0131 y\u00fckleri otomatik giderme:<\/strong> Yaln\u0131zca bir kapasite sorgulama ekran\u0131 veya elle dengelemeniz gereken bir pano olmamal\u0131d\u0131r.<\/li>\n\n\n<li>S\u0131raya ba\u011fl\u0131 ve ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re s\u00fcresi de\u011fi\u015fen tip de\u011fi\u015fimleri i\u00e7in <strong>haz\u0131rl\u0131k s\u00fcresi matrisi<\/strong>.<\/li>\n\n\n<li><strong>Tak\u0131mlar\u0131 kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklar olarak ele alma<\/strong> ve ayn\u0131 anda birden fazla operat\u00f6r gerektiren i\u015fleri \u00e7izelgeleme.<\/li>\n\n\n<li>Stoklar\u0131 ve beklenen sat\u0131n alma sipari\u015flerini kontrol eden <strong>malzemeyi dikkate alan \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li><strong>Sage 100 ile a\u00e7\u0131k\u00e7a tan\u0131mlanm\u0131\u015f veri ak\u0131\u015f\u0131.<\/strong> Tedarik\u00e7iye, kulland\u0131\u011f\u0131n\u0131z Sage 100\u2019de i\u015f fi\u015flerini veya Fertigungsauftr\u00e4ge verilerini nas\u0131l okudu\u011funu ve tarihleri sisteme nas\u0131l geri yazd\u0131\u011f\u0131n\u0131 sorun.<\/li>\n\n<\/ul>\n\n\n<p>Se\u00e7enekler \u00fc\u00e7 gruba ayr\u0131l\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Sage 100 i\u00e7inde planlama:<\/strong> ABD\u2019de Enhanced Scheduling, Almanya\u2019da Plantafel eklentisi. A\u015f\u0131r\u0131 y\u00fckleri planlamac\u0131 giderir.<\/li>\n\n\n<li><strong>Yerel sunucuda \u00e7al\u0131\u015fan Leitstand ve APS eklentileri:<\/strong> Sage 100\u2019\u00fcn yan\u0131nda kurulur ve tedarik\u00e7inin y\u00fcr\u00fctt\u00fc\u011f\u00fc bir projeyle devreye al\u0131n\u0131r.<\/li>\n\n\n<li><strong>Sahada i\u015flerin y\u00fcr\u00fct\u00fclmesini de kapsayan bulut APS:<\/strong> SkyPlanner bu gruptad\u0131r. Sage 100 ile birlikte \u00e7al\u0131\u015farak her kayna\u011f\u0131 otomatik \u00e7izelgeler, \u00fcretimdeki de\u011fi\u015fikliklere g\u00f6re yeniden planlar ve \u00e7izelgeyi operat\u00f6rlerin kullan\u0131m\u0131na sunar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner nerede devreye girer?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS, yukar\u0131daki eksiklerin her birini tamamlar. Her i\u015f merkezinin kapasitesi s\u0131n\u0131rl\u0131 kabul edilir ve Arcturus AI motoru her ad\u0131m\u0131 saniyeler i\u00e7inde \u00e7izelgeler. Makineler, \u00e7al\u0131\u015fanlar, tak\u0131mlar ve malzemeler ayn\u0131 motor taraf\u0131ndan birlikte \u00e7izelgelenir. D\u00f6rt makineli bir i\u015f merkezi, d\u00f6rt ayr\u0131 i\u015f merkezi veya tek bir i\u015f merkezi grubu olarak tan\u0131mlan\u0131r; her makinenin kendi zaman \u00e7izelgesi olur.<\/p>\n\n\n<p>Haz\u0131rl\u0131k s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcrelerini her iki y\u00f6nde de tutar. Motor, en az haz\u0131rl\u0131k gerektiren s\u0131ralamay\u0131 se\u00e7er. Tak\u0131mlar, kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklard\u0131r; bir i\u015f ayn\u0131 anda birden fazla operat\u00f6r gerektirebilir. Bir makine veya \u00e7al\u0131\u015fan m\u00fcsait de\u011filse motor, tan\u0131mlad\u0131\u011f\u0131n\u0131z alternatifleri kullan\u0131r.<\/p>\n\n\n<p>Malzemeyi esas alan \u00e7izelgeleme, mevcut stok ve teslim al\u0131nacak sat\u0131n alma sipari\u015flerinden hareketle gelecekteki stok durumunu sim\u00fcle eder. Sipari\u015f edilen malzeme, teslim tarihinde kullan\u0131labilir kabul edilir. B\u00f6ylece i\u015fler yaln\u0131zca malzemenin haz\u0131r oldu\u011fu zamana planlan\u0131r.<\/p>\n\n\n<p>Autopilot, \u00fcretimde de\u011fi\u015fiklik oldu\u011funda kilitledi\u011finiz i\u015fleri ve belirledi\u011finiz \u00f6ncelikleri koruyarak \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Planlamac\u0131lar i\u015fleri Gantt zaman \u00e7izelgesinde d\u00fczenler; operat\u00f6rler ise Mobile Confirmations ile telefon veya tabletten i\u015f kay\u0131tlar\u0131n\u0131 girer.<\/p>\n\n\n<p>\u0130\u015f merkezlerindeki y\u00fck\u00fc dengelemek veya Plantafel \u00fczerinde g\u00f6revleri s\u00fcr\u00fckleyerek ta\u015f\u0131mak her hafta saatlerinizi al\u0131yorsa <strong>SkyPlanner&#8217;\u0131 se\u00e7in<\/strong>.<\/p>\n\n\n<p>S\u0131radaki i\u015fin hangisi olaca\u011f\u0131n\u0131 tip de\u011fi\u015fimleri, ortak kullan\u0131lan tak\u0131mlar veya birden fazla operat\u00f6r gerektiren i\u015fler belirliyorsa <strong>SkyPlanner&#8217;\u0131 se\u00e7in<\/strong>.<\/p>\n\n\n<p>Mevcut Sage 100 sisteminizle birlikte \u00e7al\u0131\u015fan, kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alan bir \u00fcretim \u00e7izelgesini haftalar i\u00e7inde kullanmaya ba\u015flamak istiyorsan\u0131z <strong>SkyPlanner&#8217;\u0131 se\u00e7in<\/strong>.<\/p>\n\n\n<p>A\u00e7\u0131k i\u015f fi\u015flerinizi veya Fertigungsauftr\u00e4ge kay\u0131tlar\u0131n\u0131z\u0131 Excel&#8217;e aktararak <a href=\"\/tr\/deneme\/\">30 g\u00fcnl\u00fck \u00fccretsiz denemeye<\/a> ba\u015flay\u0131n (20 i\u015f merkezine kadar, kredi kart\u0131 gerekmez). Sonras\u0131nda fiyatlar, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Ayl\u0131k faturaland\u0131r\u0131l\u0131r; istedi\u011finiz zaman iptal edebilirsiniz. S\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan entegrasyon teklifi, paketinizle birlikte ba\u015ftan sunulur. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz. Sistemin devreye al\u0131nmas\u0131, kullan\u0131ma haz\u0131rl\u0131k s\u00fcreci ba\u015flad\u0131ktan sonra genellikle haftalar i\u00e7inde tamamlan\u0131r.<\/p>\n\n\n<p>SkyPlanner, Sage 100 ile \u00e7ift y\u00f6nl\u00fc entegre olur. ABD s\u00fcr\u00fcm\u00fc Sage 100&#8217;den i\u015f fi\u015fleri, i\u015f merkezleri, stok kartlar\u0131 ve sat\u0131n alma sipari\u015fleri al\u0131n\u0131r; planlanan ad\u0131m tarihleri ve i\u015f\u00e7ilik kay\u0131tlar\u0131 Business Object Interface \u00fczerinden geri g\u00f6nderilir. Almanya s\u00fcr\u00fcm\u00fc Sage 100&#8217;den Fertigungsauftr\u00e4ge, Arbeitsg\u00e4nge ve Arbeitspl\u00e4tze al\u0131n\u0131r. Arbeitsgang tarihleri ve R\u00fcckmeldungen ise devreye alma s\u00fcrecindeki kapsam belirleme a\u015famas\u0131nda Sage i\u015f orta\u011f\u0131n\u0131zla kararla\u015ft\u0131r\u0131lan y\u00f6ntemle geri g\u00f6nderilir. SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015f sonras\u0131nda destek verir. Sage i\u015f orta\u011f\u0131n\u0131z veya \u015firket i\u00e7i geli\u015ftiricileriniz, yaln\u0131zca bir API belirteci kullanarak belgelenmi\u015f REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API ba\u015fvuru kayna\u011f\u0131<\/a>) \u00fczerinden \u00e7al\u0131\u015fabilir.<\/p>\n\n\n<p>Sistemlerin nas\u0131l ba\u011fland\u0131\u011f\u0131n\u0131 <a href=\"\/tr\/entegrasyonlar\/erp\/sage-100\/\">Sage 100 i\u00e7in SkyPlanner<\/a> sayfas\u0131nda okuyun veya do\u011frudan <a href=\"\/tr\/entegrasyonlar\/erp\/sage-100\/entegrasyon-kilavuzu\/\">Sage 100 entegrasyon k\u0131lavuzuna<\/a> ge\u00e7in. Sage 200 veya Sage X3 m\u00fc kullan\u0131yorsunuz? <a href=\"\/tr\/entegrasyonlar\/erp\/sage-200\/\">Sage 200<\/a> ve <a href=\"\/tr\/entegrasyonlar\/erp\/sage-x3\/\">Sage X3<\/a> sayfalar\u0131n\u0131 inceleyin. Di\u011fer ERP sistemlerini <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131 sayfas\u0131nda<\/a> bulabilirsiniz.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo i\u00e7in randevu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel&#x27;in Kauhava&#x27;daki \u00e7at\u0131 g\u00fcvenli\u011fi \u00fcr\u00fcnleri fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 tespit etmek i\u00e7in gereken g\u00f6r\u00fcn\u00fcrl\u00fc\u011f\u00fc sa\u011flad\u0131 ve \u00fcretim y\u00f6netimini daha net hale getirdi.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenli\u011fi ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 bu y\u0131l %99,2&#8217;ye ula\u015ft\u0131. \u00c7izelgeleme sayesinde g\u00fcnde d\u00f6rt saate kadar \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/piristeel\/\">Piristeel&#8217;in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec CEO&#x27;su Hannu Ryyn\u00e4nen, \u015firketin Lohja&#x27;daki \u00fcretim salonunda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000&#8217;lerce<\/b><span>otomatik \u00e7izelgelenen \u00fcretim emri<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimi art\u0131k farkl\u0131 bir \u015fekilde kontrol alt\u0131nda tutuyoruz ve kapasitemizi anlama konusunda bamba\u015fka bir seviyedeyiz.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 End\u00fcstriyel kar\u0131\u015ft\u0131r\u0131c\u0131lar, pompalar ve y\u00fcksek teknolojili fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Binlerce \u00fcretim emri otomatik olarak \u00e7izelgeleniyor ve t\u00fcm kurulu\u015f \u00fcretimin durumunu ger\u00e7ek zamanl\u0131 olarak g\u00f6rebiliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/mamec\/\">Mamec&#8217;in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 100&#8217;de \u00e7izelgeleme arac\u0131 var m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet, her iki \u00fcr\u00fcnde de var. ABD s\u00fcr\u00fcm\u00fc Sage 100 Production Management, ad\u0131m tarihlerini kapasite s\u0131n\u0131r\u0131 g\u00f6zetmeden ileriye veya geriye do\u011fru hesaplayan Enhanced Scheduling \u00f6zelli\u011fini i\u00e7erir. Almanya s\u00fcr\u00fcm\u00fc Sage 100 Produktion ise ileriye ve geriye do\u011fru \u00e7izelgeleme, darbo\u011faz g\u00f6r\u00fcn\u00fcm\u00fc ve iste\u011fe ba\u011fl\u0131 grafik Plantafel sunar. Her ikisinde de a\u015f\u0131r\u0131 y\u00fckleri planlamac\u0131 \u00e7\u00f6zer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 100 Enhanced Scheduling, kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alarak \u00fcretim \u00e7izelgeleme yapar m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. Sage&#8217;in yard\u0131m belgelerinde bu \u00f6zellik, her \u00fcretim emrini ba\u011f\u0131ms\u0131z olarak \u00e7izelgeleyen bir &#8220;infinite&#8221; (sonsuz) y\u00fckleme tekni\u011fi olarak tan\u0131mlan\u0131r. Ard\u0131ndan Work Center Capacity Inquiry, kapasiteye atanm\u0131\u015f y\u00fckleri g\u00f6sterir. Planlamac\u0131 da \u00fcretim emirlerini yeniden \u00e7izelgeler veya kuyruk s\u00fcresi ekler.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 100 Plantafel, kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alan bir \u00e7izelgeleme arac\u0131 m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Plantafel, planlamac\u0131n\u0131n g\u00f6revleri s\u00fcr\u00fckleyip b\u0131rakarak ta\u015f\u0131d\u0131\u011f\u0131 grafik bir panodur. Sage 100 de emirlerin ve malzeme ihtiyac\u0131n\u0131n tarihlerini buna g\u00f6re g\u00fcnceller. Kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alan bir \u00fcretim \u00e7izelgeleme arac\u0131 ise her operasyonu bo\u015f kapasiteye kendisi yerle\u015ftirir ve \u00fcretimde de\u011fi\u015fiklik oldu\u011funda yeniden planlar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 100, s\u0131ralamaya ba\u011fl\u0131 haz\u0131rl\u0131k s\u00fcrelerini y\u00f6netir mi?<\/summary>\n<p class=\"sp-faq__a\">Sage 100, her ad\u0131m veya Arbeitsgang i\u00e7in haz\u0131rl\u0131k ve i\u015flem s\u00fcrelerini tutar. SkyPlanner APS buna bir haz\u0131rl\u0131k s\u00fcresi matrisi ekler. Bu matris, \u00fcr\u00fcn \u00e7iftleri aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcrelerini saklar (maviden k\u0131rm\u0131z\u0131ya 30 dakika, k\u0131rm\u0131z\u0131dan maviye 60). SkyPlanner APS, i\u015fleri bu s\u00fcreleri en aza indirecek \u015fekilde s\u0131ralar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner APS, Sage 100&#8217;e nas\u0131l ba\u011flan\u0131r?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, Sage 100 ile \u00e7ift y\u00f6nl\u00fc entegre olur ve SkyPlanner ekibi entegrasyonu devreye alma s\u0131ras\u0131nda yap\u0131land\u0131r\u0131r. ABD s\u00fcr\u00fcm\u00fc Sage 100&#8217;e Business Object Interface ve ODBC \u00fczerinden ba\u011flan\u0131l\u0131r. Almanya s\u00fcr\u00fcm\u00fc Sage 100&#8217;\u00fcn verileri SQL Server veritaban\u0131ndan okunur; yazma y\u00f6ntemi Sage i\u015f orta\u011f\u0131n\u0131zla kararla\u015ft\u0131r\u0131l\u0131r. Planlanan tarihler her ad\u0131ma geri yaz\u0131l\u0131r. SkyPlanner webhook&#8217;lar\u0131 da \u00e7izelgedeki de\u011fi\u015fiklikleri ger\u00e7ekle\u015fti\u011fi anda iletir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner&#8217;\u0131 Sage 100 ile entegre etmeden \u00f6nce deneyebilir miyim?<\/summary>\n<p class=\"sp-faq__a\">Evet. A\u00e7\u0131k \u00fcretim emirlerinizi veya Fertigungsauftr\u00e4ge kay\u0131tlar\u0131n\u0131z\u0131 ve kaynaklar\u0131n\u0131z\u0131 Excel&#8217;e aktar\u0131n. 30 g\u00fcnl\u00fck deneme s\u00fcresinde bu verileri SkyPlanner&#8217;a aktar\u0131n ve olu\u015fan \u00e7izelgeyi mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n. Kredi kart\u0131 gerekmez. <a href=\"\/tr\/fiyatlandirma\/\">Fiyatlar\u0131 inceleyin<\/a>, <a href=\"\/tr\/deneme\/\">denemeyi ba\u015flat\u0131n<\/a> veya <a href=\"\/tr\/iletisim-satis\/\">sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Sage 100 Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu? Production Management ve Sage 100 Produktion nas\u0131l \u00e7al\u0131\u015f\u0131r? Her operasyonu kapasitenin bo\u015f oldu\u011fu zamana yerle\u015ftiren bir \u00fcretim \u00e7izelgeleme arac\u0131 anlam\u0131nda hay\u0131r. Bu ad\u0131 ta\u015f\u0131yan iki farkl\u0131 \u00fcr\u00fcn var. ABD\u2019deki Sage 100 Production Management, her i\u015f fi\u015fini Sage\u2019in &#8220;infinite&#8221; (s\u0131n\u0131rs\u0131z) dedi\u011fi y\u00fckleme &#8230; <a title=\"Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu? Production Management ve Sage 100 Produktion nas\u0131l \u00e7al\u0131\u015f\u0131r?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/\" aria-label=\"Read more about Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu? Production Management ve Sage 100 Produktion nas\u0131l \u00e7al\u0131\u015f\u0131r?\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106538,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107613","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu?<\/title>\n<meta name=\"description\" content=\"Sage 100: ABD\u2019de s\u0131n\u0131rs\u0131z y\u00fckleme, Almanya\u2019da manuel Plantafel. Nas\u0131l \u00e7al\u0131\u015f\u0131rlar, planlamac\u0131ya ne kal\u0131r ve ne zaman APS gerekir?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu? Production Management ve Sage 100 Produktion nas\u0131l \u00e7al\u0131\u015f\u0131r?\" \/>\n<meta property=\"og:description\" content=\"Sage 100: ABD\u2019de s\u0131n\u0131rs\u0131z y\u00fckleme, Almanya\u2019da manuel Plantafel. Nas\u0131l \u00e7al\u0131\u015f\u0131rlar, planlamac\u0131ya ne kal\u0131r ve ne zaman APS gerekir?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-100\\\/uretim-cizelgeleme\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-100\\\/uretim-cizelgeleme\\\/\",\"name\":\"Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Sage 100: ABD\u2019de s\u0131n\u0131rs\u0131z y\u00fckleme, Almanya\u2019da manuel Plantafel. Nas\u0131l \u00e7al\u0131\u015f\u0131rlar, planlamac\u0131ya ne kal\u0131r ve ne zaman APS gerekir?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-100\\\/uretim-cizelgeleme\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-100\\\/uretim-cizelgeleme\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-100\\\/uretim-cizelgeleme\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Sage 100 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-100\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu? Production Management ve Sage 100 Produktion nas\u0131l \u00e7al\u0131\u015f\u0131r?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu?","description":"Sage 100: ABD\u2019de s\u0131n\u0131rs\u0131z y\u00fckleme, Almanya\u2019da manuel Plantafel. Nas\u0131l \u00e7al\u0131\u015f\u0131rlar, planlamac\u0131ya ne kal\u0131r ve ne zaman APS gerekir?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/","og_locale":"tr_TR","og_type":"article","og_title":"Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu? Production Management ve Sage 100 Produktion nas\u0131l \u00e7al\u0131\u015f\u0131r?","og_description":"Sage 100: ABD\u2019de s\u0131n\u0131rs\u0131z y\u00fckleme, Almanya\u2019da manuel Plantafel. Nas\u0131l \u00e7al\u0131\u015f\u0131rlar, planlamac\u0131ya ne kal\u0131r ve ne zaman APS gerekir?","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"16 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/","name":"Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Sage 100: ABD\u2019de s\u0131n\u0131rs\u0131z y\u00fckleme, Almanya\u2019da manuel Plantafel. Nas\u0131l \u00e7al\u0131\u015f\u0131rlar, planlamac\u0131ya ne kal\u0131r ve ne zaman APS gerekir?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/uretim-cizelgeleme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Sage 100 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-100\/"},{"@type":"ListItem","position":5,"name":"Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu? Production Management ve Sage 100 Produktion nas\u0131l \u00e7al\u0131\u015f\u0131r?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Sage 100 Sage 100 kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yap\u0131yor mu? Production Management ve Sage 100 Produktion nas\u0131l \u00e7al\u0131\u015f\u0131r? Her operasyonu kapasitenin bo\u015f oldu\u011fu zamana yerle\u015ftiren bir \u00fcretim \u00e7izelgeleme arac\u0131 anlam\u0131nda hay\u0131r. Bu ad\u0131 ta\u015f\u0131yan iki farkl\u0131 \u00fcr\u00fcn var. ABD\u2019deki Sage 100 Production Management, her i\u015f fi\u015fini Sage\u2019in &#8220;infinite&#8221; (s\u0131n\u0131rs\u0131z) dedi\u011fi y\u00fckleme&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/107613","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=107613"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/107613\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106538"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=107613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}