{"id":107234,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"entegrasyon-kilavuzu","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/","title":{"rendered":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop System Entegrasyon K\u0131lavuzu"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ E2 Shop System<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\"><span class=\"hl\">SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in<\/span> E2 Shop System Entegrasyon K\u0131lavuzu<\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Bu E2 Shop System entegrasyon k\u0131lavuzu, i\u015f ortaklar\u0131na ve BT ekiplerine E2 Shop System (E2 SHOP) veya E2 MFG ile SkyPlanner APS aras\u0131nda nas\u0131l ba\u011flant\u0131 kurulaca\u011f\u0131n\u0131 g\u00f6sterir. SkyPlanner, E2 ile \u00e7ift y\u00f6nl\u00fc entegre olur:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Sipari\u015fler ve i\u015fler rota ad\u0131mlar\u0131yla birlikte SkyPlanner&#8217;a aktar\u0131l\u0131r. \u0130\u015f merkezleri, \u00e7al\u0131\u015fanlar ve vardiyalar, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, malzeme ihtiya\u00e7lar\u0131 ve sat\u0131n alma sipari\u015fleri de bu aktar\u0131ma dahildir.<\/li>\n\n\n<li>Planlanan ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131, SkyPlanner&#8217;\u0131n atad\u0131\u011f\u0131 makine ve \u00e7al\u0131\u015fan bilgileriyle birlikte her i\u015f ad\u0131m\u0131na geri yaz\u0131l\u0131r.<\/li>\n\n\n<li>\u0130sterseniz tamamlanan ad\u0131mlar ve kaydedilen s\u00fcreler de i\u015fe geri aktar\u0131labilir.<\/li>\n\n\n<li>SkyPlanner webhook\u2019lar\u0131, \u00e7izelgedeki de\u011fi\u015fiklikleri an\u0131nda iletir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo i\u00e7in randevu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve alt\u0131nda sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu E2 kurulumunuza g\u00f6re yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra da destek verir. Bu k\u0131lavuz, s\u00fcrece kat\u0131lmak veya SkyPlanner&#8217;\u0131n dok\u00fcmante edilmi\u015f REST API&#8217;sini (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API referans\u0131<\/a>) kullanarak kendi \u00e7\u00f6z\u00fcm\u00fcn\u00fc geli\u015ftirmek isteyen i\u015f ortaklar\u0131 ve geli\u015ftiriciler i\u00e7indir.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"which-e2-do-you-run\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hangi E2 s\u00fcr\u00fcm\u00fcn\u00fc kullan\u0131yorsunuz?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Entegrasyon y\u00f6ntemini belirledi\u011fi i\u00e7in \u00f6nce bunu netle\u015ftirin:<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Kulland\u0131\u011f\u0131n\u0131z \u00fcr\u00fcn<\/th><th>Bug\u00fcnk\u00fc durumu<\/th><th>Entegrasyon y\u00f6ntemi<\/th><\/tr><\/thead><tbody><tr><td>E2 Shop System (masa\u00fcst\u00fc, kendi sunucunuzda)<\/td><td>Shoptech&#8217;in sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyeler i\u00e7in geli\u015ftirdi\u011fi ilk E2 \u00fcr\u00fcn\u00fc<\/td><td>E2 sunucunuza do\u011frudan ba\u011flant\u0131 ve uygun yerlerde dosya aktar\u0131m\u0131<\/td><\/tr><tr><td>E2 MFG (E2 Manufacturing System)<\/td><td>Tekrarlayan, kesikli ve karma \u00fcretime y\u00f6nelik E2 s\u00fcr\u00fcm\u00fc; ECI taraf\u0131ndan &#8220;for existing customers&#8221; (mevcut m\u00fc\u015fteriler i\u00e7in) ifadesiyle listelenir<\/td><td>Yerel sunucuda \u00e7al\u0131\u015fan E2 Shop System ile ayn\u0131<\/td><\/tr><tr><td>Bar\u0131nd\u0131rma hizmetiyle sunulan E2 SHOP<\/td><td>ECI&#8217;nin JobBOSS\u00b2 ad\u0131yla yeniden geli\u015ftirdi\u011fi web platformu<\/td><td>Art\u0131k JobBOSS\u00b2 kullan\u0131yorsan\u0131z <a href=\"\/tr\/entegrasyonlar\/erp\/jobboss\/entegrasyon-kilavuzu\/\">JobBOSS\u00b2 entegrasyon k\u0131lavuzuna<\/a> ba\u015fvurun<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>ECI, JobBOSS\u00b2 i\u00e7in &#8220;formerly E2 Shop&#8221; (eski ad\u0131yla E2 Shop) ifadesini kullan\u0131r ve \u00fcr\u00fcn\u00fcn &#8220;combines E2 SHOP&#8217;s cloud-native, user-friendly platform with JobBOSS&#8217; depth of functionality&#8221; (E2 SHOP&#8217;\u0131n bulut i\u00e7in geli\u015ftirilmi\u015f, kullan\u0131c\u0131 dostu platformunu JobBOSS&#8217;un kapsaml\u0131 i\u015flevleriyle birle\u015ftirdi\u011fini) belirtir (<a href=\"https:\/\/www.ecisolutions.com\/news\/eci-launches-jobboss2-a-new-cloud-native-erp-for-small-and-medium-manufacturers\/\">ECI<\/a>). Bu k\u0131lavuzun geri kalan\u0131, E2 Shop System veya E2 MFG kullanan i\u015fletmeleri kapsar.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"e2-s-integration-routes\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">E2 entegrasyon y\u00f6ntemleri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ECI&#8217;nin <a href=\"https:\/\/integrations.ecimanufacturing.com\/\">ECI \u00fcretim API dok\u00fcmantasyonu<\/a> sitesinde yay\u0131mlad\u0131\u011f\u0131 \u00fcretim API&#8217;leri JobBOSS\u00b2, M1, Macola ve Deacom i\u00e7in hizmet verir. E2 ba\u011flant\u0131s\u0131 ise do\u011frudan kurulum \u00fczerinden yap\u0131l\u0131r. Bu y\u00f6ntem, yerel sunucuda \u00e7al\u0131\u015fan E2 i\u00e7in uygundur: veriler, kendi BT ekibinizin y\u00f6netti\u011fi bir sunucuda bulunur. Kurulumunuzda kullan\u0131lacak okuma ve yazma y\u00f6ntemi, devreye alma s\u00fcrecindeki kapsam belirleme a\u015famas\u0131nda netle\u015ftirilir.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Do\u011frudan sunucu ba\u011flant\u0131s\u0131 (yerel kurulum).<\/strong> A\u011f\u0131n\u0131zda \u00e7al\u0131\u015fan bir entegrasyon servisi; a\u00e7\u0131k i\u015fleri, rota ad\u0131mlar\u0131n\u0131, i\u015f merkezlerini, \u00e7al\u0131\u015fanlar\u0131, malzemeleri ve sat\u0131n alma sipari\u015flerini E2 veritaban\u0131ndan okur. Planlanan ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131n\u0131 da i\u015f ad\u0131mlar\u0131na geri yazar. Eri\u015fimi, bu i\u015f i\u00e7in ayr\u0131lm\u0131\u015f servis hesab\u0131n\u0131 ve yaz\u0131lacak alanlar\u0131 BT ekibiniz onaylar. S\u00fcrekli \u00e7al\u0131\u015fan \u00e7ift y\u00f6nl\u00fc entegrasyonda temel y\u00f6ntem budur.<\/li>\n\n\n<li><strong>Zamanlanm\u0131\u015f d\u0131\u015fa ve i\u00e7e aktar\u0131mlar.<\/strong> E2 raporlar\u0131 ve tablo d\u0131\u015fa aktar\u0131mlar\u0131, i\u015flerin, rotalar\u0131n ve i\u015f merkezlerinin CSV veya Excel dosyalar\u0131n\u0131 olu\u015fturur. SkyPlanner&#8217;\u0131n veri i\u00e7e aktarma \u00f6zelli\u011fi bu dosyalar\u0131 okur. Deneme a\u015famas\u0131nda bu y\u00f6ntem kullan\u0131l\u0131r; yaln\u0131zca ara s\u0131ra y\u00fckledi\u011finiz ana veriler i\u00e7in de uygundur.<\/li>\n\n\n<li><strong>Bar\u0131nd\u0131r\u0131lan kurulumlar.<\/strong> ECI taraf\u0131ndan bar\u0131nd\u0131r\u0131lan E2 kurulumlar\u0131nda veri eri\u015fimi ECI ile birlikte d\u00fczenlenir. ECI m\u00fc\u015fteri temsilcinizle erkenden g\u00f6r\u00fc\u015f\u00fcn.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner taraf\u0131nda REST API; sipari\u015fleri, \u00fcr\u00fcnleri, malzemeleri, s\u00fcre\u00e7 ad\u0131mlar\u0131n\u0131, s\u00fcre kay\u0131tlar\u0131n\u0131 ve sat\u0131n alma sipari\u015flerini okur ve yazar. Kimlik do\u011frulama, <code>Authorization-Token<\/code> ba\u015fl\u0131\u011f\u0131ndaki API token&#8217;\u0131 ile yap\u0131l\u0131r (SkyPlanner Settings &gt; API). API, Swagger\/OpenAPI ile dok\u00fcmante edilmi\u015ftir. <a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">Entegrasyon e\u011fitiminde<\/a> ilk \u00e7a\u011fr\u0131lar ad\u0131m ad\u0131m a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Olaylar ve periyodik sorgulama<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>E2 periyodik olarak sorgulan\u0131r. Entegrasyon servisi, son \u00e7al\u0131\u015fmadan bu yana de\u011fi\u015fen i\u015fleri ve rota ad\u0131mlar\u0131n\u0131 okur. \u0130\u015fletmeyle kararla\u015ft\u0131r\u0131lan s\u0131kl\u0131\u011fa g\u00f6re i\u015fler birka\u00e7 dakikada bir, stoklar ve sat\u0131n alma sipari\u015fleri ise saatte bir sorgulan\u0131r.<\/p>\n\n\n<p>SkyPlanner, durum veya \u00e7izelge de\u011fi\u015fti\u011finde webhook g\u00f6nderir. Servis bunlar\u0131 al\u0131r ve yeni tarihleri hemen E2&#8217;ye yazar; dolay\u0131s\u0131yla geri yazma i\u015flemi olay bazl\u0131d\u0131r. \u00dcretim sahas\u0131ndaki olaylar, SkyPlanner&#8217;\u0131n <code>\/timelogs<\/code> u\u00e7 noktas\u0131ndan belirli aral\u0131klarla da okunabilir.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Veri e\u015fleme<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>E2 nesnesi<\/th><th>SkyPlanner nesnesi<\/th><th>Y\u00f6n<\/th><th>S\u0131kl\u0131k<\/th><\/tr><\/thead><tbody><tr><td>Par\u00e7alar ve maliyet tahminleri, \u00e7ok seviyeli \u00fcr\u00fcn a\u011fa\u00e7lar\u0131<\/td><td>\u00dcr\u00fcnler, malzemeler, \u00fcr\u00fcn yap\u0131s\u0131<\/td><td>E2 \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fcklemede, ard\u0131ndan de\u011fi\u015fiklik oldu\u011funda<\/td><\/tr><tr><td>Rota ad\u0131mlar\u0131: i\u015f merkezi, haz\u0131rl\u0131k s\u00fcresi, i\u015flem s\u00fcresi<\/td><td>S\u00fcreleri ve haz\u0131rl\u0131k s\u00fcreleriyle birlikte s\u00fcre\u00e7 ad\u0131mlar\u0131<\/td><td>E2 \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fcklemede, ard\u0131ndan de\u011fi\u015fiklik oldu\u011funda<\/td><\/tr><tr><td>\u0130\u015f merkezleri ve makineler<\/td><td>\u0130\u015f merkezleri, i\u015f merkezi gruplar\u0131, verimlilik oranlar\u0131<\/td><td>E2 \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fcklemede, sonras\u0131nda nadiren<\/td><\/tr><tr><td>\u00c7al\u0131\u015fanlar, vardiyalar, b\u00f6l\u00fcmler, \u00e7al\u0131\u015f\u0131lmayan g\u00fcnler<\/td><td>Personel, vardiyalar, takvimler<\/td><td>E2 \u2192 SkyPlanner<\/td><td>G\u00fcnl\u00fck veya vardiyalar SkyPlanner&#8217;da y\u00f6netilir<\/td><\/tr><tr><td>Sipari\u015fler ve i\u015fler: i\u015f numaras\u0131, par\u00e7a, miktar, teslim tarihi, \u00f6ncelik, acil i\u015f i\u015fareti<\/td><td>Teslim tarihleri ve \u00f6ncelikleriyle birlikte sipari\u015fler<\/td><td>E2 \u2192 SkyPlanner<\/td><td>Birka\u00e7 dakikada bir sorgulama<\/td><\/tr><tr><td>\u0130\u015fin rota ad\u0131mlar\u0131: durum, tamamlanan miktar, kalan saat<\/td><td>Her s\u00fcre\u00e7 ad\u0131m\u0131 i\u00e7in i\u015fler<\/td><td>E2 \u2192 SkyPlanner<\/td><td>Birka\u00e7 dakikada bir sorgulama<\/td><\/tr><tr><td>Malzeme ihtiya\u00e7lar\u0131, teslim tarihleriyle birlikte sat\u0131n alma sipari\u015fleri<\/td><td>Malzeme ihtiya\u00e7lar\u0131, teslim tarihine g\u00f6re sat\u0131n alma sipari\u015fleri<\/td><td>E2 \u2192 SkyPlanner<\/td><td>Saatte bir veya \u00e7izelgeleme \u00e7al\u0131\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda sorgulama<\/td><\/tr><tr><td>\u0130\u015f ad\u0131m\u0131n\u0131n planlanan ba\u015flang\u0131\u00e7 ve biti\u015fi, i\u015f merkezi, \u00e7al\u0131\u015fan<\/td><td>Her ad\u0131m i\u00e7in planlanan ba\u015flang\u0131\u00e7 ve biti\u015f, makine ve operat\u00f6r<\/td><td>SkyPlanner \u2192 E2<\/td><td>\u00c7izelge de\u011fi\u015fti\u011finde, SkyPlanner webhook&#8217;u arac\u0131l\u0131\u011f\u0131yla<\/td><\/tr><tr><td>Her ad\u0131mda harcanan i\u015f s\u00fcresi ve tamamlanan miktarlar<\/td><td>S\u00fcre kay\u0131tlar\u0131 ve operat\u00f6r bildirimleri<\/td><td>SkyPlanner \u2192 E2<\/td><td>Tercih edilirse her bildirimde veya her vardiyada<\/td><\/tr><tr><td>E2&#8217;de bulunmaz<\/td><td>\u0130\u015fler aras\u0131 ge\u00e7i\u015f s\u00fcresi matrisi, s\u0131n\u0131rl\u0131 kapasiteli kaynak olarak tak\u0131mlar, alternatif makineler ve personel<\/td><td>SkyPlanner&#8217;da y\u00f6netilir<\/td><td>Devreye alma s\u00fcrecinde yap\u0131land\u0131r\u0131l\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Entegrasyon ak\u0131\u015flar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Ana verilerin ilk y\u00fcklemesi.<\/strong> Par\u00e7alar\u0131, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131n\u0131, rotalar\u0131, i\u015f merkezlerini, \u00e7al\u0131\u015fanlar\u0131 ve vardiyalar\u0131 okuyun. \u0130\u015f merkezlerini dikkatle e\u015fleyin: \u00fc\u00e7 freze bulunan bir i\u015f merkezi, bir i\u015f merkezi grubuna veya \u00fc\u00e7 i\u015f merkezine d\u00f6n\u00fc\u015ft\u00fcr\u00fcl\u00fcr. B\u00f6ylece SkyPlanner her makine i\u00e7in i\u015f s\u0131ras\u0131n\u0131 belirler.<\/p>\n\n\n<p><strong>2. \u0130\u015f senkronizasyonu.<\/strong> A\u00e7\u0131k i\u015fleri rota ad\u0131mlar\u0131, malzeme ihtiya\u00e7lar\u0131 ve a\u00e7\u0131k sat\u0131n alma sipari\u015fleriyle birlikte okuyun. SkyPlanner, sipari\u015f edilen malzemeyi sat\u0131n alma sipari\u015finin teslim tarihinde kullan\u0131labilir kabul eder ve sipari\u015f Delivered olarak i\u015faretlendi\u011finde sto\u011fu g\u00fcnceller. Kapanm\u0131\u015f ve beklemeye al\u0131nm\u0131\u015f i\u015fleri atlay\u0131n. Acil i\u015f i\u015faretini SkyPlanner&#8217;a \u00f6ncelik olarak aktar\u0131n.<\/p>\n\n\n<p><strong>3. \u00c7izelgenin geri yaz\u0131lmas\u0131.<\/strong> \u00c7izelgeleme motoru bir ad\u0131m\u0131 yerle\u015ftirdi\u011finde veya ta\u015f\u0131d\u0131\u011f\u0131nda, SkyPlanner webhook&#8217;u servisi tetikler. Servis, planlanan ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131n\u0131 E2&#8217;deki ilgili i\u015f ad\u0131m\u0131na yazar. SkyPlanner ad\u0131m\u0131 ba\u015fka bir makineye veya ki\u015fiye ta\u015f\u0131m\u0131\u015fsa i\u015f merkezi ve \u00e7al\u0131\u015fan bilgilerini de yazar. Ard\u0131ndan Whiteboard ve Planning Board, SkyPlanner&#8217;\u0131n tarihlerini g\u00f6sterir.<\/p>\n\n\n<p><strong>4. \u00dcretim sahas\u0131ndan bildirimler.<\/strong> Operat\u00f6rler, SkyPlanner Mobile Confirmations veya Production Timer ile \u00e7al\u0131\u015fmalar\u0131n\u0131 kaydeder; bu s\u00fcre kay\u0131tlar\u0131 \u00e7izelgeyi g\u00fcncel tutar. Ger\u00e7ekle\u015fen s\u00fcrelerin E2&#8217;ye geri aktar\u0131l\u0131p aktar\u0131lmayaca\u011f\u0131na siz karar verirsiniz. Aktar\u0131lmas\u0131n\u0131 se\u00e7erseniz her bildirim, i\u015f ad\u0131m\u0131na s\u00fcre ve miktar olarak yaz\u0131l\u0131r. Se\u00e7mezseniz E2 Data Collection oldu\u011fu gibi kullan\u0131lmaya devam eder ve SkyPlanner ilerlemeyi i\u015f ad\u0131mlar\u0131ndan okur.<\/p>\n\n\n<p><strong>5. Veri sahipli\u011fi ve \u00e7ak\u0131\u015fma kurallar\u0131.<\/strong> Canl\u0131ya ge\u00e7meden \u00f6nce bunlar\u0131 yaz\u0131l\u0131 hale getirin:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Veri<\/th><th>Sorumlu sistem<\/th><\/tr><\/thead><tbody><tr><td>Maliyet tahminleri, rotalar, miktarlar, teslim tarihleri, i\u015f durumu<\/td><td>E2<\/td><\/tr><tr><td>Ad\u0131m s\u0131ras\u0131, ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131, her ad\u0131m i\u00e7in makine ve operat\u00f6r<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u0130\u015fler aras\u0131 ge\u00e7i\u015f s\u00fcresi matrisi, tak\u0131m ve operat\u00f6r gereksinimleri, alternatif kaynaklar<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Vardiyalar ve \u00e7al\u0131\u015f\u0131lmayan g\u00fcnler<\/td><td>Kapsam belirleme a\u015famas\u0131nda se\u00e7ilen tek bir sistem<\/td><\/tr><tr><td>S\u00fcre, malzeme \u00e7\u0131k\u0131\u015flar\u0131, mal kabulleri, maliyetlendirme<\/td><td>E2; veriler do\u011frudan girilir veya SkyPlanner s\u00fcre kay\u0131tlar\u0131ndan aktar\u0131l\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0130\u015f ad\u0131mlar\u0131n\u0131n tarihlerini yaln\u0131zca tek bir sistem yazmal\u0131d\u0131r. Planlamac\u0131lar i\u015fleri SkyPlanner&#8217;da ta\u015f\u0131r ve tarihler E2&#8217;ye aktar\u0131l\u0131r. SkyPlanner&#8217;da \u00e7izelgelenen i\u015flerin kartlar\u0131 Planning Board \u00fczerinde art\u0131k s\u00fcr\u00fcklenmemelidir; aksi takdirde iki plan birbirinden sapar.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipik proje ad\u0131mlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Uygulama, devreye alma s\u00fcrecinin ba\u015flamas\u0131ndan sonra normalde birka\u00e7 hafta i\u00e7inde tamamlan\u0131r. \u00d6ncesinde, E2&#8217;den CSV veya Excel olarak d\u0131\u015fa aktard\u0131\u011f\u0131n\u0131z i\u015f merkezleri, rotalar ve a\u00e7\u0131k i\u015flerle 30 g\u00fcnl\u00fck \u00fccretsiz deneme s\u0131ras\u0131nda \u00e7izelgeyi do\u011frulay\u0131n.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Kapsam belirleme.<\/strong> E2 \u00fcr\u00fcn\u00fcn\u00fc ve s\u00fcr\u00fcm\u00fcn\u00fc, sunucuyu, e\u015fleme tablosunu, veri sahipli\u011fi kurallar\u0131n\u0131 ve s\u00fcrelerin geri yaz\u0131l\u0131p yaz\u0131lmayaca\u011f\u0131n\u0131 netle\u015ftirin.<\/li>\n\n\n<li><strong>Eri\u015fim.<\/strong> BT ekibiniz hizmet hesab\u0131n\u0131 olu\u015fturur ve okuma ve yazma eri\u015fimini onaylar. E2&#8217;nin tam yede\u011fini al\u0131n ve \u00f6nce \u015firket verilerinin bir kopyas\u0131 \u00fczerinde test yap\u0131n.<\/li>\n\n\n<li><strong>\u0130lk veri y\u00fcklemesi.<\/strong> Par\u00e7alar, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, rotalar, i\u015f merkezleri, \u00e7al\u0131\u015fanlar ve vardiyalar.<\/li>\n\n\n<li><strong>\u0130\u015f ve sat\u0131n alma sipari\u015fi senkronizasyonu.<\/strong> De\u011fi\u015fiklikleri d\u00fczenli sorgularla al\u0131n; yeniden deneme ve g\u00fcnl\u00fck kayd\u0131 mekanizmalar\u0131n\u0131 kullan\u0131n.<\/li>\n\n\n<li><strong>SkyPlanner&#8217;da k\u0131s\u0131tlar\u0131n tan\u0131mlanmas\u0131.<\/strong> Haz\u0131rl\u0131k ve ge\u00e7i\u015f s\u00fcreleri matrisi, tak\u0131mlar, i\u015f ba\u015f\u0131na operat\u00f6r say\u0131lar\u0131 ve alternatif makineler veya personel.<\/li>\n\n\n<li><strong>\u00c7izelgenin geri yaz\u0131lmas\u0131.<\/strong> Webhook ile tetiklenerek i\u015f ad\u0131mlar\u0131na tarihler yaz\u0131l\u0131r; tercih edilirse s\u00fcre ve miktarlar da eklenir.<\/li>\n\n\n<li><strong>Paralel test.<\/strong> SkyPlanner&#8217;\u0131 mevcut Whiteboard ile birlikte \u00e7al\u0131\u015ft\u0131r\u0131n, tarihleri kar\u015f\u0131la\u015ft\u0131r\u0131n ve ana verileri d\u00fczeltin.<\/li>\n\n\n<li><strong>Canl\u0131ya ge\u00e7i\u015f.<\/strong> Veriler birbiriyle e\u015fle\u015fti\u011finde geri yazmay\u0131 etkinle\u015ftirin.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-e2-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">E2 entegrasyonunu planlarken dikkat edilecekler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u00dcr\u00fcn ve s\u00fcr\u00fcm.<\/strong> E2 Shop System ve E2 MFG kurulumlar\u0131 s\u00fcr\u00fcme g\u00f6re farkl\u0131l\u0131k g\u00f6sterir. Kapsam belirleme a\u015famas\u0131nda kulland\u0131\u011f\u0131n\u0131z \u00fcr\u00fcn\u00fc ve s\u00fcr\u00fcm\u00fc do\u011frulay\u0131n; her E2 g\u00fcncellemesinden sonra entegrasyonu yeniden test edin.<\/li>\n\n\n<li><strong>Sizin sunucunuz, sizin kurallar\u0131n\u0131z.<\/strong> Yerel kurulumlu E2, kendi a\u011f\u0131n\u0131zda \u00e7al\u0131\u015f\u0131r. Entegrasyon hizmetinin nerede \u00e7al\u0131\u015faca\u011f\u0131n\u0131, hangi hesab\u0131 kullanaca\u011f\u0131n\u0131 ve hangi alanlara yazabilece\u011fini BT ekibinizle kararla\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>\u0130\u015f merkezlerinin arkas\u0131ndaki makineler.<\/strong> Bir i\u015f merkezi tek bir makine, bir makine grubu veya bir \u00fcretim h\u00fccresi olabilir. \u0130lk veri y\u00fcklemesinden \u00f6nce her birinin SkyPlanner i\u015f merkezleriyle nas\u0131l e\u015flenece\u011fine karar verin.<\/li>\n\n\n<li><strong>D\u0131\u015far\u0131dan al\u0131nan hizmetler.<\/strong> Tedarik\u00e7ide y\u00fcr\u00fct\u00fclen ad\u0131mlar sizin kapasitenizi kullanmaz; lead time olarak de\u011ferlendirilir. Bunlar\u0131 yaln\u0131zca s\u00fcre i\u00e7eren ad\u0131mlar olarak modelleyin.<\/li>\n\n\n<li><strong>Zaman birimleri.<\/strong> Haz\u0131rl\u0131k ve i\u015flem s\u00fcreleri par\u00e7a, parti veya saat baz\u0131nda tan\u0131mlanm\u0131\u015f olabilir. \u0130\u00e7e aktar\u0131rken birimleri d\u00f6n\u00fc\u015ft\u00fcr\u00fcn; aksi halde t\u00fcm s\u00fcreler yanl\u0131\u015f olur.<\/li>\n\n\n<li><strong>Acil i\u015fler.<\/strong> E2, y\u00fcksek \u00f6ncelikli i\u015fleri i\u015faretler. Acil i\u015flerin s\u0131ras\u0131n\u0131 korumak i\u00e7in bu i\u015fareti SkyPlanner&#8217;daki \u00f6ncelikle veya Fast Track ile e\u015fleyin.<\/li>\n\n\n<li><strong>JobBOSS\u00b2&#8217;ye ge\u00e7meyi mi planl\u0131yorsunuz?<\/strong> SkyPlanner taraf\u0131n\u0131 bir kez kurun. JobBOSS\u00b2&#8217;ye ge\u00e7ti\u011finizde ayn\u0131 plan, <a href=\"\/tr\/entegrasyonlar\/erp\/jobboss\/entegrasyon-kilavuzu\/\">JobBOSS\u00b2 k\u0131lavuzunda<\/a> a\u00e7\u0131klanan ECI JobBOSS\u00b2 API (bar\u0131nd\u0131r\u0131lan s\u00fcr\u00fcm) veya ERP API \u00fczerinden ba\u011flan\u0131r.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-e2-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">E2 entegrasyonunu kim yap\u0131land\u0131r\u0131r ve destekler?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner ekibi entegrasyonu devreye alma s\u00fcrecinde yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra destekler.<\/strong> Bu hizmet, \u00fczerinde anla\u015f\u0131lm\u0131\u015f nesneleri ve senkronizasyon kurallar\u0131n\u0131 kapsar. Her \u00fcretim i\u015fletmesi E2&#8217;yi farkl\u0131 kullan\u0131r; bu deneyim yap\u0131land\u0131rmaya yans\u0131t\u0131l\u0131r.<\/li>\n\n\n<li><strong>E2 i\u015f orta\u011f\u0131n\u0131z veya BT hizmet sa\u011flay\u0131c\u0131n\u0131z s\u00fcrece kat\u0131labilir.<\/strong> Sunucunuzu ve E2 yap\u0131land\u0131rman\u0131z\u0131 tan\u0131d\u0131klar\u0131 i\u00e7in SkyPlanner ekibiyle birlikte eri\u015fim ve hizmet hesab\u0131 i\u015flemlerini y\u00fcr\u00fctebilirler.<\/li>\n\n\n<li><strong>Kendi geli\u015ftiricileriniz entegrasyonu geni\u015fletebilir.<\/strong> Bunun i\u00e7in bir API token kullanarak SkyPlanner&#8217;\u0131n REST API aray\u00fcz\u00fcyle \u00e7al\u0131\u015fabilirler. Ba\u015flamak i\u00e7in bir API token yeterlidir; gerekti\u011finde SkyPlanner ekibi yard\u0131mc\u0131 olur. Teknik belgelere <a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">SkyPlanner entegrasyon belgelerinden<\/a> ula\u015fabilirsiniz.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve ayl\u0131k faturaland\u0131r\u0131l\u0131r. Entegrasyon i\u00e7in s\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re, abonelik plan\u0131n\u0131zla birlikte \u00f6nceden fiyat teklifi sunulur. <a href=\"\/tr\/fiyatlandirma\/\">Fiyatland\u0131rmay\u0131<\/a>, <a href=\"\/tr\/entegrasyonlar\/erp\/e2-shop-system\/uretim-cizelgeleme\/\">E2 Shop System ile kapasiteye uygun \u00fcretim \u00e7izelgeleme<\/a> sayfas\u0131n\u0131, <a href=\"\/tr\/entegrasyonlar\/erp\/e2-shop-system\/\">E2 Shop System sayfas\u0131n\u0131<\/a>, <a href=\"\/tr\/ozellikler\/\">SkyPlanner \u00f6zelliklerini<\/a> ve <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131 sayfas\u0131n\u0131<\/a> inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner kullanan \u00fcreticiler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta kazan\u0131lan zaman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131; t\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f bir plan 30 dakikadan k\u0131sa s\u00fcrede haz\u0131rlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec CEO&#x27;su Hannu Ryyn\u00e4nen, \u015firketin Lohja&#x27;daki \u00fcretim tesisinde\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000&#8217;lerce<\/b><span>otomatik \u00e7izelgelenen i\u015f emri<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimi art\u0131k farkl\u0131 bir \u015fekilde kontrol alt\u0131nda tutuyoruz; kapasitemize ili\u015fkin bilgimiz ise bamba\u015fka bir d\u00fczeye ula\u015ft\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 End\u00fcstriyel kar\u0131\u015ft\u0131r\u0131c\u0131lar, pompalar ve y\u00fcksek teknolojili fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Binlerce i\u015f emri otomatik olarak \u00e7izelgeleniyor ve t\u00fcm organizasyon \u00fcretimi ger\u00e7ek zamanl\u0131 olarak g\u00f6rebiliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/mamec\/\">Mamec&#8217;in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 tesisinde kaynakl\u0131 bir \u00e7elik yap\u0131y\u0131 ta\u015flayan KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>teslimat performans\u0131; \u00f6nceki oran yakla\u015f\u0131k %50<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumam\u0131zda belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal i\u015fleme ve fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k %50&#8217;den %98&#8217;e kadar y\u00fckseldi. \u00c7izelgeleme i\u00e7in art\u0131k iki yerine bir \u00fcretim sorumlusu yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp&#8217;un de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>E2 Shop System&#8217;in bir API aray\u00fcz\u00fc var m\u0131?<\/summary>\n<p class=\"sp-faq__a\">ECI&#8217;nin yay\u0131mlad\u0131\u011f\u0131 \u00fcretim API&#8217;leri JobBOSS\u00b2, M1, Macola ve Deacom i\u00e7in kullan\u0131l\u0131r. Yerel kurulumlu E2 Shop System ve E2 MFG&#8217;ye ba\u011flant\u0131, kurulumun bulundu\u011fu ortamda sa\u011flan\u0131r: a\u011f\u0131n\u0131zda \u00e7al\u0131\u015fan bir entegrasyon hizmeti, BT ekibinizin onaylad\u0131\u011f\u0131 eri\u015fimle E2 verilerini okur ve yazar. Geri kalan veri aktar\u0131m\u0131 dosya d\u0131\u015fa aktar\u0131mlar\u0131yla sa\u011flan\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Planlanan tarihler E2&#8217;ye nas\u0131l geri yaz\u0131l\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Her i\u015f ad\u0131m\u0131 i\u00e7in ayr\u0131 ayr\u0131 yaz\u0131l\u0131r. Bir SkyPlanner webhook&#8217;u entegrasyon hizmetini tetikler. Hizmet, planlanan ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131n\u0131 E2&#8217;deki i\u015f ad\u0131m\u0131na yazar; SkyPlanner ad\u0131m\u0131 ba\u015fka bir kayna\u011fa ta\u015f\u0131d\u0131ysa i\u015f merkezi ve \u00e7al\u0131\u015fan bilgilerini de yazar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, \u00fcretim sahas\u0131nda kaydedilen s\u00fcreleri E2&#8217;ye geri yazabilir mi?<\/summary>\n<p class=\"sp-faq__a\">Evet, tercih ederseniz. SkyPlanner&#8217;daki her teyit, i\u015f ad\u0131m\u0131na s\u00fcre ve miktar olarak aktar\u0131l\u0131r. E2 Data Collection kullanmay\u0131 tercih eden i\u015fletmeler bunu kullanmaya devam eder; SkyPlanner ise ilerleme bilgilerini E2&#8217;den okur.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bar\u0131nd\u0131r\u0131lan E2 SHOP kullan\u0131yoruz. Hangi k\u0131lavuz bizim i\u00e7in ge\u00e7erli?<\/summary>\n<p class=\"sp-faq__a\">Bar\u0131nd\u0131r\u0131lan E2 SHOP, JobBOSS\u00b2&#8217;ye d\u00f6n\u00fc\u015ft\u00fc. Art\u0131k JobBOSS\u00b2&#8217;ye giri\u015f yap\u0131yorsan\u0131z <a href=\"\/tr\/entegrasyonlar\/erp\/jobboss\/entegrasyon-kilavuzu\/\">JobBOSS\u00b2 entegrasyon k\u0131lavuzunu<\/a> kullan\u0131n. H\u00e2l\u00e2 bar\u0131nd\u0131r\u0131lan E2 kullan\u0131yorsan\u0131z veri eri\u015fimi, kapsam belirleme a\u015famas\u0131nda ECI ile d\u00fczenlenir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Daha sonra JobBOSS\u00b2&#8217;ye ge\u00e7ersek entegrasyon korunur mu?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner taraf\u0131 ayn\u0131 kal\u0131r: i\u015f merkezleri, k\u0131s\u0131tlar, haz\u0131rl\u0131k ve ge\u00e7i\u015f s\u00fcreleri matrisi ve \u00e7izelgeniz korunur. Yaln\u0131zca E2 ba\u011flant\u0131s\u0131n\u0131n yerini ECI&#8217;nin JobBOSS\u00b2 API veya ERP API ba\u011flant\u0131s\u0131 al\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Entegrasyonu kurmadan \u00f6nce SkyPlanner&#8217;\u0131 deneyebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck \u00fccretsiz denemede, E2&#8217;den CSV veya Excel dosyalar\u0131 i\u00e7e aktar\u0131larak 20 i\u015f merkezine kadar \u00e7al\u0131\u015f\u0131labilir; kredi kart\u0131 gerekmez. <a href=\"\/tr\/deneme\/\">Denemeyi ba\u015flat\u0131n<\/a> veya entegrasyonun kapsam\u0131n\u0131 belirlemek i\u00e7in <a href=\"\/tr\/iletisim-satis\/\">sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ E2 Shop System SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop System Entegrasyon K\u0131lavuzu Bu E2 Shop System entegrasyon k\u0131lavuzu, i\u015f ortaklar\u0131na ve BT ekiplerine E2 Shop System (E2 SHOP) veya E2 MFG ile SkyPlanner APS aras\u0131nda nas\u0131l ba\u011flant\u0131 kurulaca\u011f\u0131n\u0131 g\u00f6sterir. SkyPlanner, E2 ile \u00e7ift y\u00f6nl\u00fc entegre olur: skyplanner.ai \u00b7 \u00dcretim &#8230; <a title=\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop System Entegrasyon K\u0131lavuzu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/\" aria-label=\"Read more about SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop System Entegrasyon K\u0131lavuzu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106335,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107234","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop APS Entegrasyon K\u0131lavuzu<\/title>\n<meta name=\"description\" content=\"E2 Shop System\u2013SkyPlanner APS: yerel sunucu ba\u011flant\u0131s\u0131, dosya aktar\u0131m\u0131, i\u015f ad\u0131m\u0131 tarihlerini geri yazma, Data Collection, veri e\u015fleme ve proje ipu\u00e7lar\u0131.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop System Entegrasyon K\u0131lavuzu\" \/>\n<meta property=\"og:description\" content=\"E2 Shop System\u2013SkyPlanner APS: yerel sunucu ba\u011flant\u0131s\u0131, dosya aktar\u0131m\u0131, i\u015f ad\u0131m\u0131 tarihlerini geri yazma, Data Collection, veri e\u015fleme ve proje ipu\u00e7lar\u0131.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/e2-shop-system\\\/entegrasyon-kilavuzu\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/e2-shop-system\\\/entegrasyon-kilavuzu\\\/\",\"name\":\"\u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop APS Entegrasyon K\u0131lavuzu\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"E2 Shop System\u2013SkyPlanner APS: yerel sunucu ba\u011flant\u0131s\u0131, dosya aktar\u0131m\u0131, i\u015f ad\u0131m\u0131 tarihlerini geri yazma, Data Collection, veri e\u015fleme ve proje ipu\u00e7lar\u0131.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/e2-shop-system\\\/entegrasyon-kilavuzu\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/e2-shop-system\\\/entegrasyon-kilavuzu\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/e2-shop-system\\\/entegrasyon-kilavuzu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"E2 Shop System i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/e2-shop-system\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop System Entegrasyon K\u0131lavuzu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop APS Entegrasyon K\u0131lavuzu","description":"E2 Shop System\u2013SkyPlanner APS: yerel sunucu ba\u011flant\u0131s\u0131, dosya aktar\u0131m\u0131, i\u015f ad\u0131m\u0131 tarihlerini geri yazma, Data Collection, veri e\u015fleme ve proje ipu\u00e7lar\u0131.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/","og_locale":"tr_TR","og_type":"article","og_title":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop System Entegrasyon K\u0131lavuzu","og_description":"E2 Shop System\u2013SkyPlanner APS: yerel sunucu ba\u011flant\u0131s\u0131, dosya aktar\u0131m\u0131, i\u015f ad\u0131m\u0131 tarihlerini geri yazma, Data Collection, veri e\u015fleme ve proje ipu\u00e7lar\u0131.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/","name":"\u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop APS Entegrasyon K\u0131lavuzu","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"E2 Shop System\u2013SkyPlanner APS: yerel sunucu ba\u011flant\u0131s\u0131, dosya aktar\u0131m\u0131, i\u015f ad\u0131m\u0131 tarihlerini geri yazma, Data Collection, veri e\u015fleme ve proje ipu\u00e7lar\u0131.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/entegrasyon-kilavuzu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"E2 Shop System i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/e2-shop-system\/"},{"@type":"ListItem","position":5,"name":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop System Entegrasyon K\u0131lavuzu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ E2 Shop System SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in E2 Shop System Entegrasyon K\u0131lavuzu Bu E2 Shop System entegrasyon k\u0131lavuzu, i\u015f ortaklar\u0131na ve BT ekiplerine E2 Shop System (E2 SHOP) veya E2 MFG ile SkyPlanner APS aras\u0131nda nas\u0131l ba\u011flant\u0131 kurulaca\u011f\u0131n\u0131 g\u00f6sterir. SkyPlanner, E2 ile \u00e7ift y\u00f6nl\u00fc entegre olur: skyplanner.ai \u00b7 \u00dcretim&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/107234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=107234"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/107234\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106335"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=107234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}