{"id":107060,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"entegrasyon-kilavuzu","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/","title":{"rendered":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in APplus Entegrasyon K\u0131lavuzu"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ APplus<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\"><span class=\"hl\">SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in<\/span> APplus Entegrasyon K\u0131lavuzu<\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Bu APplus entegrasyon k\u0131lavuzu, APplus i\u015f ortaklar\u0131na ve BT ekiplerine APplus&#8217;\u0131 SkyPlanner APS&#8217;ye nas\u0131l ba\u011flayacaklar\u0131n\u0131 g\u00f6sterir. SkyPlanner, Asseco&#8217;nun kendi aray\u00fczlerini kullanarak APplus ile \u00e7ift y\u00f6nl\u00fc entegrasyon sa\u011flar:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00dcretim emirleri (Fertigungsauftr\u00e4ge); operasyonlar\u0131 (Arbeitsg\u00e4nge), rotalar\u0131 (Arbeitspl\u00e4ne), \u00fcr\u00fcn a\u011fa\u00e7lar\u0131 (St\u00fccklisten), kapasite birimleri (Kapazit\u00e4tsstellen ve Kapazit\u00e4tseinheiten), tak\u0131mlar (Betriebsmittel), stoklar ve sat\u0131n alma sipari\u015fleriyle birlikte i\u00e7eri aktar\u0131l\u0131r.<\/li>\n\n\n<li>Her operasyonun planlanan ba\u015flang\u0131c\u0131, biti\u015fi ve kapasite birimi \u00fcretim emrine geri yaz\u0131l\u0131r.<\/li>\n\n\n<li>Tercih ederseniz operat\u00f6rlerin s\u00fcre kay\u0131tlar\u0131, emre BDE mesajlar\u0131 olarak geri aktar\u0131labilir.<\/li>\n\n\n<li>SkyPlanner webhook\u2019lar\u0131, \u00e7izelgedeki de\u011fi\u015fiklikleri an\u0131nda iletir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo i\u00e7in randevu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve alt\u0131nda sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu APplus yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar ve canl\u0131ya ge\u00e7i\u015ften sonra da destek verir. Bu k\u0131lavuz, s\u00fcrece kat\u0131lmak veya SkyPlanner&#8217;\u0131n dok\u00fcmante edilmi\u015f REST API&#8217;sini (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API referans\u0131<\/a>) kullanarak kendi \u00e7\u00f6z\u00fcmlerini geli\u015ftirmek isteyen i\u015f ortaklar\u0131 ve geli\u015ftiriciler i\u00e7indir.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"applus-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">APplus entegrasyon aray\u00fczleri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>APplus, harici bir \u00e7izelgeleme sistemi i\u00e7in \u015fu ba\u011flant\u0131 yollar\u0131n\u0131 sunar:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>APplus web servisleri.<\/strong> APplus, web servisleri mimarisi \u00fczerine kuruludur. Asseco&#8217;ya g\u00f6re gerekli t\u00fcm \u00e7izelgeleme i\u015flevlerine do\u011frudan internet \u00fczerinden eri\u015filebilir ve bu i\u015flevler m\u00fc\u015fterilerin ve tedarik\u00e7ilerin BT sistemleri taraf\u0131ndan kullan\u0131labilir (<a href=\"https:\/\/www.applus-erp.de\/en\/solutions\/erp-features\/e-business\/\">Asseco<\/a>). \u00dcretim verilerini okumak ve planlanan tarihleri yazmak i\u00e7in kullan\u0131lan temel ba\u011flant\u0131 yolu budur.<\/li>\n\n\n<li><strong>Business Integration Framework.<\/strong> APplus 6.3&#8217;ten bu yana bu altyap\u0131, uyarlanabilir veri yap\u0131lar\u0131 arac\u0131l\u0131\u011f\u0131yla \u00fc\u00e7\u00fcnc\u00fc taraf sistemleri programlama gerektirmeden birbirine ba\u011flar (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/it-business-2016-asseco-stellt-neue-produktversion-applus-63-vor\/\">Asseco<\/a>). APplus nesnelerini SkyPlanner&#8217;\u0131n REST API&#8217;siyle e\u015flemek i\u00e7in kullan\u0131n.<\/li>\n\n\n<li><strong>Universal Cloud Connector.<\/strong> \u0130\u015f ortaklar\u0131n\u0131n \u00e7\u00f6z\u00fcmlerini ve SaaS hizmetlerini APplus&#8217;a ba\u011flamak i\u00e7in APplus 7.1&#8217;de eklenmi\u015ftir; aktar\u0131lan veriler i\u00e7in y\u00fcksek g\u00fcvenlik sa\u011flar (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/asseco-veroeffentlicht-applus-71\/\">Asseco<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>APplus 10 ile birlikte Flow Mode, belirlenen zamanlarda veya belirli olaylar ger\u00e7ekle\u015fti\u011finde s\u00fcre\u00e7leri manuel ad\u0131m gerektirmeden ba\u015flat\u0131r (<a href=\"https:\/\/www.applus-erp.de\/en\/new-version\/\">Asseco<\/a>). Her nesnenin hangi ba\u011flant\u0131 yoluyla aktar\u0131laca\u011f\u0131, devreye alma s\u00fcrecinin kapsam belirleme a\u015famas\u0131nda kararla\u015ft\u0131r\u0131l\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kimlik do\u011frulama ve eri\u015fim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>APplus taraf\u0131.<\/strong> Entegrasyon, APplus&#8217;ta kendisine ayr\u0131lm\u0131\u015f bir teknik kullan\u0131c\u0131 hesab\u0131yla \u00e7al\u0131\u015f\u0131r. Bu hesab\u0131n yetkileri yaln\u0131zca okudu\u011fu ve yazd\u0131\u011f\u0131 nesnelerle s\u0131n\u0131rl\u0131d\u0131r. Kullan\u0131c\u0131 hesab\u0131n\u0131 ve web servisi eri\u015fimini APplus i\u015f orta\u011f\u0131n\u0131z yap\u0131land\u0131r\u0131r.<\/li>\n\n\n<li><strong>A\u011f.<\/strong> APplus, \u015firket i\u00e7i sunucularda veya bar\u0131nd\u0131r\u0131lan bir s\u00fcr\u00fcm olarak \u00e7al\u0131\u015f\u0131r (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">APplus hakk\u0131nda bilgiler<\/a>). Entegrasyon, BT ekibinizin veya bar\u0131nd\u0131rma sa\u011flay\u0131c\u0131n\u0131z\u0131n izin verdi\u011fi ba\u011flant\u0131 yolunu kullanarak APplus&#8217;a eri\u015fir.<\/li>\n\n\n<li><strong>SkyPlanner taraf\u0131.<\/strong> REST API, Settings &gt; API alt\u0131nda olu\u015fturulan ve <code>Authorization-Token<\/code> ba\u015fl\u0131\u011f\u0131nda iletilen bir API belirteciyle kimlik do\u011frular. API, Swagger\/OpenAPI ile dok\u00fcmante edilmi\u015ftir. <a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">Entegrasyon e\u011fitimi<\/a>, ilk \u00e7a\u011fr\u0131lar\u0131 ad\u0131m ad\u0131m a\u00e7\u0131klar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Olaylar ve periyodik sorgulama<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>APplus taraf\u0131nda entegrasyon, a\u00e7\u0131k \u00fcretim emirlerini ve son de\u011fi\u015fiklikleri almak i\u00e7in web servislerini periyodik olarak sorgular veya Business Integration Framework de\u011fi\u015fiklikleri SkyPlanner&#8217;a g\u00f6nderir. S\u0131kl\u0131k, tesis baz\u0131nda belirlenir: emirler i\u00e7in birka\u00e7 dakikada bir, stoklar i\u00e7in saatte bir olabilir.<\/p>\n\n\n<p>Durum veya \u00e7izelge de\u011fi\u015fti\u011finde SkyPlanner webhook g\u00f6nderir; dolay\u0131s\u0131yla geri yazma i\u015flemleri olay tabanl\u0131d\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Veri e\u015fleme<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>APplus nesnesi<\/th><th>SkyPlanner nesnesi<\/th><th>Y\u00f6n<\/th><th>S\u0131kl\u0131k<\/th><\/tr><\/thead><tbody><tr><td>Par\u00e7alar (Artikel), birimler<\/td><td>\u00dcr\u00fcnler ve malzemeler<\/td><td>APplus \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, ard\u0131ndan periyodik sorgulama<\/td><\/tr><tr><td>\u00dcr\u00fcn a\u011fa\u00e7lar\u0131 (St\u00fccklisten, Strukturst\u00fccklisten)<\/td><td>\u00dcr\u00fcn yap\u0131s\u0131, alt \u00fcr\u00fcnler, \u00fcr\u00fcn ba\u015f\u0131na malzemeler<\/td><td>APplus \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, ard\u0131ndan de\u011fi\u015fiklik oldu\u011funda<\/td><\/tr><tr><td>Operasyonlar\u0131, haz\u0131rl\u0131k ve \u00e7al\u0131\u015fma s\u00fcreleriyle birlikte rotalar (Arbeitspl\u00e4ne)<\/td><td>S\u00fcreleri, haz\u0131rl\u0131k ve s\u00f6k\u00fcm s\u00fcreleriyle birlikte s\u00fcre\u00e7 ad\u0131mlar\u0131<\/td><td>APplus \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, ard\u0131ndan de\u011fi\u015fiklik oldu\u011funda<\/td><\/tr><tr><td>Kapasite noktalar\u0131 ve birimleri (Kapazit\u00e4tsstellen, Kapazit\u00e4tseinheiten)<\/td><td>\u0130\u015f merkezi gruplar\u0131 ve i\u015f merkezleri, verimlilik oranlar\u0131<\/td><td>APplus \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, sonras\u0131nda nadiren<\/td><\/tr><tr><td>Personel kapasitesi<\/td><td>Vardiyalar\u0131yla birlikte personel<\/td><td>APplus \u2192 SkyPlanner<\/td><td>G\u00fcnl\u00fck veya vardiyalar do\u011frudan SkyPlanner&#8217;da y\u00f6netilir<\/td><\/tr><tr><td>Tak\u0131mlar ve fikst\u00fcrler (Betriebsmittel)<\/td><td>Kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklar olarak tak\u0131mlar<\/td><td>APplus \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, ard\u0131ndan de\u011fi\u015fiklik oldu\u011funda<\/td><\/tr><tr><td>Operasyonlar\u0131 ve malzemeleriyle birlikte \u00fcretim emirleri (Fertigungsauftr\u00e4ge)<\/td><td>Terminleri ve malzeme ihtiya\u00e7lar\u0131yla birlikte emirler ve i\u015fler<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Birka\u00e7 dakikada bir sorgulama<\/td><\/tr><tr><td>Mevcut stok<\/td><td>Stok bakiyeleri<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Saatte bir veya \u00e7izelgeleme \u00e7al\u0131\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda sorgulama<\/td><\/tr><tr><td>Teslimat tarihleriyle birlikte sat\u0131n alma sipari\u015fleri (Bestellungen)<\/td><td>Sat\u0131n alma sipari\u015fleri, teslimat tarihine g\u00f6re gelecek malzemeler<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Saatte bir veya \u00e7izelgeleme \u00e7al\u0131\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda sorgulama<\/td><\/tr><tr><td>\u00dcretim emrindeki her operasyon i\u00e7in planlanan ba\u015flang\u0131\u00e7, biti\u015f ve kapasite birimi<\/td><td>Her i\u015f i\u00e7in \u00e7izelgelenen ba\u015flang\u0131\u00e7 ve biti\u015f<\/td><td>SkyPlanner \u2192 APplus<\/td><td>\u00c7izelge de\u011fi\u015fti\u011finde, SkyPlanner webhook&#8217;u arac\u0131l\u0131\u011f\u0131yla<\/td><\/tr><tr><td>BDE mesajlar\u0131: operasyon ba\u015f\u0131na s\u00fcre ve miktar, \u00e7al\u0131\u015fan<\/td><td>S\u00fcre kay\u0131tlar\u0131 ve operat\u00f6r teyitleri<\/td><td>SkyPlanner \u2192 APplus<\/td><td>Tercih edilirse her teyitte veya her vardiyada<\/td><\/tr><tr><td>APplus&#8217;ta bulunmaz<\/td><td>Haz\u0131rl\u0131k s\u00fcresi matrisi, i\u015f ba\u015f\u0131na operat\u00f6r say\u0131lar\u0131, alternatif makineler ve personel<\/td><td>SkyPlanner&#8217;da y\u00f6netilir<\/td><td>Devreye alma s\u00fcrecinde yap\u0131land\u0131r\u0131l\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Entegrasyon modelleri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Ana verilerin ilk y\u00fcklemesi.<\/strong> Par\u00e7alar\u0131, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131n\u0131, rotalar\u0131, kapasite noktalar\u0131n\u0131 ve birimlerini, Betriebsmittel ve personel kapasitesini APplus web servisleri \u00fczerinden okuyun. E\u015flemeyi dikkatle yap\u0131n: d\u00f6rt Kapazit\u00e4tseinheiten i\u00e7eren bir Kapazit\u00e4tsstelle, d\u00f6rt i\u015f merkezinden olu\u015fan bir i\u015f merkezi grubuna d\u00f6n\u00fc\u015f\u00fcr.<\/p>\n\n\n<p><strong>2. Emir senkronizasyonu.<\/strong> \u00dcretim emirlerini operasyonlar\u0131 ve malzemeleriyle birlikte, ayr\u0131ca a\u00e7\u0131k sat\u0131n alma sipari\u015flerini okuyun. SkyPlanner, sipari\u015f edilen malzemeyi sat\u0131n alma sipari\u015finin teslimat tarihinde kullan\u0131labilir kabul eder ve sipari\u015f Delivered olarak i\u015faretlendi\u011finde sto\u011fu g\u00fcnceller. Sat\u0131n alma \u00f6nerileri, sipari\u015fe d\u00f6n\u00fc\u015fene kadar APplus Disposition i\u00e7inde kal\u0131r.<\/p>\n\n\n<p><strong>3. \u00c7izelgenin geri yaz\u0131lmas\u0131.<\/strong> \u00c7izelgeleme motoru bir operasyonu yerle\u015ftirdi\u011finde veya ta\u015f\u0131d\u0131\u011f\u0131nda, bir SkyPlanner webhook&#8217;u kapsam belirleme a\u015famas\u0131nda kararla\u015ft\u0131r\u0131lan ba\u011flant\u0131 yolu \u00fczerinden (web servisleri veya Business Integration Framework) APplus&#8217;taki g\u00fcncellemeyi tetikler. \u00dcretim emrinde o operasyonun planlanan ba\u015flang\u0131c\u0131n\u0131, planlanan biti\u015fini ve kapasite birimini ayarlar. B\u00f6ylece APplus&#8217;taki planlama panosu SkyPlanner&#8217;\u0131n s\u0131ralamas\u0131n\u0131 g\u00f6sterir.<\/p>\n\n\n<p><strong>4. At\u00f6lye emirlerinin serbest b\u0131rak\u0131lmas\u0131.<\/strong> Planlamac\u0131, at\u00f6lye emirlerini (Werkstattauftr\u00e4ge) APplus&#8217;ta serbest b\u0131rakmaya devam eder; art\u0131k SkyPlanner&#8217;\u0131n tarihlerini kullan\u0131r. Serbest b\u0131rak\u0131lan emirler ve durumlar\u0131, bir sonraki senkronizasyonda SkyPlanner&#8217;a geri aktar\u0131l\u0131r.<\/p>\n\n\n<p><strong>5. \u00dcretim sahas\u0131 teyitleri.<\/strong> Operat\u00f6rler, SkyPlanner Mobile Confirmations veya Production Timer ile \u00e7al\u0131\u015fmalar\u0131n\u0131 kaydeder; bu s\u00fcre kay\u0131tlar\u0131 \u00e7izelgeyi g\u00fcncel tutar. Ger\u00e7ekle\u015fen s\u00fcrelerin geri aktar\u0131l\u0131p aktar\u0131lmayaca\u011f\u0131n\u0131 siz se\u00e7ersiniz. Aktar\u0131m se\u00e7ilirse s\u00fcre ve miktar, operasyon baz\u0131nda emre BDE mesajlar\u0131 olarak yaz\u0131l\u0131r. Barkodlu BDE kullan\u0131m\u0131na devam edilirse SkyPlanner bunun yerine mesajlar\u0131 APplus&#8217;tan okur.<\/p>\n\n\n<p><strong>6. Veri sahipli\u011fi ve \u00e7ak\u0131\u015fma kurallar\u0131.<\/strong> Canl\u0131ya ge\u00e7meden \u00f6nce bunlar\u0131 yaz\u0131l\u0131 hale getirin:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Veri<\/th><th>Sorumlu sistem<\/th><\/tr><\/thead><tbody><tr><td>Par\u00e7alar, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, rotalar, miktarlar, emir durumu, at\u00f6lye emirlerinin serbest b\u0131rak\u0131lmas\u0131<\/td><td>APplus<\/td><\/tr><tr><td>Operasyon s\u0131ralamas\u0131, ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131, kapasite birimi atamas\u0131<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Haz\u0131rl\u0131k s\u00fcresi matrisi, operat\u00f6r say\u0131lar\u0131, alternatif kaynaklar<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Betriebsmittel ana verileri<\/td><td>APplus; zaman i\u00e7indeki kullan\u0131labilirlik SkyPlanner&#8217;da planlan\u0131r<\/td><\/tr><tr><td>Vardiyalar ve \u00e7al\u0131\u015f\u0131lmayan g\u00fcnler<\/td><td>Kapsam belirleme a\u015famas\u0131nda se\u00e7ilen tek bir sistem<\/td><\/tr><tr><td>BDE mesajlar\u0131, malzeme \u00e7\u0131k\u0131\u015flar\u0131 ve giri\u015fleri<\/td><td>APplus; do\u011frudan girilir veya SkyPlanner s\u00fcre kay\u0131tlar\u0131ndan aktar\u0131l\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Operasyon tarihlerini yazacak tek bir sistem se\u00e7in. PPS \u00e7izelgelemesi \u00e7al\u0131\u015f\u0131yorsa veya Feinplanung ya da APplus APS tarih yaz\u0131yorsa, SkyPlanner&#8217;\u0131n \u00e7izelgeledi\u011fi emirler i\u00e7in bu i\u015flevi kapat\u0131n.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipik proje ad\u0131mlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Uygulama, devreye alma s\u00fcreci ba\u015flad\u0131ktan sonra normalde haftalar i\u00e7inde tamamlan\u0131r. Bundan \u00f6nce, APplus&#8217;tan CSV veya Excel olarak d\u0131\u015fa aktard\u0131\u011f\u0131n\u0131z kapasite birimleri, rotalar ve a\u00e7\u0131k \u00fcretim emirleriyle 30 g\u00fcnl\u00fck \u00fccretsiz deneme s\u0131ras\u0131nda \u00e7izelgeyi do\u011frulay\u0131n.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>E\u015fleme.<\/strong> E\u015fleme tablosunu, veri sahipli\u011fi kurallar\u0131n\u0131, senkronizasyon s\u0131kl\u0131klar\u0131n\u0131 ve BDE mesajlar\u0131n\u0131n geri aktar\u0131l\u0131p aktar\u0131lmayaca\u011f\u0131n\u0131 kesinle\u015ftirin.<\/li>\n\n\n<li><strong>APplus eri\u015fimi.<\/strong> Teknik kullan\u0131c\u0131 hesab\u0131n\u0131 olu\u015fturun, APplus i\u015f orta\u011f\u0131n\u0131zla birlikte web servislerini etkinle\u015ftirin ve \u00f6nce bir test sisteminde deneyin.<\/li>\n\n\n<li><strong>\u0130lk y\u00fckleme.<\/strong> Par\u00e7alar, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, rotalar, kapasite noktalar\u0131 ve birimleri, Betriebsmittel, personel.<\/li>\n\n\n<li><strong>Emir ve sat\u0131n alma sipari\u015fi senkronizasyonu.<\/strong> Filtreleme, sayfalama ve yeniden deneme mekanizmalar\u0131yla periyodik sorgulama veya Business Integration Framework \u00fczerinden g\u00f6nderim.<\/li>\n\n\n<li><strong>SkyPlanner&#8217;da k\u0131s\u0131tlar\u0131n tan\u0131mlanmas\u0131.<\/strong> Haz\u0131rl\u0131k s\u00fcresi matrisi, tak\u0131mlar, i\u015f ba\u015f\u0131na operat\u00f6r say\u0131lar\u0131 ve alternatif makineler veya personel.<\/li>\n\n\n<li><strong>\u00c7izelgenin geri yaz\u0131lmas\u0131.<\/strong> SkyPlanner webhook&#8217;lar\u0131ndan gelen operasyon tarihleri ve tercih edilirse BDE mesajlar\u0131.<\/li>\n\n\n<li><strong>Paralel test.<\/strong> SkyPlanner&#8217;\u0131 mevcut planlama panosuyla paralel \u00e7al\u0131\u015ft\u0131r\u0131n, tarihleri kar\u015f\u0131la\u015ft\u0131r\u0131n ve ana verileri d\u00fczeltin.<\/li>\n\n\n<li><strong>Canl\u0131ya ge\u00e7i\u015f.<\/strong> Veriler e\u015fle\u015fti\u011finde geri yazmay\u0131 etkinle\u015ftirin.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-applus-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">APplus entegrasyonunda dikkat edilmesi gerekenler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>S\u0131n\u0131rl\u0131 ve s\u0131n\u0131rs\u0131z kapasite birimleri.<\/strong> APplus&#8217;ta baz\u0131 kapasite birimleri s\u0131n\u0131rs\u0131z kapasiteyle planlanabilir. SkyPlanner&#8217;da ise her i\u015f merkezinin kapasitesi s\u0131n\u0131rl\u0131d\u0131r. Bu nedenle i\u00e7e aktar\u0131rken her birinin vardiyalar\u0131n\u0131 ve verimlilik oranlar\u0131n\u0131 kontrol edin.<\/li>\n\n\n<li><strong>Kullan\u0131mdaki planlama katmanlar\u0131.<\/strong> Feinplanung veya APplus APS&#8217;nin lisansl\u0131 ve devrede olup olmad\u0131\u011f\u0131n\u0131 kontrol edin. Tarihleri yazma yetkisini tek bir sisteme verin.<\/li>\n\n\n<li><strong>\u00dcretim evraklar\u0131 ve barkodlar.<\/strong> BDE mesajlar\u0131, \u00fcretim evraklar\u0131 yazd\u0131r\u0131lm\u0131\u015f emirlere i\u015flenir. Serbest b\u0131rakma ve yazd\u0131rma i\u015flemlerinin bug\u00fcn oldu\u011fu gibi APplus&#8217;ta kal\u0131p kalmayaca\u011f\u0131n\u0131 kararla\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>Haz\u0131rl\u0131k ve i\u015flem s\u00fcresi birimleri.<\/strong> \u0130\u00e7e aktar\u0131rken haz\u0131rl\u0131k ve i\u015flem s\u00fcrelerini do\u011fru birime ve hesaplama esas\u0131na g\u00f6re d\u00f6n\u00fc\u015ft\u00fcr\u00fcn; aksi takdirde t\u00fcm s\u00fcreler yanl\u0131\u015f olur.<\/li>\n\n\n<li><strong>Fason operasyonlar.<\/strong> Fasona verilen operasyonlar kendi kapasitenizi kullanmaz, yaln\u0131zca ge\u00e7en s\u00fcreyi temsil eder. Bunlar\u0131 yaln\u0131zca s\u00fcre i\u00e7eren ad\u0131mlar olarak modelleyin.<\/li>\n\n\n<li><strong>Bar\u0131nd\u0131r\u0131lan kurulumlar.<\/strong> Bar\u0131nd\u0131r\u0131lan s\u00fcr\u00fcm\u00fc kullan\u0131yorsan\u0131z web servislerine hangi a\u011f yolu \u00fczerinden eri\u015filece\u011fini bar\u0131nd\u0131rma sa\u011flay\u0131c\u0131s\u0131yla erkenden kararla\u015ft\u0131r\u0131n.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-applus-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">APplus entegrasyonunu kim yap\u0131land\u0131r\u0131r ve destekler?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner ekibi, entegrasyonu devreye alma s\u00fcrecinde yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra destekler.<\/strong> Bu hizmet, \u00fczerinde anla\u015f\u0131lan web servislerini ve e\u015flemeleri kapsar. Her tesis APplus&#8217;\u0131 farkl\u0131 kullan\u0131r; tesise \u00f6zg\u00fc bilgi birikimi burada devreye girer.<\/li>\n\n\n<li><strong>APplus i\u015f orta\u011f\u0131n\u0131z da s\u00fcrece kat\u0131labilir.<\/strong> \u0130\u015f orta\u011f\u0131n\u0131z \u00f6zelle\u015ftirmelerinizi, kullan\u0131c\u0131 yetkilerinizi ve Business Integration Framework yap\u0131land\u0131rman\u0131z\u0131 bilir; SkyPlanner ekibiyle birlikte eri\u015fimi a\u00e7abilir.<\/li>\n\n\n<li><strong>Kendi geli\u015ftiricileriniz de entegrasyonu geli\u015ftirebilir.<\/strong> Bunun i\u00e7in bir API belirteciyle SkyPlanner&#8217;\u0131n REST API aray\u00fcz\u00fcn\u00fc kullanabilirler. Ba\u015flamak i\u00e7in bir API belirteci yeterlidir; gerekti\u011finde SkyPlanner ekibi yard\u0131mc\u0131 olur. Entegrasyon belgelerine <a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">SkyPlanner entegrasyon belgeleri<\/a> sayfas\u0131ndan ula\u015fabilirsiniz.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla sunulur ve ayl\u0131k faturaland\u0131r\u0131l\u0131r. S\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za uygun entegrasyon teklifi, se\u00e7ti\u011finiz planla birlikte ba\u015ftan sunulur. <a href=\"\/tr\/fiyatlandirma\/\">Fiyatland\u0131rma<\/a>, <a href=\"\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/\">APplus \u00fcretim \u00e7izelgeleme<\/a>, <a href=\"\/tr\/entegrasyonlar\/erp\/applus\/\">APplus<\/a> ve <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131<\/a> sayfalar\u0131n\u0131 inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo i\u00e7in randevu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta kazan\u0131lan zaman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamada her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf sa\u011flan\u0131yor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f bir plan\u0131 haz\u0131rlamak 30 dakikadan az s\u00fcr\u00fcyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations \u00dcretim M\u00fcd\u00fcr\u00fc Anu J\u00e4rvinen, Rauma&#x27;da robotlu bir paletleme h\u00fccresinin yan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 ayl\u0131k<\/b><span>bo\u015f kapasiteyi sat\u0131\u015f ekibi g\u00f6rebiliyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, t\u00fcm \u00fcretim planlamas\u0131 i\u00e7in sa\u011flam ve g\u00fcvenilir bir temel olu\u015fturuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Fredman Operations \u00b7 G\u0131dayla temasa uygun ambalaj k\u00e2\u011f\u0131tlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">Sat\u0131\u015f ekibi bo\u015f kapasiteyi alt\u0131 ay \u00f6nceden g\u00f6rebiliyor. \u00d6nceden yan\u0131tlanmas\u0131 bir saat veya daha uzun s\u00fcren \u00e7izelge de\u011fi\u015fikli\u011fi talepleri art\u0131k saniyeler i\u00e7inde yan\u0131tlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/fredman-operations\/\">Fredman Operations&#8217;\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Daha az<\/b><span>malzeme eksikli\u011finden kaynaklanan duru\u015f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner&#8217;\u0131n bize sa\u011flad\u0131\u011f\u0131 de\u011fer, g\u00fcnl\u00fck kullan\u0131mda, \u00f6zellikle de teslim tarihlerini belirlerken i\u015fimize yarayan bir ara\u00e7 olmas\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, \u00dcretim Planlama M\u00fcd\u00fcr\u00fc<\/b><br>Eskomatic \u00b7 Fason tala\u015fl\u0131 imalat<\/p>\n\n\n<p class=\"ind-cust__result\">\u0130\u015f y\u00fck\u00fcn\u00fcn otomatik \u00e7izelgelenmesi daha do\u011fru teslim tarihleri sa\u011fl\u0131yor. Malzeme eksikli\u011finden kaynaklanan \u00fcretim duru\u015flar\u0131 da \u00f6nemli \u00f6l\u00e7\u00fcde azald\u0131.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/eskomatic\/\">Eskomatic&#8217;in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>APplus&#8217;\u0131n \u00fcretim emirleri i\u00e7in bir API&#8217;si var m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet. APplus, web servisi mimarisi \u00fczerine kuruludur. Asseco, \u00e7izelgeleme i\u015flevlerinin m\u00fc\u015fterilerin ve tedarik\u00e7ilerin BT sistemleri taraf\u0131ndan do\u011frudan kullan\u0131labildi\u011fini belirtiyor. Business Integration Framework, uyarlanabilir veri yap\u0131lar\u0131 arac\u0131l\u0131\u011f\u0131yla \u00fc\u00e7\u00fcnc\u00fc taraf sistemleri ba\u011flar. Universal Cloud Connector ise SaaS \u00e7\u00f6z\u00fcmlerini APplus&#8217;a ba\u011flar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Planlanan tarihler APplus&#8217;a nas\u0131l geri yaz\u0131l\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Her \u00e7izelge de\u011fi\u015fikli\u011finde bir SkyPlanner webhook&#8217;u, \u00fcretim emrindeki her operasyon i\u00e7in planlanan ba\u015flang\u0131c\u0131n, planlanan biti\u015fin ve kapasite biriminin g\u00fcncellenmesini tetikler. G\u00fcncelleme, APplus web servisleri veya Business Integration Framework \u00fczerinden yap\u0131l\u0131r. Kullan\u0131lacak yol, devreye alma s\u00fcrecindeki kapsam belirleme a\u015famas\u0131nda kararla\u015ft\u0131r\u0131l\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, APplus&#8217;a BDE mesajlar\u0131 g\u00f6nderebilir mi?<\/summary>\n<p class=\"sp-faq__a\">Evet, tercih ederseniz. SkyPlanner&#8217;daki operat\u00f6r zaman kay\u0131tlar\u0131, emirdeki her operasyonun s\u00fcre ve miktar bilgilerini i\u00e7eren BDE mesajlar\u0131 olarak g\u00f6nderilir. Barkodlu BDE kullan\u0131m\u0131n\u0131 s\u00fcrd\u00fcren tesislerde ise SkyPlanner bu mesajlar\u0131 okur.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bir APplus i\u015f orta\u011f\u0131, APplus APS&#8217;yi mi yoksa SkyPlanner&#8217;\u0131 m\u0131 \u00f6nermeli?<\/summary>\n<p class=\"sp-faq__a\">M\u00fc\u015fteri, ger\u00e7ek kapasiteyi dikkate alan ve haftalar i\u00e7inde \u00e7al\u0131\u015f\u0131r hale gelen bir \u00fcretim \u00e7izelgesi istiyorsa SkyPlanner&#8217;\u0131 \u00f6nermeli. APplus APS, birden fazla tak\u0131m\u0131 kapsayan haz\u0131rl\u0131k matrisleri ve \u00e7oklu kaynak planlamas\u0131 i\u00e7in APplus&#8217;a entegre edilmi\u015f bir i\u015f orta\u011f\u0131 \u00fcr\u00fcn\u00fcd\u00fcr (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>). SkyPlanner bu ihtiya\u00e7lar\u0131 kar\u015f\u0131lar, APplus web servisleri \u00fczerinden ba\u011flan\u0131r, otomatik olarak yeniden planlama yapar ve ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla s\u0131n\u0131rs\u0131z kullan\u0131c\u0131 sunar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Entegrasyon, bar\u0131nd\u0131r\u0131lan APplus s\u00fcr\u00fcm\u00fcyle \u00e7al\u0131\u015f\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet. APplus, \u015firket i\u00e7inde veya bar\u0131nd\u0131r\u0131lan bir s\u00fcr\u00fcm olarak \u00e7al\u0131\u015f\u0131r. SkyPlanner her ikisine de web servisleri \u00fczerinden ba\u011flan\u0131r. Kullan\u0131lacak a\u011f yolu, kapsam belirleme a\u015famas\u0131nda BT ekibinizle veya bar\u0131nd\u0131rma sa\u011flay\u0131c\u0131n\u0131zla kararla\u015ft\u0131r\u0131l\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Entegrasyonu kurmadan \u00f6nce SkyPlanner&#8217;\u0131 deneyebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck \u00fccretsiz denemede, APplus&#8217;tan CSV veya Excel dosyalar\u0131yla veri aktararak 20 i\u015f merkezine kadar \u00e7al\u0131\u015fabilir ve t\u00fcm Basic \u00f6zelliklerini kullanabilirsiniz. Kredi kart\u0131 gerekmez. <a href=\"\/tr\/deneme\/\">Denemeyi ba\u015flat\u0131n<\/a> veya entegrasyonun kapsam\u0131n\u0131 belirlemek i\u00e7in <a href=\"\/tr\/iletisim-satis\/\">sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ APplus SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in APplus Entegrasyon K\u0131lavuzu Bu APplus entegrasyon k\u0131lavuzu, APplus i\u015f ortaklar\u0131na ve BT ekiplerine APplus&#8217;\u0131 SkyPlanner APS&#8217;ye nas\u0131l ba\u011flayacaklar\u0131n\u0131 g\u00f6sterir. SkyPlanner, Asseco&#8217;nun kendi aray\u00fczlerini kullanarak APplus ile \u00e7ift y\u00f6nl\u00fc entegrasyon sa\u011flar: skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu APplus yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar &#8230; <a title=\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in APplus Entegrasyon K\u0131lavuzu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/\" aria-label=\"Read more about SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in APplus Entegrasyon K\u0131lavuzu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106248,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107060","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretim \u00c7izelgeleme i\u00e7in APplus APS Entegrasyon K\u0131lavuzu<\/title>\n<meta name=\"description\" content=\"APplus\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: web servisleri, Business Integration Framework, BDE mesajlar\u0131, veri e\u015fleme, operasyon geri yaz\u0131m\u0131 ve proje ipu\u00e7lar\u0131.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in APplus Entegrasyon K\u0131lavuzu\" \/>\n<meta property=\"og:description\" content=\"APplus\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: web servisleri, Business Integration Framework, BDE mesajlar\u0131, veri e\u015fleme, operasyon geri yaz\u0131m\u0131 ve proje ipu\u00e7lar\u0131.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/entegrasyon-kilavuzu\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/entegrasyon-kilavuzu\\\/\",\"name\":\"\u00dcretim \u00c7izelgeleme i\u00e7in APplus APS Entegrasyon K\u0131lavuzu\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"APplus\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: web servisleri, Business Integration Framework, BDE mesajlar\u0131, veri e\u015fleme, operasyon geri yaz\u0131m\u0131 ve proje ipu\u00e7lar\u0131.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/entegrasyon-kilavuzu\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/entegrasyon-kilavuzu\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/entegrasyon-kilavuzu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"APplus i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in APplus Entegrasyon K\u0131lavuzu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretim \u00c7izelgeleme i\u00e7in APplus APS Entegrasyon K\u0131lavuzu","description":"APplus\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: web servisleri, Business Integration Framework, BDE mesajlar\u0131, veri e\u015fleme, operasyon geri yaz\u0131m\u0131 ve proje ipu\u00e7lar\u0131.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/","og_locale":"tr_TR","og_type":"article","og_title":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in APplus Entegrasyon K\u0131lavuzu","og_description":"APplus\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: web servisleri, Business Integration Framework, BDE mesajlar\u0131, veri e\u015fleme, operasyon geri yaz\u0131m\u0131 ve proje ipu\u00e7lar\u0131.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"13 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/","name":"\u00dcretim \u00c7izelgeleme i\u00e7in APplus APS Entegrasyon K\u0131lavuzu","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"APplus\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: web servisleri, Business Integration Framework, BDE mesajlar\u0131, veri e\u015fleme, operasyon geri yaz\u0131m\u0131 ve proje ipu\u00e7lar\u0131.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"APplus i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/"},{"@type":"ListItem","position":5,"name":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in APplus Entegrasyon K\u0131lavuzu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ APplus SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in APplus Entegrasyon K\u0131lavuzu Bu APplus entegrasyon k\u0131lavuzu, APplus i\u015f ortaklar\u0131na ve BT ekiplerine APplus&#8217;\u0131 SkyPlanner APS&#8217;ye nas\u0131l ba\u011flayacaklar\u0131n\u0131 g\u00f6sterir. SkyPlanner, Asseco&#8217;nun kendi aray\u00fczlerini kullanarak APplus ile \u00e7ift y\u00f6nl\u00fc entegrasyon sa\u011flar: skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu APplus yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/107060","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=107060"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/107060\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106248"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=107060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}