{"id":107031,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"uretim-cizelgeleme","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/","title":{"rendered":"APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu? APplus PPS, Feinplanung ve SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ APplus<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu? <span class=\"hl\">APplus PPS, Feinplanung ve SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">K\u0131smen. APplus PPS, en basit h\u00e2liyle kapasite s\u0131n\u0131r\u0131 koymadan \u00e7izelgeleme yapar; darbo\u011fazlar\u0131 veya t\u00fcm kapasite birimlerini s\u0131n\u0131rl\u0131 kaynak olarak tan\u0131mlayabilirsiniz. Planlamac\u0131, planlama panosunda ince d\u00fczeltmeler yapar. APplus Feinplanung, haz\u0131rl\u0131klar\u0131 ve i\u015f s\u0131ras\u0131n\u0131 optimize eder. Asseco, karma\u015f\u0131k haz\u0131rl\u0131k matrisleri ve \u00e7ok kaynakl\u0131 planlama i\u00e7in entegre bir i\u015f orta\u011f\u0131 \u00fcr\u00fcn\u00fc olan APplus APS&#8217;yi sunar. Her makineyi, \u00e7al\u0131\u015fan\u0131, tak\u0131m\u0131 ve malzemeyi <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131n\u0131 g\u00f6zeterek \u00e7izelgelemek<\/a> ve kendini g\u00fcncel tutan tek bir \u00e7izelgede toplamak isteyen tesisler, APplus ile birlikte SkyPlanner APS kullan\u0131r.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Bu yaz\u0131, Asseco Solutions&#8217;\u0131n APplus \u00fcr\u00fcn\u00fcn\u00fc APplus 10 s\u00fcr\u00fcm\u00fc d\u00e2hil ele al\u0131r. Bir \u00f6zelli\u011fin standart paketinize d\u00e2hil olup olmad\u0131\u011f\u0131 veya ayr\u0131 lisans gerektirip gerektirmedi\u011fi, Asseco&#8217;nun fiyat ve lisans listesinde belirlenir (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">APplus hakk\u0131nda bilgiler<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-applus-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">APplus kapasiteyi ad\u0131m ad\u0131m nas\u0131l planlar?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Ana veriler<\/h3>\n\n\n<p>Planlama; par\u00e7alar, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131 (St\u00fccklisten ve Strukturst\u00fccklisten) ve operasyonlar\u0131 (Arbeitsg\u00e4nge) i\u00e7eren \u00fcretim rotalar\u0131yla (Arbeitspl\u00e4ne) ba\u015flar. Operasyonlar, kapasite noktalar\u0131 ve kapasite birimleri (Kapazit\u00e4tsstellen ve Kapazit\u00e4tseinheiten) \u00fczerinde y\u00fcr\u00fct\u00fcl\u00fcr. Tak\u0131m ve fikst\u00fcrler, Betriebsmittel olarak adland\u0131r\u0131l\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Malzeme planlama<\/h3>\n\n\n<p>Disposition, talebe g\u00f6re sat\u0131n alma \u00f6nerileri ve \u00fcretim emirleri (Fertigungsauftr\u00e4ge) olu\u015fturur. Neyin \u00fcretilece\u011fini, neyin sat\u0131n al\u0131naca\u011f\u0131n\u0131 ve bunlar\u0131n ne zamana kadar yap\u0131lmas\u0131 gerekti\u011fini belirler.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. PPS \u00e7izelgelemesi<\/h3>\n\n\n<p>APplus; makineleri, malzemeyi, personel kapasitesini ve gerekiyorsa tak\u0131mlar\u0131 tek \u00e7al\u0131\u015ft\u0131rmada planlar. En basit durumda kapasite s\u0131n\u0131r\u0131 uygulanmaz. Darbo\u011fazlar veya t\u00fcm kapasite birimleri, kaynak s\u0131n\u0131rlar\u0131 dikkate al\u0131narak hesaplanabilir (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/pps\/\">Asseco PPS<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Planlama panosu<\/h3>\n\n\n<p>Plantafel, bekleyen \u00fcretim emirlerini kapasite birimleri \u00fczerinde g\u00f6sterir. Planlamac\u0131, operasyonlar\u0131 s\u00fcr\u00fckleyip b\u0131rakarak ta\u015f\u0131r. Asseco, ince d\u00fczeltmelerin veya ta\u015f\u0131malar\u0131n do\u011frudan planlama panosunda yap\u0131labildi\u011fini belirtir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. At\u00f6lye emirlerinin \u00fcretime a\u00e7\u0131lmas\u0131<\/h3>\n\n\n<p>Planlamac\u0131 (Disponent), at\u00f6lye emirlerini (Werkstattauftr\u00e4ge) kendi onay\u0131yla \u00fcretime a\u00e7ar. Barkodlu i\u015f evraklar\u0131 \u00fcretim sahas\u0131na g\u00f6nderilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. APplus Feinplanung<\/h3>\n\n\n<p>Feinplanung, aray\u00fcz ba\u011flant\u0131s\u0131 gerektirmeyen entegre bir mod\u00fcld\u00fcr. \u00d6nceden tan\u0131mlanm\u0131\u015f optimizasyon senaryolar\u0131yla haz\u0131rl\u0131k s\u00fcrelerini, i\u015f s\u0131ras\u0131n\u0131, y\u00fcklemeyi ve i\u015f merkezi atamalar\u0131n\u0131 optimize eder. Geciken ad\u0131mlar ve tarihler, ileriye do\u011fru \u00e7izelgeleme yoluyla belirlenir (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/feinplanung\/\">Asseco Feinplanung<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. APplus APS<\/h3>\n\n\n<p>Asseco, karma\u015f\u0131k durumlar i\u00e7in bir i\u015f orta\u011f\u0131n\u0131n APS \u00fcr\u00fcn\u00fcn\u00fc APplus APS ad\u0131yla entegre etmi\u015ftir. Asseco bunun nedenini \u015f\u00f6yle a\u00e7\u0131klar: ERP&#8217;nin detayl\u0131 planlamas\u0131, pazar ihtiya\u00e7lar\u0131n\u0131n b\u00fcy\u00fck b\u00f6l\u00fcm\u00fcn\u00fc kar\u015f\u0131lar; geri kalan ihtiya\u00e7lar ise \u00f6zel \u00e7\u00f6z\u00fcmler gerektirir. Birden \u00e7ok tak\u0131m ve fikst\u00fcr\u00fc kapsayan ayr\u0131nt\u0131l\u0131 haz\u0131rl\u0131k s\u00fcresi matrisini ve \u00e7ok kaynakl\u0131 planlamay\u0131 \u00f6rnek g\u00f6sterir. Malzeme planlama ve sat\u0131n almada ana sistem APplus olmaya devam eder (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">8. \u00dcretim sahas\u0131 verileri<\/h3>\n\n\n<p>PPS&#8217;de bir emir olu\u015fturulup barkodlu i\u015f evraklar\u0131 yazd\u0131r\u0131ld\u0131ktan sonra, BDE bildirimleri bu emre i\u015flenir (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/betriebsdatenerfassung\/\">Asseco BDE<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hangi i\u015fler planlamac\u0131ya kal\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>En basit durumda kapasite s\u0131n\u0131rs\u0131z kabul edilir.<\/strong> PPS, kapasite s\u0131n\u0131r\u0131 koymadan \u00e7izelgeler. Hangi kapasite birimlerinin s\u0131n\u0131rl\u0131 olaca\u011f\u0131na birinin karar vermesi ve bu tan\u0131mlar\u0131 g\u00fcncel tutmas\u0131 gerekir.<\/li>\n\n\n<li><strong>D\u00fczeltmeler elle yap\u0131l\u0131r.<\/strong> \u0130nce d\u00fczeltmeler ve ta\u015f\u0131malar planlama panosunda yap\u0131l\u0131r.<\/li>\n\n\n<li><strong>\u00dcretime a\u00e7ma i\u015flemi elle yap\u0131l\u0131r.<\/strong> Planlamac\u0131, her at\u00f6lye emrini ayr\u0131 ayr\u0131 onaylayarak \u00fcretime a\u00e7ar.<\/li>\n\n\n<li><strong>Karma\u015f\u0131k haz\u0131rl\u0131klar ek bir katman gerektirir.<\/strong> Asseco, birden \u00e7ok tak\u0131m\u0131 kapsayan haz\u0131rl\u0131k matrislerinin ve \u00e7ok kaynakl\u0131 planlaman\u0131n \u00f6zel \u00e7\u00f6z\u00fcmler gerektirdi\u011fini belirtir. APplus APS&#8217;nin sunulma nedeni budur.<\/li>\n\n\n<li><strong>\u0130ki planlama katman\u0131, iki \u00fcr\u00fcn.<\/strong> APplus APS, APplus&#8217;a entegre edilmi\u015f bir i\u015f orta\u011f\u0131 \u00fcr\u00fcn\u00fcd\u00fcr; kendine \u00f6zg\u00fc kurulum ve uzmanl\u0131k gerektirir.<\/li>\n\n\n<li><strong>\u0130lerlemeyi izlemek i\u00e7in BDE gerekir.<\/strong> Ger\u00e7ekle\u015fme bildirimleri, emre i\u015flenen barkodlu bildirimlerden gelir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-applus-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">APplus&#8217;\u0131n kendi \u00e7izelgelemesi ne zaman yeterli olur?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>APplus planlamas\u0131 \u015fu durumlarda ihtiyac\u0131 kar\u015f\u0131lar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Darbo\u011faz olu\u015fturan kapasite birimlerini s\u0131n\u0131rl\u0131 olarak tan\u0131mlad\u0131\u011f\u0131n\u0131zda, m\u00fc\u015fterilerinizin kabul etti\u011fi teslimat tarihleri elde ediyorsan\u0131z.<\/li>\n\n\n<li>Planlamac\u0131n\u0131n de\u011fi\u015fikliklerden sonra planlama panosunu d\u00fczeltmeye zaman\u0131 varsa.<\/li>\n\n\n<li>Haz\u0131rl\u0131k s\u00fcreleri k\u0131saysa veya Feinplanung&#8217;\u0131n haz\u0131rl\u0131k optimizasyonu bunlar\u0131 kar\u015f\u0131l\u0131yorsa.<\/li>\n\n\n<li>\u0130\u015fler ayn\u0131 anda yaln\u0131zca bir makine gerektiriyor, ekipler veya ortak kullan\u0131lan tak\u0131mlar i\u015f s\u0131ras\u0131n\u0131 belirlemiyorsa.<\/li>\n\n\n<li>Plan, g\u00fcnde birka\u00e7 kez de\u011fil, haftada birka\u00e7 kez de\u011fi\u015fiyorsa.<\/li>\n\n<\/ul>\n\n\n<p>Bu ko\u015fullar size uyuyorsa \u00fcretim rotalar\u0131n\u0131, takvimleri ve s\u0131n\u0131rl\u0131 kapasite birimlerini do\u011fru ve g\u00fcncel tutun; elinizdeki planlama katmanlar\u0131n\u0131 kullan\u0131n.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ne zaman \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131na ihtiya\u00e7 duyars\u0131n\u0131z?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A\u015fa\u011f\u0131dakilerden birka\u00e7\u0131 sizin i\u00e7in ge\u00e7erliyse mevcut yap\u0131n\u0131z art\u0131k yeterli de\u011fildir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Planlamac\u0131, planlama panosunu her g\u00fcn elle yeniden d\u00fczenliyor.<\/li>\n\n\n<li>Kapasite yeterli g\u00f6r\u00fcnmesine ra\u011fmen teslimat tarihleri sark\u0131yor.<\/li>\n\n\n<li>Tip de\u011fi\u015fimi s\u00fcresi, \u00f6nceki \u00fcr\u00fcne ve kullan\u0131lan tak\u0131ma ba\u011fl\u0131.<\/li>\n\n\n<li>Operat\u00f6rler, vardiyalar ve devams\u0131zl\u0131klar, \u00fcretim miktar\u0131n\u0131 makineler kadar s\u0131n\u0131rl\u0131yor.<\/li>\n\n\n<li>Fikst\u00fcrler veya tak\u0131mlar makineler aras\u0131nda ta\u015f\u0131n\u0131yor.<\/li>\n\n\n<li>Hangi operasyonun ba\u015flayabilece\u011fini, geciken malzemeler belirliyor.<\/li>\n\n\n<li>APplus APS&#8217;yi de\u011ferlendiriyor ve \u00f6nce kar\u015f\u0131la\u015ft\u0131rma yapmak istiyorsunuz.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Hangi \u00f6zellikleri aramal\u0131s\u0131n\u0131z?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>T\u00fcm kaynaklar\u0131n kapasite s\u0131n\u0131rlar\u0131n\u0131 ayn\u0131 anda g\u00f6zetme:<\/strong> makineleri, \u00e7al\u0131\u015fanlar\u0131 ve tak\u0131mlar\u0131 belirli ba\u015flang\u0131\u00e7 ve biti\u015f saatleriyle \u00e7izelgeleme.<\/li>\n\n\n<li>\u00d6nceliklere ve termin tarihlerine g\u00f6re <strong>operasyon d\u00fczeyinde s\u0131ralama<\/strong>.<\/li>\n\n\n<li>S\u0131raya ba\u011fl\u0131, iki y\u00f6nde farkl\u0131 tip de\u011fi\u015fimi s\u00fcrelerini i\u00e7eren <strong>haz\u0131rl\u0131k s\u00fcresi matrisi<\/strong>.<\/li>\n\n\n<li><strong>Tak\u0131mlar\u0131 kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklar olarak \u00e7izelgeleme<\/strong> ve <strong>birden \u00e7ok operat\u00f6r gerektiren i\u015fleri \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li><strong>Malzemeyi dikkate alan \u00e7izelgeleme:<\/strong> stok ve teslim al\u0131nacak sat\u0131n alma sipari\u015fleri kontrol edilir.<\/li>\n\n\n<li>\u00dcretimdeki ilerleme veya sipari\u015fler de\u011fi\u015fti\u011finde <strong>otomatik yeniden \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li><strong>APplus ile sorunsuz veri ak\u0131\u015f\u0131.<\/strong> APplus, web servisi mimarisine ve Business Integration Framework&#8217;e sahiptir. Her tedarik\u00e7iye, planlanan tarihlerin \u00fcretim emirlerinize nas\u0131l aktar\u0131laca\u011f\u0131n\u0131 ve canl\u0131ya ge\u00e7i\u015ften sonra kimin destek verece\u011fini sorun.<\/li>\n\n<\/ul>\n\n\n<p>Se\u00e7enekler d\u00f6rt gruba ayr\u0131l\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>APplus&#8217;\u0131n temel planlamas\u0131:<\/strong> ERP i\u00e7indeki PPS \u00e7izelgelemesi ve planlama panosu.<\/li>\n\n\n<li><strong>APplus planlama mod\u00fclleri:<\/strong> Asseco&#8217;nun fiyat listesine g\u00f6re lisanslanan Feinplanung ve APplus APS.<\/li>\n\n\n<li>Bir uygulama projesiyle ba\u011flanan ve planlama ekibi taraf\u0131ndan kullan\u0131lan <strong>planlama panolar\u0131 ve DACH b\u00f6lgesindeki APS tedarik\u00e7ilerinin \u00e7\u00f6z\u00fcmleri<\/strong>.<\/li>\n\n\n<li>SkyPlanner&#8217;\u0131n da yer ald\u0131\u011f\u0131 <strong>\u00fcretim sahas\u0131nda uygulamay\u0131 destekleyen bulut APS \u00e7\u00f6z\u00fcmleri<\/strong>: APplus&#8217;\u0131n yan\u0131nda t\u00fcm kaynaklar otomatik \u00e7izelgelenir, plan operat\u00f6rlerin elindedir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner nerede devreye girer?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS, yukar\u0131da s\u0131ralanan eksiklerin t\u00fcm\u00fcn\u00fc giderir. Her i\u015f merkezinin, \u00e7al\u0131\u015fan\u0131n ve tak\u0131m\u0131n kapasite s\u0131n\u0131r\u0131 dikkate al\u0131n\u0131r. Arcturus AI motoru; i\u015f \u00f6nceli\u011fine, tamamlanma tarihine, m\u00fc\u015fteri \u00f6nceli\u011fine, Fast Track ve Dynamic Priorities \u00f6zelliklerine g\u00f6re s\u0131ralama yaparak saniyeler i\u00e7inde operasyon d\u00fczeyinde bir \u00e7izelge olu\u015fturur.<\/p>\n\n\n<p>Haz\u0131rl\u0131k s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcresini iki y\u00f6n i\u00e7in de tutar. \u00d6rne\u011fin maviden k\u0131rm\u0131z\u0131ya ge\u00e7i\u015f 30 dakika, k\u0131rm\u0131z\u0131dan maviye ge\u00e7i\u015f 60 dakika olabilir. Motor, en az haz\u0131rl\u0131k gerektiren s\u0131ray\u0131 se\u00e7er. Tak\u0131mlar, kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklard\u0131r. Birden \u00e7ok ki\u015fi ayn\u0131 i\u015fte ayn\u0131 anda \u00e7al\u0131\u015fabilir; birincil makine veya personel uygun olmad\u0131\u011f\u0131nda i\u015f alternatif makine ya da personele aktar\u0131l\u0131r.<\/p>\n\n\n<p>Malzeme odakl\u0131 \u00e7izelgeleme, mevcut stoktan ve teslim al\u0131nacak sat\u0131n alma sipari\u015flerinden hareketle gelecekteki stok durumunu sim\u00fcle eder. B\u00f6ylece operasyon, malzemesinin haz\u0131r olaca\u011f\u0131 zamana planlan\u0131r. Autopilot, \u00fcretimde de\u011fi\u015fiklik oldu\u011funda otomatik olarak yeniden \u00e7izelgeler. Running Time Lock ise \u00fcretim sahas\u0131ndaki d\u00fczenin bozulmamas\u0131 i\u00e7in \u00f6n\u00fcm\u00fczdeki saatlere ait i\u015fleri sabitler. Operat\u00f6rler, Mobile Confirmations, Production Timer ve Quick Log Mode ile telefon veya tabletten i\u015f kayd\u0131 girer.<\/p>\n\n\n<p><strong>\u015eu durumlarda APplus Feinplanung ve APplus APS yerine SkyPlanner&#8217;\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Haz\u0131rl\u0131klar i\u015f s\u0131ras\u0131na ve tak\u0131mlara ba\u011fl\u0131ysa.<\/strong> Asseco, birden \u00e7ok tak\u0131m\u0131 kapsayan haz\u0131rl\u0131k matrislerini ve \u00e7ok kaynakl\u0131 planlamay\u0131 \u00f6zel \u00e7\u00f6z\u00fcm gerektiren durumlar olarak belirtir (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>). SkyPlanner; haz\u0131rl\u0131k s\u00fcresi matrisini, kapasitesi s\u0131n\u0131rl\u0131 tak\u0131mlar\u0131 ve birden \u00e7ok operat\u00f6r gerektiren i\u015fleri tek \u00e7izelgede birle\u015ftirir.<\/li>\n\n\n<li><strong>Haftalar i\u00e7inde canl\u0131 kullan\u0131ma ge\u00e7meniz gerekiyorsa.<\/strong> APplus APS bir i\u015f orta\u011f\u0131 \u00fcr\u00fcn\u00fcd\u00fcr ve Asseco&#8217;nun fiyat listesine g\u00f6re lisanslan\u0131r (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">APplus hakk\u0131nda bilgiler<\/a>). SkyPlanner, deneme s\u00fcresince kendi \u00fcretim emirlerinizle test edebilece\u011finiz bir bulut yaz\u0131l\u0131m\u0131d\u0131r. Devreye alma s\u00fcreci ba\u015flad\u0131ktan sonra haftalar i\u00e7inde canl\u0131 kullan\u0131ma ge\u00e7ersiniz.<\/li>\n\n\n<li><strong>Plan\u0131n kendini g\u00fcncel tutmas\u0131 gerekiyorsa.<\/strong> APplus&#8217;ta d\u00fczeltmeler planlama panosunda yap\u0131l\u0131r (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/pps\/\">Asseco PPS<\/a>). Autopilot, her \u00f6nemli de\u011fi\u015fiklikte otomatik olarak yeniden planlar.<\/li>\n\n\n<li><strong>Her operat\u00f6r\u00fcn plan\u0131 g\u00f6rmesi gerekiyorsa.<\/strong> SkyPlanner&#8217;da kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r. Mobile Confirmations, i\u015f kuyru\u011funu her telefon veya tablete ta\u015f\u0131r.<\/li>\n\n<\/ul>\n\n\n<p>A\u00e7\u0131k APplus \u00fcretim emirlerinizi Excel&#8217;e aktararak <a href=\"\/tr\/deneme\/\">30 g\u00fcnl\u00fck \u00fccretsiz denemeye<\/a> ba\u015flay\u0131n (20 i\u015f merkezine kadar, t\u00fcm Basic \u00f6zellikleri, kredi kart\u0131 gerekmez). Sonras\u0131nda <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rma<\/a>, 5 i\u015f merkezi d\u00e2hil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve ayl\u0131k faturaland\u0131r\u0131l\u0131r. Entegrasyon i\u00e7in s\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za uygun fiyat teklifi, abonelik plan\u0131n\u0131zla birlikte ba\u015ftan sunulur.<\/p>\n\n\n<p>SkyPlanner, APplus web servisleri ve Business Integration Framework \u00fczerinden APplus ile \u00e7ift y\u00f6nl\u00fc entegre olur. SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu yap\u0131land\u0131r\u0131r. \u0130\u015f orta\u011f\u0131n\u0131z veya geli\u015ftiricileriniz de dok\u00fcmantasyonu sunulan <a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">REST API<\/a> \u00fczerinde \u00e7al\u0131\u015fabilir. <a href=\"\/tr\/entegrasyonlar\/erp\/applus\/\">APplus i\u00e7in SkyPlanner<\/a> sayfas\u0131n\u0131, <a href=\"\/tr\/entegrasyonlar\/erp\/applus\/entegrasyon-kilavuzu\/\">APplus entegrasyon k\u0131lavuzunu<\/a> veya t\u00fcm <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131n\u0131<\/a> inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo i\u00e7in randevu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta kazan\u0131lan zaman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sayesinde \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131k.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt donan\u0131mlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf sa\u011flan\u0131yor ve yeni i\u015f kuyru\u011fu saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda \u015fi\u015fe dolum hatt\u0131nda \u00e7al\u0131\u015fan, temiz oda k\u0131yafetli operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, Bilgi Teknolojileri M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan, optimize edilmi\u015f \u00fc\u00e7 ayl\u0131k bir plan 30 dakikadan k\u0131sa s\u00fcrede haz\u0131rlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec CEO&#x27;su Hannu Ryyn\u00e4nen, \u015firketin Lohja&#x27;daki \u00fcretim tesisinde\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000&#8217;lerce<\/b><span>i\u015f emri otomatik olarak \u00e7izelgeleniyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimi art\u0131k bamba\u015fka bir \u015fekilde kontrol alt\u0131nda tutuyoruz ve kapasitemizi \u00e7ok daha iyi anl\u0131yoruz.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 End\u00fcstriyel kar\u0131\u015ft\u0131r\u0131c\u0131lar, pompalar ve y\u00fcksek teknolojili fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Binlerce i\u015f emri otomatik olarak \u00e7izelgeleniyor ve t\u00fcm kurulu\u015f \u00fcretimin durumunu ger\u00e7ek zamanl\u0131 olarak g\u00f6rebiliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/mamec\/\">Mamec&#8217;in yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 fabrikas\u0131nda kaynakl\u0131 bir \u00e7elik konstr\u00fcksiyonu ta\u015flayan KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%98<\/b><span>teslimat performans\u0131; yakla\u015f\u0131k %50&#8217;den y\u00fckseldi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumam\u0131zda belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal i\u015fleme ve fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k %50&#8217;den %98&#8217;e kadar y\u00fckseldi. \u00c7izelgeleme i\u00e7in art\u0131k iki yerine bir sorumlu yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp&#8217;un yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>APplus, \u00e7izelgelemede kapasiteyi s\u0131n\u0131rl\u0131 m\u0131 yoksa s\u0131n\u0131rs\u0131z m\u0131 kabul eder?<\/summary>\n<p class=\"sp-faq__a\">En basit kullan\u0131mda kapasite s\u0131n\u0131rs\u0131z kabul edilir; s\u0131n\u0131r tan\u0131mlad\u0131\u011f\u0131n\u0131z yerlerde ise bu s\u0131n\u0131rlar dikkate al\u0131n\u0131r. APplus PPS, en basit durumda s\u0131n\u0131rs\u0131z kapasiteye g\u00f6re planlama yapar. Darbo\u011fazlar veya t\u00fcm kapasite birimleri i\u00e7in hesaplama, s\u0131n\u0131rl\u0131 kaynaklar esas al\u0131narak da yap\u0131labilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>APplus Feinplanung ile APplus APS aras\u0131ndaki fark nedir?<\/summary>\n<p class=\"sp-faq__a\">Feinplanung; haz\u0131rl\u0131klar\u0131, i\u015f s\u0131ras\u0131n\u0131, y\u00fcklemeyi ve i\u015f merkezi atamalar\u0131n\u0131 optimize eden entegre ayr\u0131nt\u0131l\u0131 planlama mod\u00fcl\u00fcd\u00fcr. APplus APS ise birden fazla tak\u0131m\u0131 kapsayan haz\u0131rl\u0131k matrisleri ve \u00e7ok kaynakl\u0131 planlama gibi karma\u015f\u0131k durumlar i\u00e7in APplus&#8217;a entegre edilmi\u015f, bir i\u015f orta\u011f\u0131na ait APS \u00fcr\u00fcn\u00fcd\u00fcr.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>APplus APS mi yoksa SkyPlanner m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Ger\u00e7ek makine ve personel kapasitesini dikkate alan, kendini g\u00fcncel tutan tek bir \u00fcretim \u00e7izelgesini haftalar i\u00e7inde devreye almak istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in. SkyPlanner, haz\u0131rl\u0131k s\u00fcresi matrisi, s\u0131n\u0131rl\u0131 tak\u0131m kapasitesi ve birden fazla operat\u00f6r gerektiren i\u015fleri desteklemesiyle Asseco&#8217;nun belirtti\u011fi karma\u015f\u0131k durumlar\u0131 kar\u015f\u0131lar. Otomatik olarak yeniden \u00e7izelgeleme yapar ve ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla s\u0131n\u0131rs\u0131z kullan\u0131c\u0131 sunar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, APplus&#8217;\u0131n yerini mi al\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. Par\u00e7alar, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, rotalar, malzeme planlama, sat\u0131n alma, \u00fcretim emirlerinin serbest b\u0131rak\u0131lmas\u0131 ve finans APplus&#8217;ta kal\u0131r. SkyPlanner, \u00fcretim emirlerinizin operasyonlar\u0131n\u0131 s\u0131ralar ve planlanan tarihleri APplus&#8217;a geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00d6nce APplus verilerimizle, kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alan \u00fcretim \u00e7izelgelemeyi deneyebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. A\u00e7\u0131k \u00fcretim emirlerini, kapasite birimlerini ve rotalar\u0131 Excel dosyas\u0131 olarak d\u0131\u015fa aktar\u0131n. Bu dosyay\u0131 30 g\u00fcnl\u00fck \u00fccretsiz deneme ortam\u0131na i\u00e7e aktararak olu\u015fan \u00e7izelgeyi planlama panonuzla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ APplus APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu? APplus PPS, Feinplanung ve SkyPlanner APS K\u0131smen. APplus PPS, en basit h\u00e2liyle kapasite s\u0131n\u0131r\u0131 koymadan \u00e7izelgeleme yapar; darbo\u011fazlar\u0131 veya t\u00fcm kapasite birimlerini s\u0131n\u0131rl\u0131 kaynak olarak tan\u0131mlayabilirsiniz. Planlamac\u0131, planlama panosunda ince d\u00fczeltmeler yapar. APplus Feinplanung, haz\u0131rl\u0131klar\u0131 ve i\u015f s\u0131ras\u0131n\u0131 optimize eder. Asseco, karma\u015f\u0131k haz\u0131rl\u0131k matrisleri ve &#8230; <a title=\"APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu? APplus PPS, Feinplanung ve SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/\" aria-label=\"Read more about APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu? APplus PPS, Feinplanung ve SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106248,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107031","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu?<\/title>\n<meta name=\"description\" content=\"APplus PPS en basit h\u00e2liyle kapasite s\u0131n\u0131r\u0131 olmadan planlar. \u00dcst\u00fcnde Feinplanung ve APplus APS vard\u0131r. Ne yaparlar, kapasiteyi g\u00f6zeten APS ne zaman gerekir?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu? APplus PPS, Feinplanung ve SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"APplus PPS en basit h\u00e2liyle kapasite s\u0131n\u0131r\u0131 olmadan planlar. \u00dcst\u00fcnde Feinplanung ve APplus APS vard\u0131r. Ne yaparlar, kapasiteyi g\u00f6zeten APS ne zaman gerekir?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/uretim-cizelgeleme\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/uretim-cizelgeleme\\\/\",\"name\":\"APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"APplus PPS en basit h\u00e2liyle kapasite s\u0131n\u0131r\u0131 olmadan planlar. \u00dcst\u00fcnde Feinplanung ve APplus APS vard\u0131r. Ne yaparlar, kapasiteyi g\u00f6zeten APS ne zaman gerekir?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/uretim-cizelgeleme\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/uretim-cizelgeleme\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/uretim-cizelgeleme\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"APplus i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/applus\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu? APplus PPS, Feinplanung ve SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu?","description":"APplus PPS en basit h\u00e2liyle kapasite s\u0131n\u0131r\u0131 olmadan planlar. \u00dcst\u00fcnde Feinplanung ve APplus APS vard\u0131r. Ne yaparlar, kapasiteyi g\u00f6zeten APS ne zaman gerekir?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/","og_locale":"tr_TR","og_type":"article","og_title":"APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu? APplus PPS, Feinplanung ve SkyPlanner APS","og_description":"APplus PPS en basit h\u00e2liyle kapasite s\u0131n\u0131r\u0131 olmadan planlar. \u00dcst\u00fcnde Feinplanung ve APplus APS vard\u0131r. Ne yaparlar, kapasiteyi g\u00f6zeten APS ne zaman gerekir?","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"12 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/","name":"APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"APplus PPS en basit h\u00e2liyle kapasite s\u0131n\u0131r\u0131 olmadan planlar. \u00dcst\u00fcnde Feinplanung ve APplus APS vard\u0131r. Ne yaparlar, kapasiteyi g\u00f6zeten APS ne zaman gerekir?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/uretim-cizelgeleme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"APplus i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/applus\/"},{"@type":"ListItem","position":5,"name":"APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu? APplus PPS, Feinplanung ve SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ APplus APplus \u00dcretim \u00c7izelgeleme Yapabiliyor mu? APplus PPS, Feinplanung ve SkyPlanner APS K\u0131smen. APplus PPS, en basit h\u00e2liyle kapasite s\u0131n\u0131r\u0131 koymadan \u00e7izelgeleme yapar; darbo\u011fazlar\u0131 veya t\u00fcm kapasite birimlerini s\u0131n\u0131rl\u0131 kaynak olarak tan\u0131mlayabilirsiniz. Planlamac\u0131, planlama panosunda ince d\u00fczeltmeler yapar. APplus Feinplanung, haz\u0131rl\u0131klar\u0131 ve i\u015f s\u0131ras\u0131n\u0131 optimize eder. Asseco, karma\u015f\u0131k haz\u0131rl\u0131k matrisleri ve&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/107031","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=107031"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/107031\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106248"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=107031"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}