{"id":106973,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"uretim-cizelgeleme","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/","title":{"rendered":"PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? PSIpenta Planlama Mod\u00fclleri ve SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ PSIpenta<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? <span class=\"hl\">PSIpenta Planlama Mod\u00fclleri ve SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Evet, PSIpenta ayr\u0131 mod\u00fcller arac\u0131l\u0131\u011f\u0131yla ger\u00e7ek kapasiteyi dikkate alan \u00fcretim \u00e7izelgeleme yapar. PSIpenta\/ERP&#8217;nin Production mod\u00fcl\u00fc, darbo\u011faz olu\u015fturan malzeme ve kapasiteyi planlar. Leitstand mod\u00fcl\u00fc, kaynaklar\u0131 s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z kapasiteye g\u00f6re planlar ve plan\u0131n de\u011fi\u015ftirilmeyece\u011fi bir d\u00f6nem tan\u0131mlaman\u0131za olanak verir. PSIpenta\/MES Scheduling, her i\u015f merkezindeki i\u015fleri s\u0131n\u0131rl\u0131 kapasiteye g\u00f6re s\u0131ralar. T\u00fcm makineleri, \u00e7al\u0131\u015fanlar\u0131, tak\u0131mlar\u0131 ve malzemeleri kendini g\u00fcncel tutan tek bir \u00e7izelgede y\u00f6netmek isteyen tesisler, PSIpenta\/ERP&#8217;nin yan\u0131nda SkyPlanner APS kullan\u0131r.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Bu makale, PSI Software SE&#8217;nin PSIpenta\/ERP 10 \u00fcr\u00fcn\u00fcn\u00fc ve PSI&#8217;\u0131n bug\u00fcn yay\u0131mlad\u0131\u011f\u0131 mod\u00fcl sayfalar\u0131n\u0131 ele al\u0131r. PSIpenta mod\u00fclerdir; dolay\u0131s\u0131yla tesisinizde neler yapabilece\u011finiz, lisanslad\u0131\u011f\u0131n\u0131z mod\u00fcllere ba\u011fl\u0131d\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-psipenta-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">PSIpenta kapasiteyi ad\u0131m ad\u0131m nas\u0131l planlar?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Ana veriler<\/h3>\n\n\n<p>Planlama; par\u00e7alar, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131 (St\u00fccklisten) ve operasyonlar\u0131 (Arbeitsg\u00e4nge) i\u00e7eren \u00fcretim rotalar\u0131 (Arbeitspl\u00e4ne) ile ba\u015flar. Her operasyon bir i\u015f merkezinde (Arbeitsplatz) veya makinede y\u00fcr\u00fct\u00fcl\u00fcr. Tak\u0131mlar ve fikst\u00fcrler, kendilerine ait mod\u00fclde Betriebsmittel olarak y\u00f6netilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Malzeme ihtiya\u00e7 planlamas\u0131<\/h3>\n\n\n<p>Materialdisposition, ihtiya\u00e7lar\u0131n kar\u015f\u0131lan\u0131p kar\u015f\u0131lanmad\u0131\u011f\u0131n\u0131 s\u00fcrekli hesaplar. Talebe g\u00f6re sat\u0131n alma \u00f6nerileri ve \u00fcretim emirleri (Fertigungsauftr\u00e4ge) olu\u015fturur. Bu ad\u0131m, neyin \u00fcretilece\u011fini, neyin sat\u0131n al\u0131naca\u011f\u0131n\u0131 ve bunlar\u0131n ne zamana kadar yap\u0131lmas\u0131 gerekti\u011fini belirler.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Production mod\u00fcl\u00fcnde kaba ve ayr\u0131nt\u0131l\u0131 planlama<\/h3>\n\n\n<p>Production mod\u00fcl\u00fc iki planlama d\u00fczeyi sunar (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/produktion-1\">PSI Produktion<\/a>):<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kaba planlama<\/strong>, darbo\u011faz olu\u015fturan malzeme ve kapasiteyi hedeflere g\u00f6re tahsis eder.<\/li>\n\n\n<li><strong>Ayr\u0131nt\u0131l\u0131 planlama<\/strong>, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131n\u0131 ve \u00fcretim rotalar\u0131n\u0131 birden fazla seviyede optimize ederek planlar.<\/li>\n\n<\/ul>\n\n\n<p>B\u00f6ylece sipari\u015flerin tarihleri belirlenir ve darbo\u011fazlar g\u00f6r\u00fcn\u00fcr h\u00e2le gelir. Bu, PSIpenta kullanan her tesiste bulunan temel planlama katman\u0131d\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Leitstand mod\u00fcl\u00fc<\/h3>\n\n\n<p>PSIpenta\/Advanced Scheduling &amp; Monitoring, PSI&#8217;\u0131n planlama panosudur. PSI, bu \u00fcr\u00fcn\u00fcn her ERP sistemine ba\u011flanabildi\u011fini belirtir. \u00dcr\u00fcn; sizin tan\u0131mlad\u0131\u011f\u0131n\u0131z, plan\u0131n sabit tutuldu\u011fu bir d\u00f6nem, s\u0131n\u0131rl\u0131 kapasiteye g\u00f6re planlama ve sim\u00fclasyon \u00f6zellikleri ekler. Bu \u00f6zellikler yapay zek\u00e2 y\u00f6ntemleriyle geni\u015fletilebilir. Kaynaklar, s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z kapasiteye g\u00f6re planlan\u0131r (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/leitstand-1\">PSI Leitstand<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Adaptive Planung<\/h3>\n\n\n<p>APS mod\u00fcl\u00fc, t\u00fcm planlama d\u00fczeylerindeki aksakl\u0131klara tepki vermek i\u00e7in kontrol bile\u015fenleri kullan\u0131r. Gideremedi\u011fi gecikmeleri kritik yollar olarak i\u015faretler; b\u00f6ylece bu gecikmeler \u00fczerinde \u00e7al\u0131\u015f\u0131labilir (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/adaptive-planung\">PSI Adaptive Planung<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. PSIpenta\/MES Scheduling<\/h3>\n\n\n<p>MES \u00fcr\u00fcn ailesindeki Scheduling, her i\u015f merkezindeki i\u015f s\u0131ras\u0131n\u0131 s\u0131n\u0131rl\u0131 kapasiteye g\u00f6re planlar. \u00c7oklu kaynak deste\u011fi, otomatik planlama ve g\u00fcncelleme sunar. Standartla\u015ft\u0131r\u0131lm\u0131\u015f mesajlarla PSIpenta\/MES&#8217;e entegre olur ve girdi verilerini PSIpenta\/ERP&#8217;den veya ba\u015fka bir ERP&#8217;den al\u0131r (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/mes\/modul\/psipentames-scheduling\">PSI MES Scheduling<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. \u00dcretim sahas\u0131 verileri<\/h3>\n\n\n<p>ERP ile tam entegre \u00e7al\u0131\u015fan Betriebsdatenerfassung (BDE), sipari\u015f verilerini ve \u00fcretim bildirimlerini (R\u00fcckmeldungen) otomatik olarak devral\u0131r. Bildirimler, hangi i\u015flerin tamamland\u0131\u011f\u0131n\u0131 planlamaya iletir.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Planlamac\u0131ya kalan i\u015fler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planlama katman\u0131n\u0131 se\u00e7mek.<\/strong> PSIpenta, mod\u00fcl baz\u0131nda lisanslan\u0131r. PSI, yaln\u0131zca ihtiya\u00e7 duydu\u011funuz i\u015flevleri sat\u0131n ald\u0131\u011f\u0131n\u0131z\u0131 belirtir (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\">PSI<\/a>). \u0130\u015fleri ger\u00e7ek kapasiteye g\u00f6re s\u0131ralamak i\u00e7in Production mod\u00fcl\u00fcne ek olarak Leitstand, Adaptive Planung veya MES \u00fcr\u00fcn ailesi gerekir.<\/li>\n\n\n<li><strong>Kaba planlama darbo\u011fazlara odaklan\u0131r.<\/strong> Production mod\u00fcl\u00fc, darbo\u011faz kapasitesini tahsis eder. Her makinedeki her operasyonu saat baz\u0131nda s\u0131ralamaz.<\/li>\n\n\n<li><strong>Kapasitenin s\u0131n\u0131rl\u0131 m\u0131 s\u0131n\u0131rs\u0131z m\u0131 oldu\u011fu bir ayard\u0131r.<\/strong> Leitstand, her kayna\u011f\u0131 s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z kapasiteye g\u00f6re planlar. Bu nedenle hangi kaynaklar\u0131n s\u0131n\u0131rl\u0131 olaca\u011f\u0131na birinin karar vermesi ve bu ayarlar\u0131 g\u00fcncel tutmas\u0131 gerekir.<\/li>\n\n\n<li><strong>Giderilemeyen gecikmeler planlamac\u0131ya d\u00f6ner.<\/strong> Adaptive Planung, mod\u00fcl\u00fcn gideremedi\u011fi gecikmeleri planlamac\u0131n\u0131n ele almas\u0131 i\u00e7in kritik yollar olarak i\u015faretler.<\/li>\n\n\n<li><strong>MES Scheduling, MES \u00fcr\u00fcn ailesinin par\u00e7as\u0131d\u0131r.<\/strong> PSIpenta\/MES&#8217;e entegre oldu\u011fu i\u00e7in PSIpenta\/MES kullanmayan bir tesisin \u00f6nce bu \u00fcr\u00fcn ailesini eklemesi gerekir.<\/li>\n\n\n<li><strong>Birden fazla mod\u00fcl, birden fazla proje demektir.<\/strong> Her katman\u0131n ayr\u0131 kurulumu, verileri ve sorumlusu vard\u0131r.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-psipenta-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">PSIpenta&#8217;n\u0131n kendi \u00e7izelgelemesi ne zaman yeterli?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u015eu durumlarda PSIpenta&#8217;n\u0131n kendi planlamas\u0131 i\u015finizi g\u00f6r\u00fcr:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Darbo\u011fazlara y\u00f6nelik kaba planlama, m\u00fc\u015fterilerinizin kabul etti\u011fi teslimat tarihleri veriyorsa.<\/li>\n\n\n<li>Zaten Leitstand veya MES Scheduling kullan\u0131yorsan\u0131z ve bir planlamac\u0131 sistemi g\u00fcncel tutuyorsa.<\/li>\n\n\n<li>Tip de\u011fi\u015fimleri k\u0131sa s\u00fcr\u00fcyorsa veya \u00f6nceki \u00fcr\u00fcne ba\u011fl\u0131 de\u011filse.<\/li>\n\n\n<li>Operat\u00f6rler ve ortak kullan\u0131lan tak\u0131mlar, i\u015f s\u0131ras\u0131n\u0131 nadiren belirliyorsa.<\/li>\n\n\n<li>Plan g\u00fcnde birka\u00e7 kez de\u011fil, ayda birka\u00e7 kez de\u011fi\u015fiyorsa.<\/li>\n\n<\/ul>\n\n\n<p>Bu ko\u015fullar size uyuyorsa \u00fcretim rotalar\u0131n\u0131, takvimleri ve BDE bildirimlerini do\u011fru tutun; elinizdeki mod\u00fclleri kullan\u0131n.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ger\u00e7ek kapasiteye g\u00f6re \u00e7al\u0131\u015fan bir \u00e7izelgeleme yaz\u0131l\u0131m\u0131 ne zaman gerekir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A\u015fa\u011f\u0131dakilerden birka\u00e7\u0131 sizin i\u00e7in ge\u00e7erliyse mevcut yap\u0131n\u0131z art\u0131k ihtiya\u00e7lar\u0131n\u0131z\u0131 kar\u015f\u0131lam\u0131yor demektir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Planlamac\u0131, her acil sipari\u015f veya ar\u0131zadan sonra sipari\u015fleri elle yeniden s\u0131ral\u0131yor.<\/li>\n\n\n<li>Darbo\u011faz planlamas\u0131 sorunsuz g\u00f6r\u00fcnse de teslimat tarihleri sark\u0131yor.<\/li>\n\n\n<li>Tip de\u011fi\u015fimi s\u00fcresi, \u00f6nce hangi \u00fcr\u00fcn\u00fcn \u00fcretildi\u011fine ba\u011fl\u0131.<\/li>\n\n\n<li>Operat\u00f6rler, vardiyalar ve devams\u0131zl\u0131klar \u00fcretim miktar\u0131n\u0131 makineler kadar s\u0131n\u0131rl\u0131yor.<\/li>\n\n\n<li>Fikst\u00fcrler veya tak\u0131mlar makineler aras\u0131nda ta\u015f\u0131n\u0131yor.<\/li>\n\n\n<li>Hangi operasyonun ba\u015flayabilece\u011fini geciken malzemeler belirliyor.<\/li>\n\n\n<li>Yeni bir PSI mod\u00fcl\u00fc projesine ba\u015flamadan, ger\u00e7ek kapasiteye uygun bir \u00e7izelge istiyorsunuz.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Hangi \u00f6zellikleri aramal\u0131s\u0131n\u0131z?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>T\u00fcm kaynaklar\u0131n kapasite s\u0131n\u0131rlar\u0131n\u0131 ayn\u0131 anda dikkate alma:<\/strong> makineleri, \u00e7al\u0131\u015fanlar\u0131 ve tak\u0131mlar\u0131 ger\u00e7ek ba\u015flang\u0131\u00e7 ve biti\u015f saatleriyle \u00e7izelgeleme.<\/li>\n\n\n<li>\u00d6nceliklere ve teslim tarihlerine g\u00f6re <strong>operasyon d\u00fczeyinde s\u0131ralama<\/strong>.<\/li>\n\n\n<li>S\u0131ralamaya ba\u011fl\u0131, iki y\u00f6nde farkl\u0131 tip de\u011fi\u015fimi s\u00fcrelerini i\u00e7eren bir <strong>haz\u0131rl\u0131k s\u00fcresi matrisi<\/strong>.<\/li>\n\n\n<li><strong>Tak\u0131mlar\u0131 s\u0131n\u0131rl\u0131 kapasiteli ortak kaynaklar olarak y\u00f6netme<\/strong> ve <strong>birden fazla operat\u00f6r\u00fcn \u00e7al\u0131\u015ft\u0131\u011f\u0131 i\u015fleri planlama<\/strong>.<\/li>\n\n\n<li>Stoklar\u0131 ve a\u00e7\u0131k sat\u0131n alma sipari\u015flerini kontrol eden, <strong>malzeme durumuna g\u00f6re \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li>\u00dcretimdeki ilerleme veya sipari\u015fler de\u011fi\u015fti\u011finde <strong>otomatik yeniden \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li><strong>PSIpenta ile sorunsuz veri ak\u0131\u015f\u0131.<\/strong> PSI, PSIpenta\/ERP ve PSIpenta\/BDE i\u00e7in REST ve SOAP API&#8217;leri ile PSIintegration katman\u0131n\u0131 sunar. Her tedarik\u00e7iye, planlanan tarihlerin \u00fcretim emirlerinize nas\u0131l aktar\u0131laca\u011f\u0131n\u0131 ve canl\u0131ya ge\u00e7i\u015ften sonra deste\u011fi kimin verece\u011fini sorun.<\/li>\n\n<\/ul>\n\n\n<p>Se\u00e7enekler d\u00f6rt grupta toplan\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Production mod\u00fcl\u00fcndeki <strong>PSIpenta temel planlamas\u0131<\/strong>: ERP i\u00e7inde kaba ve ayr\u0131nt\u0131l\u0131 planlama.<\/li>\n\n\n<li><strong>PSI planlama mod\u00fclleri<\/strong> (Leitstand, Adaptive Planung, MES Scheduling, PSIasm\/Qualicision): ayr\u0131 lisanslanan PSI \u00fcr\u00fcnleri.<\/li>\n\n\n<li>Bir uygulama projesiyle entegre edilen ve bir planlama ekibi taraf\u0131ndan y\u00f6netilen <strong>DACH b\u00f6lgesindeki APS ve Leitstand tedarik\u00e7ilerinin \u00e7\u00f6z\u00fcmleri<\/strong>.<\/li>\n\n\n<li>SkyPlanner&#8217;\u0131n yer ald\u0131\u011f\u0131 <strong>\u00fcretim sahas\u0131nda i\u015f y\u00fcr\u00fctmeyi de kapsayan bulut APS \u00e7\u00f6z\u00fcmleri<\/strong>: PSIpenta&#8217;n\u0131n yan\u0131nda her kaynak otomatik olarak \u00e7izelgelenir, plan do\u011frudan operat\u00f6rlere ula\u015f\u0131r.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner nerede devreye girer?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS, yukar\u0131da s\u0131ralanan eksiklerin her birini giderir. Her i\u015f merkezinin, \u00e7al\u0131\u015fan\u0131n ve tak\u0131m\u0131n kapasitesi s\u0131n\u0131rl\u0131 kabul edilir. Arcturus AI motoru saniyeler i\u00e7inde operasyon d\u00fczeyinde bir \u00e7izelge olu\u015fturur. \u0130\u015fleri; i\u015f \u00f6nceli\u011fi, tamamlanma tarihi, m\u00fc\u015fteri \u00f6nceli\u011fi, Fast Track ve Dynamic Priorities&#8217;e g\u00f6re s\u0131ralar.<\/p>\n\n\n<p>Haz\u0131rl\u0131k s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcresini iki y\u00f6n i\u00e7in de tutar. \u00d6rne\u011fin maviden k\u0131rm\u0131z\u0131ya ge\u00e7i\u015f 30 dakika, k\u0131rm\u0131z\u0131dan maviye ge\u00e7i\u015f 60 dakika olabilir. Motor, en az haz\u0131rl\u0131k gerektiren s\u0131ralamay\u0131 se\u00e7er. Tak\u0131mlar s\u0131n\u0131rl\u0131 kapasiteli ortak kaynaklard\u0131r; ayn\u0131 i\u015fte birden fazla ki\u015fi ayn\u0131 anda \u00e7al\u0131\u015fabilir. As\u0131l makine veya personel m\u00fcsait olmad\u0131\u011f\u0131nda i\u015f, alternatif makinelere veya personele aktar\u0131l\u0131r.<\/p>\n\n\n<p>Malzemeye dayal\u0131 \u00e7izelgeleme, mevcut stoklar ve a\u00e7\u0131k sat\u0131n alma sipari\u015fleri \u00fczerinden gelecekteki stok durumunu sim\u00fcle eder. B\u00f6ylece operasyon, malzemesinin haz\u0131r oldu\u011fu zamana planlan\u0131r. Autopilot, \u00fcretim de\u011fi\u015fti\u011finde \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Running Time Lock ise \u00fcretim sahas\u0131ndaki d\u00fczenin bozulmamas\u0131 i\u00e7in \u00f6n\u00fcm\u00fczdeki saatlerde yap\u0131lacak i\u015fleri sabitler. Operat\u00f6rler, Mobile Confirmations, Production Timer ve Quick Log Mode ile telefon veya tabletten i\u015f kay\u0131tlar\u0131n\u0131 girer.<\/p>\n\n\n<p><strong>\u015eu durumlarda PSIpenta Leitstand ve MES Scheduling yerine SkyPlanner&#8217;\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Haftalar i\u00e7inde kullan\u0131ma haz\u0131r bir \u00e7izelgeye ihtiyac\u0131n\u0131z varsa.<\/strong> PSIpenta mod\u00fclleri tek tek lisanslan\u0131r ve MES Scheduling, PSIpenta\/MES \u00fcr\u00fcn ailesine aittir (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/mes\/modul\/psipentames-scheduling\">PSI<\/a>). SkyPlanner, deneme s\u00fcresinde kendi \u00fcretim emirlerinizle test edebilece\u011finiz bir bulut yaz\u0131l\u0131m\u0131d\u0131r. Kurulum ve devreye alma s\u00fcreci ba\u015flad\u0131ktan sonra haftalar i\u00e7inde canl\u0131 kullan\u0131ma ge\u00e7ebilirsiniz.<\/li>\n\n\n<li><strong>Plan\u0131n kendini g\u00fcncel tutmas\u0131 gerekiyorsa.<\/strong> Adaptive Planung, gideremedi\u011fi gecikmeleri kritik yollar olarak planlamac\u0131ya aktar\u0131r (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/adaptive-planung\">PSI<\/a>). Autopilot ise \u00fcretim de\u011fi\u015fti\u011finde \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur.<\/li>\n\n\n<li><strong>\u0130\u015f s\u0131ras\u0131n\u0131 tip de\u011fi\u015fimleri, tak\u0131mlar, ekipler ve malzemeler belirliyorsa.<\/strong> Haz\u0131rl\u0131k s\u00fcresi matrisi, s\u0131n\u0131rl\u0131 kapasiteli tak\u0131mlar, birden fazla operat\u00f6r\u00fcn \u00e7al\u0131\u015ft\u0131\u011f\u0131 i\u015fler, alternatif i\u015f merkezleri ve sat\u0131n alma sipari\u015flerinin var\u0131\u015f tarihleri tek bir \u00e7izelgede ele al\u0131n\u0131r.<\/li>\n\n\n<li><strong>Her operat\u00f6r\u00fcn plan\u0131 g\u00f6rmesi gerekiyorsa.<\/strong> SkyPlanner&#8217;da kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r. Mobile Confirmations ile i\u015f s\u0131ras\u0131 her telefon veya tablette g\u00f6r\u00fcnt\u00fclenir.<\/li>\n\n<\/ul>\n\n\n<p>A\u00e7\u0131k PSIpenta \u00fcretim emirlerinizi Excel&#8217;e aktararak <a href=\"\/tr\/deneme\/\">30 g\u00fcnl\u00fck \u00fccretsiz denemeye<\/a> ba\u015flay\u0131n (20 i\u015f merkezine kadar, t\u00fcm Basic \u00f6zellikleri d\u00e2hil, kredi kart\u0131 gerekmez). Sonras\u0131nda <a href=\"\/tr\/fiyatlandirma\/\">fiyatlar<\/a>, 5 i\u015f merkezi d\u00e2hil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve ayl\u0131k faturaland\u0131r\u0131l\u0131r. Entegrasyon i\u00e7in s\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan fiyat teklifi, abonelik plan\u0131n\u0131zla birlikte \u00f6nceden sunulur.<\/p>\n\n\n<p>SkyPlanner, PSIpenta\/ERP REST API, PSIintegration ve PSIpenta\/BDE API \u00fczerinden PSIpenta ile \u00e7ift y\u00f6nl\u00fc entegre olur. SkyPlanner ekibi, kurulum ve devreye alma s\u00fcrecinde entegrasyonu yap\u0131land\u0131r\u0131r. \u0130\u015f orta\u011f\u0131n\u0131z veya geli\u015ftiricileriniz de dok\u00fcmantasyonu sunulan <a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">REST API<\/a> \u00fczerinde \u00e7al\u0131\u015fabilir. <a href=\"\/tr\/entegrasyonlar\/erp\/psipenta\/\">PSIpenta i\u00e7in SkyPlanner<\/a> sayfas\u0131n\u0131, <a href=\"\/tr\/entegrasyonlar\/erp\/psipenta\/entegrasyon-kilavuzu\/\">PSIpenta entegrasyon k\u0131lavuzunu<\/a> veya t\u00fcm <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131n\u0131<\/a> inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim sahas\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta zaman tasarrufu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sayesinde \u00fcretim planlamam\u0131z Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ge\u00e7ti.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf sa\u011flan\u0131yor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f bir plan, 30 dakikadan k\u0131sa s\u00fcrede haz\u0131rlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel&#x27;in Kauhava&#x27;daki \u00e7at\u0131 g\u00fcvenlik sistemleri fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 tespit edebilmemiz i\u00e7in gereken g\u00f6r\u00fcn\u00fcrl\u00fc\u011f\u00fc sa\u011flad\u0131 ve \u00fcretim y\u00f6netimini netle\u015ftirdi.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenlik ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 bu y\u0131l %99,2&#8217;ye ula\u015ft\u0131. \u00c7izelgeleme sayesinde g\u00fcnde d\u00f6rt saate kadar \u00e7al\u0131\u015fma s\u00fcresinden tasarruf sa\u011flan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/piristeel\/\">Piristeel&#8217;in yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations \u00dcretim M\u00fcd\u00fcr\u00fc Anu J\u00e4rvinen, Rauma&#x27;daki robotlu paletleme h\u00fccresinin yan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 ayl\u0131k<\/b><span>bo\u015f kapasiteyi sat\u0131\u015f ekibi g\u00f6rebiliyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, t\u00fcm \u00fcretim planlamam\u0131z i\u00e7in g\u00fcvenilir bir temel olu\u015fturuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Fredman Operations \u00b7 G\u0131dayla temasa uygun ambalaj k\u00e2\u011f\u0131tlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">Sat\u0131\u015f ekibi bo\u015f kapasiteyi alt\u0131 ay \u00f6nceden g\u00f6rebiliyor. Yan\u0131tlanmas\u0131 bir saat veya daha uzun s\u00fcren \u00e7izelge de\u011fi\u015fikli\u011fi talepleri art\u0131k saniyeler i\u00e7inde yan\u0131tlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/fredman-operations\/\">Fredman Operations&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>PSIpenta \u00fcretim planlamada kapasiteyi s\u0131n\u0131rl\u0131 m\u0131, s\u0131n\u0131rs\u0131z m\u0131 kabul eder?<\/summary>\n<p class=\"sp-faq__a\">Mod\u00fcle ba\u011fl\u0131 olarak her ikisi de m\u00fcmk\u00fcnd\u00fcr. Production mod\u00fcl\u00fc, darbo\u011faz olu\u015fturan malzemeleri ve kapasiteyi planlar. Leitstand, her kayna\u011f\u0131 s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z kapasiteye g\u00f6re planlar. PSIpenta\/MES Scheduling ise her i\u015f merkezinin s\u0131n\u0131rl\u0131 kapasitesini dikkate al\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hangi PSIpenta mod\u00fcl\u00fc ayr\u0131nt\u0131l\u0131 \u00e7izelgeleme yapar?<\/summary>\n<p class=\"sp-faq__a\">Leitstand mod\u00fcl\u00fc (PSIpenta\/Advanced Scheduling &amp; Monitoring), Adaptive Planung APS mod\u00fcl\u00fc ve MES \u00fcr\u00fcn ailesindeki PSIpenta\/MES Scheduling bu i\u015flevi sunar. Her biri, PSI&#8217;\u0131n mod\u00fcler \u00fcr\u00fcn\u00fcnde ayr\u0131 bir mod\u00fcld\u00fcr.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>PSIpenta Leitstand m\u0131, SkyPlanner m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Kapasite s\u0131n\u0131rlar\u0131na uyan, kendini g\u00fcncel tutan tek bir \u00fcretim \u00e7izelgesini haftalar i\u00e7inde devreye almak istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in. PSI mod\u00fclleri ayr\u0131 ayr\u0131 lisanslan\u0131r ve devreye al\u0131n\u0131r. SkyPlanner, \u00fcretimde de\u011fi\u015fiklik oldu\u011funda \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur; tip de\u011fi\u015fimlerini, tak\u0131mlar\u0131, ekipleri ve malzemeyi birlikte planlar. Ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatla s\u0131n\u0131rs\u0131z kullan\u0131c\u0131 sunar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, PSIpenta&#8217;n\u0131n yerini al\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. Par\u00e7alar, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, rotalar, malzeme ihtiya\u00e7 planlamas\u0131, sat\u0131n alma ve finans PSIpenta&#8217;da kal\u0131r. SkyPlanner, \u00fcretim emirlerinizdeki operasyonlar\u0131 s\u0131ralar ve planlanan tarihleri geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00d6nce kendi PSIpenta verilerimizle kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alan \u00fcretim \u00e7izelgelemeyi deneyebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. A\u00e7\u0131k \u00fcretim emirlerini, i\u015f merkezlerini ve rotalar\u0131 Excel&#8217;e aktar\u0131n. Bu dosyay\u0131 30 g\u00fcnl\u00fck \u00fccretsiz deneme s\u00fcr\u00fcm\u00fcne i\u00e7e aktararak olu\u015fturulan \u00e7izelgeyi mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ PSIpenta PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? PSIpenta Planlama Mod\u00fclleri ve SkyPlanner APS Evet, PSIpenta ayr\u0131 mod\u00fcller arac\u0131l\u0131\u011f\u0131yla ger\u00e7ek kapasiteyi dikkate alan \u00fcretim \u00e7izelgeleme yapar. PSIpenta\/ERP&#8217;nin Production mod\u00fcl\u00fc, darbo\u011faz olu\u015fturan malzeme ve kapasiteyi planlar. Leitstand mod\u00fcl\u00fc, kaynaklar\u0131 s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z kapasiteye g\u00f6re planlar ve plan\u0131n de\u011fi\u015ftirilmeyece\u011fi bir d\u00f6nem tan\u0131mlaman\u0131za &#8230; <a title=\"PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? PSIpenta Planlama Mod\u00fclleri ve SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/\" aria-label=\"Read more about PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? PSIpenta Planlama Mod\u00fclleri ve SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106219,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106973","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?<\/title>\n<meta name=\"description\" content=\"PSIpenta: Production, Leitstand, Adaptive Planung ve MES Scheduling ile katmanl\u0131 kapasite planlama. Hangisi ne yapar, kapasite k\u0131s\u0131tl\u0131 APS ne zaman gerekir?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? PSIpenta Planlama Mod\u00fclleri ve SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"PSIpenta: Production, Leitstand, Adaptive Planung ve MES Scheduling ile katmanl\u0131 kapasite planlama. Hangisi ne yapar, kapasite k\u0131s\u0131tl\u0131 APS ne zaman gerekir?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/psipenta\\\/uretim-cizelgeleme\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/psipenta\\\/uretim-cizelgeleme\\\/\",\"name\":\"PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"PSIpenta: Production, Leitstand, Adaptive Planung ve MES Scheduling ile katmanl\u0131 kapasite planlama. Hangisi ne yapar, kapasite k\u0131s\u0131tl\u0131 APS ne zaman gerekir?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/psipenta\\\/uretim-cizelgeleme\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/psipenta\\\/uretim-cizelgeleme\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/psipenta\\\/uretim-cizelgeleme\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"PSIpenta i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/psipenta\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? PSIpenta Planlama Mod\u00fclleri ve SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?","description":"PSIpenta: Production, Leitstand, Adaptive Planung ve MES Scheduling ile katmanl\u0131 kapasite planlama. Hangisi ne yapar, kapasite k\u0131s\u0131tl\u0131 APS ne zaman gerekir?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/","og_locale":"tr_TR","og_type":"article","og_title":"PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? PSIpenta Planlama Mod\u00fclleri ve SkyPlanner APS","og_description":"PSIpenta: Production, Leitstand, Adaptive Planung ve MES Scheduling ile katmanl\u0131 kapasite planlama. Hangisi ne yapar, kapasite k\u0131s\u0131tl\u0131 APS ne zaman gerekir?","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"12 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/","name":"PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"PSIpenta: Production, Leitstand, Adaptive Planung ve MES Scheduling ile katmanl\u0131 kapasite planlama. Hangisi ne yapar, kapasite k\u0131s\u0131tl\u0131 APS ne zaman gerekir?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/uretim-cizelgeleme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"PSIpenta i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/psipenta\/"},{"@type":"ListItem","position":5,"name":"PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? PSIpenta Planlama Mod\u00fclleri ve SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ PSIpenta PSIpenta Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? PSIpenta Planlama Mod\u00fclleri ve SkyPlanner APS Evet, PSIpenta ayr\u0131 mod\u00fcller arac\u0131l\u0131\u011f\u0131yla ger\u00e7ek kapasiteyi dikkate alan \u00fcretim \u00e7izelgeleme yapar. PSIpenta\/ERP&#8217;nin Production mod\u00fcl\u00fc, darbo\u011faz olu\u015fturan malzeme ve kapasiteyi planlar. Leitstand mod\u00fcl\u00fc, kaynaklar\u0131 s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z kapasiteye g\u00f6re planlar ve plan\u0131n de\u011fi\u015ftirilmeyece\u011fi bir d\u00f6nem tan\u0131mlaman\u0131za&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106973","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=106973"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106973\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106219"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=106973"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}