{"id":106944,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"entegrasyon-kilavuzu","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/","title":{"rendered":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in QAD Adaptive ERP Entegrasyon K\u0131lavuzu"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\"><span class=\"hl\">SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in<\/span> QAD Adaptive ERP Entegrasyon K\u0131lavuzu<\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Bu QAD Adaptive ERP entegrasyon k\u0131lavuzu, i\u015f ortaklar\u0131na ve BT ekiplerine QAD Adaptive ERP&#8217;yi SkyPlanner APS&#8217;ye nas\u0131l ba\u011flayacaklar\u0131n\u0131 g\u00f6sterir. \u00d6nceki QAD Enterprise Edition ve MFG\/PRO kurulumlar\u0131 da buna dahildir. SkyPlanner, QAD&#8217;nin kendi aray\u00fczlerini kullanarak QAD Adaptive ERP ile \u00e7ift y\u00f6nl\u00fc entegre olur:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00dcretim emirleri ve bunlar\u0131n operasyonlar\u0131, stok kartlar\u0131, \u00fcr\u00fcn yap\u0131lar\u0131, rotalar, i\u015f merkezleri, at\u00f6lye takvimleri, stoklar ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r.<\/li>\n\n\n<li>\u00c7izelgelemede belirlenen serbest b\u0131rakma ve termin tarihleri Work Order Maintenance (16.1) program\u0131na geri yaz\u0131l\u0131r.<\/li>\n\n\n<li>Operat\u00f6rlerin s\u00fcre kay\u0131tlar\u0131 Labor Feedback by Work Order (16.20.1), tamamlanan miktarlar ise Work Order Receipt (16.11) \u00fczerinden geri aktar\u0131l\u0131r.<\/li>\n\n\n<li>SkyPlanner webhook\u2019lar\u0131, \u00e7izelgedeki de\u011fi\u015fiklikleri an\u0131nda iletir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo i\u00e7in randevu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve alt\u0131nda sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu QAD kurulumunuza g\u00f6re yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra da destekler. Bu k\u0131lavuz, s\u00fcrece kat\u0131lmak veya SkyPlanner&#8217;\u0131n belgelenmi\u015f REST API&#8217;sini (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API ba\u015fvuru kayna\u011f\u0131<\/a>) kullanarak kendi \u00e7\u00f6z\u00fcmlerini geli\u015ftirmek isteyen i\u015f ortaklar\u0131 ve geli\u015ftiriciler i\u00e7indir.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD&#8217;nin entegrasyon aray\u00fczleri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QAD, harici bir \u00e7izelgeleme uygulamas\u0131 i\u00e7in \u00fc\u00e7 yol sunar:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD QXtend Inbound (QXI).<\/strong> QAD bunu \u015f\u00f6yle tan\u0131mlar: &#8220;a Web services-based, SOAP-compliant, XML framework, enabling complete platform-independent access to QAD Enterprise Applications business functionality.&#8221; (QAD Enterprise Applications i\u015flevlerine platformdan tamamen ba\u011f\u0131ms\u0131z eri\u015fim sa\u011flayan, web servisleri tabanl\u0131, SOAP uyumlu bir XML \u00e7er\u00e7evesi.) Her istek bir <strong>QDoc<\/strong> belgesidir; QAD program\u0131n\u0131, program ekran\u0131ndakiyle ayn\u0131 do\u011frulama kurallar\u0131yla \u00e7al\u0131\u015ft\u0131r\u0131r ve kar\u015f\u0131l\u0131\u011f\u0131nda bir yan\u0131t QDoc&#8217;u d\u00f6ner. Yay\u0131mlanm\u0131\u015f QDoc&#8217;lar aras\u0131nda <code>maintainItemMaster<\/code>, <code>maintainRouting<\/code> ve <code>maintainPurchaseOrder<\/code> bulunur. Yay\u0131mlanm\u0131\u015f QDoc&#8217;u olmayan programlarda QAD&#8217;nin <strong>QGen<\/strong> arac\u0131 men\u00fc program\u0131n\u0131 e\u015fle\u015ftirir: &#8220;QGen is used to map custom programs or QAD Enterprise Applications programs that do not have released QDoc schemas and events files.&#8221; (QGen, yay\u0131mlanm\u0131\u015f QDoc \u015femalar\u0131 ve olay dosyalar\u0131 bulunmayan \u00f6zel programlar\u0131 veya QAD Enterprise Applications programlar\u0131n\u0131 e\u015fle\u015ftirmek i\u00e7in kullan\u0131l\u0131r.) QAD de bu yolu kullan\u0131r: &#8220;QAD Production Scheduler uses QAD QXtend to update work orders.&#8221; (QAD Production Scheduler, \u00fcretim emirlerini g\u00fcncellemek i\u00e7in QAD QXtend kullan\u0131r.) (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/2370949\/Qxtend_UG_v0110.pdf\/093456b1-c885-de26-7e61-754987199fa7?t=1634559415409&amp;download=true\">QXtend k\u0131lavuzu<\/a>)<\/li>\n\n\n<li><strong>QAD QXtend Outbound (QXO).<\/strong> QXO &#8220;exports user-configurable business objects as XML QDocs out of QAD products.&#8221; (Kullan\u0131c\u0131n\u0131n yap\u0131land\u0131rabildi\u011fi i\u015f nesnelerini QAD \u00fcr\u00fcnlerinden XML QDoc&#8217;lar\u0131 olarak d\u0131\u015fa aktar\u0131r.) Standart i\u015f nesneleri aras\u0131nda Item, Product Structure, Routing, Work Center, Department, Inventory Transaction ve Inventory Status bulunur.<\/li>\n\n\n<li><strong>\u0130\u015f belgeleri i\u00e7in REST API&#8217;leri.<\/strong> Adaptive ERP 2022.1 s\u00fcr\u00fcm\u00fcnden itibaren bu \u00f6zellik kullan\u0131labilir: &#8220;Query REST APIs are now available for business documents,&#8221; (\u0130\u015f belgeleri i\u00e7in art\u0131k sorgulama ama\u00e7l\u0131 REST API&#8217;leri kullan\u0131labilir.) Filtreleme, s\u0131ralama, sayfalama ve verinin yaln\u0131zca bir b\u00f6l\u00fcm\u00fcn\u00fc alma \u00f6zellikleri sunan bu API&#8217;ler, kendi ortam\u0131n\u0131zdaki Swagger belgelerinde a\u00e7\u0131klan\u0131r (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/159231649\/QAD_Adaptive_ERP_Web_UI_RN_v2022_1.pdf\/602f6b29-ef47-decd-4825-127b06b25b16?t=1670945442202&amp;download=true\">s\u00fcr\u00fcm notlar\u0131<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>Yazma i\u015flemleri QXtend \u00fczerinden yap\u0131l\u0131r. Okuma i\u015flemleri ise QXO ve REST sorgu API&#8217;leri \u00fczerinden y\u00fcr\u00fct\u00fcl\u00fcr.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kimlik do\u011frulama ve lisanslama<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>QXtend Inbound.<\/strong> Al\u0131c\u0131da Require Authentication etkinle\u015ftirildi\u011finde her QDoc bir Session ID veya QAD kullan\u0131c\u0131 ad\u0131 ve parolas\u0131 i\u00e7erir. QXI, program\u0131 \u00e7al\u0131\u015ft\u0131rmadan \u00f6nce kullan\u0131c\u0131n\u0131n men\u00fc eri\u015fim yetkilerini kontrol eder.<\/li>\n\n\n<li><strong>Entegrasyon kullan\u0131c\u0131s\u0131.<\/strong> Yaln\u0131zca entegrasyonun \u00e7a\u011f\u0131rd\u0131\u011f\u0131 men\u00fc programlar\u0131na eri\u015febilen, entegrasyona \u00f6zel bir QAD kullan\u0131c\u0131s\u0131 olu\u015fturun: Work Order Maintenance, Labor Feedback by Work Order, Work Order Receipt ve ana veri programlar\u0131.<\/li>\n\n\n<li><strong>QXtend lisans\u0131.<\/strong> QXtend, arac\u0131 ve al\u0131c\u0131 say\u0131s\u0131na g\u00f6re lisanslan\u0131r. QAD k\u0131lavuzunda, harici bir uygulamayla yap\u0131lan \u00e7ift y\u00f6nl\u00fc web servisi trafi\u011finin \u00fccretsiz olmad\u0131\u011f\u0131 belirtilir. Bu nedenle proje ba\u015flamadan \u00f6nce QXtend lisans\u0131n\u0131 teyit edin.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner taraf\u0131nda REST API, <code>Authorization-Token<\/code> ba\u015fl\u0131\u011f\u0131ndaki API token&#8217;\u0131 ile kimlik do\u011frular (SkyPlanner Settings &gt; API). API, Swagger\/OpenAPI ile belgelenmi\u015ftir. <a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">Entegrasyon rehberi<\/a>, ilk \u00e7a\u011fr\u0131lar\u0131 ad\u0131m ad\u0131m a\u00e7\u0131klar.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-change-data\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Olaylar ve veri de\u011fi\u015fiklikleri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QXtend Outbound, QAD&#8217;nin veri de\u011fi\u015fikliklerini aktarma mekanizmas\u0131d\u0131r. &#8220;A change occurs to watched data in QAD Enterprise Applications. Change notifications are written out to the qxevents database.&#8221; (QAD Enterprise Applications i\u00e7inde izlenen veriler de\u011fi\u015fti\u011finde, de\u011fi\u015fiklik bildirimleri qxevents veritaban\u0131na yaz\u0131l\u0131r.) QXO daha sonra QDoc&#8217;lar\u0131 olu\u015fturur ve bunlar\u0131 &#8220;to a directory location where the subscriber polls for and picks up new QDocs,&#8221; (abonenin d\u00fczenli olarak kontrol edip yeni QDoc&#8217;lar\u0131 ald\u0131\u011f\u0131 bir dizine) veya bir URL \u00fczerinden dinleyen web servisine iletir.<\/p>\n\n\n<p>SkyPlanner, QXO&#8217;nun yay\u0131n yapt\u0131\u011f\u0131 noktaya web servisi olarak abone olur. QXO&#8217;nun kapsamad\u0131\u011f\u0131 verileri ise REST sorgu API&#8217;lerini d\u00fczenli aral\u0131klarla sorgulayarak al\u0131r. Work Order, standart QXO i\u015f nesnelerinden biri de\u011fildir. Bu nedenle entegrasyonda ya \u00fcretim emri tablolar\u0131 (<code>wo_mstr<\/code>, <code>wr_route<\/code>) \u00fczerinde bir QXO i\u015f nesnesi eklenir ya da \u00fcretim emirleri REST sorgu API&#8217;leri \u00fczerinden birka\u00e7 dakikada bir sorgulan\u0131r.<\/p>\n\n\n<p>SkyPlanner, durum veya \u00e7izelge de\u011fi\u015fti\u011finde webhook g\u00f6nderir. B\u00f6ylece geri yazma i\u015flemleri olay odakl\u0131 y\u00fcr\u00fct\u00fcl\u00fcr.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Veri e\u015fleme<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>QAD nesnesi (program, aray\u00fcz)<\/th><th>SkyPlanner nesnesi<\/th><th>Y\u00f6n<\/th><th>S\u0131kl\u0131k<\/th><\/tr><\/thead><tbody><tr><td>Stok kartlar\u0131 (Item Master Maintenance 1.4.1; QXO Item)<\/td><td>\u00dcr\u00fcnler ve malzemeler<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, ard\u0131ndan de\u011fi\u015fiklik oldu\u011funda QXO \u00fczerinden<\/td><\/tr><tr><td>\u00dcr\u00fcn yap\u0131lar\u0131 (13.5; QXO Product Structure)<\/td><td>\u00dcr\u00fcn yap\u0131s\u0131, alt \u00fcr\u00fcnler, \u00fcr\u00fcn ba\u015f\u0131na malzemeler<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, ard\u0131ndan de\u011fi\u015fiklik oldu\u011funda QXO \u00fczerinden<\/td><\/tr><tr><td>Rotalar (14.13.1; QXO Routing): kuyruk, haz\u0131rl\u0131k, i\u015flem, bekleme, ta\u015f\u0131ma<\/td><td>S\u00fcre, haz\u0131rl\u0131k s\u00fcresi ve s\u00f6k\u00fcm s\u00fcresi bilgileriyle s\u00fcre\u00e7 ad\u0131mlar\u0131<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, ard\u0131ndan de\u011fi\u015fiklik oldu\u011funda QXO \u00fczerinden<\/td><\/tr><tr><td>\u0130\u015f merkezleri (14.5) ve b\u00f6l\u00fcmler (14.1; QXO Work Center, Department)<\/td><td>\u0130\u015f merkezleri, i\u015f merkezi gruplar\u0131, verimlilik oranlar\u0131<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, sonras\u0131nda nadiren<\/td><\/tr><tr><td>At\u00f6lye ve i\u015f merkezi takvimleri<\/td><td>Vardiyalar ve \u00e7al\u0131\u015f\u0131lmayan g\u00fcnler<\/td><td>QAD \u2192 SkyPlanner<\/td><td>G\u00fcnl\u00fck veya vardiyalar\u0131n SkyPlanner&#8217;da y\u00f6netilmesi<\/td><\/tr><tr><td>Rotalar\u0131 (16.13.13) ve bile\u015fenleriyle birlikte \u00fcretim emirleri (16.1)<\/td><td>Termin tarihleri ve malzeme ihtiya\u00e7lar\u0131yla birlikte sipari\u015fler ve i\u015fler<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u00d6zel QXO nesnesi veya birka\u00e7 dakikada bir REST sorgulamas\u0131<\/td><\/tr><tr><td>Stoklar (QXO Inventory Status, Inventory Transaction)<\/td><td>Stok bakiyeleri<\/td><td>QAD \u2192 SkyPlanner<\/td><td>De\u011fi\u015fiklik oldu\u011funda veya saatte bir<\/td><\/tr><tr><td>Termin tarihleriyle birlikte sat\u0131n alma sipari\u015fleri<\/td><td>Sat\u0131n alma sipari\u015fleri, teslimat tarihine g\u00f6re gelecek malzemeler<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Saatte bir veya \u00e7izelgeleme \u00e7al\u0131\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda sorgulama<\/td><\/tr><tr><td>\u00dcretim emri serbest b\u0131rakma ve termin tarihleri (Work Order Maintenance 16.1, QXtend Inbound QDoc)<\/td><td>Her emir i\u00e7in planlanan ba\u015flang\u0131\u00e7 ve biti\u015f<\/td><td>SkyPlanner \u2192 QAD<\/td><td>\u00c7izelge de\u011fi\u015fti\u011finde SkyPlanner webhook&#8217;u arac\u0131l\u0131\u011f\u0131yla<\/td><\/tr><tr><td>Labor Feedback by Work Order (16.20.1): operasyon baz\u0131nda haz\u0131rl\u0131k ve i\u015flem s\u00fcresi<\/td><td>S\u00fcre kay\u0131tlar\u0131 ve operat\u00f6r bildirimleri<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Tercih edilirse bildirim veya vardiya ba\u015f\u0131na<\/td><\/tr><tr><td>Work Order Receipt (16.11)<\/td><td>Tamamlanan miktarlar<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Tercih edilirse bildirim ba\u015f\u0131na<\/td><\/tr><tr><td>QAD&#8217;de bulunmaz<\/td><td>Haz\u0131rl\u0131k s\u00fcresi matrisi, s\u0131n\u0131rl\u0131 kaynak olarak tak\u0131mlar, alternatif makineler ve personel<\/td><td>SkyPlanner&#8217;da y\u00f6netilir<\/td><td>Devreye alma s\u0131ras\u0131nda yap\u0131land\u0131r\u0131l\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Entegrasyon y\u00f6ntemleri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Ana verilerin ilk y\u00fcklemesi.<\/strong> Stok kartlar\u0131n\u0131, \u00fcr\u00fcn yap\u0131lar\u0131n\u0131, rotalar\u0131, i\u015f merkezlerini ve takvimleri QXO veya REST sorgu API&#8217;leri \u00fczerinden okuyun. \u0130\u015f merkezlerinin nas\u0131l e\u015fle\u015ftirilece\u011fini dikkatle belirleyin: d\u00f6rt makineli bir i\u015f merkezi, bir i\u015f merkezi grubuna veya d\u00f6rt ayr\u0131 i\u015f merkezine d\u00f6n\u00fc\u015f\u00fcr. Production Line Maintenance i\u00e7indeki tekrarl\u0131 \u00fcretim hatlar\u0131 da i\u015f merkezi olarak tan\u0131mlanabilir.<\/p>\n\n\n<p><strong>2. \u00dcretim emri senkronizasyonu.<\/strong> Kesin planlanm\u0131\u015f ve serbest b\u0131rak\u0131lm\u0131\u015f \u00fcretim emirlerini, rotalar\u0131 ve bile\u015fenleriyle birlikte okuyun; a\u00e7\u0131k sat\u0131n alma sipari\u015flerini de al\u0131n. SkyPlanner, sipari\u015f edilen malzemeyi sat\u0131n alma sipari\u015finin teslim tarihinde kullan\u0131labilir kabul eder. Sipari\u015f Delivered olarak i\u015faretlendi\u011finde stoku g\u00fcnceller.<\/p>\n\n\n<p>MRP planl\u0131 sipari\u015flerini de\u011fil, \u00fcretim emirlerini \u00e7izelgeleyin. Planl\u0131 sipari\u015fler \u00f6nce QAD&#8217;de kesin planlanm\u0131\u015f veya serbest b\u0131rak\u0131lm\u0131\u015f \u00fcretim emirlerine d\u00f6n\u00fc\u015ft\u00fcr\u00fcl\u00fcr.<\/p>\n\n\n<p><strong>3. \u00c7izelgenin geri yaz\u0131lmas\u0131.<\/strong> \u00c7izelgeleme motoru bir emri yerle\u015ftirdi\u011finde veya zaman\u0131n\u0131 de\u011fi\u015ftirdi\u011finde SkyPlanner webhook&#8217;u, Work Order Maintenance (16.1) \u00fczerinde bir QXtend Inbound QDoc tetikler. Serbest b\u0131rakma tarihi \u00e7izelgedeki ilk operasyonun tarihine, termin tarihi ise son operasyonun tarihine ayarlan\u0131r. QXtend, program\u0131 QAD&#8217;nin kendi do\u011frulama kurallar\u0131yla \u00e7al\u0131\u015ft\u0131r\u0131r ve entegrasyonun kontrol etti\u011fi bir yan\u0131t QDoc&#8217;u d\u00f6nd\u00fcr\u00fcr.<\/p>\n\n\n<p>Her makinedeki operasyon s\u0131ras\u0131 SkyPlanner&#8217;da tutulur ve Mobile Confirmations \u00fczerinden operat\u00f6rlere iletilir. B\u00f6ylece entegrasyon, QAD&#8217;nin serbest b\u0131rak\u0131lm\u0131\u015f emirlerde rota de\u011fi\u015fikliklerini engellemesinden etkilenmez.<\/p>\n\n\n<p><strong>4. \u00dcretim sahas\u0131ndan bildirimler.<\/strong> Operat\u00f6rler, SkyPlanner Mobile Confirmations veya Production Timer ile \u00e7al\u0131\u015fmalar\u0131n\u0131 kaydeder. Bu s\u00fcre kay\u0131tlar\u0131 \u00e7izelgeyi g\u00fcncel tutar. Ger\u00e7ekle\u015fen s\u00fcrelerin QAD&#8217;ye geri aktar\u0131l\u0131p aktar\u0131lmayaca\u011f\u0131n\u0131 siz se\u00e7ersiniz. Aktar\u0131lacaksa haz\u0131rl\u0131k ve i\u015flem s\u00fcreleri operasyon baz\u0131nda Labor Feedback by Work Order&#8217;a, tamamlanan miktarlar ise Work Order Receipt&#8217;e g\u00f6nderilir. Aktar\u0131lmayacaksa i\u015f\u00e7ilik kay\u0131tlar\u0131 eskisi gibi QAD&#8217;ye girilir.<\/p>\n\n\n<p><strong>5. Veri sahipli\u011fi ve \u00e7ak\u0131\u015fma kurallar\u0131.<\/strong> Canl\u0131ya ge\u00e7meden \u00f6nce bu kurallar\u0131 yaz\u0131l\u0131 hale getirin:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Veri<\/th><th>Sorumlu sistem<\/th><\/tr><\/thead><tbody><tr><td>Stok kartlar\u0131, \u00fcr\u00fcn yap\u0131lar\u0131, rotalar, miktarlar, \u00fcretim emri durumu<\/td><td>QAD<\/td><\/tr><tr><td>Operasyon s\u0131ras\u0131, ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131, makine atamas\u0131<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u00dcretim emri serbest b\u0131rakma ve termin tarihleri<\/td><td>SkyPlanner yazar, QAD saklar<\/td><\/tr><tr><td>Haz\u0131rl\u0131k s\u00fcresi matrisi, tak\u0131m ve operat\u00f6r gereksinimleri, alternatif kaynaklar<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Vardiyalar ve \u00e7al\u0131\u015f\u0131lmayan g\u00fcnler<\/td><td>Kapsam belirleme a\u015famas\u0131nda se\u00e7ilen tek bir sistem<\/td><\/tr><tr><td>\u0130\u015f\u00e7ilik, bile\u015fen \u00e7\u0131k\u0131\u015flar\u0131 ve \u00fcretim giri\u015fleri<\/td><td>QAD; kay\u0131tlar do\u011frudan girilir veya SkyPlanner s\u00fcre kay\u0131tlar\u0131ndan aktar\u0131l\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u00dcretim emri tarihlerini yazacak tek bir sistem se\u00e7in. SkyPlanner herhangi bir QAD \u00e7izelgeleme mod\u00fcl\u00fcne ihtiya\u00e7 duymaz. Bu nedenle \u00e7izelgeledi\u011fi emirlerin tarihlerini yazma g\u00f6revini, \u00e7izelgeleme \u00e7al\u0131\u015fma ekranlar\u0131ndan veya di\u011fer \u00e7izelgeleme uygulamalar\u0131ndan devral\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipik proje ad\u0131mlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Uygulama, devreye alma s\u00fcreci ba\u015flad\u0131ktan sonra genellikle haftalar i\u00e7inde tamamlan\u0131r. \u00d6ncesinde, QAD&#8217;den CSV veya Excel olarak d\u0131\u015fa aktar\u0131lan i\u015f merkezleri, rotalar ve a\u00e7\u0131k \u00fcretim emirleriyle 30 g\u00fcnl\u00fck \u00fccretsiz denemede \u00e7izelgenizi do\u011frulay\u0131n.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>E\u015fle\u015ftirme.<\/strong> E\u015fle\u015ftirme tablosunu, veri sahipli\u011fi kurallar\u0131n\u0131, kapsamdaki tesisleri ve domain&#8217;leri, senkronizasyon s\u0131kl\u0131klar\u0131n\u0131 ve i\u015f\u00e7ilik kay\u0131tlar\u0131n\u0131n geri aktar\u0131l\u0131p aktar\u0131lmayaca\u011f\u0131n\u0131 kesinle\u015ftirin.<\/li>\n\n\n<li><strong>QAD eri\u015fimi.<\/strong> Entegrasyon kullan\u0131c\u0131s\u0131n\u0131 olu\u015fturun, QXtend lisans\u0131n\u0131 teyit edin, QXtend al\u0131c\u0131s\u0131n\u0131 ve QXO abonesini yap\u0131land\u0131r\u0131n. \u00d6nce bir test domain&#8217;inde deneyin.<\/li>\n\n\n<li><strong>QDoc yap\u0131land\u0131rmas\u0131.<\/strong> Varsa yay\u0131mlanm\u0131\u015f QDoc&#8217;lar\u0131 kullan\u0131n. Gerekti\u011finde Work Order Maintenance, Labor Feedback by Work Order ve Work Order Receipt i\u00e7in QGen ile QDoc olu\u015fturun.<\/li>\n\n\n<li><strong>\u0130lk y\u00fckleme.<\/strong> Stok kartlar\u0131, \u00fcr\u00fcn yap\u0131lar\u0131, rotalar, i\u015f merkezleri, takvimler.<\/li>\n\n\n<li><strong>\u00dcretim emri ve sat\u0131n alma sipari\u015fi senkronizasyonu.<\/strong> QXO olaylar\u0131 veya filtreleme, sayfalama ve yeniden deneme mekanizmalar\u0131yla REST \u00fczerinden d\u00fczenli sorgulama.<\/li>\n\n\n<li><strong>SkyPlanner&#8217;da k\u0131s\u0131tlar\u0131n tan\u0131mlanmas\u0131.<\/strong> Haz\u0131rl\u0131k s\u00fcresi matrisi, tak\u0131mlar, i\u015f ba\u015f\u0131na operat\u00f6r say\u0131lar\u0131 ve alternatif makineler veya personel.<\/li>\n\n\n<li><strong>\u00c7izelgenin geri yaz\u0131lmas\u0131 ve paralel test.<\/strong> SkyPlanner webhook&#8217;lar\u0131 \u00fczerinden tarihleri aktar\u0131n, mevcut planla paralel \u00e7al\u0131\u015ft\u0131r\u0131n, tarihleri kar\u015f\u0131la\u015ft\u0131r\u0131n ve ana verileri d\u00fczeltin.<\/li>\n\n\n<li><strong>Canl\u0131ya ge\u00e7i\u015f.<\/strong> Veriler e\u015fle\u015fti\u011finde geri yazmay\u0131 etkinle\u015ftirin.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-qad-adaptive-erp-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD Adaptive ERP entegrasyonunda dikkat edilmesi gerekenler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>CRP&#8217;nin yeniden \u00e7al\u0131\u015ft\u0131r\u0131lmas\u0131.<\/strong> CRP, se\u00e7ilen \u00fcretim emirlerinin t\u00fcm a\u00e7\u0131k operasyonlar\u0131n\u0131 yeniden \u00e7izelgeler. QAD, elle girilen tarihleri yaln\u0131zca &#8220;you also adjusted the work order release and due date to match,&#8221; (\u00fcretim emrinin serbest b\u0131rakma ve termin tarihlerini de e\u015fle\u015fecek \u015fekilde ayarlad\u0131\u011f\u0131n\u0131zda) korur. SkyPlanner&#8217;\u0131n yazd\u0131\u011f\u0131 tarihler tam olarak bunlard\u0131r. CRP&#8217;yi geri yazma i\u015fleminden sonra \u00e7al\u0131\u015ft\u0131r\u0131n veya SkyPlanner&#8217;\u0131n \u00e7izelgeledi\u011fi emirleri kapsam d\u0131\u015f\u0131nda b\u0131rak\u0131n.<\/li>\n\n\n<li><strong>Serbest b\u0131rak\u0131lan emirlerin rotalar\u0131 sabitlenir.<\/strong> &#8220;Once the work order status is Exploded, Allocated, or Released, no more changes can be made to the routing.&#8221; (\u00dcretim emrinin durumu Exploded, Allocated veya Released oldu\u011funda rotada art\u0131k de\u011fi\u015fiklik yap\u0131lamaz.) Rotay\u0131 serbest b\u0131rakma s\u0131ras\u0131nda okuyun; rota de\u011fi\u015fikliklerini yaln\u0131zca planlanm\u0131\u015f veya kesin planlanm\u0131\u015f emirlerde yap\u0131n.<\/li>\n\n\n<li><strong>Rotadaki zaman birimleri.<\/strong> Haz\u0131rl\u0131k ve i\u015flem s\u00fcreleri kapasite y\u00fck\u00fcne dahildir; ancak &#8220;queue, wait, and move times are excluded from load calculations.&#8221; (kuyruk, bekleme ve ta\u015f\u0131ma s\u00fcreleri y\u00fck hesaplamalar\u0131na dahil edilmez.) SkyPlanner&#8217;da kuyruk, bekleme ve ta\u015f\u0131ma ad\u0131mlar\u0131n\u0131 yaln\u0131zca s\u00fcre i\u00e7erecek \u015fekilde modelleyin. \u0130\u015flem s\u00fcresinin birim ba\u015f\u0131na m\u0131 yoksa emir ba\u015f\u0131na m\u0131 tan\u0131mland\u0131\u011f\u0131n\u0131 kontrol edin.<\/li>\n\n\n<li><strong>QXtend i\u015flem kapasitesi.<\/strong> QAD \u015fu uyar\u0131y\u0131 yapar: &#8220;UI API adapter performance may be unacceptable when processing high volumes of data or real-time transactions.&#8221; (Y\u00fcksek hacimli veriler veya ger\u00e7ek zamanl\u0131 i\u015flemler i\u015flenirken UI API ba\u011fda\u015ft\u0131r\u0131c\u0131s\u0131n\u0131n performans\u0131 kabul edilemez d\u00fczeyde olabilir.) Yaln\u0131zca de\u011fi\u015fen emirleri toplu olarak g\u00f6nderin ve mevcutsa yerle\u015fik QDocs belgelerini kullan\u0131n.<\/li>\n\n\n<li><strong>Domain ve tesisler.<\/strong> Birden fazla domain i\u00e7eren QAD kurulumlar\u0131nda i\u015f merkezleri ve \u00fcretim emirleri, domain ve tesis baz\u0131nda tutulur. Kapsamdaki her tesisi kendine ait bir i\u015f merkezi grubuyla e\u015fle\u015ftirin.<\/li>\n\n\n<li><strong>Tekrarl\u0131 ve kesikli \u00fcretimin bir arada kullan\u0131lmas\u0131.<\/strong> Advanced Repetitive hatlar\u0131nda \u00fcretim emirleri de\u011fil, tekrarl\u0131 \u00fcretim \u00e7izelgeleri kullan\u0131l\u0131r. SkyPlanner&#8217;\u0131n hangi hatlar\u0131 \u00e7izelgeleyece\u011fine kapsam belirleme a\u015famas\u0131nda karar verin.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-qad-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD entegrasyonunu kim yap\u0131land\u0131r\u0131r ve destekler?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner ekibi, ilk kurulum s\u00fcrecinde entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra destek sa\u011flar.<\/strong> Bu hizmet, \u00fczerinde anla\u015f\u0131lm\u0131\u015f QDocs belgelerini, QXO aboneliklerini ve REST sorgular\u0131n\u0131 kapsar. Her tesis QAD&#8217;yi farkl\u0131 kullan\u0131r; bu bilgi birikimi de burada devreye girer.<\/li>\n\n\n<li><strong>QAD i\u015f orta\u011f\u0131n\u0131z da s\u00fcrece kat\u0131labilir.<\/strong> \u0130\u015f orta\u011f\u0131n\u0131z domain yap\u0131n\u0131z\u0131, \u00f6zelle\u015ftirmelerinizi ve lisans ko\u015fullar\u0131n\u0131z\u0131 bilir. SkyPlanner ekibiyle birlikte QXtend, QGen QDocs ve entegrasyon kullan\u0131c\u0131s\u0131n\u0131n kurulumunu yapabilir.<\/li>\n\n\n<li><strong>Kendi geli\u015ftiricileriniz de entegrasyonu geli\u015ftirebilir.<\/strong> Bunun i\u00e7in bir API belirteciyle SkyPlanner&#8217;\u0131n REST API aray\u00fcz\u00fcn\u00fc kullanabilirler. Ba\u015flamak i\u00e7in bir API belirteci yeterlidir; gerekti\u011finde SkyPlanner ekibi yard\u0131mc\u0131 olur. Teknik bilgilere <a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">SkyPlanner entegrasyon dok\u00fcmantasyonundan<\/a> ula\u015fabilirsiniz.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla sunulur ve ayl\u0131k faturaland\u0131r\u0131l\u0131r. Entegrasyon i\u00e7in s\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan fiyat teklifi, se\u00e7ti\u011finiz planla birlikte \u00f6nceden verilir. <a href=\"\/tr\/fiyatlandirma\/\">Fiyatland\u0131rmay\u0131<\/a>, <a href=\"\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/uretim-cizelgeleme\/\">QAD Adaptive ERP ile \u00fcretim \u00e7izelgeleme<\/a> sayfas\u0131n\u0131, <a href=\"\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/\">QAD Adaptive ERP sayfas\u0131n\u0131<\/a> ve <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131 sayfas\u0131n\u0131<\/a> inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>haftal\u0131k zaman tasarrufu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt donan\u0131mlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlama sayesinde her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f kuyru\u011fu saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda \u00e7al\u0131\u015fan temiz oda k\u0131yafetli operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan, optimize edilmi\u015f \u00fc\u00e7 ayl\u0131k bir plan\u0131 haz\u0131rlamak 30 dakikadan az s\u00fcr\u00fcyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec CEO&#x27;su Hannu Ryyn\u00e4nen, \u015firketin Lohja&#x27;daki \u00fcretim tesisinde\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000&#8217;lerce<\/b><span>\u00fcretim emri otomatik \u00e7izelgeleniyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimi art\u0131k bamba\u015fka bir \u015fekilde kontrol alt\u0131nda tutuyoruz ve kapasitemizi \u00e7ok daha iyi anl\u0131yoruz.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 End\u00fcstriyel kar\u0131\u015ft\u0131r\u0131c\u0131lar, pompalar ve y\u00fcksek teknolojili fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Binlerce \u00fcretim emri otomatik olarak \u00e7izelgeleniyor ve t\u00fcm kurulu\u015f \u00fcretimi ger\u00e7ek zamanl\u0131 olarak g\u00f6rebiliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/mamec\/\">Mamec&#8217;in yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel&#x27;in Kauhava&#x27;daki \u00e7at\u0131 g\u00fcvenlik \u00fcr\u00fcnleri fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 belirlemek i\u00e7in gereken g\u00f6r\u00fcn\u00fcrl\u00fc\u011f\u00fc sa\u011flad\u0131 ve \u00fcretim y\u00f6netimini netle\u015ftirdi.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenli\u011fi ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 bu y\u0131l %99,2&#8217;ye ula\u015ft\u0131. \u00c7izelgeleme sayesinde g\u00fcnde d\u00f6rt saate kadar \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/piristeel\/\">Piristeel&#8217;in yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>QAD Adaptive ERP&#8217;de \u00fcretim emirleri i\u00e7in bir API var m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet. QXtend Inbound, Work Order Maintenance ve \u00fcretim sahas\u0131 programlar\u0131n\u0131 SOAP ve XML QDocs \u00fczerinden \u00e7al\u0131\u015ft\u0131r\u0131r. Yay\u0131mlanm\u0131\u015f bir QDoc bulunmad\u0131\u011f\u0131nda gerekli QDoc, QGen ile olu\u015fturulur. \u0130\u015f belgelerine y\u00f6nelik REST API aray\u00fczleri ise filtreleme ve sayfalama \u00f6zellikleriyle sorgu eri\u015fimi sa\u011flar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>QAD, webhook deste\u011fi sunuyor mu?<\/summary>\n<p class=\"sp-faq__a\">QAD, veri de\u011fi\u015fikliklerini QXtend Outbound ile aktar\u0131r: tablo tetikleyicileri de\u011fi\u015fiklikleri kaydeder; QXO ise QDocs belgelerini bir web servisi URL&#8217;sine veya d\u00fczenli olarak kontrol edilen bir dizine iletir. SkyPlanner&#8217;\u0131n kendi webhook&#8217;lar\u0131, \u00e7izelge de\u011fi\u015fikliklerini ger\u00e7ekle\u015ftikleri anda g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00c7izelgelenen tarihler QAD&#8217;ye nas\u0131l geri yaz\u0131l\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Work Order Maintenance (16.1) \u00fczerinde bir QXtend Inbound QDoc kullan\u0131l\u0131r. Bu belge, \u00fcretim emrinin serbest b\u0131rakma ve termin tarihlerini SkyPlanner \u00e7izelgesine g\u00f6re ayarlar. QAD, QDoc belgesini ekranda uygulanan kurallarla do\u011frular ve yan\u0131t olarak bir QDoc d\u00f6nd\u00fcr\u00fcr.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Operat\u00f6r bildirimleri QAD&#8217;ye nas\u0131l ula\u015f\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Haz\u0131rl\u0131k ve i\u015flem s\u00fcreleri Labor Feedback by Work Order (16.20.1), tamamlanan miktarlar ise Work Order Receipt (16.11) \u00fczerinden kaydedilir. Her iki aktar\u0131mda da QXtend Inbound QDocs kullan\u0131l\u0131r. Verilerin geri yaz\u0131l\u0131p yaz\u0131lmayaca\u011f\u0131na kapsam belirleme a\u015famas\u0131nda karar verilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bir QAD i\u015f orta\u011f\u0131, QAD Advanced Scheduling&#8217;i mi yoksa SkyPlanner&#8217;\u0131 m\u0131 \u00f6nermeli?<\/summary>\n<p class=\"sp-faq__a\">M\u00fc\u015fteri kesikli \u00fcretim emirleriyle \u00e7al\u0131\u015f\u0131yor ve haftalar i\u00e7inde ger\u00e7ek kapasiteyi dikkate alan, i\u015fler bir \u00fcretim \u00e7izelgesi istiyorsa SkyPlanner&#8217;\u0131 \u00f6nermeli. QAD, Advanced Scheduling&#8217;i her tesis i\u00e7in hat baz\u0131nda \u00e7izelgeleme sa\u011flayan bir \u00e7\u00f6z\u00fcm olarak tan\u0131ml\u0131yor ve DSCP Production Planning ile Redzone&#8217;un yan\u0131nda sunuyor (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">QAD<\/a>). SkyPlanner, QXtend \u00fczerinden ba\u011flan\u0131r; her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi \u00e7izelgeler, otomatik olarak yeniden planlama yapar ve ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla s\u0131n\u0131rs\u0131z kullan\u0131c\u0131 sunar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Entegrasyonu kurmadan \u00f6nce SkyPlanner&#8217;\u0131 test edebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck \u00fccretsiz denemede, QAD&#8217;den CSV veya Excel ile veri aktararak 20 i\u015f merkezine kadar \u00e7al\u0131\u015fabilirsiniz. Kredi kart\u0131 gerekmez. <a href=\"\/tr\/deneme\/\">Denemeyi ba\u015flat\u0131n<\/a> veya entegrasyonun kapsam\u0131n\u0131 belirlemek i\u00e7in <a href=\"\/tr\/iletisim-satis\/\">sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ QAD Adaptive ERP SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in QAD Adaptive ERP Entegrasyon K\u0131lavuzu Bu QAD Adaptive ERP entegrasyon k\u0131lavuzu, i\u015f ortaklar\u0131na ve BT ekiplerine QAD Adaptive ERP&#8217;yi SkyPlanner APS&#8217;ye nas\u0131l ba\u011flayacaklar\u0131n\u0131 g\u00f6sterir. \u00d6nceki QAD Enterprise Edition ve MFG\/PRO kurulumlar\u0131 da buna dahildir. SkyPlanner, QAD&#8217;nin kendi aray\u00fczlerini kullanarak QAD Adaptive ERP &#8230; <a title=\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in QAD Adaptive ERP Entegrasyon K\u0131lavuzu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/\" aria-label=\"Read more about SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in QAD Adaptive ERP Entegrasyon K\u0131lavuzu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106190,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106944","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretim \u00c7izelgeleme i\u00e7in QAD APS Entegrasyon K\u0131lavuzu<\/title>\n<meta name=\"description\" content=\"QAD Adaptive ERP\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound olaylar\u0131, i\u015f\u00e7ilik bildirimi, e\u015fleme, proje ipu\u00e7lar\u0131.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in QAD Adaptive ERP Entegrasyon K\u0131lavuzu\" \/>\n<meta property=\"og:description\" content=\"QAD Adaptive ERP\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound olaylar\u0131, i\u015f\u00e7ilik bildirimi, e\u015fleme, proje ipu\u00e7lar\u0131.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/qad-adaptive-erp\\\/entegrasyon-kilavuzu\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/qad-adaptive-erp\\\/entegrasyon-kilavuzu\\\/\",\"name\":\"\u00dcretim \u00c7izelgeleme i\u00e7in QAD APS Entegrasyon K\u0131lavuzu\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"QAD Adaptive ERP\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound olaylar\u0131, i\u015f\u00e7ilik bildirimi, e\u015fleme, proje ipu\u00e7lar\u0131.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/qad-adaptive-erp\\\/entegrasyon-kilavuzu\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/qad-adaptive-erp\\\/entegrasyon-kilavuzu\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/qad-adaptive-erp\\\/entegrasyon-kilavuzu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"QAD Adaptive ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/qad-adaptive-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in QAD Adaptive ERP Entegrasyon K\u0131lavuzu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretim \u00c7izelgeleme i\u00e7in QAD APS Entegrasyon K\u0131lavuzu","description":"QAD Adaptive ERP\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound olaylar\u0131, i\u015f\u00e7ilik bildirimi, e\u015fleme, proje ipu\u00e7lar\u0131.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/","og_locale":"tr_TR","og_type":"article","og_title":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in QAD Adaptive ERP Entegrasyon K\u0131lavuzu","og_description":"QAD Adaptive ERP\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound olaylar\u0131, i\u015f\u00e7ilik bildirimi, e\u015fleme, proje ipu\u00e7lar\u0131.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"16 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/","name":"\u00dcretim \u00c7izelgeleme i\u00e7in QAD APS Entegrasyon K\u0131lavuzu","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"QAD Adaptive ERP\u2013SkyPlanner APS ba\u011flant\u0131s\u0131: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound olaylar\u0131, i\u015f\u00e7ilik bildirimi, e\u015fleme, proje ipu\u00e7lar\u0131.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/entegrasyon-kilavuzu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"QAD Adaptive ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/qad-adaptive-erp\/"},{"@type":"ListItem","position":5,"name":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in QAD Adaptive ERP Entegrasyon K\u0131lavuzu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ QAD Adaptive ERP SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in QAD Adaptive ERP Entegrasyon K\u0131lavuzu Bu QAD Adaptive ERP entegrasyon k\u0131lavuzu, i\u015f ortaklar\u0131na ve BT ekiplerine QAD Adaptive ERP&#8217;yi SkyPlanner APS&#8217;ye nas\u0131l ba\u011flayacaklar\u0131n\u0131 g\u00f6sterir. \u00d6nceki QAD Enterprise Edition ve MFG\/PRO kurulumlar\u0131 da buna dahildir. SkyPlanner, QAD&#8217;nin kendi aray\u00fczlerini kullanarak QAD Adaptive ERP&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106944","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=106944"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106944\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106190"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=106944"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}