{"id":106654,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/karat\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"karat","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/karat\/","title":{"rendered":"KARAT i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ KARAT<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">KARAT i\u00e7in SkyPlanner APS: <span class=\"hl\">Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS, KARAT i\u00e7in her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeleyen bir \u00fcretim \u00e7izelgeleme eklentisidir. Hangi operasyonun nerede ve ne zaman y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniler. KARAT Software&#8217;in IS KARAT \u00fcr\u00fcn\u00fcyle hem \u015firket i\u00e7i kurulumda hem de SaaS olarak \u00e7al\u0131\u015f\u0131r.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner, KARAT ile \u00e7ift y\u00f6nl\u00fc entegre olur: \u00fcretim emirleri, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131 ve rotalar, makineler, \u00e7al\u0131\u015fma yerleri, insan kaynaklar\u0131, stoklar ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r; planlanan tarihler ve i\u015f kay\u0131tlar\u0131 ise KARAT&#8217;a geri g\u00f6nderilir. SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu KARAT yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar.<\/p>\n\n\n<p>Fiyatlar 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi ayl\u0131k 20 \u20ac&#8217;dur. \u00dccretsiz deneme 30 g\u00fcn s\u00fcrer, 20 i\u015f merkezine kadar kullan\u0131m sunar ve kredi kart\u0131 gerektirmez.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcretiminizde neler de\u011fi\u015fir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Her makinede uygulanabilir bir i\u015f s\u0131ras\u0131.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her \u00fcretim emrinin her operasyonunu belirli bir makineye, belirli bir zamana yerle\u015ftirir. Kapasiteyi ger\u00e7ek vardiyalar, devams\u0131zl\u0131klar ve fazla mesai belirler. B\u00f6ylece \u00fcretiminizde ger\u00e7ekten uygulanabilecek bir plan elde edersiniz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Tip de\u011fi\u015fimi maliyetleri azal\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcresini her iki y\u00f6n i\u00e7in ayr\u0131 ayr\u0131 tutar. A\u00e7\u0131k renkten koyu renge ge\u00e7i\u015fte k\u0131sa bir durulama yeterli olabilirken, koyudan a\u00e7\u0131\u011fa ge\u00e7i\u015fte tam temizlik gerekir. Motor, i\u015fleri en az zaman kayb\u0131na yol a\u00e7acak s\u0131raya koyar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u00c7al\u0131\u015fanlar\u0131n ve tak\u0131mlar\u0131n da kapasitesi s\u0131n\u0131rl\u0131.<\/p>\n\n\n<p class=\"fx-pain__b\">\u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe, vardiyas\u0131nda uygun zaman\u0131 olan \u00fc\u00e7 ki\u015fi atan\u0131r. Bir makinede kullan\u0131mda olan kal\u0131p, ayn\u0131 anda ba\u015fka bir makineye asla atanmaz. Bir makine me\u015fgulse i\u015f alternatif bir makineye veya ki\u015fiye aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Geciken malzeme art\u0131k plan\u0131 bozmuyor.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her malzeme i\u00e7in mevcut stoku ve beklenen sat\u0131n alma sipari\u015flerini kontrol eder. Tedarik\u00e7i teslimat\u0131n\u0131 bekleyen bir \u00fcretim emri, o teslimat tarihinden sonras\u0131na planlan\u0131r; \u00fcretimde ba\u015flat\u0131l\u0131p ard\u0131ndan durdurulmaz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Acil i\u015flerde ve ar\u0131zalarda plan otomatik yenilenir.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir makine durdu\u011funda veya acil bir sipari\u015f geldi\u011finde Autopilot \u00e7izelgeyi yeniler. Belirledi\u011finiz kilitlere ve \u00f6nceliklere ba\u011fl\u0131 kal\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operat\u00f6rler i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr.<\/p>\n\n\n<p class=\"fx-pain__b\">Her operat\u00f6r, s\u0131radaki i\u015fleri telefon veya tabletinden g\u00f6r\u00fcr ve yapt\u0131\u011f\u0131 i\u015fi an\u0131nda kaydeder. Ofis, ilerlemeyi canl\u0131 olarak takip eder. Ger\u00e7ekle\u015fen s\u00fcrelerin KARAT&#8217;a geri aktar\u0131l\u0131p aktar\u0131lmayaca\u011f\u0131n\u0131 siz se\u00e7ersiniz.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila\u2019daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>haftal\u0131k zaman tasarrufu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 \u00fcretim hatt\u0131na saniyeler i\u00e7inde ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU\u2019nun de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied\u2019\u0131n Nairobi\u2019deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda \u00e7al\u0131\u015fan temiz oda k\u0131yafetli operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, Bilgi Teknolojileri M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f plan, 30 dakikadan k\u0131sa s\u00fcrede haz\u0131rlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied\u2019\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec CEO&#x27;su Hannu Ryyn\u00e4nen, \u015firketin Lohja&#x27;daki \u00fcretim tesisinde\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000&#8217;lerce<\/b><span>i\u015f emri otomatik olarak \u00e7izelgeleniyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimi art\u0131k bamba\u015fka bir \u015fekilde kontrol alt\u0131nda tutuyoruz ve kapasiteye ili\u015fkin kavray\u0131\u015f\u0131m\u0131z tamamen farkl\u0131 bir d\u00fczeyde.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 End\u00fcstriyel kar\u0131\u015ft\u0131r\u0131c\u0131lar, pompalar ve y\u00fcksek teknolojili fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Binlerce i\u015f emri otomatik olarak \u00e7izelgeleniyor ve t\u00fcm kurulu\u015f \u00fcretimi ger\u00e7ek zamanl\u0131 olarak g\u00f6rebiliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/mamec\/\">Mamec&#8217;in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations \u00dcretim M\u00fcd\u00fcr\u00fc Anu J\u00e4rvinen, Rauma&#x27;daki robotlu paletleme h\u00fccresinin yan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 ayl\u0131k<\/b><span>bo\u015f kapasiteyi sat\u0131\u015f ekibi g\u00f6rebiliyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, t\u00fcm \u00fcretim planlamam\u0131z\u0131n temelini olu\u015fturuyor ve g\u00fcvenilirli\u011fini sa\u011fl\u0131yor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Fredman Operations \u00b7 G\u0131da temas\u0131na uygun ambalaj k\u00e2\u011f\u0131tlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">Sat\u0131\u015f ekibi bo\u015f kapasiteyi alt\u0131 ay \u00f6nceden g\u00f6r\u00fcyor. Daha \u00f6nce yan\u0131tlanmas\u0131 bir saat veya daha uzun s\u00fcren \u00e7izelge de\u011fi\u015fikli\u011fi talepleri art\u0131k saniyeler i\u00e7inde yan\u0131tlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/fredman-operations\/\">Fredman Operations&#8217;\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-karat-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">KARAT entegrasyonu nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>KARAT, i\u015fleri g\u00f6nderir.<\/strong> \u00dcretim emirleri (v\u00fdrobn\u00ed p\u0159\u00edkazy) ve \u00fcretim i\u015fleri (v\u00fdrobn\u00ed zak\u00e1zky), operasyonlar\u0131yla birlikte SkyPlanner&#8217;a aktar\u0131l\u0131r. \u00dcr\u00fcn a\u011fa\u00e7lar\u0131 (kusovn\u00edky), rotalar (technologick\u00e9 postupy), makineler, \u00e7al\u0131\u015fma yerleri, insan kaynaklar\u0131, stoklar ve a\u00e7\u0131lm\u0131\u015f sat\u0131n alma sipari\u015fleri de aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>SkyPlanner, \u00e7izelgeyi olu\u015fturur ve g\u00fcncel tutar.<\/strong> Arcturus motoru, her operasyonu saniyeler i\u00e7inde planlar ve \u00fcretimdeki de\u011fi\u015fikliklere g\u00f6re yeniden planlama yapar.<\/li>\n\n\n<li><strong>Tarihler ve i\u015f kay\u0131tlar\u0131 geri g\u00f6nderilir.<\/strong> Planlanan ba\u015flang\u0131\u00e7 ve biti\u015f tarihleri KARAT&#8217;taki \u00fcretim verilerine geri aktar\u0131l\u0131r. \u0130\u015f kay\u0131tlar\u0131 da KARAT terminal bildirimi (termin\u00e1lov\u00e9 odv\u00e1d\u011bn\u00ed) \u00fczerinden operasyon bildirimi olarak aktar\u0131labilir.<\/li>\n\n<\/ol>\n\n\n<p>KARAT, ana kay\u0131t sisteminiz olmaya devam eder. Stok kartlar\u0131, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, rotalar, MRP, sat\u0131n alma, depolar, maliyetlendirme ve finans mevcut sisteminizde kal\u0131r. SkyPlanner tek bir i\u015fi \u00fcstlenir: her kaynaktaki her operasyonun s\u0131ras\u0131n\u0131 ve zamanlamas\u0131n\u0131 belirlemek.<\/p>\n\n\n<p>KARAT, \u00fczerinde mutab\u0131k kal\u0131nan veri aray\u00fczleri ve XML bi\u00e7iminde elektronik veri al\u0131\u015fveri\u015fi arac\u0131l\u0131\u011f\u0131yla d\u0131\u015f sistemlere ba\u011flan\u0131r (<a href=\"https:\/\/www.karatsoftware.cz\/podpora-a-sluzby\/vyvoj-software-a-aplikaci\/\">KARAT Software<\/a>). Terminal bildirim mod\u00fcl\u00fc de kararla\u015ft\u0131r\u0131lan bir aray\u00fcz \u00fczerinden d\u0131\u015f sistemlerle veri al\u0131\u015fveri\u015fi yapar. SkyPlanner, her iki y\u00f6ndeki aktar\u0131m i\u00e7in bu yollar\u0131 kullan\u0131r. SkyPlanner webhook&#8217;lar\u0131, \u00e7izelgedeki her de\u011fi\u015fikli\u011fi ger\u00e7ekle\u015fti\u011fi anda iletir. KARAT ile senkronizasyon s\u0131kl\u0131\u011f\u0131 ise her tesis i\u00e7in ayr\u0131 belirlenir.<\/p>\n\n\n<p>Her tesis KARAT&#8217;\u0131 farkl\u0131 kulland\u0131\u011f\u0131 i\u00e7in SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu sizin yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar ve canl\u0131ya ge\u00e7i\u015f sonras\u0131nda da destek sa\u011flar. Entegrasyon i\u00e7in s\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re \u00f6nceden fiyat teklifi verilir. KARAT Software, KARAT i\u015f orta\u011f\u0131n\u0131z veya kendi geli\u015ftiricileriniz de SkyPlanner&#8217;\u0131n dok\u00fcmantasyonu sunulan API&#8217;sini kullanarak entegrasyon geli\u015ftirebilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API referans\u0131<\/a>).<\/p>\n\n\n<p>Veri ak\u0131\u015flar\u0131, e\u015fle\u015ftirmeler ve geri yazma kurallar\u0131 <a href=\"\/tr\/entegrasyonlar\/erp\/karat\/entegrasyon-kilavuzu\/\">\u00fcretim \u00e7izelgeleme i\u00e7in KARAT entegrasyon k\u0131lavuzunda<\/a> a\u00e7\u0131klanm\u0131\u015ft\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-karat-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">KARAT neleri \u00e7izelgeler, SkyPlanner neler ekler?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>KARAT&#8217;\u0131n kendi planlama i\u015flevleri vard\u0131r. IS KARAT&#8217;\u0131n iste\u011fe ba\u011fl\u0131 bir bile\u015feni olan APS KARAT, ileriye ve geriye do\u011fru planlamay\u0131 birle\u015ftirir ve Gantt \u015femas\u0131 \u00fczerinde \u00e7al\u0131\u015f\u0131r (<a href=\"https:\/\/www.karatsoftware.cz\/erp-karat\/planovani-a-rizeni-vyroby-aps\/\">APS KARAT<\/a>). KARAT Software, \u00e7al\u0131\u015fma \u015feklini \u015f\u00f6yle a\u00e7\u0131klar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>S\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z kapasite.<\/strong> APS KARAT, kaynaklar\u0131 s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z kapasiteyle planlar. Gantt \u00fczerinde kaynak de\u011fi\u015ftirme ve rezervasyonlar\u0131 ta\u015f\u0131ma gibi sim\u00fclasyon ad\u0131mlar\u0131 sunar.<\/li>\n\n\n<li><strong>Birden fazla y\u00f6ntem.<\/strong> Kapasite planlama (ileriye, geriye ve karma), lead time&#8217;a g\u00f6re planlama, teknoloji uzmanlar\u0131 ve tasar\u0131mc\u0131lar gibi insan kaynaklar\u0131 i\u00e7in a\u011f\u0131rl\u0131kl\u0131 planlama, darbo\u011faz planlamas\u0131 ve g\u00fcnl\u00fck operasyonel planlama.<\/li>\n\n\n<li><strong>D\u0131\u015fa aktar\u0131lan verilerle planlama.<\/strong> \u0130leri planlama, ger\u00e7ek \u00fcretim verilerinden d\u0131\u015fa aktar\u0131lan verilerle \u00e7al\u0131\u015f\u0131r. Planlamac\u0131lar ayr\u0131 bir mod\u00fclde alternatif planlar olu\u015fturup en iyi plan\u0131 sisteme geri kaydederken sistem ilk plana g\u00f6re \u00e7al\u0131\u015fmaya devam eder (<a href=\"https:\/\/www.karatsoftware.cz\/propojeni-pokrocileho-planovani-vyroby-aps-a-rizeni-dodavatelskeho-retezce-scm-v-is-karat\/\">KARAT&#8217;\u0131n APS ve SCM a\u00e7\u0131klamas\u0131<\/a>).<\/li>\n\n\n<li><strong>Sonu\u00e7lar kapan\u0131\u015fta yans\u0131t\u0131l\u0131r.<\/strong> Makine kapasiteleri ile malzeme \u00e7\u0131k\u0131\u015f ve giri\u015f talepleri, k\u0131smi planlar veya ana plan kapat\u0131ld\u0131ktan sonra g\u00fcncellenir.<\/li>\n\n<\/ul>\n\n\n<p>Gantt, planlamac\u0131n\u0131n plan\u0131 elle de\u011fi\u015ftirmesine de olanak tan\u0131r. SkyPlanner ise her makinenin, \u00e7al\u0131\u015fan\u0131n ve tak\u0131m\u0131n kapasite s\u0131n\u0131rlar\u0131n\u0131 koruyan canl\u0131 bir \u00e7izelge ekler. Tip de\u011fi\u015fimlerini i\u015f s\u0131ras\u0131na g\u00f6re planlar, gelecek malzemeleri kontrol eder ve \u00fcretimde de\u011fi\u015fiklik oldu\u011funda kendili\u011finden yeniden planlama yapar.<\/p>\n\n\n<p>T\u00fcm ad\u0131mlar ve s\u0131n\u0131rlar, <a href=\"\/tr\/entegrasyonlar\/erp\/karat\/uretim-cizelgeleme\/\">KARAT ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yapabilir mi?<\/a> yaz\u0131s\u0131nda a\u00e7\u0131klanm\u0131\u015ft\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"karat-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bug\u00fcnk\u00fc KARAT ile SkyPlanner eklenmi\u015f KARAT<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>APS KARAT<\/th><th>SkyPlanner APS ile KARAT<\/th><\/tr><\/thead><tbody><tr><td>Kapasite<\/td><td>Kaynak baz\u0131nda s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z<\/td><td>Her makine, \u00e7al\u0131\u015fan ve tak\u0131m i\u00e7in ger\u00e7ek vardiyalara g\u00f6re s\u0131n\u0131rl\u0131 kapasite<\/td><\/tr><tr><td>Veriler<\/td><td>\u00dcretimden d\u0131\u015fa aktar\u0131lan verilerle planlama; kapan\u0131\u015fta sisteme geri kay\u0131t<\/td><td>G\u00fcncel emirler ve kaydedilen ilerlemeyle \u00e7al\u0131\u015fma<\/td><\/tr><tr><td>Planlar<\/td><td>Planlamac\u0131n\u0131n olu\u015fturdu\u011fu alternatiflerden en iyisi sisteme geri kaydedilir<\/td><td>Autopilot&#8217;un g\u00fcncel tuttu\u011fu tek bir canl\u0131 plan<\/td><\/tr><tr><td>\u00c7izelge<\/td><td>Gantt \u00fczerinde kaynak rezervasyonlar\u0131<\/td><td>Her operasyon i\u00e7in saniyeler i\u00e7inde ayr\u0131nt\u0131l\u0131 s\u0131ralama<\/td><\/tr><tr><td>\u00c7al\u0131\u015fanlar<\/td><td>\u0130nsan kaynaklar\u0131 i\u00e7in a\u011f\u0131rl\u0131kl\u0131 planlama<\/td><td>Operat\u00f6rler isimleri ve vardiyalar\u0131yla planlan\u0131r, birden fazla operat\u00f6r gerektiren i\u015flere personel atan\u0131r<\/td><\/tr><tr><td>Malzemeler<\/td><td>Sat\u0131n al\u0131nan girdiler ve hen\u00fcz teslim edilmemi\u015f sat\u0131n alma sipari\u015fleri planlamaya dahil edilir<\/td><td>\u0130\u015fler, malzeme stoktan veya beklenen sat\u0131n alma sipari\u015flerinden sa\u011fland\u0131\u011f\u0131nda ba\u015flar; her de\u011fi\u015fiklikte yeniden planlan\u0131r<\/td><\/tr><tr><td>De\u011fi\u015fiklikler<\/td><td>Planlamac\u0131 sim\u00fclasyon yapar, kaynaklar\u0131 de\u011fi\u015ftirir veya rezervasyonlar\u0131 ta\u015f\u0131r<\/td><td>Autopilot, \u00f6nceliklerinize ba\u011fl\u0131 kalarak t\u00fcm tesisi yeniden planlar<\/td><\/tr><tr><td>Planlamac\u0131 g\u00f6r\u00fcn\u00fcm\u00fc<\/td><td>Projeye veya kayna\u011fa g\u00f6re ya da darbo\u011faz modunda Gantt g\u00f6r\u00fcn\u00fcm\u00fc<\/td><td>Etkile\u015fimli Gantt: i\u015fleri ta\u015f\u0131san\u0131z da plan tutarl\u0131 kal\u0131r<\/td><\/tr><tr><td>shop floor<\/td><td>KARAT&#8217;ta terminal bildirimi<\/td><td>Operat\u00f6rler, telefon veya tabletten i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr ve yapt\u0131klar\u0131 i\u015fi kaydeder<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>\u015eu durumlarda APS KARAT yerine SkyPlanner&#8217;\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Plan\u0131n s\u00fcrekli g\u00fcncel kalmas\u0131 gerekiyorsa.<\/strong> APS KARAT, d\u0131\u015fa aktar\u0131lan verilerle planlama yaparken \u00fcretim ilk plana g\u00f6re devam eder. SkyPlanner, g\u00fcncel emirler ve kaydedilen ilerleme \u00fczerinden planlama yapar. Autopilot ise plan\u0131 etkileyen her de\u011fi\u015fiklikte otomatik olarak yeniden planlar.<\/li>\n\n\n<li><strong>Kapasite s\u0131n\u0131rlar\u0131n\u0131n a\u015f\u0131lmamas\u0131 gerekiyorsa.<\/strong> SkyPlanner, her kayna\u011f\u0131n kapasite s\u0131n\u0131r\u0131n\u0131 korur ve ger\u00e7ek biti\u015f tarihini g\u00f6sterir. B\u00f6ylece \u00f6ncelikleri de\u011fi\u015ftirerek, fazla mesaiyle veya alternatif bir makine kullanarak harekete ge\u00e7ebilirsiniz.<\/li>\n\n\n<li><strong>\u00dcretim miktar\u0131n\u0131z\u0131 tip de\u011fi\u015fimleri belirliyorsa.<\/strong> Haz\u0131rl\u0131k s\u00fcresi matrisi, ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re tip de\u011fi\u015fim s\u00fcrelerini tutar. Renk, aroma veya malzemeye g\u00f6re i\u015f s\u0131ralar\u0131n\u0131 toplam haz\u0131rl\u0131k s\u00fcresini en aza indirecek \u015fekilde d\u00fczenler.<\/li>\n\n\n<li><strong>Operat\u00f6rler, tak\u0131mlar ve gelecek malzemeler plan\u0131 k\u0131s\u0131tl\u0131yorsa.<\/strong> Her makine, \u00e7al\u0131\u015fan, tak\u0131m ve malzeme ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde planlan\u0131r. Birden fazla operat\u00f6r gerektiren i\u015flere personel atan\u0131r, alternatif i\u015f merkezleri kullan\u0131l\u0131r ve i\u015fler malzeme stoktan veya sat\u0131n alma sipari\u015flerinden sa\u011fland\u0131\u011f\u0131nda ba\u015flar.<\/li>\n\n\n<li><strong>Her operat\u00f6r\u00fcn plana g\u00f6re \u00e7al\u0131\u015fmas\u0131 gerekiyorsa.<\/strong> Mobile Confirmations, g\u00fcncel i\u015f s\u0131ras\u0131n\u0131 telefon veya tablete ta\u015f\u0131r. Kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r: fiyat, kullan\u0131c\u0131 say\u0131s\u0131na de\u011fil i\u015f merkezi say\u0131s\u0131na ba\u011fl\u0131d\u0131r.<\/li>\n\n\n<li><strong>Haftalar i\u00e7inde canl\u0131 bir \u00e7izelgeye ge\u00e7mek istiyorsan\u0131z.<\/strong> SkyPlanner, KARAT&#8217;\u0131n yan\u0131nda \u00e7al\u0131\u015fan bir bulut yaz\u0131l\u0131m\u0131d\u0131r. 30 g\u00fcnl\u00fck deneme s\u00fcresince kendi \u00fcretim emirlerinizle test edebilirsiniz. Uygulama, devreye alma s\u00fcrecinin ba\u015flamas\u0131ndan itibaren normalde haftalar i\u00e7inde tamamlan\u0131r.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Nas\u0131l ba\u015flan\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00dccretsiz denemeyi ba\u015flat\u0131n.<\/strong> 30 g\u00fcn, en fazla 20 i\u015f merkezi, Basic paketinin t\u00fcm \u00f6zellikleri. Kredi kart\u0131 gerekmez.<\/li>\n\n\n<li><strong>\u00dcretiminizi modelleyin.<\/strong> SkyPlanner&#8217;da makineleri, \u00e7al\u0131\u015fanlar\u0131 ve vardiyalar\u0131 olu\u015fturun veya KARAT&#8217;taki makinelerinizi ve \u00e7al\u0131\u015fma yerlerinizi i\u00e7e aktar\u0131n. Devreye alma s\u00fcrecinde destek alabilirsiniz.<\/li>\n\n\n<li><strong>\u00dcretim emirlerinizi y\u00fckleyin.<\/strong> A\u00e7\u0131k \u00fcretim emirlerini ve operasyonlar\u0131n\u0131 KARAT&#8217;tan Excel&#8217;e aktar\u0131n. Ard\u0131ndan bunlar\u0131 SkyPlanner&#8217;a y\u00fckleyin ve olu\u015fan \u00e7izelgeyi mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>KARAT&#8217;\u0131 ba\u011flay\u0131n.<\/strong> SkyPlanner ekibi, \u00e7ift y\u00f6nl\u00fc entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra da destek sa\u011flar.<\/li>\n\n<\/ol>\n\n\n<p><strong>Fiyatland\u0131rma.<\/strong> Paketler, i\u015f merkezi ba\u015f\u0131na ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. \u0130stedi\u011finiz zaman i\u015f merkezi ekleyebilir, \u00e7\u0131karabilir veya aboneli\u011finizi iptal edebilirsiniz. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rma sayfas\u0131na<\/a> bak\u0131n veya <a href=\"\/tr\/entegrasyonlar\/erp\/\">t\u00fcm ERP entegrasyonlar\u0131n\u0131<\/a> inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>KARAT i\u00e7in en iyi \u00e7izelgeleme eklentisi hangisidir?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, ger\u00e7ek makine ve personel kapasitesini dikkate alan, KARAT ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015fan bir \u00fcretim \u00e7izelgeleme eklentisidir. \u00dcretim emirleri, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, rotalar, makineler, \u00e7al\u0131\u015fma yerleri, stoklar ve sat\u0131n alma sipari\u015fleri KARAT&#8217;tan al\u0131n\u0131r; planlanan tarihler ve kaydedilen i\u015fler KARAT&#8217;a geri aktar\u0131l\u0131r. Her makine, operat\u00f6r, tak\u0131m ve malzeme s\u0131n\u0131rl\u0131 kabul edilir. Ge\u00e7i\u015f y\u00f6n\u00fcn\u00fc dikkate alan bir haz\u0131rl\u0131k s\u00fcresi matrisi, haz\u0131rl\u0131\u011f\u0131 en aza indirecek \u015fekilde i\u015fleri s\u0131ralar. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot otomatik olarak yeniden \u00e7izelgeler. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve \u00fccretsiz deneme 30 g\u00fcn s\u00fcrer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>KARAT, s\u0131n\u0131rl\u0131 kapasiteyi dikkate alarak \u00fcretim \u00e7izelgeleme yapabiliyor mu?<\/summary>\n<p class=\"sp-faq__a\">K\u0131smen. IS KARAT&#8217;\u0131n iste\u011fe ba\u011fl\u0131 bir bile\u015feni olan APS KARAT, Gantt \u015femas\u0131nda s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z kapasiteyle planlama yapar. Planlamac\u0131lar, \u00fcretimden d\u0131\u015fa aktar\u0131lan verilerle farkl\u0131 plan se\u00e7enekleri olu\u015fturur ve en uygun olan\u0131 sisteme geri kaydeder. KARAT ile birlikte \u00e7al\u0131\u015fan SkyPlanner APS ise g\u00fcncel veriler \u00fczerinden her makinenin, ki\u015finin, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131n\u0131 dikkate al\u0131r ve otomatik olarak yeniden planlar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hangi \u00e7izelgeleme yaz\u0131l\u0131m\u0131 KARAT ile entegre \u00e7al\u0131\u015f\u0131r?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, KARAT ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r. \u00dcretim emirlerini, rotalar\u0131, kaynaklar\u0131, stoklar\u0131 ve sat\u0131n alma sipari\u015flerini \u00fczerinde mutab\u0131k kal\u0131nan bir KARAT veri aray\u00fcz\u00fc \u00fczerinden okur. Planlanan tarihleri ve kaydedilen i\u015fleri de ayn\u0131 aray\u00fcz ve KARAT terminal bildirimleri \u00fczerinden geri aktar\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, KARAT \u00fcretim mod\u00fcllerinin yerini mi al\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r, bu mod\u00fclleri tamamlayan bir katman olarak \u00e7al\u0131\u015f\u0131r. Stok kartlar\u0131, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, rotalar, MRP, sat\u0131n alma, depolar, maliyet hesaplama ve finans KARAT&#8217;ta kal\u0131r. SkyPlanner, \u00fcretim emirlerinizi ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeler ve tarihleri KARAT&#8217;a geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>APS KARAT&#8217;\u0131 m\u0131, SkyPlanner&#8217;\u0131 m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Plan\u0131n\u0131z s\u0131k de\u011fi\u015fiyorsa ve g\u00fcncel verilere dayanmas\u0131 gerekiyorsa SkyPlanner&#8217;\u0131 se\u00e7in. APS KARAT, \u00fcretimden d\u0131\u015fa aktar\u0131lan veriler \u00fczerinden planlama yapar; planlamac\u0131lar farkl\u0131 se\u00e7enekler olu\u015fturup kar\u015f\u0131la\u015ft\u0131rd\u0131ktan sonra birini sisteme geri kaydeder. SkyPlanner ise her de\u011fi\u015fiklikte otomatik olarak yeniden planlar; tip de\u011fi\u015fimlerini, tak\u0131mlar\u0131, ekipleri ve malzemeleri planlamaya dahil eder. Kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131r\u0131 olmadan her operat\u00f6r\u00fcn kendi i\u015f s\u0131ras\u0131n\u0131 telefonda g\u00f6rmesini sa\u011flar. \u00dccretsiz denemede bunu kendi KARAT emirlerinizle do\u011frulayabilirsiniz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00c7ek\u00e7e kullan\u0131labiliyor mu?<\/summary>\n<p class=\"sp-faq__a\">Evet. Her kullan\u0131c\u0131 SkyPlanner aray\u00fcz\u00fcn\u00fc \u00c7ek\u00e7eye \u00e7evirebilir; b\u00f6ylece planlamac\u0131lar ve operat\u00f6rler kendi dillerinde \u00e7al\u0131\u015f\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>KARAT kullanan bir tesis i\u00e7in SkyPlanner&#8217;\u0131n maliyeti nedir?<\/summary>\n<p class=\"sp-faq__a\">Fiyatlar 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi i\u00e7in ayl\u0131k 20 \u20ac \u00f6denir. \u0130\u015f merkezi, kendine ait \u00e7izelgelenmi\u015f i\u015f s\u0131ras\u0131 olan bir \u00fcretim kayna\u011f\u0131d\u0131r. S\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za uygun entegrasyonun fiyat\u0131, paketinizle birlikte en ba\u015ftan teklif edilir. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>KARAT entegrasyonundan \u00f6nce SkyPlanner&#8217;\u0131 test edebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck denemede, KARAT&#8217;taki a\u00e7\u0131k \u00fcretim emirlerinizi Excel&#8217;e aktararak kullan\u0131rs\u0131n\u0131z. Herhangi bir entegrasyon \u00e7al\u0131\u015fmas\u0131 ba\u015flamadan \u00f6nce, kendi \u00fcretiminiz i\u00e7in ger\u00e7ek kapasiteyi dikkate alan bir <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">\u00fcretim \u00e7izelgesi<\/a> g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ KARAT KARAT i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, KARAT i\u00e7in her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeleyen bir \u00fcretim \u00e7izelgeleme eklentisidir. Hangi operasyonun nerede ve ne zaman y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniler. KARAT Software&#8217;in IS KARAT \u00fcr\u00fcn\u00fcyle hem &#8230; <a title=\"KARAT i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/karat\/\" aria-label=\"Read more about KARAT i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100689,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106654","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>KARAT \u00c7izelgeleme Entegrasyonu: Sonlu Kapasiteli APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: KARAT i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemenin kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac&#039;dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/karat\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KARAT i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: KARAT i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemenin kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac&#039;dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/karat\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/karat\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/karat\\\/\",\"name\":\"KARAT \u00c7izelgeleme Entegrasyonu: Sonlu Kapasiteli APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: KARAT i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemenin kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac'dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/karat\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/karat\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/karat\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"KARAT i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"KARAT \u00c7izelgeleme Entegrasyonu: Sonlu Kapasiteli APS","description":"SkyPlanner APS: KARAT i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemenin kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac'dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/karat\/","og_locale":"tr_TR","og_type":"article","og_title":"KARAT i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","og_description":"SkyPlanner APS: KARAT i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemenin kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac'dan.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/karat\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"13 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/karat\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/karat\/","name":"KARAT \u00c7izelgeleme Entegrasyonu: Sonlu Kapasiteli APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: KARAT i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemenin kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac'dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/karat\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/karat\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/karat\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"KARAT i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ KARAT KARAT i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, KARAT i\u00e7in her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeleyen bir \u00fcretim \u00e7izelgeleme eklentisidir. Hangi operasyonun nerede ve ne zaman y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniler. KARAT Software&#8217;in IS KARAT \u00fcr\u00fcn\u00fcyle hem&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106654","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=106654"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106654\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100689"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=106654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}