{"id":106596,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/sap-business-bydesign\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"sap-business-bydesign","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/","title":{"rendered":"SAP Business ByDesign i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ SAP Business ByDesign<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SAP Business ByDesign i\u00e7in SkyPlanner APS: <span class=\"hl\">Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS, SAP Business ByDesign i\u00e7in ger\u00e7ek makine ve personel kapasitesini dikkate alan bir \u00fcretim \u00e7izelgeleme eklentisidir. Her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi belirli saatlere g\u00f6re \u00e7izelgeler. Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak g\u00fcnceller.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner, SAP Business ByDesign ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r. \u00dcretim emirleri, Bills of Material ve Bills of Operations bilgileriyle birlikte Production Models, ekipman ve i\u015f g\u00fcc\u00fc kaynaklar\u0131, malzemeler, stok ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r. Planlanan ba\u015flang\u0131\u00e7 tarihleri ve ana kaynak bilgisi \u00fcretim emirlerine geri g\u00f6nderilir. Teyit edilen miktarlar ve tamamlanan g\u00f6revler ise \u00fcretim partilerine aktar\u0131l\u0131r. SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu ByDesign ortam\u0131n\u0131za g\u00f6re yap\u0131land\u0131r\u0131r.<\/p>\n\n\n<p>Fiyatlar, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac\u2019dan ba\u015flar. Her ek i\u015f merkezi ayl\u0131k 20 \u20ac\u2019dur. \u00dccretsiz deneme 30 g\u00fcn s\u00fcrer; 20 i\u015f merkezine kadar kullan\u0131m ve t\u00fcm Basic \u00f6zellikleri dahildir. Kredi kart\u0131 gerekmez.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcretiminizde neler de\u011fi\u015fir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Her makinede uygulanabilir bir i\u015f s\u0131ras\u0131.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner her operasyonu haftal\u0131k bir zaman dilimine de\u011fil, belirli bir makinede belirli bir saate yerle\u015ftirir. Kapasiteyi vardiyalar, devams\u0131zl\u0131klar ve fazla mesailer belirler. B\u00f6ylece \u00fcretimde uygulanabilir bir plan olu\u015fur.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Tip de\u011fi\u015fimi maliyetleri azal\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">Haz\u0131rl\u0131k s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki ge\u00e7i\u015f s\u00fcresini her iki y\u00f6nde de tutar. Maviden k\u0131rm\u0131z\u0131ya ge\u00e7i\u015f 30 dakika, k\u0131rm\u0131z\u0131dan maviye ge\u00e7i\u015f ise 60 dakika s\u00fcrebilir. Arcturus, en az zaman kayb\u0131na yol a\u00e7an s\u0131ralamay\u0131 uygular.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u00c7al\u0131\u015fanlar\u0131n ve tak\u0131mlar\u0131n da kapasitesi s\u0131n\u0131rl\u0131.<\/p>\n\n\n<p class=\"fx-pain__b\">\u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe, vardiyalar\u0131nda m\u00fcsait olan \u00fc\u00e7 ki\u015fi atan\u0131r. Bir makinede kullan\u0131lan fikst\u00fcr veya kal\u0131p, ayn\u0131 anda ba\u015fka bir makineye asla atanmaz. Makine dolu oldu\u011funda i\u015f, alternatif bir makineye veya ki\u015fiye y\u00f6nlendirilir.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Malzeme, i\u015f ba\u015flamadan \u00f6nce gelir.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner her malzeme i\u00e7in stoku ve teslimat\u0131 beklenen sat\u0131n alma sipari\u015flerini kontrol eder. Tedarik\u00e7i teslimat\u0131n\u0131 bekleyen \u00fcretim emri, teslimat tarihinden sonraya planlan\u0131r; \u00fcretime al\u0131n\u0131p ard\u0131ndan malzeme yoklu\u011fundan durdurulmaz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Acil sipari\u015flerde ve ar\u0131zalarda \u00e7izelge otomatik yenilenir.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir makine durdu\u011funda veya acil sipari\u015f geldi\u011finde Autopilot \u00e7izelgeyi yeniden olu\u015fturur. Running Time Lock, \u00f6n\u00fcm\u00fczdeki saatlerde yap\u0131lacak i\u015fleri sabit tutar; b\u00f6ylece \u00fcretim d\u00fczeni bozulmaz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operat\u00f6rler i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr.<\/p>\n\n\n<p class=\"fx-pain__b\">Her operat\u00f6r, s\u0131radaki i\u015fleri telefon veya tabletinden g\u00f6r\u00fcr ve yapt\u0131k\u00e7a kaydeder. Kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r. Teyitler, ByDesign&#8217;daki \u00fcretim partilerine geri aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila\u2019daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>haftal\u0131k zaman tasarrufu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 \u00fcretim hatt\u0131na saniyeler i\u00e7inde ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU\u2019nun de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied\u2019\u0131n Nairobi\u2019deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda \u00e7al\u0131\u015fan temiz oda k\u0131yafetli operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, Bilgi Teknolojileri M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f plan, 30 dakikadan k\u0131sa s\u00fcrede haz\u0131rlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied\u2019\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel\u2019in Kauhava\u2019daki \u00e7at\u0131 g\u00fcvenlik ekipmanlar\u0131 fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 tespit etmemizi kolayla\u015ft\u0131rd\u0131 ve \u00fcretim y\u00f6netimine netlik kazand\u0131rd\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenli\u011fi ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Bu y\u0131l teslimat performans\u0131 %99,2\u2019ye ula\u015ft\u0131. \u00c7izelgeleme sayesinde g\u00fcnde d\u00f6rt saate kadar \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/piristeel\/\">Piristeel\u2019in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 tesisinde kaynakl\u0131 bir \u00e7elik konstr\u00fcksiyonu ta\u015flayan KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%98<\/b><span>teslimat performans\u0131; yakla\u015f\u0131k %50\u2019den y\u00fckseldi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumam\u0131zda belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal imalat\u0131 ve fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k %50\u2019den %98\u2019e kadar y\u00fckseldi. Art\u0131k \u00e7izelgeleme i\u00e7in iki yerine bir sorumlu yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp\u2019un de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-sap-business-bydesign-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP Business ByDesign entegrasyonu nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>ByDesign i\u015fleri g\u00f6nderir.<\/strong> \u00dcretime serbest b\u0131rak\u0131lan \u00fcretim emirleri ve operasyonlar\u0131, Production Models, Bills of Material ve Bills of Operations, ekipman ve i\u015f g\u00fcc\u00fc kaynaklar\u0131, malzemeler, stok ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>SkyPlanner \u00e7izelgeyi olu\u015fturur ve g\u00fcncel tutar.<\/strong> Arcturus, her kaynaktaki her operasyonu saniyeler i\u00e7inde planlar ve \u00fcretim de\u011fi\u015ftik\u00e7e yeniden planlama yapar.<\/li>\n\n\n<li><strong>Tarihler, kaynaklar ve teyitler geri g\u00f6nderilir.<\/strong> Planlanan ba\u015flang\u0131\u00e7 ve ana kaynak bilgisi her \u00fcretim emrine geri aktar\u0131l\u0131r. Teyit edilen miktarlar, fire ve tamamlanan g\u00f6revler \u00fcretim partisine i\u015flenir.<\/li>\n\n<\/ol>\n\n\n<p>SAP Business ByDesign, ana kay\u0131t sisteminiz olmaya devam eder. Malzemeler, Production Models, Supply Planning, sat\u0131n alma, stok, maliyetlendirme ve finans mevcut sistemde kal\u0131r. SkyPlanner&#8217;\u0131n sorumlulu\u011fu tektir: her makine, ki\u015fi ve tak\u0131m i\u00e7in t\u00fcm operasyonlar\u0131n s\u0131ras\u0131n\u0131 ve zamanlamas\u0131n\u0131 belirlemek.<\/p>\n\n\n<p>SkyPlanner, ByDesign verilerini SAP&#8217;nin kullan\u0131ma sundu\u011fu Query Production Orders, Query Production Model ve Query Purchase Orders gibi A2X web servislerinden ve \u00f6zel OData servislerinden okur. Verileri geri yazmak i\u00e7in kullan\u0131ma sunulmu\u015f iki servisten yararlan\u0131r. Manage Production Orders, EarliestStartPeriod ve operasyonun MainResourceID alanlar\u0131n\u0131 ayarlar. Manage Production Lots, teyit edilen miktarlar\u0131, fireyi ve tamamlanan g\u00f6revleri i\u015fler. SkyPlanner webhook&#8217;lar\u0131 her \u00e7izelge de\u011fi\u015fikli\u011fini an\u0131nda iletir. ByDesign senkronizasyon s\u0131kl\u0131\u011f\u0131 ise tesis baz\u0131nda belirlenir.<\/p>\n\n\n<p>Her \u015firket ByDesign&#8217;\u0131 farkl\u0131 kulland\u0131\u011f\u0131 i\u00e7in SkyPlanner ekibi, devreye alma s\u00fcrecinde REST API \u00fczerinden entegrasyonu ortam\u0131n\u0131za g\u00f6re yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra da destek verir. Entegrasyon i\u00e7in s\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re \u00f6nceden fiyat teklifi sunulur. SAP ByDesign i\u015f orta\u011f\u0131n\u0131z veya kendi geli\u015ftiricileriniz de SkyPlanner&#8217;\u0131n dok\u00fcmante edilmi\u015f API&#8217;sini kullanarak entegrasyon geli\u015ftirebilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API ba\u015fvuru dok\u00fcman\u0131<\/a>).<\/p>\n\n\n<p>Web servisleri, veri e\u015fleme ve geri yazma kurallar\u0131 i\u00e7in <a href=\"\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/entegrasyon-kilavuzu\/\">\u00fcretim \u00e7izelgelemeye y\u00f6nelik SAP ByDesign APS entegrasyon k\u0131lavuzuna<\/a> bak\u0131n.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-sap-bydesign-schedules-and-what-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP ByDesign neleri \u00e7izelgeler, SkyPlanner ne ekler?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SAP Business ByDesign, malzemeleri planlar ve kapasiteyi toplu d\u00fczeyde kontrol eder. SAP&#8217;nin kendi yard\u0131m dok\u00fcmanlar\u0131 s\u0131n\u0131rlar\u0131 \u015f\u00f6yle a\u00e7\u0131klar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planlama \u00e7al\u0131\u015ft\u0131rmas\u0131 s\u0131n\u0131rs\u0131z kapasite varsayar.<\/strong> &#8220;The planning run schedules production proposals based on infinite resources using the location calendar.&#8221; (Planlama \u00e7al\u0131\u015ft\u0131rmas\u0131, lokasyon takvimini kullanarak \u00fcretim \u00f6nerilerini s\u0131n\u0131rs\u0131z kaynak varsay\u0131m\u0131yla \u00e7izelgeler.) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2ceab4f1722d10149ffdbd617d89688f.html\">SAP yard\u0131m\u0131, Load Leveling<\/a>)<\/li>\n\n\n<li><strong>Kapasite kaba d\u00fczeyde planlan\u0131r.<\/strong> &#8220;In rough-cut planning, capacity is typically checked in buckets, such as days, weeks, or months.&#8221; (Kaba planlamada kapasite genellikle g\u00fcn, hafta veya ay gibi zaman dilimlerinde kontrol edilir.) Bir planlama operasyonunun kapasite ihtiyac\u0131, ba\u015flang\u0131c\u0131 ile biti\u015fi aras\u0131na e\u015fit olarak da\u011f\u0131t\u0131l\u0131r. (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2cb65fd0722d1014b0658b613e1bd8b3.html\">SAP yard\u0131m\u0131, Capacity Planning<\/a>)<\/li>\n\n\n<li><strong>Load Leveling elle \u00e7al\u0131\u015ft\u0131r\u0131l\u0131r ve dengeleme ufkuyla s\u0131n\u0131rl\u0131d\u0131r.<\/strong> Planlamac\u0131 bu i\u015flemi Resource Load g\u00f6r\u00fcn\u00fcm\u00fcnden \u00e7al\u0131\u015ft\u0131r\u0131r. &#8220;If the available capacity is not sufficient, the planning operation is infinitely scheduled in the first bucket after the load leveling horizon.&#8221; (Kullan\u0131labilir kapasite yeterli de\u011filse planlama operasyonu, y\u00fck dengeleme ufkundan sonraki ilk zaman dilimine kapasite s\u0131n\u0131r\u0131 g\u00f6zetilmeden \u00e7izelgelenir.)<\/li>\n\n\n<li><strong>\u0130\u015f s\u0131ralamas\u0131 \u00fcretime b\u0131rak\u0131l\u0131r.<\/strong> &#8220;The dispatching of operations on resources to fulfill several production orders is normally determined on the shop floor.&#8221; (Birden fazla \u00fcretim emrini kar\u015f\u0131lamak i\u00e7in operasyonlar\u0131n kaynaklara hangi s\u0131rayla atanaca\u011f\u0131 normalde \u00fcretim sahas\u0131nda belirlenir.)<\/li>\n\n\n<li><strong>Yaln\u0131zca ana kaynaklar dikkate al\u0131n\u0131r.<\/strong> \u00dcretim emirleri i\u00e7in \u015fu ifade kullan\u0131l\u0131r: &#8220;The availability of main resources is considered for scheduling.&#8221; (\u00c7izelgelemede ana kaynaklar\u0131n kullan\u0131labilirli\u011fi dikkate al\u0131n\u0131r.) SAP&#8217;nin emir \u00e7izelgelemede dikkate al\u0131nan unsurlar listesinde yaln\u0131zca ana kaynaklar yer al\u0131r: kaynak takvimindeki kullan\u0131labilirlikleri ve planlanan s\u00fcreleri. (<a href=\"https:\/\/help.sap.com\/docs\/SAP_BUSINESS_BYDESIGN\/2754875d2d2a403f95e58a41a9c7d6de\/2cc8cd4c722d101484e1917e19a9e2cd.html\">SAP yard\u0131m\u0131, Production Orders<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner, ByDesign&#8217;\u0131n \u00fcretime b\u0131rakt\u0131\u011f\u0131 ayr\u0131nt\u0131l\u0131 \u00e7izelgelemeyi \u00fcstlenir. Operat\u00f6rleri, tak\u0131mlar\u0131, tip de\u011fi\u015fimlerini ve gelecek malzemeyi birlikte de\u011ferlendirerek her operasyonu ger\u00e7ek kapasiteye uygun bi\u00e7imde s\u0131ralar. Yeni tarihler \u00fcretim emirlerine geri aktar\u0131l\u0131r. B\u00f6ylece ByDesign&#8217;daki planlama, sat\u0131n alma ve finans s\u00fcre\u00e7leri ger\u00e7ek \u00e7izelgeyi esas al\u0131r.<\/p>\n\n\n<p>T\u00fcm ad\u0131mlar ve s\u0131n\u0131rlar, <a href=\"\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/uretim-cizelgeleme\/\">SAP ByDesign ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yapabilir mi?<\/a> yaz\u0131s\u0131nda a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-bydesign-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP ByDesign: Bug\u00fcnk\u00fc durum ve SkyPlanner ile gelenler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>SAP ByDesign Supply Planning<\/th><th>SkyPlanner APS ile SAP ByDesign<\/th><\/tr><\/thead><tbody><tr><td>Kapasite<\/td><td>S\u0131n\u0131rs\u0131z kapasiteyle planlama; vardiya, g\u00fcn, hafta veya ay dilimlerinde kaba kapasite planlama<\/td><td>Her makine, ki\u015fi ve tak\u0131m i\u00e7in ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131, vardiyalar ve saatler<\/td><\/tr><tr><td>S\u0131ralama<\/td><td>\u0130\u015flerin kaynaklara atanma s\u0131ras\u0131 \u00fcretimde belirlenir<\/td><td>Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder<\/td><\/tr><tr><td>Kapasite a\u015f\u0131mlar\u0131<\/td><td>Load Leveling&#8217;i planlamac\u0131 \u00e7al\u0131\u015ft\u0131r\u0131r; ta\u015fan y\u00fck, dengeleme ufkundan sonraya kapasite s\u0131n\u0131r\u0131 g\u00f6zetilmeden \u00e7izelgelenir<\/td><td>Her operasyon, kapasitenin m\u00fcsait oldu\u011fu zamana yerle\u015ftirilir<\/td><\/tr><tr><td>Kaynaklar<\/td><td>Emir \u00e7izelgelemede ana kaynaklar dikkate al\u0131n\u0131r<\/td><td>Makine, operat\u00f6r ve tak\u0131mlar\u0131n kapasitesi s\u0131n\u0131rl\u0131d\u0131r; \u00fc\u00e7 operat\u00f6r gerektiren i\u015fe \u00fc\u00e7 ki\u015fi atan\u0131r<\/td><\/tr><tr><td>Tip de\u011fi\u015fimleri<\/td><td>Bill of Operations i\u00e7indeki haz\u0131rl\u0131k ve s\u00f6k\u00fcm faaliyetleri<\/td><td>Haz\u0131rl\u0131k s\u00fcresi matrisi: mavi\u2192k\u0131rm\u0131z\u0131 30 dk, k\u0131rm\u0131z\u0131\u2192mavi 60 dk; en d\u00fc\u015f\u00fck toplam haz\u0131rl\u0131k s\u00fcresi<\/td><\/tr><tr><td>Malzemeler<\/td><td>Planlama \u00e7al\u0131\u015ft\u0131rmas\u0131, makine zamanlamas\u0131ndan ba\u011f\u0131ms\u0131z \u00f6neriler olu\u015fturur<\/td><td>\u0130\u015fler, stoktaki veya sat\u0131n alma sipari\u015fleriyle gelecek malzeme haz\u0131r oldu\u011funda ba\u015flar<\/td><\/tr><tr><td>Yak\u0131n d\u00f6nem plan\u0131<\/td><td>Sabitlenmi\u015f \u00f6nerilerin zaman\u0131 de\u011fi\u015ftirilmez<\/td><td>Running Time Lock, \u00f6n\u00fcm\u00fczdeki saatlerde yap\u0131lacak i\u015fleri sabit tutar<\/td><\/tr><tr><td>De\u011fi\u015fiklikler<\/td><td>Planlama ve Load Leveling yeniden \u00e7al\u0131\u015ft\u0131r\u0131l\u0131r<\/td><td>Autopilot, \u00f6nceliklerinize g\u00f6re yeniden planlar<\/td><\/tr><tr><td>Shop floor<\/td><td>ByDesign&#8217;da Task Control ve \u00fcretim teyitleri<\/td><td>Operat\u00f6rler i\u015f s\u0131ralar\u0131n\u0131 telefon veya tabletten g\u00f6r\u00fcr ve yapt\u0131klar\u0131 i\u015fleri kaydeder; kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"sap-bydesign-scheduling-software-and-add-ons-com\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP ByDesign i\u00e7in \u00e7izelgeleme yaz\u0131l\u0131mlar\u0131n\u0131n ve eklentilerinin kar\u015f\u0131la\u015ft\u0131rmas\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Se\u00e7enek<\/th><th>Nedir?<\/th><th>Ne zaman uygundur?<\/th><\/tr><\/thead><tbody><tr><td>ByDesign Supply Planning ve Load Leveling<\/td><td>S\u0131n\u0131rs\u0131z kapasiteyle planlama, zaman dilimleri baz\u0131nda kaba kapasite planlama ve Resource Load g\u00f6r\u00fcn\u00fcm\u00fcnde etkile\u015fimli y\u00fck dengeleme<\/td><td>Malzeme \u00f6nerilerine ve a\u015f\u0131r\u0131 y\u00fckl\u00fc kaynaklar\u0131 haftal\u0131k olarak g\u00f6rmeye ihtiya\u00e7 duydu\u011funuzda<\/td><\/tr><tr><td>APS paketleri (\u00f6rne\u011fin PlanetTogether, Delfoi Planner)<\/td><td>Bir uygulama projesiyle ByDesign&#8217;a ba\u011flanan ayr\u0131 \u00e7izelgeleme yaz\u0131l\u0131m\u0131<\/td><td>Planlama ekibi \u00e7izelgeleme yaz\u0131l\u0131m\u0131n\u0131 ayr\u0131 bir uygulama olarak kulland\u0131\u011f\u0131nda<\/td><\/tr><tr><td>Talep odakl\u0131 planlama platformlar\u0131 (\u00f6rne\u011fin b2wise)<\/td><td>SAP verileriyle tampon stok ve kontrol noktas\u0131 planlama<\/td><td>As\u0131l sorun makine s\u0131ralamas\u0131 de\u011fil, tampon stoklar oldu\u011funda<\/td><\/tr><tr><td>API ile ba\u011flanan bulut APS (SkyPlanner APS)<\/td><td>Taray\u0131c\u0131da \u00e7al\u0131\u015fan, ByDesign \u00fcretim emirleriyle \u00e7ift y\u00f6nl\u00fc senkronize olan \u00e7izelgeleme yaz\u0131l\u0131m\u0131<\/td><td>\u00c7izelgenin kendini optimize etmesi, g\u00fcncel kalmas\u0131 ve her operat\u00f6re ula\u015fmas\u0131 gerekti\u011finde<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>\u015eu durumlarda ByDesign Load Leveling yerine SkyPlanner&#8217;\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Zaman dilimleri de\u011fil, net bir i\u015f s\u0131ras\u0131 gerekti\u011finde.<\/strong> ByDesign kapasiteyi vardiya, g\u00fcn, hafta veya ay dilimlerinde kontrol eder. Arcturus ise her operasyonu belirli bir makinede belirli bir saate yerle\u015ftirir.<\/li>\n\n\n<li><strong>Plan haftada birka\u00e7 kez de\u011fi\u015fir.<\/strong> Autopilot, \u00f6nemli her de\u011fi\u015fiklikte otomatik olarak yeniden planlama yapar. Yeni ba\u015flang\u0131\u00e7 tarihleri \u00fcretim emirlerine geri aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>Operat\u00f6rler ve tak\u0131mlar plan\u0131 s\u0131n\u0131rlar.<\/strong> ByDesign, \u00fcretim emirlerini \u00e7izelgelerken ana kaynaklar\u0131 dikkate al\u0131r. SkyPlanner ise t\u00fcm makinelerin, \u00e7al\u0131\u015fanlar\u0131n, tak\u0131mlar\u0131n ve malzemelerin s\u0131n\u0131rlar\u0131n\u0131 ayn\u0131 anda hesaba katar; birden fazla operat\u00f6r gerektiren i\u015flere personel atar.<\/li>\n\n\n<li><strong>\u00dcretim miktar\u0131n\u0131z\u0131 tip de\u011fi\u015fimleri belirler.<\/strong> Haz\u0131rl\u0131k s\u00fcresi matrisi, ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re tip de\u011fi\u015fim s\u00fcrelerini tutar ve toplam haz\u0131rl\u0131k s\u00fcresi en k\u0131sa olan s\u0131ralamay\u0131 uygular.<\/li>\n\n\n<li><strong>Her operat\u00f6r plana g\u00f6re \u00e7al\u0131\u015fmal\u0131.<\/strong> Mobile Confirmations, g\u00fcncel i\u015f kuyru\u011funu telefon veya tablette g\u00f6sterir. Kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r: fiyat, kullan\u0131c\u0131 say\u0131s\u0131na de\u011fil i\u015f merkezi say\u0131s\u0131na ba\u011fl\u0131d\u0131r.<\/li>\n\n\n<li><strong>Ayl\u0131k tek bir fiyat istersiniz.<\/strong> Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. \u00c7ift y\u00f6nl\u00fc entegrasyonun fiyat\u0131 ba\u015ftan teklif edilir ve entegrasyon deste\u011fini SkyPlanner ekibi sa\u011flar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Nas\u0131l ba\u015flayabilirsiniz?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00dccretsiz denemeyi ba\u015flat\u0131n.<\/strong> 30 g\u00fcn boyunca 20 i\u015f merkezine kadar t\u00fcm Basic \u00f6zelliklerini kullan\u0131n. Kredi kart\u0131 gerekmez.<\/li>\n\n\n<li><strong>\u00dcretiminizi modelleyin.<\/strong> SkyPlanner&#8217;da makineleri, \u00e7al\u0131\u015fanlar\u0131 ve vardiyalar\u0131 olu\u015fturun ya da ByDesign&#8217;daki ekipman ve i\u015f g\u00fcc\u00fc kaynaklar\u0131n\u0131z\u0131 i\u00e7e aktar\u0131n. Kurulum ve kullan\u0131ma ge\u00e7i\u015f a\u015famas\u0131nda destek alabilirsiniz.<\/li>\n\n\n<li><strong>\u00dcretim emirlerinizi y\u00fckleyin.<\/strong> A\u00e7\u0131k \u00fcretim emirlerini ve bunlara ait operasyonlar\u0131 ByDesign&#8217;dan Excel&#8217;e aktar\u0131n. Ard\u0131ndan bu verileri SkyPlanner&#8217;a aktararak olu\u015fan \u00e7izelgeyi mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>SAP Business ByDesign ba\u011flant\u0131s\u0131n\u0131 kurun.<\/strong> SkyPlanner ekibi \u00e7ift y\u00f6nl\u00fc entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131 kullan\u0131ma ge\u00e7tikten sonra da destek sa\u011flar.<\/li>\n\n<\/ol>\n\n\n<p><strong>Fiyatland\u0131rma.<\/strong> Paketler i\u015f merkezi ba\u015f\u0131na ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. \u0130stedi\u011finiz zaman i\u015f merkezi ekleyebilir, kald\u0131rabilir veya aboneli\u011finizi iptal edebilirsiniz. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rma<\/a> sayfas\u0131na bak\u0131n, <a href=\"\/tr\/kaynaklar\/gelismis-planlama-ve-cizelgeleme\/\">ileri planlama ve \u00e7izelgeleme k\u0131lavuzunu<\/a> okuyun veya <a href=\"\/tr\/entegrasyonlar\/erp\/\">t\u00fcm ERP entegrasyonlar\u0131n\u0131<\/a> inceleyin. Ba\u015fka bir SAP sistemi mi kullan\u0131yorsunuz? <a href=\"\/tr\/entegrasyonlar\/erp\/sap-business-one\/\">SAP Business One i\u00e7in SkyPlanner<\/a> ve <a href=\"\/tr\/entegrasyonlar\/erp\/sap-s4hana\/\">SAP S\/4HANA i\u00e7in SkyPlanner<\/a> sayfalar\u0131na g\u00f6z at\u0131n.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SAP Business ByDesign i\u00e7in en iyi \u00e7izelgeleme eklentisi hangisi?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, SAP Business ByDesign ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015fan ve ger\u00e7ek kapasiteyi dikkate alan bir \u00fcretim \u00e7izelgeleme eklentisidir. \u00dcretim emirleri, Production Models, kaynaklar, malzemeler, stoklar ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r. Planlanan ba\u015flang\u0131\u00e7 tarihleri ve ana kaynaklar \u00fcretim emirlerine, \u00fcretim teyitleri ise \u00fcretim partilerine geri aktar\u0131l\u0131r. Her makinenin, operat\u00f6r\u00fcn, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131 dikkate al\u0131n\u0131r. \u00dcretimde bir de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve \u00fccretsiz deneme s\u00fcresi 30 g\u00fcnd\u00fcr.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SAP ByDesign ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yapar m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Makine d\u00fczeyinde yapmaz. ByDesign&#8217;da planlama \u00e7al\u0131\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda kapasite s\u0131n\u0131rlar\u0131 dikkate al\u0131nmaz; kapasite kontrol\u00fc kaba planlamada kullan\u0131lan zaman dilimleri \u00fczerinden yap\u0131l\u0131r. Load Leveling, kullan\u0131c\u0131 etkile\u015fimi gerektiren bir ad\u0131md\u0131r ve planlama ufkunu a\u015fan y\u00fck\u00fc, bu ufkun \u00f6tesine kapasite s\u0131n\u0131r\u0131 g\u00f6zetmeden yerle\u015ftirir. SAP&#8217;nin yard\u0131m belgelerine g\u00f6re operasyonlar\u0131n i\u015fleme al\u0131nmas\u0131 \u00fcretim sahas\u0131na b\u0131rak\u0131l\u0131r. ByDesign ile birlikte \u00e7al\u0131\u015fan SkyPlanner APS ise her makinenin, \u00e7al\u0131\u015fan\u0131n, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131n\u0131 dikkate alarak \u00e7izelgeleme yapar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hangi \u00e7izelgeleme yaz\u0131l\u0131m\u0131 SAP Business ByDesign ile entegre \u00e7al\u0131\u015f\u0131r?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, SAP&#8217;nin kullan\u0131ma sundu\u011fu web servisleri \u00fczerinden SAP Business ByDesign ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r. \u00dcretim emirlerini, Production Models verilerini, kaynaklar\u0131, malzemeleri ve sat\u0131n alma sipari\u015flerini Query servisleri ve \u00f6zel OData arac\u0131l\u0131\u011f\u0131yla okur. Manage Production Orders \u00fczerinden EarliestStartPeriod alan\u0131n\u0131 ve operasyonun MainResourceID alan\u0131n\u0131, Manage Production Lots \u00fczerinden ise \u00fcretim teyitlerini yazar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>ByDesign Load Leveling mi, SkyPlanner m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Her makine i\u00e7in kendini g\u00fcncel tutan bir i\u015f s\u0131ralamas\u0131na ihtiyac\u0131n\u0131z varsa SkyPlanner&#8217;\u0131 se\u00e7in. Planlamac\u0131 \u00e7al\u0131\u015ft\u0131rd\u0131\u011f\u0131nda Load Leveling, Resource Load g\u00f6r\u00fcn\u00fcm\u00fcndeki zaman dilimleri aras\u0131nda y\u00fck\u00fc dengeler. \u00dcretim emri \u00e7izelgelemesi ise yaln\u0131zca ana kaynaklar\u0131 dikkate al\u0131r. SkyPlanner her operasyonu belirli bir saate yerle\u015ftirir; operat\u00f6rleri, tak\u0131mlar\u0131, tip de\u011fi\u015fimlerini ve malzemeyi birlikte planlar ve otomatik olarak yeniden planlama yapar. Malzeme \u00f6nerileri i\u00e7in Supply Planning&#8217;i kullanmaya devam edin, operasyon \u00e7izelgelemesini SkyPlanner&#8217;a b\u0131rak\u0131n.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, ByDesign Supply Planning veya Production Control yerine mi ge\u00e7er?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r, onlar\u0131 tamamlayan bir katman olarak \u00e7al\u0131\u015f\u0131r. Malzemeler ve Production Models ByDesign&#8217;da kal\u0131r; planlama, sat\u0131n alma, stok y\u00f6netimi, maliyetlendirme ve finans i\u015flemleri de ByDesign&#8217;da y\u00fcr\u00fct\u00fcl\u00fcr. SkyPlanner, serbest b\u0131rak\u0131lm\u0131\u015f \u00fcretim emirlerini ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeler ve tarihleri geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bu entegrasyon, SAP Business One veya SAP S\/4HANA entegrasyonuyla ayn\u0131 m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. Her SAP ERP&#8217;nin kendine ait API&#8217;leri vard\u0131r ve SkyPlanner her birine ayr\u0131 olarak ba\u011flan\u0131r. <a href=\"\/tr\/entegrasyonlar\/erp\/sap-business-one\/\">SAP Business One i\u00e7in SkyPlanner<\/a> ve <a href=\"\/tr\/entegrasyonlar\/erp\/sap-s4hana\/\">SAP S\/4HANA i\u00e7in SkyPlanner<\/a> sayfalar\u0131na bak\u0131n.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>ByDesign kullanan bir \u015firket i\u00e7in SkyPlanner&#8217;\u0131n maliyeti nedir?<\/summary>\n<p class=\"sp-faq__a\">5 i\u015f merkezi dahil fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi i\u00e7in ayl\u0131k 20 \u20ac \u00f6denir. \u0130\u015f merkezi, kendine ait \u00e7izelgelenmi\u015f i\u015f kuyru\u011fu olan bir \u00fcretim kayna\u011f\u0131d\u0131r. S\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan entegrasyon teklifi, se\u00e7ti\u011finiz paketle birlikte ba\u015ftan sunulur. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devreye alma ne kadar s\u00fcrer?<\/summary>\n<p class=\"sp-faq__a\">Uygulama, kullan\u0131ma ge\u00e7i\u015f s\u00fcreci ba\u015flad\u0131ktan sonra genellikle haftalar i\u00e7inde tamamlan\u0131r. Ekip, kaynaklar\u0131n\u0131z\u0131 ve Bills of Operations verilerinizi e\u015fle\u015ftirir, \u00fcretim emirleri ve sat\u0131n alma sipari\u015fleri i\u00e7in ba\u011flant\u0131lar\u0131 kurar ve planlanan tarihleri geri g\u00f6nderir. Canl\u0131 kullan\u0131ma ge\u00e7meden \u00f6nce her \u015fey mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131larak test edilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>ByDesign entegrasyonundan \u00f6nce SkyPlanner&#8217;\u0131 test edebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck denemede, ByDesign&#8217;daki a\u00e7\u0131k \u00fcretim emirlerinizi Excel&#8217;e aktararak kullanabilirsiniz. Entegrasyon \u00e7al\u0131\u015fmalar\u0131 ba\u015flamadan \u00f6nce kendi \u00fcretiminiz i\u00e7in <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">ger\u00e7ek kapasiteyi dikkate alan bir \u00fcretim \u00e7izelgesi<\/a> g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ SAP Business ByDesign SAP Business ByDesign i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, SAP Business ByDesign i\u00e7in ger\u00e7ek makine ve personel kapasitesini dikkate alan bir \u00fcretim \u00e7izelgeleme eklentisidir. Her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi belirli saatlere g\u00f6re \u00e7izelgeler. Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda &#8230; <a title=\"SAP Business ByDesign i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/\" aria-label=\"Read more about SAP Business ByDesign i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100689,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106596","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP ByDesign \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: SAP ByDesign i\u00e7in \u00e7ift y\u00f6nl\u00fc entegrasyonlu, ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzeme. Ayda 199 \u20ac&#039;dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SAP Business ByDesign i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: SAP ByDesign i\u00e7in \u00e7ift y\u00f6nl\u00fc entegrasyonlu, ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzeme. Ayda 199 \u20ac&#039;dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-business-bydesign\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-business-bydesign\\\/\",\"name\":\"SAP ByDesign \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: SAP ByDesign i\u00e7in \u00e7ift y\u00f6nl\u00fc entegrasyonlu, ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzeme. Ayda 199 \u20ac'dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-business-bydesign\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-business-bydesign\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-business-bydesign\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SAP Business ByDesign i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP ByDesign \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS","description":"SkyPlanner APS: SAP ByDesign i\u00e7in \u00e7ift y\u00f6nl\u00fc entegrasyonlu, ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzeme. Ayda 199 \u20ac'dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/","og_locale":"tr_TR","og_type":"article","og_title":"SAP Business ByDesign i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","og_description":"SkyPlanner APS: SAP ByDesign i\u00e7in \u00e7ift y\u00f6nl\u00fc entegrasyonlu, ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzeme. Ayda 199 \u20ac'dan.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"15 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/","name":"SAP ByDesign \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: SAP ByDesign i\u00e7in \u00e7ift y\u00f6nl\u00fc entegrasyonlu, ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzeme. Ayda 199 \u20ac'dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-business-bydesign\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"SAP Business ByDesign i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ SAP Business ByDesign SAP Business ByDesign i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, SAP Business ByDesign i\u00e7in ger\u00e7ek makine ve personel kapasitesini dikkate alan bir \u00fcretim \u00e7izelgeleme eklentisidir. Her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi belirli saatlere g\u00f6re \u00e7izelgeler. Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=106596"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106596\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100689"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=106596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}