{"id":106567,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/delmiaworks\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"delmiaworks","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/delmiaworks\/","title":{"rendered":"DELMIAWorks (IQMS) i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ DELMIAWorks<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">DELMIAWorks (IQMS) i\u00e7in SkyPlanner APS: <span class=\"hl\">Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS, eski ad\u0131 IQMS olan DELMIAWorks ERP sistemine eklenen, ger\u00e7ek kapasiteyi dikkate alan bir \u00fcretim \u00e7izelgeleme \u00e7\u00f6z\u00fcm\u00fcd\u00fcr. Her presi, kal\u0131b\u0131, operat\u00f6r\u00fc ve malzemeyi belirli saatlere g\u00f6re \u00e7izelgeler. Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden d\u00fczenler.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner, DELMIAWorks ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r. \u00dcretim emirleri, par\u00e7a operasyonlar\u0131n\u0131 i\u00e7eren Bills of Manufacturing, i\u015f merkezleri, tak\u0131mlar ve kal\u0131plar, stok kartlar\u0131 ve sat\u0131n alma sipari\u015fleri SkyPlanner\u2019a aktar\u0131l\u0131r. Planlanan ba\u015flang\u0131\u00e7 ve biti\u015f tarihleri, atanan i\u015f merkezi, \u00fcretim kay\u0131tlar\u0131 ve i\u015flere kaydedilen i\u015f\u00e7ilik s\u00fcreleri ise DELMIAWorks\u2019e geri g\u00f6nderilir. SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu DELMIAWorks yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar.<\/p>\n\n\n<p>Fiyatlar, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac\u2019dan ba\u015flar. Her ek i\u015f merkezi ayl\u0131k 20 \u20ac\u2019dur. \u00dccretsiz deneme 30 g\u00fcn s\u00fcrer; 20 i\u015f merkezine kadar kullan\u0131m ve t\u00fcm Basic \u00f6zellikleri dahildir. Kredi kart\u0131 gerekmez.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcretiminizde neler de\u011fi\u015fir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Her pres, uygulanabilir bir i\u015f s\u0131ras\u0131yla \u00e7al\u0131\u015f\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner her \u00fcretim emrini belirli bir saate, belirli bir prese, ekstr\u00fcdere veya montaj h\u00fccresine yerle\u015ftirir. Kapasiteyi vardiyalar, devams\u0131zl\u0131klar ve fazla mesai belirler. B\u00f6ylece plan, \u00fcretim sahas\u0131nda yap\u0131labilecek i\u015fle \u00f6rt\u00fc\u015f\u00fcr.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kal\u0131p ve renk de\u011fi\u015fimlerinin maliyeti d\u00fc\u015fer.<\/p>\n\n\n<p class=\"fx-pain__b\">Haz\u0131rl\u0131k s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcresini her iki y\u00f6n i\u00e7in ayr\u0131 ayr\u0131 tutar. Maviden k\u0131rm\u0131z\u0131ya ge\u00e7i\u015f 30 dakika s\u00fcrebilirken, k\u0131rm\u0131z\u0131dan maviye ge\u00e7i\u015f kovan\u0131n tamamen temizlenmesi gerekti\u011fi i\u00e7in 60 dakika s\u00fcrer. Arcturus, t\u00fcm preslerde toplam zaman kayb\u0131n\u0131 en aza indiren i\u015f s\u0131ras\u0131n\u0131 uygular.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kal\u0131plar\u0131n s\u0131n\u0131rl\u0131 kapasitesi hesaba kat\u0131l\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir preste kullan\u0131lan kal\u0131p, ayn\u0131 anda ikinci bir prese asla atanmaz. Aile kal\u0131b\u0131n\u0131n \u00fcretti\u011fi par\u00e7alar tek bir i\u015f olarak \u00e7izelgelenir. \u0130lk tercih edilen pres doluysa i\u015f, kal\u0131ba uygun alternatif bir prese aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ekipler makinelerle birlikte planlan\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">\u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe, vardiyalar\u0131nda m\u00fcsait olan \u00fc\u00e7 ki\u015fi atan\u0131r. Kal\u0131p ba\u011flama personeli, proses teknisyenleri ve pres operat\u00f6rleri ayn\u0131 plan \u00fczerinden \u00e7izelgelenir.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Re\u00e7ine ve insertler i\u015f ba\u015flamadan \u00f6nce gelir.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner her malzeme i\u00e7in stoklar\u0131 ve beklenen sat\u0131n alma sipari\u015flerini kontrol eder. Re\u00e7ine teslimat\u0131n\u0131 bekleyen bir \u00fcretim emri, \u00f6nce prese y\u00fcklenip sonra durdurulmak yerine teslimat tarihinden sonras\u0131na planlan\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u0131za ve acil sipari\u015flerde plan otomatik yenilenir.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir pres ar\u0131zaland\u0131\u011f\u0131nda veya acil sipari\u015f geldi\u011finde Autopilot \u00e7izelgeyi yeniden d\u00fczenler. Running Time Lock, \u00f6n\u00fcm\u00fczdeki saatlerde yap\u0131lacak i\u015fleri sabitler; b\u00f6ylece ba\u011flanm\u0131\u015f kal\u0131plar yerinde kal\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Her operat\u00f6r i\u015f s\u0131ras\u0131n\u0131 g\u00f6r\u00fcr.<\/p>\n\n\n<p class=\"fx-pain__b\">Operat\u00f6rler s\u0131radaki i\u015flerini telefon veya tabletten g\u00f6r\u00fcr ve yapt\u0131klar\u0131 i\u015fi anl\u0131k olarak kaydeder. Kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r; her vardiya ayn\u0131 planla \u00e7al\u0131\u015f\u0131r.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila\u2019daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta kazan\u0131lan zaman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt donan\u0131mlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saat tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU\u2019nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied\u2019\u0131n Nairobi\u2019deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u00fcretim verimlili\u011finde art\u0131\u015f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f bir plan\u0131 haz\u0131rlamak 30 dakikadan az s\u00fcr\u00fcyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied\u2019\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec CEO\u2019su Hannu Ryyn\u00e4nen, \u015firketin Lohja\u2019daki \u00fcretim tesisinde\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000\u2019lerce<\/b><span>\u00fcretim emri otomatik \u00e7izelgeleniyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretim art\u0131k bamba\u015fka bir \u015fekilde kontrol\u00fcm\u00fcz alt\u0131nda; kapasitemize ili\u015fkin bilgimiz de tamamen farkl\u0131 bir d\u00fczeye ula\u015ft\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 End\u00fcstriyel kar\u0131\u015ft\u0131r\u0131c\u0131lar, pompalar ve y\u00fcksek teknolojili fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Binlerce \u00fcretim emri otomatik olarak \u00e7izelgeleniyor ve \u015firketin tamam\u0131 \u00fcretimi ger\u00e7ek zamanl\u0131 g\u00f6rebiliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/mamec\/\">Mamec\u2019in yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>2021\u2019den bu yana teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner kapasitemizi g\u00f6rmemizi sa\u011fl\u0131yor ve planlamay\u0131 \u00f6ng\u00f6r\u00fclebilir hale getiriyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Kimya ve g\u0131da \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">SkyPlanner\u2019\u0131n kullan\u0131lmaya ba\u015fland\u0131\u011f\u0131 2021\u2019den bu yana teslimat performans\u0131 kesintisiz olarak %100 seviyesinde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/opes-corporation\/\">Opes Corporation\u2019\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-delmiaworks-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">DELMIAWorks entegrasyonu nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>DELMIAWorks i\u015f bilgilerini g\u00f6nderir.<\/strong> \u00dcretim emirleri, par\u00e7a operasyonlar\u0131n\u0131 i\u00e7eren Bills of Manufacturing, i\u015f merkezleri, tak\u0131mlar ve kal\u0131plar, stok kartlar\u0131, stok miktarlar\u0131 ve sat\u0131n alma sipari\u015fleri SkyPlanner\u2019a aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>SkyPlanner \u00e7izelgeyi olu\u015fturur ve g\u00fcncel tutar.<\/strong> Arcturus t\u00fcm \u00fcretim emirlerini t\u00fcm presler i\u00e7in saniyeler i\u00e7inde planlar ve \u00fcretimdeki de\u011fi\u015fikliklere g\u00f6re plan\u0131 yeniler.<\/li>\n\n\n<li><strong>Tarihler, pres atamalar\u0131 ve i\u015f kay\u0131tlar\u0131 geri g\u00f6nderilir.<\/strong> Planlanan ba\u015flang\u0131\u00e7 ve biti\u015f tarihleri ile atanan i\u015f merkezi, DELMIAWorks\u2019teki \u00fcretim emirlerine geri aktar\u0131l\u0131r. Sa\u011flam par\u00e7alar \u00fcretim kayd\u0131 olarak, haz\u0131rl\u0131k ve \u00e7al\u0131\u015fma s\u00fcreleri ise i\u015flere ait i\u015f\u00e7ilik kay\u0131tlar\u0131 olarak i\u015flenir.<\/li>\n\n<\/ol>\n\n\n<p>DELMIAWorks ana kay\u0131t sisteminiz olmaya devam eder. Stok kartlar\u0131, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, MRP, sat\u0131n alma, kalite, RealTime izleme, maliyetlendirme ve muhasebe mevcut sistemde kal\u0131r. SkyPlanner\u2019\u0131n sorumlulu\u011fu tek bir konudur: her \u00fcretim emrinin pres, kal\u0131p ve operat\u00f6r baz\u0131nda s\u0131ras\u0131n\u0131 ve zamanlamas\u0131n\u0131 belirlemek.<\/p>\n\n\n<p>SkyPlanner, DELMIAWorks verilerini REST ve GraphQL SDK\u2019lar\u0131 sunan DELMIAWorks WebAPI \u00fczerinden okur. Verileri WebAPI REST denetleyicileri \u00fczerinden geri yazar: Manufacturing WorkOrders denetleyicisi her \u00fcretim emrinin planlanan tarihlerini ve i\u015f merkezini aktar\u0131r, AddProductionRecords sa\u011flam par\u00e7alar\u0131 kaydeder, Time &amp; Attendance g\u00f6rev \u00e7a\u011fr\u0131lar\u0131 ise i\u015f\u00e7ilik kay\u0131tlar\u0131n\u0131 i\u015fler. Kullan\u0131lacak \u00fcretim emri alanlar\u0131, devreye alma s\u00fcrecindeki kapsam belirleme a\u015famas\u0131nda kesinle\u015ftirilir. SkyPlanner webhook\u2019lar\u0131, \u00e7izelgedeki her de\u011fi\u015fikli\u011fi an\u0131nda iletir. DELMIAWorks ile senkronizasyon s\u0131kl\u0131\u011f\u0131 ise tesis baz\u0131nda ayarlan\u0131r.<\/p>\n\n\n<p>Her tesis DELMIAWorks\u2019\u00fc farkl\u0131 \u015fekilde kulland\u0131\u011f\u0131 i\u00e7in SkyPlanner ekibi, devreye alma s\u00fcrecinde REST API \u00fczerinden entegrasyonu sizin yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar ve canl\u0131ya ge\u00e7i\u015ften sonra da destek verir. Entegrasyon i\u00e7in s\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re ba\u015ftan fiyat teklifi sunulur. DELMIAWorks i\u015f orta\u011f\u0131n\u0131z veya kendi geli\u015ftiricileriniz de SkyPlanner\u2019\u0131n dok\u00fcmante edilmi\u015f API\u2019si \u00fczerinden entegrasyon geli\u015ftirebilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API ba\u015fvuru k\u0131lavuzu<\/a>).<\/p>\n\n\n<p>WebAPI denetleyicileri, veri e\u015fle\u015ftirme ve geri yazma kurallar\u0131 <a href=\"\/tr\/entegrasyonlar\/erp\/delmiaworks\/entegrasyon-kilavuzu\/\">\u00fcretim \u00e7izelgeleme i\u00e7in DELMIAWorks APS entegrasyon k\u0131lavuzunda<\/a> a\u00e7\u0131klanmaktad\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-delmiaworks-schedules-and-what-skyplanner-a\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">DELMIAWorks neleri \u00e7izelgeler, SkyPlanner ne ekler?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>DELMIAWorks, kapasite s\u0131n\u0131rlar\u0131n\u0131 ger\u00e7ekten dikkate alan bir \u00e7izelge sunar. Advanced Planning and Scheduling mod\u00fcl\u00fc, ERP\u2019nin &#8220;a core component&#8221; (temel bir bile\u015feni) olarak tan\u0131mlan\u0131r. Dassault\u2019nun <a href=\"https:\/\/www.solidworks.com\/product\/delmiaworks\/manufacturing-erp\/manufacturing\/scheduling\/aps-software\/\">APS sayfas\u0131<\/a> i\u015fleyi\u015fi \u015f\u00f6yle a\u00e7\u0131klar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Y\u00fckleme kurallara g\u00f6re yap\u0131l\u0131r.<\/strong> Auto Load, &#8220;work orders based on priority and &#8220;runs the best&#8221; machine information.&#8221; (\u00fcretim emirlerini \u00f6nceli\u011fe ve en iyi \u00e7al\u0131\u015ft\u0131klar\u0131 makine bilgisine g\u00f6re) yerle\u015ftirir. Kurallar Bill of Manufacturing d\u00fczeyinde tan\u0131mlan\u0131r.<\/li>\n\n\n<li><strong>Malzeme ve tak\u0131mlar istisna listelerinde ele al\u0131n\u0131r.<\/strong> &#8220;Exceptions lists&#8221; (istisna listeleri), &#8220;materials and tools or other constraints associated with a work order that will be unavailable or need to be expedited.&#8221; (bir \u00fcretim emriyle ili\u015fkili olup zaman\u0131nda mevcut olmayacak veya temini h\u0131zland\u0131r\u0131lmas\u0131 gereken malzeme, tak\u0131m ve di\u011fer k\u0131s\u0131tlar\u0131) g\u00f6sterir. Planlamac\u0131 bu listeye g\u00f6re i\u015flem yapar.<\/li>\n\n\n<li><strong>Yak\u0131n vadeli plan korunur.<\/strong> &#8220;User-defined &#8220;time fences&#8221; protect the current schedule against repositioning.&#8221; (Kullan\u0131c\u0131n\u0131n tan\u0131mlad\u0131\u011f\u0131 zaman s\u0131n\u0131rlar\u0131, mevcut \u00e7izelgedeki i\u015flerin yerlerinin de\u011fi\u015ftirilmesini \u00f6nler.)<\/li>\n\n\n<li><strong>Kaba kapasite kontrol\u00fc yap\u0131l\u0131r.<\/strong> &#8220;Rough Cut Capacity Tools&#8221; (kaba kapasite planlama ara\u00e7lar\u0131), &#8220;work center daily and weekly required hours to available hours.&#8221; (i\u015f merkezinin g\u00fcnl\u00fck ve haftal\u0131k ihtiya\u00e7 duydu\u011fu saatleri kullan\u0131labilir saatlerle) kar\u015f\u0131la\u015ft\u0131r\u0131r.<\/li>\n\n<\/ul>\n\n\n<p>G\u00fcnl\u00fck i\u015fleyi\u015fte planlamac\u0131, y\u00fck\u00fc dengelemek i\u00e7in \u00fcretim emirlerini i\u015f merkezleri aras\u0131nda s\u00fcr\u00fckler ve de\u011fi\u015fikliklerden sonra Update Schedule ile Auto Load i\u015flemlerini yeniden \u00e7al\u0131\u015ft\u0131r\u0131r. SkyPlanner buna t\u00fcm plan\u0131n optimizasyonunu ekler: Arcturus, t\u00fcm \u00fcretim emirlerini b\u00fct\u00fcn preslerde tek seferde s\u0131ralarken y\u00f6ne g\u00f6re de\u011fi\u015fen tip de\u011fi\u015fimi s\u00fcrelerini, kal\u0131plar\u0131n kapasite s\u0131n\u0131rlar\u0131n\u0131, ekiplere personel atanmas\u0131n\u0131 ve gelecek malzemeleri birlikte hesaba katar. Ard\u0131ndan Autopilot plan\u0131 g\u00fcncel tutar.<\/p>\n\n\n<p>\u0130\u015flem ad\u0131mlar\u0131 ve bir \u00e7izelgeleme yaz\u0131l\u0131m\u0131n\u0131n hangi noktada fayda sa\u011flad\u0131\u011f\u0131, <a href=\"\/tr\/entegrasyonlar\/erp\/delmiaworks\/uretim-cizelgeleme\/\">DELMIAWorks kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alan \u00fcretim \u00e7izelgeleme sunuyor mu?<\/a> yaz\u0131s\u0131nda a\u00e7\u0131klanmaktad\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"delmiaworks-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">DELMIAWorks: mevcut haliyle ve SkyPlanner ile<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>DELMIAWorks APS<\/th><th>SkyPlanner APS ile DELMIAWorks<\/th><\/tr><\/thead><tbody><tr><td>Kapasite<\/td><td>\u0130\u015f merkezi baz\u0131nda kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alan \u00e7izelge; g\u00fcnl\u00fck ve haftal\u0131k kaba kapasite kontrolleri<\/td><td>Her pres, ki\u015fi ve kal\u0131p i\u00e7in kapasite s\u0131n\u0131rlar\u0131; ger\u00e7ek vardiyalar ve saatler<\/td><\/tr><tr><td>\u0130\u015f s\u0131ras\u0131<\/td><td>\u00d6nceli\u011fe ve &#8220;runs best&#8221; (en iyi \u00e7al\u0131\u015ft\u0131\u011f\u0131) i\u015f merkezine g\u00f6re Auto Load<\/td><td>Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder<\/td><\/tr><tr><td>Tip de\u011fi\u015fimleri<\/td><td>Bir sonraki haz\u0131rl\u0131k i\u00e7in \u015fablonlar ve kontrol listeleri<\/td><td>Haz\u0131rl\u0131k s\u00fcresi matrisi: mavi\u2192k\u0131rm\u0131z\u0131 30 dk, k\u0131rm\u0131z\u0131\u2192mavi 60 dk; en d\u00fc\u015f\u00fck toplam haz\u0131rl\u0131k s\u00fcresi<\/td><\/tr><tr><td>Kal\u0131plar ve tak\u0131mlar<\/td><td>Tak\u0131m \u00e7ak\u0131\u015fmalar\u0131 istisna listelerinde g\u00f6sterilir<\/td><td>Kal\u0131plar ve tak\u0131mlar, kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklar olarak atan\u0131r<\/td><\/tr><tr><td>Ekipler<\/td><td>\u0130\u015fg\u00fcc\u00fc kapasitesi standartla kar\u015f\u0131la\u015ft\u0131r\u0131l\u0131r<\/td><td>\u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe, vardiyalar\u0131nda m\u00fcsait olan \u00fc\u00e7 ki\u015fi atan\u0131r<\/td><\/tr><tr><td>Malzemeler<\/td><td>Planlamac\u0131n\u0131n temini h\u0131zland\u0131rmak i\u00e7in kulland\u0131\u011f\u0131 malzeme istisna listesi<\/td><td>\u0130\u015fler, malzeme stokta haz\u0131r oldu\u011funda veya sat\u0131n alma sipari\u015fleri teslim edildi\u011finde ba\u015flar<\/td><\/tr><tr><td>Yak\u0131n vadeli plan<\/td><td>Zaman s\u0131n\u0131rlar\u0131 mevcut \u00e7izelgeyi korur<\/td><td>Running Time Lock, \u00f6n\u00fcm\u00fczdeki saatlerde yap\u0131lacak i\u015fleri sabitler<\/td><\/tr><tr><td>De\u011fi\u015fiklikler<\/td><td>Update Schedule ve Auto Load i\u015flemlerinin ard\u0131ndan elle yer de\u011fi\u015ftirme<\/td><td>Autopilot, \u00f6nceliklerinize ve kilitlerinize uyarak plan\u0131 yeniler<\/td><\/tr><tr><td>shop floor<\/td><td>Pres ba\u015f\u0131nda Shopworks ve RealTime<\/td><td>Operat\u00f6rler ayr\u0131ca telefon veya tabletten i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr ve i\u015f kayd\u0131 girer; kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"delmiaworks-scheduling-software-and-add-ons-comp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">DELMIAWorks \u00e7izelgeleme yaz\u0131l\u0131m\u0131 ve eklentilerinin kar\u015f\u0131la\u015ft\u0131rmas\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Se\u00e7enek<\/th><th>Nedir?<\/th><th>Ne zaman uygundur?<\/th><\/tr><\/thead><tbody><tr><td>DELMIAWorks APS<\/td><td>DELMIAWorks i\u00e7indeki kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alan \u00e7izelge, Auto Load ve kapasite ara\u00e7lar\u0131<\/td><td>\u00c7izelgeyi tek bir planlamac\u0131 y\u00f6netiyorsa ve tip de\u011fi\u015fimleri basitse<\/td><\/tr><tr><td>DELMIA Ortems<\/td><td>Dassault&#8217;nun ERP ve MES ile ba\u011flant\u0131l\u0131, ayr\u0131 bir kurumsal planlama ve \u00e7izelgeleme \u00fcr\u00fcn\u00fc<\/td><td>Merkezi planlama ekibi birden fazla fabrikay\u0131 kapsayan bir optimizasyon projesi y\u00fcr\u00fct\u00fcyorsa<\/td><\/tr><tr><td>\u00d6ncelik bazl\u0131 \u00fcretim y\u00fcr\u00fctme ara\u00e7lar\u0131 (\u00f6rne\u011fin LillyWorks)<\/td><td>Zamanlanm\u0131\u015f bir \u00e7izelge yerine, sipari\u015f riskine g\u00f6re s\u0131ralanan i\u015f listeleri<\/td><td>Sipari\u015fe g\u00f6re \u00e7al\u0131\u015fan bir at\u00f6lye, saatleri belirlenmi\u015f bir i\u015f s\u0131ras\u0131 de\u011fil, \u00f6ncelik listesi istiyorsa<\/td><\/tr><tr><td>API ile ba\u011flanan bulut tabanl\u0131 APS (SkyPlanner APS)<\/td><td>Taray\u0131c\u0131da \u00e7al\u0131\u015fan ve DELMIAWorks \u00fcretim emirleriyle \u00e7ift y\u00f6nl\u00fc senkronize olan bir \u00e7izelgeleme arac\u0131<\/td><td>\u00c7izelgenin kendini optimize etmesi, g\u00fcncel kalmas\u0131 ve her operat\u00f6re ula\u015fmas\u0131 gerekiyorsa<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>\u015eu durumlarda DELMIAWorks APS yerine SkyPlanner&#8217;\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Plan\u0131n tamam\u0131n\u0131n optimize edilmesini istiyorsan\u0131z.<\/strong> Auto Load, \u00f6ncelik ve &#8220;runs best&#8221; kurallar\u0131na g\u00f6re \u00e7al\u0131\u015f\u0131r. Arcturus plan\u0131n tamam\u0131n\u0131 saniyeler i\u00e7inde optimize eder; Autopilot ise her \u00f6nemli de\u011fi\u015fiklikte yeniden planlama yapar.<\/li>\n\n\n<li><strong>\u00dcretim miktar\u0131n\u0131z\u0131 kal\u0131p ve renk de\u011fi\u015fimleri belirliyorsa.<\/strong> Haz\u0131rl\u0131k s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti i\u00e7in ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re farkl\u0131 bir tip de\u011fi\u015fimi s\u00fcresi tutar ve toplam haz\u0131rl\u0131k s\u00fcresini en aza indiren i\u015f s\u0131ras\u0131n\u0131 uygular.<\/li>\n\n\n<li><strong>Kal\u0131plar, ekipler ve re\u00e7ine de presler kadar plan\u0131 k\u0131s\u0131tl\u0131yorsa.<\/strong> Tek bir \u00e7izelgeleme motoru, her presin, ki\u015finin, kal\u0131b\u0131n ve malzemenin s\u0131n\u0131rlar\u0131n\u0131 hesaba katar. Birden fazla operat\u00f6r gerektiren i\u015flere gerekli personel atan\u0131r; i\u015fler malzeme haz\u0131r oldu\u011funda ba\u015flar.<\/li>\n\n\n<li><strong>\u0130stisna listeleri planlamac\u0131n\u0131n fazla zaman\u0131n\u0131 al\u0131yorsa.<\/strong> SkyPlanner, kullan\u0131lamayan tak\u0131mlar\u0131 ve geciken malzemeleri birinin \u00e7\u00f6zmesi i\u00e7in listelemek yerine, plan\u0131 bu k\u0131s\u0131tlar\u0131 dikkate alarak olu\u015fturur.<\/li>\n\n\n<li><strong>Her operat\u00f6r\u00fcn plana g\u00f6re \u00e7al\u0131\u015fmas\u0131n\u0131 istiyorsan\u0131z.<\/strong> Mobile Confirmations, g\u00fcncel i\u015f kuyru\u011funu telefona veya tablete ta\u015f\u0131r. Kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r: fiyat kullan\u0131c\u0131 say\u0131s\u0131na de\u011fil, i\u015f merkezi say\u0131s\u0131na ba\u011fl\u0131d\u0131r.<\/li>\n\n\n<li><strong>Net bir fiyat istiyorsan\u0131z.<\/strong> Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. \u00c7ift y\u00f6nl\u00fc entegrasyonun fiyat\u0131 ba\u015ftan verilir ve deste\u011fi SkyPlanner ekibi taraf\u0131ndan sa\u011flan\u0131r.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Nas\u0131l ba\u015flayabilirsiniz?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00dccretsiz denemeyi ba\u015flat\u0131n.<\/strong> 30 g\u00fcn boyunca, 20 i\u015f merkezine kadar t\u00fcm Basic \u00f6zelliklerini kullan\u0131n. Kredi kart\u0131 gerekmez.<\/li>\n\n\n<li><strong>\u00dcretiminizi modelleyin.<\/strong> SkyPlanner&#8217;da presleri, kal\u0131plar\u0131, personeli ve vardiyalar\u0131 olu\u015fturun veya DELMIAWorks i\u015f merkezlerinizi i\u00e7e aktar\u0131n. Kurulum ve kullan\u0131ma ba\u015flama s\u00fcrecinde destek alabilirsiniz.<\/li>\n\n\n<li><strong>\u00dcretim emirlerinizi y\u00fckleyin.<\/strong> A\u00e7\u0131k \u00fcretim emirlerini ve operasyonlar\u0131n\u0131 DELMIAWorks&#8217;ten Excel&#8217;e aktar\u0131n. Ard\u0131ndan bunlar\u0131 SkyPlanner&#8217;a al\u0131n ve SkyPlanner&#8217;\u0131n \u00e7izelgesini mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>DELMIAWorks ba\u011flant\u0131s\u0131n\u0131 kurun.<\/strong> SkyPlanner ekibi \u00e7ift y\u00f6nl\u00fc entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131 kullan\u0131ma ge\u00e7tikten sonra da deste\u011fini s\u00fcrd\u00fcr\u00fcr.<\/li>\n\n<\/ol>\n\n\n<p><strong>Fiyatland\u0131rma.<\/strong> Paketler i\u015f merkezi ba\u015f\u0131na ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. \u0130stedi\u011finiz zaman i\u015f merkezi ekleyebilir, \u00e7\u0131karabilir veya aboneli\u011finizi iptal edebilirsiniz. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rma<\/a> sayfas\u0131na bak\u0131n, <a href=\"\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">\u00fcretim \u00e7izelgeleme rehberini<\/a> okuyun veya <a href=\"\/tr\/entegrasyonlar\/erp\/\">t\u00fcm ERP entegrasyonlar\u0131n\u0131<\/a> inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>DELMIAWorks i\u00e7in en iyi \u00e7izelgeleme eklentisi hangisidir?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, DELMIAWorks ile \u00e7ift y\u00f6nl\u00fc entegre olan ve ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alarak \u00fcretim \u00e7izelgeleme yapan bir eklentidir. \u00dcretim emirleri, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, i\u015f merkezleri, kal\u0131plar, stok kalemleri ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r; planlanan tarihler, i\u015f merkezleri, \u00fcretim kay\u0131tlar\u0131 ve i\u015f\u00e7ilik verileri geri g\u00f6nderilir. Her presin, operat\u00f6r\u00fcn, kal\u0131b\u0131n ve malzemenin s\u0131n\u0131rlar\u0131 hesaba kat\u0131l\u0131r. Ge\u00e7i\u015f y\u00f6n\u00fcn\u00fc dikkate alan haz\u0131rl\u0131k s\u00fcresi matrisi, kal\u0131p ve renk de\u011fi\u015fimlerini haz\u0131rl\u0131k s\u00fcresini en aza indirecek \u015fekilde s\u0131ralar. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve \u00fccretsiz deneme 30 g\u00fcn s\u00fcrer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>DELMIAWorks kapasite k\u0131s\u0131tlar\u0131n\u0131 dikkate alan \u00fcretim \u00e7izelgeleme sunuyor mu?<\/summary>\n<p class=\"sp-faq__a\">Evet. DELMIAWorks APS, her i\u015f merkezi i\u00e7in kapasite s\u0131n\u0131rlar\u0131na uygun bir \u00e7izelge sunar. Auto Load ile \u00f6nceli\u011fe ve i\u015fin en verimli y\u00fcr\u00fct\u00fcld\u00fc\u011f\u00fc makineye g\u00f6re y\u00fckleme yapar; zaman s\u0131n\u0131rlar\u0131 ile tak\u0131m ve malzeme istisna listeleri sa\u011flar. SkyPlanner APS ise t\u00fcm preslerin, kal\u0131plar\u0131n, ekiplerin ve malzemelerin s\u0131n\u0131rlar\u0131n\u0131 ayn\u0131 anda dikkate alarak plan\u0131n tamam\u0131n\u0131 optimize eder ve otomatik olarak yeniden \u00e7izelgeleme yapar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hangi \u00e7izelgeleme yaz\u0131l\u0131m\u0131 DELMIAWorks ile entegre olur?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, DELMIAWorks WebAPI \u00fczerinden DELMIAWorks ile \u00e7ift y\u00f6nl\u00fc entegre olur. SkyPlanner, REST denetleyicileri arac\u0131l\u0131\u011f\u0131yla \u00fcretim emirlerini, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131n\u0131, i\u015f merkezlerini, stok kalemlerini ve sat\u0131n alma sipari\u015flerini okur. Planlanan tarihler ve i\u015f merkezleri Manufacturing WorkOrders denetleyicisi arac\u0131l\u0131\u011f\u0131yla \u00fcretim emirlerine geri yaz\u0131l\u0131r. Sa\u011flam par\u00e7a verileri AddProductionRecords \u00fczerinden, i\u015f\u00e7ilik verileri ise Time &amp; Attendance g\u00f6rev \u00e7a\u011fr\u0131lar\u0131 \u00fczerinden geri g\u00f6nderilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>DELMIAWorks APS mi yoksa SkyPlanner m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">\u00c7izelgenin kendini optimize etmesi gerekiyorsa ve tip de\u011fi\u015fimleri, kal\u0131plar, ekipler ile malzeme \u00fcretim miktar\u0131n\u0131 k\u0131s\u0131tl\u0131yorsa SkyPlanner&#8217;\u0131 se\u00e7in. DELMIAWorks APS, \u00fcretim emirlerini kurallara g\u00f6re y\u00fckler; tak\u0131m ve malzeme sorunlar\u0131n\u0131 planlamac\u0131ya istisna olarak g\u00f6sterir. SkyPlanner bunlar\u0131 tek bir planda \u00e7\u00f6zer, otomatik olarak yeniden planlama yapar ve s\u0131n\u0131rs\u0131z kullan\u0131c\u0131 deste\u011fiyle her operat\u00f6r\u00fcn kendi i\u015f kuyru\u011funu telefonundan g\u00f6rmesini sa\u011flar. \u00dccretsiz denemede kendi DELMIAWorks \u00fcretim emirlerinizle bunu do\u011frulayabilirsiniz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>DELMIAWorks ile IQMS ayn\u0131 m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet. Dassault Systemes, IQMS&#8217;i sat\u0131n ald\u0131 ve EnterpriseIQ ERP \u00fcr\u00fcn\u00fcn\u00fcn ad\u0131n\u0131 DELMIAWorks olarak de\u011fi\u015ftirdi. SkyPlanner, WebAPI \u00fczerinden g\u00fcncel DELMIAWorks s\u00fcr\u00fcmleriyle \u00e7al\u0131\u015f\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, DELMIAWorks MRP veya RealTime&#8217;\u0131n yerini al\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r, onlar\u0131 tamamlayan bir katman olarak \u00e7al\u0131\u015f\u0131r. Stok, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, MRP, sat\u0131n alma, kalite ve RealTime ile pres izleme i\u015flevleri DELMIAWorks&#8217;te kal\u0131r. SkyPlanner, \u00fcretim emirlerinizi ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeler ve tarihleri geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>DELMIAWorks kullanan bir fabrika i\u00e7in SkyPlanner&#8217;\u0131n maliyeti nedir?<\/summary>\n<p class=\"sp-faq__a\">5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar; her ek i\u015f merkezi i\u00e7in ayl\u0131k 20 \u20ac al\u0131n\u0131r. \u0130\u015f merkezi, pres gibi, kendine ait \u00e7izelgelenmi\u015f i\u015f kuyru\u011fu bulunan bir \u00fcretim kayna\u011f\u0131d\u0131r. S\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za uygun entegrasyonun fiyat\u0131, paketinizle birlikte ba\u015ftan verilir. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devreye alma ne kadar s\u00fcrer?<\/summary>\n<p class=\"sp-faq__a\">Devreye alma, ba\u015flang\u0131\u00e7 \u00e7al\u0131\u015fmalar\u0131 ba\u015flad\u0131ktan sonra genellikle haftalar i\u00e7inde tamamlan\u0131r. Ekip preslerinizi, kal\u0131plar\u0131n\u0131z\u0131 ve operasyonlar\u0131n\u0131z\u0131 e\u015fle\u015ftirir, \u00fcretim emirleri ve sat\u0131n alma sipari\u015fleri i\u00e7in ba\u011flant\u0131 kurar ve planlanan tarihleri geri g\u00f6nderir. Canl\u0131 kullan\u0131ma ge\u00e7meden \u00f6nce her \u015fey mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131larak test edilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>DELMIAWorks entegrasyonundan \u00f6nce SkyPlanner&#8217;\u0131 test edebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck denemede, a\u00e7\u0131k DELMIAWorks \u00fcretim emirlerinizi Excel&#8217;e aktararak kullan\u0131rs\u0131n\u0131z. Herhangi bir entegrasyon \u00e7al\u0131\u015fmas\u0131 ba\u015flamadan \u00f6nce, kendi preslerinizin ger\u00e7ek kapasitesini dikkate alan bir <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">\u00fcretim \u00e7izelgesi<\/a> g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ DELMIAWorks DELMIAWorks (IQMS) i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, eski ad\u0131 IQMS olan DELMIAWorks ERP sistemine eklenen, ger\u00e7ek kapasiteyi dikkate alan bir \u00fcretim \u00e7izelgeleme \u00e7\u00f6z\u00fcm\u00fcd\u00fcr. Her presi, kal\u0131b\u0131, operat\u00f6r\u00fc ve malzemeyi belirli saatlere g\u00f6re \u00e7izelgeler. Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi &#8230; <a title=\"DELMIAWorks (IQMS) i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/delmiaworks\/\" aria-label=\"Read more about DELMIAWorks (IQMS) i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100689,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106567","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>DELMIAWorks \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: DELMIAWorks (IQMS) i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her pres, kal\u0131p ve operat\u00f6r\u00fcn kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac\u2019dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/delmiaworks\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"DELMIAWorks (IQMS) i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: DELMIAWorks (IQMS) i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her pres, kal\u0131p ve operat\u00f6r\u00fcn kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac\u2019dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/delmiaworks\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/delmiaworks\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/delmiaworks\\\/\",\"name\":\"DELMIAWorks \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: DELMIAWorks (IQMS) i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her pres, kal\u0131p ve operat\u00f6r\u00fcn kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac\u2019dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/delmiaworks\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/delmiaworks\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/delmiaworks\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"DELMIAWorks (IQMS) i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"DELMIAWorks \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS","description":"SkyPlanner APS: DELMIAWorks (IQMS) i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her pres, kal\u0131p ve operat\u00f6r\u00fcn kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac\u2019dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/delmiaworks\/","og_locale":"tr_TR","og_type":"article","og_title":"DELMIAWorks (IQMS) i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","og_description":"SkyPlanner APS: DELMIAWorks (IQMS) i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her pres, kal\u0131p ve operat\u00f6r\u00fcn kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac\u2019dan.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/delmiaworks\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"15 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/delmiaworks\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/delmiaworks\/","name":"DELMIAWorks \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: DELMIAWorks (IQMS) i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her pres, kal\u0131p ve operat\u00f6r\u00fcn kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac\u2019dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/delmiaworks\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/delmiaworks\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/delmiaworks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"DELMIAWorks (IQMS) i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ DELMIAWorks DELMIAWorks (IQMS) i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, eski ad\u0131 IQMS olan DELMIAWorks ERP sistemine eklenen, ger\u00e7ek kapasiteyi dikkate alan bir \u00fcretim \u00e7izelgeleme \u00e7\u00f6z\u00fcm\u00fcd\u00fcr. Her presi, kal\u0131b\u0131, operat\u00f6r\u00fc ve malzemeyi belirli saatlere g\u00f6re \u00e7izelgeler. Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106567","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=106567"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106567\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100689"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=106567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}