{"id":106509,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/senior-erp\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"senior-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/senior-erp\/","title":{"rendered":"Senior ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Senior ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Senior ERP i\u00e7in SkyPlanner APS: <span class=\"hl\">Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS, Senior Sistemas\u2019\u0131n Senior ERP \u00fcr\u00fcn\u00fc i\u00e7in her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasitesine g\u00f6re planlayan bir \u00fcretim \u00e7izelgeleme eklentisidir. Her \u00fcretim emrinin hangi a\u015famas\u0131n\u0131n (est\u00e1gio), hangi kaynakta ve ne zaman y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner, Senior ERP ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r. \u00dcretim emirleri (ordens de produ\u00e7\u00e3o, OP), bunlar\u0131n a\u015famalar\u0131, rotalar (roteiros), kaynaklar ve kaynak merkezleri, SKU\u2019lar, stoklar ve sat\u0131n alma sipari\u015fleri SkyPlanner\u2019a aktar\u0131l\u0131r. Planlanan a\u015fama tarihleri, kaynaklar ve \u00fcretim bildirimleri (apontamentos) ise Senior ERP\u2019ye geri g\u00f6nderilir. SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu Senior ERP yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar.<\/p>\n\n\n<p>Fiyatlar 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi ayl\u0131k 20 \u20ac&#8217;dur. \u00dccretsiz deneme 30 g\u00fcn s\u00fcrer, 20 i\u015f merkezine kadar kullan\u0131m sunar ve kredi kart\u0131 gerektirmez.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcretiminizde neler de\u011fi\u015fir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0130\u015f s\u0131ras\u0131 s\u00fcr\u00fckleyerek de\u011fil, hesaplanarak belirlenir.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her OP a\u015famas\u0131n\u0131 belirli bir kayna\u011fa ve zamana atar. Kapasiteyi fiil\u00ee vardiyalar, devams\u0131zl\u0131klar ve fazla mesailer belirler. Art\u0131k Gantt \u015femas\u0131nda a\u015famalar\u0131 elle s\u0131ralaman\u0131z gerekmez.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u00dcr\u00fcnler aras\u0131 tip de\u011fi\u015fimleri planlan\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki ge\u00e7i\u015f s\u00fcresini her iki y\u00f6n i\u00e7in ayr\u0131 ayr\u0131 tutar. Maviden k\u0131rm\u0131z\u0131ya ge\u00e7i\u015f 30 dakika, k\u0131rm\u0131z\u0131dan maviye ge\u00e7i\u015f ise 60 dakika s\u00fcrebilir. \u00c7izelgeleme motoru, i\u015fleri haz\u0131rl\u0131kta en az zaman kaybettirecek s\u0131raya koyar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ekip ve tak\u0131m kapasitesi de s\u0131n\u0131rl\u0131d\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">\u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe, vardiyas\u0131nda uygun zaman\u0131 olan \u00fc\u00e7 ki\u015fi atan\u0131r. Bir makinede kullan\u0131lan kal\u0131p, ayn\u0131 anda ba\u015fka bir makineye asla atanmaz. Makine me\u015fgulse i\u015f, alternatif bir makineye veya ki\u015fiye aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0130\u015f ba\u015flamadan malzeme kontrol\u00fc.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, stoklar\u0131 ve a\u00e7\u0131k sat\u0131n alma sipari\u015flerini Senior ERP\u2019den al\u0131r. Tedarik\u00e7i teslimat\u0131n\u0131 bekleyen bir OP, bu teslimat tarihinden sonras\u0131na planlan\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Acil sipari\u015flerde ve ar\u0131zalarda \u00e7izelge otomatik yenilenir.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir makine durdu\u011funda veya acil bir sipari\u015f geldi\u011finde Autopilot \u00e7izelgeyi yeniler. Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize ederken sabitledi\u011finiz i\u015fler ve belirledi\u011finiz \u00f6ncelikler korunur.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operat\u00f6rler i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr.<\/p>\n\n\n<p class=\"fx-pain__b\">Her operat\u00f6r, s\u0131radaki i\u015flerini telefon veya tabletten g\u00f6r\u00fcr ve \u00e7al\u0131\u015fmas\u0131n\u0131 an\u0131nda kaydeder. Ofis, ilerlemeyi canl\u0131 olarak takip eder. \u00dcretim bildirimleri Senior\u2019daki ilgili OP a\u015famas\u0131na geri aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila\u2019daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>haftal\u0131k zaman tasarrufu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 \u00fcretim hatt\u0131na saniyeler i\u00e7inde ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU\u2019nun de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied\u2019\u0131n Nairobi\u2019deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda \u00e7al\u0131\u015fan temiz oda k\u0131yafetli operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, Bilgi Teknolojileri M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f plan, 30 dakikadan k\u0131sa s\u00fcrede haz\u0131rlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied\u2019\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>2021&#8217;den bu yana teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner kapasitemizi g\u00f6rmemizi sa\u011fl\u0131yor ve planlamay\u0131 \u00f6ng\u00f6r\u00fclebilir h\u00e2le getiriyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Kimya ve g\u0131da \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">SkyPlanner&#8217;\u0131n kullan\u0131lmaya ba\u015fland\u0131\u011f\u0131 2021&#8217;den bu yana teslimat performans\u0131 kesintisiz olarak %100 seviyesinde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/opes-corporation\/\">Opes Corporation&#8217;\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel\u2019in Kauhava\u2019daki \u00e7at\u0131 g\u00fcvenlik ekipmanlar\u0131 fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 g\u00f6r\u00fcn\u00fcr hale getirdi ve \u00fcretim y\u00f6netimine netlik kazand\u0131rd\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenli\u011fi ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 bu y\u0131l %99,2\u2019ye ula\u015ft\u0131. \u00c7izelgeleme sayesinde g\u00fcnde d\u00f6rt saate kadar \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/piristeel\/\">Piristeel\u2019in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-senior-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Senior ERP entegrasyonu nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Senior ERP, yap\u0131lacak i\u015fleri g\u00f6nderir.<\/strong> Kesinle\u015fmi\u015f ve serbest b\u0131rak\u0131lm\u0131\u015f OP\u2019ler; a\u015famalar\u0131, rotalar\u0131, kaynaklar\u0131 ve kaynak merkezleriyle birlikte SkyPlanner\u2019a aktar\u0131l\u0131r. Varyantlar\u0131yla birlikte SKU\u2019lar, \u00fcr\u00fcn yap\u0131lar\u0131, stoklar ve sat\u0131n alma sipari\u015fleri de aktar\u0131l\u0131r. Bir OP a\u015famas\u0131n\u0131n durumu de\u011fi\u015fti\u011finde Events Hub webhook\u2019u SkyPlanner\u2019a bildirim g\u00f6nderir.<\/li>\n\n\n<li><strong>SkyPlanner \u00e7izelgeyi olu\u015fturur ve g\u00fcncel tutar.<\/strong> Arcturus motoru her a\u015famay\u0131 saniyeler i\u00e7inde planlar ve \u00fcretimdeki de\u011fi\u015fikliklere g\u00f6re plan\u0131 yeniler. SkyPlanner webhook\u2019lar\u0131, \u00e7izelgedeki her de\u011fi\u015fikli\u011fi an\u0131nda iletir.<\/li>\n\n\n<li><strong>Tarihler, kaynaklar ve bildirimler geri aktar\u0131l\u0131r.<\/strong> Her OP a\u015famas\u0131n\u0131n planlanan ba\u015flang\u0131\u00e7 ve biti\u015f zaman\u0131 ile o a\u015fama i\u00e7in se\u00e7ilen kaynak OP\u2019ye geri yaz\u0131l\u0131r. Operat\u00f6rlerin zaman kay\u0131tlar\u0131, a\u015fama baz\u0131nda \u00fcretilen miktar, hurda miktar\u0131, ba\u015flang\u0131\u00e7 ve biti\u015f saatleriyle birlikte \u00fcretim bildirimi (apontamentos de produ\u00e7\u00e3o) olarak g\u00f6nderilir. SkyPlanner ekibi, devreye alma kapsam\u0131n\u0131 belirlerken a\u015fama tarihleri ve kaynaklar\u0131n Senior kurulumunuza hangi yolla geri yaz\u0131laca\u011f\u0131n\u0131 belirler.<\/li>\n\n<\/ol>\n\n\n<p>Senior ERP, ana kay\u0131t sisteminiz olmaya devam eder. SKU m\u00fchendislik verileri, MRP, sat\u0131n alma, stok, maliyetlendirme ve yasal mali raporlama mevcut sisteminizde kal\u0131r. Her kaynaktaki her a\u015faman\u0131n s\u0131ras\u0131n\u0131 ve zamanlamas\u0131n\u0131 ise SkyPlanner y\u00f6netir.<\/p>\n\n\n<p>SkyPlanner, Senior\u2019\u0131n kendi aray\u00fczleri \u00fczerinden ba\u011flan\u0131r. api.senior.com.br adresindeki Senior X Platform REST API\u2019leri, Bearer belirteci ve client_id \u00fcst bilgisiyle kimlik do\u011frular. Gest\u00e3o Empresarial ERP, \u00fcretim emirleri, \u00fcr\u00fcnler ve \u00fcretim bildirimleri i\u00e7in Senior sunucunuzda G5 web servisleri (SOAP) sunar (<a href=\"https:\/\/documentacao.senior.com.br\/gestaoempresarialerp\/5.10.4\/webservices\/com_senior_g5_co_mpr_pcp_ordemproducao.htm\">Senior dok\u00fcmantasyonu<\/a>). Senior X Events Hub, orderProductionStageChangeStatus \u00fcretim olay\u0131 da dahil olmak \u00fczere webhook bildirimleri g\u00f6nderir.<\/p>\n\n\n<p>Her tesis Senior ERP\u2019yi farkl\u0131 kulland\u0131\u011f\u0131 i\u00e7in SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar ve canl\u0131ya ge\u00e7i\u015ften sonra da destek verir. Entegrasyon i\u00e7in s\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re \u00f6nceden fiyat teklifi sunulur. Senior i\u015f orta\u011f\u0131n\u0131z veya kendi geli\u015ftiricileriniz de SkyPlanner\u2019\u0131n dok\u00fcmante edilmi\u015f API\u2019sini kullanarak entegrasyon geli\u015ftirebilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API ba\u015fvuru dok\u00fcman\u0131<\/a>).<\/p>\n\n\n<p>Aray\u00fczler, veri e\u015fle\u015ftirmeleri ve geri yazma kurallar\u0131 <a href=\"\/tr\/entegrasyonlar\/erp\/senior-erp\/entegrasyon-kilavuzu\/\">\u00fcretim \u00e7izelgeleme i\u00e7in Senior ERP entegrasyon k\u0131lavuzunda<\/a> yer al\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-senior-erp-schedules-and-what-skyplanner-ad\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Senior ERP neleri \u00e7izelgeler, SkyPlanner ne katar?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Senior ERP, \u00fcretimi Gest\u00e3o Industrial &gt; Gest\u00e3o de PCP i\u00e7inde planlar. MRP, OP\u2019leri olu\u015fturur; planlamac\u0131, Programa\u00e7\u00e3o de produ\u00e7\u00e3o ekran\u0131nda bunlar\u0131n a\u015famalar\u0131n\u0131 s\u0131ralar ve sonu\u00e7 Gantt \u015femas\u0131nda g\u00f6r\u00fcn\u00fcr. Kapsam\u0131 Senior\u2019\u0131n kendi ifadeleriyle g\u00f6relim:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>MRP, kaynaklar\u0131n m\u00fcsait oldu\u011funu varsayar.<\/strong> Senior, MRP\u2019nin &#8220;works with infinite capacity: that is, it assumes resources are always available&#8221; (sonsuz kapasiteyle \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131, yani kaynaklar\u0131n her zaman m\u00fcsait oldu\u011funu varsayd\u0131\u011f\u0131n\u0131) ve &#8220;without considering queues, setup constraints or conflicts between simultaneous orders.&#8221; (kuyruklar\u0131, haz\u0131rl\u0131k k\u0131s\u0131tlar\u0131n\u0131 veya e\u015f zamanl\u0131 emirler aras\u0131ndaki \u00e7ak\u0131\u015fmalar\u0131 dikkate almadan) planlama yapt\u0131\u011f\u0131n\u0131 belirtir. (<a href=\"https:\/\/www.senior.com.br\/blog\/aps-na-industria\">Senior blogu, \u00e7eviri<\/a>)<\/li>\n\n\n<li><strong>Gantt, elle s\u0131ralama yapmak i\u00e7indir.<\/strong> &#8220;This screen allows manual sequencing and adjustment of the start and end of order stages.&#8221; (Bu ekran, emir a\u015famalar\u0131n\u0131 elle s\u0131ralamaya ve ba\u015flang\u0131\u00e7 ile biti\u015flerini ayarlamaya olanak tan\u0131r.) (<a href=\"https:\/\/documentacao.senior.com.br\/seniorxplatform\/manual-do-usuario\/erp\/Subsystems\/index\/gestao-industrial\/gestao-pcp\/programacao-gantt.htm\">Senior dok\u00fcmantasyonu, \u00e7eviri<\/a>)<\/li>\n\n\n<li><strong>A\u015famalar, kullan\u0131c\u0131 komutuyla s\u0131ralan\u0131r.<\/strong> Programa\u00e7\u00e3o de produ\u00e7\u00e3o ekran\u0131nda, &#8220;when more than one stage is selected, the Sequence Stages button is enabled.&#8221; (birden fazla a\u015fama se\u00e7ildi\u011finde Sequence Stages d\u00fc\u011fmesi etkinle\u015fir.) (<a href=\"https:\/\/documentacao.senior.com.br\/seniorxplatform\/manual-do-usuario\/erp\/Subsystems\/index\/gestao-industrial\/gestao-pcp\/programacao-producao.htm\">Senior dok\u00fcmantasyonu, \u00e7eviri<\/a>)<\/li>\n\n\n<li><strong>Her kaynak i\u00e7in tek bir haz\u0131rl\u0131k s\u00fcresi vard\u0131r.<\/strong> Recurso kayd\u0131nda i\u015flem, y\u00fckleme ve aktarma s\u00fcrelerinin yan\u0131nda Tempo setup alan\u0131 bulunur. Ayr\u0131ca &#8220;represents the percentage of time a resource is effectively available&#8221; (bir kayna\u011f\u0131n fiilen kullan\u0131labilir oldu\u011fu zaman\u0131n y\u00fczdesini g\u00f6steren) Fator de carga alan\u0131 yer al\u0131r. (<a href=\"https:\/\/documentacao.senior.com.br\/seniorxplatform\/manual-do-usuario\/erp\/Subsystems\/index\/gestao-industrial\/gestao-engenharia\/recurso.htm\">Senior dok\u00fcmantasyonu<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>G\u00fcnl\u00fck i\u015fleyi\u015fte planlamac\u0131, MRP\u2019nin olu\u015fturdu\u011fu emirleri a\u015fama a\u015fama elle s\u0131ralar. Her acil sipari\u015f veya ar\u0131zadan sonra bu i\u015f yeniden ba\u015flar.<\/p>\n\n\n<p>Senior, sanayiye y\u00f6nelik \u00fcr\u00fcn portf\u00f6y\u00fcnde APS\u2019ye de yer verir. 2017 y\u0131l\u0131nda Drummer APS i\u00e7in Linter Sistemas ile i\u015f ortakl\u0131\u011f\u0131 kurdu\u011funu duyurmu\u015ftur (<a href=\"https:\/\/www.senior.com.br\/noticias\/parceria-linter-sistemas\">Senior<\/a>).<\/p>\n\n\n<p>T\u00fcm ad\u0131mlar ve s\u0131n\u0131rlamalar <a href=\"\/tr\/entegrasyonlar\/erp\/senior-erp\/uretim-cizelgeleme\/\">Senior ERP, ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yapabilir mi?<\/a> yaz\u0131s\u0131nda a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"senior-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Senior ERP\u2019nin mevcut kullan\u0131m\u0131 ve SkyPlanner ile kullan\u0131m\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Senior ERP Gest\u00e3o de PCP<\/th><th>SkyPlanner APS ile Senior ERP<\/th><\/tr><\/thead><tbody><tr><td>Kapasite<\/td><td>Sonsuz kapasiteyle MRP; kaynak baz\u0131nda kullan\u0131labilirlik y\u00fczdesi (%) i\u00e7in Fator de carga<\/td><td>Her makine, ki\u015fi ve tak\u0131m i\u00e7in fiil\u00ee vardiyalara g\u00f6re s\u0131n\u0131rl\u0131 kapasite<\/td><\/tr><tr><td>\u0130\u015f s\u0131ras\u0131<\/td><td>Planlamac\u0131, OP a\u015famalar\u0131n\u0131 Programa\u00e7\u00e3o de produ\u00e7\u00e3o veya Gantt \u00fczerinde s\u0131ralar<\/td><td>Motor, her a\u015famay\u0131 saniyeler i\u00e7inde s\u0131ralar<\/td><\/tr><tr><td>\u00dcr\u00fcn de\u011fi\u015fimleri<\/td><td>Her kaynak i\u00e7in tek bir Tempo setup de\u011feri<\/td><td>Ge\u00e7i\u015f s\u00fcresi matrisi: \u00fcr\u00fcnler aras\u0131nda en d\u00fc\u015f\u00fck toplam haz\u0131rl\u0131k s\u00fcresi<\/td><\/tr><tr><td>Personel ve tak\u0131mlar<\/td><td>Rotadaki kaynaklar ve kaynak merkezleri<\/td><td>Vardiyalar\u0131 ki\u015fi baz\u0131nda tan\u0131ml\u0131 operat\u00f6rler; birden fazla operat\u00f6r gerektiren i\u015fler; kapasitesi s\u0131n\u0131rl\u0131, ortak kullan\u0131lan tak\u0131mlar<\/td><\/tr><tr><td>Malzemeler<\/td><td>MRP, \u00fcretim emirleri ve sat\u0131n alma sipari\u015fleri \u00f6nerir<\/td><td>\u0130\u015fler, malzeme stokta oldu\u011funda veya sat\u0131n alma sipari\u015fi teslim edildi\u011finde ba\u015flar<\/td><\/tr><tr><td>De\u011fi\u015fiklikler<\/td><td>A\u015famalar elle yeniden s\u0131ralan\u0131r<\/td><td>Autopilot, \u00f6nceliklerinize g\u00f6re t\u00fcm tesisi yeniden planlar<\/td><\/tr><tr><td>Planlamac\u0131 ekran\u0131<\/td><td>A\u015famalar\u0131n ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131n\u0131n elle ayarland\u0131\u011f\u0131 Gantt \u015femas\u0131<\/td><td>Etkile\u015fimli Gantt: bir i\u015fi ta\u015f\u0131d\u0131\u011f\u0131n\u0131zda plan tutarl\u0131l\u0131\u011f\u0131n\u0131 korur<\/td><\/tr><tr><td>shop floor<\/td><td>Senior veya F\u00e1brica ao Vivo i\u00e7inde Apontamento de produ\u00e7\u00e3o<\/td><td>Operat\u00f6rler, i\u015f s\u0131ralar\u0131n\u0131 telefon veya tabletten g\u00f6r\u00fcr ve \u00e7al\u0131\u015fmalar\u0131n\u0131 kaydeder<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"senior-erp-scheduling-software-and-add-ons-compa\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Senior ERP i\u00e7in \u00e7izelgeleme yaz\u0131l\u0131mlar\u0131 ve eklentilerinin kar\u015f\u0131la\u015ft\u0131rmas\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Se\u00e7enek<\/th><th>Nedir?<\/th><th>Ne zaman uygundur?<\/th><\/tr><\/thead><tbody><tr><td>Senior Gest\u00e3o de PCP<\/td><td>Senior ERP i\u00e7indeki MRP, OP a\u015famalar\u0131, Programa\u00e7\u00e3o de produ\u00e7\u00e3o ve Gantt<\/td><td>Bir planlamac\u0131 birka\u00e7 kritik kaynak i\u00e7in i\u015fleri elle s\u0131ral\u0131yorsa<\/td><\/tr><tr><td>Senior\u2019\u0131n APS \u00e7\u00f6z\u00fcm\u00fc ve Drummer APS (Linter Sistemas)<\/td><td>Senior\u2019\u0131n sanayi portf\u00f6y\u00fcnde yer alan APS; 2017 y\u0131l\u0131nda Senior i\u015f orta\u011f\u0131 \u00fcr\u00fcn\u00fc olarak duyurulan Drummer<\/td><td>Senior\u2019\u0131n i\u015f orta\u011f\u0131 ekosisteminde kalmak ve onlarla bir proje y\u00fcr\u00fctmek istiyorsan\u0131z<\/td><\/tr><tr><td>Dan\u0131\u015fmanl\u0131k firmalar\u0131 arac\u0131l\u0131\u011f\u0131yla sunulan kurumsal APS (\u00f6rne\u011fin Brezilya\u2019daki Siemens Opcenter APS i\u015f ortaklar\u0131)<\/td><td>Bir uygulama projesiyle entegre edilen APS yaz\u0131l\u0131m paketi<\/td><td>Bir planlama ekibi, birden fazla tesisi kapsayan b\u00fcy\u00fck bir plan\u0131 y\u00f6netiyorsa<\/td><\/tr><tr><td>API ile ba\u011flanan bulut tabanl\u0131 APS (SkyPlanner APS)<\/td><td>Taray\u0131c\u0131da \u00e7al\u0131\u015fan, ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme yapan ve Senior OP\u2019leriyle \u00e7ift y\u00f6nl\u00fc senkronize olan yaz\u0131l\u0131m<\/td><td>\u00c7izelgenin kendili\u011finden g\u00fcncel kalmas\u0131 ve her operat\u00f6re ula\u015fmas\u0131 gerekiyorsa<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>\u015eu durumlarda Senior ERP i\u00e7in SkyPlanner\u2019\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>OP a\u015famalar\u0131n\u0131 bug\u00fcn elle s\u0131ral\u0131yorsunuz.<\/strong> Arcturus; \u00f6ncelikleri, teslim tarihlerini, haz\u0131rl\u0131klar\u0131 ve kapasitesi s\u0131n\u0131rl\u0131 t\u00fcm kaynaklar\u0131 dikkate alarak plan\u0131n tamam\u0131n\u0131 saniyeler i\u00e7inde optimize eder. Planlamac\u0131, plan\u0131 olu\u015fturmak yerine g\u00f6zden ge\u00e7irir.<\/li>\n\n\n<li><strong>\u00dcr\u00fcn de\u011fi\u015fimleri \u00fcretim miktar\u0131n\u0131z\u0131 belirliyor.<\/strong> Senior, her kaynak i\u00e7in tek bir haz\u0131rl\u0131k s\u00fcresi tutar. SkyPlanner\u2019\u0131n ge\u00e7i\u015f s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti i\u00e7in her iki y\u00f6nde farkl\u0131 bir s\u00fcre tutar ve toplam haz\u0131rl\u0131k s\u00fcresi en d\u00fc\u015f\u00fck olan s\u0131ralamay\u0131 uygular.<\/li>\n\n\n<li><strong>Ekipler, tak\u0131mlar ve malzemeler plan\u0131 s\u0131n\u0131rl\u0131yor.<\/strong> Her makine, ki\u015fi, tak\u0131m ve malzemenin s\u0131n\u0131rlar\u0131 ayn\u0131 anda dikkate al\u0131n\u0131r. Birden fazla operat\u00f6r gerektiren i\u015flere gerekli personel atan\u0131r. \u0130\u015fler, malzeme stoktan haz\u0131r oldu\u011funda veya sat\u0131n alma sipari\u015fi teslim edildi\u011finde ba\u015flar.<\/li>\n\n\n<li><strong>Plan haftada birka\u00e7 kez de\u011fi\u015fiyor.<\/strong> Autopilot, plan\u0131 etkileyen her de\u011fi\u015fiklikte yeniden planlama yapar. Running Time Lock, \u00f6n\u00fcm\u00fczdeki saatlerde yap\u0131lacak i\u015fleri sabitler ve yeni a\u015fama tarihleri Senior\u2019a geri aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>Her operat\u00f6r plana g\u00f6re \u00e7al\u0131\u015fmal\u0131.<\/strong> Mobile Confirmations, g\u00fcncel i\u015f kuyru\u011funu telefon veya tablette g\u00f6sterir; \u00fcretim bildirimleri de OP&#8217;ye geri aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>\u00d6nce fiyat\u0131 net g\u00f6rmek ve denemek istiyorsunuz.<\/strong> Ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla kendi OP&#8217;leriniz \u00fczerinde 30 g\u00fcnl\u00fck deneme yapabilirsiniz. \u00c7ift y\u00f6nl\u00fc entegrasyonun fiyat teklifi de ba\u015ftan verilir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Nas\u0131l ba\u015flayabilirsiniz?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00dccretsiz denemeyi ba\u015flat\u0131n.<\/strong> 30 g\u00fcn boyunca 20 i\u015f merkezine kadar t\u00fcm Basic \u00f6zelliklerini kullan\u0131n. Kredi kart\u0131 gerekmez.<\/li>\n\n\n<li><strong>\u00dcretiminizi modelleyin.<\/strong> SkyPlanner&#8217;da makineleri, \u00e7al\u0131\u015fanlar\u0131 ve vardiyalar\u0131 tan\u0131mlay\u0131n ya da Senior&#8217;daki kaynaklar\u0131n\u0131z\u0131 ve kaynak merkezlerinizi i\u00e7e aktar\u0131n. Devreye alma s\u00fcrecinde destek alabilirsiniz.<\/li>\n\n\n<li><strong>Sipari\u015flerinizi y\u00fckleyin.<\/strong> A\u00e7\u0131k OP&#8217;leri a\u015famalar\u0131yla birlikte Senior ERP&#8217;den Excel veya CSV dosyas\u0131na aktar\u0131n. Ard\u0131ndan bunlar\u0131 SkyPlanner&#8217;a y\u00fckleyip olu\u015fturulan \u00e7izelgeyi mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>Senior ERP ba\u011flant\u0131s\u0131n\u0131 kurun.<\/strong> SkyPlanner ekibi \u00e7ift y\u00f6nl\u00fc entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131 kullan\u0131ma ge\u00e7tikten sonra da destek verir.<\/li>\n\n<\/ol>\n\n\n<p><strong>Fiyatland\u0131rma.<\/strong> Paketler i\u015f merkezi ba\u015f\u0131na ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. \u0130stedi\u011finiz zaman i\u015f merkezi ekleyebilir, \u00e7\u0131karabilir veya aboneli\u011finizi iptal edebilirsiniz. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rma<\/a> sayfas\u0131na bak\u0131n ya da <a href=\"\/tr\/entegrasyonlar\/erp\/\">t\u00fcm ERP entegrasyonlar\u0131n\u0131<\/a> inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Senior ERP i\u00e7in en iyi \u00e7izelgeleme eklentisi hangisi?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, Senior ERP ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015fan bir \u00fcretim \u00e7izelgeleme eklentisidir. OP&#8217;leri a\u015famalar\u0131yla birlikte, rotalar\u0131, kaynaklar\u0131, SKU&#8217;lar\u0131, stoklar\u0131 ve sat\u0131n alma sipari\u015flerini al\u0131r; planlanan a\u015fama tarihlerini, kaynaklar\u0131 ve \u00fcretim bildirimlerini geri g\u00f6nderir. Her makine, operat\u00f6r, tak\u0131m ve malzeme i\u00e7in kapasite ve miktar s\u0131n\u0131rlar\u0131n\u0131 g\u00f6zetir. Ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re farkl\u0131 s\u00fcreler i\u00e7eren haz\u0131rl\u0131k s\u00fcresi matrisiyle i\u015fleri, toplam haz\u0131rl\u0131k s\u00fcresini en aza indirecek \u015fekilde s\u0131ralar. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot otomatik olarak yeniden \u00e7izelgeler. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve \u00fccretsiz deneme 30 g\u00fcn s\u00fcrer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Senior ERP&#8217;de ger\u00e7ek kapasiteyi g\u00f6zeten \u00fcretim \u00e7izelgeleme var m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Senior ERP&#8217;nin Gest\u00e3o de PCP mod\u00fcl\u00fcnde, Senior&#8217;\u0131n sonsuz kapasiteyle \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 belirtti\u011fi MRP ve a\u015famalar\u0131 Gantt \u015femas\u0131 \u00fczerinde elle s\u0131ralamak i\u00e7in Programa\u00e7\u00e3o de produ\u00e7\u00e3o bulunur. Senior ayr\u0131ca sekt\u00f6rel \u00e7\u00f6z\u00fcm portf\u00f6y\u00fcnde APS&#8217;ye de yer verir. SkyPlanner APS ise Senior ERP ile birlikte \u00e7al\u0131\u015farak her makine, \u00e7al\u0131\u015fan, tak\u0131m ve malzemenin kapasite ve miktar s\u0131n\u0131rlar\u0131n\u0131 g\u00f6zeten bir \u00fcretim \u00e7izelgesi olu\u015fturur.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hangi \u00e7izelgeleme yaz\u0131l\u0131m\u0131 Senior ERP ile entegre \u00e7al\u0131\u015f\u0131r?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, Senior X Platform API&#8217;leri, ERP&#8217;nin G5 web servisleri ve Events Hub webhook&#8217;lar\u0131 \u00fczerinden Senior ERP ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r. OP&#8217;leri, rotalar\u0131, kaynaklar\u0131, stoklar\u0131 ve sat\u0131n alma sipari\u015flerini okur; planlanan a\u015fama tarihlerini, kaynaklar\u0131 ve \u00fcretim bildirimlerini geri g\u00f6nderir. SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda Senior kurulumunuza uygun ba\u011flant\u0131 y\u00f6ntemini belirler.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Senior&#8217;\u0131n APS \u00e7\u00f6z\u00fcm\u00fcn\u00fc m\u00fc, SkyPlanner&#8217;\u0131 m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Ger\u00e7ek kapasiteyi g\u00f6zeten, haftalar i\u00e7inde kullan\u0131ma alabilece\u011finiz ve kendini g\u00fcncel tutan bir \u00e7izelge istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in. SkyPlanner fiyatlar\u0131n\u0131 a\u00e7\u0131k\u00e7a yay\u0131mlar ve 30 g\u00fcnl\u00fck denemede kendi OP&#8217;lerinizle test yapman\u0131z\u0131 sa\u011flar. \u00dcr\u00fcnler aras\u0131ndaki ge\u00e7i\u015fleri her \u00fcr\u00fcn \u00e7iftine g\u00f6re planlar; ekipleri, tak\u0131mlar\u0131 ve malzemeleri tek bir \u00e7izelgede planlar. Autopilot her de\u011fi\u015fiklikte yeniden planlama yapar. Entegrasyonun fiyat teklifi de ba\u015ftan verilir; b\u00f6ylece toplam maliyeti \u00f6nceden g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, Gest\u00e3o de PCP&#8217;nin yerini mi al\u0131r?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, Gest\u00e3o de PCP&#8217;yi tamamlayarak \u00e7al\u0131\u015f\u0131r. SKU m\u00fchendislik verileri, MRP, OP olu\u015fturma ve durum takibi, sat\u0131n alma, stok ve maliyetlendirme Senior ERP&#8217;de kal\u0131r. SkyPlanner, OP a\u015famalar\u0131n\u0131 ger\u00e7ek kapasiteye g\u00f6re s\u0131ralar; tarihleri ve kaynaklar\u0131 geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Entegrasyon ERP XT ve Senior X ile \u00e7al\u0131\u015f\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet. ERP XT kendi sunucular\u0131n\u0131zda \u00e7al\u0131\u015f\u0131r ve Senior X \u00fczerindeki bulut servislerinden yararlan\u0131r. SkyPlanner, kurulumunuzun gereksinimlerine g\u00f6re Senior sunucunuzdaki G5 web servislerini ve buluttaki Senior X Platform API&#8217;leri ile Events Hub&#8217;\u0131 kullan\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Senior ERP kullanan bir fabrika i\u00e7in SkyPlanner&#8217;\u0131n maliyeti nedir?<\/summary>\n<p class=\"sp-faq__a\">5 i\u015f merkezi dahil fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi i\u00e7in ayl\u0131k 20 \u20ac \u00f6denir. \u0130\u015f merkezi, kendine ait \u00e7izelgelenmi\u015f i\u015f kuyru\u011fu olan bir \u00fcretim kayna\u011f\u0131d\u0131r. S\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan entegrasyon teklifi, se\u00e7ti\u011finiz paketle birlikte ba\u015ftan sunulur. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Senior ERP entegrasyonunu kurmadan \u00f6nce SkyPlanner&#8217;\u0131 deneyebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck denemede, a\u00e7\u0131k OP&#8217;lerinizi Excel veya CSV dosyas\u0131na aktararak kullan\u0131rs\u0131n\u0131z. Herhangi bir entegrasyon \u00e7al\u0131\u015fmas\u0131 ba\u015flamadan \u00f6nce kendi \u00fcretiminiz i\u00e7in ger\u00e7ek kapasiteyi g\u00f6zeten bir <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">\u00fcretim \u00e7izelgesi<\/a> g\u00f6r\u00fcrs\u00fcn\u00fcz. Sonras\u0131nda uygulamaya ge\u00e7i\u015f, devreye alma s\u00fcrecinin ba\u015flamas\u0131ndan itibaren normalde birka\u00e7 hafta i\u00e7inde tamamlan\u0131r.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Senior ERP Senior ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, Senior Sistemas\u2019\u0131n Senior ERP \u00fcr\u00fcn\u00fc i\u00e7in her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasitesine g\u00f6re planlayan bir \u00fcretim \u00e7izelgeleme eklentisidir. Her \u00fcretim emrinin hangi a\u015famas\u0131n\u0131n (est\u00e1gio), hangi kaynakta ve ne zaman y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot &#8230; <a title=\"Senior ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/senior-erp\/\" aria-label=\"Read more about Senior ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100689,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106509","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Senior ERP: Ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme entegrasyonu (APS)<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: Senior ERP i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemeyi kapasitesine g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/senior-erp\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Senior ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: Senior ERP i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemeyi kapasitesine g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/senior-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/senior-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/senior-erp\\\/\",\"name\":\"Senior ERP: Ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme entegrasyonu (APS)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: Senior ERP i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemeyi kapasitesine g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/senior-erp\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/senior-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/senior-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Senior ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Senior ERP: Ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme entegrasyonu (APS)","description":"SkyPlanner APS: Senior ERP i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemeyi kapasitesine g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/senior-erp\/","og_locale":"tr_TR","og_type":"article","og_title":"Senior ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","og_description":"SkyPlanner APS: Senior ERP i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemeyi kapasitesine g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/senior-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"15 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/senior-erp\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/senior-erp\/","name":"Senior ERP: Ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme entegrasyonu (APS)","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: Senior ERP i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzemeyi kapasitesine g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/senior-erp\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/senior-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/senior-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Senior ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Senior ERP Senior ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, Senior Sistemas\u2019\u0131n Senior ERP \u00fcr\u00fcn\u00fc i\u00e7in her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasitesine g\u00f6re planlayan bir \u00fcretim \u00e7izelgeleme eklentisidir. Her \u00fcretim emrinin hangi a\u015famas\u0131n\u0131n (est\u00e1gio), hangi kaynakta ve ne zaman y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=106509"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106509\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100689"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=106509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}