{"id":106451,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/helios\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"helios","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/helios\/","title":{"rendered":"HELIOS i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ HELIOS<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">HELIOS i\u00e7in SkyPlanner APS: <span class=\"hl\">Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS, HELIOS i\u00e7in her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeleyen bir \u00fcretim \u00e7izelgeleme eklentisidir. Hangi operasyonun nerede ve ne zaman yap\u0131laca\u011f\u0131n\u0131 g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Asseco Solutions\u2019\u0131n HELIOS Nephrite ve HELIOS iNuvio \u00fcr\u00fcnleriyle \u00e7al\u0131\u015f\u0131r; h\u00e2l\u00e2 HELIOS Orange veya HELIOS Green kullanan tesisleri de destekler.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner ile HELIOS aras\u0131ndaki entegrasyon \u00e7ift y\u00f6nl\u00fcd\u00fcr: \u00fcretim emirleri, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131 ve rotalar, \u00e7al\u0131\u015fma yerleri, makineler, meslekler, stoklar ve sat\u0131n alma sipari\u015fleri SkyPlanner\u2019a aktar\u0131l\u0131r; planlanan tarihler ve kaydedilen i\u015fler HELIOS\u2019a geri g\u00f6nderilir. SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu HELIOS yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar.<\/p>\n\n\n<p>Fiyatlar 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi ayl\u0131k 20 \u20ac&#8217;dur. \u00dccretsiz deneme 30 g\u00fcn s\u00fcrer, 20 i\u015f merkezine kadar kullan\u0131m sunar ve kredi kart\u0131 gerektirmez.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcretiminizde neler de\u011fi\u015fir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Her makinede uygulanabilir bir i\u015f s\u0131ras\u0131.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her \u00fcretim emrinin her operasyonunu belirli bir makineye ve zamana yerle\u015ftirir. Kapasiteyi ger\u00e7ek vardiyalar, devams\u0131zl\u0131klar ve fazla mesailer belirler. B\u00f6ylece \u00fcretimde ger\u00e7ekten uygulanabilecek bir plan elde edersiniz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Tip de\u011fi\u015fimi maliyetleri azal\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcresini her iki y\u00f6n i\u00e7in ayr\u0131 ayr\u0131 tutar. A\u00e7\u0131k renkten koyu renge ge\u00e7i\u015fte k\u0131sa bir durulama yeterli olabilirken, koyudan a\u00e7\u0131\u011fa ge\u00e7i\u015fte tam temizlik gerekir. Motor, i\u015fleri en az zaman kayb\u0131na yol a\u00e7acak s\u0131raya koyar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u00c7al\u0131\u015fanlar\u0131n ve tak\u0131mlar\u0131n da kapasitesi s\u0131n\u0131rl\u0131.<\/p>\n\n\n<p class=\"fx-pain__b\">\u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe, vardiyas\u0131nda uygun zaman\u0131 olan \u00fc\u00e7 ki\u015fi atan\u0131r. Bir makinede kullan\u0131mda olan kal\u0131p, ayn\u0131 anda ba\u015fka bir makineye asla atanmaz. Bir makine me\u015fgulse i\u015f alternatif bir makineye veya ki\u015fiye aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Geciken malzeme art\u0131k plan\u0131 bozmuyor.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her malzeme i\u00e7in eldeki stoklar\u0131 ve teslim edilecek sat\u0131n alma sipari\u015flerini kontrol eder. Tedarik\u00e7i teslimat\u0131n\u0131 bekleyen bir \u00fcretim emri, teslimat tarihinden sonras\u0131na planlan\u0131r; \u00fcretimde ba\u015flat\u0131l\u0131p sonra durdurulmaz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Acil i\u015flerde ve ar\u0131zalarda plan otomatik yenilenir.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir makine durdu\u011funda, bir operat\u00f6r hastal\u0131k nedeniyle i\u015fe gelemedi\u011finde veya acil bir sipari\u015f geldi\u011finde Autopilot \u00e7izelgeyi yeniden olu\u015fturur. Belirledi\u011finiz kilitler ve \u00f6ncelikler ge\u00e7erlili\u011fini korur.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operat\u00f6rler i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr.<\/p>\n\n\n<p class=\"fx-pain__b\">Her operat\u00f6r s\u0131radaki i\u015flerini telefon veya tablette g\u00f6r\u00fcr ve yapt\u0131\u011f\u0131 i\u015fi an\u0131nda kaydeder. Ofis, ilerlemeyi canl\u0131 olarak takip eder. Ger\u00e7ekle\u015fen s\u00fcrelerin HELIOS\u2019a geri aktar\u0131l\u0131p aktar\u0131lmayaca\u011f\u0131n\u0131 siz se\u00e7ersiniz.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila\u2019daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>haftal\u0131k zaman tasarrufu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 \u00fcretim hatt\u0131na saniyeler i\u00e7inde ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU\u2019nun de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied\u2019\u0131n Nairobi\u2019deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda \u00e7al\u0131\u015fan temiz oda k\u0131yafetli operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, Bilgi Teknolojileri M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f plan, 30 dakikadan k\u0131sa s\u00fcrede haz\u0131rlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied\u2019\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 fabrikas\u0131nda kaynakl\u0131 bir \u00e7elik konstr\u00fcksiyonu ta\u015flayan KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%98<\/b><span>teslimat performans\u0131; \u00f6nceki seviye yakla\u015f\u0131k %50<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumam\u0131zda belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal i\u015fleme ve fason imalat<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k %50&#8217;den %98&#8217;e kadar y\u00fckseldi. \u00c7izelgeleme i\u00e7in art\u0131k iki yerine bir sorumlu yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp&#8217;un de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel\u2019in Kauhava\u2019daki \u00e7at\u0131 g\u00fcvenlik ekipmanlar\u0131 fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 g\u00f6r\u00fcn\u00fcr hale getirdi ve \u00fcretim y\u00f6netimine netlik kazand\u0131rd\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenli\u011fi ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 bu y\u0131l %99,2\u2019ye ula\u015ft\u0131. \u00c7izelgeleme sayesinde g\u00fcnde d\u00f6rt saate kadar \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/piristeel\/\">Piristeel\u2019in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-helios-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">HELIOS entegrasyonu nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>HELIOS, yap\u0131lacak i\u015fleri g\u00f6nderir.<\/strong> Operasyonlar\u0131yla birlikte \u00fcretim emirleri (v\u00fdrobn\u00ed p\u0159\u00edkazy), \u00fcr\u00fcn a\u011fa\u00e7lar\u0131 (kusovn\u00edky), rotalar (technologick\u00e9 postupy), \u00e7al\u0131\u015fma yerleri, makineler, meslekler, stoklar ve sat\u0131n alma sipari\u015fleri SkyPlanner\u2019a aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>SkyPlanner \u00e7izelgeyi olu\u015fturur ve g\u00fcncel tutar.<\/strong> Arcturus motoru her operasyonu saniyeler i\u00e7inde planlar ve \u00fcretim de\u011fi\u015ftik\u00e7e yeniden planlama yapar.<\/li>\n\n\n<li><strong>Tarihler ve kaydedilen i\u015fler geri g\u00f6nderilir.<\/strong> Planlanan ba\u015flang\u0131\u00e7 ve biti\u015f tarihleri HELIOS\u2019taki \u00fcretim emirlerine aktar\u0131l\u0131r. Kaydedilen i\u015fler de operasyon kay\u0131tlar\u0131 (evidence v\u00fdrobn\u00edch operac\u00ed) olarak g\u00f6nderilebilir.<\/li>\n\n<\/ol>\n\n\n<p>HELIOS, ana kay\u0131t sisteminiz olmaya devam eder. Malzemeler, teknik haz\u0131rl\u0131k (TPV), MRP, sat\u0131n alma, stok y\u00f6netimi, maliyet hesaplama ve finans mevcut sisteminizde kal\u0131r. SkyPlanner\u2019\u0131n sorumlulu\u011fu tek bir konudur: her kaynak \u00fczerindeki her operasyonun s\u0131ras\u0131 ve zamanlamas\u0131.<\/p>\n\n\n<p>HELIOS iNuvio i\u00e7in SkyPlanner, verileri Helios Inuvio Server \u00fczerindeki Inuvio REST API arac\u0131l\u0131\u011f\u0131yla okur; \u00fcretim s\u00fcre\u00e7leriniz i\u00e7in yap\u0131land\u0131r\u0131lan REST eylemleriyle geri yazar. HELIOS Nephrite i\u00e7in SkyPlanner ekibi, devreye alma kapsam\u0131n\u0131 belirlerken sizinle ve HELIOS i\u015f orta\u011f\u0131n\u0131zla birlikte kurulumunuza uygun REST ba\u011flant\u0131 yolunu belirler. Ayn\u0131 nesneler her iki y\u00f6nde de aktar\u0131l\u0131r. SkyPlanner web kancalar\u0131, \u00e7izelgedeki her de\u011fi\u015fikli\u011fi an\u0131nda iletir. HELIOS senkronizasyon s\u0131kl\u0131\u011f\u0131 ise tesis baz\u0131nda belirlenir.<\/p>\n\n\n<p>Her tesis HELIOS\u2019u farkl\u0131 kulland\u0131\u011f\u0131 i\u00e7in SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar ve canl\u0131 kullan\u0131ma ge\u00e7tikten sonra da destekler. S\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za uygun entegrasyon teklifi \u00f6nceden sunulur. HELIOS i\u015f orta\u011f\u0131n\u0131z veya kendi geli\u015ftiricileriniz de SkyPlanner\u2019\u0131n dok\u00fcmante edilmi\u015f API\u2019sini kullanarak entegrasyon geli\u015ftirebilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API referans\u0131<\/a>).<\/p>\n\n\n<p>REST kaynaklar\u0131, veri e\u015fle\u015ftirmeleri ve geri yazma kurallar\u0131 <a href=\"\/tr\/entegrasyonlar\/erp\/helios\/entegrasyon-kilavuzu\/\">\u00fcretim \u00e7izelgeleme i\u00e7in HELIOS entegrasyon k\u0131lavuzunda<\/a> a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-helios-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">HELIOS neleri \u00e7izelgeler, SkyPlanner neler ekler?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>HELIOS\u2019un kendi planlama \u00f6zellikleri vard\u0131r. HELIOS Nephrite, <a href=\"https:\/\/www.helios.eu\/vyroba-nephrite\">her \u00e7al\u0131\u015fma yerinde operasyonlar aras\u0131 s\u00fcreleri ve parti s\u0131ralamas\u0131n\u0131 optimize eden<\/a> kendi APS\u2019sini ve \u00fcretim plan\u0131 i\u00e7in bir planlama panosunu i\u00e7erir. HELIOS iNuvio\u2019da Gantt g\u00f6r\u00fcn\u00fcm\u00fcyle birlikte temel kapasite planlama (Z\u00e1kladn\u00ed kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed) ve ileri \u00fcretim planlama (Pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby) bulunur. <a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Pokro%C4%8Dil%C3%A9_pl%C3%A1nov%C3%A1n%C3%AD_v%C3%BDroby_-_V%C3%BDroba\">iNuvio yard\u0131m sayfas\u0131<\/a>, sistemin nas\u0131l \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 a\u00e7\u0131klar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u00d6nce geriye do\u011fru planlar, sonra optimize eder.<\/strong> Temelde, emrin biti\u015f tarihinden geriye do\u011fru planlama yap\u0131l\u0131r; ard\u0131ndan devam eden \u00fcretim i\u00e7in optimizasyon uygulan\u0131r (*Z\u00e1kladem je tedy zp\u011btn\u00e9 pl\u00e1nov\u00e1n\u00ed*).<\/li>\n\n\n<li><strong>S\u0131n\u0131rs\u0131z kapasiteye ge\u00e7ilebilir.<\/strong> Bir ayar, s\u0131n\u0131r tarihler kar\u015f\u0131lanamad\u0131\u011f\u0131nda s\u0131n\u0131rs\u0131z kapasiteyle planlama yap\u0131lmas\u0131n\u0131 sa\u011flar (*Pl\u00e1novat do neomezen\u00fdch kapacit p\u0159i nedodr\u017een\u00ed limitn\u00edch term\u00edn\u016f*). Kapasiteyi bloke etmeyecek \u015fekilde ayarlanan kaynaklar da takvimdeki \u00e7al\u0131\u015fma saatleri i\u00e7inde s\u0131n\u0131rs\u0131z kapasiteyle planlan\u0131r.<\/li>\n\n\n<li><strong>Tek bir aktif plan, ayr\u0131 hesaplamalarla olu\u015fturulur.<\/strong> Yaln\u0131zca bir kapasite plan\u0131 aktif olabilir; di\u011ferleri test planlar\u0131d\u0131r. Her planda son hesaplaman\u0131n tarihi g\u00f6sterilir (<a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Z%C3%A1kladn%C3%AD_kapacitn%C3%AD_pl%C3%A1nov%C3%A1n%C3%AD_-_V%C3%BDroba\">temel kapasite planlama yard\u0131m sayfas\u0131<\/a>).<\/li>\n\n\n<li><strong>\u00c7ak\u0131\u015fmalar\u0131 planlamac\u0131 \u00e7\u00f6zer.<\/strong> Her hesaplamadan sonra HELIOS, kaynaklara a\u015f\u0131r\u0131 y\u00fckleme ve operasyon s\u0131ras\u0131n\u0131n bozulmas\u0131 gibi \u00e7ak\u0131\u015fmalar\u0131 planlamac\u0131n\u0131n \u00e7\u00f6zmesi i\u00e7in listeler.<\/li>\n\n<\/ul>\n\n\n<p>Rotadaki her operasyonun kendi makine ve operat\u00f6r haz\u0131rl\u0131k s\u00fcresi vard\u0131r (*p\u0159\u00edpravn\u00fd \u010das strojn\u00ed, p\u0159\u00edpravn\u00fd \u010das obsluhy*). SkyPlanner ise her makine, ki\u015fi ve tak\u0131m\u0131n ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131n\u0131 koruyan bir \u00e7izelge sunar. Tip de\u011fi\u015fimlerini i\u015f s\u0131ras\u0131na g\u00f6re planlar, gelecek malzemeyi kontrol eder ve \u00fcretim de\u011fi\u015fti\u011finde kendili\u011finden yeniden planlama yapar.<\/p>\n\n\n<p>T\u00fcm ad\u0131mlar ve s\u0131n\u0131rlar <a href=\"\/tr\/entegrasyonlar\/erp\/helios\/uretim-cizelgeleme\/\">HELIOS, ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131na g\u00f6re \u00fcretim \u00e7izelgeleme yapabiliyor mu?<\/a> ba\u015fl\u0131kl\u0131 yaz\u0131da a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"helios-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">HELIOS\u2019un bug\u00fcnk\u00fc hali ve SkyPlanner ile kullan\u0131m\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>HELIOS kapasite planlama<\/th><th>SkyPlanner APS ile HELIOS<\/th><\/tr><\/thead><tbody><tr><td>Kapasite<\/td><td>Kaynak baz\u0131nda s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z; tarihler kar\u015f\u0131lanamad\u0131\u011f\u0131nda s\u0131n\u0131rs\u0131z kapasiteye ge\u00e7i\u015f<\/td><td>Ger\u00e7ek vardiyalarla her makine, ki\u015fi ve tak\u0131m i\u00e7in s\u0131n\u0131rl\u0131 kapasite<\/td><\/tr><tr><td>\u00c7izelge<\/td><td>Her operasyon i\u00e7in \u00f6ng\u00f6r\u00fclen tarihleri i\u00e7eren \u00fcretim partileri<\/td><td>Saniyeler i\u00e7inde her operasyon i\u00e7in ayr\u0131nt\u0131l\u0131 s\u0131ralama<\/td><\/tr><tr><td>Planlar<\/td><td>Bir aktif plan, test i\u00e7in kullan\u0131lan di\u011fer planlar<\/td><td>Autopilot\u2019\u0131n g\u00fcncel tuttu\u011fu tek bir canl\u0131 plan<\/td><\/tr><tr><td>Tip de\u011fi\u015fimleri<\/td><td>Rotadaki her operasyon i\u00e7in belirlenen haz\u0131rl\u0131k s\u00fcresi<\/td><td>Haz\u0131rl\u0131k s\u00fcresi matrisi: en d\u00fc\u015f\u00fck toplam haz\u0131rl\u0131k s\u00fcresi<\/td><\/tr><tr><td>Personel<\/td><td>Meslek ihtiya\u00e7lar\u0131n\u0131n personel kaynaklar\u0131yla e\u015fle\u015ftirilmesi<\/td><td>Vardiyalar\u0131yla birlikte ki\u015fi baz\u0131nda operat\u00f6r atamas\u0131; \u00e7ok operat\u00f6rl\u00fc i\u015flerde gerekli kadronun sa\u011flanmas\u0131<\/td><\/tr><tr><td>Tak\u0131mlar<\/td><td>Teknik haz\u0131rl\u0131kta tutulan tak\u0131m ba\u011flant\u0131lar\u0131<\/td><td>Kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklar olarak tak\u0131mlar<\/td><\/tr><tr><td>Malzemeler<\/td><td>MRP ile sat\u0131n alma ve \u00fcretim taleplerinin olu\u015fturulmas\u0131<\/td><td>Malzeme stoktan veya sat\u0131n alma sipari\u015fi teslimat\u0131ndan sa\u011fland\u0131\u011f\u0131nda ba\u015flayan i\u015fler<\/td><\/tr><tr><td>De\u011fi\u015fiklikler<\/td><td>Plan\u0131 yeniden hesaplama ve listedeki \u00e7ak\u0131\u015fmalar\u0131 \u00e7\u00f6zme<\/td><td>Autopilot ile \u00f6nceliklerinize g\u00f6re t\u00fcm tesisin yeniden planlanmas\u0131<\/td><\/tr><tr><td>Planlamac\u0131 g\u00f6r\u00fcn\u00fcm\u00fc<\/td><td>Emirleri kaynak kapasitesiyle birlikte g\u00f6steren Gantt<\/td><td>Etkile\u015fimli Gantt: i\u015fleri ta\u015f\u0131san\u0131z da plan tutarl\u0131 kal\u0131r<\/td><\/tr><tr><td>shop floor<\/td><td>HELIOS\u2019ta terminal veya barkod \u00fczerinden operasyon bildirimi<\/td><td>Operat\u00f6rlerin i\u015f s\u0131ras\u0131n\u0131 g\u00f6rmesi ve telefon veya tablette i\u015f kayd\u0131 yapmas\u0131<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>\u015eu durumlarda HELIOS APS ve iNuvio ileri planlama yerine SkyPlanner\u2019\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Plan haftada birka\u00e7 kez de\u011fi\u015fiyorsa.<\/strong> Autopilot, ayr\u0131 bir yeniden hesaplama \u00e7al\u0131\u015ft\u0131rman\u0131za veya \u00e7ak\u0131\u015fma listesiyle u\u011fra\u015fman\u0131za gerek kalmadan, plan\u0131 etkileyen her \u00f6nemli de\u011fi\u015fiklikte otomatik olarak yeniden planlama yapar. Yeni tarihler HELIOS\u2019a geri aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>Ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 korunmak zorundaysa.<\/strong> SkyPlanner, bir tarihi tutturmak i\u00e7in asla s\u0131n\u0131rs\u0131z kapasiteye ge\u00e7mez. Ger\u00e7ek biti\u015f tarihini g\u00f6sterir; \u00f6ncelikleri de\u011fi\u015ftirerek, fazla mesai ekleyerek veya alternatif bir makine kullanarak bu tarihe m\u00fcdahale etmenizi sa\u011flar.<\/li>\n\n\n<li><strong>\u00dcretim miktar\u0131n\u0131z\u0131 tip de\u011fi\u015fimleri belirliyorsa.<\/strong> Haz\u0131rl\u0131k s\u00fcresi matrisi, ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re de\u011fi\u015fen tip de\u011fi\u015fimi s\u00fcrelerini tutar. Renk, aroma veya malzeme s\u0131ralamas\u0131n\u0131, toplam haz\u0131rl\u0131k s\u00fcresi en d\u00fc\u015f\u00fck olacak \u015fekilde olu\u015fturur.<\/li>\n\n\n<li><strong>Operat\u00f6rler, tak\u0131mlar ve gelecek malzeme plan\u0131 birlikte k\u0131s\u0131tl\u0131yorsa.<\/strong> Her makine, ki\u015fi, tak\u0131m ve malzemenin kapasite s\u0131n\u0131r\u0131 dikkate al\u0131n\u0131r. Birden fazla operat\u00f6r gerektiren i\u015flere gerekli personel atan\u0131r, alternatif i\u015f merkezleri kullan\u0131l\u0131r. \u0130\u015fler, malzeme stoktan sa\u011fland\u0131\u011f\u0131nda veya sat\u0131n alma sipari\u015fi teslim edildi\u011finde ba\u015flar.<\/li>\n\n\n<li><strong>Her operat\u00f6r\u00fcn plana g\u00f6re \u00e7al\u0131\u015fmas\u0131 gerekiyorsa.<\/strong> Mobile Confirmations, g\u00fcncel i\u015f s\u0131ras\u0131n\u0131 telefon veya tablete getirir. Kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r: fiyat kullan\u0131c\u0131 say\u0131s\u0131na de\u011fil, i\u015f merkezi say\u0131s\u0131na ba\u011fl\u0131d\u0131r.<\/li>\n\n\n<li><strong>Haftalar i\u00e7inde canl\u0131 bir \u00e7izelgeye ge\u00e7mek istiyorsan\u0131z.<\/strong> SkyPlanner, HELIOS\u2019un yan\u0131nda \u00e7al\u0131\u015fan bir bulut yaz\u0131l\u0131m\u0131d\u0131r. 30 g\u00fcnl\u00fck denemede kendi \u00fcretim emirlerinizle test edersiniz. Sistem, devreye alma s\u00fcreci ba\u015flad\u0131ktan sonra normalde haftalar i\u00e7inde kullan\u0131ma al\u0131n\u0131r.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Nas\u0131l ba\u015flayabilirsiniz?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00dccretsiz denemeyi ba\u015flat\u0131n.<\/strong> 30 g\u00fcn, 20 i\u015f merkezine kadar kullan\u0131m, t\u00fcm Basic \u00f6zellikleri. Kredi kart\u0131 gerekmez.<\/li>\n\n\n<li><strong>\u00dcretiminizi modelleyin.<\/strong> SkyPlanner\u2019da makineleri, personeli ve vardiyalar\u0131 olu\u015fturun veya HELIOS\u2019taki \u00e7al\u0131\u015fma yerlerini ve makineleri i\u00e7e aktar\u0131n. Devreye alma deste\u011finden yararlanabilirsiniz.<\/li>\n\n\n<li><strong>Emirlerinizi y\u00fckleyin.<\/strong> HELIOS liste g\u00f6r\u00fcn\u00fcm\u00fcnden a\u00e7\u0131k \u00fcretim emirlerini ve operasyonlar\u0131n\u0131 Excel\u2019e aktar\u0131n. Ard\u0131ndan SkyPlanner\u2019a i\u00e7e aktararak olu\u015fan \u00e7izelgeyi mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>HELIOS\u2019u ba\u011flay\u0131n.<\/strong> SkyPlanner ekibi \u00e7ift y\u00f6nl\u00fc entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131 kullan\u0131ma ge\u00e7tikten sonra destek sa\u011flar.<\/li>\n\n<\/ol>\n\n\n<p><strong>Fiyatland\u0131rma.<\/strong> Paketler i\u015f merkezi ba\u015f\u0131na ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. \u0130stedi\u011finiz zaman i\u015f merkezi ekleyebilir, kald\u0131rabilir veya aboneli\u011finizi iptal edebilirsiniz. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rmay\u0131<\/a> inceleyin ya da <a href=\"\/tr\/entegrasyonlar\/erp\/\">t\u00fcm ERP entegrasyonlar\u0131na<\/a> g\u00f6z at\u0131n.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>HELIOS i\u00e7in en iyi \u00e7izelgeleme eklentisi hangisi?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, ger\u00e7ek makine ve personel kapasitesini dikkate alarak \u00fcretim \u00e7izelgeleme yapan ve HELIOS ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015fan bir eklentidir. \u00dcretim emirleri, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, rotalar, \u00e7al\u0131\u015fma yerleri, makineler, stoklar ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r; planlanan tarihler ve kaydedilen \u00e7al\u0131\u015fmalar HELIOS&#8217;a geri g\u00f6nderilir. Her makinenin, operat\u00f6r\u00fcn, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131 dikkate al\u0131n\u0131r. Ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re haz\u0131rl\u0131k s\u00fcrelerini tan\u0131mlayan matris, i\u015fleri haz\u0131rl\u0131k ihtiyac\u0131n\u0131 en aza indirecek \u015fekilde s\u0131ralar. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve \u00fccretsiz deneme s\u00fcresi 30 g\u00fcnd\u00fcr.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>HELIOS, kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alarak \u00fcretim \u00e7izelgeleme yapabiliyor mu?<\/summary>\n<p class=\"sp-faq__a\">K\u0131smen. HELIOS Nephrite&#8217;\u0131n kendi APS \u00e7\u00f6z\u00fcm\u00fc vard\u0131r. HELIOS iNuvio ise s\u0131n\u0131rl\u0131 kapasiteyle planlama yapabilen temel ve geli\u015fmi\u015f kapasite planlama \u00f6zellikleri sunar. Planlar, tek bir aktif plan \u00fczerinde hesaplamalar \u00e7al\u0131\u015ft\u0131r\u0131larak olu\u015fturulur. Tarihlere uyulamad\u0131\u011f\u0131nda s\u0131n\u0131rs\u0131z kapasiteye ge\u00e7ilebilir; \u00e7ak\u0131\u015fmalar\u0131 \u00e7\u00f6zmek ise planlamac\u0131ya kal\u0131r. HELIOS ile birlikte \u00e7al\u0131\u015fan SkyPlanner APS, her makinenin, \u00e7al\u0131\u015fan\u0131n, tak\u0131m\u0131n ve malzemenin kapasite s\u0131n\u0131rlar\u0131na uyar ve otomatik olarak yeniden planlama yapar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hangi \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131 HELIOS ile entegre \u00e7al\u0131\u015f\u0131r?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, HELIOS ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r. HELIOS iNuvio&#8217;da \u00fcretim emirlerini, rotalar\u0131, stoklar\u0131 ve sat\u0131n alma sipari\u015flerini Inuvio REST API \u00fczerinden okur; planlanan tarihleri ve kaydedilen \u00e7al\u0131\u015fmalar\u0131 REST eylemleri \u00fczerinden geri yazar. HELIOS Nephrite&#8217;ta da ayn\u0131 nesneler iki y\u00f6nde aktar\u0131l\u0131r. SkyPlanner ekibi, devreye alma s\u00fcrecindeki kapsam belirleme a\u015famas\u0131nda kurulumunuz i\u00e7in kullan\u0131lacak ba\u011flant\u0131 y\u00f6ntemini belirler.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, HELIOS \u00fcretim mod\u00fcllerinin yerini mi al\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r, bu mod\u00fclleri tamamlar. Teknik haz\u0131rl\u0131k (TPV), \u00fcretim kontrol\u00fc, MRP, sat\u0131n alma, stok y\u00f6netimi, maliyet hesaplama ve finans HELIOS&#8217;ta kal\u0131r. SkyPlanner, \u00fcretim emirlerinizi ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeler ve tarihleri geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>HELIOS APS mi, SkyPlanner m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Plan\u0131n\u0131z s\u0131k de\u011fi\u015fiyorsa ve kapasite s\u0131n\u0131rlar\u0131n\u0131n a\u015f\u0131lmamas\u0131 gerekiyorsa SkyPlanner&#8217;\u0131 kullanmal\u0131s\u0131n\u0131z. HELIOS, tek bir aktif plan \u00fczerinde hesaplamalar \u00e7al\u0131\u015ft\u0131rarak planlama yapar. Tarihlere uymak i\u00e7in s\u0131n\u0131rs\u0131z kapasiteye ge\u00e7ebilir ve planlamac\u0131ya bir \u00e7ak\u0131\u015fma listesi b\u0131rak\u0131r. SkyPlanner her de\u011fi\u015fiklikte otomatik olarak yeniden planlama yapar; tip de\u011fi\u015fimlerini, tak\u0131mlar\u0131, ekipleri ve malzemeleri planlar. Kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r ve her operat\u00f6r kendi i\u015f s\u0131ras\u0131n\u0131 telefonundan g\u00f6rebilir. \u00dccretsiz denemede, kendi HELIOS \u00fcretim emirlerinizle bunu do\u011frulayabilirsiniz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, HELIOS Orange ve HELIOS Green ile \u00e7al\u0131\u015f\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet. SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda kulland\u0131\u011f\u0131n\u0131z HELIOS \u00fcr\u00fcn ailesi ve s\u00fcr\u00fcm\u00fc i\u00e7in ba\u011flant\u0131n\u0131n kapsam\u0131n\u0131 belirler. \u00c7izelgeleme t\u00fcm \u00fcr\u00fcn ailelerinde ayn\u0131 \u015fekilde \u00e7al\u0131\u015f\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner&#8217;\u0131n \u00c7ek\u00e7e aray\u00fcz\u00fc var m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet. Her kullan\u0131c\u0131 SkyPlanner aray\u00fcz\u00fcn\u00fc \u00c7ek\u00e7eye \u00e7evirebilir; b\u00f6ylece planlamac\u0131lar ve operat\u00f6rler kendi dillerinde \u00e7al\u0131\u015f\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>HELIOS kullanan bir tesis i\u00e7in SkyPlanner&#8217;\u0131n maliyeti nedir?<\/summary>\n<p class=\"sp-faq__a\">Fiyatlar, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi i\u00e7in ayl\u0131k 20 \u20ac \u00f6denir. \u0130\u015f merkezi, kendine ait \u00e7izelgelenmi\u015f i\u015f s\u0131ras\u0131 bulunan bir \u00fcretim kayna\u011f\u0131d\u0131r. Entegrasyon teklifi, s\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re abonelik plan\u0131n\u0131zla birlikte \u00f6nceden haz\u0131rlan\u0131r. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>HELIOS entegrasyonundan \u00f6nce SkyPlanner&#8217;\u0131 deneyebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck denemede, HELIOS&#8217;taki a\u00e7\u0131k \u00fcretim emirlerinizin Excel \u00e7\u0131kt\u0131s\u0131 kullan\u0131l\u0131r. Herhangi bir entegrasyon \u00e7al\u0131\u015fmas\u0131 ba\u015flamadan \u00f6nce kendi \u00fcretiminizin kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alan <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">\u00fcretim \u00e7izelgesini<\/a> g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ HELIOS HELIOS i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme SkyPlanner APS, HELIOS i\u00e7in her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeleyen bir \u00fcretim \u00e7izelgeleme eklentisidir. Hangi operasyonun nerede ve ne zaman yap\u0131laca\u011f\u0131n\u0131 g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Asseco Solutions\u2019\u0131n HELIOS Nephrite ve &#8230; <a title=\"HELIOS i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/helios\/\" aria-label=\"Read more about HELIOS i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100689,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106451","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>HELIOS \u00e7izelgeleme entegrasyonu: Ger\u00e7ek kapasiteye g\u00f6re APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: HELIOS\u2019a \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzeme i\u00e7in ger\u00e7ek kapasite. Ayl\u0131k 199 \u20ac\u2019dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/helios\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"HELIOS i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: HELIOS\u2019a \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzeme i\u00e7in ger\u00e7ek kapasite. Ayl\u0131k 199 \u20ac\u2019dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/helios\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/helios\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/helios\\\/\",\"name\":\"HELIOS \u00e7izelgeleme entegrasyonu: Ger\u00e7ek kapasiteye g\u00f6re APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: HELIOS\u2019a \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzeme i\u00e7in ger\u00e7ek kapasite. Ayl\u0131k 199 \u20ac\u2019dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/helios\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/helios\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/helios\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"HELIOS i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"HELIOS \u00e7izelgeleme entegrasyonu: Ger\u00e7ek kapasiteye g\u00f6re APS","description":"SkyPlanner APS: HELIOS\u2019a \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzeme i\u00e7in ger\u00e7ek kapasite. Ayl\u0131k 199 \u20ac\u2019dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/helios\/","og_locale":"tr_TR","og_type":"article","og_title":"HELIOS i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme","og_description":"SkyPlanner APS: HELIOS\u2019a \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzeme i\u00e7in ger\u00e7ek kapasite. Ayl\u0131k 199 \u20ac\u2019dan.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/helios\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/helios\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/helios\/","name":"HELIOS \u00e7izelgeleme entegrasyonu: Ger\u00e7ek kapasiteye g\u00f6re APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: HELIOS\u2019a \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r, tak\u0131m ve malzeme i\u00e7in ger\u00e7ek kapasite. Ayl\u0131k 199 \u20ac\u2019dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/helios\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/helios\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/helios\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"HELIOS i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ HELIOS HELIOS i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme SkyPlanner APS, HELIOS i\u00e7in her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeleyen bir \u00fcretim \u00e7izelgeleme eklentisidir. Hangi operasyonun nerede ve ne zaman yap\u0131laca\u011f\u0131n\u0131 g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Asseco Solutions\u2019\u0131n HELIOS Nephrite ve&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106451","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=106451"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/106451\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100689"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=106451"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}