{"id":104282,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"uretim-cizelgeleme","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/","title":{"rendered":"Sage 200 Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Kaba Kapasite Planlama ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Sage 200<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Sage 200 Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? <span class=\"hl\">Kaba Kapasite Planlama ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Sage 200&#8217;\u00fcn temel paketinde, ger\u00e7ek makine ve personel kapasitesini a\u015fmadan \u00fcretim \u00e7izelgeleme yapan bir ara\u00e7 yoktur. Kapasite planlama, \u00fcretim katman\u0131nda sa\u011flan\u0131r: art\u0131k kullan\u0131mdan kald\u0131r\u0131lan eski Sage 200 Manufacturing mod\u00fcl\u00fc ya da Sicon Manufacturing veya Cim200 gibi bir eklentiyle. Sicon, i\u015f g\u00fcc\u00fc ve makine y\u00fck\u00fcn\u00fc kullan\u0131labilir kapasiteyle kar\u015f\u0131la\u015ft\u0131rarak g\u00f6sterir. Cim200, i\u015f emri operasyonlar\u0131n\u0131 bir zaman \u00e7izelgesine yerle\u015ftirir ve kaynak \u00e7ak\u0131\u015fmalar\u0131n\u0131 i\u015faretler. Her ikisinde de a\u015f\u0131r\u0131 y\u00fckleri planlamac\u0131 giderir. T\u00fcm k\u0131s\u0131tlar\u0131 tek bir hesaplama motorunda ele alarak <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme<\/a> ihtiyac\u0131 duyan fabrikalar, Sage 200&#8217;\u00fcn yan\u0131nda SkyPlanner APS kullan\u0131r.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-sage-200-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage 200&#8217;de ad\u0131m ad\u0131m kapasite planlama<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Hangi \u00fcretim \u00e7\u00f6z\u00fcm\u00fcn\u00fc kulland\u0131\u011f\u0131n\u0131z\u0131 belirleyin<\/h3>\n\n\n<p>Sage 200 Professional&#8217;\u0131n temel paketi stok, sat\u0131\u015f sipari\u015fleri, sat\u0131n alma sipari\u015fleri ve finans\u0131 kapsar. \u00dcretim ise ayr\u0131 bir katmanda y\u00f6netilir ve bu katman 2025 y\u0131l\u0131nda de\u011fi\u015fti.<\/p>\n\n\n<p>Sage&#8217;in yard\u0131m belgesi a\u00e7\u0131k\u00e7a belirtiyor: &#8220;The Sage 200 Manufacturing module is now retired, from the Sage 200 Professional 2025 R2 release.&#8221; (Bu mod\u00fcl, belirtilen s\u00fcr\u00fcmden itibaren kullan\u0131mdan kald\u0131r\u0131lm\u0131\u015ft\u0131r.) (<a href=\"https:\/\/desktophelp.sage.co.uk\/sage200\/professional\/Content\/General\/What_Manufacturing_does.htm\">kaynak<\/a>) Sage i\u015f orta\u011f\u0131 PKF Smith Cooper, mod\u00fcl\u00fcn &#8220;was withdrawn from sale effective 1st November 2020&#8221; (belirtilen tarihten itibaren sat\u0131\u015ftan kald\u0131r\u0131ld\u0131\u011f\u0131n\u0131) bildiriyor. Sage, t\u00fcm deste\u011fin biti\u015f tarihini 31 Aral\u0131k 2025 olarak belirledi. (<a href=\"https:\/\/www.pkfscs.co.uk\/blog\/sage-200-manufacturing-retirement\/\">kaynak<\/a>)<\/p>\n\n\n<p>Ayn\u0131 i\u015f orta\u011f\u0131, Sage 200 ile tam entegre \u00e7al\u0131\u015fan iki \u00fcretim \u00e7\u00f6z\u00fcm\u00fc belirtiyor: <strong>Cim200<\/strong> ve <strong>Sicon Manufacturing<\/strong>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Kaynaklar ve s\u00fcreler<\/h3>\n\n\n<p>Eski mod\u00fcl; <strong>Cost Headings<\/strong>, <strong>Resource Groups<\/strong> ve <strong>Resources<\/strong> ile birlikte <strong>Labour Register<\/strong>, <strong>Machine Register<\/strong> ve <strong>Operations Register<\/strong> bile\u015fenlerini kullan\u0131r. Sage&#8217;in ifadesiyle: &#8220;Resource groups take values from cost headings. Resources take values from the resource groups.&#8221; (Kaynak gruplar\u0131 de\u011ferlerini maliyet ba\u015fl\u0131klar\u0131ndan, kaynaklar ise kaynak gruplar\u0131ndan al\u0131r.)<\/p>\n\n\n<p>Sicon, her kaynak i\u00e7in kullan\u0131labilir i\u015f g\u00fcc\u00fc ve makine kapasitesini &#8220;taking into account shutdown, maintenance periods and holiday.&#8221; (duru\u015flar\u0131, bak\u0131m d\u00f6nemlerini ve tatilleri dikkate alarak) hesaplar. (<a href=\"https:\/\/www.sicon.co.uk\/product\/material-and-resource-planning-mrp\/\">kaynak<\/a>) Sicon MRP&#8217;nin s\u00fcre tahmini i\u00e7in kulland\u0131\u011f\u0131 veriler \u015f\u00f6yle a\u00e7\u0131klan\u0131r: &#8220;the Sage 200 BOM cost items to estimate your labour and machine times.&#8221; (\u0130\u015f g\u00fcc\u00fc ve makine s\u00fcrelerinizi tahmin etmek i\u00e7in \u00fcr\u00fcn a\u011fac\u0131ndaki maliyet kalemleri.) (<a href=\"https:\/\/www.pkfscs.co.uk\/sage-solutions\/sicon-mrp\/\">kaynak<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Planlama: MPS ve MRP<\/h3>\n\n\n<p>Eski mod\u00fclde d\u00f6rt planlama mod\u00fcl\u00fc birbirini besler: <strong>Make to Stock<\/strong>, <strong>Sales Forecasts<\/strong>, <strong>Master Production Schedule<\/strong> ve <strong>Material Requirements Planning<\/strong>. MRP&#8217;nin i\u015flevi \u015f\u00f6yle a\u00e7\u0131klan\u0131r: &#8220;recommends purchase orders or works orders be created to fulfil the demand.&#8221; (Talebi kar\u015f\u0131lamak i\u00e7in sat\u0131n alma sipari\u015fleri veya i\u015f emirleri olu\u015fturulmas\u0131n\u0131 \u00f6nerir.)<\/p>\n\n\n<p>MPS ad\u0131m\u0131nda olu\u015fturulan \u00e7\u0131kt\u0131 &#8220;the material and capacity requirements&#8221; (malzeme ve kapasite ihtiya\u00e7lar\u0131) olarak tan\u0131mlan\u0131r. Sage, planlama d\u00f6nemleri i\u00e7in \u015funu belirtir: &#8220;Planning periods are normally a month or a four week period.&#8221; (Planlama d\u00f6nemleri genellikle bir ay veya d\u00f6rt haftad\u0131r.) (<a href=\"https:\/\/desktophelp.sage.co.uk\/sage200\/professional\/Content\/PLN\/How_Planning_Works.htm\">kaynak<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. \u0130\u015f emirleri ve operasyonlar<\/h3>\n\n\n<p>\u0130\u015f emirleri elle, sat\u0131\u015f sipari\u015flerinden, MRP \u00f6nerilerinden, Trial Kitting \u00fczerinden veya bir tahminin d\u00f6n\u00fc\u015ft\u00fcr\u00fclmesiyle olu\u015fturulur. Eski mod\u00fclde <strong>Works Orders<\/strong> i\u00e7in &#8220;works alongside the Operation Times module&#8221; (Operation Times mod\u00fcl\u00fcyle birlikte \u00e7al\u0131\u015f\u0131r) denir. Bu mod\u00fclde kullan\u0131c\u0131lar &#8220;enter job details retrospectively or in real time.&#8221; (\u0130\u015f ayr\u0131nt\u0131lar\u0131n\u0131 sonradan veya ger\u00e7ek zamanl\u0131 olarak girer.) (<a href=\"https:\/\/desktophelp.sage.co.uk\/sage200\/professional\/Content\/WO\/Manufacturing%20Works%20Orders.htm\">kaynak<\/a>)<\/p>\n\n\n<p>Sicon Works Order Processing i\u00e7indeki Shop Floor Data Capture uygulamas\u0131n\u0131n kullan\u0131c\u0131lara sa\u011flad\u0131\u011f\u0131 i\u015flev \u015f\u00f6yle a\u00e7\u0131klan\u0131r: &#8220;logon to works order operations to record actual time spent.&#8221; (Harcanan ger\u00e7ek s\u00fcreyi kaydetmek i\u00e7in i\u015f emri operasyonlar\u0131nda oturum a\u00e7ma.) (<a href=\"https:\/\/uk-marketplace.sage.com\/en-GB\/apps\/53905\/sicon-works-order-processing\/features\">kaynak<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Kapasite g\u00f6r\u00fcn\u00fcm\u00fc<\/h3>\n\n\n<p>Sage 200&#8217;de kapasitenin nas\u0131l g\u00f6sterildi\u011fi, kullan\u0131lan \u00fcretim \u00e7\u00f6z\u00fcm\u00fcne g\u00f6re de\u011fi\u015fir:<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u00dcretim \u00e7\u00f6z\u00fcm\u00fc<\/th><th>Kapasite \u00f6zelli\u011fi<\/th><th>Nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/th><\/tr><\/thead><tbody><tr><td>Eski Sage 200 Manufacturing<\/td><td>MPS kapasite ihtiya\u00e7lar\u0131<\/td><td>Genellikle bir ay veya d\u00f6rt haftal\u0131k planlama d\u00f6nemleri i\u00e7in ihtiya\u00e7lar<\/td><\/tr><tr><td>Sicon MRP<\/td><td>Kaba kapasite planlama<\/td><td>&#8220;a daily\/weekly schedule of labour and machine capacity based on existing live works orders&#8221; (Mevcut aktif i\u015f emirlerine dayal\u0131 g\u00fcnl\u00fck\/haftal\u0131k i\u015f g\u00fcc\u00fc ve makine kapasitesi \u00e7izelgesi)<\/td><\/tr><tr><td>Cim200<\/td><td>Graphical Scheduler<\/td><td>Operasyonlar, rota s\u00fcreleri ve takvimlere g\u00f6re zaman \u00e7izelgesine yerle\u015ftirilir; kaynak \u00e7ak\u0131\u015fmalar\u0131 vurgulan\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Sicon&#8217;un grafik g\u00f6r\u00fcn\u00fcmleri &#8220;with a drag and drop interface&#8221; (s\u00fcr\u00fckle ve b\u0131rak aray\u00fcz\u00fcyle) sunulur. Kullan\u0131c\u0131lar plan\u0131 &#8220;by moving works orders and sub-assemblies in real-time.&#8221; (\u0130\u015f emirlerini ve alt montajlar\u0131 ger\u00e7ek zamanl\u0131 olarak ta\u015f\u0131yarak) d\u00fczenleyebilir. (<a href=\"https:\/\/www.sicon.co.uk\/product\/material-and-resource-planning-mrp\/\">kaynak<\/a>) Cim200&#8217;\u00fcn \u00e7izelgeleme arac\u0131, rota s\u00fcrelerini &#8220;the production and operation calendars&#8221; (\u00fcretim ve operasyon takvimleri) ile birlikte kullan\u0131r ve operasyonlar\u0131 s\u0131ralar\u0131n\u0131 bozacak \u015fekilde \u00e7izelgelemez. (<a href=\"https:\/\/cim-software.co.uk\/knowledgebase\/cim200\/scheduler\/works-order-view\/\">kaynak<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. A\u015f\u0131r\u0131 y\u00fckleri giderme<\/h3>\n\n\n<p>Son ad\u0131m planlamac\u0131ya aittir. Sicon&#8217;un plan\u0131 \u015f\u00f6yle a\u00e7\u0131klan\u0131r: &#8220;shows labour and machine availability with functionality to amend works order dates to smooth overloads.&#8221; (Kullan\u0131labilir i\u015f g\u00fcc\u00fc ve makine kapasitesini g\u00f6sterir; a\u015f\u0131r\u0131 y\u00fckleri dengelemek i\u00e7in i\u015f emri tarihlerini de\u011fi\u015ftirme i\u015flevi sunar.) (<a href=\"https:\/\/uk-marketplace.sage.com\/en-GB\/apps\/52808\/sicon-manufacturing-suite\/features\">kaynak<\/a>) Cim200&#8217;de k\u0131rm\u0131z\u0131 g\u00f6sterilen bir operasyon, &#8220;there is a resource clash&#8221; (bir kaynak \u00e7ak\u0131\u015fmas\u0131 var) anlam\u0131na gelir ve planlamac\u0131 i\u015fi yeni bir ba\u015flang\u0131\u00e7 zaman\u0131na s\u00fcr\u00fckler. Ba\u011f\u0131ml\u0131 operasyonlar da buna g\u00f6re kayar. (<a href=\"https:\/\/cim-software.co.uk\/knowledgebase\/cim200\/scheduler\/works-order-view\/\">kaynak<\/a>) Her iki durumda da hangi i\u015fin ta\u015f\u0131naca\u011f\u0131na bir ki\u015fi karar verir.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Planlamac\u0131ya kalan i\u015fler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Temel pakette kapasite k\u0131s\u0131tlar\u0131n\u0131 g\u00f6zeten bir \u00e7izelgeleme arac\u0131 yoktur.<\/strong> Sage 200&#8217;\u00fcn temel paketinde \u00fcretim \u00e7izelgeleme bulunmaz. Sage 200 API ba\u015fvuru belgesi (2025.02) stok, sat\u0131\u015f, sat\u0131n alma ve finans\u0131 kapsar; i\u015f emri veya operasyon kaynaklar\u0131n\u0131 i\u00e7ermez.<\/li>\n\n\n<li><strong>Orijinal mod\u00fcl kullan\u0131mdan kald\u0131r\u0131ld\u0131.<\/strong> Sage 200 Professional 2025 R2 s\u00fcr\u00fcm\u00fcnden itibaren kullan\u0131lamaz ve 31 Aral\u0131k 2025 sonras\u0131nda Sage deste\u011fi verilmez.<\/li>\n\n\n<li><strong>Planlama d\u00f6nem ve zaman dilimi baz\u0131ndad\u0131r.<\/strong> Eski MPS, ayl\u0131k veya d\u00f6rt haftal\u0131k d\u00f6nemlerle planlama yapar. Sicon&#8217;un kaba kapasite g\u00f6r\u00fcn\u00fcm\u00fc g\u00fcnl\u00fck veya haftal\u0131k zaman dilimleriyle \u00e7al\u0131\u015f\u0131r.<\/li>\n\n\n<li><strong>A\u015f\u0131r\u0131 y\u00fckler elle giderilir.<\/strong> Sicon&#8217;un kendi ifadesi \u015f\u00f6yledir: &#8220;amend works order dates to smooth overloads.&#8221; (A\u015f\u0131r\u0131 y\u00fckleri dengelemek i\u00e7in i\u015f emri tarihlerini de\u011fi\u015ftirme.) Cim200 kaynak \u00e7ak\u0131\u015fmalar\u0131n\u0131 k\u0131rm\u0131z\u0131yla i\u015faretler. Grafik sorunu g\u00f6sterir, planlamac\u0131 ise \u00e7\u00f6zer.<\/li>\n\n\n<li><strong>S\u00fcreler BOM verilerinden tahmin edilir.<\/strong> Sicon MRP, i\u015f g\u00fcc\u00fc ve makine s\u00fcrelerini Sage 200 BOM maliyet kalemlerinden tahmin eder. Bu nedenle plan\u0131n do\u011frulu\u011fu, bu de\u011ferlerin do\u011frulu\u011fuyla s\u0131n\u0131rl\u0131d\u0131r.<\/li>\n\n\n<li><strong>\u00c7izelgeleme ayr\u0131 bir eklentiyle sa\u011flan\u0131r.<\/strong> Cim200 ayr\u0131 olarak &#8220;monthly subscription basis.&#8221; (Ayl\u0131k abonelik esas\u0131na g\u00f6re) lisanslan\u0131r. (<a href=\"https:\/\/cim-software.co.uk\/cim200\/\">kaynak<\/a>)<\/li>\n\n\n<li><strong>Her de\u011fi\u015fiklik yeniden dengeleme gerektirir.<\/strong> Acil bir sipari\u015f geldi\u011finde planlamac\u0131 i\u015f emirlerini yeniden ta\u015f\u0131r.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-sage-200-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage 200&#8217;\u00fcn kendi planlamas\u0131 ne zaman yeterli?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sicon&#8217;un kaba kapasite plan\u0131 veya Cim200&#8217;\u00fcn \u00e7izelgeleme arac\u0131 \u015fu durumlarda ihtiyac\u0131 kar\u015f\u0131lar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Az say\u0131da kritik kayna\u011f\u0131n\u0131z vard\u0131r ve \u00fcretimin geri kalan\u0131nda bo\u015f kapasite bulunur.<\/li>\n\n\n<li>\u0130\u015f emirleri uzun s\u00fcrer ve teslimat i\u00e7in bol zaman vard\u0131r.<\/li>\n\n\n<li>Haftal\u0131k planlama yapars\u0131n\u0131z ve karar vermek i\u00e7in g\u00fcnl\u00fck veya haftal\u0131k y\u00fck\u00fc bilmeniz yeterlidir.<\/li>\n\n\n<li>\u0130\u015f s\u0131ras\u0131, bir \u00fcretim sorumlusunun makine ba\u015f\u0131nda belirleyebilece\u011fi kadar basittir.<\/li>\n\n\n<li>Tip de\u011fi\u015fimleri, ortak kullan\u0131lan tak\u0131mlar ve malzemelerin geli\u015f zaman\u0131 i\u015f s\u0131ras\u0131n\u0131 de\u011fi\u015ftirmez.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme \u00e7\u00f6z\u00fcm\u00fc ne zaman gerekir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A\u015fa\u011f\u0131dakilerden birka\u00e7\u0131 sizin i\u00e7in ge\u00e7erliyse eklentinizin planlama olanaklar\u0131 art\u0131k ihtiyac\u0131n\u0131z\u0131 kar\u015f\u0131lam\u0131yor demektir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Planlamac\u0131, a\u015f\u0131r\u0131 y\u00fckleri dengelemek i\u00e7in her hafta saatlerce i\u015f emirlerini ta\u015f\u0131r.<\/li>\n\n\n<li>Haftal\u0131k y\u00fck uygun g\u00f6r\u00fcnmesine ra\u011fmen teslimatlar gecikir.<\/li>\n\n\n<li>Tip de\u011fi\u015fimi s\u00fcresi, \u00f6nce hangi \u00fcr\u00fcn\u00fcn \u00fcretildi\u011fine ba\u011fl\u0131d\u0131r.<\/li>\n\n\n<li>Personel, vardiyalar ve devams\u0131zl\u0131klar da plan\u0131 makineler kadar k\u0131s\u0131tlar.<\/li>\n\n\n<li>Pres kal\u0131plar\u0131, di\u011fer \u00fcretim kal\u0131plar\u0131 veya fikst\u00fcrler makineler aras\u0131nda ortak kullan\u0131l\u0131r.<\/li>\n\n\n<li>Hangi i\u015f emrinin ba\u015flayabilece\u011fini malzeme mevcudiyeti belirler.<\/li>\n\n\n<li>Acil sipari\u015fler ve ar\u0131zalar haftada birka\u00e7 kez yeniden planlama yapmay\u0131 zorunlu k\u0131lar.<\/li>\n\n\n<li>Kullan\u0131mdan kald\u0131r\u0131lan Sage 200 Manufacturing mod\u00fcl\u00fcnden ba\u015fka bir \u00e7\u00f6z\u00fcme ge\u00e7iyorsunuz ve ayn\u0131 zamanda \u00e7izelgeleme ihtiyac\u0131n\u0131z\u0131 da \u00e7\u00f6zmek istiyorsunuz.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Hangi \u00f6zellikleri aramal\u0131s\u0131n\u0131z?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Operasyon d\u00fczeyinde \u00e7izelgeleme:<\/strong> Her operasyon i\u00e7in ba\u015flang\u0131\u00e7, biti\u015f ve i\u015f merkezi belirlenmeli.<\/li>\n\n\n<li><strong>T\u00fcm kaynaklar\u0131n kapasite s\u0131n\u0131rlar\u0131n\u0131 ayn\u0131 anda g\u00f6zetme:<\/strong> Makineler, personel ve tak\u0131mlar birlikte ele al\u0131nmal\u0131.<\/li>\n\n\n<li><strong>A\u015f\u0131r\u0131 y\u00fcklerin otomatik giderilmesi:<\/strong> Elle yeniden dengelemeniz gereken bir grafikle s\u0131n\u0131rl\u0131 kalmamal\u0131.<\/li>\n\n\n<li>S\u0131raya ba\u011fl\u0131, ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re s\u00fcresi de\u011fi\u015fen tip de\u011fi\u015fimleri i\u00e7in <strong>haz\u0131rl\u0131k s\u00fcresi matrisi<\/strong>.<\/li>\n\n\n<li><strong>Tak\u0131mlar\u0131n kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklar olarak ele al\u0131nmas\u0131<\/strong> ve ayn\u0131 anda birka\u00e7 operat\u00f6r gerektiren i\u015flerin desteklenmesi.<\/li>\n\n\n<li>Stoklar\u0131 ve gelecek sat\u0131n alma sipari\u015flerini kontrol eden <strong>malzeme mevcudiyetine g\u00f6re \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li><strong>Sage 200 ile net bir veri aktar\u0131m y\u00f6ntemi.<\/strong> Sage 200 REST API; \u00fcr\u00fcnleri, stoklar\u0131 ve sipari\u015fleri kapsar. \u0130\u015f emirleri ise \u00fcretim eklentinizde tutulur. Bu nedenle her tedarik\u00e7iye i\u015f emirlerini nas\u0131l okuduklar\u0131n\u0131 ve tarihleri sisteme nas\u0131l geri yazd\u0131klar\u0131n\u0131 sorun.<\/li>\n\n<\/ul>\n\n\n<p>Se\u00e7enekler \u00fc\u00e7 gruba ayr\u0131l\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Sage 200 eklentinizdeki planlama<\/strong>, y\u00fck durumunu veya operasyon \u00e7ak\u0131\u015fmalar\u0131n\u0131 g\u00f6stererek \u00e7\u00f6z\u00fcm\u00fc planlamac\u0131ya b\u0131rak\u0131r.<\/li>\n\n\n<li><strong>Kurumsal APS paketleri<\/strong>, bir uygulama projesiyle entegre edilir ve bu i\u015fe ayr\u0131lm\u0131\u015f bir planlama ekibi taraf\u0131ndan kullan\u0131l\u0131r.<\/li>\n\n\n<li>SkyPlanner&#8217;\u0131n da yer ald\u0131\u011f\u0131 <strong>\u00fcretim sahas\u0131nda uygulama deste\u011fi sunan bulut APS \u00e7\u00f6z\u00fcmleri<\/strong>, Sage 200&#8217;\u00fcn yan\u0131nda t\u00fcm kaynaklar\u0131 otomatik olarak \u00e7izelgeler. \u00dcretim de\u011fi\u015ftik\u00e7e yeniden planlama yapar ve \u00e7izelgeyi operat\u00f6rlerin kullan\u0131m\u0131na sunar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner nerede devreye girer?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS, yukar\u0131daki eksiklerin her birini giderir. Her i\u015f merkezinin kapasite s\u0131n\u0131r\u0131 dikkate al\u0131n\u0131r ve Arcturus AI motoru, t\u00fcm i\u015f emri operasyonlar\u0131n\u0131 saniyeler i\u00e7inde \u00e7izelgeler. Makineler, personel, tak\u0131mlar ve malzemeler tek bir motorda birlikte \u00e7izelgelenir; ek mod\u00fcl lisans\u0131 gerekmez. S\u0131ralama; i\u015f \u00f6nceli\u011fine, tamamlanma tarihine ve m\u00fc\u015fteri \u00f6nceli\u011fine g\u00f6re yap\u0131l\u0131r.<\/p>\n\n\n<p>Haz\u0131rl\u0131k s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcresini her iki y\u00f6n i\u00e7in de tutar. Motor, en az haz\u0131rl\u0131k gerektiren s\u0131ray\u0131 se\u00e7er. Tak\u0131mlar, kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklar olarak ele al\u0131n\u0131r ve bir i\u015f ayn\u0131 anda birka\u00e7 operat\u00f6r gerektirebilir. Bir makine veya personel kullan\u0131lamad\u0131\u011f\u0131nda motor, tan\u0131mlad\u0131\u011f\u0131n\u0131z alternatifleri kullan\u0131r.<\/p>\n\n\n<p>Malzemeye dayal\u0131 \u00e7izelgeleme, mevcut stoklar\u0131 ve gelecek sat\u0131n alma sipari\u015flerini kullanarak gelecekteki stok durumunu sim\u00fcle eder. Sipari\u015f edilen malzeme, teslim tarihinde kullan\u0131labilir kabul edilir. B\u00f6ylece i\u015fler yaln\u0131zca malzemenin haz\u0131r oldu\u011fu tarihlerde planlan\u0131r.<\/p>\n\n\n<p>Autopilot, \u00fcretimde de\u011fi\u015fiklik oldu\u011funda belirledi\u011finiz kilitlere ve \u00f6nceliklere uyarak \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Planlamac\u0131lar i\u015fleri Gantt zaman \u00e7izelgesinde d\u00fczenler; operat\u00f6rler ise Mobile Confirmations ile telefon veya tabletten i\u015f kay\u0131tlar\u0131n\u0131 girer.<\/p>\n\n\n<p>A\u015f\u0131r\u0131 y\u00fckleri dengelemek ve \u00e7ak\u0131\u015fmalar\u0131 elle gidermek her hafta saatlerinizi al\u0131yorsa <strong>SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong><\/p>\n\n\n<p>S\u0131rada hangi i\u015fin yap\u0131labilece\u011fini tip de\u011fi\u015fimleri, ortak kullan\u0131lan tak\u0131mlar veya birden fazla operat\u00f6r gerektiren i\u015fler belirliyorsa <strong>SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong><\/p>\n\n\n<p>Kullan\u0131mdan kald\u0131r\u0131lan Sage 200 Manufacturing mod\u00fcl\u00fcnden ayr\u0131l\u0131yor ve uzun bir projenin ard\u0131ndan de\u011fil, haftalar i\u00e7inde uygulanabilir bir \u00e7izelgeye ula\u015fmak istiyorsan\u0131z <strong>SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong><\/p>\n\n\n<p><a href=\"\/tr\/deneme\/\">30 g\u00fcnl\u00fck \u00fccretsiz denemeye<\/a> a\u00e7\u0131k \u00fcretim emirlerinizin Excel \u00e7\u0131kt\u0131s\u0131yla ba\u015flay\u0131n (20 i\u015f merkezine kadar, kredi kart\u0131 gerekmez). Deneme s\u00fcresi i\u00e7inde kendi \u00fcretiminizin ger\u00e7ek kapasiteye uygun \u00e7izelgesini g\u00f6r\u00fcn. Sonras\u0131nda fiyatlar, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Faturaland\u0131rma ayl\u0131kt\u0131r; istedi\u011finiz zaman iptal edebilirsiniz. Entegrasyon i\u00e7in s\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan fiyat teklifi, abonelik paketinizle birlikte \u00f6nceden sunulur. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz. Uygulama genellikle kurulum ve devreye alma s\u00fcreci ba\u015flad\u0131ktan sonra haftalar i\u00e7inde tamamlan\u0131r.<\/p>\n\n\n<p>SkyPlanner, Sage 200 ile \u00e7ift y\u00f6nl\u00fc entegre olur. \u00dcretim emirleri \u00fcretim eklentinizden; \u00fcr\u00fcnler, stoklar ve sat\u0131n alma sipari\u015fleri ise Sage 200 REST API \u00fczerinden al\u0131n\u0131r. Planlanan operasyon tarihleri \u00fcretim emirlerine geri aktar\u0131l\u0131r. SkyPlanner ekibi, kurulum s\u00fcrecinde entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra da destek verir. \u0130\u015f orta\u011f\u0131n\u0131z veya \u015firket i\u00e7i geli\u015ftiricileriniz, yaln\u0131zca bir API belirteciyle dok\u00fcmantasyonu sunulan REST API \u00fczerinde \u00e7al\u0131\u015fabilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API ba\u015fvuru kayna\u011f\u0131<\/a>).<\/p>\n\n\n<p>Sistemlerin nas\u0131l ba\u011fland\u0131\u011f\u0131n\u0131 <a href=\"\/tr\/entegrasyonlar\/erp\/sage-200\/\">Sage 200 i\u00e7in SkyPlanner<\/a> sayfas\u0131nda okuyun veya do\u011frudan <a href=\"\/tr\/entegrasyonlar\/erp\/sage-200\/entegrasyon-kilavuzu\/\">Sage 200 entegrasyon k\u0131lavuzuna<\/a> ge\u00e7in. Di\u011fer ERP&#8217;leri <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131 sayfas\u0131nda<\/a> bulabilirsiniz.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>haftal\u0131k zaman tasarrufu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamada her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel&#x27;in Kauhava&#x27;daki \u00e7at\u0131 g\u00fcvenlik ekipmanlar\u0131 fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 tespit edebilmemiz i\u00e7in gereken g\u00f6r\u00fcn\u00fcrl\u00fc\u011f\u00fc sa\u011flad\u0131 ve \u00fcretim y\u00f6netimini netle\u015ftirdi.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenli\u011fi ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 bu y\u0131l %99,2&#8217;ye ula\u015ft\u0131. \u00c7izelgeleme ise g\u00fcnde d\u00f6rt saate kadar \u00e7al\u0131\u015fma s\u00fcresi tasarrufu sa\u011fl\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/piristeel\/\">Piristeel&#8217;in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 200&#8217;de \u00e7izelgeleme arac\u0131 var m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Temel \u00fcr\u00fcnde yok. \u00c7izelgeleme, \u00fcretim katman\u0131ndaki \u00e7\u00f6z\u00fcmlerle sa\u011flan\u0131r: Sicon&#8217;\u0131n Rough Cut Capacity Planning arac\u0131, Cim200&#8217;\u00fcn Graphical Scheduler arac\u0131 veya kullan\u0131mdan kald\u0131r\u0131lan Sage 200 Manufacturing mod\u00fcl\u00fc. Sicon ve eski mod\u00fcl, kapasite y\u00fck\u00fcn\u00fc g\u00f6sterir. Cim200, \u00fcretim emri operasyonlar\u0131n\u0131 \u00e7izelgeler ve kaynak \u00e7ak\u0131\u015fmalar\u0131n\u0131 i\u015faretler. \u00dc\u00e7\u00fcnde de \u00e7ak\u0131\u015fmalar\u0131 planlamac\u0131 \u00e7\u00f6zer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 200 Manufacturing h\u00e2l\u00e2 destekleniyor mu?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. Sage, mod\u00fcl\u00fcn sat\u0131\u015f\u0131n\u0131 Kas\u0131m 2020&#8217;de durdurdu. Mod\u00fcl, Sage 200 Professional 2025 R2 ve sonraki s\u00fcr\u00fcmlerde kullan\u0131lamaz. Sage deste\u011fi 31 Aral\u0131k 2025&#8217;te sona erdi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sicon Rough Cut Capacity Planning, ger\u00e7ek kapasiteye uygun \u00fcretim \u00e7izelgeleme yapar m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Bu ara\u00e7 kapasiteyi g\u00f6r\u00fcnt\u00fcler. G\u00fcncel \u00fcretim emirlerine g\u00f6re i\u015f g\u00fcc\u00fc ve makine kapasitesini g\u00fcnl\u00fck veya haftal\u0131k \u00e7izelgede g\u00f6sterir. A\u015f\u0131r\u0131 y\u00fckleri dengelemek i\u00e7in \u00fcretim emirlerinin tarihlerini siz de\u011fi\u015ftirirsiniz. Ger\u00e7ek kapasiteyi esas alan bir \u00fcretim \u00e7izelgeleme arac\u0131 ise her operasyonu otomatik olarak yaln\u0131zca kapasitenin m\u00fcsait oldu\u011fu zamanlara yerle\u015ftirir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 200, s\u0131ralamaya ba\u011fl\u0131 haz\u0131rl\u0131k s\u00fcrelerini dikkate al\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Sicon, BOM verilerinden i\u015f g\u00fcc\u00fc ve makine s\u00fcrelerini tahmin eder. Cim200 ise \u00fcretim emirlerindeki rota s\u00fcrelerine g\u00f6re \u00e7izelgeleme yapar. SkyPlanner APS ise bir haz\u0131rl\u0131k s\u00fcresi matrisi sunar. \u00dcr\u00fcn \u00e7iftleri aras\u0131ndaki tip de\u011fi\u015fim s\u00fcrelerini bu matriste saklar (maviden k\u0131rm\u0131z\u0131ya 30 dakika, k\u0131rm\u0131z\u0131dan maviye 60 dakika) ve i\u015fleri bu s\u00fcreleri en aza indirecek \u015fekilde s\u0131ralar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner APS, Sage 200&#8217;e nas\u0131l ba\u011flan\u0131r?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, Sage 200 ile \u00e7ift y\u00f6nl\u00fc entegre olur. SkyPlanner ekibi bu entegrasyonu kurulum s\u00fcrecinde yap\u0131land\u0131r\u0131r. \u00dcr\u00fcnler, stoklar, sat\u0131n alma sipari\u015fleri ve sat\u0131\u015f sipari\u015fleri Sage 200 REST API \u00fczerinden; \u00fcretim emirleri ise \u00fcretim eklentinizden al\u0131n\u0131r. Planlanan operasyon tarihleri \u00fcretim emirlerine geri aktar\u0131l\u0131r. SkyPlanner web kancalar\u0131, \u00e7izelgedeki de\u011fi\u015fiklikleri ger\u00e7ekle\u015fti\u011fi anda iletir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner&#8217;\u0131 Sage 200 ile entegre etmeden \u00f6nce test edebilir miyim?<\/summary>\n<p class=\"sp-faq__a\">Evet. A\u00e7\u0131k \u00fcretim emirlerinizi ve kaynaklar\u0131n\u0131z\u0131 Excel&#8217;e aktar\u0131n. 30 g\u00fcnl\u00fck deneme s\u00fcresinde bunlar\u0131 SkyPlanner&#8217;a y\u00fckleyin ve olu\u015fan \u00e7izelgeyi mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n. Kredi kart\u0131 gerekmez. <a href=\"\/tr\/fiyatlandirma\/\">Fiyatlar\u0131 inceleyin<\/a>, <a href=\"\/tr\/deneme\/\">denemeyi ba\u015flat\u0131n<\/a> veya <a href=\"\/tr\/iletisim-satis\/\">sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Sage 200 Sage 200 Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Kaba Kapasite Planlama ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131 Sage 200&#8217;\u00fcn temel paketinde, ger\u00e7ek makine ve personel kapasitesini a\u015fmadan \u00fcretim \u00e7izelgeleme yapan bir ara\u00e7 yoktur. Kapasite planlama, \u00fcretim katman\u0131nda sa\u011flan\u0131r: art\u0131k kullan\u0131mdan kald\u0131r\u0131lan eski Sage 200 Manufacturing mod\u00fcl\u00fc ya da Sicon Manufacturing &#8230; <a title=\"Sage 200 Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Kaba Kapasite Planlama ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/\" aria-label=\"Read more about Sage 200 Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Kaba Kapasite Planlama ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103243,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104282","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sage 200 Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?<\/title>\n<meta name=\"description\" content=\"Sage 200 eklentileriyle kapasite planlama: kaba y\u00fck grafikleri veya \u00e7ak\u0131\u015fma uyar\u0131l\u0131 operasyon \u00e7izelgeleri. Sicon, Cim200, eski MRP ve APS ihtiyac\u0131.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sage 200 Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Kaba Kapasite Planlama ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\" \/>\n<meta property=\"og:description\" content=\"Sage 200 eklentileriyle kapasite planlama: kaba y\u00fck grafikleri veya \u00e7ak\u0131\u015fma uyar\u0131l\u0131 operasyon \u00e7izelgeleri. Sicon, Cim200, eski MRP ve APS ihtiyac\u0131.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-200\\\/uretim-cizelgeleme\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-200\\\/uretim-cizelgeleme\\\/\",\"name\":\"Sage 200 Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Sage 200 eklentileriyle kapasite planlama: kaba y\u00fck grafikleri veya \u00e7ak\u0131\u015fma uyar\u0131l\u0131 operasyon \u00e7izelgeleri. Sicon, Cim200, eski MRP ve APS ihtiyac\u0131.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-200\\\/uretim-cizelgeleme\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-200\\\/uretim-cizelgeleme\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-200\\\/uretim-cizelgeleme\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Sage 200 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-200\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Sage 200 Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Kaba Kapasite Planlama ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sage 200 Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?","description":"Sage 200 eklentileriyle kapasite planlama: kaba y\u00fck grafikleri veya \u00e7ak\u0131\u015fma uyar\u0131l\u0131 operasyon \u00e7izelgeleri. Sicon, Cim200, eski MRP ve APS ihtiyac\u0131.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/","og_locale":"tr_TR","og_type":"article","og_title":"Sage 200 Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Kaba Kapasite Planlama ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131","og_description":"Sage 200 eklentileriyle kapasite planlama: kaba y\u00fck grafikleri veya \u00e7ak\u0131\u015fma uyar\u0131l\u0131 operasyon \u00e7izelgeleri. Sicon, Cim200, eski MRP ve APS ihtiyac\u0131.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/","name":"Sage 200 Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Sage 200 eklentileriyle kapasite planlama: kaba y\u00fck grafikleri veya \u00e7ak\u0131\u015fma uyar\u0131l\u0131 operasyon \u00e7izelgeleri. Sicon, Cim200, eski MRP ve APS ihtiyac\u0131.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Sage 200 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/"},{"@type":"ListItem","position":5,"name":"Sage 200 Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Kaba Kapasite Planlama ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Sage 200 Sage 200 Kapasite K\u0131s\u0131tlar\u0131na G\u00f6re \u00dcretim \u00c7izelgeleme Yapar m\u0131? Kaba Kapasite Planlama ve SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131 Sage 200&#8217;\u00fcn temel paketinde, ger\u00e7ek makine ve personel kapasitesini a\u015fmadan \u00fcretim \u00e7izelgeleme yapan bir ara\u00e7 yoktur. Kapasite planlama, \u00fcretim katman\u0131nda sa\u011flan\u0131r: art\u0131k kullan\u0131mdan kald\u0131r\u0131lan eski Sage 200 Manufacturing mod\u00fcl\u00fc ya da Sicon Manufacturing&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/104282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=104282"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/104282\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/103243"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=104282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}