{"id":103695,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"uretim-cizelgeleme","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/","title":{"rendered":"Infor M3&#8217;te \u00dcretim \u00c7izelgeleme Var m\u0131? PDS010, Scheduling Workbench ve SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Infor M3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Infor M3&#8217;te \u00dcretim \u00c7izelgeleme Var m\u0131? <span class=\"hl\">PDS010, Scheduling Workbench ve SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Infor M3, ger\u00e7ek makine ve personel kapasitesini g\u00f6zeten ayr\u0131nt\u0131l\u0131 \u00fcretim \u00e7izelgeleme de\u011fil, kaba kapasite planlama yapar. Temel M3&#8217;te her i\u015f merkezi i\u00e7in sonlu veya sonsuz kapasite se\u00e7ilir ve her operasyon ak\u0131\u015f\u0131nda tek bir darbo\u011faz esas al\u0131narak planlama yap\u0131l\u0131r. Ayr\u0131nt\u0131l\u0131 s\u0131ralama, M3 Scheduling Workbench eklentisiyle sa\u011flan\u0131r. Ancak burada bile Infor, canl\u0131ya ge\u00e7erken t\u00fcm kaynaklar\u0131n sonsuz kapasiteyle ba\u015flat\u0131lmas\u0131n\u0131 ve yaln\u0131zca kritik darbo\u011faz\u0131n kapasitesinin s\u0131n\u0131rland\u0131r\u0131lmas\u0131n\u0131 \u00f6nerir (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">Infor dok\u00fcmantasyonu<\/a>). Her makine, personel, tak\u0131m ve malzemenin kapasitesini saat baz\u0131nda g\u00f6zetmek, tip de\u011fi\u015fimlerini s\u0131ralamak, plan\u0131 otomatik olarak yeniden olu\u015fturmak ve haftalar i\u00e7inde canl\u0131ya ge\u00e7mek isteyen fabrikalar, M3&#8217;\u00fcn yan\u0131nda SkyPlanner APS kullan\u0131r.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A\u015fa\u011f\u0131daki program kodlar\u0131, Infor&#8217;un M3 Business Engine ve M3 CloudSuite dok\u00fcmantasyonundan al\u0131nm\u0131\u015ft\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-infor-m3-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Infor M3&#8217;te ad\u0131m ad\u0131m kapasite planlama<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. \u0130\u015f merkezleri ve kapasite<\/h3>\n\n\n<p>\u0130\u015f merkezleri <strong>Work Center. Open (PDS010)<\/strong> program\u0131nda olu\u015fturulur. G\u00fcnl\u00fck kapasite <strong>Work Center. Change Capacity (PDS015)<\/strong> program\u0131nda, kuyruk ve ta\u015f\u0131ma s\u00fcreleri ise <strong>PDS020<\/strong> program\u0131nda tutulur. Stok kartlar\u0131 <strong>Item. Open (MMS001)<\/strong> program\u0131nda yer al\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Operasyonlar \u00fcr\u00fcn yap\u0131s\u0131nda yer al\u0131r<\/h3>\n\n\n<p>M3&#8217;te ayr\u0131 bir rota nesnesi yoktur. \u00dcr\u00fcn yap\u0131s\u0131n\u0131n ba\u015fl\u0131k kayd\u0131 <strong>PDS001<\/strong> program\u0131nda olu\u015fturulur. Malzemeler ve operasyonlar <strong>Product. Connect Materials\/Operations (PDS002)<\/strong> program\u0131nda ba\u011flan\u0131r; operasyon numaras\u0131, i\u015f merkezi, haz\u0131rl\u0131k s\u00fcresi ve i\u015flem s\u00fcresi burada tan\u0131mlan\u0131r.<\/p>\n\n\n<p>Infor, \u00e7izelgeleme yapan herkes i\u00e7in \u00f6nemli bir kural ekler: &#8220;Note that the structure must have at least one operation.&#8221; (Yap\u0131da en az bir operasyon bulunmas\u0131 gerekti\u011fini unutmay\u0131n.) Operasyon yoksa y\u00fck olu\u015fmaz. (<a href=\"https:\/\/docs.infor.com\/m3udi\/16.x\/en-us\/m3beud\/manexechs\/cps600.html\">Infor dok\u00fcmantasyonu<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Malzeme ve tedarik planlama<\/h3>\n\n\n<p>Supply Chain Planning mod\u00fclleri; Material Planning, Master Production Scheduling, Rough Cut Capacity Planning, DRP ve Global CTP&#8217;yi kapsar. Bunlar malzeme ve tedariki planlar. \u00dcr\u00fcn tan\u0131t\u0131m\u0131nda kapasite i\u00e7in belirtilen i\u015flev, kaba kapasite planlamad\u0131r. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/solution_overview_fashion\/jpo1586931917083.html\">Infor dok\u00fcmantasyonu<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. \u00dcretim emirleri y\u00fck olu\u015fturur<\/h3>\n\n\n<p>&#8220;Load is automatically generated when a manufacturing order or planned manufacturing order is generated or replanned.&#8221; (Bir \u00fcretim emri veya planl\u0131 \u00fcretim emri olu\u015fturuldu\u011funda ya da yeniden planland\u0131\u011f\u0131nda y\u00fck otomatik olarak olu\u015fur.) A veya B y\u00fck tipi, <strong>PMS120<\/strong> program\u0131nda \u00fcretim emri tipi \u00fczerinde belirlenir. \u00dcretim emirleri <strong>PMS100<\/strong>, planl\u0131 \u00fcretim emirleri ise <strong>PMS170<\/strong> program\u0131nda a\u00e7\u0131l\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Sonlu kapasite ayar\u0131 ve darbo\u011faz planlama<\/h3>\n\n\n<p>Kapasiteyi s\u0131n\u0131rland\u0131rmak i\u00e7in iki ayar kullan\u0131l\u0131r:<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Ayar<\/th><th>Program<\/th><th>\u0130\u015flevi<\/th><\/tr><\/thead><tbody><tr><td>Sonsuz\/sonlu kapasite<\/td><td>Work Center. Open (PDS010)<\/td><td>Ba\u015flang\u0131\u00e7 ve biti\u015f saatleri hesaplan\u0131rken &#8220;whether overload can be created for the operation&#8221; (operasyon i\u00e7in a\u015f\u0131r\u0131 y\u00fck olu\u015fturulup olu\u015fturulamayaca\u011f\u0131n\u0131) belirler<\/td><\/tr><tr><td>Darbo\u011faz planlama<\/td><td>Settings &#8211; Capacity Planning (CRS786)<\/td><td>T\u00fcm ihtiya\u00e7lar\u0131 tek bir operasyonu esas alarak planlar; bu operasyon ak\u0131\u015f\u0131n ba\u015f\u0131ndaysa itme, sonundaysa \u00e7ekme yakla\u015f\u0131m\u0131n\u0131 kullan\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Sipari\u015f giri\u015fi s\u0131ras\u0131nda bir sim\u00fclasyon, \u00fcretim emrinin tamam\u0131 i\u00e7in ba\u015flang\u0131\u00e7 ve biti\u015f tarihlerini hesaplar. S\u0131n\u0131r a\u00e7\u0131k\u00e7a belirtilmi\u015ftir: &#8220;Only one operation in a flow of operations can be set as bottleneck planned.&#8221; (Bir operasyon ak\u0131\u015f\u0131nda yaln\u0131zca bir operasyon darbo\u011faz planlamas\u0131na tabi tutulabilir.) (<a href=\"https:\/\/docs.infor.com\/m3udi\/16.x\/en-us\/m3beud\/manexechs\/crs786.html\">Infor dok\u00fcmantasyonu<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Y\u00fck g\u00f6r\u00fcn\u00fcmleri ve manuel dengeleme<\/h3>\n\n\n<p>Planlamac\u0131lar y\u00fck\u00fc <strong>Load. Display Totals (CPS100)<\/strong>, <strong>Detailed (CPS105)<\/strong>, <strong>per Product (CPS110)<\/strong>, <strong>Over &amp; Under (CPS120)<\/strong>, <strong>Gantt Chart for MOs (CPS130)<\/strong> ve <strong>Work Center Schedule (PMS230)<\/strong> \u00fczerinden izler. Y\u00fck\u00fc manuel olarak yeniden dengelerler. Infor, y\u00fck dengelemeyi &#8220;an ongoing way of working more or less all the time.&#8221; (neredeyse s\u00fcrekli devam eden bir \u00e7al\u0131\u015fma bi\u00e7imi) olarak tan\u0131mlar.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. Infor&#8217;un planlama eklentileri<\/h3>\n\n\n<p><strong>M3 Capacity Planning Workbench<\/strong>, i\u015f merkezlerini tablo ve grafik \u00fczerinde g\u00f6sterir. G\u00f6r\u00fcn\u00fcmler, &#8220;their current capacity and load situation in M3 ERP,&#8221; (M3 ERP&#8217;deki mevcut kapasite ve y\u00fck durumlar\u0131n\u0131) yans\u0131t\u0131r; a\u015f\u0131r\u0131 ve d\u00fc\u015f\u00fck kapasite kullan\u0131m\u0131 renklerle belirtilir. Bu ara\u00e7, durumu g\u00f6r\u00fcnt\u00fclemek ve istisnalar\u0131 izlemek i\u00e7indir. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/solution_overview_fashion\/yps1694163159688.html\">Infor dok\u00fcmantasyonu<\/a>)<\/p>\n\n\n<p><strong>M3 Scheduling Workbench (SWB)<\/strong>, Infor&#8217;un M3 i\u00e7in sundu\u011fu, kapasite k\u0131s\u0131tlar\u0131n\u0131 g\u00f6zeten \u00fcretim \u00e7izelgeleme arac\u0131d\u0131r. Infor bunu &#8220;a powerful decision support tool for production planning and the scheduling of manufacturing orders.&#8221; (\u00fcretim planlama ve \u00fcretim emirlerini \u00e7izelgeleme i\u00e7in g\u00fc\u00e7l\u00fc bir karar destek arac\u0131) olarak tan\u0131mlar. Yine Infor&#8217;un ifadesiyle: &#8220;It takes into consideration finite capacity constraints and material flow from raw materials to finished products.&#8221; (Sonlu kapasite k\u0131s\u0131tlar\u0131n\u0131 ve ham maddeden bitmi\u015f \u00fcr\u00fcne kadar malzeme ak\u0131\u015f\u0131n\u0131 dikkate al\u0131r.) K\u0131s\u0131tlar Teorisi&#8217;ne dayal\u0131 darbo\u011faz y\u00f6netimi, kural tabanl\u0131 s\u0131ralama optimizasyonu ve Interactive Scheduling Board sunar. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/solution_overview_fashion\/lko1518614227567.html\">Infor dok\u00fcmantasyonu<\/a>)<\/p>\n\n\n<p><strong>M3 Planning Workbench (PWB)<\/strong>, orta vadeli kapasite ve fason \u00fcretim kararlar\u0131 i\u00e7in kullan\u0131lan bir masa\u00fcst\u00fc arac\u0131d\u0131r. Macro Orders, sim\u00fclasyonda ele al\u0131nan emir say\u0131s\u0131n\u0131 azalt\u0131r. (<a href=\"https:\/\/docs.infor.com\/m3pwb\/2026.x\/en-us\/m3pwbolh\/svr1587368598875.html\">Infor dok\u00fcmantasyonu<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Planlamac\u0131ya kalan i\u015fler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Sonlu kapasite, i\u015f merkezi baz\u0131nda bir ayard\u0131r.<\/strong> Temel M3, a\u015f\u0131r\u0131 y\u00fcke izin verilip verilmeyece\u011fini belirler. Birden \u00e7ok kayna\u011f\u0131 birlikte de\u011ferlendirerek i\u015f s\u0131ralamas\u0131 yapmaz.<\/li>\n\n\n<li><strong>Her ak\u0131\u015fta tek darbo\u011faz.<\/strong> Infor&#8217;un ifadesiyle, &#8220;all requirements planning will occur around this operation.&#8221; (t\u00fcm ihtiya\u00e7 planlamas\u0131 bu operasyon esas al\u0131narak yap\u0131l\u0131r.)<\/li>\n\n\n<li><strong>Dengeleme yine elle yap\u0131l\u0131r.<\/strong> Y\u00fck g\u00f6r\u00fcn\u00fcmleri a\u015f\u0131r\u0131 ve d\u00fc\u015f\u00fck y\u00fck\u00fc g\u00f6sterir; i\u015fleri kayd\u0131ran ise planlamac\u0131d\u0131r.<\/li>\n\n\n<li><strong>Y\u00fck\u00fcn do\u011frulu\u011fu, \u00fcretim bildirimlerine ba\u011fl\u0131d\u0131r.<\/strong> Infor \u015f\u00f6yle der: &#8220;it is important that every operation is reported.&#8221; (her operasyonun bildirilmesi \u00f6nemlidir.) Eksik bildirimler, eski y\u00fck\u00fcn g\u00f6r\u00fcn\u00fcmde kalmas\u0131na yol a\u00e7ar.<\/li>\n\n\n<li><strong>SWB bir eklentidir.<\/strong> Infor, Food and Beverage CloudSuite kapsam\u0131nda SWB&#8217;yi Factory Track ve di\u011fer eklentilerle birlikte &#8220;core plus add-ons are recommended,&#8221; (temel \u00e7\u00f6z\u00fcm ve eklentiler \u00f6nerilir) ba\u015fl\u0131\u011f\u0131 alt\u0131nda listeler. (<a href=\"https:\/\/docs.infor.com\/m3csfab\/latest\/en-us\/csfablib\/solution_overview_food-beverage\/nyj1693564666315.html\">Infor dok\u00fcmantasyonu<\/a>)<\/li>\n\n\n<li><strong>SWB ayr\u0131 bir uygulama olarak \u00e7al\u0131\u015f\u0131r.<\/strong> Kullan\u0131c\u0131lar uygulamay\u0131 ki\u015fisel RDWeb kullan\u0131c\u0131 kimlikleriyle RDWeb \u00fczerinden veya ba\u015flat men\u00fcs\u00fcnden a\u00e7ar. ION API ve M3 BE&#8217;nin de SWB i\u00e7in yap\u0131land\u0131r\u0131lmas\u0131 gerekir. (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/bxo1633498608635.html\">Infor dok\u00fcmantasyonu<\/a>, <a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/wsu1633500923509.html\">Infor dok\u00fcmantasyonu<\/a>)<\/li>\n\n\n<li><strong>SWB, darbo\u011faz\u0131 esas alan bir planla canl\u0131ya ge\u00e7er.<\/strong> Infor&#8217;un canl\u0131ya ge\u00e7i\u015f \u00f6nerisi, &#8220;start all resources with infinite capacity,&#8221; (t\u00fcm kaynaklar\u0131 sonsuz kapasiteyle ba\u015flat\u0131n) yakla\u015f\u0131m\u0131yla yaln\u0131zca kritik darbo\u011faz\u0131n kapasitesini s\u0131n\u0131rland\u0131rmakt\u0131r. Ayr\u0131ca \u015funu belirtir: &#8220;Focus only on the critical bottlenecks before going live.&#8221; (Canl\u0131ya ge\u00e7meden \u00f6nce yaln\u0131zca kritik darbo\u011fazlara odaklan\u0131n.) Di\u011fer t\u00fcm kaynaklar sonsuz kapasitede kal\u0131r. (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">Infor dok\u00fcmantasyonu<\/a>)<\/li>\n\n\n<li><strong>PWB emirleri ge\u00e7icidir.<\/strong> &#8220;The order number in M3 PWB is temporary until a new order number is inserted by the central system.&#8221; (M3 PWB&#8217;deki emir numaras\u0131, merkezi sistem taraf\u0131ndan yeni bir emir numaras\u0131 atanana kadar ge\u00e7icidir.) (<a href=\"https:\/\/docs.infor.com\/m3pwb\/2026.x\/en-us\/m3pwbolh\/pfa1568180108821.html\">Infor dok\u00fcmantasyonu<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Hem temel M3&#8217;te hem de Infor&#8217;un \u00f6nerdi\u011fi \u015fekilde canl\u0131ya al\u0131nan SWB&#8217;de darbo\u011faz, kapasitesi g\u00f6zetilerek planlan\u0131r. Di\u011fer t\u00fcm i\u015f merkezleri i\u00e7inse kaba bir y\u00fck de\u011feri hesaplan\u0131r. Planlamac\u0131lar, ger\u00e7ek i\u015f s\u0131ras\u0131n\u0131 M3&#8217;\u00fcn yan\u0131nda elektronik tablolarda tutar.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-infor-m3-s-own-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Infor M3&#8217;\u00fcn kendi planlamas\u0131 ne zaman yeterli?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>PDS010 ve CRS786 \u015fu ko\u015fullarda ihtiyac\u0131 kar\u015f\u0131lar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Her \u00fcr\u00fcn ak\u0131\u015f\u0131nda belirgin tek bir darbo\u011faz vard\u0131r ve fabrikan\u0131n geri kalan\u0131nda bo\u015f kapasite bulunur.<\/li>\n\n\n<li>\u00dcr\u00fcn yap\u0131lar\u0131 sabittir ve her operasyonun bildirimi zaman\u0131nda yap\u0131l\u0131r.<\/li>\n\n\n<li>Planlamac\u0131lar CPS120 ve CPS130&#8217;da haftal\u0131k y\u00fck dengelemesi yapar; bu s\u0131kl\u0131k yeterlidir.<\/li>\n\n\n<li>As\u0131l sorun malzeme tedarikidir; bu y\u00fczden MRP ve MPS, makinelerdeki i\u015f s\u0131ras\u0131ndan daha \u00f6nemlidir.<\/li>\n\n\n<li>S\u0131rada hangi i\u015fin yap\u0131laca\u011f\u0131n\u0131 tip de\u011fi\u015fimleri, ortak kullan\u0131lan tak\u0131mlar ve operat\u00f6r m\u00fcsaitli\u011fi belirlemez.<\/li>\n\n<\/ul>\n\n\n<p>SWB; \u00f6zel bir planlama ekibi olan, Infor veya bir i\u015f orta\u011f\u0131yla eklenti projesi y\u00fcr\u00fctmeyi kabul eden ve kapasite k\u0131s\u0131tl\u0131 modeli ad\u0131m ad\u0131m devreye alan fabrikalara uygundur.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kapasiteyi g\u00f6zeten bir \u00fcretim \u00e7izelgeleme arac\u0131 ne zaman gerekir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A\u015fa\u011f\u0131dakilerden birka\u00e7\u0131 sizin i\u00e7in ge\u00e7erliyse temel M3 art\u0131k ihtiya\u00e7lar\u0131n\u0131za yetmiyor demektir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Darbo\u011fazlar \u00fcr\u00fcn karmas\u0131yla birlikte yer de\u011fi\u015ftirir; dolay\u0131s\u0131yla ak\u0131\u015f ba\u015f\u0131na tek darbo\u011faz modeli uygun de\u011fildir.<\/li>\n\n\n<li>CPS100&#8217;de d\u00f6nem baz\u0131nda y\u00fck dengeli g\u00f6r\u00fcnse de teslimat tarihleri gecikir.<\/li>\n\n\n<li>Tip de\u011fi\u015fimi s\u00fcresi, bir \u00f6nceki \u00fcretilen \u00fcr\u00fcne ba\u011fl\u0131d\u0131r.<\/li>\n\n\n<li>Kal\u0131plar, pres kal\u0131plar\u0131 veya fikst\u00fcrler i\u015f merkezleri aras\u0131nda ortak kullan\u0131l\u0131r.<\/li>\n\n\n<li>Personel ve vardiyalar, plan\u0131 makineler kadar k\u0131s\u0131tlar; baz\u0131 i\u015fler birden fazla operat\u00f6r gerektirir.<\/li>\n\n\n<li>Acil sipari\u015fler ve ar\u0131zalar, vardiya i\u00e7inde yeniden planlama yapmay\u0131 zorunlu k\u0131lar.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Hangi \u00f6zellikleri aramal\u0131s\u0131n\u0131z?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>T\u00fcm kaynaklar\u0131n kapasitesini ayn\u0131 anda, tek bir motorda g\u00f6zetme<\/strong>: makineler, personel, tak\u0131mlar ve malzemeler.<\/li>\n\n\n<li>Her iki y\u00f6nde de i\u015f s\u0131ras\u0131na ba\u011fl\u0131 tip de\u011fi\u015fimi s\u00fcrelerini i\u00e7eren <strong>bir haz\u0131rl\u0131k s\u00fcresi matrisi<\/strong>.<\/li>\n\n\n<li><strong>Tak\u0131mlar\u0131n kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklar olarak ele al\u0131nmas\u0131<\/strong> ve <strong>birden fazla operat\u00f6r gerektiren i\u015fler<\/strong>.<\/li>\n\n\n<li>Motorun ger\u00e7ekten kulland\u0131\u011f\u0131 <strong>alternatif i\u015f merkezleri ve personel<\/strong>.<\/li>\n\n\n<li>Mevcut stoklar\u0131 ve sat\u0131n alma sipari\u015fleriyle gelecek malzemeleri dikkate alan <strong>\u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li>\u00dcretimin ilerleyi\u015fi veya sipari\u015fler de\u011fi\u015fti\u011finde <strong>otomatik yeniden \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li><strong>Tarihleri hangi sistemin y\u00f6netece\u011finin a\u00e7\u0131k\u00e7a belirlenmesi.<\/strong> MRP&#8217;nin yeniden olu\u015fturdu\u011fu planl\u0131 \u00fcretim emirlerini de\u011fil, kesinle\u015fmi\u015f \u00fcretim emirlerini \u00e7izelgeleyin. Operasyon tarihlerinin M3 taraf\u0131ndan m\u0131, \u00e7izelgeleme sistemi taraf\u0131ndan m\u0131 y\u00f6netilece\u011fini belirleyin.<\/li>\n\n\n<li>M3&#8217;teki y\u00fck\u00fcn do\u011fru kalmas\u0131 i\u00e7in PMS070MI \u00fczerinden <strong>operasyon bildirimlerinin M3&#8217;e geri aktar\u0131lmas\u0131<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p>Se\u00e7enekler d\u00f6rt gruba ayr\u0131l\u0131yor:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>M3&#8217;\u00fcn kendi kapasite planlama i\u015flevi<\/strong>, M3 i\u00e7inde her ak\u0131\u015f i\u00e7in bir darbo\u011faz\u0131 kapsar.<\/li>\n\n\n<li><strong>Infor&#8217;un eklentileri SWB ve PWB<\/strong>, planlamac\u0131lara haz\u0131rl\u0131k matrisleri ve kural tabanl\u0131 optimizasyonla kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde s\u0131ralama yapma ve orta vadeli sim\u00fclasyon olana\u011f\u0131 sunar.<\/li>\n\n\n<li><strong>Kurumsal APS paketleri<\/strong> bir uygulama projesiyle entegre edilir ve merkezi bir planlama ekibi gerektirir.<\/li>\n\n\n<li>SkyPlanner&#8217;\u0131n da yer ald\u0131\u011f\u0131 <strong>sahada uygulamay\u0131 destekleyen bulut APS \u00e7\u00f6z\u00fcmleri<\/strong>, M3 ile birlikte \u00e7al\u0131\u015farak her kayna\u011f\u0131 otomatik olarak \u00e7izelgeler ve \u00e7izelgeyi operat\u00f6rlerin kullan\u0131m\u0131na sunar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner nerede devreye girer?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS, her i\u015f merkezini, \u00e7al\u0131\u015fan\u0131, tak\u0131m\u0131 ve malzemeyi tek bir motorla, kapasite ve miktar s\u0131n\u0131rlar\u0131n\u0131 dikkate alarak \u00e7izelgeler. Arcturus AI motoru, operasyon d\u00fczeyindeki \u00e7izelgeyi saniyeler i\u00e7inde olu\u015fturur; i\u015f \u00f6nceli\u011fi, tamamlanma tarihi, m\u00fc\u015fteri \u00f6nceli\u011fi, Fast Track ve Dynamic Priorities do\u011frultusunda s\u0131ralar. Kimsenin CPS120&#8217;yi elle yeniden dengelemesi gerekmez.<\/p>\n\n\n<p>Haz\u0131rl\u0131k s\u00fcresi matrisi, \u00fcr\u00fcnler aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcrelerini her iki y\u00f6nde de tutar; motor, en az haz\u0131rl\u0131k gerektiren s\u0131ralamay\u0131 se\u00e7er. Tak\u0131mlar, kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklard\u0131r ve bir i\u015f birden fazla operat\u00f6r gerektirebilir. Birincil i\u015f merkezi veya \u00e7al\u0131\u015fan uygun olmad\u0131\u011f\u0131nda motor, i\u015fi alternatif i\u015f merkezlerine ya da \u00e7al\u0131\u015fanlara aktar\u0131r.<\/p>\n\n\n<p>Malzemeye dayal\u0131 \u00e7izelgeleme, mevcut stoklar\u0131 ve sat\u0131n alma sipari\u015fleriyle gelecek malzemeleri temel alarak gelecekteki stok durumunu sim\u00fcle eder. Sipari\u015f edilen malzeme, teslim tarihinde kullan\u0131labilir say\u0131l\u0131r; b\u00f6ylece bir \u00fcretim emri ancak malzeme haz\u0131r oldu\u011funda ba\u015flar.<\/p>\n\n\n<p>Autopilot, \u00fcretimde de\u011fi\u015fiklik oldu\u011funda belirledi\u011finiz kilitlere ve \u00f6nceliklere uyarak \u00e7izelgeyi otomatik olarak yeniler. Running Time Lock ise ba\u015flam\u0131\u015f i\u015fleri yerinde tutar. Operat\u00f6rler, Mobile Confirmations ve Production Timer ile \u00e7al\u0131\u015fmalar\u0131 kaydeder; bildirimler PMS070MI \u00fczerinden M3&#8217;e geri aktar\u0131l\u0131r.<\/p>\n\n\n<p><strong>\u015eu durumlarda M3 Scheduling Workbench yerine SkyPlanner&#8217;\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kaba bir plan de\u011fil, ger\u00e7ek kapasiteye uygun \u00fcretim \u00e7izelgeleme istiyorsan\u0131z.<\/strong> Infor, SWB&#8217;yi canl\u0131ya al\u0131rken kritik darbo\u011faz d\u0131\u015f\u0131ndaki t\u00fcm kaynaklar\u0131n kapasitesini sonsuz kabul etmeyi \u00f6nerir. SkyPlanner, ilk \u00e7izelgeden itibaren t\u00fcm planlama ufku boyunca her makineyi, \u00e7al\u0131\u015fan\u0131, tak\u0131m\u0131 ve malzemeyi kapasite ve miktar s\u0131n\u0131rlar\u0131na g\u00f6re, saat baz\u0131nda planlar.<\/li>\n\n\n<li><strong>\u00c7izelgenizi haftalar i\u00e7inde kullan\u0131ma almak istiyorsan\u0131z.<\/strong> Kullan\u0131c\u0131lar SWB uygulamas\u0131n\u0131 kendi RDWeb kullan\u0131c\u0131 kimlikleriyle RDWeb \u00fczerinden veya ba\u015flat men\u00fcs\u00fcnden a\u00e7ar. \u00d6nce ION API ve M3 BE&#8217;nin buna uygun yap\u0131land\u0131r\u0131lmas\u0131 gerekir (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/bxo1633498608635.html\">Infor belgeleri<\/a>). SkyPlanner taray\u0131c\u0131da \u00e7al\u0131\u015f\u0131r, deneme s\u00fcresinde kendi \u00fcretim emirlerinizle test edilir ve devreye alma s\u00fcreci ba\u015flad\u0131ktan sonra haftalar i\u00e7inde canl\u0131ya al\u0131n\u0131r.<\/li>\n\n\n<li><strong>Plan\u0131n kendili\u011finden g\u00fcncel kalmas\u0131 gerekiyorsa.<\/strong> Autopilot, her \u00f6nemli de\u011fi\u015fiklikte otomatik olarak yeniden planlar. Haz\u0131rl\u0131k s\u00fcresi matrisini, birden fazla operat\u00f6r gerektiren i\u015fleri, alternatif i\u015f merkezlerini ve sat\u0131n alma sipari\u015flerinin geli\u015f tarihlerini ayn\u0131 hesaplamada dikkate al\u0131r.<\/li>\n\n\n<li><strong>Operat\u00f6rlerin ayn\u0131 \u00e7izelgeye g\u00f6re \u00e7al\u0131\u015fmas\u0131 gerekiyorsa.<\/strong> Mobile Confirmations, her operat\u00f6re telefon veya tablet \u00fczerinden g\u00fcncel i\u015f kuyru\u011funu sunar. Kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r ve bildirimler PMS070MI \u00fczerinden M3&#8217;e geri aktar\u0131l\u0131r.<\/li>\n\n<\/ul>\n\n\n<p>M3&#8217;ten d\u0131\u015fa aktard\u0131\u011f\u0131n\u0131z bir CSV veya Excel dosyas\u0131yla <a href=\"\/tr\/deneme\/\">30 g\u00fcnl\u00fck \u00fccretsiz denemeye<\/a> ba\u015flay\u0131n. Kredi kart\u0131 gerekmez ve 20 i\u015f merkezine kadar kullanabilirsiniz. Fiyatlar, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve ayl\u0131k faturaland\u0131r\u0131l\u0131r. Entegrasyon i\u00e7in s\u00fcre\u00e7 ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan teklif, abonelik plan\u0131n\u0131zla birlikte \u00f6nceden sunulur.<\/p>\n\n\n<p>Sistemlerin nas\u0131l ba\u011fland\u0131\u011f\u0131n\u0131 <a href=\"\/tr\/entegrasyonlar\/erp\/infor-m3\/\">Infor M3 i\u00e7in SkyPlanner<\/a> sayfas\u0131nda inceleyin veya <a href=\"\/tr\/entegrasyonlar\/erp\/infor-m3\/entegrasyon-kilavuzu\/\">Infor M3 entegrasyon k\u0131lavuzuna<\/a> gidin. Di\u011fer ERP&#8217;leri <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131 sayfas\u0131nda<\/a> bulabilirsiniz.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeye ba\u015flay\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo i\u00e7in randevu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim sahas\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta kazan\u0131lan zaman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt cihazlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamada her hafta 2 saat \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni bir i\u015f kuyru\u011fu \u00fcretim hatt\u0131na saniyeler i\u00e7inde ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131 ve t\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f bir plan\u0131n haz\u0131rlanmas\u0131 30 dakikadan az s\u00fcr\u00fcyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec CEO&#x27;su Hannu Ryyn\u00e4nen, \u015firketin Lohja&#x27;daki \u00fcretim tesisinde\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000&#8217;lerce<\/b><span>otomatik \u00e7izelgelenen i\u015f emri<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretim art\u0131k bamba\u015fka bir \u015fekilde kontrol alt\u0131nda ve kapasiteye ili\u015fkin bilgimiz tamamen farkl\u0131 bir d\u00fczeyde.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 End\u00fcstriyel kar\u0131\u015ft\u0131r\u0131c\u0131lar, pompalar ve y\u00fcksek teknolojili fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Binlerce i\u015f emri otomatik olarak \u00e7izelgeleniyor ve kurulu\u015fun tamam\u0131 \u00fcretimi ger\u00e7ek zamanl\u0131 olarak g\u00f6rebiliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/mamec\/\">Mamec&#8217;in yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel&#x27;in Kauhava&#x27;daki \u00e7at\u0131 g\u00fcvenlik \u00fcr\u00fcnleri fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 tespit etmek i\u00e7in gereken g\u00f6r\u00fcn\u00fcrl\u00fc\u011f\u00fc sa\u011flad\u0131 ve \u00fcretim y\u00f6netimini netle\u015ftirdi.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenli\u011fi ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 bu y\u0131l %99,2&#8217;ye ula\u015ft\u0131. \u00c7izelgelemede g\u00fcnl\u00fck d\u00f6rt saate kadar \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/piristeel\/\">Piristeel&#8217;in yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Infor M3&#8217;te bir \u00e7izelgeleme arac\u0131 var m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet. M3&#8217;\u00fcn temel i\u015flevleri, i\u015f merkezi kapasitesinden operasyon tarihlerini hesaplar ve CRS786&#8217;da her ak\u0131\u015f i\u00e7in bir darbo\u011faz\u0131 planlayabilir. M3 Scheduling Workbench ise bir eklenti olarak \u00fcretim emirlerini kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde s\u0131ralama olana\u011f\u0131 sunar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M3 Scheduling Workbench ile Planning Workbench aras\u0131ndaki fark nedir?<\/summary>\n<p class=\"sp-faq__a\">Scheduling Workbench, \u00fcretim emirlerini kapasite s\u0131n\u0131rlar\u0131n\u0131 ve malzeme ak\u0131\u015f\u0131n\u0131 dikkate alarak s\u0131ralar. Planning Workbench, orta vadeli kapasite ve fason \u00fcretim kararlar\u0131 i\u00e7in kullan\u0131lan bir masa\u00fcst\u00fc arac\u0131d\u0131r. Burada olu\u015fturulan emirler, M3 numara atayana kadar ge\u00e7ici kal\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M3 Scheduling Workbench, M3 CloudSuite&#8217;e dahil mi?<\/summary>\n<p class=\"sp-faq__a\">Infor, Food and Beverage CloudSuite kapsam\u0131nda bunu temel bir uygulama olarak de\u011fil, \u00f6nerilen bir eklenti olarak listeler. Kendi CloudSuite aboneli\u011finizin kapsam\u0131n\u0131 Infor veya i\u015f orta\u011f\u0131n\u0131zla kontrol edin.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M3 Scheduling Workbench mi, SkyPlanner m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Kaba bir plan yerine ger\u00e7ek kapasiteye uygun bir \u00fcretim \u00e7izelgesi istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in. Infor, SWB&#8217;yi canl\u0131ya al\u0131rken t\u00fcm kaynaklarda sonsuz kapasiteyle ba\u015flamay\u0131 ve yaln\u0131zca kritik darbo\u011faz\u0131n kapasitesini s\u0131n\u0131rlamay\u0131 \u00f6nerir. SWB, RDWeb \u00fczerinden ayr\u0131 bir uygulama olarak \u00e7al\u0131\u015fan bir eklentidir. SkyPlanner, her makineyi, \u00e7al\u0131\u015fan\u0131, tak\u0131m\u0131 ve malzemeyi kapasite ve miktar s\u0131n\u0131rlar\u0131 i\u00e7inde, ba\u015flang\u0131\u00e7 ve biti\u015f saatlerini belirleyerek \u00e7izelgeler. Ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re de\u011fi\u015fen tip de\u011fi\u015fimi s\u00fcrelerini, birden fazla operat\u00f6r gerektiren i\u015fleri ve alternatif i\u015f merkezlerini dikkate al\u0131r. Autopilot, her \u00f6nemli de\u011fi\u015fiklikte yeniden planlar ve haftalar i\u00e7inde canl\u0131 kullan\u0131ma ge\u00e7ersiniz. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar; kendi verilerinizle 30 g\u00fcnl\u00fck deneme yapabilirsiniz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M3 MRP, \u00e7izelgelemede kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate al\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">M3 MRP ve MPS, malzeme ve tedariki planlar. Infor&#8217;un planlamaya genel bak\u0131\u015f dok\u00fcman\u0131nda kapasite planlama y\u00f6ntemi olarak kaba kapasite planlamas\u0131 yer al\u0131r. PDS010&#8217;daki s\u0131n\u0131rl\u0131 kapasite ayar\u0131 daha sonra, bir emrin operasyon ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131 hesaplan\u0131rken devreye girer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner&#8217;\u0131 Infor M3 ile entegre etmeden \u00f6nce test edebilir miyim?<\/summary>\n<p class=\"sp-faq__a\">Evet. M3&#8217;ten malzemeleri, i\u015f merkezlerini ve a\u00e7\u0131k \u00fcretim emirlerini d\u0131\u015fa aktar\u0131n. 30 g\u00fcnl\u00fck deneme s\u00fcresinde bunlar\u0131 CSV veya Excel olarak i\u00e7e aktar\u0131n ve olu\u015fan \u00e7izelgeyi mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n. <a href=\"\/tr\/fiyatlandirma\/\">Fiyatlar\u0131 inceleyin<\/a>, <a href=\"\/tr\/deneme\/\">denemeye ba\u015flay\u0131n<\/a> veya <a href=\"\/tr\/iletisim-satis\/\">sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Infor M3 Infor M3&#8217;te \u00dcretim \u00c7izelgeleme Var m\u0131? PDS010, Scheduling Workbench ve SkyPlanner APS Infor M3, ger\u00e7ek makine ve personel kapasitesini g\u00f6zeten ayr\u0131nt\u0131l\u0131 \u00fcretim \u00e7izelgeleme de\u011fil, kaba kapasite planlama yapar. Temel M3&#8217;te her i\u015f merkezi i\u00e7in sonlu veya sonsuz kapasite se\u00e7ilir ve her operasyon ak\u0131\u015f\u0131nda tek bir darbo\u011faz esas al\u0131narak planlama &#8230; <a title=\"Infor M3&#8217;te \u00dcretim \u00c7izelgeleme Var m\u0131? PDS010, Scheduling Workbench ve SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/\" aria-label=\"Read more about Infor M3&#8217;te \u00dcretim \u00c7izelgeleme Var m\u0131? PDS010, Scheduling Workbench ve SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102949,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103695","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor M3&#039;te \u00dcretim \u00c7izelgeleme Var m\u0131? SWB A\u00e7\u0131klamas\u0131<\/title>\n<meta name=\"description\" content=\"Infor M3&#039;te kapasite i\u015f merkezi baz\u0131nda s\u0131n\u0131rl\u0131d\u0131r; ak\u0131\u015f ba\u015f\u0131na tek darbo\u011faz planlan\u0131r. PDS010, CRS786 ve Scheduling Workbench ne yapar, nerede yetersiz kal\u0131r?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Infor M3&#039;te \u00dcretim \u00c7izelgeleme Var m\u0131? PDS010, Scheduling Workbench ve SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Infor M3&#039;te kapasite i\u015f merkezi baz\u0131nda s\u0131n\u0131rl\u0131d\u0131r; ak\u0131\u015f ba\u015f\u0131na tek darbo\u011faz planlan\u0131r. PDS010, CRS786 ve Scheduling Workbench ne yapar, nerede yetersiz kal\u0131r?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/infor-m3\\\/uretim-cizelgeleme\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/infor-m3\\\/uretim-cizelgeleme\\\/\",\"name\":\"Infor M3'te \u00dcretim \u00c7izelgeleme Var m\u0131? SWB A\u00e7\u0131klamas\u0131\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Infor M3'te kapasite i\u015f merkezi baz\u0131nda s\u0131n\u0131rl\u0131d\u0131r; ak\u0131\u015f ba\u015f\u0131na tek darbo\u011faz planlan\u0131r. PDS010, CRS786 ve Scheduling Workbench ne yapar, nerede yetersiz kal\u0131r?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/infor-m3\\\/uretim-cizelgeleme\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/infor-m3\\\/uretim-cizelgeleme\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/infor-m3\\\/uretim-cizelgeleme\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Infor M3 i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/infor-m3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Infor M3&#8217;te \u00dcretim \u00c7izelgeleme Var m\u0131? PDS010, Scheduling Workbench ve SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor M3'te \u00dcretim \u00c7izelgeleme Var m\u0131? SWB A\u00e7\u0131klamas\u0131","description":"Infor M3'te kapasite i\u015f merkezi baz\u0131nda s\u0131n\u0131rl\u0131d\u0131r; ak\u0131\u015f ba\u015f\u0131na tek darbo\u011faz planlan\u0131r. PDS010, CRS786 ve Scheduling Workbench ne yapar, nerede yetersiz kal\u0131r?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/","og_locale":"tr_TR","og_type":"article","og_title":"Infor M3'te \u00dcretim \u00c7izelgeleme Var m\u0131? PDS010, Scheduling Workbench ve SkyPlanner APS","og_description":"Infor M3'te kapasite i\u015f merkezi baz\u0131nda s\u0131n\u0131rl\u0131d\u0131r; ak\u0131\u015f ba\u015f\u0131na tek darbo\u011faz planlan\u0131r. PDS010, CRS786 ve Scheduling Workbench ne yapar, nerede yetersiz kal\u0131r?","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"15 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/","name":"Infor M3'te \u00dcretim \u00c7izelgeleme Var m\u0131? SWB A\u00e7\u0131klamas\u0131","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Infor M3'te kapasite i\u015f merkezi baz\u0131nda s\u0131n\u0131rl\u0131d\u0131r; ak\u0131\u015f ba\u015f\u0131na tek darbo\u011faz planlan\u0131r. PDS010, CRS786 ve Scheduling Workbench ne yapar, nerede yetersiz kal\u0131r?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Infor M3 i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/"},{"@type":"ListItem","position":5,"name":"Infor M3&#8217;te \u00dcretim \u00c7izelgeleme Var m\u0131? PDS010, Scheduling Workbench ve SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Infor M3 Infor M3&#8217;te \u00dcretim \u00c7izelgeleme Var m\u0131? PDS010, Scheduling Workbench ve SkyPlanner APS Infor M3, ger\u00e7ek makine ve personel kapasitesini g\u00f6zeten ayr\u0131nt\u0131l\u0131 \u00fcretim \u00e7izelgeleme de\u011fil, kaba kapasite planlama yapar. Temel M3&#8217;te her i\u015f merkezi i\u00e7in sonlu veya sonsuz kapasite se\u00e7ilir ve her operasyon ak\u0131\u015f\u0131nda tek bir darbo\u011faz esas al\u0131narak planlama&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/103695","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=103695"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/103695\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/102949"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=103695"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}