{"id":103394,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"uretim-cizelgeleme","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/","title":{"rendered":"Acumatica Kapasite K\u0131s\u0131tlar\u0131n\u0131 Dikkate Alan \u00dcretim \u00c7izelgeleme Sunuyor mu? Classic ve Optimized APS ile SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Acumatica Cloud ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Acumatica Kapasite K\u0131s\u0131tlar\u0131n\u0131 Dikkate Alan \u00dcretim \u00c7izelgeleme Sunuyor mu? <span class=\"hl\">Classic ve Optimized APS ile SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Yaln\u0131zca kaba planlama d\u00fczeyinde. Acumatica Manufacturing Edition i\u00e7indeki Advanced Planning and Scheduling (APS), ayr\u0131nt\u0131l\u0131 ve kapasite k\u0131s\u0131tlar\u0131na uyan \u00fcretim \u00e7izelgeleme yerine Rough Cut Planning olarak \u00e7al\u0131\u015f\u0131r. Classic APS, i\u015f merkezlerini, makineleri ve tak\u0131mlar\u0131 sabit zaman bloklar\u0131na yerle\u015ftirir; biti\u015fi 120 g\u00fcn\u00fcn \u00f6tesine uzanan emirleri ise s\u0131n\u0131rs\u0131z kapasiteyle planlar (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">kaynak<\/a>). 2026 R2 ile gelen ve h\u00e2l\u00e2 deneysel olan Optimized motoru yaln\u0131zca i\u015f merkezlerini \u00e7izelgeler. T\u00fcm planlama ufku boyunca her makinenin, \u00e7al\u0131\u015fan\u0131n, tak\u0131m\u0131n ve malzemenin k\u0131s\u0131tlar\u0131n\u0131 saat baz\u0131nda dikkate almak isteyen tesisler, Acumatica yan\u0131nda SkyPlanner APS kullan\u0131r.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-acumatica-aps-works-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Acumatica APS ad\u0131m ad\u0131m nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Bir motoru etkinle\u015ftirin<\/h3>\n\n\n<p>APS, <strong>Enable\/Disable Features (CS100000)<\/strong> ekran\u0131ndaki Manufacturing grubunda yer alan bir \u00f6zelliktir. 2026 R2 s\u00fcr\u00fcm\u00fcnde iki se\u00e7enek vard\u0131r: <strong>Advanced Planning and Scheduling (Classic)<\/strong> ve <strong>Advanced Planning and Scheduling (Optimized)<\/strong>. \u0130kincisi i\u00e7in y\u00f6nerge \u015f\u00f6yledir: &#8220;select the Advanced Planning and Scheduling (Optimized) check box under Experimental Features.&#8221; (Experimental Features alt\u0131ndaki Advanced Planning and Scheduling (Optimized) onay kutusunu se\u00e7in.) Acumatica bunu a\u00e7\u0131k\u00e7a belirtir: &#8220;The two APS engines cannot be enabled at the same time.&#8221; (\u0130ki APS motoru ayn\u0131 anda etkinle\u015ftirilemez.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">kaynak<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Kapasiteye ili\u015fkin ana veriler<\/h3>\n\n\n<p>Kapasitenin temeli <strong>Work Calendar (CS209000)<\/strong> ekran\u0131nda tan\u0131mlan\u0131r: \u00e7al\u0131\u015fma g\u00fcnleri, ba\u015flang\u0131\u00e7 ve biti\u015f saatleri, molalar. <strong>Work Centers (AM207000)<\/strong> ekran\u0131ndaki her i\u015f merkezinin bir veya daha fazla vardiyas\u0131 vard\u0131r ve her vardiya bir takvime ba\u011fl\u0131d\u0131r. Acumatica \u015f\u00f6yle a\u00e7\u0131klar: &#8220;The daily capacity for a work center is the total number of working hours for all shifts.&#8221; (Bir i\u015f merkezinin g\u00fcnl\u00fck kapasitesi, t\u00fcm vardiyalardaki \u00e7al\u0131\u015fma saatlerinin toplam\u0131d\u0131r.)<\/p>\n\n\n<p>S\u00fcrenin neye g\u00f6re hesaplanaca\u011f\u0131n\u0131 <strong>Basis for Capacity<\/strong> alan\u0131 belirler:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u0130\u015f g\u00fcc\u00fcne dayal\u0131 i\u015f merkezlerinde, vardiyadaki <strong>Crew Size<\/strong> ve <strong>Efficiency<\/strong> de\u011ferleri<\/li>\n\n\n<li>Makineye dayal\u0131 i\u015f merkezlerinde, kendi takvimi ve verimlilik de\u011feri olan <strong>Machines (AM204500)<\/strong> kay\u0131tlar\u0131<\/li>\n\n<\/ul>\n\n\n<p><strong>Tools (AM205500)<\/strong> ekran\u0131ndaki tak\u0131mlar da \u00e7izelgelenebilir. <strong>Production Preferences (AM102000)<\/strong> ekran\u0131nda <strong>Block Size<\/strong> de\u011ferini ve APS&#8217;nin makine kaynaklar\u0131yla tak\u0131mlar\u0131 dikkate al\u0131p almayaca\u011f\u0131n\u0131 se\u00e7ersiniz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Operasyonlar BOM \u00fczerinde tan\u0131mlan\u0131r<\/h3>\n\n\n<p>Acumatica&#8217;da ayr\u0131 bir rota ana veri kayd\u0131 yoktur. Operasyonlar <strong>Bill of Material (AM208000)<\/strong> ekran\u0131nda yer al\u0131r. Her operasyonda \u015fu bilgiler bulunur:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Operation ID<\/strong> ve <strong>Work Center<\/strong><\/li>\n\n\n<li><strong>Setup Time<\/strong>, <strong>Run Time<\/strong>, <strong>Machine Time<\/strong><\/li>\n\n\n<li><strong>Queue Time<\/strong>, <strong>Finish Time<\/strong> ve <strong>Move Time<\/strong><\/li>\n\n<\/ul>\n\n\n<p>Bir \u00fcretim emri olu\u015fturdu\u011funuzda operasyonlar bu emre kopyalan\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. \u00dcretim emrini \u00e7izelgeleme<\/h3>\n\n\n<p>Her \u00fcretim emrinde bir <strong>Scheduling Method<\/strong> se\u00e7ilir:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Y\u00f6ntem<\/th><th>\u0130\u015flevi<\/th><\/tr><\/thead><tbody><tr><td>Finish On<\/td><td>K\u0131s\u0131t tarihinden geriye do\u011fru \u00e7izelgeler<\/td><\/tr><tr><td>Start On<\/td><td>K\u0131s\u0131t tarihinden ileriye do\u011fru \u00e7izelgeler<\/td><\/tr><tr><td>User Dates<\/td><td>Elle girilen ba\u015flang\u0131\u00e7 ve biti\u015f tarihlerini kullan\u0131r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">5. Rough Cut Planning: kapasite k\u0131s\u0131tlar\u0131yla \u00e7izelgeleme<\/h3>\n\n\n<p>Classic APS&#8217;de se\u00e7ti\u011finiz emirler i\u00e7in <strong>Rough Cut Planning (AM501000)<\/strong> formunu \u00e7al\u0131\u015ft\u0131r\u0131rs\u0131n\u0131z. Y\u00fckleme s\u0131ras\u0131 sabittir: \u00f6nce <strong>Dispatch Priority<\/strong> (&#8220;One (1) is the highest priority and ten (10) is the lowest&#8221; (Bir (1) en y\u00fcksek, on (10) en d\u00fc\u015f\u00fck \u00f6nceliktir)), ard\u0131ndan k\u0131s\u0131t tarihi, son olarak \u00fcretim emri numaras\u0131. (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">kaynak<\/a>)<\/p>\n\n\n<p>Kapasite k\u0131s\u0131tlar\u0131yla \u00fcretim \u00e7izelgeleme, i\u015f merkezlerinin, makinelerin ve tak\u0131mlar\u0131n kapasitesini ve mevcut y\u00fck\u00fcn\u00fc dikkate al\u0131r. &#8220;Operations are always scheduled in contiguous blocks skipping over non-working hours and schedule breaks.&#8221; (Operasyonlar her zaman \u00e7al\u0131\u015fma d\u0131\u015f\u0131 saatler ve takvimdeki molalar atlanarak birbirini izleyen bloklar h\u00e2linde \u00e7izelgelenir.) Bloklar 5, 10, 15, 30 veya 60 dakikad\u0131r. Emir t\u00fcr\u00fc veya stok kalemi bu kontrol\u00fc d\u0131\u015flamad\u0131k\u00e7a malzeme mevcudiyeti kontrol edilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. \u00c7izelgeyi g\u00f6zden ge\u00e7irme ve g\u00fcncel tutma<\/h3>\n\n\n<p>Planlamac\u0131 <strong>Production Schedule Board (AM215555)<\/strong> ekran\u0131nda \u00e7al\u0131\u015f\u0131r. Bu ekran emirleri i\u015f merkezi ve makine baz\u0131nda g\u00f6sterir; k\u0131s\u0131t tarihlerini ve \u00f6ncelikleri de\u011fi\u015ftirmenize, \u00e7izelgeleri sabitlemenize olanak tan\u0131r. <strong>APS Maintenance Process (AM512000)<\/strong>, \u00e7izelgelemeyi belirli aral\u0131klarla yeniden \u00e7al\u0131\u015ft\u0131r\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. Optimized motoru (2026 R2, deneysel)<\/h3>\n\n\n<p>Optimized motoru &#8220;calculates production dates with minute-level precision.&#8221; (\u00dcretim tarihlerini dakika hassasiyetinde hesaplar.) Her i\u015f merkezi i\u00e7in <strong>Work Center Scheduling Method<\/strong> alan\u0131 Finite veya Infinite olarak ayarlan\u0131r. Finite se\u00e7ene\u011fi, 1 ile 999 g\u00fcn aras\u0131nda belirlenen s\u00fcre i\u00e7in &#8220;the remaining available capacity during the work center&#8217;s finite scheduling time fence,&#8221; (i\u015f merkezinin kapasite k\u0131s\u0131tl\u0131 \u00e7izelgeleme ufku i\u00e7inde kalan kullan\u0131labilir kapasiteyi) ay\u0131r\u0131r. &#8220;A production order can include both finite and infinite work centers.&#8221; (Bir \u00fcretim emri hem kapasitesi s\u0131n\u0131rl\u0131 hem de s\u0131n\u0131rs\u0131z kabul edilen i\u015f merkezleri i\u00e7erebilir.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-Scheduling-Production-Orders?contentId=uGA1DJYAmrgLBcx6_ArzHA\">kaynak<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Planlamac\u0131ya kalan i\u015fler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Classic, 120 g\u00fcnden sonra kapasiteyi s\u0131n\u0131rs\u0131z kabul eder.<\/strong> &#8220;In APS, the system uses infinite capacity planning for production orders whose end date is beyond 120 days.&#8221; (APS&#8217;de sistem, biti\u015f tarihi bu s\u0131n\u0131r\u0131n \u00f6tesinde olan \u00fcretim emirleri i\u00e7in s\u0131n\u0131rs\u0131z kapasite planlama kullan\u0131r.) Bu s\u0131n\u0131r\u0131n \u00f6tesindeki tarihler yaln\u0131zca operasyon s\u00fcrelerine g\u00f6re belirlenir.<\/li>\n\n\n<li><strong>Optimized, makine, tak\u0131m ve malzemeyi kapsam d\u0131\u015f\u0131 b\u0131rak\u0131r.<\/strong> &#8220;Optimized APS schedules work centers rather than individual machines, tools, or material availability.&#8221; (Optimized APS, tek tek makineleri, tak\u0131mlar\u0131 veya malzeme mevcudiyetini de\u011fil, i\u015f merkezlerini \u00e7izelgeler.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\">kaynak<\/a>) Bu motor etkin oldu\u011funda makine ve tak\u0131m \u00e7izelgeleme formlar\u0131 kullan\u0131lamaz.<\/li>\n\n\n<li><strong>\u00dcr\u00fcn \u00f6zelliklerine g\u00f6re s\u0131ralama yap\u0131lmaz.<\/strong> &#8220;The engine does not use attribute values to determine the scheduling sequence of operations.&#8221; (Motor, operasyonlar\u0131n \u00e7izelgeleme s\u0131ras\u0131n\u0131 belirlerken \u00f6zellik de\u011ferlerini kullanmaz.) Setup Time, \u00f6nce hangi \u00fcr\u00fcn\u00fcn i\u015flendi\u011finden ba\u011f\u0131ms\u0131z olarak her operasyon i\u00e7in sabit bir de\u011ferdir.<\/li>\n\n\n<li><strong>Ayr\u0131lm\u0131\u015f kapasitenin \u00f6ncesine ve sonras\u0131na b\u00f6lme yap\u0131lmaz.<\/strong> Optimized i\u00e7in a\u00e7\u0131klama \u015f\u00f6yledir: &#8220;the engine does not split the operation around capacity already reserved by another operation.&#8221; (Motor, operasyonu ba\u015fka bir operasyonun ay\u0131rd\u0131\u011f\u0131 kapasitenin \u00f6ncesine ve sonras\u0131na b\u00f6lmez.) Ayr\u0131ca &#8220;does not consider fixed manufacturing lead times during scheduling.&#8221; (\u00c7izelgeleme s\u0131ras\u0131nda sabit \u00fcretim temin s\u00fcrelerini dikkate almaz.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-Limitations?contentId=p3YHY33jvtE3KqjTX0facg\">kaynak<\/a>)<\/li>\n\n\n<li><strong>\u0130\u015f g\u00fcc\u00fc, ekipteki ki\u015fi say\u0131s\u0131yla temsil edilir.<\/strong> \u00c7al\u0131\u015fanlar, kendi vardiyalar\u0131 ve devams\u0131zl\u0131klar\u0131 olan bireysel operat\u00f6rler olarak de\u011fil, i\u015f merkezi vardiyas\u0131ndaki ki\u015fi say\u0131s\u0131 ve verimlilik de\u011ferleriyle modellenir.<\/li>\n\n\n<li><strong>Malzemede ya hep ya hi\u00e7 yakla\u015f\u0131m\u0131 vard\u0131r.<\/strong> Classic malzeme kontrol\u00fc yapt\u0131\u011f\u0131nda, t\u00fcm malzemelerin gereken miktarda eksiksiz mevcut olmas\u0131 gerekir.<\/li>\n\n\n<li><strong>Sabitlenen emirlerin yeri de\u011fi\u015fmez.<\/strong> &#8220;When you run finite scheduling of production orders, the system does not reschedule the firmed production orders.&#8221; (\u00dcretim emirleri i\u00e7in kapasite k\u0131s\u0131tl\u0131 \u00e7izelgeleme \u00e7al\u0131\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda sistem, sabitlenmi\u015f \u00fcretim emirlerini yeniden \u00e7izelgelemez.)<\/li>\n\n\n<li><strong>Yeniden \u00e7izelgeleme, de\u011fi\u015fime anl\u0131k tepki de\u011fil, \u00e7al\u0131\u015ft\u0131r\u0131lan bir i\u015flemdir.<\/strong> Rough Cut Planning veya APS Maintenance Process i\u015flemini \u00e7al\u0131\u015ft\u0131r\u0131rs\u0131n\u0131z.<\/li>\n\n<\/ul>\n\n\n<p>Acumatica, kapasite k\u0131s\u0131tlar\u0131n\u0131 dikkate alan kendi i\u015flemine do\u011fru ad\u0131 verir: Rough Cut Planning. \u00c7al\u0131\u015fanlar yerine ekipteki ki\u015fi say\u0131s\u0131n\u0131 kullanmak, her operasyon i\u00e7in tek bir haz\u0131rl\u0131k s\u00fcresi tan\u0131mlamak ve 120 g\u00fcnden sonra kapasiteyi s\u0131n\u0131rs\u0131z kabul etmek, kaba bir plan olu\u015fturur; \u00fcretim sahas\u0131n\u0131n kapasite k\u0131s\u0131tlar\u0131na uyan bir \u00e7izelge de\u011fil.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-acumatica-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Acumatica&#8217;n\u0131n kendi \u00e7izelgelemesi ne zaman yeterli?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Classic APS \u015fu durumlarda i\u015finizi g\u00f6r\u00fcr:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Planlama ufkunuz 120 g\u00fcn\u00fcn \u00e7ok alt\u0131ndad\u0131r.<\/li>\n\n\n<li>\u0130\u015f g\u00fcc\u00fc ortak havuz olarak y\u00f6netilir ve vardiya ba\u015f\u0131na ki\u015fi say\u0131s\u0131 bunu yeterince iyi temsil eder.<\/li>\n\n\n<li>Haz\u0131rl\u0131k s\u00fcreleri, \u00f6nce hangi \u00fcr\u00fcn\u00fcn i\u015flendi\u011fine neredeyse hi\u00e7 ba\u011fl\u0131 de\u011fildir.<\/li>\n\n\n<li>\u00d6ncelikler ve k\u0131s\u0131t tarihleri, planlamac\u0131n\u0131n istedi\u011fini ifade etmeye yeter.<\/li>\n\n\n<li>Belirli aral\u0131klarla yeniden \u00e7izelgeleme, de\u011fi\u015fim h\u0131z\u0131n\u0131za ayak uydurur.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kapasite k\u0131s\u0131tlar\u0131na uyan bir \u00fcretim \u00e7izelgeleme arac\u0131 ne zaman gerekir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A\u015fa\u011f\u0131dakilerden birka\u00e7\u0131 sizin i\u00e7in ge\u00e7erliyse Acumatica APS art\u0131k ihtiya\u00e7lar\u0131n\u0131z\u0131 kar\u015f\u0131lam\u0131yor demektir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Belirli operat\u00f6rlerin m\u00fcsaitli\u011fi, vardiyalar\u0131 ve devams\u0131zl\u0131klar\u0131, plan\u0131 makineler kadar k\u0131s\u0131tlar.<\/li>\n\n\n<li>Tip de\u011fi\u015fimi s\u00fcresi \u00fcretim s\u0131ras\u0131na ba\u011fl\u0131d\u0131r: alerjenler, renkler, malzemeler veya kullan\u0131lan tak\u0131mlar s\u00fcreyi belirler.<\/li>\n\n\n<li>Makinelerin, tak\u0131mlar\u0131n ve malzemelerin birlikte kontrol edilmesi gerekir.<\/li>\n\n\n<li>Mevcut sipari\u015fleriniz veya \u00e7er\u00e7eve anla\u015fmalar\u0131n\u0131z 120 g\u00fcn\u00fcn \u00f6tesine uzan\u0131r.<\/li>\n\n\n<li>Acil sipari\u015fler ve ar\u0131zalar, haftada birka\u00e7 kez yeniden planlama gerektirir.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Hangi \u00f6zellikleri aramal\u0131s\u0131n\u0131z?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>T\u00fcm kaynaklar\u0131n kapasite k\u0131s\u0131tlar\u0131n\u0131 ayn\u0131 anda dikkate alma:<\/strong> i\u015f merkezleri, makineler, \u00e7al\u0131\u015fanlar ve tak\u0131mlar.<\/li>\n\n\n<li><strong>Haz\u0131rl\u0131k s\u00fcresi matrisi:<\/strong> \u00fcr\u00fcnler aras\u0131nda s\u0131raya ba\u011fl\u0131, ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re farkl\u0131la\u015fan tip de\u011fi\u015fimi s\u00fcreleri.<\/li>\n\n\n<li><strong>Tak\u0131mlar\u0131 kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklar olarak ele alma<\/strong>; b\u00f6ylece bir fikst\u00fcr hi\u00e7bir zaman ayn\u0131 anda iki makineye atanmaz.<\/li>\n\n\n<li>Her \u00e7al\u0131\u015fan\u0131n vardiyas\u0131n\u0131 dikkate alan <strong>birden fazla operat\u00f6r gerektiren i\u015fler<\/strong>.<\/li>\n\n\n<li>Stoku ve gelecek sat\u0131n alma sipari\u015flerini teslimat tarihine g\u00f6re kontrol eden <strong>malzemeyi dikkate alan \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li>Motorun ger\u00e7ekten kulland\u0131\u011f\u0131 <strong>alternatif makineler ve personel<\/strong>.<\/li>\n\n\n<li>Bir i\u015fin yeri de\u011fi\u015fti\u011finde \u00e7izelgenin geri kalan\u0131n\u0131n tutarl\u0131l\u0131\u011f\u0131n\u0131 koruyan <strong>g\u00f6rsel Gantt d\u00fczenleme<\/strong>.<\/li>\n\n\n<li>\u00dcretimin ilerleyi\u015fi veya sipari\u015fler de\u011fi\u015fti\u011finde <strong>otomatik yeniden \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li>Acumatica&#8217;daki \u00fcretim emri operasyonlar\u0131na <strong>sorunsuz geri yazma<\/strong>; Acumatica APS&#8217;nin tarihlerin \u00fczerine yazmamas\u0131 i\u00e7in emirlerin sabitlenmesi.<\/li>\n\n<\/ul>\n\n\n<p>Se\u00e7enekler d\u00f6rt gruba ayr\u0131l\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Acumatica&#8217;n\u0131n kendi APS \u00e7\u00f6z\u00fcm\u00fc<\/strong>, yukar\u0131daki s\u0131n\u0131rlamalarla, kapasiteyi a\u015fmadan y\u00fcklemeyi tek bir sistem i\u00e7inde sa\u011flar. Acumatica, &#8220;Advanced planning and scheduling is subject to licensing&#8221; (\u0130leri planlama ve \u00e7izelgeleme lisansa tabidir) diyor (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">kaynak<\/a>). De\u011fi\u015fikliklerin plana yans\u0131mas\u0131 i\u00e7in planlamac\u0131n\u0131n APS&#8217;yi yeniden \u00e7al\u0131\u015ft\u0131rmas\u0131 gerekir.<\/li>\n\n\n<li><strong>Acumatica ekranlar\u0131 i\u00e7inde \u00e7al\u0131\u015fan \u00e7izelgeleme eklentileri<\/strong>, planlamac\u0131n\u0131n y\u00f6netti\u011fi \u00e7izelgeleme panosunun i\u015flevlerini geni\u015fletir.<\/li>\n\n\n<li><strong>Kurumsal APS paketleri<\/strong> bir uygulama projesiyle sisteme ba\u011flan\u0131r ve bu i\u015fe ayr\u0131lm\u0131\u015f bir planlama ekibi taraf\u0131ndan y\u00f6netilir.<\/li>\n\n\n<li><strong>Sahada i\u015f takibi de sunan bulut APS \u00e7\u00f6z\u00fcmleri<\/strong>, SkyPlanner&#8217;\u0131n yer ald\u0131\u011f\u0131 gruptur. Bu \u00e7\u00f6z\u00fcmler Acumatica ile birlikte \u00e7al\u0131\u015farak her kayna\u011f\u0131 otomatik olarak \u00e7izelgeler ve \u00e7izelgeyi operat\u00f6rlerin kullan\u0131m\u0131na sunar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner nerede devreye girer?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS tam da bu eksikleri gidermek i\u00e7in tasarlanm\u0131\u015ft\u0131r. T\u00fcm planlama ufku boyunca her i\u015f merkezinin, \u00e7al\u0131\u015fan\u0131n ve tak\u0131m\u0131n kapasitesi s\u0131n\u0131rl\u0131 kabul edilir. Arcturus AI motoru, operasyon d\u00fczeyindeki \u00e7izelgeyi saniyeler i\u00e7inde olu\u015fturur. \u0130\u015fleri i\u015f \u00f6nceli\u011fi, tamamlanma tarihi, m\u00fc\u015fteri \u00f6nceli\u011fi, Fast Track ve Dynamic Priorities \u00f6l\u00e7\u00fctlerine g\u00f6re s\u0131ralar.<\/p>\n\n\n<p>Haz\u0131rl\u0131k s\u00fcreleri matrisi, \u00fcr\u00fcn \u00f6zelliklerine g\u00f6re her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcresini her iki y\u00f6n i\u00e7in ayr\u0131 ayr\u0131 tutar. Motor, en az haz\u0131rl\u0131k gerektiren s\u0131ralamay\u0131 se\u00e7er. Tak\u0131mlar, kapasitesi s\u0131n\u0131rl\u0131 ortak kaynaklard\u0131r. Ayn\u0131 i\u015fte birden fazla ki\u015fi e\u015f zamanl\u0131 \u00e7al\u0131\u015fabilir. Birincil makine veya personel m\u00fcsait de\u011filse motor i\u015fi alternatif makinelere ya da personele aktar\u0131r.<\/p>\n\n\n<p>Malzemeye dayal\u0131 \u00e7izelgeleme, mevcut stoklar\u0131 ve teslim al\u0131nacak sat\u0131n alma sipari\u015flerini kullanarak gelecekteki stok durumunu sim\u00fcle eder. Sipari\u015f edilen malzeme, teslim tarihinde kullan\u0131labilir kabul edilir. Autopilot, \u00fcretimde de\u011fi\u015fiklik oldu\u011funda belirledi\u011finiz kilitlere ve \u00f6nceliklere uyarak \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Operat\u00f6rler, Mobile Confirmations, Production Timer ve Quick Log Mode ile telefon veya tablet \u00fczerinden i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr ve yapt\u0131klar\u0131 i\u015fleri kaydeder.<\/p>\n\n\n<p>Hesap tablolar\u0131n\u0131 b\u0131rak\u0131yor ve \u00e7al\u0131\u015ft\u0131rman\u0131z gereken yeni bir s\u00fcre\u00e7 yerine kendini g\u00fcncel tutan bir \u00e7izelge istiyorsan\u0131z, <strong>Acumatica APS yerine SkyPlanner&#8217;\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Kaba planlama de\u011fil, her makinenin, \u00e7al\u0131\u015fan\u0131n, tak\u0131m\u0131n ve malzemenin belirli bir saatteki ger\u00e7ek kapasitesini ve kullan\u0131labilirli\u011fini g\u00f6zeten \u00fcretim \u00e7izelgeleme istiyorsunuz.<\/li>\n\n\n<li>Plan\u0131 k\u0131s\u0131tlayan unsur ekipteki ki\u015fi say\u0131s\u0131 de\u011fil, i\u015f g\u00fcc\u00fcn\u00fcn m\u00fcsaitli\u011fi; \u00e7al\u0131\u015fanlar\u0131n da kendilerine ait vardiyalar\u0131 ve devams\u0131zl\u0131klar\u0131 var.<\/li>\n\n\n<li>Tip de\u011fi\u015fimleri i\u015f s\u0131ras\u0131na ba\u011fl\u0131 ya da s\u0131rada hangi i\u015fin yap\u0131labilece\u011fini ortak kullan\u0131lan tak\u0131mlar belirliyor.<\/li>\n\n\n<li>\u0130ki motor aras\u0131nda se\u00e7im yapmadan makineleri, tak\u0131mlar\u0131 ve malzemeleri birlikte kontrol etmeniz gerekiyor.<\/li>\n\n\n<li>Sipari\u015fleriniz 120 g\u00fcnden daha ileriye uzan\u0131yor ve her tarih i\u00e7in kapasite s\u0131n\u0131rlar\u0131na uyulmas\u0131 gerekiyor.<\/li>\n\n\n<li>Plan haftada birka\u00e7 kez de\u011fi\u015fiyor ve APS&#8217;yi belirli aral\u0131klarla \u00e7al\u0131\u015ft\u0131rmak bu de\u011fi\u015fikliklere yeti\u015femiyor. Autopilot her de\u011fi\u015fiklikte plan\u0131 yeniden olu\u015fturur.<\/li>\n\n\n<li>Operat\u00f6rlerin telefon veya tablet \u00fczerinden i\u015f s\u0131ralar\u0131n\u0131 g\u00f6rmesi ve yapt\u0131klar\u0131 i\u015fleri kaydetmesi, bu kay\u0131tlar\u0131n da Acumatica&#8217;ya geri aktar\u0131lmas\u0131 gerekiyor.<\/li>\n\n<\/ul>\n\n\n<p>Devreye alma s\u00fcreci ba\u015flad\u0131ktan sonra haftalar i\u00e7inde canl\u0131 kullan\u0131ma ge\u00e7ersiniz. SkyPlanner ekibi \u00e7ift y\u00f6nl\u00fc entegrasyonu yap\u0131land\u0131r\u0131r ve entegrasyon deste\u011fini sa\u011flar.<\/p>\n\n\n<p><a href=\"\/tr\/deneme\/\">30 g\u00fcnl\u00fck \u00fccretsiz denemeye<\/a>, Acumatica Generic Inquiry \u00fczerinden Excel&#8217;e aktard\u0131\u011f\u0131n\u0131z verilerle ba\u015flay\u0131n (20 i\u015f merkezine kadar, kredi kart\u0131 gerekmez). Sonras\u0131nda fiyatlar, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve ayl\u0131k faturaland\u0131r\u0131l\u0131r. Entegrasyon i\u00e7in s\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan fiyat teklifi, paketinizle birlikte \u00f6nceden sunulur.<\/p>\n\n\n<p>SkyPlanner, s\u00f6zle\u015fme tabanl\u0131 REST API \u00fczerinden Acumatica ile \u00e7ift y\u00f6nl\u00fc entegre olur. SkyPlanner ekibi entegrasyonu devreye alma s\u0131ras\u0131nda yap\u0131land\u0131r\u0131r. \u0130\u015f orta\u011f\u0131n\u0131z veya geli\u015ftiricileriniz de dok\u00fcmantasyonu sunulan <a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">REST API<\/a> \u00fczerinde \u00e7al\u0131\u015fabilir. <a href=\"\/tr\/entegrasyonlar\/erp\/acumatica\/\">Acumatica i\u00e7in SkyPlanner<\/a> sayfas\u0131n\u0131, <a href=\"\/tr\/entegrasyonlar\/erp\/acumatica\/entegrasyon-kilavuzu\/\">Acumatica entegrasyon k\u0131lavuzunu<\/a> veya t\u00fcm <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131n\u0131<\/a> inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta kazan\u0131lan zaman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt cihazlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamada her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresi kazan\u0131l\u0131yor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT Direkt\u00f6r\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan, optimize edilmi\u015f \u00fc\u00e7 ayl\u0131k bir plan\u0131 haz\u0131rlamak 30 dakikadan az s\u00fcr\u00fcyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 tesisinde kaynakl\u0131 bir \u00e7elik yap\u0131y\u0131 ta\u015flayan KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%98<\/b><span>teslimat performans\u0131; yakla\u015f\u0131k %50&#8217;den y\u00fckseldi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumam\u0131zda belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal i\u015fleme ve fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k %50&#8217;den %98&#8217;e kadar y\u00fckseldi. Art\u0131k \u00e7izelgeleme i\u00e7in iki yerine bir sorumlu yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Daha az<\/b><span>malzeme eksikli\u011finden kaynaklanan duru\u015f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner&#8217;\u0131n bize sa\u011flad\u0131\u011f\u0131 de\u011fer, g\u00fcnl\u00fck kullan\u0131mda, \u00f6zellikle de teslimat tarihlerini belirlerken i\u015fimizi g\u00f6ren bir ara\u00e7 olmas\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, \u00dcretim Planlama M\u00fcd\u00fcr\u00fc<\/b><br>Eskomatic \u00b7 Fason tala\u015fl\u0131 imalat<\/p>\n\n\n<p class=\"ind-cust__result\">Otomatik y\u00fck \u00e7izelgeleme sayesinde teslimat tarihleri daha do\u011fru belirleniyor. Malzeme eksikli\u011finden kaynaklanan \u00fcretim duru\u015flar\u0131 da \u00f6nemli \u00f6l\u00e7\u00fcde azald\u0131.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/eskomatic\/\">Eskomatic yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Acumatica&#8217;n\u0131n \u00fcretim \u00e7izelgeleme arac\u0131 var m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet, kaba planlama d\u00fczeyinde var. Manufacturing Edition, \u00fcretim emirlerini ileriye veya geriye do\u011fru \u00e7izelgeler. APS ise Rough Cut Planning ve Production Schedule Board \u00f6zelliklerini ekler. Classic APS, biti\u015f tarihi 120 g\u00fcnden daha ileride olan emirleri s\u0131n\u0131rs\u0131z kapasite varsay\u0131m\u0131yla planlar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Classic ve Optimized APS aras\u0131ndaki fark nedir?<\/summary>\n<p class=\"sp-faq__a\">Classic, i\u015f merkezleri, makineler ve tak\u0131mlar i\u00e7in 5 ile 60 dakika aras\u0131nda sabit zaman bloklar\u0131 ay\u0131r\u0131r. Optimized, her i\u015f merkezi i\u00e7in kapasite s\u0131n\u0131rlar\u0131n\u0131n ge\u00e7erli oldu\u011fu bir zaman aral\u0131\u011f\u0131 kullanarak tarihleri dakika hassasiyetinde hesaplar, ancak yaln\u0131zca i\u015f merkezlerini \u00e7izelgeler. Optimized, 2026 R2 s\u00fcr\u00fcm\u00fcnde deneysel bir \u00f6zelliktir ve ayn\u0131 anda yaln\u0131zca bir motor etkin olabilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Acumatica APS mi yoksa SkyPlanner m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Kaba bir plan yerine ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131na uyan bir \u00fcretim \u00e7izelgesi istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in. Acumatica&#8217;da kapasite s\u0131n\u0131rlar\u0131n\u0131 g\u00f6zeten planlama, Rough Cut Planning ile yap\u0131l\u0131r. Classic APS, 120 g\u00fcnden sonras\u0131n\u0131 s\u0131n\u0131rs\u0131z kapasiteyle planlar; i\u015f g\u00fcc\u00fc ekipteki ki\u015fi say\u0131s\u0131yla temsil edilir; her operasyon i\u00e7in tek bir sabit haz\u0131rl\u0131k s\u00fcresi kullan\u0131l\u0131r ve APS lisansa tabidir. SkyPlanner, t\u00fcm planlama ufku boyunca her makineyi, \u00e7al\u0131\u015fan\u0131, tak\u0131m\u0131 ve malzemeyi kapasite ve kullan\u0131labilirlik s\u0131n\u0131rlar\u0131na uyarak ger\u00e7ek ba\u015flang\u0131\u00e7 ve biti\u015f saatleriyle \u00e7izelgeler. Haz\u0131rl\u0131k s\u00fcreleri matrisinde ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re tan\u0131mlanan tip de\u011fi\u015fimi s\u00fcrelerini kullan\u0131r. Autopilot da plan\u0131 etkileyen her de\u011fi\u015fiklikte yeniden planlama yapar. Ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla haftalar i\u00e7inde canl\u0131 kullan\u0131ma ge\u00e7ersiniz; kendi verilerinizle 30 g\u00fcnl\u00fck deneme yapabilirsiniz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Acumatica, i\u015f s\u0131ras\u0131na ba\u011fl\u0131 haz\u0131rl\u0131k s\u00fcrelerini dikkate al\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. Setup Time, her BOM operasyonunda sabit bir de\u011ferdir. Optimized motoru da operasyonlar\u0131 s\u0131ralarken nitelik de\u011ferlerini kullanmaz. SkyPlanner APS, \u00fcr\u00fcn \u00e7iftleri aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcrelerini i\u00e7eren bir haz\u0131rl\u0131k s\u00fcreleri matrisi kullan\u0131r; \u00f6rne\u011fin maviden k\u0131rm\u0131z\u0131ya ge\u00e7i\u015f 30 dakika, k\u0131rm\u0131z\u0131dan maviye ge\u00e7i\u015f 60 dakika olabilir. Motor, bu s\u00fcreleri en aza indirecek \u015fekilde i\u015fleri s\u0131ralar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Acumatica, operat\u00f6rleri ki\u015fi baz\u0131nda \u00e7izelgeler mi?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. \u0130\u015f g\u00fcc\u00fc, i\u015f merkezi vardiyas\u0131 i\u00e7in ekip b\u00fcy\u00fckl\u00fc\u011f\u00fc ve verimlilik de\u011ferleriyle modellenir. SkyPlanner, \u00e7al\u0131\u015fanlar\u0131 kendi vardiyalar\u0131n\u0131, devams\u0131zl\u0131klar\u0131n\u0131 ve fazla mesailerini dikkate alarak \u00e7izelgeler; gerekti\u011finde bir i\u015fe birden fazla operat\u00f6r atar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner&#8217;\u0131 Acumatica ile entegre etmeden \u00f6nce deneyebilir miyim?<\/summary>\n<p class=\"sp-faq__a\">Evet. A\u00e7\u0131k \u00fcretim emirlerini, operasyonlar\u0131 ve i\u015f merkezlerini Acumatica Generic Inquiry \u00fczerinden Excel&#8217;e aktar\u0131n ve 30 g\u00fcnl\u00fck deneme s\u0131ras\u0131nda SkyPlanner&#8217;a i\u00e7e aktar\u0131n. Kredi kart\u0131 gerekmez. <a href=\"\/tr\/fiyatlandirma\/\">Fiyatlar\u0131 inceleyin<\/a>, <a href=\"\/tr\/deneme\/\">denemeyi ba\u015flat\u0131n<\/a> veya <a href=\"\/tr\/iletisim-satis\/\">sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Acumatica Cloud ERP Acumatica Kapasite K\u0131s\u0131tlar\u0131n\u0131 Dikkate Alan \u00dcretim \u00c7izelgeleme Sunuyor mu? Classic ve Optimized APS ile SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131 Yaln\u0131zca kaba planlama d\u00fczeyinde. Acumatica Manufacturing Edition i\u00e7indeki Advanced Planning and Scheduling (APS), ayr\u0131nt\u0131l\u0131 ve kapasite k\u0131s\u0131tlar\u0131na uyan \u00fcretim \u00e7izelgeleme yerine Rough Cut Planning olarak \u00e7al\u0131\u015f\u0131r. Classic APS, i\u015f merkezlerini, makineleri &#8230; <a title=\"Acumatica Kapasite K\u0131s\u0131tlar\u0131n\u0131 Dikkate Alan \u00dcretim \u00c7izelgeleme Sunuyor mu? Classic ve Optimized APS ile SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/\" aria-label=\"Read more about Acumatica Kapasite K\u0131s\u0131tlar\u0131n\u0131 Dikkate Alan \u00dcretim \u00c7izelgeleme Sunuyor mu? Classic ve Optimized APS ile SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102804,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103394","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Acumatica Kapasiteye Uygun \u00dcretim \u00c7izelgeleme Sunar m\u0131? APS Rehberi<\/title>\n<meta name=\"description\" content=\"Acumatica APS k\u0131s\u0131tl\u0131d\u0131r: Classic 120 g\u00fcn sonras\u0131 kapasiteyi s\u0131n\u0131rs\u0131z sayar; Optimized yaln\u0131z i\u015f merkezlerini kapsar. Kapasiteye uyan APS ne zaman gerekir?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Acumatica Kapasite K\u0131s\u0131tlar\u0131n\u0131 Dikkate Alan \u00dcretim \u00c7izelgeleme Sunuyor mu? Classic ve Optimized APS ile SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\" \/>\n<meta property=\"og:description\" content=\"Acumatica APS k\u0131s\u0131tl\u0131d\u0131r: Classic 120 g\u00fcn sonras\u0131 kapasiteyi s\u0131n\u0131rs\u0131z sayar; Optimized yaln\u0131z i\u015f merkezlerini kapsar. Kapasiteye uyan APS ne zaman gerekir?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/acumatica\\\/uretim-cizelgeleme\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/acumatica\\\/uretim-cizelgeleme\\\/\",\"name\":\"Acumatica Kapasiteye Uygun \u00dcretim \u00c7izelgeleme Sunar m\u0131? APS Rehberi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Acumatica APS k\u0131s\u0131tl\u0131d\u0131r: Classic 120 g\u00fcn sonras\u0131 kapasiteyi s\u0131n\u0131rs\u0131z sayar; Optimized yaln\u0131z i\u015f merkezlerini kapsar. Kapasiteye uyan APS ne zaman gerekir?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/acumatica\\\/uretim-cizelgeleme\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/acumatica\\\/uretim-cizelgeleme\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/acumatica\\\/uretim-cizelgeleme\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP sisteminiz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Acumatica i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteyle \u00dcretim \u00c7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/acumatica\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Acumatica Kapasite K\u0131s\u0131tlar\u0131n\u0131 Dikkate Alan \u00dcretim \u00c7izelgeleme Sunuyor mu? Classic ve Optimized APS ile SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Acumatica Kapasiteye Uygun \u00dcretim \u00c7izelgeleme Sunar m\u0131? APS Rehberi","description":"Acumatica APS k\u0131s\u0131tl\u0131d\u0131r: Classic 120 g\u00fcn sonras\u0131 kapasiteyi s\u0131n\u0131rs\u0131z sayar; Optimized yaln\u0131z i\u015f merkezlerini kapsar. Kapasiteye uyan APS ne zaman gerekir?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/","og_locale":"tr_TR","og_type":"article","og_title":"Acumatica Kapasite K\u0131s\u0131tlar\u0131n\u0131 Dikkate Alan \u00dcretim \u00c7izelgeleme Sunuyor mu? Classic ve Optimized APS ile SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131","og_description":"Acumatica APS k\u0131s\u0131tl\u0131d\u0131r: Classic 120 g\u00fcn sonras\u0131 kapasiteyi s\u0131n\u0131rs\u0131z sayar; Optimized yaln\u0131z i\u015f merkezlerini kapsar. Kapasiteye uyan APS ne zaman gerekir?","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"16 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/","name":"Acumatica Kapasiteye Uygun \u00dcretim \u00c7izelgeleme Sunar m\u0131? APS Rehberi","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Acumatica APS k\u0131s\u0131tl\u0131d\u0131r: Classic 120 g\u00fcn sonras\u0131 kapasiteyi s\u0131n\u0131rs\u0131z sayar; Optimized yaln\u0131z i\u015f merkezlerini kapsar. Kapasiteye uyan APS ne zaman gerekir?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/uretim-cizelgeleme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP sisteminiz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Acumatica i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteyle \u00dcretim \u00c7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/acumatica\/"},{"@type":"ListItem","position":5,"name":"Acumatica Kapasite K\u0131s\u0131tlar\u0131n\u0131 Dikkate Alan \u00dcretim \u00c7izelgeleme Sunuyor mu? Classic ve Optimized APS ile SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Acumatica Cloud ERP Acumatica Kapasite K\u0131s\u0131tlar\u0131n\u0131 Dikkate Alan \u00dcretim \u00c7izelgeleme Sunuyor mu? Classic ve Optimized APS ile SkyPlanner APS Kar\u015f\u0131la\u015ft\u0131rmas\u0131 Yaln\u0131zca kaba planlama d\u00fczeyinde. Acumatica Manufacturing Edition i\u00e7indeki Advanced Planning and Scheduling (APS), ayr\u0131nt\u0131l\u0131 ve kapasite k\u0131s\u0131tlar\u0131na uyan \u00fcretim \u00e7izelgeleme yerine Rough Cut Planning olarak \u00e7al\u0131\u015f\u0131r. Classic APS, i\u015f merkezlerini, makineleri&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/103394","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=103394"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/103394\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/102804"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=103394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}