{"id":103243,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/sage-200\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"sage-200","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/","title":{"rendered":"Sage 200 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Sage 200<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Sage 200 i\u00e7in SkyPlanner APS: <span class=\"hl\">Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS, her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasitesine g\u00f6re \u00e7izelgeleyen bir Sage 200 eklentisidir. Hangi i\u015f emri operasyonunun nerede ve ne zaman y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniler.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner, Sage 200 ile \u00e7ift y\u00f6nl\u00fc entegre olur: i\u015f emirleri, \u00fcr\u00fcnler, stoklar ve sat\u0131n alma sipari\u015fleri SkyPlanner\u2019a aktar\u0131l\u0131r; planlanan operasyon tarihleri ve ger\u00e7ekle\u015fen i\u015f kay\u0131tlar\u0131 ise geri g\u00f6nderilir. SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu Sage 200 yap\u0131land\u0131rman\u0131za ve \u00fcretim eklentinize g\u00f6re ayarlar.<\/p>\n\n\n<p>Fiyatlar 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi ayl\u0131k 20 \u20ac&#8217;dur. \u00dccretsiz deneme 30 g\u00fcn s\u00fcrer, 20 i\u015f merkezine kadar kullan\u0131m sunar ve kredi kart\u0131 gerektirmez.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcretiminizde neler de\u011fi\u015fir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">T\u00fcm kaynaklar, ger\u00e7ek kapasiteleriyle tek \u00e7izelgede.<\/p>\n\n\n<p class=\"fx-pain__b\">Her makine, ki\u015fi ve tak\u0131m; ger\u00e7ek vardiyalar, devams\u0131zl\u0131klar ve fazla mesai dikkate al\u0131narak kapasitesi i\u00e7inde \u00e7izelgelenir. Her operasyona bir ba\u015flang\u0131\u00e7 saati, biti\u015f saati ve i\u015f merkezi atan\u0131r. \u0130ki operat\u00f6r gerektiren bir i\u015fe, vardiyas\u0131nda m\u00fcsait olan iki ki\u015fi atan\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">A\u015f\u0131r\u0131 y\u00fckleri \u00e7izelgeleme motoru \u00e7\u00f6zer.<\/p>\n\n\n<p class=\"fx-pain__b\">A\u015f\u0131r\u0131 y\u00fckleri ve \u00e7ak\u0131\u015fmalar\u0131 gidermek i\u00e7in i\u015f emirlerini ve operasyonlar\u0131 s\u00fcr\u00fckleyip durman\u0131za gerek kalmaz. Arcturus motoru, her operasyonu ger\u00e7ekten kapasite bulunan bir yere saniyeler i\u00e7inde yerle\u015ftirir.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Daha az tip de\u011fi\u015fimi.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, bir makinede bir \u00fcr\u00fcnden di\u011ferine ge\u00e7i\u015fin her iki y\u00f6nde ne kadar s\u00fcrd\u00fc\u011f\u00fcn\u00fc bilir. Maviden k\u0131rm\u0131z\u0131ya ge\u00e7i\u015f 30 dakika, k\u0131rm\u0131z\u0131dan maviye ge\u00e7i\u015f ise 60 dakika s\u00fcrebilir. \u00c7izelge, i\u015fleri haz\u0131rl\u0131kta en az zaman kaybedilecek s\u0131raya koyar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0130\u015f ba\u015flamadan malzeme kontrol\u00fc.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, stoklar\u0131 ve a\u00e7\u0131k sat\u0131n alma sipari\u015flerini Sage 200\u2019den okur. Tedarik\u00e7i teslimat\u0131n\u0131 bekleyen bir i\u015f emri, teslimat tarihinden sonras\u0131na planlan\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Acil sipari\u015flerde ve ar\u0131zalarda \u00e7izelge otomatik yenilenir.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir makine durdu\u011funda veya acil bir sipari\u015f geldi\u011finde Autopilot \u00e7izelgeyi otomatik olarak yeniler. Belirledi\u011finiz kilitler ve \u00f6ncelikler ge\u00e7erlili\u011fini korur.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operat\u00f6rler i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr.<\/p>\n\n\n<p class=\"fx-pain__b\">Her operat\u00f6r, s\u0131radaki i\u015flerini telefondan veya tabletten g\u00f6r\u00fcr ve yapt\u0131\u011f\u0131 i\u015fi an\u0131nda kaydeder. Ofis, ilerlemeyi canl\u0131 olarak izler; ger\u00e7ekle\u015fen i\u015f kay\u0131tlar\u0131 da i\u015f emrine geri aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila\u2019daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta zaman tasarrufu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 \u00fcretim hatt\u0131na saniyeler i\u00e7inde ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU\u2019nun de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied\u2019\u0131n Nairobi\u2019deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda \u00e7al\u0131\u015fan temiz oda k\u0131yafetli operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, Bilgi Teknolojileri M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f plan, 30 dakikadan k\u0131sa s\u00fcrede haz\u0131rlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied\u2019\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations \u00dcretim M\u00fcd\u00fcr\u00fc Anu J\u00e4rvinen, Rauma\u2019daki robotlu paletleme h\u00fccresinin yan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 ayl\u0131k<\/b><span>bo\u015f kapasiteyi sat\u0131\u015f ekibi g\u00f6rebiliyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, t\u00fcm \u00fcretim planlamam\u0131z i\u00e7in g\u00fcvenilir bir temel olu\u015fturuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Fredman Operations \u00b7 G\u0131daya uygun ambalaj k\u00e2\u011f\u0131tlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">Sat\u0131\u015f ekibi bo\u015f kapasiteyi alt\u0131 ay \u00f6ncesinden g\u00f6rebiliyor. \u00d6nceden bir saat veya daha uzun s\u00fcrede yan\u0131tlanan \u00e7izelge de\u011fi\u015fikli\u011fi talepleri art\u0131k saniyeler i\u00e7inde yan\u0131tlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/fredman-operations\/\">Fredman Operations\u2019\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec CEO&#x27;su Hannu Ryyn\u00e4nen, \u015firketin Lohja&#x27;daki \u00fcretim tesisinde\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000&#8217;lerce<\/b><span>\u00fcretim emri otomatik \u00e7izelgeleniyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimi art\u0131k bamba\u015fka bir \u015fekilde kontrol alt\u0131nda tutuyoruz ve kapasiteyi kavray\u0131\u015f\u0131m\u0131z tamamen farkl\u0131 bir d\u00fczeye ula\u015ft\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 End\u00fcstriyel kar\u0131\u015ft\u0131r\u0131c\u0131lar, pompalar ve y\u00fcksek teknolojili fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Binlerce \u00fcretim emri otomatik olarak \u00e7izelgeleniyor ve \u015firketin tamam\u0131 \u00fcretimi ger\u00e7ek zamanl\u0131 olarak g\u00f6rebiliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/mamec\/\">Mamec&#8217;in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-sage-200-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage 200 entegrasyonu nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Sage 200, yap\u0131lacak i\u015fleri g\u00f6nderir.<\/strong> \u0130\u015f emirleri; operasyonlar\u0131, i\u015f g\u00fcc\u00fc ve makine kaynaklar\u0131yla birlikte SkyPlanner\u2019a aktar\u0131l\u0131r. \u00dcr\u00fcnler, stok seviyeleri ve sat\u0131n alma sipari\u015fleri de bu ak\u0131\u015fa dahildir.<\/li>\n\n\n<li><strong>SkyPlanner \u00e7izelgeyi olu\u015fturur ve g\u00fcncel tutar.<\/strong> Arcturus motoru, her operasyonu saniyeler i\u00e7inde planlar ve \u00fcretim de\u011fi\u015ftik\u00e7e yeniden planlama yapar.<\/li>\n\n\n<li><strong>Tarihler ve ger\u00e7ekle\u015fen i\u015f kay\u0131tlar\u0131 geri g\u00f6nderilir.<\/strong> Planlanan operasyon tarihleri i\u015f emirlerine geri aktar\u0131l\u0131r. Operat\u00f6rlerin s\u00fcre kay\u0131tlar\u0131 da her operasyonun s\u00fcre kayd\u0131na i\u015flenir.<\/li>\n\n<\/ol>\n\n\n<p>Sage 200, ana kay\u0131t sisteminiz olmaya devam eder. \u00dcr\u00fcnler, BOM\u2019lar, MRP, sat\u0131n alma, stok ve maliyet hesaplamalar\u0131 mevcut sistemde kal\u0131r. Her kaynaktaki her operasyonun s\u0131ras\u0131n\u0131 ve zamanlamas\u0131n\u0131 SkyPlanner belirler.<\/p>\n\n\n<p>SkyPlanner; \u00fcr\u00fcnleri, depo stoklar\u0131n\u0131, sat\u0131n alma sipari\u015flerini ve sat\u0131\u015f sipari\u015flerini Sage 200 REST API \u00fczerinden okur. \u0130\u015f emirleri ve operasyonlar, kulland\u0131\u011f\u0131n\u0131z \u00fcretim eklentisinden gelir: Sicon Manufacturing, Cim200 veya eski Sage 200 Manufacturing mod\u00fcl\u00fc. Her tesis Sage 200\u2019\u00fc farkl\u0131 kulland\u0131\u011f\u0131ndan SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar ve canl\u0131 kullan\u0131ma ge\u00e7tikten sonra da destek verir. Entegrasyon i\u00e7in s\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re \u00f6nceden fiyat teklifi sunulur. Sage 200 i\u015f orta\u011f\u0131n\u0131z veya kendi geli\u015ftiricileriniz de SkyPlanner\u2019\u0131n belgelenmi\u015f API\u2019si \u00fczerinden entegrasyon geli\u015ftirebilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API ba\u015fvuru kayna\u011f\u0131<\/a>).<\/p>\n\n\n<p>U\u00e7 noktalar, veri e\u015fle\u015ftirmeleri ve geri yazma kurallar\u0131 <a href=\"\/tr\/entegrasyonlar\/erp\/sage-200\/entegrasyon-kilavuzu\/\">\u00fcretim \u00e7izelgeleme i\u00e7in Sage 200 entegrasyon k\u0131lavuzunda<\/a> yer al\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-sage-200-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage 200 neleri \u00e7izelgeler, SkyPlanner neler ekler?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sage 200\u2019de \u00fcretim i\u015flevleri her zaman mod\u00fcllerle sunulmu\u015ftur. 2026 y\u0131l\u0131nda da \u00e7izelgeleme i\u015flevleri, kulland\u0131\u011f\u0131n\u0131z eklentiye ba\u011fl\u0131d\u0131r. Sage\u2019in kendi yard\u0131m sayfas\u0131nda art\u0131k \u015fu duyuru yer al\u0131yor: <a href=\"https:\/\/desktophelp.sage.co.uk\/sage200\/professional\/Content\/General\/What_Manufacturing_does.htm\">&#8220;The Sage 200 Manufacturing module is now retired, from the Sage 200 Professional 2025 R2 release.&#8221;<\/a> (Bu mod\u00fcl, belirtilen s\u00fcr\u00fcmden itibaren kullan\u0131mdan kald\u0131r\u0131lm\u0131\u015ft\u0131r.) Her se\u00e7ene\u011fin kapasiteyi nas\u0131l ele ald\u0131\u011f\u0131na bakal\u0131m:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Eski Sage 200 Manufacturing, d\u00f6nemler baz\u0131nda planlama yapar.<\/strong> MPS, &#8220;the material and capacity requirements&#8221; (malzeme ve kapasite ihtiya\u00e7lar\u0131n\u0131) olu\u015fturur. Sage ayr\u0131ca \u015fu bilgiyi verir: &#8220;Planning periods are normally a month or a four week period.&#8221; (Planlama d\u00f6nemleri normalde bir ay veya d\u00f6rt haftad\u0131r.) (<a href=\"https:\/\/desktophelp.sage.co.uk\/sage200\/professional\/Content\/PLN\/How_Planning_Works.htm\">kaynak<\/a>)<\/li>\n\n\n<li><strong>Sicon MRP, kaba kapasite plan\u0131n\u0131 g\u00f6sterir.<\/strong> Rough Cut Capacity Planning, &#8220;a daily\/weekly schedule of labour and machine capacity based on existing live works orders.&#8221; (mevcut aktif i\u015f emirlerine dayal\u0131 g\u00fcnl\u00fck\/haftal\u0131k i\u015f g\u00fcc\u00fc ve makine kapasitesi \u00e7izelgesi) sunar. (<a href=\"https:\/\/www.sicon.co.uk\/product\/material-and-resource-planning-mrp\/\">kaynak<\/a>)<\/li>\n\n\n<li><strong>A\u015f\u0131r\u0131 y\u00fckler elle dengelenir.<\/strong> Sicon\u2019un grafik plan\u0131, &#8220;with functionality to amend works order dates to smooth overloads.&#8221; (a\u015f\u0131r\u0131 y\u00fckleri dengelemek i\u00e7in i\u015f emri tarihlerini de\u011fi\u015ftirme i\u015fleviyle) sunulur. (<a href=\"https:\/\/uk-marketplace.sage.com\/en-GB\/apps\/52808\/sicon-manufacturing-suite\/features\">kaynak<\/a>)<\/li>\n\n\n<li><strong>Cim200 operasyonlar\u0131 \u00e7izelgeler ve \u00e7ak\u0131\u015fmalar\u0131 i\u015faretler.<\/strong> \u00c7izelgeleme arac\u0131, rota s\u00fcrelerini ve \u00fcretim takvimlerini kullanarak i\u015f emri operasyonlar\u0131n\u0131 s\u0131rayla yerle\u015ftirir. K\u0131rm\u0131z\u0131 g\u00f6sterilen operasyonlar, &#8220;there is a resource clash&#8221; (kaynak \u00e7ak\u0131\u015fmas\u0131 var) anlam\u0131na gelir; planlamac\u0131 bunlar\u0131 s\u00fcr\u00fckleyerek ba\u015fka bir zamana ta\u015f\u0131r. (<a href=\"https:\/\/cim-software.co.uk\/knowledgebase\/cim200\/scheduler\/works-order-view\/\">kaynak<\/a>) Cim200, &#8220;available on a monthly subscription basis.&#8221; (ayl\u0131k abonelikle sunulan) ayr\u0131 bir eklentidir. (<a href=\"https:\/\/cim-software.co.uk\/cim200\/\">kaynak<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>G\u00fcnl\u00fck \u00fcretimde \u00e7ak\u0131\u015fmalar\u0131 \u00e7\u00f6zmek yine planlamac\u0131ya kal\u0131r. Sicon g\u00fcnl\u00fck veya haftal\u0131k y\u00fck\u00fc, Cim200 ise zaman \u00e7izelgesindeki \u00e7ak\u0131\u015fmalar\u0131 g\u00f6sterir. Birinin, \u00e7ak\u0131\u015fmalar ortadan kalkana kadar i\u015flerin yerini de\u011fi\u015ftirmesi gerekir. Her acil sipari\u015f veya ar\u0131zadan sonra ayn\u0131 i\u015f ba\u015ftan yap\u0131l\u0131r.<\/p>\n\n\n<p>T\u00fcm se\u00e7enekler ve s\u0131n\u0131rlamalar\u0131, <a href=\"\/tr\/entegrasyonlar\/erp\/sage-200\/uretim-cizelgeleme\/\">Sage 200 ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yapabilir mi?<\/a> yaz\u0131s\u0131nda a\u00e7\u0131klan\u0131yor.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sage-200-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage 200: Mevcut durum ve SkyPlanner ile kullan\u0131m<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>\u00dcretim eklentisiyle Sage 200<\/th><th>SkyPlanner APS ile Sage 200<\/th><\/tr><\/thead><tbody><tr><td>Kapasite g\u00f6r\u00fcn\u00fcm\u00fc<\/td><td>G\u00fcnl\u00fck veya haftal\u0131k y\u00fck (Sicon) ya da \u00e7ak\u0131\u015fmalar\u0131n i\u015faretlendi\u011fi operasyon zaman \u00e7izelgesi (Cim200)<\/td><td>Her operasyon, dakika hassasiyetinde zaman \u00e7izelgesinde<\/td><\/tr><tr><td>A\u015f\u0131r\u0131 y\u00fckler<\/td><td>Planlamac\u0131, a\u015f\u0131r\u0131 y\u00fckleri ve \u00e7ak\u0131\u015fmalar\u0131 gidermek i\u00e7in i\u015f emirlerinin veya operasyonlar\u0131n yerini de\u011fi\u015ftirir<\/td><td>\u00c7izelgeleme motoru, i\u015fleri yaln\u0131zca kapasite bulunan yerlere yerle\u015ftirir<\/td><\/tr><tr><td>Kaynaklar<\/td><td>\u0130\u015f g\u00fcc\u00fc ve makine kaynaklar\u0131<\/td><td>Makineler, isim baz\u0131nda ki\u015filer ve tak\u0131mlar; hepsi ger\u00e7ek kapasiteleriyle<\/td><\/tr><tr><td>\u0130\u015fler aras\u0131 ge\u00e7i\u015fler<\/td><td>BOM, rota ve kaynak verilerinden al\u0131nan operasyon s\u00fcreleri<\/td><td>Haz\u0131rl\u0131k s\u00fcresi matrisi: en d\u00fc\u015f\u00fck toplam haz\u0131rl\u0131k s\u00fcresi<\/td><\/tr><tr><td>Malzemeler<\/td><td>MRP, i\u015f emirleri ve sat\u0131n alma sipari\u015fleri \u00f6nerir<\/td><td>\u0130\u015fler, malzeme stokta oldu\u011funda veya beklenen teslimatlar geldi\u011finde ba\u015flar<\/td><\/tr><tr><td>De\u011fi\u015fiklikler<\/td><td>Planlama yeniden \u00e7al\u0131\u015ft\u0131r\u0131l\u0131r, ard\u0131ndan yeni \u00e7ak\u0131\u015fmalar\u0131 gidermek i\u00e7in i\u015flerin yeri de\u011fi\u015ftirilir<\/td><td>Autopilot, t\u00fcm tesisi \u00f6nceliklerinize g\u00f6re yeniden planlar<\/td><\/tr><tr><td>Planlamac\u0131 g\u00f6r\u00fcn\u00fcm\u00fc<\/td><td>Kapasite grafi\u011fi veya operasyon zaman \u00e7izelgesi<\/td><td>Etkile\u015fimli Gantt: bir i\u015fin yerini de\u011fi\u015ftirseniz de plan tutarl\u0131l\u0131\u011f\u0131n\u0131 korur<\/td><\/tr><tr><td>shop floor<\/td><td>S\u00fcreler, i\u015f emri operasyonlar\u0131na kaydedilir<\/td><td>Operat\u00f6rler i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr, yapt\u0131klar\u0131 i\u015fi telefondan veya tabletten kaydeder<\/td><\/tr><tr><td>Ba\u015flang\u0131\u00e7<\/td><td>Ayr\u0131 eklenti aboneli\u011fi ve kurulumu<\/td><td>D\u0131\u015fa aktard\u0131\u011f\u0131n\u0131z i\u015f emirleriyle 30 g\u00fcnl\u00fck deneme, ard\u0131ndan ayl\u0131k 199 \u20ac\u2019dan ba\u015flayan fiyatlar<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-sage-200\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage 200 i\u00e7in \u00e7izelgeleme arac\u0131 nas\u0131l se\u00e7ilir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sicon\u2019un kaba kapasite plan\u0131 veya Cim200\u2019\u00fcn \u00e7izelgeleme arac\u0131; az say\u0131da kritik kayna\u011f\u0131, uzun termin s\u00fcreleri ve haftal\u0131k planlama d\u00fczeni olan bir tesise uygundur. Her iki durumda da Sage 200 ana sistem olarak kal\u0131r.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>S\u0131rada hangi i\u015fin yap\u0131labilece\u011fini makineler, ki\u015filer, tak\u0131mlar ve malzemeler birlikte s\u0131n\u0131rl\u0131yorsa SkyPlanner\u2019\u0131 se\u00e7in.<\/strong> Tek bir motor, t\u00fcm k\u0131s\u0131tlar\u0131 ayn\u0131 anda dikkate alarak \u00e7izelgeleme yapar. Ek mod\u00fcl lisans\u0131 alman\u0131z gerekmez.<\/li>\n\n\n<li><strong>A\u015f\u0131r\u0131 y\u00fckleri elle dengelemek i\u00e7in saatler harc\u0131yorsan\u0131z SkyPlanner\u2019\u0131 se\u00e7in.<\/strong> \u00c7izelgeleme motoru bunu saniyeler i\u00e7inde yapar ve yapmaya devam eder.<\/li>\n\n\n<li><strong>\u0130\u015fler aras\u0131 ge\u00e7i\u015fler \u00fcretim miktar\u0131n\u0131z\u0131 belirliyorsa SkyPlanner\u2019\u0131 se\u00e7in.<\/strong> \u0130\u015fler, en az haz\u0131rl\u0131k gerektiren s\u0131rayla y\u00fcr\u00fct\u00fcl\u00fcr.<\/li>\n\n\n<li><strong>S\u0131rada hangi i\u015fin yap\u0131labilece\u011fini ortak kullan\u0131lan tak\u0131mlar ve birden fazla operat\u00f6r gerektiren i\u015fler belirliyorsa SkyPlanner\u2019\u0131 se\u00e7in.<\/strong><\/li>\n\n\n<li><strong>Kullan\u0131mdan kald\u0131r\u0131lan Sage 200 Manufacturing mod\u00fcl\u00fcnden ge\u00e7i\u015f yap\u0131yorsan\u0131z<\/strong> ve kapsaml\u0131 bir \u00fcretim projesini beklemeden ilk g\u00fcnden ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeleme yapmak istiyorsan\u0131z SkyPlanner\u2019\u0131 se\u00e7in.<\/li>\n\n\n<li><strong>Plan\u0131n\u0131z haftada birka\u00e7 kez de\u011fi\u015fiyorsa SkyPlanner\u2019\u0131 se\u00e7in.<\/strong> Autopilot yeniden planlama yapar, Running Time Lock devam eden i\u015fleri yerinde tutar ve yeni tarihler Sage 200\u2019e geri aktar\u0131l\u0131r.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Nas\u0131l ba\u015flan\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00dccretsiz denemeyi ba\u015flat\u0131n.<\/strong> 30 g\u00fcn, 20 i\u015f merkezine kadar kullan\u0131m ve t\u00fcm Basic \u00f6zellikleri. Kredi kart\u0131 gerekmez.<\/li>\n\n\n<li><strong>\u00dcretiminizi modelleyin.<\/strong> Makineleri, ki\u015fileri ve vardiyalar\u0131 SkyPlanner\u2019da olu\u015fturun veya i\u00e7e aktar\u0131n. Devreye alma deste\u011fi de alabilirsiniz.<\/li>\n\n\n<li><strong>Sipari\u015flerinizi y\u00fckleyin.<\/strong> A\u00e7\u0131k i\u015f emirlerini ve operasyonlar\u0131n\u0131 \u00fcretim eklentinizden Excel\u2019e aktar\u0131n. Bunlar\u0131 SkyPlanner\u2019a y\u00fckleyip olu\u015fan \u00e7izelgeyi mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>Sage 200\u2019\u00fc ba\u011flay\u0131n.<\/strong> SkyPlanner ekibi \u00e7ift y\u00f6nl\u00fc entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131 kullan\u0131ma ge\u00e7tikten sonra da destek verir.<\/li>\n\n<\/ol>\n\n\n<p><strong>Fiyatland\u0131rma.<\/strong> Paketler i\u015f merkezi ba\u015f\u0131na ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. \u0130stedi\u011finiz zaman i\u015f merkezi ekleyebilir, \u00e7\u0131karabilir veya aboneli\u011finizi iptal edebilirsiniz. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rma<\/a> sayfas\u0131na bak\u0131n.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k\u00e7a sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 200 i\u00e7in en iyi \u00e7izelgeleme eklentisi hangisidir?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, Sage 200 ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015fan, ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yapan bir eklentidir. \u0130\u015f emirleri, \u00fcr\u00fcnler, stoklar ve sat\u0131n alma sipari\u015fleri SkyPlanner\u2019a aktar\u0131l\u0131r; planlanan operasyon tarihleri ve ger\u00e7ekle\u015fen i\u015f kay\u0131tlar\u0131 ise geri g\u00f6nderilir. Her makine, operat\u00f6r, tak\u0131m ve malzeme ger\u00e7ek kapasitesiyle ele al\u0131n\u0131r. Ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re s\u00fcreleri tan\u0131mlayan haz\u0131rl\u0131k s\u00fcresi matrisi, i\u015fleri en az haz\u0131rl\u0131k gerektirecek s\u0131raya koyar. \u00dcretim de\u011fi\u015fti\u011finde Autopilot \u00e7izelgeyi otomatik olarak yeniler. Fiyatlar ayl\u0131k 199 \u20ac\u2019dan ba\u015flar ve \u00fccretsiz deneme 30 g\u00fcn s\u00fcrer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 200, ger\u00e7ek kapasiteyi dikkate alan \u00fcretim \u00e7izelgeleme sunuyor mu?<\/summary>\n<p class=\"sp-faq__a\">Temel \u00fcr\u00fcnde bu \u00f6zellik yok. Bu eksikli\u011fi eklentiler tamaml\u0131yor: Sicon, i\u015f g\u00fcc\u00fc ve makine y\u00fck\u00fcn\u00fc kullan\u0131labilir kapasiteyle kar\u015f\u0131la\u015ft\u0131rarak g\u00f6steriyor. Cim200 ise operasyonlar\u0131 bir zaman \u00e7izelgesine yerle\u015ftiriyor ve kaynak \u00e7ak\u0131\u015fmalar\u0131n\u0131 i\u015faretliyor. Her ikisinde de a\u015f\u0131r\u0131 y\u00fcklenmeyi gidermek i\u00e7in i\u015fleri planlamac\u0131n\u0131n kayd\u0131rmas\u0131 gerekiyor. SkyPlanner APS ise her operasyon, makine, \u00e7al\u0131\u015fan ve tak\u0131m i\u00e7in ger\u00e7ek kapasiteyi dikkate alan bir <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">\u00fcretim \u00e7izelgesi<\/a> olu\u015fturuyor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 200&#8217;e herhangi bir \u015fey y\u00fcklememiz gerekiyor mu?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. SkyPlanner, Sage 200 ile birlikte bulutta \u00e7al\u0131\u015f\u0131r. \u00dcr\u00fcn, stok ve sipari\u015f verileri i\u00e7in Sage 200 REST API kullan\u0131r; i\u015f emirlerini ise \u00fcretim eklentinizden okur.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, Sicon, Cim200 veya Sage 200 Manufacturing&#8217;in yerini mi al\u0131yor?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner bu \u00e7\u00f6z\u00fcmleri tamamlar. \u00dcr\u00fcn a\u011fa\u00e7lar\u0131, i\u015f emirleri, MRP, stok \u00e7\u0131k\u0131\u015flar\u0131 ve maliyetlendirme mevcut eklentinizde kal\u0131r. SkyPlanner, i\u015f emri operasyonlar\u0131n\u0131 ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeler ve tarihleri geri aktar\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 200 Manufacturing kullan\u0131mdan kald\u0131r\u0131ld\u0131. SkyPlanner yard\u0131mc\u0131 olabilir mi?<\/summary>\n<p class=\"sp-faq__a\">Evet. Sage, mod\u00fcl\u00fc Kas\u0131m 2020&#8217;de sat\u0131\u015ftan kald\u0131rd\u0131. Mod\u00fcl, Sage 200 Professional 2025 R2 ve sonraki s\u00fcr\u00fcmlerde kullan\u0131lam\u0131yor. SkyPlanner, hangi eklentiye ge\u00e7erseniz ge\u00e7in o eklentideki i\u015f emirlerini \u00e7izelgeler. Mevcut verilerinizle denemeye bug\u00fcn ba\u015flayabilirsiniz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 200 kullanan bir tesis i\u00e7in SkyPlanner&#8217;\u0131n maliyeti nedir?<\/summary>\n<p class=\"sp-faq__a\">5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi i\u00e7in ayda 20 \u20ac \u00f6denir. \u0130\u015f merkezi, kendine ait \u00e7izelgelenmi\u015f i\u015f kuyru\u011fu olan bir \u00fcretim kayna\u011f\u0131d\u0131r. S\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za uygun entegrasyon i\u00e7in abonelik plan\u0131n\u0131zla birlikte ba\u015ftan teklif verilir. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devreye alma ne kadar s\u00fcrer?<\/summary>\n<p class=\"sp-faq__a\">Devreye alma, ba\u015flang\u0131\u00e7 s\u00fcreci ba\u015flad\u0131ktan sonra genellikle haftalar i\u00e7inde tamamlan\u0131r. Ekip, kaynaklar\u0131n\u0131z\u0131 ve i\u015f emri operasyonlar\u0131n\u0131z\u0131 e\u015fle\u015ftirir, stok ve sat\u0131n alma sipari\u015fi ba\u011flant\u0131lar\u0131n\u0131 kurar ve planlanan tarihlerin geri aktar\u0131lmas\u0131n\u0131 sa\u011flar. Canl\u0131 kullan\u0131ma ge\u00e7meden \u00f6nce her \u015fey mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131larak test edilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sage 200 entegrasyonundan \u00f6nce SkyPlanner&#8217;\u0131 deneyebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck deneme, a\u00e7\u0131k i\u015f emirlerinizin Excel&#8217;e aktar\u0131lm\u0131\u015f verileriyle \u00e7al\u0131\u015f\u0131r. Entegrasyon \u00e7al\u0131\u015fmalar\u0131 ba\u015flamadan \u00f6nce kendi \u00fcretiminizin ger\u00e7ek kapasiteye g\u00f6re haz\u0131rlanm\u0131\u015f \u00e7izelgesini g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Sage 200 Sage 200 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasitesine g\u00f6re \u00e7izelgeleyen bir Sage 200 eklentisidir. Hangi i\u015f emri operasyonunun nerede ve ne zaman y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniler. skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme SkyPlanner, &#8230; <a title=\"Sage 200 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/\" aria-label=\"Read more about Sage 200 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100689,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103243","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sage 200 \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: Sage 200 i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzemeyi kapasiteye g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sage 200 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: Sage 200 i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzemeyi kapasiteye g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-200\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-200\\\/\",\"name\":\"Sage 200 \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS: Sage 200 i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzemeyi kapasiteye g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-200\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-200\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-200\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Sage 200 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sage 200 \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS","description":"SkyPlanner APS: Sage 200 i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzemeyi kapasiteye g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/","og_locale":"tr_TR","og_type":"article","og_title":"Sage 200 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","og_description":"SkyPlanner APS: Sage 200 i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzemeyi kapasiteye g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"13 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/","name":"Sage 200 \u00c7izelgeleme Entegrasyonu: Kapasiteye G\u00f6re APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS: Sage 200 i\u00e7in \u00e7ift y\u00f6nl\u00fc entegre \u00fcretim \u00e7izelgeleme eklentisi. Her makine, ki\u015fi, tak\u0131m ve malzemeyi kapasiteye g\u00f6re planlar. Ayl\u0131k 199 \u20ac\u2019dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-200\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Sage 200 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Sage 200 Sage 200 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, her makineyi, operat\u00f6r\u00fc, tak\u0131m\u0131 ve malzemeyi ger\u00e7ek kapasitesine g\u00f6re \u00e7izelgeleyen bir Sage 200 eklentisidir. Hangi i\u015f emri operasyonunun nerede ve ne zaman y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniler. skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme SkyPlanner,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/103243","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=103243"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/103243\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100689"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=103243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}