{"id":103094,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/monitor-erp\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"monitor-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/monitor-erp\/","title":{"rendered":"Monitor ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Monitor ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Monitor ERP i\u00e7in SkyPlanner APS: <span class=\"hl\">Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS, Monitor ERP i\u00e7in geli\u015ftirilmi\u015f bir \u00fcretim \u00e7izelgeleme eklentisidir. T\u00fcm i\u015f merkezlerini, operat\u00f6rleri, tak\u0131mlar\u0131 ve malzemeleri ayn\u0131 anda, ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeler. Monitor G5 kapasite a\u015f\u0131m\u0131n\u0131n nerede oldu\u011funu g\u00f6sterir. SkyPlanner bu a\u015f\u0131m\u0131 giderir; \u00fcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner, Monitor ERP ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r: \u00fcretim emirleri, operasyonlar, i\u015f merkezleri ve malzemeler SkyPlanner&#8217;a aktar\u0131l\u0131r; planlanan operasyon tarihleri ve i\u015f kay\u0131tlar\u0131 Monitor ERP&#8217;ye geri g\u00f6nderilir. SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu Monitor G5 yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar.<\/p>\n\n\n<p>Fiyatlar 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi ayl\u0131k 20 \u20ac&#8217;dur. \u00dccretsiz deneme 30 g\u00fcn s\u00fcrer, 20 i\u015f merkezine kadar kullan\u0131m sunar ve kredi kart\u0131 gerektirmez.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcretiminizde neler de\u011fi\u015fir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u00d6ncelik plan\u0131nda sat\u0131r s\u00fcr\u00fcklemeye son.<\/p>\n\n\n<p class=\"fx-pain__b\">Arcturus motoru, t\u00fcm i\u015f merkezlerindeki a\u00e7\u0131k operasyonlar\u0131 tek seferde s\u0131ralar. Planlamac\u0131, her i\u015f merkezi i\u00e7in \u00e7izelgeyi elle olu\u015fturmak yerine sonucu g\u00f6zden ge\u00e7irir.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kapasite a\u015f\u0131mlar\u0131 sadece g\u00f6sterilmez, giderilir.<\/p>\n\n\n<p class=\"fx-pain__b\">Her makine, \u00e7al\u0131\u015fan ve tak\u0131m i\u00e7in ger\u00e7ek vardiyalar, devams\u0131zl\u0131klar ve fazla mesailer dikkate al\u0131narak kapasiteye uygun bir \u00e7izelge olu\u015fturulur. \u0130ki \u00fcretim emri asla ayn\u0131 makineye ayn\u0131 saatte atanmaz. Bir makinenin kapasitesi doldu\u011funda i\u015f, alternatif bir makineye veya \u00e7al\u0131\u015fana aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Tek bir sipari\u015f kalemi i\u00e7in de\u011fil, t\u00fcm sipari\u015fler i\u00e7in teslimat tarihi.<\/p>\n\n\n<p class=\"fx-pain__b\">Her \u00fcretim emrinin biti\u015f tarihi, t\u00fcm fabrikan\u0131n \u00e7izelgesine g\u00f6re belirlenir. Sat\u0131\u015f ekibi m\u00fc\u015fterilere bu plana dayanarak yan\u0131t verir; plan zaten di\u011fer t\u00fcm sipari\u015fleri de kapsar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Daha az tip de\u011fi\u015fimi.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki haz\u0131rl\u0131k s\u00fcresini her iki y\u00f6nde de bilir. Maviden k\u0131rm\u0131z\u0131ya ge\u00e7i\u015f 30 dakika, k\u0131rm\u0131z\u0131dan maviye ge\u00e7i\u015f ise 60 dakika s\u00fcrebilir. \u00c7izelgeleme motoru i\u015fleri en az zaman kayb\u0131na yol a\u00e7acak \u015fekilde s\u0131ralar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ortak tak\u0131m ve ekipler \u00e7ak\u0131\u015fmaz.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir makinede kullan\u0131lan kal\u0131p veya fikst\u00fcr, asla ayn\u0131 anda ba\u015fka bir makineye atanmaz. \u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe, vardiyas\u0131nda m\u00fcsait olan \u00fc\u00e7 ki\u015fi atan\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0130\u015f ba\u015flamadan malzeme kontrol edilir.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, stoklar\u0131 ve a\u00e7\u0131k sat\u0131n alma sipari\u015flerini dikkate alarak \u00e7izelgeleme yapar. Tedarik\u00e7iden gelecek malzemeyi bekleyen bir i\u015f, makine ba\u015f\u0131nda beklemek yerine teslimat tarihinden sonras\u0131na planlan\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operat\u00f6rler i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr.<\/p>\n\n\n<p class=\"fx-pain__b\">Her operat\u00f6r s\u0131radaki i\u015fleri telefon veya tabletinden g\u00f6r\u00fcr ve \u00e7al\u0131\u015fmas\u0131n\u0131 an\u0131nda kaydeder. Ofis, ilerlemeyi canl\u0131 olarak izler; i\u015f kay\u0131tlar\u0131 da Monitor&#8217;a geri aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila\u2019daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta kazan\u0131lan zaman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt donan\u0131mlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saat \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU\u2019nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied\u2019\u0131n Nairobi\u2019deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u00fcretim verimlili\u011finde art\u0131\u015f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f bir plan\u0131 haz\u0131rlamak 30 dakikadan az s\u00fcr\u00fcyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied\u2019\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 fabrikas\u0131nda kaynakl\u0131 bir \u00e7elik yap\u0131y\u0131 ta\u015flayan KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%98<\/b><span>teslimat performans\u0131; yakla\u015f\u0131k %50\u2019den y\u00fckseldi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumam\u0131zda belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal i\u015fleme ve fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k %50\u2019den %98\u2019e kadar y\u00fckseldi. \u00c7izelgeleme i\u00e7in art\u0131k iki yerine bir y\u00f6netici yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp\u2019un yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Daha az<\/b><span>malzeme eksikli\u011finden kaynaklanan duru\u015f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner\u2019\u0131n bize katt\u0131\u011f\u0131 de\u011fer, \u00f6zellikle teslim tarihlerini belirlerken g\u00fcnl\u00fck kullan\u0131mda i\u015fimizi g\u00f6ren bir ara\u00e7 olmas\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, \u00dcretim Planlama M\u00fcd\u00fcr\u00fc<\/b><br>Eskomatic \u00b7 Fason tala\u015fl\u0131 imalat<\/p>\n\n\n<p class=\"ind-cust__result\">\u0130\u015f y\u00fck\u00fcn\u00fcn otomatik \u00e7izelgelenmesi sayesinde teslim tarihleri daha do\u011fru belirleniyor. Malzeme eksikli\u011finden kaynaklanan \u00fcretim duru\u015flar\u0131 da b\u00fcy\u00fck \u00f6l\u00e7\u00fcde azald\u0131.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/eskomatic\/\">Eskomatic\u2019in yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-monitor-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP entegrasyonu nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Monitor, i\u015f bilgilerini g\u00f6nderir.<\/strong> \u00dcretim emirleri; operasyonlar\u0131, i\u015f merkezleri, haz\u0131rl\u0131k s\u00fcreleri ve birim s\u00fcreleriyle birlikte SkyPlanner&#8217;a aktar\u0131l\u0131r. Malzeme ihtiya\u00e7lar\u0131, stoklar ve sat\u0131n alma sipari\u015fleri de bu aktar\u0131ma dahildir.<\/li>\n\n\n<li><strong>SkyPlanner \u00e7izelgeyi olu\u015fturur ve g\u00fcncel tutar.<\/strong> Arcturus motoru, her i\u015f merkezindeki t\u00fcm operasyonlar\u0131 saniyeler i\u00e7inde planlar ve \u00fcretim de\u011fi\u015ftik\u00e7e yeniden planlama yapar.<\/li>\n\n\n<li><strong>Tarihler ve i\u015f kay\u0131tlar\u0131 geri g\u00f6nderilir.<\/strong> Her operasyon i\u00e7in planlanan ba\u015flang\u0131\u00e7 ve biti\u015f, Monitor&#8217;daki \u00fcretim emrine geri aktar\u0131l\u0131r. Bildirilen s\u00fcre ve miktarlar da iki sistemin birbiriyle uyumlu kalmas\u0131n\u0131 sa\u011flar.<\/li>\n\n<\/ol>\n\n\n<p>Entegrasyon, Monitor&#8217;\u0131n kendi aray\u00fcz\u00fc olan Monitor ERP API \u00fczerinden \u00e7al\u0131\u015f\u0131r; bu nedenle Monitor&#8217;a hi\u00e7bir \u015fey y\u00fcklenmez. Her fabrikan\u0131n Monitor G5 kullan\u0131m\u0131 farkl\u0131d\u0131r. Bu y\u00fczden SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda i\u015f merkezlerinizi, operasyon sat\u0131rlar\u0131n\u0131z\u0131 ve sipari\u015f ak\u0131\u015f\u0131n\u0131z\u0131 e\u015fle\u015ftirir; canl\u0131ya ge\u00e7i\u015ften sonra da entegrasyon deste\u011fi sa\u011flar. Entegrasyon i\u00e7in s\u00fcre\u00e7 ve ihtiya\u00e7lar\u0131n\u0131za uygun fiyat teklifi \u00f6nceden sunulur. Monitor i\u015f orta\u011f\u0131n\u0131z veya kendi yaz\u0131l\u0131m geli\u015ftiricileriniz de SkyPlanner&#8217;\u0131n dok\u00fcmante edilmi\u015f API&#8217;sini kullanarak geli\u015ftirme yapabilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API ba\u015fvuru kayna\u011f\u0131<\/a>).<\/p>\n\n\n<p>U\u00e7 noktalar, alan e\u015fle\u015ftirmeleri, s\u00fcr\u00fcmler ve geri yazma i\u015flemleri, <a href=\"\/tr\/entegrasyonlar\/erp\/monitor-erp\/entegrasyon-kilavuzu\/\">\u00fcretim \u00e7izelgeleme i\u00e7in Monitor ERP entegrasyon k\u0131lavuzunda<\/a> a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-monitor-erp-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP ile SkyPlanner aras\u0131nda hangi veriler aktar\u0131l\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Monitor ERP<\/th><th>SkyPlanner<\/th><th>Aktar\u0131m y\u00f6n\u00fc<\/th><\/tr><\/thead><tbody><tr><td>Par\u00e7a (Artikel)<\/td><td>\u00dcr\u00fcnler ve malzemeler<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>BOM ve rota (Beredning): haz\u0131rl\u0131k, birim ve kuyruk s\u00fcrelerini i\u00e7eren operasyon sat\u0131rlar\u0131<\/td><td>S\u00fcreleri ve haz\u0131rl\u0131k s\u00fcreleriyle birlikte proses ad\u0131mlar\u0131<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>\u0130\u015f merkezi (Produktionsgrupp), alternatif i\u015f merkezleri, havuz \u00fcyeleri<\/td><td>\u0130\u015f merkezleri, i\u015f merkezi gruplar\u0131, alternatifler<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>\u00dcretim \u00e7izelgeleri ve takvim istisnalar\u0131<\/td><td>Vardiyalar ve devams\u0131zl\u0131klar<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>Operasyonlar\u0131 ve termin tarihiyle birlikte \u00fcretim emri (Tillverkningsorder)<\/td><td>Termin tarihi ve \u00f6nceli\u011fiyle birlikte sipari\u015f ve i\u015fler<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>\u00dcretim emri malzemeleri, stoklar, sat\u0131n alma sipari\u015fleri<\/td><td>Malzeme ihtiya\u00e7lar\u0131, stoklar, beklenen teslimatlar<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>\u00dcretim emri operasyonu: planlanan ba\u015flang\u0131\u00e7, planlanan biti\u015f, i\u015f merkezi<\/td><td>Operasyon baz\u0131nda planlanan ba\u015flang\u0131\u00e7, biti\u015f ve i\u015f merkezi<\/td><td>Monitor&#8217;a geri<\/td><\/tr><tr><td>Operasyon bildirimi: s\u00fcre ve miktar<\/td><td>Operat\u00f6rlerin s\u00fcre kay\u0131tlar\u0131 ve miktar bildirimleri<\/td><td>\u00c7ift y\u00f6nl\u00fc; tek kanal se\u00e7ilir<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Haz\u0131rl\u0131k s\u00fcresi matrisleri, kapasitesi s\u0131n\u0131rl\u0131 kaynaklar olarak tan\u0131mlanan tak\u0131mlar ve birden fazla operat\u00f6r gerektiren i\u015fler SkyPlanner&#8217;da tutulur ve devreye alma s\u0131ras\u0131nda yap\u0131land\u0131r\u0131l\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"monitor-priority-planning-and-finite-capacity-sc\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor&#8217;da \u00f6ncelik planlama ve kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Monitor G5, planlama yetenekleri g\u00fc\u00e7l\u00fc bir ERP sistemidir. \u0130\u015f merkezi baz\u0131nda y\u00fck\u00fc g\u00f6sterir ve biti\u015f tarihlerini hesaplar. Ancak kapasite a\u015f\u0131mlar\u0131n\u0131 giderme i\u015fi h\u00e2l\u00e2 planlamac\u0131ya d\u00fc\u015fer. Monitor&#8217;\u0131n kendi yard\u0131m dok\u00fcmanlar\u0131 da bunu belirtir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Emirler, di\u011fer emirlerin y\u00fck\u00fc kontrol edilmeden kaydedilir.<\/strong> Varsay\u0131lan ayarda bir emrin kayd\u0131 \u015f\u00f6yle tan\u0131mlan\u0131r: &#8220;as per the requirement date in BOM and routing regardless of the work center&#8217;s capacity.&#8221; (\u0130\u015f merkezinin kapasitesinden ba\u011f\u0131ms\u0131z olarak BOM ve rotadaki ihtiya\u00e7 tarihine g\u00f6re.) (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/GeneralRegisters\/BasicSettings\/SystemSettings\/bOrderManufacturing.htm\">Monitor yard\u0131m\u0131<\/a>)<\/li>\n\n\n<li><strong>Loading plan kapasite a\u015f\u0131mlar\u0131n\u0131 g\u00f6sterir, gidermez.<\/strong> Master planning \u015f\u00f6yle tan\u0131mlan\u0131r: &#8220;a loading plan where any overload might require the entire order to be replanned with regard to quantity and dates.&#8221; (Herhangi bir kapasite a\u015f\u0131m\u0131n\u0131n, emrin tamam\u0131n\u0131n miktar ve tarihler a\u00e7\u0131s\u0131ndan yeniden planlanmas\u0131n\u0131 gerektirebilece\u011fi bir y\u00fckleme plan\u0131.) (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/UserGuide\/Using\/Flows\/ManufacturingOrderFlow\/MainPlanning.htm\">Monitor yard\u0131m\u0131<\/a>)<\/li>\n\n\n<li><strong>Priority planning, i\u015f merkezlerini tek tek ele al\u0131r.<\/strong> \u0130\u015flevin a\u00e7\u0131klamas\u0131 \u015f\u00f6yledir: &#8220;shows all operations for the work center in all manufacturing orders,&#8221; (T\u00fcm \u00fcretim emirlerinde ilgili i\u015f merkezine ait b\u00fct\u00fcn operasyonlar\u0131 g\u00f6sterir.) Planlamac\u0131, s\u0131ralamay\u0131 belirlemek i\u00e7in sat\u0131rlar\u0131 s\u00fcr\u00fckler. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/PriorityPlanning\/bPriorityPlan.htm\">Monitor yard\u0131m\u0131<\/a>)<\/li>\n\n\n<li><strong>Check delivery times, tek bir sipari\u015f kalemini planlar.<\/strong> CDT, teklif verdi\u011finiz kalem i\u00e7in bo\u015f kapasite bulur. Elle yap\u0131lan yeniden planlama \u00f6\u011feleri i\u00e7in ise \u015fu belirtilir: &#8220;are not saved.&#8221; (Kaydedilmez.) (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/UserGuide\/Using\/CheckDeliveryTimes\/CheckCapacityAvailability.htm\">Monitor yard\u0131m\u0131<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Bu nedenle, t\u00fcm fabrikay\u0131 kapsayan ve ger\u00e7ek kapasiteyi g\u00f6zeten \u00e7izelge i\u00e7in \u00f6zel bir \u00e7izelgeleme yaz\u0131l\u0131m\u0131 gerekir. SkyPlanner t\u00fcm i\u015f merkezlerindeki i\u015fleri birlikte s\u0131ralar ve \u00e7izelgeyi g\u00fcncel tutar. Monitor&#8217;daki planlaman\u0131n her ad\u0131m\u0131, <a href=\"\/tr\/entegrasyonlar\/erp\/monitor-erp\/uretim-cizelgeleme\/\">Monitor ERP ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yapabilir mi?<\/a> yaz\u0131s\u0131nda a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"monitor-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP&#8217;nin mevcut hali ve SkyPlanner ile kazand\u0131klar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Monitor G5 ile planlama<\/th><th>SkyPlanner APS ile Monitor G5<\/th><\/tr><\/thead><tbody><tr><td>Kapasite<\/td><td>Y\u00fck, i\u015f merkezi baz\u0131nda g\u00f6sterilir; kapasite a\u015f\u0131mlar\u0131n\u0131 planlamac\u0131 giderir<\/td><td>Her makine, \u00e7al\u0131\u015fan ve tak\u0131m, vardiyalar\u0131yla birlikte ger\u00e7ek kapasitesine g\u00f6re \u00e7izelgelenir<\/td><\/tr><tr><td>S\u0131ralama<\/td><td>\u0130\u015f merkezleri tek tek ele al\u0131n\u0131r; \u00f6ncelik plan\u0131ndaki sat\u0131rlar s\u00fcr\u00fcklenerek s\u0131ralan\u0131r<\/td><td>T\u00fcm i\u015f merkezlerindeki i\u015fler tek seferde, saniyeler i\u00e7inde s\u0131ralan\u0131r<\/td><\/tr><tr><td>Teslimat tarihleri<\/td><td>CDT, tek bir sipari\u015f kalemi i\u00e7in teslimat tarihi verir<\/td><td>Her sipari\u015fin tarihi, fabrika genelindeki \u00e7izelgeye g\u00f6re belirlenir<\/td><\/tr><tr><td>Tip de\u011fi\u015fimleri<\/td><td>Ayn\u0131 tak\u0131m\u0131 kullanan emirler elle filtrelenip gruplan\u0131r<\/td><td>\u0130\u015fler, toplam haz\u0131rl\u0131k s\u00fcresini en aza indirecek \u015fekilde s\u0131ralan\u0131r<\/td><\/tr><tr><td>Tak\u0131mlar ve ekipler<\/td><td>Haz\u0131rl\u0131k \u00e7ak\u0131\u015fmalar\u0131, elle kontrol edilmek \u00fczere g\u00f6sterilir<\/td><td>Tak\u0131mlar\u0131n kapasite s\u0131n\u0131rlar\u0131 g\u00f6zetilir; birden fazla operat\u00f6r gerektiren i\u015flere yeterli personel atan\u0131r<\/td><\/tr><tr><td>Malzemeler<\/td><td>CDT&#8217;de malzeme yeterlili\u011fi sipari\u015f kalemi baz\u0131nda kontrol edilir<\/td><td>\u0130\u015fler, malzeme stokta bulundu\u011funda veya teslim al\u0131nd\u0131\u011f\u0131nda ba\u015flar<\/td><\/tr><tr><td>De\u011fi\u015fiklikler<\/td><td>Planlamac\u0131 New finish i\u015flevini yeniden uygular ve tekrar planlama yapar<\/td><td>Autopilot, belirledi\u011finiz kilitleri ve \u00f6ncelikleri g\u00f6zeterek yeniden planlama yapar<\/td><\/tr><tr><td>shop floor<\/td><td>Kay\u0131t terminali ve makine entegrasyonu<\/td><td>Telefon veya tablette operat\u00f6r i\u015f kuyru\u011fu ve i\u015f kayd\u0131<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-monitor-erp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP i\u00e7in \u00e7izelgeleme yaz\u0131l\u0131m\u0131 nas\u0131l se\u00e7ilir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Monitor&#8217;\u0131n kendi \u00f6ncelik planlamas\u0131, bir veya iki i\u015f merkezinin darbo\u011faz olu\u015fturdu\u011fu ve planlamac\u0131n\u0131n her g\u00fcn \u00f6ncelik plan\u0131 \u00fczerinde \u00e7al\u0131\u015ft\u0131\u011f\u0131 fabrikalar i\u00e7in uygundur. Bunun \u00f6tesinde, al\u0131c\u0131lar d\u00f6rt \u00e7\u00f6z\u00fcm grubunu kar\u015f\u0131la\u015ft\u0131r\u0131r. \u00d6zel planlama ekranlar\u0131, Monitor dan\u0131\u015fmanlar\u0131 taraf\u0131ndan tek bir fabrikan\u0131n ihtiya\u00e7lar\u0131na g\u00f6re geli\u015ftirilir. shop floor ve OEE ara\u00e7lar\u0131 s\u00fcre ve miktarlar\u0131 Monitor&#8217;a geri bildirir, ancak ger\u00e7ek kapasiteye uygun bir \u00e7izelge olu\u015fturmaz. Kurumsal APS paketlerinin belgelenmi\u015f ERP entegrasyonlar\u0131 aras\u0131nda Monitor yer almaz. SkyPlanner ise shop floor uygulamalar\u0131n\u0131 da kapsayan bulut tabanl\u0131 APS grubundad\u0131r.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planlamac\u0131n\u0131z \u00f6ncelik plan\u0131nda sat\u0131r s\u00fcr\u00fcklemek i\u00e7in haftada saatler harc\u0131yorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> Loading plan&#8217;daki kapasite a\u015f\u0131mlar\u0131n\u0131 gidermeye harcanan zaman da buna dahildir.<\/li>\n\n\n<li><strong>\u00dcr\u00fcn karmas\u0131 de\u011fi\u015ftik\u00e7e darbo\u011fazlar da yer de\u011fi\u015ftiriyorsa<\/strong> ve i\u015f merkezlerini tek tek planlamak art\u0131k yetmiyorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/li>\n\n\n<li><strong>\u00dcretim miktar\u0131n\u0131z\u0131 \u00fcr\u00fcn de\u011fi\u015fimlerindeki haz\u0131rl\u0131klar belirliyorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> Haz\u0131rl\u0131k s\u00fcresi matrisi, toplam haz\u0131rl\u0131k s\u00fcresini en aza indirecek \u015fekilde i\u015fleri s\u0131ralar.<\/li>\n\n\n<li><strong>S\u0131radaki i\u015fin ba\u015flay\u0131p ba\u015flayamayaca\u011f\u0131n\u0131 ortak kullan\u0131lan tak\u0131mlar, ayarc\u0131lar ve ekipler belirliyorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong><\/li>\n\n\n<li><strong>Hangi i\u015fin ba\u015flayaca\u011f\u0131n\u0131 malzemenin geli\u015f zaman\u0131 belirliyorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> Her operasyonun ba\u015flayabilmesi stok durumuna ve sat\u0131n alma sipari\u015flerine ba\u011fl\u0131d\u0131r.<\/li>\n\n\n<li><strong>Plan her g\u00fcn de\u011fi\u015fiyorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> Autopilot, bir ar\u0131za veya acil sipari\u015f sonras\u0131nda yeniden planlama yapar ve yeni tarihler Monitor&#8217;a geri aktar\u0131l\u0131r.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Nas\u0131l ba\u015flan\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00dccretsiz denemeyi ba\u015flat\u0131n.<\/strong> 30 g\u00fcn boyunca en fazla 20 i\u015f merkezi ve t\u00fcm Basic \u00f6zellikleri; kredi kart\u0131 gerekmez.<\/li>\n\n\n<li><strong>\u00dcretiminizi modelleyin.<\/strong> SkyPlanner&#8217;da makineleri, \u00e7al\u0131\u015fanlar\u0131 ve vardiyalar\u0131 tan\u0131mlay\u0131n veya i\u00e7e aktar\u0131n. Kurulum ve kullan\u0131ma ge\u00e7i\u015f deste\u011fi alabilirsiniz.<\/li>\n\n\n<li><strong>\u00dcretim emirlerinizi y\u00fckleyin.<\/strong> A\u00e7\u0131k \u00fcretim emirlerinin operasyonlar\u0131n\u0131 ve i\u015f merkezlerini Monitor&#8217;dan Excel&#8217;e aktar\u0131n. Bunlar\u0131 SkyPlanner&#8217;a y\u00fckleyip SkyPlanner&#8217;\u0131n \u00e7izelgesini \u00f6ncelik plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>Monitor ERP&#8217;yi ba\u011flay\u0131n.<\/strong> SkyPlanner ekibi, \u00e7ift y\u00f6nl\u00fc entegrasyonu Monitor G5 yap\u0131land\u0131rman\u0131za g\u00f6re kurar ve canl\u0131ya ge\u00e7tikten sonra da destek verir.<\/li>\n\n<\/ol>\n\n\n<p><strong>Fiyatland\u0131rma.<\/strong> Paketler i\u015f merkezi ba\u015f\u0131na ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. \u0130stedi\u011finiz zaman i\u015f merkezi ekleyebilir, \u00e7\u0131karabilir veya aboneli\u011finizi iptal edebilirsiniz. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rma<\/a> sayfas\u0131na, di\u011fer ERP&#8217;ler i\u00e7in <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131 merkezine<\/a> bak\u0131n.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k\u00e7a sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Monitor ERP i\u00e7in en iyi \u00e7izelgeleme eklentisi hangisi?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, ger\u00e7ek kapasiteyi dikkate alan ve Monitor ERP ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015fan bir \u00fcretim \u00e7izelgeleme eklentisidir. \u00dcretim emirleri, operasyonlar, i\u015f merkezleri ve malzemeler SkyPlanner&#8217;a aktar\u0131l\u0131r; planlanan operasyon tarihleri ve kaydedilen \u00e7al\u0131\u015fmalar Monitor&#8217;a geri g\u00f6nderilir. Her i\u015f merkezinin, operat\u00f6r\u00fcn, tak\u0131m\u0131n ve malzemenin kapasitesi s\u0131n\u0131rl\u0131 kabul edilir. Ge\u00e7i\u015f y\u00f6n\u00fcn\u00fc dikkate alan haz\u0131rl\u0131k s\u00fcresi matrisi, i\u015fleri haz\u0131rl\u0131k s\u00fcresini en aza indirecek \u015fekilde s\u0131ralar. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot otomatik olarak yeniden \u00e7izelgeleme yapar. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve \u00fccretsiz deneme 30 g\u00fcn s\u00fcrer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Monitor ERP ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yapabiliyor mu?<\/summary>\n<p class=\"sp-faq__a\">Monitor G5 kapasiteyi dikkate al\u0131r. Loading plan, y\u00fck\u00fc kapasiteyle kar\u015f\u0131la\u015ft\u0131rarak g\u00f6sterir. Priority planning ise her seferinde tek bir i\u015f merkezi i\u00e7in operasyon baz\u0131nda New finish hesaplar. Tesis genelindeki a\u015f\u0131r\u0131 y\u00fckleri \u00e7\u00f6zmek planlamac\u0131ya kal\u0131r. SkyPlanner APS, Monitor ERP&#8217;nin yan\u0131nda \u00e7al\u0131\u015farak her i\u015f merkezinin, \u00e7al\u0131\u015fan\u0131n, tak\u0131m\u0131n ve malzemenin ger\u00e7ek kapasitesini dikkate alan bir <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">\u00fcretim \u00e7izelgesi<\/a> olu\u015fturur.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Monitor G5&#8217;e herhangi bir \u015fey y\u00fcklememiz gerekiyor mu?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. SkyPlanner, Monitor ile birlikte \u00e7al\u0131\u015fan bulut tabanl\u0131 bir uygulamad\u0131r ve Monitor&#8217;\u0131n kendi belgelenmi\u015f aray\u00fcz\u00fc olan Monitor ERP API \u00fczerinden ba\u011flant\u0131 kurar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, Monitor&#8217;\u0131n \u00fcretim mod\u00fcl\u00fcn\u00fcn yerini mi al\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r, bu mod\u00fcl\u00fc tamamlayacak \u015fekilde \u00e7al\u0131\u015f\u0131r. Par\u00e7alar, BOM&#8217;lar ve rotalar, \u00fcretim emirleri, sat\u0131n alma, stok, raporlama ve finans Monitor&#8217;da kal\u0131r. SkyPlanner, \u00fcretim emri operasyonlar\u0131n\u0131 ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeler ve planlanan tarihleri geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, havuz i\u015f merkezlerimizi ve alternatif makinelerimizi kullanabilir mi?<\/summary>\n<p class=\"sp-faq__a\">Evet. Havuzdaki kaynaklar ve alternatif i\u015f merkezleri, SkyPlanner&#8217;da alternatif i\u015f merkezleri olarak tan\u0131mlan\u0131r. Birincil makine me\u015fgul oldu\u011funda \u00e7izelgeleme motoru i\u015fi alternatif bir makineye ta\u015f\u0131r. Se\u00e7ilen i\u015f merkezi de Monitor&#8217;daki ilgili operasyona geri aktar\u0131l\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Monitor ERP kullanan bir \u00fcretici i\u00e7in SkyPlanner&#8217;\u0131n maliyeti nedir?<\/summary>\n<p class=\"sp-faq__a\">5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar; her ek i\u015f merkezi i\u00e7in ayl\u0131k 20 \u20ac \u00f6denir. \u0130\u015f merkezi, kendine ait \u00e7izelgelenmi\u015f bir i\u015f kuyru\u011fu olan \u00fcretim kayna\u011f\u0131d\u0131r. Entegrasyon i\u00e7in s\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan teklif, paketinizle birlikte ba\u015ftan sunulur. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devreye alma ne kadar s\u00fcrer?<\/summary>\n<p class=\"sp-faq__a\">Devreye alma, kurulum ve kullan\u0131ma ge\u00e7i\u015f s\u00fcreci ba\u015flad\u0131ktan sonra genellikle birka\u00e7 hafta i\u00e7inde tamamlan\u0131r. Ekip, i\u015f merkezlerinizi ve operasyon sat\u0131rlar\u0131n\u0131z\u0131 e\u015fle\u015ftirir, \u00fcretim emirleri ile sat\u0131n alma sipari\u015flerinin ba\u011flant\u0131s\u0131n\u0131 kurar ve planlanan tarihleri geri g\u00f6nderir. Canl\u0131ya ge\u00e7meden \u00f6nce her \u015fey mevcut \u00f6ncelik plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131larak test edilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Monitor ERP entegrasyonundan \u00f6nce SkyPlanner&#8217;\u0131 deneyebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck denemede, Monitor&#8217;dan Excel&#8217;e aktard\u0131\u011f\u0131n\u0131z a\u00e7\u0131k \u00fcretim emirleri kullan\u0131l\u0131r. Entegrasyon \u00e7al\u0131\u015fmalar\u0131 ba\u015flamadan \u00f6nce kendi \u00fcretiminizin ger\u00e7ek kapasiteye g\u00f6re haz\u0131rlanm\u0131\u015f \u00e7izelgesini g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Monitor ERP Monitor ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, Monitor ERP i\u00e7in geli\u015ftirilmi\u015f bir \u00fcretim \u00e7izelgeleme eklentisidir. T\u00fcm i\u015f merkezlerini, operat\u00f6rleri, tak\u0131mlar\u0131 ve malzemeleri ayn\u0131 anda, ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeler. Monitor G5 kapasite a\u015f\u0131m\u0131n\u0131n nerede oldu\u011funu g\u00f6sterir. SkyPlanner bu a\u015f\u0131m\u0131 giderir; \u00fcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot &#8230; <a title=\"Monitor ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/monitor-erp\/\" aria-label=\"Read more about Monitor ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100689,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103094","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Monitor ERP \u00e7izelgeleme entegrasyonu: Kapasiteye uygun APS<\/title>\n<meta name=\"description\" content=\"Monitor ERP i\u00e7in SkyPlanner APS eklentisi: kapasiteye g\u00f6re \u00e7izelgeleme; i\u015f merkezleri, operat\u00f6rler, tak\u0131mlar ve malzemelerle \u00e7ift y\u00f6nl\u00fc entegrasyon. Ayda 199 \u20ac\u2019dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/monitor-erp\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Monitor ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" \/>\n<meta property=\"og:description\" content=\"Monitor ERP i\u00e7in SkyPlanner APS eklentisi: kapasiteye g\u00f6re \u00e7izelgeleme; i\u015f merkezleri, operat\u00f6rler, tak\u0131mlar ve malzemelerle \u00e7ift y\u00f6nl\u00fc entegrasyon. Ayda 199 \u20ac\u2019dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/monitor-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/monitor-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/monitor-erp\\\/\",\"name\":\"Monitor ERP \u00e7izelgeleme entegrasyonu: Kapasiteye uygun APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Monitor ERP i\u00e7in SkyPlanner APS eklentisi: kapasiteye g\u00f6re \u00e7izelgeleme; i\u015f merkezleri, operat\u00f6rler, tak\u0131mlar ve malzemelerle \u00e7ift y\u00f6nl\u00fc entegrasyon. Ayda 199 \u20ac\u2019dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/monitor-erp\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/monitor-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/monitor-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Monitor ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Monitor ERP \u00e7izelgeleme entegrasyonu: Kapasiteye uygun APS","description":"Monitor ERP i\u00e7in SkyPlanner APS eklentisi: kapasiteye g\u00f6re \u00e7izelgeleme; i\u015f merkezleri, operat\u00f6rler, tak\u0131mlar ve malzemelerle \u00e7ift y\u00f6nl\u00fc entegrasyon. Ayda 199 \u20ac\u2019dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/monitor-erp\/","og_locale":"tr_TR","og_type":"article","og_title":"Monitor ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","og_description":"Monitor ERP i\u00e7in SkyPlanner APS eklentisi: kapasiteye g\u00f6re \u00e7izelgeleme; i\u015f merkezleri, operat\u00f6rler, tak\u0131mlar ve malzemelerle \u00e7ift y\u00f6nl\u00fc entegrasyon. Ayda 199 \u20ac\u2019dan.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/monitor-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/monitor-erp\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/monitor-erp\/","name":"Monitor ERP \u00e7izelgeleme entegrasyonu: Kapasiteye uygun APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Monitor ERP i\u00e7in SkyPlanner APS eklentisi: kapasiteye g\u00f6re \u00e7izelgeleme; i\u015f merkezleri, operat\u00f6rler, tak\u0131mlar ve malzemelerle \u00e7ift y\u00f6nl\u00fc entegrasyon. Ayda 199 \u20ac\u2019dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/monitor-erp\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/monitor-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/monitor-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Monitor ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Monitor ERP Monitor ERP i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, Monitor ERP i\u00e7in geli\u015ftirilmi\u015f bir \u00fcretim \u00e7izelgeleme eklentisidir. T\u00fcm i\u015f merkezlerini, operat\u00f6rleri, tak\u0131mlar\u0131 ve malzemeleri ayn\u0131 anda, ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeler. Monitor G5 kapasite a\u015f\u0131m\u0131n\u0131n nerede oldu\u011funu g\u00f6sterir. SkyPlanner bu a\u015f\u0131m\u0131 giderir; \u00fcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/103094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=103094"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/103094\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100689"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=103094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}