{"id":103007,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/katana\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"katana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/katana\/","title":{"rendered":"Katana i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Katana<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Katana i\u00e7in SkyPlanner APS: <span class=\"hl\">Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS, Katana Cloud Inventory (Katana MRP) i\u00e7in ger\u00e7ek makine ve personel kapasitesini g\u00f6zeten bir \u00fcretim \u00e7izelgeleme eklentisidir. Katana&#8217;daki \u00fcretim emirlerini her i\u015f merkezi, operat\u00f6r, tak\u0131m ve malzemeyi kapsayan bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. Hangi operasyonun nerede ve ne zaman yap\u0131laca\u011f\u0131n\u0131 g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner, Katana ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r. \u00dcretim emirleri, re\u00e7eteler, operasyonlar, kaynaklar, stoklar ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r; \u00e7izelgedeki s\u0131ralama, terminler ve kaydedilen \u00e7al\u0131\u015fmalar Katana&#8217;ya geri g\u00f6nderilir. SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu Katana yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar.<\/p>\n\n\n<p>Fiyatlar 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi ayl\u0131k 20 \u20ac&#8217;dur. \u00dccretsiz deneme 30 g\u00fcn s\u00fcrer, 20 i\u015f merkezine kadar kullan\u0131m sunar ve kredi kart\u0131 gerektirmez.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcretiminizde neler de\u011fi\u015fir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">T\u00fcm fabrika i\u00e7in tek liste yerine her makine i\u00e7in ayr\u0131 zaman \u00e7izelgesi.<\/p>\n\n\n<p class=\"fx-pain__b\">Katana, \u00fcretim emirlerini tek bir \u00f6ncelik listesinde s\u0131ralar. SkyPlanner&#8217;\u0131n Arcturus motoru ise her operasyonu, yap\u0131laca\u011f\u0131 i\u015f merkezine belirli bir zaman diliminde yerle\u015ftirir. Bunlar\u0131n t\u00fcm\u00fcn\u00fc etkile\u015fimli bir Gantt \u00e7izelgesinde g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ger\u00e7ek kapasiteyle do\u011frulanan teslimat tarihleri.<\/p>\n\n\n<p class=\"fx-pain__b\">Her sipari\u015fin biti\u015f tarihi, makinelerin ve \u00e7al\u0131\u015fanlar\u0131n i\u015f y\u00fck\u00fcne g\u00f6re belirlenir. M\u00fc\u015fteriye tarih vermeden \u00f6nce CNC&#8217;nin iki hafta boyunca dolu oldu\u011funu, montajda ise kapasite bulundu\u011funu g\u00f6rebilirsiniz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Tesisinize uygun vardiyalar.<\/p>\n\n\n<p class=\"fx-pain__b\">Her i\u015f merkezi ve \u00e7al\u0131\u015fan i\u00e7in vardiyalar, izinler, devams\u0131zl\u0131klar ve fazla mesai vardiyalar\u0131 ayr\u0131 ayr\u0131 tan\u0131mlan\u0131r. Darbo\u011fazdaki kayna\u011fa ikinci bir vardiya ekledi\u011finizde etkisini tarihlerde hemen g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Daha az tip de\u011fi\u015fimi.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki haz\u0131rl\u0131k s\u00fcresini her iki y\u00f6n i\u00e7in de saklar. Maviden k\u0131rm\u0131z\u0131ya ge\u00e7i\u015f 30 dakika, k\u0131rm\u0131z\u0131dan maviye ge\u00e7i\u015f ise 60 dakika s\u00fcrebilir. Motor, i\u015fleri en az zaman kayb\u0131 yaratacak s\u0131raya koyar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ortak tak\u0131m ve ekipler \u00e7ak\u0131\u015fmaz.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir i\u015f merkezinde kullan\u0131lan kal\u0131p, ayn\u0131 anda ba\u015fka bir i\u015f merkezine asla atanmaz. \u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe, ilgili vardiyada m\u00fcsait olan \u00fc\u00e7 ki\u015fi atan\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Acil sipari\u015flerde ve ar\u0131zalarda otomatik yeniden \u00e7izelgeleme.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir sipari\u015fe Fast Track veya daha y\u00fcksek \u00f6ncelik atay\u0131n; motor ona yer a\u00e7ar. Makine durdu\u011funda Autopilot \u00e7izelgeyi yeniden olu\u015fturur, Running Time Lock ise ba\u015flam\u0131\u015f i\u015flerin yerini korur.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Her de\u011fi\u015fiklikte malzeme kontrol\u00fc.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, stoklar\u0131 ve beklenen sat\u0131n alma sipari\u015flerini kontrol eder. Tedarik\u00e7iden teslimat bekleyen bir i\u015fi, malzemenin var\u0131\u015f tarihinden sonras\u0131na planlar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operat\u00f6rler i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr.<\/p>\n\n\n<p class=\"fx-pain__b\">Her operat\u00f6r, s\u0131radaki i\u015flerini telefon veya tabletten g\u00f6r\u00fcr ve yapt\u0131\u011f\u0131 \u00e7al\u0131\u015fmay\u0131 Mobile Confirmations ya da Production Timer ile kaydeder. \u0130lerleme bilgisi, Katana&#8217;daki \u00fcretim emrine geri aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta kazan\u0131lan zaman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt donan\u0131mlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 \u00fcretim hatt\u0131na saniyeler i\u00e7inde ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda \u015fi\u015fe dolum hatt\u0131nda \u00e7al\u0131\u015fan, temiz oda k\u0131yafetli operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f plan, 30 dakikadan k\u0131sa s\u00fcrede haz\u0131rlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 tesisinde kaynakl\u0131 \u00e7elik konstr\u00fcksiyonu ta\u015flayan bir KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%98<\/b><span>yakla\u015f\u0131k %50&#8217;den y\u00fckselen teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumam\u0131zda belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal i\u015fleme ve fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k %50&#8217;den %98&#8217;e kadar y\u00fckseldi. \u00c7izelgeleme i\u00e7in art\u0131k iki yerine bir \u00fcretim sorumlusu yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp&#8217;un yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%100<\/b><span>2021&#8217;den bu yana teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, kapasitemizi g\u00f6r\u00fcn\u00fcr k\u0131l\u0131yor ve planlamay\u0131 \u00f6ng\u00f6r\u00fclebilir hale getiriyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Kimyasal ve g\u0131da \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">SkyPlanner&#8217;\u0131n kullan\u0131lmaya ba\u015fland\u0131\u011f\u0131 2021&#8217;den bu yana teslimat performans\u0131 kesintisiz olarak %100 d\u00fczeyinde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/opes-corporation\/\">Opes Corporation&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-katana-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana entegrasyonu nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Katana i\u015fleri g\u00f6nderir.<\/strong> \u00dcretim emirleri operasyon sat\u0131rlar\u0131yla birlikte SkyPlanner&#8217;a aktar\u0131l\u0131r. \u00dcr\u00fcn re\u00e7eteleri, \u00fcretim operasyonlar\u0131, kaynaklar, stoklar ve sat\u0131n alma sipari\u015fleri de bu aktar\u0131ma dahildir.<\/li>\n\n\n<li><strong>SkyPlanner \u00e7izelgeyi olu\u015fturur ve g\u00fcncel tutar.<\/strong> Arcturus motoru, t\u00fcm i\u015f merkezlerindeki her operasyonu saniyeler i\u00e7inde planlar ve \u00fcretimdeki de\u011fi\u015fikliklere g\u00f6re yeniden \u00e7izelgeler.<\/li>\n\n\n<li><strong>Plan Katana&#8217;ya geri aktar\u0131l\u0131r.<\/strong> SkyPlanner, Katana&#8217;n\u0131n Schedule sekmesindeki \u00fcretim emirlerini ayn\u0131 s\u0131raya koyar ve her emrin \u00fcretim terminini yazar. Kaydedilen \u00e7al\u0131\u015fmalar operasyon sat\u0131rlar\u0131na geri aktar\u0131l\u0131r.<\/li>\n\n<\/ol>\n\n\n<p>Entegrasyon, Katana&#8217;n\u0131n herkese a\u00e7\u0131k API&#8217;si \u00fczerinden \u00e7al\u0131\u015f\u0131r; bu nedenle Katana&#8217;ya herhangi bir kurulum yap\u0131lmaz. Katana webhook&#8217;lar\u0131 yeni ve de\u011fi\u015ftirilen sipari\u015fleri bildirir, SkyPlanner webhook&#8217;lar\u0131 ise \u00e7izelge de\u011fi\u015fikliklerini an\u0131nda iletir. Her tesis Katana&#8217;daki kaynaklar\u0131 ve operasyonlar\u0131 farkl\u0131 yap\u0131land\u0131r\u0131r. Bu y\u00fczden SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda sizin yap\u0131land\u0131rman\u0131z i\u00e7in e\u015fle\u015ftirmeleri yapar ve canl\u0131ya ge\u00e7i\u015ften sonra da entegrasyon deste\u011fi sa\u011flar.<\/p>\n\n\n<p>Entegrasyon i\u00e7in s\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re \u00f6nceden fiyat teklifi verilir. Katana dan\u0131\u015fman\u0131n\u0131z veya kendi yaz\u0131l\u0131m geli\u015ftiricileriniz de SkyPlanner&#8217;\u0131n belgelenmi\u015f API&#8217;si \u00fczerinden entegrasyon geli\u015ftirebilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API ba\u015fvuru kayna\u011f\u0131<\/a>). U\u00e7 noktalar, alan e\u015fle\u015ftirmeleri ve geri yazma kurallar\u0131 <a href=\"\/tr\/entegrasyonlar\/erp\/katana\/entegrasyon-kilavuzu\/\">\u00fcretim \u00e7izelgeleme i\u00e7in Katana entegrasyon k\u0131lavuzunda<\/a> yer al\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-katana-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana neyi \u00e7izelgeler, SkyPlanner ne ekler?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Katana&#8217;n\u0131n Make ekran\u0131ndaki Schedule sekmesi &#8220;acts as a central production queue&#8221; (merkezi bir \u00fcretim kuyru\u011fu i\u015flevi g\u00f6r\u00fcr). <a href=\"https:\/\/support.katanamrp.com\/en\/articles\/5914369-managing-manufacturing-order-priorities\">Katana yard\u0131m merkezi<\/a> \u00e7al\u0131\u015fma \u015feklini \u015f\u00f6yle a\u00e7\u0131klar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>T\u00fcm fabrika i\u00e7in tek liste.<\/strong> &#8220;The topmost MO has the highest priority.&#8221; (En \u00fcstteki \u00fcretim emri en y\u00fcksek \u00f6nceli\u011fe sahiptir.)<\/li>\n\n\n<li><strong>S\u0131ralamay\u0131 planlamac\u0131 belirler.<\/strong> &#8220;Click and drag the MO to the desired position in the list.&#8221; (\u00dcretim emrine t\u0131klay\u0131p listede istedi\u011finiz konuma s\u00fcr\u00fckleyin.)<\/li>\n\n\n<li><strong>Kapasite, haftal\u0131k tek bir say\u0131yla ifade edilir.<\/strong> Otomatik terminler, fabrikan\u0131n tamam\u0131 i\u00e7in belirlenen Weekly throughput de\u011ferini kullan\u0131r ve &#8220;Weekly capacity is spread evenly across 5 weekdays.&#8221; (Haftal\u0131k kapasite hafta i\u00e7i g\u00fcnlerine e\u015fit olarak da\u011f\u0131t\u0131l\u0131r.) (<a href=\"https:\/\/support.katanamrp.com\/en\/articles\/5914341-how-to-manage-production-deadlines\">kaynak<\/a>)<\/li>\n\n\n<li><strong>Karma\u015f\u0131k tesisler i\u00e7in Katana&#8217;n\u0131n kendi \u00f6nerisi.<\/strong> &#8220;For complex, long-term, or multi-stream production setups, manual deadlines might offer better control.&#8221; (Karma\u015f\u0131k, uzun vadeli veya birden fazla \u00fcretim ak\u0131\u015f\u0131 olan yap\u0131larda terminleri elle belirlemek daha iyi kontrol sa\u011flayabilir.)<\/li>\n\n<\/ul>\n\n\n<p>Katana&#8217;daki kaynaklar\u0131n kendilerine ait vardiyalar\u0131 veya takvimleri yoktur; Tasks sekmesi de \u00fcretim emri \u00f6nceli\u011fini izler. Dolay\u0131s\u0131yla Katana, belirli bir makinenin a\u015f\u0131r\u0131 y\u00fcklenip y\u00fcklenmedi\u011fini kontrol etmez. Haz\u0131rl\u0131k ise \u00f6nceki \u00fcr\u00fcne ba\u011fl\u0131 bir tip de\u011fi\u015fimi olarak de\u011fil, bir maliyet t\u00fcr\u00fc olarak ele al\u0131n\u0131r. Bu s\u0131n\u0131rlamalar\u0131n her biri <a href=\"\/tr\/entegrasyonlar\/erp\/katana\/uretim-cizelgeleme\/\">Katana ger\u00e7ek kapasiteyi g\u00f6zeterek \u00fcretim \u00e7izelgeleme yapar m\u0131?<\/a> yaz\u0131s\u0131nda a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-moves-between-katana-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana ile SkyPlanner aras\u0131nda hangi veriler aktar\u0131l\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Katana<\/th><th>SkyPlanner<\/th><th>Aktar\u0131m y\u00f6n\u00fc<\/th><\/tr><\/thead><tbody><tr><td>\u00dcr\u00fcnler, malzemeler, varyantlar<\/td><td>\u00dcr\u00fcnler ve malzemeler<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>\u00dcr\u00fcn re\u00e7etesi \/ BOM<\/td><td>\u00dcr\u00fcn yap\u0131s\u0131, alt \u00fcr\u00fcnler<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>\u00dcretim operasyonlar\u0131: Type, Resource, Time<\/td><td>\u0130\u015flem ad\u0131mlar\u0131, haz\u0131rl\u0131k s\u00fcreleri<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>Kaynaklar (i\u015f merkezi, makine, \u00e7al\u0131\u015fan)<\/td><td>\u0130\u015f merkezleri, i\u015f merkezi gruplar\u0131<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>Operasyon sat\u0131rlar\u0131 ve malzeme bile\u015fenleriyle birlikte \u00fcretim emri<\/td><td>Sipari\u015fler ve i\u015fler<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>Stoklar, var\u0131\u015f tarihleriyle birlikte sat\u0131n alma sipari\u015fleri<\/td><td>Stok ve beklenen malzemeler<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>Sat\u0131\u015f sipari\u015finin teslimat tarihi<\/td><td>Sipari\u015f termini, m\u00fc\u015fteri \u00f6nceli\u011fi<\/td><td>SkyPlanner&#8217;a<\/td><\/tr><tr><td>Schedule sekmesinde \u00fcretim emrinin s\u0131ras\u0131, \u00fcretim termini<\/td><td>\u00c7izelgedeki s\u0131ralama, planlanan biti\u015f<\/td><td>Katana&#8217;ya geri<\/td><\/tr><tr><td>Operasyon sat\u0131r\u0131n\u0131n durumu ve ger\u00e7ekle\u015fen s\u00fcre<\/td><td>Mobile Confirmations, s\u00fcre kay\u0131tlar\u0131<\/td><td>Katana&#8217;ya geri<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"katana-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana: mevcut haliyle ve SkyPlanner ile<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Katana<\/th><th>SkyPlanner APS ile Katana<\/th><\/tr><\/thead><tbody><tr><td>Plan<\/td><td>\u00dcretim emirleri i\u00e7in tek bir \u00f6ncelik listesi<\/td><td>Her operasyon, ilgili i\u015f merkezinin zaman \u00e7izelgesinde<\/td><\/tr><tr><td>Kapasite<\/td><td>Tek bir haftal\u0131k \u00fcretim miktar\u0131<\/td><td>Her makine, \u00e7al\u0131\u015fan ve tak\u0131m i\u00e7in ayr\u0131 vardiyalar<\/td><\/tr><tr><td>Takvimler<\/td><td>T\u00fcm fabrika i\u00e7in pazartesiden cumaya<\/td><td>Kaynak baz\u0131nda vardiyalar, izinler, devams\u0131zl\u0131klar ve fazla mesailer<\/td><\/tr><tr><td>S\u0131ralama<\/td><td>Planlamac\u0131 \u00fcretim emirlerini elle s\u00fcr\u00fckleyerek s\u0131ralar<\/td><td>Motor, t\u00fcm a\u00e7\u0131k sipari\u015fleri \u00f6ncelik ve teslim tarihine g\u00f6re s\u0131ralar<\/td><\/tr><tr><td>Tip de\u011fi\u015fimleri<\/td><td>Haz\u0131rl\u0131k, operasyon maliyeti olarak ele al\u0131n\u0131r<\/td><td>Haz\u0131rl\u0131k s\u00fcreleri matrisiyle en d\u00fc\u015f\u00fck toplam haz\u0131rl\u0131k s\u00fcresi<\/td><\/tr><tr><td>De\u011fi\u015fiklikler<\/td><td>Her aksakl\u0131ktan sonra s\u00fcr\u00fckleyerek yeniden s\u0131ralama<\/td><td>Autopilot t\u00fcm fabrikay\u0131 yeniden planlar<\/td><\/tr><tr><td>Malzemeler<\/td><td>\u00d6ncelik s\u0131ras\u0131na g\u00f6re rezerve edilir<\/td><td>Her de\u011fi\u015fiklikte stok ve beklenen sat\u0131n alma sipari\u015fleri kontrol edilir<\/td><\/tr><tr><td>Shop floor<\/td><td>Kaynak baz\u0131nda g\u00f6rev listesi<\/td><td>Zamanlar\u0131 belirlenmi\u015f i\u015f kuyru\u011fu, Mobile Confirmations, Production Timer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-katana\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana i\u00e7in \u00e7izelgeleme yaz\u0131l\u0131m\u0131 nas\u0131l se\u00e7ilir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Katana&#8217;n\u0131n Schedule sekmesi, \u00e7evrim s\u00fcreleri k\u0131sa ve \u00fcretim miktar\u0131 istikrarl\u0131 olan, tek bir darbo\u011faz\u0131 bulunan ya da hi\u00e7 darbo\u011faz\u0131 olmayan k\u00fc\u00e7\u00fck bir at\u00f6lyeye uygundur. Bunun \u00f6tesindeki ihtiya\u00e7lar i\u00e7in al\u0131c\u0131lar d\u00f6rt se\u00e7ene\u011fi kar\u015f\u0131la\u015ft\u0131r\u0131r: yaln\u0131zca Katana kullanmak, CSV d\u0131\u015fa aktar\u0131mlar\u0131yla beslenen elektronik tablolarda \u00e7izelgeleme yapmak, durum takibi sa\u011flayan shop floor ara\u00e7lar\u0131 kullanmak veya her kayna\u011f\u0131 \u00e7izelgeleyip sonu\u00e7lar\u0131 Katana&#8217;ya geri yazan bulut tabanl\u0131 bir APS kullanmak.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ayn\u0131 sipari\u015flerin birden fazla makineye da\u011f\u0131t\u0131lmas\u0131 gerekiyorsa SkyPlanner&#8217;\u0131 se\u00e7in;<\/strong> tek bir haftal\u0131k \u00fcretim miktar\u0131, kapasite a\u015f\u0131m\u0131n\u0131 gizler.<\/li>\n\n\n<li><strong>Vardiyalar makineye veya ekibe g\u00f6re de\u011fi\u015fiyorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong><\/li>\n\n\n<li><strong>Tip de\u011fi\u015fimleri \u00fcretim s\u0131ras\u0131na ba\u011fl\u0131ysa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> S\u0131ralamay\u0131 haz\u0131rl\u0131k s\u00fcreleri matrisi belirler.<\/li>\n\n\n<li><strong>S\u0131radaki i\u015fin ba\u015flayabilmesi ortak kullan\u0131lan tak\u0131mlara ve ekiplere ba\u011fl\u0131ysa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong><\/li>\n\n\n<li><strong>\u0130\u015f s\u0131ras\u0131n\u0131n Katana&#8217;ya geri aktar\u0131lmas\u0131n\u0131 istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in;<\/strong> b\u00f6ylece malzeme rezervasyonlar\u0131 ger\u00e7ek plana g\u00f6re yap\u0131l\u0131r.<\/li>\n\n\n<li><strong>Operat\u00f6rlerin zamanlar\u0131 belirlenmi\u015f bir i\u015f kuyru\u011funa g\u00f6re \u00e7al\u0131\u015fmas\u0131 gerekiyorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> Kuyru\u011fu telefon veya tabletten takip edebilirler.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Nas\u0131l ba\u015flan\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00dccretsiz denemeyi ba\u015flat\u0131n.<\/strong> 30 g\u00fcn boyunca en fazla 20 i\u015f merkezi ve Basic paketinin t\u00fcm \u00f6zellikleri; kredi kart\u0131 gerekmez.<\/li>\n\n\n<li><strong>\u00dcretiminizi modelleyin.<\/strong> SkyPlanner&#8217;da i\u015f merkezlerini, \u00e7al\u0131\u015fanlar\u0131 ve vardiyalar\u0131 olu\u015fturun veya i\u00e7e aktar\u0131n. Ba\u015flang\u0131\u00e7 s\u00fcrecinde destek alabilirsiniz.<\/li>\n\n\n<li><strong>Sipari\u015flerinizi y\u00fckleyin.<\/strong> Katana&#8217;n\u0131n Make ekran\u0131ndaki Tasks listesini CSV olarak d\u0131\u015fa aktar\u0131n. A\u00e7\u0131k sipari\u015flerinizle birlikte i\u00e7e aktar\u0131n ve SkyPlanner&#8217;\u0131n \u00e7izelgesini mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>Katana ba\u011flant\u0131s\u0131n\u0131 kurun.<\/strong> SkyPlanner ekibi \u00e7ift y\u00f6nl\u00fc entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131 kullan\u0131ma ge\u00e7tikten sonra da destek sa\u011flar.<\/li>\n\n<\/ol>\n\n\n<p><strong>Fiyatland\u0131rma.<\/strong> Paketler i\u015f merkezi ba\u015f\u0131na ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. \u0130stedi\u011finiz zaman i\u015f merkezi ekleyebilir, \u00e7\u0131karabilir veya aboneli\u011finizi iptal edebilirsiniz. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rma sayfas\u0131na<\/a> bak\u0131n. Ba\u015fka bir sistem de mi kullan\u0131yorsunuz? T\u00fcm <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131n\u0131<\/a> inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Katana i\u00e7in en iyi \u00e7izelgeleme eklentisi hangisidir?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, ger\u00e7ek kapasiteyi dikkate alan ve Katana ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015fan bir \u00fcretim \u00e7izelgeleme eklentisidir. \u00dcretim emirleri, re\u00e7eteler, operasyonlar, kaynaklar, stoklar ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r; \u00e7izelgedeki i\u015f s\u0131ras\u0131, terminler ve kaydedilen \u00e7al\u0131\u015fmalar Katana&#8217;ya geri g\u00f6nderilir. Her i\u015f merkezinin, operat\u00f6r\u00fcn ve tak\u0131m\u0131n kapasitesi, her malzemenin de miktar\u0131 s\u0131n\u0131rl\u0131d\u0131r. Ge\u00e7i\u015f y\u00f6n\u00fcn\u00fc dikkate alan haz\u0131rl\u0131k s\u00fcreleri matrisi, i\u015fleri en az haz\u0131rl\u0131k gerektirecek \u015fekilde s\u0131ralar. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve \u00fccretsiz deneme 30 g\u00fcn s\u00fcrer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Katana MRP ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yapar m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. Katana, \u00fcretim emirlerini tek bir \u00f6ncelik listesinde s\u0131ralar ve tek bir haftal\u0131k \u00fcretim miktar\u0131ndan hareketle terminleri tahmin eder. Kaynaklar\u0131n kendilerine ait kapasite veya vardiya tan\u0131mlar\u0131 yoktur. SkyPlanner APS, her i\u015f merkezi, \u00e7al\u0131\u015fan ve tak\u0131m i\u00e7in ger\u00e7ek kapasiteyi dikkate alan bir <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">\u00fcretim \u00e7izelgesi<\/a> ekler.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Katana&#8217;ya herhangi bir \u015fey y\u00fcklememiz gerekiyor mu?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. SkyPlanner, Katana ile birlikte bulutta \u00e7al\u0131\u015f\u0131r ve bir API anahtar\u0131 kullanarak Katana API \u00fczerinden ba\u011flant\u0131 kurar. Katana webhook&#8217;lar\u0131 sipari\u015f de\u011fi\u015fikliklerini bildirir; b\u00f6ylece \u00e7izelge g\u00fcncel kal\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, Katana&#8217;n\u0131n yerini mi al\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r, Katana&#8217;y\u0131 tamamlar. \u00dcr\u00fcnler, re\u00e7eteler, stoklar, sat\u0131n alma, sat\u0131\u015f sipari\u015fleri ve muhasebe ba\u011flant\u0131lar\u0131n\u0131z Katana&#8217;da kal\u0131r. SkyPlanner, \u00fcretim emirlerinizi ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeler; i\u015f s\u0131ras\u0131n\u0131, terminleri ve ilerleme bilgilerini Katana&#8217;ya geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Katana&#8217;n\u0131n yan\u0131nda SkyPlanner kullanman\u0131n maliyeti nedir?<\/summary>\n<p class=\"sp-faq__a\">5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi i\u00e7in ayl\u0131k 20 \u20ac al\u0131n\u0131r. 20 i\u015f merkezi olan bir fabrikan\u0131n \u00f6deyece\u011fi tutar ayl\u0131k 499 \u20ac&#8217;dur. S\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan entegrasyon teklifi, paketinizle birlikte ba\u015ftan sunulur. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Entegrasyon i\u00e7in hangi Katana paketine ihtiyac\u0131m\u0131z var?<\/summary>\n<p class=\"sp-faq__a\">Katana&#8217;n\u0131n fiyatland\u0131rma sayfas\u0131nda hem Free hem de Advantage paketinde API eri\u015fimi bulundu\u011fu belirtilir. \u00dcretim emirleri ve \u00fcretim operasyonlar\u0131, Katana&#8217;n\u0131n Manufacturing Management \u00f6zelli\u011fiyle sunulur. API anahtar\u0131n\u0131 Settings &gt; API b\u00f6l\u00fcm\u00fcnden olu\u015fturabilirsiniz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devreye alma ne kadar s\u00fcrer?<\/summary>\n<p class=\"sp-faq__a\">Devreye alma, ba\u015flang\u0131\u00e7 \u00e7al\u0131\u015fmalar\u0131 ba\u015flad\u0131ktan sonra normalde haftalar i\u00e7inde tamamlan\u0131r. Ekip, kaynaklar\u0131n\u0131z\u0131 ve \u00fcretim operasyonlar\u0131n\u0131z\u0131 e\u015fle\u015ftirir, \u00fcretim emirleri ile sat\u0131n alma sipari\u015flerinin ba\u011flant\u0131s\u0131n\u0131 kurar, i\u015f s\u0131ras\u0131n\u0131 ve terminleri Katana&#8217;ya geri g\u00f6nderir. Canl\u0131 kullan\u0131ma ge\u00e7meden \u00f6nce her \u015fey mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131larak test edilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00d6nce SkyPlanner&#8217;\u0131 kendi Katana verilerimizle test edebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. Deneme s\u00fcresinde i\u015f merkezlerinizi ve a\u00e7\u0131k sipari\u015flerinizi Katana&#8217;dan d\u0131\u015fa aktard\u0131\u011f\u0131n\u0131z bir CSV dosyas\u0131ndan i\u00e7e aktar\u0131n. Entegrasyon \u00e7al\u0131\u015fmalar\u0131na ba\u015flanmadan \u00f6nce kendi \u00fcretiminizin ger\u00e7ek kapasiteye g\u00f6re haz\u0131rlanm\u0131\u015f \u00e7izelgesini g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Katana Katana i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, Katana Cloud Inventory (Katana MRP) i\u00e7in ger\u00e7ek makine ve personel kapasitesini g\u00f6zeten bir \u00fcretim \u00e7izelgeleme eklentisidir. Katana&#8217;daki \u00fcretim emirlerini her i\u015f merkezi, operat\u00f6r, tak\u0131m ve malzemeyi kapsayan bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. Hangi operasyonun nerede ve ne zaman yap\u0131laca\u011f\u0131n\u0131 g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde &#8230; <a title=\"Katana i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/katana\/\" aria-label=\"Read more about Katana i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100689,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103007","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Katana MRP \u00c7izelgeleme Entegrasyonu: Kapasiteye Uygun APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: Katana MRP i\u00e7in kapasiteye uygun \u00e7izelgeleme, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, vardiya, tak\u0131m ve malzeme. Ayda 199 \u20ac&#039;dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/katana\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Katana i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: Katana MRP i\u00e7in kapasiteye uygun \u00e7izelgeleme, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, vardiya, tak\u0131m ve malzeme. Ayda 199 \u20ac&#039;dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/katana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/katana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/katana\\\/\",\"name\":\"Katana MRP \u00c7izelgeleme Entegrasyonu: Kapasiteye Uygun APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS: Katana MRP i\u00e7in kapasiteye uygun \u00e7izelgeleme, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, vardiya, tak\u0131m ve malzeme. Ayda 199 \u20ac'dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/katana\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/katana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/katana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Katana i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Katana MRP \u00c7izelgeleme Entegrasyonu: Kapasiteye Uygun APS","description":"SkyPlanner APS: Katana MRP i\u00e7in kapasiteye uygun \u00e7izelgeleme, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, vardiya, tak\u0131m ve malzeme. Ayda 199 \u20ac'dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/katana\/","og_locale":"tr_TR","og_type":"article","og_title":"Katana i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","og_description":"SkyPlanner APS: Katana MRP i\u00e7in kapasiteye uygun \u00e7izelgeleme, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, vardiya, tak\u0131m ve malzeme. Ayda 199 \u20ac'dan.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/katana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"12 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/katana\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/katana\/","name":"Katana MRP \u00c7izelgeleme Entegrasyonu: Kapasiteye Uygun APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS: Katana MRP i\u00e7in kapasiteye uygun \u00e7izelgeleme, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, vardiya, tak\u0131m ve malzeme. Ayda 199 \u20ac'dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/katana\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/katana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/katana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Katana i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Katana Katana i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, Katana Cloud Inventory (Katana MRP) i\u00e7in ger\u00e7ek makine ve personel kapasitesini g\u00f6zeten bir \u00fcretim \u00e7izelgeleme eklentisidir. Katana&#8217;daki \u00fcretim emirlerini her i\u015f merkezi, operat\u00f6r, tak\u0131m ve malzemeyi kapsayan bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. Hangi operasyonun nerede ve ne zaman yap\u0131laca\u011f\u0131n\u0131 g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/103007","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=103007"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/103007\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100689"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=103007"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}