{"id":102978,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/jobboss\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"jobboss","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/jobboss\/","title":{"rendered":"JobBOSS\u00b2 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ JobBOSS\u00b2<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">JobBOSS\u00b2 i\u00e7in SkyPlanner APS: <span class=\"hl\">Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS, ECI&#8217;nin JobBOSS\u00b2 (JobBOSS 2) \u00fcr\u00fcn\u00fc i\u00e7in geli\u015ftirilmi\u015f bir \u00fcretim \u00e7izelgeleme eklentisidir. Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde her makine, operat\u00f6r, tak\u0131m ve malzemeyi ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeler. Hangi i\u015f ad\u0131m\u0131n\u0131n hangi makinede, saat ka\u00e7ta y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner, JobBOSS\u00b2 ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r. Orders ve Order Line Items, Order Routings, Estimates ve Routings, Work Centers, Employees, Company Calendar, Job Requirements ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r. Her i\u015f ad\u0131m\u0131n\u0131n planlanan ba\u015flang\u0131\u00e7 ve biti\u015f tarihleri JobBOSS\u00b2&#8217;ye geri g\u00f6nderilir; kaydedilen \u00e7al\u0131\u015fmalar da Time Tickets olarak aktar\u0131labilir. SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu JobBOSS\u00b2 kurulumunuza g\u00f6re yap\u0131land\u0131r\u0131r.<\/p>\n\n\n<p>Fiyatlar 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi ayl\u0131k 20 \u20ac&#8217;dur. \u00dccretsiz deneme 30 g\u00fcn s\u00fcrer, 20 i\u015f merkezine kadar kullan\u0131m sunar ve kredi kart\u0131 gerektirmez.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-shop\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">At\u00f6lyenizde neler de\u011fi\u015fir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Her i\u015f ad\u0131m\u0131n\u0131n makinesi ve zaman\u0131 bellidir.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her Order Routing ad\u0131m\u0131n\u0131 belirli bir makineye ve saate yerle\u015ftirirken mevcut vardiyalar\u0131, devams\u0131zl\u0131klar\u0131 ve fazla mesaileri dikkate al\u0131r. D\u00f6rt freze tezg\u00e2h\u0131 olan bir i\u015f merkezi, fiilen uygulayabilece\u011finiz d\u00f6rt ayr\u0131 i\u015f kuyru\u011funa d\u00f6n\u00fc\u015f\u00fcr.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Haz\u0131rl\u0131k s\u00fcreleri k\u0131sal\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her par\u00e7a veya malzeme \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcresini her iki y\u00f6n i\u00e7in ayr\u0131 ayr\u0131 tutar. Al\u00fcminyumdan \u00e7eli\u011fe ge\u00e7i\u015f 30 dakika, \u00e7elikten al\u00fcminyuma ge\u00e7i\u015f ise 60 dakika s\u00fcrebilir. \u00c7izelgeleme motoru, toplam haz\u0131rl\u0131k s\u00fcresini en aza indirecek \u015fekilde i\u015fleri s\u0131ralar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operat\u00f6rler ve fikst\u00fcrler de s\u0131n\u0131rs\u0131z de\u011fildir.<\/p>\n\n\n<p class=\"fx-pain__b\">\u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe, vardiyalar\u0131nda m\u00fcsait olan \u00fc\u00e7 ki\u015fi atan\u0131r. Bir makinede kullan\u0131lan fikst\u00fcr asla ayn\u0131 anda ba\u015fka bir makineye ayr\u0131lmaz. Makine doluysa i\u015f alternatif bir makineye veya ki\u015fiye aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ba\u015flang\u0131c\u0131 malzemenin geli\u015f tarihi belirler.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner her par\u00e7a i\u00e7in stoklar\u0131 ve beklenen sat\u0131n alma sipari\u015flerini kontrol eder. \u00c7ubuk malzeme veya d\u0131\u015far\u0131dan al\u0131nan bir hizmeti bekleyen i\u015f, teslim tarihinden sonras\u0131na planlan\u0131r; ba\u015flat\u0131l\u0131p sonra \u00fcretim alan\u0131nda beklemeye al\u0131nmaz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Acil i\u015fler art\u0131k haftal\u0131k plan\u0131 bozmaz.<\/p>\n\n\n<p class=\"fx-pain__b\">Acil bir sipari\u015f geldi\u011finde veya bir makine ar\u0131zaland\u0131\u011f\u0131nda Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder, Autopilot da yeniden planlar. Belirledi\u011finiz kilitler ve \u00f6ncelikler ge\u00e7erlili\u011fini korur. Running Time Lock ise \u00f6n\u00fcm\u00fczdeki saatlerde \u00fcretimde y\u00fcr\u00fct\u00fclecek i\u015fleri sabit tutar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operat\u00f6rler plana g\u00f6re \u00e7al\u0131\u015f\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">Her operat\u00f6r s\u0131radaki i\u015fleri telefon veya tabletinden g\u00f6r\u00fcr, haz\u0131rl\u0131k ve \u00e7al\u0131\u015fma s\u00fcrelerini anl\u0131k olarak kaydeder. Ofis, i\u015flerin ilerleyi\u015fini canl\u0131 izler. Ger\u00e7ekle\u015fen s\u00fcrelerin JobBOSS\u00b2&#8217;ye Time Tickets olarak geri aktar\u0131l\u0131p aktar\u0131lmayaca\u011f\u0131na siz karar verirsiniz.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner kullanan \u00fcreticiler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta kazan\u0131lan zaman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sayesinde \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131k.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamada her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f kuyru\u011fu saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan, optimize edilmi\u015f \u00fc\u00e7 ayl\u0131k bir plan\u0131n haz\u0131rlanmas\u0131 30 dakikadan az s\u00fcr\u00fcyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 fabrikas\u0131nda kaynakl\u0131 bir \u00e7elik yap\u0131y\u0131 ta\u015flayan KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%98<\/b><span>teslimat performans\u0131; \u00f6nceki oran yakla\u015f\u0131k %50<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumada belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal i\u015fleme ve fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k %50&#8217;den %98&#8217;e kadar y\u00fckseldi. \u00c7izelgeleme i\u00e7in art\u0131k iki yerine bir amir yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp&#8217;un de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel&#x27;in Kauhava&#x27;daki \u00e7at\u0131 g\u00fcvenli\u011fi ekipmanlar\u0131 fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 daha g\u00f6r\u00fcn\u00fcr hale getirdi ve \u00fcretim y\u00f6netimini netle\u015ftirdi.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenli\u011fi ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 bu y\u0131l %99,2&#8217;ye ula\u015ft\u0131. \u00c7izelgelemede g\u00fcnde d\u00f6rt saate kadar \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/piristeel\/\">Piristeel&#8217;in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-jobboss-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">JobBOSS\u00b2 entegrasyonu nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>JobBOSS\u00b2 i\u015fleri g\u00f6nderir.<\/strong> A\u00e7\u0131k i\u015fler; Order Routings, Estimates, Routings ve malzemeleriyle birlikte SkyPlanner&#8217;a aktar\u0131l\u0131r. Work Centers, Employees, vardiyalar, Job Requirements ve sat\u0131n alma sipari\u015f kalemleri de aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>SkyPlanner \u00e7izelgeyi olu\u015fturur ve g\u00fcncel tutar.<\/strong> Arcturus motoru her i\u015f ad\u0131m\u0131n\u0131 saniyeler i\u00e7inde planlar, \u00fcretimde de\u011fi\u015fiklik olduk\u00e7a yeniden planlama yapar.<\/li>\n\n\n<li><strong>Tarihler ve \u00e7al\u0131\u015fma kay\u0131tlar\u0131 geri g\u00f6nderilir.<\/strong> Planlanan ba\u015flang\u0131\u00e7 ve biti\u015f tarihleri JobBOSS\u00b2&#8217;deki her Order Routing ad\u0131m\u0131na geri aktar\u0131l\u0131r. Kaydedilen haz\u0131rl\u0131k ve \u00e7al\u0131\u015fma s\u00fcreleri de Time Ticket Details olarak g\u00f6nderilebilir.<\/li>\n\n<\/ol>\n\n\n<p>JobBOSS\u00b2 ana kay\u0131t sisteminiz olmaya devam eder. Teklif verme, Estimates, Order Entry, sat\u0131n alma, stok, i\u015f maliyetlendirme ve muhasebe mevcut sistemde kal\u0131r. SkyPlanner tek bir sorumlulu\u011fu \u00fcstlenir: her kaynaktaki her i\u015f ad\u0131m\u0131n\u0131n s\u0131ras\u0131n\u0131 ve zamanlamas\u0131n\u0131 belirlemek.<\/p>\n\n\n<p>SkyPlanner, ECI&#8217;nin kendi aray\u00fczleri \u00fczerinden ba\u011flan\u0131r. Bar\u0131nd\u0131r\u0131lan JobBOSS\u00b2 kurulumlar\u0131nda JobBOSS\u00b2 API kullan\u0131l\u0131r. Bu REST API, OpenAPI belgelerine sahiptir ve OAuth 2.0 istemci kimlik bilgilerini kullan\u0131r. \u015eirket i\u00e7i JobBOSS\u00b2 kurulumlar\u0131nda ise ECI&#8217;nin hem bulut hem de \u015firket i\u00e7i kurulumlara eri\u015fmek i\u00e7in geli\u015ftirdi\u011fi ERP API kullan\u0131l\u0131r. SkyPlanner webhook&#8217;lar\u0131, \u00e7izelgedeki her de\u011fi\u015fikli\u011fi an\u0131nda iletir. JobBOSS\u00b2 ile senkronizasyon s\u0131kl\u0131\u011f\u0131 her i\u015fletme i\u00e7in ayr\u0131 belirlenir.<\/p>\n\n\n<p>Her i\u015fletme JobBOSS\u00b2&#8217;yi farkl\u0131 kulland\u0131\u011f\u0131ndan SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu kurulumunuza g\u00f6re yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra da destek verir. S\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za uygun entegrasyon teklifi ba\u015ftan sunulur. JobBOSS\u00b2 i\u015f orta\u011f\u0131n\u0131z veya kendi geli\u015ftiricileriniz de SkyPlanner&#8217;\u0131n belgelenmi\u015f API&#8217;sini kullanarak geli\u015ftirme yapabilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API referans\u0131<\/a>).<\/p>\n\n\n<p>U\u00e7 noktalar, veri e\u015fle\u015ftirmeleri ve geri yazma kurallar\u0131 <a href=\"\/tr\/entegrasyonlar\/erp\/jobboss\/entegrasyon-kilavuzu\/\">\u00fcretim \u00e7izelgeleme i\u00e7in JobBOSS\u00b2 entegrasyon k\u0131lavuzunda<\/a> a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-jobboss-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">JobBOSS\u00b2 neleri \u00e7izelgeler, SkyPlanner ne katar?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>JobBOSS\u00b2&#8217;nin kendi \u00e7izelgeleme mod\u00fcl\u00fc vard\u0131r. ECI, \u00fcr\u00fcn\u00fc &#8220;the only ERP with two ways to schedule&#8221; (iki farkl\u0131 \u00e7izelgeleme y\u00f6ntemi sunan tek ERP) olarak tan\u0131mlar: Whiteboard Scheduler ve s\u00fcr\u00fckle-b\u0131rak \u00f6zellikli Planning Board. Scheduling Advisor ise geciken i\u015fleri g\u00f6sterir. ECI&#8217;nin kendi sayfalar\u0131, sistemin nas\u0131l \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 \u015f\u00f6yle a\u00e7\u0131klar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0130\u015f merkezi baz\u0131nda, kapasite s\u0131n\u0131r\u0131yla veya s\u0131n\u0131rs\u0131z.<\/strong> &#8220;Choose from finite or infinite scheduling to manage capacity questions.&#8221; (Kapasite konular\u0131n\u0131 y\u00f6netmek i\u00e7in kapasite s\u0131n\u0131rlar\u0131n\u0131 dikkate alan veya almayan \u00e7izelgelemeyi se\u00e7in.) \u0130\u015fler, i\u015f merkezine g\u00f6re \u00e7izelgelenir ve \u00e7al\u0131\u015fanlara atan\u0131r. (<a href=\"https:\/\/www.ecisolutions.com\/products\/jobboss2\/features\/scheduling\/\">ECI<\/a>)<\/li>\n\n\n<li><strong>Planlamac\u0131ya yard\u0131mc\u0131 bir ara\u00e7.<\/strong> &#8220;The Schedule is a tool to help you run your shop; it will not run it for you.&#8221; (\u00c7izelge, at\u00f6lyenizi y\u00f6netmenize yard\u0131mc\u0131 olan bir ara\u00e7t\u0131r; at\u00f6lyeyi sizin yerinize y\u00f6netmez.) (<a href=\"https:\/\/www.ecisolutions.com\/blog\/manufacturing\/jobboss2\/common-roadblocks-to-implementing-the-scheduling-module-in-jobboss2\/\">ECI blogu<\/a>)<\/li>\n\n\n<li><strong>\u0130\u015fleri elle s\u0131ralama.<\/strong> &#8220;Others may wish to manipulate the schedule to reorder the jobs in a work center to have greater control.&#8221; (Baz\u0131 kullan\u0131c\u0131lar daha fazla kontrol sa\u011flamak i\u00e7in \u00e7izelgeyi de\u011fi\u015ftirerek bir i\u015f merkezindeki i\u015fleri yeniden s\u0131ralamak isteyebilir.) ECI, \u00e7izelgeyi \u00fcretimdeki duruma elle uyarlaman\u0131n sonu\u00e7lar\u0131n\u0131 da \u015f\u00f6yle a\u00e7\u0131klar: &#8220;is a full-time job and leads to being reactive rather than proactive.&#8221; (Tam zamanl\u0131 bir i\u015ftir ve \u00f6nceden \u00f6nlem almak yerine sorunlara tepki vermeye yol a\u00e7ar.)<\/li>\n\n\n<li><strong>Malzemeler, tedarik s\u00fcreleriyle ele al\u0131n\u0131r.<\/strong> &#8220;All raw materials and outside services need realistic lead times.&#8221; (T\u00fcm ham maddeler ve d\u0131\u015far\u0131dan al\u0131nan hizmetler i\u00e7in ger\u00e7ek\u00e7i tedarik s\u00fcreleri gerekir.)<\/li>\n\n<\/ul>\n\n\n<p>JobBOSS\u00b2, her rota ad\u0131m\u0131 i\u00e7in tek bir haz\u0131rl\u0131k s\u00fcresi tutar. Kapasiteyi ise en fazla \u00fc\u00e7 vardiya i\u00e7in i\u015f merkezi saati olarak kaydeder (<a href=\"https:\/\/api-jb2.integrations.ecimanufacturing.com\/openapi.json\">JobBOSS\u00b2 API referans\u0131<\/a>). ECI, birden fazla kayna\u011f\u0131 \u00f6zel k\u0131s\u0131tlarla birlikte \u00e7izelgeleme i\u015flevini ayr\u0131 bir \u00fcr\u00fcnle sunar: LYNQ altyap\u0131s\u0131n\u0131 kullanan ECI APS eklentisi.<\/p>\n\n\n<p>T\u00fcm ad\u0131mlar ve s\u0131n\u0131rlamalar <a href=\"\/tr\/entegrasyonlar\/erp\/jobboss\/uretim-cizelgeleme\/\">JobBOSS\u00b2 ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yapabilir mi?<\/a> ba\u015fl\u0131kl\u0131 yaz\u0131da a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"jobboss-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mevcut JobBOSS\u00b2 ve SkyPlanner eklenmi\u015f hali<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>JobBOSS\u00b2 ile \u00e7izelgeleme<\/th><th>SkyPlanner APS ile JobBOSS\u00b2<\/th><\/tr><\/thead><tbody><tr><td>Kapasite<\/td><td>\u0130\u015f merkezi baz\u0131nda s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z kapasite, vardiya ba\u015f\u0131na \u00e7al\u0131\u015fma saati<\/td><td>Mevcut vardiyalar ve devams\u0131zl\u0131klar dikkate al\u0131narak her makine, operat\u00f6r ve tak\u0131m\u0131n kapasitesiyle s\u0131n\u0131rl\u0131 \u00e7izelgeleme<\/td><\/tr><tr><td>\u0130\u015f s\u0131ras\u0131<\/td><td>Planlamac\u0131, Whiteboard \u00fczerinde i\u015f merkezindeki i\u015fleri yeniden s\u0131ralar<\/td><td>Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder<\/td><\/tr><tr><td>Tip de\u011fi\u015fimleri<\/td><td>Her rota ad\u0131m\u0131 i\u00e7in tek bir haz\u0131rl\u0131k s\u00fcresi<\/td><td>Ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re haz\u0131rl\u0131k s\u00fcreleri matrisi: en d\u00fc\u015f\u00fck toplam haz\u0131rl\u0131k s\u00fcresi<\/td><\/tr><tr><td>\u00c7al\u0131\u015fanlar<\/td><td>\u0130\u015fler \u00e7al\u0131\u015fanlara atan\u0131r<\/td><td>Birden fazla operat\u00f6r gerektiren i\u015flere vardiyas\u0131nda m\u00fcsait ki\u015filer atan\u0131r; birinin yoklu\u011funda alternatif \u00e7al\u0131\u015fan se\u00e7ilir<\/td><\/tr><tr><td>Tak\u0131mlar ve fikst\u00fcrler<\/td><td>Tak\u0131mlar\u0131n bak\u0131m takibi yap\u0131l\u0131r<\/td><td>Tak\u0131m say\u0131s\u0131 s\u0131n\u0131rl\u0131d\u0131r: ayn\u0131 tak\u0131m iki makineye ayn\u0131 anda atanmaz<\/td><\/tr><tr><td>Malzemeler<\/td><td>Malzeme ve d\u0131\u015f hizmetlerin tedarik s\u00fcreleri<\/td><td>\u0130\u015fler, malzeme stoktan veya sat\u0131n alma sipari\u015flerinden sa\u011fland\u0131\u011f\u0131nda ba\u015flar<\/td><\/tr><tr><td>Acil i\u015fler ve ar\u0131zalar<\/td><td>Acil i\u015fleri i\u015faretleyin, i\u015fleri panoda s\u00fcr\u00fckleyerek ta\u015f\u0131y\u0131n<\/td><td>Autopilot, belirledi\u011finiz kilitlere ve \u00f6nceliklere uyarak yeniden planlar<\/td><\/tr><tr><td>Ba\u015flam\u0131\u015f i\u015fler<\/td><td>Toplanan veriler \u00e7izelgeyi g\u00fcnceller<\/td><td>Kaydedilen ilerleme plana yans\u0131r; Running Time Lock \u00f6n\u00fcm\u00fczdeki saatlerin \u00e7izelgesini sabitler<\/td><\/tr><tr><td>Shop floor<\/td><td>JobBOSS\u00b2 \u00fczerinden veri toplama<\/td><td>Operat\u00f6rler i\u015f s\u0131ralar\u0131n\u0131 telefon veya tabletten g\u00f6r\u00fcr ve yapt\u0131klar\u0131 i\u015fleri kaydeder<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"jobboss-scheduling-software-and-add-ons-compared\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">JobBOSS\u00b2 i\u00e7in \u00e7izelgeleme yaz\u0131l\u0131mlar\u0131n\u0131n ve eklentilerin kar\u015f\u0131la\u015ft\u0131rmas\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Se\u00e7enek<\/th><th>Nedir?<\/th><th>Ne zaman uygundur?<\/th><\/tr><\/thead><tbody><tr><td>JobBOSS\u00b2 \u00e7izelgeleme ve ECI APS<\/td><td>JobBOSS\u00b2 i\u00e7indeki Whiteboard Scheduler ve Planning Board; ECI APS ise ECI&#8217;nin LYNQ altyap\u0131s\u0131yla \u00e7al\u0131\u015fan ayr\u0131 eklentisidir<\/td><td>Panoyu tek bir planlamac\u0131 y\u00f6netiyorsa veya ECI \u00fcr\u00fcn ailesi i\u00e7inde kalmak istiyorsan\u0131z<\/td><\/tr><tr><td>D\u0131\u015fa aktar\u0131lan verilerle \u00e7al\u0131\u015fan, kapasite k\u0131s\u0131tlar\u0131n\u0131 g\u00f6zeten masa\u00fcst\u00fc \u00e7izelgeleme yaz\u0131l\u0131mlar\u0131 (\u00f6rne\u011fin User Solutions&#8217;\u0131n EDGEBIC \u00fcr\u00fcn\u00fc)<\/td><td>\u0130\u015fler ve rotalar JobBOSS&#8217;tan Excel veya CSV olarak d\u0131\u015fa aktar\u0131l\u0131r ve bilgisayardaki \u00e7izelgeleme yaz\u0131l\u0131m\u0131na al\u0131n\u0131r<\/td><td>Planlamac\u0131 dosyalar\u0131 ta\u015f\u0131may\u0131 ve tarihleri elle geri girmeyi sorun etmiyorsa<\/td><\/tr><tr><td>API ile ba\u011flanan bulut tabanl\u0131 APS (SkyPlanner APS, Skody)<\/td><td>Taray\u0131c\u0131da \u00e7al\u0131\u015fan ve JobBOSS\u00b2 i\u015fleriyle senkronize olan bir \u00e7izelgeleme yaz\u0131l\u0131m\u0131<\/td><td>\u00c7izelgenin kendili\u011finden g\u00fcncel kalmas\u0131 ve her operat\u00f6re ula\u015fmas\u0131 gerekiyorsa<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>\u015eu durumlarda JobBOSS\u00b2 \u00e7izelgeleme yerine SkyPlanner&#8217;\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0130\u015fleri bilgisayar\u0131n s\u0131ralamas\u0131n\u0131 istiyorsan\u0131z.<\/strong> ECI, \u00e7izelgesi i\u00e7in &#8220;will not run it for you&#8221; (at\u00f6lyeyi sizin yerinize y\u00f6netmez) ifadesini kullan\u0131yor ve \u00e7izelgeyi \u00fcretimdeki duruma elle uyarlaman\u0131n tam zamanl\u0131 bir i\u015f oldu\u011funu belirtiyor. Arcturus t\u00fcm plan\u0131 saniyeler i\u00e7inde optimize eder; Autopilot ise her \u00f6nemli de\u011fi\u015fiklikte yeniden planlar.<\/li>\n\n\n<li><strong>\u00dcretim miktar\u0131n\u0131z\u0131 tip de\u011fi\u015fimleri belirliyorsa.<\/strong> JobBOSS\u00b2, her rota ad\u0131m\u0131 i\u00e7in tek bir haz\u0131rl\u0131k s\u00fcresi tutar. SkyPlanner&#8217;\u0131n haz\u0131rl\u0131k s\u00fcresi matrisinde her \u00e7iftin iki ge\u00e7i\u015f y\u00f6n\u00fc i\u00e7in ayr\u0131 s\u00fcreler tan\u0131mlan\u0131r ve i\u015fler, toplam haz\u0131rl\u0131k s\u00fcresini en aza indirecek s\u0131rayla y\u00fcr\u00fct\u00fcl\u00fcr.<\/li>\n\n\n<li><strong>Operat\u00f6rler, fikst\u00fcrler ve malzeme de makineler kadar plan\u0131 k\u0131s\u0131tl\u0131yorsa.<\/strong> Her makinenin, ki\u015finin, tak\u0131m\u0131n ve malzemenin kapasite veya miktar s\u0131n\u0131rlar\u0131 ayn\u0131 anda dikkate al\u0131n\u0131r. Birden fazla operat\u00f6r gerektiren i\u015flere gerekli personel atan\u0131r ve i\u015fler malzeme haz\u0131r oldu\u011funda ba\u015flar.<\/li>\n\n\n<li><strong>Yeni bir eklenti projesine gerek kalmadan birden fazla kayna\u011f\u0131 birlikte \u00e7izelgelemek istiyorsan\u0131z.<\/strong> ECI, \u00f6zel k\u0131s\u0131tlarla birden fazla kayna\u011f\u0131 \u00e7izelgeleme \u00f6zelli\u011fini ECI APS adl\u0131 ayr\u0131 bir eklenti olarak satar. SkyPlanner, devreye alma s\u00fcreci ba\u015flad\u0131ktan sonra haftalar i\u00e7inde kullan\u0131ma ge\u00e7er. \u00d6ncesinde, 30 g\u00fcnl\u00fck deneme s\u00fcresinde kendi JobBOSS\u00b2 i\u015flerinizle test edebilirsiniz.<\/li>\n\n\n<li><strong>Her operat\u00f6r\u00fcn plana g\u00f6re \u00e7al\u0131\u015fmas\u0131n\u0131 istiyorsan\u0131z.<\/strong> Mobile Confirmations, g\u00fcncel i\u015f s\u0131ras\u0131n\u0131 telefon veya tablette g\u00f6sterir; kaydedilen s\u00fcreler JobBOSS\u00b2&#8217;ye geri aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>Net bir fiyat istiyorsan\u0131z.<\/strong> Ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla. \u00c7ift y\u00f6nl\u00fc entegrasyon i\u00e7in fiyat teklifi ba\u015ftan verilir ve entegrasyona SkyPlanner ekibi destek sa\u011flar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Nas\u0131l ba\u015flan\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00dccretsiz denemeyi ba\u015flat\u0131n.<\/strong> 30 g\u00fcn boyunca, 20 i\u015f merkezine kadar, t\u00fcm Basic \u00f6zellikleriyle. Kredi kart\u0131 gerekmez.<\/li>\n\n\n<li><strong>\u00dcretim yap\u0131n\u0131z\u0131 tan\u0131mlay\u0131n.<\/strong> SkyPlanner&#8217;da makineleri, personeli ve vardiyalar\u0131 olu\u015fturun veya JobBOSS\u00b2 Work Centers verilerinizi i\u00e7e aktar\u0131n. Devreye alma deste\u011fi alabilirsiniz.<\/li>\n\n\n<li><strong>\u0130\u015flerinizi y\u00fckleyin.<\/strong> A\u00e7\u0131k i\u015fleri ve rota ad\u0131mlar\u0131n\u0131 JobBOSS\u00b2&#8217;den Excel&#8217;e aktar\u0131n, ard\u0131ndan SkyPlanner&#8217;a y\u00fckleyin ve SkyPlanner&#8217;\u0131n \u00e7izelgesini mevcut panonuzla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>JobBOSS\u00b2 ba\u011flant\u0131s\u0131n\u0131 kurun.<\/strong> SkyPlanner ekibi \u00e7ift y\u00f6nl\u00fc entegrasyonu yap\u0131land\u0131r\u0131r ve kullan\u0131ma ge\u00e7tikten sonra da destek sa\u011flar.<\/li>\n\n<\/ol>\n\n\n<p><strong>Fiyatland\u0131rma.<\/strong> Paketler i\u015f merkezi ba\u015f\u0131na ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. \u0130stedi\u011finiz zaman i\u015f merkezi ekleyebilir, \u00e7\u0131karabilir veya aboneli\u011finizi iptal edebilirsiniz. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rmaya<\/a> bak\u0131n, <a href=\"\/tr\/ozellikler\/\">t\u00fcm \u00f6zellikleri<\/a> inceleyin veya <a href=\"\/tr\/entegrasyonlar\/erp\/\">t\u00fcm ERP entegrasyonlar\u0131na<\/a> g\u00f6z at\u0131n.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>JobBOSS\u00b2 i\u00e7in en iyi \u00e7izelgeleme eklentisi hangisidir?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, ger\u00e7ek kapasiteyi g\u00f6zeterek \u00fcretim \u00e7izelgeleme yapan ve JobBOSS\u00b2 ile \u00e7ift y\u00f6nl\u00fc entegre olan bir eklentidir. Sipari\u015fler, Order Routings, Estimates, Work Centers, Employees, Job Requirements ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r; her i\u015f ad\u0131m\u0131 i\u00e7in planlanan ba\u015flang\u0131\u00e7 ve biti\u015f tarihleri geri g\u00f6nderilir. Her makinenin, operat\u00f6r\u00fcn, tak\u0131m\u0131n ve malzemenin kapasite veya miktar s\u0131n\u0131rlar\u0131 dikkate al\u0131n\u0131r. Ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re s\u00fcrelerin tan\u0131mland\u0131\u011f\u0131 haz\u0131rl\u0131k s\u00fcresi matrisi, i\u015fleri toplam haz\u0131rl\u0131k s\u00fcresini en aza indirecek \u015fekilde s\u0131ralar. Autopilot, \u00fcretimde de\u011fi\u015fiklik oldu\u011funda \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve \u00fccretsiz deneme s\u00fcresi 30 g\u00fcnd\u00fcr.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>JobBOSS\u00b2 kapasite k\u0131s\u0131tlar\u0131n\u0131 g\u00f6zeterek \u00fcretim \u00e7izelgeleme yap\u0131yor mu?<\/summary>\n<p class=\"sp-faq__a\">Evet, i\u015f merkezi d\u00fczeyinde. ECI, sonlu veya sonsuz kapasiteyle \u00e7izelgeleme aras\u0131nda se\u00e7im yapman\u0131z\u0131 sa\u011flar; i\u015fleri ta\u015f\u0131mak i\u00e7in Whiteboard Scheduler ve Planning Board kullan\u0131l\u0131r. Ancak her i\u015f merkezindeki s\u0131ralamay\u0131 yine planlamac\u0131 yapar ve her rota ad\u0131m\u0131 i\u00e7in tek bir haz\u0131rl\u0131k s\u00fcresi bulunur. JobBOSS\u00b2 ile birlikte \u00e7al\u0131\u015fan SkyPlanner APS ise her makinenin, operat\u00f6r\u00fcn, tak\u0131m\u0131n ve malzemenin kapasite veya miktar s\u0131n\u0131rlar\u0131n\u0131 g\u00f6zeterek \u00e7izelgeleme yapar ve s\u0131ralamay\u0131 otomatik olarak optimize eder.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>JobBOSS\u00b2&#8217;nin \u00e7izelgeleme \u00f6zelli\u011fini mi, SkyPlanner&#8217;\u0131 m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Tek bir planlamac\u0131 Whiteboard&#8217;u rahat\u00e7a y\u00f6netiyorsa ve haz\u0131rl\u0131k s\u00fcreleri \u00f6nceki i\u015fe ba\u011fl\u0131 de\u011filse JobBOSS\u00b2&#8217;nin \u00e7izelgeleme \u00f6zelli\u011fini kullanmaya devam edin. S\u0131ralaman\u0131n sizin i\u00e7in optimize edilmesini istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in: ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re de\u011fi\u015fen tip de\u011fi\u015fimi s\u00fcreleri, birden fazla operat\u00f6r gerektiren i\u015fler, s\u0131n\u0131rl\u0131 say\u0131daki fikst\u00fcrler, malzeme var\u0131\u015flar\u0131 ve otomatik yeniden planlama tek bir \u00e7izelgede ele al\u0131n\u0131r. ECI&#8217;nin birden fazla kayna\u011f\u0131 birlikte \u00e7izelgelemek i\u00e7in sundu\u011fu \u00e7\u00f6z\u00fcm, LYNQ altyap\u0131s\u0131yla \u00e7al\u0131\u015fan ayr\u0131 bir eklenti olan ECI APS&#8217;dir. SkyPlanner, JobBOSS\u00b2 ile birlikte \u00e7al\u0131\u015f\u0131r; \u00fccretsiz denemede kendi i\u015flerinizle sonu\u00e7lar\u0131n\u0131 do\u011frulayabilirsiniz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hangi \u00e7izelgeleme yaz\u0131l\u0131m\u0131 JobBOSS\u00b2 ile entegre olur?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, JobBOSS\u00b2 API \u00fczerinden JobBOSS\u00b2 ile \u00e7ift y\u00f6nl\u00fc entegre olur. Bar\u0131nd\u0131r\u0131lan JobBOSS\u00b2 kurulumlar\u0131nda SkyPlanner; sipari\u015fleri, Order Routings, Estimates, Work Centers ve sat\u0131n alma sipari\u015flerini JobBOSS\u00b2 API \u00fczerinden okur ve planlanan ba\u015flang\u0131\u00e7 ve biti\u015f tarihlerini her Order Routing ad\u0131m\u0131na geri yazar. Kimlik do\u011frulama, ECI&#8217;nin Integration Engine Management Console \u00fczerinden olu\u015fturulan bir API kullan\u0131c\u0131s\u0131yla OAuth 2.0 kullan\u0131larak yap\u0131l\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Yerel sunucuda kurulu JobBOSS\u00b2 ile \u00e7al\u0131\u015f\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet. Yerel sunucuda kurulu JobBOSS\u00b2, ECI&#8217;nin hem yerel hem de bulut kurulumlar\u0131na eri\u015fmek i\u00e7in geli\u015ftirdi\u011fi ERP API \u00fczerinden ba\u011flan\u0131r. SkyPlanner ekibi, kapsam belirleme a\u015famas\u0131nda kurulumunuza uygun ba\u011flant\u0131 yolunu belirler.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, JobBOSS\u00b2&#8217;nin teklif haz\u0131rlama, Order Entry veya i\u015f maliyetlendirme i\u015flevlerinin yerini al\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. Estimates, teklifler, Order Entry, sat\u0131n alma, stok, veri toplama, i\u015f maliyetlendirme ve muhasebe JobBOSS\u00b2&#8217;de kal\u0131r. SkyPlanner, i\u015flerinizi ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeler ve tarihleri geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>JobBOSS\u00b2 kullanan bir \u00fcretici i\u00e7in SkyPlanner&#8217;\u0131n maliyeti nedir?<\/summary>\n<p class=\"sp-faq__a\">5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar; her ek i\u015f merkezi i\u00e7in ayl\u0131k 20 \u20ac eklenir. \u0130\u015f merkezi, kendine ait \u00e7izelgelenmi\u015f bir i\u015f kuyru\u011fu bulunan \u00fcretim kayna\u011f\u0131d\u0131r. S\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re entegrasyon fiyat\u0131, paketinizle birlikte ba\u015ftan teklif edilir. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devreye alma ne kadar s\u00fcrer?<\/summary>\n<p class=\"sp-faq__a\">Devreye alma, ba\u015flang\u0131\u00e7 \u00e7al\u0131\u015fmalar\u0131 ba\u015flad\u0131ktan sonra genellikle haftalar i\u00e7inde tamamlan\u0131r. Ekip, Work Centers verilerinizi, makinelerinizi ve rotalar\u0131n\u0131z\u0131 e\u015fle\u015ftirir; i\u015fleri ve sat\u0131n alma sipari\u015flerini ba\u011flar ve planlanan tarihleri geri g\u00f6nderir. Kullan\u0131ma ge\u00e7meden \u00f6nce her \u015fey mevcut \u00e7izelgenizle kar\u015f\u0131la\u015ft\u0131r\u0131larak test edilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>JobBOSS\u00b2 entegrasyonundan \u00f6nce SkyPlanner&#8217;\u0131 test edebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck denemede, a\u00e7\u0131k JobBOSS\u00b2 i\u015flerinizin Excel&#8217;e aktar\u0131lm\u0131\u015f verileri kullan\u0131l\u0131r. Entegrasyon \u00e7al\u0131\u015fmalar\u0131 ba\u015flamadan \u00f6nce kendi \u00fcretiminiz i\u00e7in ger\u00e7ek kapasiteyi g\u00f6zeten bir <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">\u00fcretim \u00e7izelgesi<\/a> g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ JobBOSS\u00b2 JobBOSS\u00b2 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, ECI&#8217;nin JobBOSS\u00b2 (JobBOSS 2) \u00fcr\u00fcn\u00fc i\u00e7in geli\u015ftirilmi\u015f bir \u00fcretim \u00e7izelgeleme eklentisidir. Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde her makine, operat\u00f6r, tak\u0131m ve malzemeyi ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeler. Hangi i\u015f ad\u0131m\u0131n\u0131n hangi makinede, saat ka\u00e7ta y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda &#8230; <a title=\"JobBOSS\u00b2 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/jobboss\/\" aria-label=\"Read more about JobBOSS\u00b2 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100689,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102978","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>JobBOSS\u00b2 \u00c7izelgeleme Entegrasyonu: Ger\u00e7ek Kapasiteye G\u00f6re APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: JobBOSS\u00b2 (JobBOSS 2) i\u00e7in \u00e7ift y\u00f6nl\u00fc \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r ve tak\u0131m\u0131n kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac&#039;dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/jobboss\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"JobBOSS\u00b2 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: JobBOSS\u00b2 (JobBOSS 2) i\u00e7in \u00e7ift y\u00f6nl\u00fc \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r ve tak\u0131m\u0131n kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac&#039;dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/jobboss\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/jobboss\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/jobboss\\\/\",\"name\":\"JobBOSS\u00b2 \u00c7izelgeleme Entegrasyonu: Ger\u00e7ek Kapasiteye G\u00f6re APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS: JobBOSS\u00b2 (JobBOSS 2) i\u00e7in \u00e7ift y\u00f6nl\u00fc \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r ve tak\u0131m\u0131n kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac'dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/jobboss\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/jobboss\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/jobboss\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"JobBOSS\u00b2 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"JobBOSS\u00b2 \u00c7izelgeleme Entegrasyonu: Ger\u00e7ek Kapasiteye G\u00f6re APS","description":"SkyPlanner APS: JobBOSS\u00b2 (JobBOSS 2) i\u00e7in \u00e7ift y\u00f6nl\u00fc \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r ve tak\u0131m\u0131n kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac'dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/jobboss\/","og_locale":"tr_TR","og_type":"article","og_title":"JobBOSS\u00b2 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme","og_description":"SkyPlanner APS: JobBOSS\u00b2 (JobBOSS 2) i\u00e7in \u00e7ift y\u00f6nl\u00fc \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r ve tak\u0131m\u0131n kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac'dan.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/jobboss\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"16 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/jobboss\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/jobboss\/","name":"JobBOSS\u00b2 \u00c7izelgeleme Entegrasyonu: Ger\u00e7ek Kapasiteye G\u00f6re APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS: JobBOSS\u00b2 (JobBOSS 2) i\u00e7in \u00e7ift y\u00f6nl\u00fc \u00fcretim \u00e7izelgeleme eklentisi. Her makine, operat\u00f6r ve tak\u0131m\u0131n kapasitesine g\u00f6re. Ayl\u0131k 199 \u20ac'dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/jobboss\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/jobboss\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/jobboss\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"JobBOSS\u00b2 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ JobBOSS\u00b2 JobBOSS\u00b2 i\u00e7in SkyPlanner APS: Ger\u00e7ek Kapasiteye G\u00f6re \u00dcretim \u00c7izelgeleme SkyPlanner APS, ECI&#8217;nin JobBOSS\u00b2 (JobBOSS 2) \u00fcr\u00fcn\u00fc i\u00e7in geli\u015ftirilmi\u015f bir \u00fcretim \u00e7izelgeleme eklentisidir. Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde her makine, operat\u00f6r, tak\u0131m ve malzemeyi ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131 i\u00e7inde \u00e7izelgeler. Hangi i\u015f ad\u0131m\u0131n\u0131n hangi makinede, saat ka\u00e7ta y\u00fcr\u00fct\u00fclece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/102978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=102978"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/102978\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100689"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=102978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}