{"id":102949,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/infor-m3\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"infor-m3","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/","title":{"rendered":"Infor M3 i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Infor M3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Infor M3 i\u00e7in SkyPlanner APS: <span class=\"hl\">Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS, Infor M3 i\u00e7in bir \u00fcretim \u00e7izelgeleme eklentisidir. T\u00fcm planlama ufku boyunca her i\u015f merkezinin, operat\u00f6r\u00fcn, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131n\u0131 saat baz\u0131nda dikkate al\u0131r. Infor M3, y\u00fck\u00fc i\u015f merkezi baz\u0131nda planlar. Infor&#8217;un kendi Scheduling Workbench eklentisi i\u00e7in canl\u0131ya ge\u00e7i\u015f \u00f6nerisi ise t\u00fcm kaynaklar\u0131 s\u0131n\u0131rs\u0131z kapasiteyle ba\u015flatmak ve yaln\u0131zca kritik darbo\u011faz\u0131n kapasitesini s\u0131n\u0131rl\u0131 tan\u0131mlamakt\u0131r (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">Infor dok\u00fcmantasyonu<\/a>). Bu, kaba kapasite planlamas\u0131d\u0131r. SkyPlanner ile hangi \u00fcretim emrinin nerede ve ne zaman i\u015flenece\u011fini g\u00f6r\u00fcrs\u00fcn\u00fcz. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner, Infor M3 ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r: stok kartlar\u0131, \u00fcr\u00fcn yap\u0131lar\u0131, i\u015f merkezleri, \u00fcretim emirleri ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r; planlanan operasyon tarihleri ve operasyon bildirimleri ise M3&#8217;e geri g\u00f6nderilir. SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu M3 yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar.<\/p>\n\n\n<p>Fiyatlar 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi ayl\u0131k 20 \u20ac&#8217;dur. \u00dccretsiz deneme 30 g\u00fcn s\u00fcrer, 20 i\u015f merkezine kadar kullan\u0131m sunar ve kredi kart\u0131 gerektirmez.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"m3-capacity-requirements-planning-and-finite-cap\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">M3 Capacity Requirements Planning ve ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Infor M3 (M3 CloudSuite, eski ad\u0131yla Movex) kaba kapasite planlamas\u0131 yapar: her i\u015f merkezi i\u00e7in y\u00fck\u00fc g\u00f6sterir ve her ak\u0131\u015fta bir darbo\u011faz\u0131 planlar. Tesisin tamam\u0131 i\u00e7in ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131na uyan ayr\u0131nt\u0131l\u0131 bir \u00e7izelge olu\u015fturmaz. Infor&#8217;un kendi dok\u00fcmantasyonu bu s\u0131n\u0131r\u0131 a\u00e7\u0131k\u00e7a g\u00f6sterir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kapasite s\u0131n\u0131r\u0131 her i\u015f merkezi i\u00e7in bir ayarla belirlenir.<\/strong> &#8220;If used, infinite\/finite capacity scheduling is set in (PDS010),&#8221; (Kullan\u0131l\u0131yorsa s\u0131n\u0131rs\u0131z\/s\u0131n\u0131rl\u0131 kapasiteyle \u00e7izelgeleme ayar\u0131 (PDS010) i\u00e7inde yap\u0131l\u0131r.) Bu ayar, bir operasyonun a\u015f\u0131r\u0131 y\u00fck olu\u015fturmas\u0131na izin verilip verilmeyece\u011fini belirler. (<a href=\"https:\/\/docs.infor.com\/m3udi\/16.x\/en-us\/m3beud\/manexechs\/cps600.html\">Infor dok\u00fcmantasyonu<\/a>)<\/li>\n\n\n<li><strong>Her ak\u0131\u015fta bir darbo\u011faz.<\/strong> Settings &#8211; Capacity Planning (CRS786) i\u00e7inde \u015fu kural yer al\u0131r: &#8220;Only one operation in a flow of operations can be set as bottleneck planned.&#8221; (Bir operasyon ak\u0131\u015f\u0131nda yaln\u0131zca bir operasyon darbo\u011faz olarak planlanacak \u015fekilde ayarlanabilir.) (<a href=\"https:\/\/docs.infor.com\/m3udi\/16.x\/en-us\/m3beud\/manexechs\/crs786.html\">Infor dok\u00fcmantasyonu<\/a>)<\/li>\n\n\n<li><strong>Y\u00fck dengeleme planlamac\u0131n\u0131n i\u015fidir.<\/strong> Infor, y\u00fck dengelemeyi &#8220;an ongoing way of working more or less all the time,&#8221; (neredeyse her zaman s\u00fcrd\u00fcr\u00fclen bir \u00e7al\u0131\u015fma bi\u00e7imi) olarak tan\u0131mlar. Bu i\u015flem CPS100 ile CPS130 aras\u0131ndaki y\u00fck g\u00f6r\u00fcn\u00fcmlerinde yap\u0131l\u0131r. (<a href=\"https:\/\/docs.infor.com\/m3udi\/16.x\/en-us\/m3beud\/manexechs\/cps600.html\">Infor dok\u00fcmantasyonu<\/a>)<\/li>\n\n\n<li><strong>Ayr\u0131nt\u0131l\u0131 s\u0131ralama i\u00e7in eklenti gerekir.<\/strong> Infor&#8217;un Food and Beverage CloudSuite \u00e7\u00f6z\u00fcm\u00fcnde M3 Scheduling Workbench, temel uygulamalar aras\u0131nda de\u011fil, \u00f6nerilen eklentiler aras\u0131nda yer al\u0131r. (<a href=\"https:\/\/docs.infor.com\/m3csfab\/latest\/en-us\/csfablib\/solution_overview_food-beverage\/nyj1693564666315.html\">Infor dok\u00fcmantasyonu<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Scheduling Workbench eklentisi bile canl\u0131ya darbo\u011faz odakl\u0131 bir planla ge\u00e7er. Infor, canl\u0131ya ge\u00e7i\u015f i\u00e7in &#8220;start all resources with infinite capacity,&#8221; (t\u00fcm kaynaklar\u0131 s\u0131n\u0131rs\u0131z kapasiteyle ba\u015flat\u0131n) \u00f6nerisinde bulunur ve yaln\u0131zca kritik darbo\u011faz\u0131n kapasitesini s\u0131n\u0131rlamay\u0131 tavsiye eder. Ayr\u0131ca &#8220;Focus only on the critical bottlenecks before going live.&#8221; (Canl\u0131ya ge\u00e7meden \u00f6nce yaln\u0131zca kritik darbo\u011fazlara odaklan\u0131n.) der. (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">Infor dok\u00fcmantasyonu<\/a>) Bu durumda di\u011fer t\u00fcm makinelere, ki\u015filere ve tak\u0131mlara kapasiteleri s\u0131n\u0131rs\u0131zm\u0131\u015f gibi y\u00fck atan\u0131r. SkyPlanner ise makineleri, \u00e7al\u0131\u015fanlar\u0131, tak\u0131mlar\u0131, malzemeleri ve tip de\u011fi\u015fimlerini tek bir motorla, s\u0131n\u0131rlar\u0131n\u0131 ayn\u0131 anda g\u00f6zeterek \u00e7izelgeler. Deneme s\u00fcresinde kendi \u00fcretim emirleriniz i\u00e7in bu \u00e7izelgeyi g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n\n\n<p>PDS010&#8217;dan Scheduling Workbench ve Planning Workbench&#8217;e kadar t\u00fcm ayr\u0131nt\u0131lar\u0131 <a href=\"\/tr\/entegrasyonlar\/erp\/infor-m3\/uretim-cizelgeleme\/\">Infor M3 ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme yapabilir mi?<\/a> yaz\u0131s\u0131nda bulabilirsiniz.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-skyplanner-adds-to-infor-m3\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner, Infor M3&#8217;e ne katar?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Infor M3<\/th><th>SkyPlanner APS ile Infor M3<\/th><\/tr><\/thead><tbody><tr><td>Kapasite<\/td><td>Kaba planlama: her ak\u0131\u015fta bir darbo\u011faz; SWB canl\u0131ya al\u0131n\u0131rken yaln\u0131zca kritik darbo\u011faz\u0131n kapasitesi s\u0131n\u0131rlan\u0131r<\/td><td>T\u00fcm planlama ufku boyunca her i\u015f merkezinin, ki\u015finin, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131 saat baz\u0131nda g\u00f6zetilir<\/td><\/tr><tr><td>\u00c7izelge<\/td><td>\u0130\u015f merkezi ve d\u00f6nem baz\u0131nda y\u00fck<\/td><td>Her \u00fcretim emri operasyonu i\u00e7in saniyeler i\u00e7inde s\u0131ral\u0131 \u00e7izelge<\/td><\/tr><tr><td>Yeniden dengeleme<\/td><td>Planlamac\u0131 CPS120 ve CPS130&#8217;da y\u00fck\u00fc ta\u015f\u0131r<\/td><td>Arcturus motoru \u00f6ncelik ve termin tarihine g\u00f6re s\u0131ralar<\/td><\/tr><tr><td>Tip de\u011fi\u015fimleri<\/td><td>Operasyon ba\u015f\u0131na haz\u0131rl\u0131k s\u00fcresi<\/td><td>Ge\u00e7i\u015f s\u00fcreleri matrisi, i\u015fleri en az haz\u0131rl\u0131k gerektirecek \u015fekilde s\u0131ralar<\/td><\/tr><tr><td>Tak\u0131mlar ve ekipler<\/td><td>Y\u00fck, i\u015f merkezi baz\u0131nda hesaplan\u0131r<\/td><td>Tak\u0131mlar\u0131n kapasite s\u0131n\u0131rlar\u0131 g\u00f6zetilir, i\u015fler birden fazla operat\u00f6r gerektirebilir ve alternatifler kullan\u0131l\u0131r<\/td><\/tr><tr><td>Malzemeler<\/td><td>MRP, tedariki i\u015f s\u0131ras\u0131ndan ba\u011f\u0131ms\u0131z planlar<\/td><td>\u0130\u015fler, malzeme stokta oldu\u011funda veya sat\u0131n alma sipari\u015fleri teslim al\u0131nd\u0131\u011f\u0131nda ba\u015flar<\/td><\/tr><tr><td>De\u011fi\u015fiklikler<\/td><td>\u00dcretim emri yeniden planlan\u0131r, y\u00fck yeniden olu\u015fturulur<\/td><td>Autopilot, kilitledi\u011finiz i\u015fleri ve \u00f6nceliklerinizi koruyarak yeniden planlar<\/td><\/tr><tr><td>Shop floor<\/td><td>Operasyon bildirimleri PMS070&#8217;te yap\u0131l\u0131r<\/td><td>Operat\u00f6rler i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr, telefon veya tablet \u00fczerinden i\u015f kayd\u0131 tutar<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Peki bu, bir M3 planlamac\u0131s\u0131n\u0131n g\u00fcnl\u00fck i\u015finde neyi de\u011fi\u015ftirir?<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 18a8 8 0 1 1 16 0\"\/><path d=\"M12 18l4-5\"\/><circle cx=\"12\" cy=\"18\" r=\"1.2\" fill=\"currentColor\" stroke=\"none\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u0130\u015f merkezlerine art\u0131k kapasitenin \u00fczerinde i\u015f atanmaz.<\/p>\n\n\n<p class=\"fx-pain__b\">Her i\u015f merkezi, ki\u015fi ve tak\u0131m i\u00e7in ger\u00e7ek vardiyalar, kullan\u0131lamayan s\u00fcreler ve fazla mesailer tan\u0131mlan\u0131r. Bir makinede kullan\u0131lan kal\u0131p, ayn\u0131 anda ba\u015fka bir makineye asla atanmaz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"12\" cy=\"12\" r=\"8.5\"\/><path d=\"M12 7.5V12l3 2\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">S\u00f6z verebilece\u011finiz teslimat tarihleri.<\/p>\n\n\n<p class=\"fx-pain__b\">\u00c7izelge, her \u00fcretim emrinin ger\u00e7ekte ne zaman tamamlanaca\u011f\u0131n\u0131 g\u00f6sterir. B\u00f6ylece sat\u0131\u015f ekibi m\u00fc\u015fterilere plana dayanarak yan\u0131t verir.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--purple\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 12a9 9 0 0 1 15-6.7L21 8\"\/><path d=\"M21 3v5h-5\"\/><path d=\"M21 12a9 9 0 0 1-15 6.7L3 16\"\/><path d=\"M3 21v-5h5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Acil sipari\u015fler i\u00e7in saniyeler i\u00e7inde yeni plan.<\/p>\n\n\n<p class=\"fx-pain__b\">Yeni bir \u00fcretim emri geldi\u011finde veya bir makine durdu\u011funda Autopilot i\u015f s\u0131ras\u0131n\u0131 yeniden olu\u015fturur. Belirledi\u011finiz kilitler ve \u00f6ncelikler ge\u00e7erlili\u011fini korur.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--orange\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"9\" cy=\"8\" r=\"3\"\/><path d=\"M3 20a6 6 0 0 1 12 0\"\/><path d=\"M16 6a3 3 0 0 1 0 6M21 20a6 6 0 0 0-4-5.7\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Operat\u00f6rler ve ofis ayn\u0131 \u00e7izelgede.<\/p>\n\n\n<p class=\"fx-pain__b\">Operat\u00f6rler, Mobile Confirmations ve Production Timer ile telefon veya tablet \u00fczerinden i\u015f kayd\u0131 tutar. Bildirimler M3&#8217;e geri aktar\u0131l\u0131r; b\u00f6ylece M3&#8217;teki y\u00fck bilgisi ger\u00e7e\u011fi yans\u0131t\u0131r.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-moves-between-infor-m3-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Infor M3 ile SkyPlanner aras\u0131nda hangi veriler aktar\u0131l\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Infor M3 nesnesi<\/th><th>SkyPlanner nesnesi<\/th><th>Y\u00f6n<\/th><\/tr><\/thead><tbody><tr><td>Item (MMS001)<\/td><td>\u00dcr\u00fcnler ve malzemeler<\/td><td>M3 \u2192 SkyPlanner<\/td><\/tr><tr><td>Product structure (PDS001, PDS002 malzemeleri)<\/td><td>\u00dcr\u00fcn yap\u0131s\u0131, alt \u00fcr\u00fcnler, malzemeler<\/td><td>M3 \u2192 SkyPlanner<\/td><\/tr><tr><td>\u00dcr\u00fcn yap\u0131s\u0131ndaki operasyonlar (PDS002)<\/td><td>Haz\u0131rl\u0131k ve i\u015flem s\u00fcreleriyle birlikte proses ad\u0131mlar\u0131<\/td><td>M3 \u2192 SkyPlanner<\/td><\/tr><tr><td>Work center (PDS010), g\u00fcnl\u00fck kapasite (PDS015)<\/td><td>\u0130\u015f merkezleri, i\u015f merkezi gruplar\u0131, verimlilikler<\/td><td>M3 \u2192 SkyPlanner<\/td><\/tr><tr><td>Manufacturing order (PMS100) ve \u00fcretim emri operasyonlar\u0131<\/td><td>Termin tarihleriyle birlikte sipari\u015fler ve i\u015fler<\/td><td>M3 \u2192 SkyPlanner<\/td><\/tr><tr><td>Stok bakiyeleri ve sat\u0131n alma sipari\u015fleri<\/td><td>Malzeme kullan\u0131labilirli\u011fi, gelecek teslimatlar<\/td><td>M3 \u2192 SkyPlanner<\/td><\/tr><tr><td>Her \u00fcretim emri operasyonu i\u00e7in planlanan ba\u015flang\u0131\u00e7 ve biti\u015f<\/td><td>Gantt \u00fczerinde \u00e7izelgelenmi\u015f i\u015fler<\/td><td>SkyPlanner \u2192 M3<\/td><\/tr><tr><td>Report Operation (PMS070MI)<\/td><td>Operat\u00f6rlerin s\u00fcre kay\u0131tlar\u0131 ve miktar bildirimleri<\/td><td>SkyPlanner \u2192 M3<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>M3&#8217;te ayr\u0131 bir rota nesnesi yoktur. Operasyonlar \u00fcr\u00fcn yap\u0131s\u0131nda yer al\u0131r. Bu nedenle SkyPlanner bunlar\u0131 PDS002&#8217;den ve her \u00fcretim emrinin operasyonlar\u0131ndan okur.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-the-infor-m3-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Infor M3 entegrasyonu nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner, Infor ION API Gateway \u00fczerindeki M3 API \u00fczerinden ba\u011flan\u0131r; dolay\u0131s\u0131yla M3&#8217;e SkyPlanner yaz\u0131l\u0131m\u0131 kurulmaz. PMS100MI ve PMS070MI gibi M3 MI programlar\u0131, OAuth 2.0 kullan\u0131larak REST \u00fczerinden \u00e7a\u011fr\u0131l\u0131r. Infor Data Fabric i\u00e7indeki Compass sorgu API&#8217;si, ana verilerin toplu olarak okunmas\u0131n\u0131 sa\u011flar. ION BODs veya M3 Event Hub ise \u00fcretim emri de\u011fi\u015fikliklerini iletebilir. SkyPlanner webhook&#8217;lar\u0131, \u00e7izelge de\u011fi\u015fikliklerini olu\u015ftuklar\u0131 anda geri g\u00f6nderir.<\/p>\n\n\n<p>Her tesis M3&#8217;\u00fc farkl\u0131 kullan\u0131r. Bu nedenle entegrasyonu kurmak i\u00e7in \u00fc\u00e7 se\u00e7ene\u011finiz vard\u0131r:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner ekibi entegrasyonu devreye alma s\u0131ras\u0131nda yap\u0131land\u0131r\u0131r<\/strong> ve canl\u0131ya ge\u00e7i\u015ften sonra destek sa\u011flar. S\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re entegrasyon i\u00e7in ba\u015ftan fiyat teklifi verilir.<\/li>\n\n\n<li><strong>Infor M3 i\u015f orta\u011f\u0131n\u0131z entegrasyonu geli\u015ftirir.<\/strong> Bunun i\u00e7in SkyPlanner&#8217;\u0131n dok\u00fcmante edilmi\u015f REST API&#8217;sini kullan\u0131r (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API ba\u015fvuru dok\u00fcman\u0131<\/a>).<\/li>\n\n\n<li><strong>Kendi yaz\u0131l\u0131mc\u0131lar\u0131n\u0131z entegrasyonu geli\u015ftirir.<\/strong> Ba\u015flamak i\u00e7in bir API belirteci yeterlidir. SkyPlanner ekibi gerekti\u011finde yard\u0131mc\u0131 olur.<\/li>\n\n<\/ol>\n\n\n<p>Bunlar\u0131n hi\u00e7birini beklemeden ba\u015flayabilirsiniz. M3&#8217;ten malzemeleri, i\u015f merkezlerini ve a\u00e7\u0131k \u00fcretim emirlerini d\u0131\u015fa aktar\u0131n; deneme s\u00fcresince CSV veya Excel dosyas\u0131 olarak i\u00e7e al\u0131n. U\u00e7 noktalar, veri e\u015fle\u015ftirme, veri sahipli\u011fi kurallar\u0131 ve proje ipu\u00e7lar\u0131 i\u00e7in <a href=\"\/tr\/entegrasyonlar\/erp\/infor-m3\/entegrasyon-kilavuzu\/\">\u00fcretim \u00e7izelgeleme i\u00e7in Infor M3 entegrasyon k\u0131lavuzuna<\/a> bak\u0131n.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta kazan\u0131lan s\u00fcre<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamada her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi art\u0131\u015f\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan, optimize edilmi\u015f \u00fc\u00e7 ayl\u0131k plan 30 dakikadan k\u0131sa s\u00fcrede haz\u0131rlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%100<\/b><span>2021&#8217;den beri teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, kapasitemizi g\u00f6r\u00fcn\u00fcr k\u0131l\u0131yor ve planlamay\u0131 \u00f6ng\u00f6r\u00fclebilir hale getiriyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Kimya ve g\u0131da \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">SkyPlanner&#8217;\u0131n kullan\u0131lmaya ba\u015fland\u0131\u011f\u0131 2021&#8217;den bu yana teslimat performans\u0131 kesintisiz olarak %100 seviyesinde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/opes-corporation\/\">Opes Corporation&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations \u00dcretim M\u00fcd\u00fcr\u00fc Anu J\u00e4rvinen, Rauma&#x27;da robotlu paletleme h\u00fccresinin yan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 ay<\/b><span>sat\u0131\u015f ekibinin bo\u015f kapasiteyi g\u00f6rebildi\u011fi d\u00f6nem<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, t\u00fcm \u00fcretim planlamam\u0131z i\u00e7in g\u00fcvenilir bir temel olu\u015fturuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Fredman Operations \u00b7 G\u0131da ile temasa uygun ambalaj k\u00e2\u011f\u0131tlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">Sat\u0131\u015f ekibi bo\u015f kapasiteyi alt\u0131 ay \u00f6nceden g\u00f6rebiliyor. Eskiden yan\u0131tlanmas\u0131 bir saat veya daha uzun s\u00fcren \u00e7izelge de\u011fi\u015fikli\u011fi talepleri art\u0131k saniyeler i\u00e7inde yan\u0131tlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/fredman-operations\/\">Fredman Operations&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-infor-m3\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Infor M3 i\u00e7in \u00e7izelgeleme yaz\u0131l\u0131m\u0131 nas\u0131l se\u00e7ilir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>M3 kullanan fabrikalar\u0131n \u00f6n\u00fcnde d\u00f6rt \u00e7izelgeleme se\u00e7ene\u011fi var:<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Se\u00e7enek<\/th><th>\u0130\u015flevi<\/th><th>Kimler i\u00e7in uygun?<\/th><\/tr><\/thead><tbody><tr><td>M3&#8217;\u00fcn temel kapasite planlamas\u0131<\/td><td>\u0130\u015f merkezi baz\u0131nda s\u0131n\u0131rl\u0131 kapasite ayar\u0131, her ak\u0131\u015fta bir darbo\u011faz, y\u00fck g\u00f6r\u00fcn\u00fcmleri<\/td><td>Tek ve belirgin bir darbo\u011faz\u0131, de\u011fi\u015fmeyen \u00fcretim yap\u0131lar\u0131 ve haftal\u0131k y\u00fck dengeleme ihtiyac\u0131 olan fabrikalar<\/td><\/tr><tr><td>Infor eklentileri (Scheduling Workbench, Planning Workbench)<\/td><td>Haz\u0131rl\u0131k matrisleri ve kural tabanl\u0131 optimizasyonla kapasite s\u0131n\u0131rlar\u0131na g\u00f6re s\u0131ralama; ayr\u0131ca orta vadeli sim\u00fclasyon<\/td><td>Ayr\u0131 bir planlama ekibi olan ve eklenti projesi y\u00fcr\u00fcten fabrikalar<\/td><\/tr><tr><td>Kurumsal APS paketleri<\/td><td>Bir uygulama projesiyle sisteme ba\u011flanan b\u00fcy\u00fck \u00f6l\u00e7ekli planlama modelleri<\/td><td>Merkezi APS ekibi olan \u015firket gruplar\u0131<\/td><\/tr><tr><td>shop floor&#8217;da \u00fcretimin y\u00fcr\u00fct\u00fclmesini de kapsayan bulut tabanl\u0131 APS (SkyPlanner)<\/td><td>Her kayna\u011f\u0131n kapasite s\u0131n\u0131rlar\u0131n\u0131 g\u00f6zetme, otomatik yeniden planlama, operat\u00f6rlerin ayn\u0131 \u00e7izelgeyle \u00e7al\u0131\u015fmas\u0131<\/td><td>T\u00fcm \u00fcretim alan\u0131 i\u00e7in g\u00fcncel bir \u00e7izelgeye ihtiya\u00e7 duyan fabrikalar<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Elektronik tablolar\u0131 b\u0131rakmak isteyen bir fabrika i\u00e7in as\u0131l se\u00e7im, M3 Scheduling Workbench ile SkyPlanner APS aras\u0131ndad\u0131r. Infor&#8217;un SWB&#8217;yi canl\u0131ya almak i\u00e7in verdi\u011fi \u00f6neri, kritik darbo\u011faz d\u0131\u015f\u0131ndaki t\u00fcm kaynaklar\u0131 s\u0131n\u0131rs\u0131z kapasiteyle \u00e7al\u0131\u015ft\u0131rmakt\u0131r. Dolay\u0131s\u0131yla devreye al\u0131nan \u015fey, \u00fcretim alan\u0131n\u0131n kapasite s\u0131n\u0131rlar\u0131n\u0131 g\u00f6zeten ayr\u0131nt\u0131l\u0131 bir \u00e7izelge de\u011fil, kaba bir pland\u0131r. SWB de bir eklentidir: Infor, Food and Beverage CloudSuite i\u00e7inde onu Factory Track&#8217;in yan\u0131nda, &#8220;core plus add-ons are recommended&#8221; (temel sistemle birlikte eklentiler \u00f6nerilir) ba\u015fl\u0131\u011f\u0131 alt\u0131nda listeler. Kullan\u0131c\u0131lar SWB&#8217;yi RDWeb \u00fczerinden, her biri kendine ait bir RDWeb kullan\u0131c\u0131 kimli\u011fiyle ayr\u0131 bir uygulama olarak ba\u015flat\u0131r. \u00d6nce ION API ve M3 BE&#8217;nin SWB i\u00e7in yap\u0131land\u0131r\u0131lmas\u0131 gerekir. (<a href=\"https:\/\/docs.infor.com\/m3csfab\/latest\/en-us\/csfablib\/solution_overview_food-beverage\/nyj1693564666315.html\">Infor belgeleri<\/a>, <a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/bxo1633498608635.html\">Infor belgeleri<\/a>, <a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">Infor belgeleri<\/a>)<\/p>\n\n\n<p><strong>\u015eu durumlarda M3 Scheduling Workbench yerine SkyPlanner&#8217;\u0131 se\u00e7in:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Yaln\u0131zca darbo\u011faz\u0131 de\u011fil, ger\u00e7ek kapasiteyi esas alan bir \u00fcretim \u00e7izelgesi istiyorsunuz.<\/strong> SWB canl\u0131ya al\u0131nd\u0131\u011f\u0131nda yaln\u0131zca kritik darbo\u011faz\u0131n kapasitesi s\u0131n\u0131rl\u0131 kabul edilir. SkyPlanner ise ilk \u00e7izelgeden itibaren her makinenin, ki\u015finin, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131n\u0131 saat baz\u0131nda hesaba katar; birden fazla operat\u00f6r gerektiren i\u015fleri ve alternatif i\u015f merkezlerini de destekler.<\/li>\n\n\n<li><strong>Bir eklenti projesi y\u00fcr\u00fctmek yerine haftalar i\u00e7inde g\u00fcncel bir \u00e7izelgeyle \u00e7al\u0131\u015fmak istiyorsunuz.<\/strong> SkyPlanner taray\u0131c\u0131da \u00e7al\u0131\u015f\u0131r; M3&#8217;e herhangi bir kurulum gerekmez. 30 g\u00fcnl\u00fck denemede kendi \u00fcretim emirlerinizle test edebilirsiniz. Devreye alma s\u00fcreci ba\u015flad\u0131ktan sonra uygulama normalde birka\u00e7 hafta i\u00e7inde tamamlan\u0131r.<\/li>\n\n\n<li><strong>Plan vardiya s\u0131ras\u0131nda de\u011fi\u015fiyor.<\/strong> Autopilot, plan\u0131 etkileyen her \u00f6nemli de\u011fi\u015fiklikte otomatik olarak yeniden planlama yapar. Running Time Lock ise ba\u015flanm\u0131\u015f i\u015flerin \u00e7izelgedeki yerini korur.<\/li>\n\n\n<li><strong>\u0130\u015f s\u0131ras\u0131n\u0131 tip de\u011fi\u015fimleri ve malzeme belirliyor.<\/strong> Haz\u0131rl\u0131k s\u00fcresi matrisi, ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re tip de\u011fi\u015fimi s\u00fcrelerini i\u00e7erir. Bir \u00fcretim emri ancak stok veya gelecek bir sat\u0131n alma sipari\u015fi malzeme ihtiyac\u0131n\u0131 kar\u015f\u0131lad\u0131\u011f\u0131nda ba\u015flar.<\/li>\n\n\n<li><strong>Operat\u00f6rlerin ayn\u0131 \u00e7izelgeyle \u00e7al\u0131\u015fmas\u0131n\u0131 istiyorsunuz.<\/strong> Mobile Confirmations, her operat\u00f6r\u00fcn i\u015f s\u0131ras\u0131n\u0131 telefonuna veya tabletine ta\u015f\u0131r; bildirilen operasyonlar M3&#8217;e geri aktar\u0131l\u0131r. Kullan\u0131c\u0131 say\u0131s\u0131 s\u0131n\u0131rs\u0131zd\u0131r.<\/li>\n\n\n<li><strong>Fiyat\u0131n a\u00e7\u0131k\u00e7a belirtilmesini istiyorsunuz.<\/strong> Ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla; \u00e7ift y\u00f6nl\u00fc entegrasyon SkyPlanner ekibi taraf\u0131ndan yap\u0131land\u0131r\u0131l\u0131r ve desteklenir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Nas\u0131l ba\u015flan\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00dccretsiz denemeyi ba\u015flat\u0131n.<\/strong> 30 g\u00fcn boyunca en fazla 20 i\u015f merkezi ve t\u00fcm Basic \u00f6zellikleri; kredi kart\u0131 gerekmez.<\/li>\n\n\n<li><strong>\u00dcretiminizi modelleyin.<\/strong> M3&#8217;teki i\u015f merkezlerinizi temel alarak SkyPlanner&#8217;da i\u015f merkezleri olu\u015fturun, ard\u0131ndan vardiyalar\u0131, tak\u0131mlar\u0131 ve tip de\u011fi\u015fimi s\u00fcrelerini ekleyin. Devreye alma deste\u011fi alabilirsiniz.<\/li>\n\n\n<li><strong>Emirlerinizi y\u00fckleyin.<\/strong> A\u00e7\u0131k \u00fcretim emirlerini ve operasyonlar\u0131n\u0131 M3&#8217;ten d\u0131\u015fa aktar\u0131n, SkyPlanner&#8217;a i\u00e7e al\u0131n ve olu\u015fturulan \u00e7izelgeyi mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>Infor M3 ba\u011flant\u0131s\u0131n\u0131 kurun.<\/strong> SkyPlanner ekibi \u00e7ift y\u00f6nl\u00fc entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131 kullan\u0131ma ge\u00e7tikten sonra da destekler.<\/li>\n\n<\/ol>\n\n\n<p><strong>Fiyatland\u0131rma.<\/strong> Paketler i\u015f merkezi ba\u015f\u0131na ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. \u0130stedi\u011finiz zaman i\u015f merkezi ekleyip \u00e7\u0131karabilir veya aboneli\u011finizi iptal edebilirsiniz. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rma sayfas\u0131na<\/a> bak\u0131n. Di\u011fer sistemleri <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131 sayfas\u0131nda<\/a> bulabilirsiniz.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Infor M3 i\u00e7in en iyi \u00e7izelgeleme eklentisi hangisi?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, Infor M3 ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015fan ve ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131n\u0131 g\u00f6zeten bir \u00fcretim \u00e7izelgeleme eklentisidir. Malzemeler, \u00fcr\u00fcn yap\u0131lar\u0131, i\u015f merkezleri, \u00fcretim emirleri ve sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r; planlanan operasyon tarihleri ve bildirilen operasyonlar M3&#8217;e geri g\u00f6nderilir. Her i\u015f merkezinin, operat\u00f6r\u00fcn, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131 hesaba kat\u0131l\u0131r. Ge\u00e7i\u015f y\u00f6n\u00fcn\u00fc dikkate alan haz\u0131rl\u0131k s\u00fcresi matrisi, i\u015fleri en az haz\u0131rl\u0131k gerektirecek \u015fekilde s\u0131ralar. \u00dcretim de\u011fi\u015fti\u011finde Autopilot otomatik olarak yeniden \u00e7izelgeleme yapar. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve \u00fccretsiz deneme 30 g\u00fcn s\u00fcrer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Infor M3, kapasite s\u0131n\u0131rlar\u0131n\u0131 g\u00f6zeten \u00fcretim \u00e7izelgeleme sunuyor mu?<\/summary>\n<p class=\"sp-faq__a\">Yaln\u0131zca kaba planlama d\u00fczeyinde. Temel M3 sisteminde, PDS010 \u00fczerinden her i\u015f merkezi i\u00e7in s\u0131n\u0131rl\u0131 veya s\u0131n\u0131rs\u0131z kapasite tan\u0131mlan\u0131r; CRS786 \u00fczerinden de her ak\u0131\u015fta bir darbo\u011faz planlan\u0131r. Ayr\u0131nt\u0131l\u0131 s\u0131ralama i\u00e7in M3 Scheduling Workbench eklentisi gerekir. Infor, bu eklentiyi canl\u0131ya al\u0131rken kritik darbo\u011faz d\u0131\u015f\u0131ndaki t\u00fcm kaynaklarda s\u0131n\u0131rs\u0131z kapasite kullan\u0131lmas\u0131n\u0131 \u00f6nerir. SkyPlanner APS ise M3 ile birlikte \u00e7al\u0131\u015farak her i\u015f merkezinin, ki\u015finin, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131n\u0131 g\u00f6zeten bir \u00e7izelge olu\u015fturur.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M3 Scheduling Workbench mi, SkyPlanner m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Kaba bir plan yerine ger\u00e7ek kapasite s\u0131n\u0131rlar\u0131na uygun bir \u00e7izelge istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in. Infor, SWB&#8217;yi canl\u0131ya al\u0131rken t\u00fcm kaynaklarda s\u0131n\u0131rs\u0131z kapasiteyle ba\u015flanmas\u0131n\u0131 ve yaln\u0131zca kritik darbo\u011faz\u0131n kapasitesinin s\u0131n\u0131rlanmas\u0131n\u0131 \u00f6nerir. SWB, kullan\u0131c\u0131lar\u0131n RDWeb \u00fczerinden ayr\u0131 bir uygulama olarak \u00e7al\u0131\u015ft\u0131rd\u0131\u011f\u0131 bir eklentidir. SkyPlanner, M3 \u00fcretim emirlerinizden hareketle her makinenin, ki\u015finin, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131n\u0131 saat baz\u0131nda hesaba katar. Haz\u0131rl\u0131k s\u00fcresi matrisinde ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re tip de\u011fi\u015fimi s\u00fcrelerini kullan\u0131r. Autopilot, plan\u0131 etkileyen her \u00f6nemli de\u011fi\u015fiklikte yeniden planlama yapar; operat\u00f6rler i\u015f s\u0131ralar\u0131na telefondan eri\u015fir. Ayl\u0131k 199 \u20ac&#8217;dan ba\u015flayan fiyatlarla haftalar i\u00e7inde canl\u0131 kullan\u0131ma ge\u00e7ersiniz; 30 g\u00fcnl\u00fck denemede kendi verilerinizle \u00e7al\u0131\u015fabilirsiniz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Infor M3&#8217;e herhangi bir kurulum yapmam\u0131z gerekiyor mu?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. SkyPlanner, M3 CloudSuite ile birlikte bulutta \u00e7al\u0131\u015f\u0131r ve ION API Gateway \u00fczerindeki M3 API \u00fczerinden OAuth 2.0 ile ba\u011flan\u0131r. \u015eirket i\u00e7inde kurulu M3 ise kendi ION u\u00e7 noktas\u0131 veya ara katman yaz\u0131l\u0131m\u0131 \u00fczerinden ba\u011flan\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, M3&#8217;\u00fcn \u00fcretim i\u015flevlerinin yerini mi al\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r, onlar\u0131 tamamlar. Malzemeler, \u00fcr\u00fcn yap\u0131lar\u0131, MRP, sat\u0131n alma, stok ve finans M3&#8217;te kal\u0131r. SkyPlanner, \u00fcretim emri operasyonlar\u0131n\u0131 \u00e7izelgeler; planlanan tarihleri ve bildirilen operasyonlar\u0131 M3&#8217;e geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Infor M3 kullanan bir fabrika i\u00e7in SkyPlanner&#8217;\u0131n maliyeti nedir?<\/summary>\n<p class=\"sp-faq__a\">5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi i\u00e7in ayl\u0131k 20 \u20ac eklenir. 20 i\u015f merkezi olan bir fabrika ayl\u0131k 499 \u20ac \u00f6der. Entegrasyon i\u00e7in s\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re, se\u00e7ti\u011finiz paketle birlikte \u00f6nceden teklif verilir. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devreye alma ne kadar s\u00fcrer?<\/summary>\n<p class=\"sp-faq__a\">Devreye alma, ba\u015flang\u0131\u00e7 s\u00fcreci ba\u015flad\u0131ktan sonra genellikle birka\u00e7 hafta i\u00e7inde tamamlan\u0131r. Ekip, i\u015f merkezlerinizi ve \u00fcr\u00fcn yap\u0131lar\u0131n\u0131z\u0131 e\u015fle\u015ftirir, \u00fcretim emirleri (MO) ve sat\u0131n alma sipari\u015fleri i\u00e7in ba\u011flant\u0131lar\u0131 kurar ve planlanan tarihlerin geri aktar\u0131lmas\u0131n\u0131 sa\u011flar. Canl\u0131 kullan\u0131ma ge\u00e7meden \u00f6nce her \u015fey mevcut plan\u0131n\u0131zla kar\u015f\u0131la\u015ft\u0131r\u0131larak test edilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Infor M3 entegrasyonundan \u00f6nce SkyPlanner&#8217;\u0131 deneyebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck denemede M3&#8217;ten d\u0131\u015fa aktard\u0131\u011f\u0131n\u0131z CSV veya Excel dosyas\u0131n\u0131 kullanabilirsiniz. Entegrasyon \u00e7al\u0131\u015fmalar\u0131 ba\u015flamadan \u00f6nce kendi sipari\u015flerinizin ger\u00e7ek kapasiteye g\u00f6re haz\u0131rlanm\u0131\u015f <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">\u00fcretim \u00e7izelgesini<\/a> g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Infor M3 Infor M3 i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme SkyPlanner APS, Infor M3 i\u00e7in bir \u00fcretim \u00e7izelgeleme eklentisidir. T\u00fcm planlama ufku boyunca her i\u015f merkezinin, operat\u00f6r\u00fcn, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131n\u0131 saat baz\u0131nda dikkate al\u0131r. Infor M3, y\u00fck\u00fc i\u015f merkezi baz\u0131nda planlar. Infor&#8217;un kendi Scheduling Workbench eklentisi i\u00e7in canl\u0131ya &#8230; <a title=\"Infor M3 i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/\" aria-label=\"Read more about Infor M3 i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100689,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102949","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor M3 \u00e7izelgeleme entegrasyonu: Ger\u00e7ek kapasiteye g\u00f6re APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: Infor M3 eklentisi, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, ki\u015fi, tak\u0131m ve malzeme s\u0131n\u0131r\u0131na g\u00f6re \u00fcretim \u00e7izelgeleme. Ayda 199 \u20ac&#039;dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Infor M3 i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: Infor M3 eklentisi, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, ki\u015fi, tak\u0131m ve malzeme s\u0131n\u0131r\u0131na g\u00f6re \u00fcretim \u00e7izelgeleme. Ayda 199 \u20ac&#039;dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/infor-m3\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/infor-m3\\\/\",\"name\":\"Infor M3 \u00e7izelgeleme entegrasyonu: Ger\u00e7ek kapasiteye g\u00f6re APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS: Infor M3 eklentisi, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, ki\u015fi, tak\u0131m ve malzeme s\u0131n\u0131r\u0131na g\u00f6re \u00fcretim \u00e7izelgeleme. Ayda 199 \u20ac'dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/infor-m3\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/infor-m3\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/infor-m3\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Infor M3 i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor M3 \u00e7izelgeleme entegrasyonu: Ger\u00e7ek kapasiteye g\u00f6re APS","description":"SkyPlanner APS: Infor M3 eklentisi, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, ki\u015fi, tak\u0131m ve malzeme s\u0131n\u0131r\u0131na g\u00f6re \u00fcretim \u00e7izelgeleme. Ayda 199 \u20ac'dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/","og_locale":"tr_TR","og_type":"article","og_title":"Infor M3 i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme","og_description":"SkyPlanner APS: Infor M3 eklentisi, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, ki\u015fi, tak\u0131m ve malzeme s\u0131n\u0131r\u0131na g\u00f6re \u00fcretim \u00e7izelgeleme. Ayda 199 \u20ac'dan.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"16 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/","name":"Infor M3 \u00e7izelgeleme entegrasyonu: Ger\u00e7ek kapasiteye g\u00f6re APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS: Infor M3 eklentisi, \u00e7ift y\u00f6nl\u00fc entegrasyon. Her i\u015f merkezi, ki\u015fi, tak\u0131m ve malzeme s\u0131n\u0131r\u0131na g\u00f6re \u00fcretim \u00e7izelgeleme. Ayda 199 \u20ac'dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/infor-m3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Infor M3 i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Infor M3 Infor M3 i\u00e7in SkyPlanner APS: Ger\u00e7ek kapasiteye g\u00f6re \u00fcretim \u00e7izelgeleme SkyPlanner APS, Infor M3 i\u00e7in bir \u00fcretim \u00e7izelgeleme eklentisidir. T\u00fcm planlama ufku boyunca her i\u015f merkezinin, operat\u00f6r\u00fcn, tak\u0131m\u0131n ve malzemenin s\u0131n\u0131rlar\u0131n\u0131 saat baz\u0131nda dikkate al\u0131r. Infor M3, y\u00fck\u00fc i\u015f merkezi baz\u0131nda planlar. Infor&#8217;un kendi Scheduling Workbench eklentisi i\u00e7in canl\u0131ya&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/102949","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=102949"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/102949\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100689"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=102949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}