{"id":102862,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/entegrasyonlar\/erp\/fulcrum\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"fulcrum","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/fulcrum\/","title":{"rendered":"Fulcrum i\u00e7in SkyPlanner APS: Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde \u00fcretim \u00e7izelgeleme"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Fulcrum<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Fulcrum i\u00e7in SkyPlanner APS: <span class=\"hl\">Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde \u00fcretim \u00e7izelgeleme<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS, Fulcrum (Fulcrum Pro) i\u00e7in ger\u00e7ek makine ve personel kapasitesini dikkate alan bir \u00fcretim \u00e7izelgeleme eklentisidir. Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde t\u00fcm makineleri, operat\u00f6rleri, tak\u0131mlar\u0131 ve malzemeleri ayn\u0131 anda tek bir \u00e7izelgede planlar. Haz\u0131rl\u0131klar, ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re s\u00fcreleri belirleyen bir matrise g\u00f6re planlan\u0131r. \u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe \u00fc\u00e7 ki\u015fi atan\u0131r; \u00fcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner, Fulcrum ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015f\u0131r. \u0130\u015fler, rota operasyonlar\u0131, i\u015f merkezleri, ekipmanlar, vardiyalar ve stok kalemleri SkyPlanner\u2019a aktar\u0131l\u0131r. Planlanan ba\u015flang\u0131\u00e7, biti\u015f ve i\u015f merkezi bilgileri ile kaydedilen s\u00fcreler ve tamamlanan miktarlar Fulcrum\u2019a geri g\u00f6nderilir. SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda entegrasyonu Fulcrum yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar.<\/p>\n\n\n<p>Fiyatlar 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi ayl\u0131k 20 \u20ac&#8217;dur. \u00dccretsiz deneme 30 g\u00fcn s\u00fcrer, 20 i\u015f merkezine kadar kullan\u0131m sunar ve kredi kart\u0131 gerektirmez.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcretiminizde neler de\u011fi\u015fir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Her operat\u00f6r ayr\u0131 ayr\u0131 planlan\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">Fulcrum, i\u015f g\u00fcc\u00fcn\u00fc bir vardiyada ayn\u0131 anda \u00e7al\u0131\u015fabilecek makine say\u0131s\u0131yla modeller. SkyPlanner ise her operat\u00f6r\u00fc kendi vardiyalar\u0131n\u0131, izinlerini ve devams\u0131zl\u0131klar\u0131n\u0131 dikkate alarak \u00e7izelgeler. \u00dc\u00e7 operat\u00f6r gerektiren bir i\u015fe, vardiyas\u0131 m\u00fcsait \u00fc\u00e7 ki\u015fi atan\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Haz\u0131rl\u0131k s\u00fcreleri i\u015f s\u0131ras\u0131na g\u00f6re belirlenir.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcresini her iki y\u00f6nde de bilir. Maviden k\u0131rm\u0131z\u0131ya ge\u00e7i\u015f 30 dakika, k\u0131rm\u0131z\u0131dan maviye ge\u00e7i\u015f ise 60 dakika s\u00fcrebilir. Arcturus motoru, i\u015fleri tezg\u00e2h\u0131n i\u015fleme s\u00fcresi kayb\u0131n\u0131 en aza indiren s\u0131rayla \u00e7al\u0131\u015ft\u0131r\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Fikst\u00fcr ve tak\u0131mlarda \u00e7ak\u0131\u015fma olmaz.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir makinede kullan\u0131lan fikst\u00fcr, kal\u0131p veya tak\u0131m ayn\u0131 anda ba\u015fka bir makineye asla atanmaz. Tak\u0131mlar da makineler ve insanlar gibi \u00e7izelgede s\u0131n\u0131rl\u0131 kapasiteye sahip kaynaklar olarak yer al\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Her de\u011fi\u015fiklikte malzeme kontrol\u00fc yap\u0131l\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner, plan her de\u011fi\u015fti\u011finde stoklar\u0131 ve beklenen sat\u0131n alma sipari\u015flerini kontrol eder. \u00c7ubuk malzeme bekleyen bir i\u015f, malzemenin bug\u00fcn sipari\u015f edildi\u011fi varsay\u0131m\u0131yla de\u011fil, sat\u0131n alma sipari\u015finin teslim tarihinden sonras\u0131na planlan\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">T\u00fcm plan saniyeler i\u00e7inde haz\u0131r.<\/p>\n\n\n<p class=\"fx-pain__b\">Arcturus, t\u00fcm makinelerdeki a\u00e7\u0131k i\u015fleri tek seferde; \u00f6ncelik, termin tarihi, m\u00fc\u015fteri \u00f6nceli\u011fi ve Fast Track\u2019e g\u00f6re optimize eder. Acil i\u015fe \u00e7izelgede yer a\u00e7\u0131l\u0131r; Bulldozer, sonraki i\u015fleri ileriye kayd\u0131rarak bunu sa\u011flar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u0131zalarda plan otomatik yenilenir.<\/p>\n\n\n<p class=\"fx-pain__b\">Bir makine ar\u0131zaland\u0131\u011f\u0131nda, malzeme gecikti\u011finde veya bir i\u015f erken bitti\u011finde Autopilot \u00e7izelgeyi otomatik olarak yeniden olu\u015fturur. Belirledi\u011finiz kilitler ve \u00f6ncelikler ge\u00e7erlili\u011fini korur; Running Time Lock ise ba\u015flam\u0131\u015f i\u015flerin yerini sabit tutar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operat\u00f6rler kendi i\u015f s\u0131ralar\u0131n\u0131 g\u00f6r\u00fcr.<\/p>\n\n\n<p class=\"fx-pain__b\">Her operat\u00f6r, s\u0131radaki i\u015flerini telefon veya tabletten g\u00f6r\u00fcr ve Mobile Confirmations, Production Timer ya da Quick Log Mode ile \u00e7al\u0131\u015fmalar\u0131n\u0131 kaydeder. Ofis, ilerlemeyi anl\u0131k olarak izler; s\u00fcreler ve miktarlar Fulcrum\u2019a geri aktar\u0131l\u0131r.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila\u2019daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>haftal\u0131k zaman tasarrufu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt donan\u0131mlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU\u2019nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied\u2019\u0131n Nairobi\u2019deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+%90<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan, optimize edilmi\u015f \u00fc\u00e7 ayl\u0131k bir plan\u0131 haz\u0131rlamak 30 dakikadan k\u0131sa s\u00fcr\u00fcyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied\u2019\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 fabrikas\u0131nda kaynakl\u0131 bir \u00e7elik yap\u0131y\u0131 ta\u015flayan KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%98<\/b><span>teslimat performans\u0131; yakla\u015f\u0131k %50\u2019den y\u00fckseldi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumam\u0131zda belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal i\u015fleme ve fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k %50\u2019den %98\u2019e kadar y\u00fckseldi. \u00c7izelgeleme i\u00e7in art\u0131k iki yerine bir y\u00f6netici yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp\u2019un yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel\u2019in Kauhava\u2019daki \u00e7at\u0131 g\u00fcvenli\u011fi \u00fcr\u00fcnleri fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 g\u00f6r\u00fcn\u00fcr h\u00e2le getirdi ve \u00fcretim y\u00f6netimini netle\u015ftirdi.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenli\u011fi ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 bu y\u0131l %99,2\u2019ye ula\u015ft\u0131. \u00c7izelgelemede g\u00fcnde d\u00f6rt saate kadar \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/piristeel\/\">Piristeel\u2019in yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-fulcrum-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Fulcrum entegrasyonu nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Fulcrum, i\u015fleri g\u00f6nderir.<\/strong> \u0130\u015fler, \u00fcretilecek kalemleri ve operasyonlar\u0131yla birlikte SkyPlanner\u2019a aktar\u0131l\u0131r. Rotalar, i\u015f merkezleri, ekipmanlar, departman vardiyalar\u0131, duru\u015flar, stoklar ve sat\u0131n alma sipari\u015fleri de aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>SkyPlanner \u00e7izelgeyi olu\u015fturur ve g\u00fcncel tutar.<\/strong> Arcturus, t\u00fcm operasyonlar\u0131 makine, operat\u00f6r ve tak\u0131m baz\u0131nda saniyeler i\u00e7inde planlar. \u00dcretimde de\u011fi\u015fiklik olduk\u00e7a Autopilot plan\u0131 yeniler.<\/li>\n\n\n<li><strong>Plan ve \u00fcretim ger\u00e7ekle\u015fmeleri geri aktar\u0131l\u0131r.<\/strong> Planlanan ba\u015flang\u0131\u00e7, biti\u015f ve i\u015f merkezi bilgileri, her i\u015f operasyonundaki \u00f6zel alanlara yaz\u0131l\u0131r. Operat\u00f6r s\u00fcreleri ve tamamlanan miktarlar, zamanlay\u0131c\u0131 kay\u0131tlar\u0131 ve miktar g\u00fcncellemeleri olarak Fulcrum\u2019a g\u00f6nderilir. B\u00f6ylece Fulcrum\u2019daki i\u015f maliyetleri do\u011fru kal\u0131r.<\/li>\n\n<\/ol>\n\n\n<p>Entegrasyon, OpenAPI tan\u0131m\u0131na sahip ve belgelenmi\u015f bir REST API olan Fulcrum Public API \u00fczerinden \u00e7al\u0131\u015f\u0131r; bu nedenle Fulcrum\u2019a hi\u00e7bir kurulum yap\u0131lmaz. SkyPlanner webhook\u2019lar\u0131, \u00e7izelgedeki de\u011fi\u015fiklikleri an\u0131nda g\u00f6nderir. Fulcrum\u2019daki yeni veya de\u011fi\u015fen i\u015fler ise k\u0131sa aral\u0131klarla sorgulanarak al\u0131n\u0131r. Her at\u00f6lye Fulcrum\u2019u farkl\u0131 kulland\u0131\u011f\u0131 i\u00e7in SkyPlanner ekibi, devreye alma s\u0131ras\u0131nda departmanlar\u0131n\u0131z\u0131, i\u015f merkezlerinizi, ekipmanlar\u0131n\u0131z\u0131 ve rotalar\u0131n\u0131z\u0131 e\u015fle\u015ftirir; canl\u0131ya ge\u00e7i\u015ften sonra da entegrasyona destek verir.<\/p>\n\n\n<p>Entegrasyon i\u00e7in s\u00fcre\u00e7 ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re ba\u015ftan fiyat teklifi verilir. Fulcrum dan\u0131\u015fman\u0131n\u0131z veya kendi geli\u015ftiricileriniz de SkyPlanner\u2019\u0131n belgelenmi\u015f API\u2019sini kullanarak entegrasyon geli\u015ftirebilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API ba\u015fvuru dok\u00fcman\u0131<\/a>).<\/p>\n\n\n<p>U\u00e7 noktalar, alan e\u015fle\u015ftirmeleri ve verilerin geri yaz\u0131lmas\u0131, <a href=\"\/tr\/entegrasyonlar\/erp\/fulcrum\/entegrasyon-kilavuzu\/\">\u00fcretim \u00e7izelgeleme i\u00e7in Fulcrum entegrasyon k\u0131lavuzunda<\/a> a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-fulcrum-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Fulcrum neleri \u00e7izelgeler, SkyPlanner neler ekler?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Fulcrum\u2019un Autoschedule \u00f6zelli\u011fi, i\u015f operasyonlar\u0131n\u0131 Greedy (m\u00fcmk\u00fcn olan en erken zamanda) veya Just-in-Time modunda ekipmanlara otomatik olarak yerle\u015ftirir. Fulcrum bu \u00f6zelli\u011fi \u015f\u00f6yle tan\u0131t\u0131r: &#8220;Automatic scheduling calculated just for you, in seconds.&#8221; (Size \u00f6zel otomatik \u00e7izelgeleme, saniyeler i\u00e7inde hesaplan\u0131r.) Kendi Launch Pad yard\u0131m dok\u00fcman\u0131nda model \u015f\u00f6yle a\u00e7\u0131klan\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u00d6nce \u00f6ncelik.<\/strong> &#8220;The schedule prioritizes jobs first based on the following: Work In Process, Job Priority Level, Production Due Date.&#8221; (\u00c7izelge, i\u015fleri \u00f6nce \u015fu \u00f6l\u00e7\u00fctlere g\u00f6re \u00f6nceliklendirir: devam eden \u00fcretim, i\u015fin \u00f6ncelik seviyesi ve \u00fcretim termin tarihi.) Ayr\u0131ca: &#8220;High priority jobs will always be scheduled before moderate to low priority.&#8221; (Y\u00fcksek \u00f6ncelikli i\u015fler her zaman orta ve d\u00fc\u015f\u00fck \u00f6ncelikli i\u015flerden \u00f6nce \u00e7izelgelenir.)<\/li>\n\n\n<li><strong>\u0130\u015f g\u00fcc\u00fc, makine say\u0131s\u0131yla ifade edilir.<\/strong> Her vardiyada ayn\u0131 anda \u00e7al\u0131\u015fabilecek ekipman say\u0131s\u0131 belirlenir. &#8220;This is usually determined by how many people you have working in a certain area at that time.&#8221; (Bu say\u0131 genellikle o s\u0131rada ilgili alanda \u00e7al\u0131\u015fan ki\u015fi say\u0131s\u0131na g\u00f6re belirlenir.) Biri hastal\u0131k nedeniyle i\u015fe gelemeyece\u011fini bildirdi\u011finde y\u00f6netici \u015fu i\u015flemi yapabilir: &#8220;decrement the Max Equipment by 1&#8221; (Max Equipment de\u011ferini bir azaltmak).<\/li>\n\n\n<li><strong>Malzemenin sipari\u015f edildi\u011fi varsay\u0131l\u0131r.<\/strong> &#8220;If materials are not in stock, the schedule assumes that you are IMMEDIATELY ordering the material when you hit &#8220;Schedule&#8221; on the job&#8221; (Malzemeler stokta yoksa \u00e7izelge, i\u015fteki Schedule d\u00fc\u011fmesine bast\u0131\u011f\u0131n\u0131z anda malzemeyi HEMEN sipari\u015f etti\u011finizi varsayar).<\/li>\n\n\n<li><strong>G\u00fcnde bir kez yeniden \u00e7al\u0131\u015f\u0131r.<\/strong> &#8220;The schedule automatically will pull in scheduled jobs once a day.&#8221; (\u00c7izelge, planlanm\u0131\u015f i\u015fleri g\u00fcnde bir kez otomatik olarak al\u0131r.) Ayn\u0131 g\u00fcn i\u00e7indeki de\u011fi\u015fiklikler i\u00e7in: &#8220;you will need to select the Reschedule button&#8221; (Reschedule d\u00fc\u011fmesini se\u00e7meniz gerekir).<\/li>\n\n<\/ul>\n\n\n<p>Haz\u0131rl\u0131k s\u00fcresi, her rota operasyonunda sabit veya birim ba\u015f\u0131na bir de\u011fer olarak tan\u0131mlan\u0131r. Fulcrum\u2019un Tools \u00f6zelli\u011findeki ara\u00e7lar, kalibrasyon sisteminde yer alan \u00f6l\u00e7\u00fcm cihazlar\u0131 ve mastarlard\u0131r; \u00e7izelgeleme kayna\u011f\u0131 de\u011fildir. Dolay\u0131s\u0131yla Fulcrum, ekipman baz\u0131nda h\u0131zl\u0131 bir plan sunar. SkyPlanner buna operat\u00f6rlerin ki\u015fi baz\u0131nda planlanmas\u0131n\u0131, i\u015f s\u0131ras\u0131na ba\u011fl\u0131 haz\u0131rl\u0131klar\u0131, kapasitesi s\u0131n\u0131rl\u0131 tak\u0131mlar\u0131 ve s\u00fcrekli yeniden planlamay\u0131 ekler. Her ba\u015fl\u0131k <a href=\"\/tr\/entegrasyonlar\/erp\/fulcrum\/uretim-cizelgeleme\/\">Fulcrum ger\u00e7ek kapasiteyi dikkate alan \u00fcretim \u00e7izelgeleme sunuyor mu?<\/a> yaz\u0131s\u0131nda a\u00e7\u0131klan\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-moves-between-fulcrum-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Fulcrum ile SkyPlanner aras\u0131nda hangi veriler aktar\u0131l\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Fulcrum<\/th><th>SkyPlanner<\/th><th>Y\u00f6n<\/th><\/tr><\/thead><tbody><tr><td>Item, Materials, rotan\u0131n girdi kalemleri ve malzemeleri<\/td><td>\u00dcr\u00fcnler, malzemeler, \u00fcr\u00fcn yap\u0131s\u0131<\/td><td>SkyPlanner\u2019a<\/td><\/tr><tr><td>Item rotas\u0131ndaki operasyonlar: haz\u0131rl\u0131k, i\u015f\u00e7ilik ve makine s\u00fcresi (sabit veya birim ba\u015f\u0131na)<\/td><td>Proses ad\u0131mlar\u0131, haz\u0131rl\u0131k s\u00fcreleri, i\u015flem s\u00fcreleri<\/td><td>SkyPlanner\u2019a<\/td><\/tr><tr><td>Work Center ve Equipment (Unlimited Capacity, Can Run Unattended)<\/td><td>\u0130\u015f merkezi gruplar\u0131, i\u015f merkezleri, parti i\u015fleri<\/td><td>SkyPlanner\u2019a<\/td><\/tr><tr><td>Department Shifts, Equipment Downtimes<\/td><td>Vardiyalar ve devams\u0131zl\u0131klar<\/td><td>SkyPlanner\u2019a<\/td><\/tr><tr><td>Job, \u00fcretilecek kalemler, i\u015f operasyonlar\u0131, \u00f6ncelik, Production Due Date<\/td><td>Sipari\u015fler, i\u015fler, \u00f6ncelikler, termin tarihleri<\/td><td>\u0130\u00e7e aktar\u0131m<\/td><\/tr><tr><td>Inventory, Expected Receive tarihleriyle birlikte Purchase Orders<\/td><td>Stok ve gelecek malzemeler<\/td><td>\u0130\u00e7e aktar\u0131m<\/td><\/tr><tr><td>\u0130\u015f operasyonlar\u0131na ait \u00f6zel alanlar<\/td><td>Planlanan ba\u015flang\u0131\u00e7, biti\u015f ve i\u015f merkezi<\/td><td>Geri aktar\u0131m<\/td><\/tr><tr><td>\u0130\u015f takibi saya\u00e7lar\u0131, tamamlanan miktar, operasyonun tamamlanma durumu<\/td><td>Operat\u00f6r s\u00fcre kay\u0131tlar\u0131 ve tamamlanan miktarlar<\/td><td>Geri aktar\u0131m<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"fulcrum-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Fulcrum\u2019un mevcut \u00f6zellikleri ve SkyPlanner ile kazand\u0131klar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Fulcrum Autoschedule<\/th><th>SkyPlanner APS ile Fulcrum<\/th><\/tr><\/thead><tbody><tr><td>\u0130\u015f s\u0131ralamas\u0131<\/td><td>Devam eden i\u015fler, \u00f6ncelik d\u00fczeyi, ard\u0131ndan termin tarihi<\/td><td>Arcturus t\u00fcm plan\u0131 \u00f6nceli\u011fe, termin tarihine ve m\u00fc\u015fteri \u00f6nceli\u011fine g\u00f6re optimize eder<\/td><\/tr><tr><td>Operat\u00f6rler<\/td><td>Vardiya ba\u015f\u0131na \u00e7al\u0131\u015fabilecek makine say\u0131s\u0131<\/td><td>Her operat\u00f6r\u00fcn vardiyalar\u0131 ve devams\u0131zl\u0131klar\u0131, birden fazla operat\u00f6r gerektiren i\u015fler<\/td><\/tr><tr><td>Tip de\u011fi\u015fimleri<\/td><td>Operasyon ba\u015f\u0131na sabit veya birim ba\u015f\u0131na haz\u0131rl\u0131k s\u00fcresi<\/td><td>Ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re haz\u0131rl\u0131k s\u00fcresi matrisi, en d\u00fc\u015f\u00fck toplam haz\u0131rl\u0131k s\u00fcresi<\/td><\/tr><tr><td>Tak\u0131mlar ve fikst\u00fcrler<\/td><td>Tak\u0131mlar\u0131n kalibrasyon takibi<\/td><td>Tak\u0131m kapasitesi s\u0131n\u0131rl\u0131d\u0131r, ayn\u0131 tak\u0131m \u00e7ak\u0131\u015fan i\u015flere asla atanmaz<\/td><\/tr><tr><td>Malzemeler<\/td><td>\u00c7izelgeleme s\u0131ras\u0131nda eksik stokun sipari\u015f edildi\u011fi varsay\u0131l\u0131r<\/td><td>Her de\u011fi\u015fiklikte stok ve beklenen sat\u0131n alma sipari\u015fleri kontrol edilir<\/td><\/tr><tr><td>Yeniden planlama<\/td><td>G\u00fcnl\u00fck yeniden \u00e7al\u0131\u015ft\u0131rma ve Reschedule d\u00fc\u011fmesi<\/td><td>\u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniler<\/td><\/tr><tr><td>shop floor<\/td><td>Job Tracking, Fulcrum&#8217;un s\u0131ralamas\u0131n\u0131 izler<\/td><td>Operat\u00f6r i\u015f kuyru\u011fu, Mobile Confirmations, Production Timer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"fulcrum-scheduling-software-and-add-ons-compared\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Fulcrum i\u00e7in \u00e7izelgeleme yaz\u0131l\u0131mlar\u0131 ve eklentileri: kar\u015f\u0131la\u015ft\u0131rma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Fulcrum&#8217;un entegrasyon listesinde \u00fc\u00e7\u00fcnc\u00fc taraf bir \u00e7izelgeleme yaz\u0131l\u0131m\u0131 yer alm\u0131yor. Bu nedenle t\u00fcm eklentiler Public API veya dosya d\u0131\u015fa aktar\u0131m\u0131 \u00fczerinden \u00e7al\u0131\u015f\u0131yor. Al\u0131c\u0131lar\u0131n de\u011ferlendirdi\u011fi \u00fc\u00e7 kategori var:<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Se\u00e7enek<\/th><th>Fulcrum ile nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/th><th>Kimler i\u00e7in uygun?<\/th><\/tr><\/thead><tbody><tr><td>Kurumsal APS paketleri (PlanetTogether, Asprova, Siemens Opcenter APS)<\/td><td>Dosyalar, veritabanlar\u0131 veya API&#8217;ler \u00fczerinden y\u00fcr\u00fct\u00fclen \u00f6zel entegrasyon projeleri<\/td><td>\u00d6zel planlama kadrosu ve uzun s\u00fcreli projeleri olan b\u00fcy\u00fck tesisler<\/td><\/tr><tr><td>Elektronik tablo ve dosya tabanl\u0131 \u00e7izelgeleme yaz\u0131l\u0131mlar\u0131 (User Solutions EDGEBIC)<\/td><td>Fulcrum&#8217;dan CSV veya Excel bi\u00e7iminde d\u0131\u015fa aktar\u0131m; User Solutions&#8217;\u0131n a\u00e7\u0131klamas\u0131: &#8220;There is no automated write-back&#8221; (Otomatik geri aktar\u0131m yoktur)<\/td><td>Tarihleri elle yeniden giren planlamac\u0131lar<\/td><\/tr><tr><td>shop floor i\u015flerinin y\u00fcr\u00fct\u00fclmesini sa\u011flayan bulut tabanl\u0131 APS (SkyPlanner)<\/td><td>Fulcrum Public API \u00fczerinden \u00e7ift y\u00f6nl\u00fc ba\u011flant\u0131; plan, saya\u00e7lar ve miktarlar geri aktar\u0131l\u0131r<\/td><td>Haftalar i\u00e7inde g\u00fcncel ve optimize edilmi\u015f bir \u00e7izelge isteyen sipari\u015fe g\u00f6re \u00fcretim at\u00f6lyeleri<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"choose-skyplanner-over-fulcrum-s-scheduler-when\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hangi durumlarda Fulcrum&#8217;un \u00e7izelgelemesi yerine SkyPlanner&#8217;\u0131 se\u00e7melisiniz?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Hangi i\u015flerin yap\u0131labilece\u011fini belirli operat\u00f6rlerin veya ayarc\u0131lar\u0131n uygunlu\u011fu belirliyorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> Fulcrum vardiya ba\u015f\u0131na makine say\u0131s\u0131n\u0131 esas al\u0131r. SkyPlanner her ki\u015fiyi ayr\u0131 ayr\u0131 \u00e7izelgeler; bir i\u015f ayn\u0131 anda birden fazla ki\u015fi gerektirebilir.<\/li>\n\n\n<li><strong>Tip de\u011fi\u015fimi s\u00fcreleri \u00f6nceki \u00fcr\u00fcne ba\u011fl\u0131ysa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> Haz\u0131rl\u0131k s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki ge\u00e7i\u015f s\u00fcresini her iki y\u00f6nde de tutar. \u00c7izelgeleme motoru i\u015fleri haz\u0131rl\u0131k s\u00fcresini en aza indirecek \u015fekilde s\u0131ralar.<\/li>\n\n\n<li><strong>Fikst\u00fcrler, kal\u0131plar veya tak\u0131mlar makineler aras\u0131nda ortak kullan\u0131l\u0131yorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> Tak\u0131mlar s\u0131n\u0131rl\u0131 kaynaklard\u0131r; ayn\u0131 tak\u0131m \u00e7ak\u0131\u015fan i\u015flere asla atanmaz.<\/li>\n\n\n<li><strong>Malzeme gecikmeleri g\u00fcnl\u00fck bir sorunsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> Her yeniden planlamada stok ve beklenen sat\u0131n alma sipari\u015fleri kontrol edilir; \u00e7izelgeleme s\u0131ras\u0131nda malzemenin sipari\u015f edildi\u011fi varsay\u0131lmaz.<\/li>\n\n\n<li><strong>Plan\u0131n g\u00fcn i\u00e7inde bir\u00e7ok kez de\u011fi\u015fmesi gerekiyorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> Autopilot \u00e7izelgeyi otomatik olarak yeniler. G\u00fcnl\u00fck d\u00f6ng\u00fcy\u00fc beklemeniz veya Reschedule d\u00fc\u011fmesine basmay\u0131 hat\u0131rlaman\u0131z gerekmez.<\/li>\n\n\n<li><strong>Operat\u00f6rlerin kendi i\u015f kuyruklar\u0131ndan \u00e7al\u0131\u015fmas\u0131n\u0131 istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> \u0130\u015flerini telefon veya tabletten takip ederler; s\u00fcre ve miktarlar Fulcrum&#8217;a geri aktar\u0131l\u0131r.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Nas\u0131l ba\u015flayabilirsiniz?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00dccretsiz denemeyi ba\u015flat\u0131n.<\/strong> 30 g\u00fcn boyunca, 20 i\u015f merkezine kadar, t\u00fcm Basic \u00f6zellikleriyle deneyin. Kredi kart\u0131 gerekmez.<\/li>\n\n\n<li><strong>\u00dcretiminizi modelleyin.<\/strong> SkyPlanner&#8217;da makineleri, operat\u00f6rleri, vardiyalar\u0131 ve tak\u0131mlar\u0131 olu\u015fturun veya i\u00e7e aktar\u0131n. Ba\u015flang\u0131\u00e7 s\u00fcrecinde destek alabilirsiniz.<\/li>\n\n\n<li><strong>\u0130\u015flerinizi y\u00fckleyin.<\/strong> Fulcrum tablolar\u0131ndan kalemleri, rotalar\u0131 ve a\u00e7\u0131k i\u015fleri CSV olarak d\u0131\u015fa aktar\u0131n. Bunlar\u0131 SkyPlanner&#8217;a aktararak olu\u015fan \u00e7izelgeyi Fulcrum \u00e7izelgenizle kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>Fulcrum ba\u011flant\u0131s\u0131n\u0131 kurun.<\/strong> SkyPlanner ekibi, Fulcrum Public API \u00fczerinden \u00e7ift y\u00f6nl\u00fc entegrasyonu yap\u0131land\u0131r\u0131r ve canl\u0131 kullan\u0131ma ge\u00e7tikten sonra da destek verir.<\/li>\n\n<\/ol>\n\n\n<p><strong>Fiyatland\u0131rma.<\/strong> Paketler i\u015f merkezi ba\u015f\u0131na ayl\u0131k olarak faturaland\u0131r\u0131l\u0131r. \u0130stedi\u011finiz zaman i\u015f merkezi ekleyebilir, kald\u0131rabilir veya aboneli\u011finizi iptal edebilirsiniz. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rma<\/a> ve <a href=\"\/tr\/ozellikler\/\">\u00f6zellikler<\/a> sayfalar\u0131na bak\u0131n. Ba\u015fka bir sistem de kullan\u0131yor musunuz? T\u00fcm <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131n\u0131<\/a> inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Fulcrum i\u00e7in en iyi \u00e7izelgeleme eklentisi hangisi?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, ger\u00e7ek makine ve personel kapasitesini dikkate alan ve Fulcrum ile \u00e7ift y\u00f6nl\u00fc entegre \u00e7al\u0131\u015fan bir \u00fcretim \u00e7izelgeleme eklentisidir. \u0130\u015fler, rota operasyonlar\u0131, i\u015f merkezleri, ekipmanlar, vardiyalar ve kalemler i\u00e7e aktar\u0131l\u0131r. Planlanan ba\u015flang\u0131\u00e7, biti\u015f ve i\u015f merkezi ile kay\u0131tl\u0131 s\u00fcreler ve tamamlanan miktarlar Fulcrum&#8217;a geri aktar\u0131l\u0131r. Her makine, operat\u00f6r, tak\u0131m ve malzeme s\u0131n\u0131rl\u0131 kaynak olarak ele al\u0131n\u0131r. Ge\u00e7i\u015f y\u00f6n\u00fcn\u00fc dikkate alan haz\u0131rl\u0131k s\u00fcresi matrisi, i\u015fleri haz\u0131rl\u0131k s\u00fcresini en aza indirecek \u015fekilde s\u0131ralar. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniler. Fiyatlar ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve \u00fccretsiz deneme 30 g\u00fcn s\u00fcrer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Fulcrum kapasite k\u0131s\u0131tlar\u0131n\u0131 dikkate alarak \u00fcretim \u00e7izelgeleme yap\u0131yor mu?<\/summary>\n<p class=\"sp-faq__a\">Evet, ekipman d\u00fczeyinde yap\u0131yor. Fulcrum&#8217;un Autoschedule \u00f6zelli\u011fi, operasyonlar\u0131 devam eden i\u015flere, \u00f6ncelik d\u00fczeyine ve termin tarihine g\u00f6re b\u00f6l\u00fcm vardiyalar\u0131 i\u00e7inde makinelere yerle\u015ftirir. \u0130\u015f g\u00fcc\u00fc, ayn\u0131 anda \u00e7al\u0131\u015fabilecek makine say\u0131s\u0131 olarak ele al\u0131n\u0131r. SkyPlanner APS buna operat\u00f6r baz\u0131nda \u00e7izelgeleme, birden fazla operat\u00f6r gerektiren i\u015fler, s\u0131n\u0131rl\u0131 tak\u0131m kapasitesi ve haz\u0131rl\u0131k s\u00fcresi matrisi ekler.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Fulcrum&#8217;un \u00e7izelgelemesini mi, SkyPlanner&#8217;\u0131 m\u0131 kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Tek k\u0131s\u0131t makinelerse ve haz\u0131rl\u0131k s\u00fcreleri \u00f6nceki \u00fcr\u00fcnden ba\u011f\u0131ms\u0131z olarak benzerse Fulcrum&#8217;un Autoschedule \u00f6zelli\u011fini kullan\u0131n. \u00c7izelgenizi operat\u00f6rler, s\u0131ralamaya ba\u011fl\u0131 haz\u0131rl\u0131k s\u00fcreleri, ortak kullan\u0131lan tak\u0131mlar veya geciken malzemeler belirliyorsa ve plan\u0131n g\u00fcn i\u00e7inde bir\u00e7ok kez de\u011fi\u015fmesi gerekiyorsa SkyPlanner&#8217;\u0131 se\u00e7in. Her iki durumda da ERP sisteminiz Fulcrum olarak kal\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Fulcrum operat\u00f6rleri \u00e7izelgeliyor mu?<\/summary>\n<p class=\"sp-faq__a\">Fulcrum, b\u00f6l\u00fcmleri &#8220;personnel constraints&#8221; (personel k\u0131s\u0131tlar\u0131) olarak ele al\u0131r ve vardiya ba\u015f\u0131na azami makine say\u0131s\u0131n\u0131 belirler. Operat\u00f6rleri ayr\u0131 ayr\u0131 \u00e7izelgelemez. SkyPlanner ise her operat\u00f6r\u00fc vardiyalar\u0131, izinleri ve devams\u0131zl\u0131klar\u0131yla birlikte \u00e7izelgeler; \u00fc\u00e7 operat\u00f6r gerektiren bir i\u015fe \u00fc\u00e7 ki\u015fi atar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Fulcrum&#8217;a herhangi bir \u015fey y\u00fcklememiz gerekiyor mu?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. SkyPlanner, Fulcrum ile birlikte bulutta \u00e7al\u0131\u015f\u0131r. Business Setup &gt; System Data &gt; Public Api alt\u0131nda olu\u015fturulan bir Bearer token kullanarak Fulcrum Public API \u00fczerinden ba\u011flan\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, Fulcrum&#8217;un yerini mi al\u0131yor?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r, Fulcrum&#8217;u tamamlar. Teklifler, sat\u0131\u015f sipari\u015fleri, kalemler, rotalar, stok, sat\u0131n alma, kalite ve muhasebe Fulcrum&#8217;da kal\u0131r. SkyPlanner i\u015flerinizi ger\u00e7ek kapasiteye g\u00f6re \u00e7izelgeler; plan\u0131, s\u00fcreleri ve miktarlar\u0131 geri g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Fulcrum ile birlikte SkyPlanner kullanman\u0131n maliyeti nedir?<\/summary>\n<p class=\"sp-faq__a\">5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Her ek i\u015f merkezi i\u00e7in ayl\u0131k 20 \u20ac \u00f6denir. 20 i\u015f merkezi olan bir at\u00f6lye ayda 499 \u20ac \u00f6der. Entegrasyon i\u00e7in s\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan teklif, paketinizle birlikte ba\u015ftan sunulur. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devreye alma ne kadar s\u00fcrer?<\/summary>\n<p class=\"sp-faq__a\">Devreye alma, ba\u015flang\u0131\u00e7 s\u00fcrecinden itibaren normalde haftalar i\u00e7inde tamamlan\u0131r. Ekip; b\u00f6l\u00fcmlerinizi, i\u015f merkezlerinizi ve ekipmanlar\u0131n\u0131z\u0131 e\u015fle\u015ftirir, i\u015fleri ve sat\u0131n alma sipari\u015flerini ba\u011flar, geri aktar\u0131m\u0131 yap\u0131land\u0131r\u0131r. Canl\u0131 kullan\u0131ma ge\u00e7meden \u00f6nce her \u015fey mevcut Fulcrum \u00e7izelgenizle kar\u015f\u0131la\u015ft\u0131r\u0131larak test edilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00d6nce SkyPlanner&#8217;\u0131 kendi Fulcrum verilerimizle test edebilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. Kalemleri, rotalar\u0131 ve a\u00e7\u0131k i\u015fleri CSV olarak d\u0131\u015fa aktar\u0131n, ard\u0131ndan deneme s\u00fcr\u00fcm\u00fcne aktar\u0131n. Entegrasyon \u00e7al\u0131\u015fmas\u0131 ba\u015flamadan \u00f6nce kendi \u00fcretiminizin ger\u00e7ek kapasitesini dikkate alan bir <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">\u00fcretim \u00e7izelgesi<\/a> g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Fulcrum Fulcrum i\u00e7in SkyPlanner APS: Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde \u00fcretim \u00e7izelgeleme SkyPlanner APS, Fulcrum (Fulcrum Pro) i\u00e7in ger\u00e7ek makine ve personel kapasitesini dikkate alan bir \u00fcretim \u00e7izelgeleme eklentisidir. Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde t\u00fcm makineleri, operat\u00f6rleri, tak\u0131mlar\u0131 ve malzemeleri ayn\u0131 anda tek bir \u00e7izelgede planlar. Haz\u0131rl\u0131klar, ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re s\u00fcreleri &#8230; <a title=\"Fulcrum i\u00e7in SkyPlanner APS: Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde \u00fcretim \u00e7izelgeleme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/fulcrum\/\" aria-label=\"Read more about Fulcrum i\u00e7in SkyPlanner APS: Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde \u00fcretim \u00e7izelgeleme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100689,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102862","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Fulcrum \u00e7izelgeleme entegrasyonu: Kapasiteye g\u00f6re APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: Fulcrum i\u00e7in \u00fcretim \u00e7izelgeleme eklentisi. Kapasiteye g\u00f6re, \u00e7ift y\u00f6nl\u00fc entegre. Her makine, operat\u00f6r, tak\u0131m ve malzeme. Ayda 199 \u20ac\u2019dan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/fulcrum\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Fulcrum i\u00e7in SkyPlanner APS: Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde \u00fcretim \u00e7izelgeleme\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: Fulcrum i\u00e7in \u00fcretim \u00e7izelgeleme eklentisi. Kapasiteye g\u00f6re, \u00e7ift y\u00f6nl\u00fc entegre. Her makine, operat\u00f6r, tak\u0131m ve malzeme. Ayda 199 \u20ac\u2019dan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/fulcrum\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/fulcrum\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/fulcrum\\\/\",\"name\":\"Fulcrum \u00e7izelgeleme entegrasyonu: Kapasiteye g\u00f6re APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS: Fulcrum i\u00e7in \u00fcretim \u00e7izelgeleme eklentisi. Kapasiteye g\u00f6re, \u00e7ift y\u00f6nl\u00fc entegre. Her makine, operat\u00f6r, tak\u0131m ve malzeme. Ayda 199 \u20ac\u2019dan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/fulcrum\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/fulcrum\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/fulcrum\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Fulcrum i\u00e7in SkyPlanner APS: Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde \u00fcretim \u00e7izelgeleme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Fulcrum \u00e7izelgeleme entegrasyonu: Kapasiteye g\u00f6re APS","description":"SkyPlanner APS: Fulcrum i\u00e7in \u00fcretim \u00e7izelgeleme eklentisi. Kapasiteye g\u00f6re, \u00e7ift y\u00f6nl\u00fc entegre. Her makine, operat\u00f6r, tak\u0131m ve malzeme. Ayda 199 \u20ac\u2019dan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/fulcrum\/","og_locale":"tr_TR","og_type":"article","og_title":"Fulcrum i\u00e7in SkyPlanner APS: Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde \u00fcretim \u00e7izelgeleme","og_description":"SkyPlanner APS: Fulcrum i\u00e7in \u00fcretim \u00e7izelgeleme eklentisi. Kapasiteye g\u00f6re, \u00e7ift y\u00f6nl\u00fc entegre. Her makine, operat\u00f6r, tak\u0131m ve malzeme. Ayda 199 \u20ac\u2019dan.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/fulcrum\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"15 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/fulcrum\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/fulcrum\/","name":"Fulcrum \u00e7izelgeleme entegrasyonu: Kapasiteye g\u00f6re APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS: Fulcrum i\u00e7in \u00fcretim \u00e7izelgeleme eklentisi. Kapasiteye g\u00f6re, \u00e7ift y\u00f6nl\u00fc entegre. Her makine, operat\u00f6r, tak\u0131m ve malzeme. Ayda 199 \u20ac\u2019dan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/fulcrum\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/fulcrum\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/fulcrum\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Fulcrum i\u00e7in SkyPlanner APS: Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde \u00fcretim \u00e7izelgeleme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Fulcrum Fulcrum i\u00e7in SkyPlanner APS: Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde \u00fcretim \u00e7izelgeleme SkyPlanner APS, Fulcrum (Fulcrum Pro) i\u00e7in ger\u00e7ek makine ve personel kapasitesini dikkate alan bir \u00fcretim \u00e7izelgeleme eklentisidir. Sipari\u015fe g\u00f6re \u00fcretim yapan at\u00f6lyelerde t\u00fcm makineleri, operat\u00f6rleri, tak\u0131mlar\u0131 ve malzemeleri ayn\u0131 anda tek bir \u00e7izelgede planlar. Haz\u0131rl\u0131klar, ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re s\u00fcreleri&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/102862","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=102862"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/102862\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100689"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=102862"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}