{"id":101403,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101403"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"entegrasyon-kilavuzu","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/entegrasyon-kilavuzu\/","title":{"rendered":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in Sage X3 Entegrasyon K\u0131lavuzu"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Sage X3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\"><span class=\"hl\">SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in<\/span> Sage X3 Entegrasyon K\u0131lavuzu<\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Bu k\u0131lavuz, Sage i\u015f ortaklar\u0131na ve BT ekiplerine Sage X3 ile SkyPlanner APS aras\u0131nda nas\u0131l ba\u011flant\u0131 kurulaca\u011f\u0131n\u0131 g\u00f6sterir. Hangi X3 aray\u00fczlerinin kullan\u0131laca\u011f\u0131n\u0131, verilerin hangi nesnelerle ta\u015f\u0131naca\u011f\u0131n\u0131 ve projelerde nerelerde sorun ya\u015fand\u0131\u011f\u0131n\u0131 ele al\u0131r. SkyPlanner, hem buluttaki hem de \u015firket i\u00e7inde kurulu Sage X3 ile \u00e7ift y\u00f6nl\u00fc entegre olur:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00dcretim emirleri, operasyonlar, rotalar, i\u015f merkezleri, takvimler, stoklar ve a\u00e7\u0131k sat\u0131n alma sipari\u015fleri SkyPlanner&#8217;a aktar\u0131l\u0131r.<\/li>\n\n\n<li>Planlanan operasyon tarihleri ve i\u015f merkezleri, \u00fcretim emirlerine (GESMFG) geri yaz\u0131l\u0131r.<\/li>\n\n\n<li>Operat\u00f6rlerin s\u00fcre kay\u0131tlar\u0131, \u00fcretim takibi (GESMTK) olarak i\u015flenir.<\/li>\n\n\n<li>SkyPlanner webhook\u2019lar\u0131, \u00e7izelgedeki de\u011fi\u015fiklikleri an\u0131nda iletir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo i\u00e7in randevu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve alt\u0131nda sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu X3 kurulumunuza g\u00f6re yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra da destek verir.<\/p>\n\n\n<p>X3 i\u00e7in ger\u00e7ek makine ve personel kapasitesini dikkate alan bir \u00fcretim \u00e7izelgeleme \u00e7\u00f6z\u00fcm\u00fcne ger\u00e7ekten ihtiya\u00e7 olup olmad\u0131\u011f\u0131n\u0131 h\u00e2l\u00e2 de\u011ferlendiriyorsan\u0131z \u00f6nce <a href=\"\/tr\/entegrasyonlar\/erp\/sage-x3\/uretim-cizelgeleme\/\">Sage X3&#8217;te \u00fcretim \u00e7izelgeleme var m\u0131?<\/a> yaz\u0131s\u0131n\u0131 okuyun. \u00dcr\u00fcn\u00fc genel olarak tan\u0131mak i\u00e7in <a href=\"\/tr\/entegrasyonlar\/erp\/sage-x3\/\">Sage X3 i\u00e7in SkyPlanner APS<\/a> sayfas\u0131na, di\u011fer ERP&#8217;ler i\u00e7inse <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131 sayfas\u0131na<\/a> bak\u0131n.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-sits-in-an-x3-landscape\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner&#8217;\u0131n X3 ortam\u0131ndaki yeri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sage X3&#8217;\u00fcn standart \u00e7izelgeleme i\u015flevi (FUNMAUTJ), operasyonlar\u0131 rota verilerine g\u00f6re s\u0131ralar ancak her \u00fcretim emrini birbirinden ba\u011f\u0131ms\u0131z \u00e7izelgeler. Sage UK destek k\u0131lavuzu bunu a\u00e7\u0131k\u00e7a belirtir: &#8220;does not delay or stagger work orders based on overall resource load.&#8221; (\u00dcretim emirlerini toplam kaynak y\u00fck\u00fcne g\u00f6re ertelemez veya zamana yaymaz.) Ger\u00e7ek makine ve personel kapasitesini dikkate alan \u00fcretim \u00e7izelgeleme ayr\u0131 bir katmand\u0131r ve Sage bunun i\u00e7in iki se\u00e7enek sunar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Production Scheduler<\/strong> (aktivite kodu POPS), yaln\u0131zca \u015firket i\u00e7i kurulumlarda kullan\u0131labilir.<\/li>\n\n\n<li><strong>Genel ama\u00e7l\u0131 Finite scheduler aray\u00fcz\u00fc<\/strong> (aktivite kodu GFS), buluttaki veya \u015firket i\u00e7inde kurulu X3&#8217;\u00fc Sage X3 Web Scheduling&#8217;e ya da ba\u011f\u0131ms\u0131z bir yaz\u0131l\u0131m sa\u011flay\u0131c\u0131s\u0131n\u0131n \u00e7izelgeleme \u00e7\u00f6z\u00fcm\u00fcne ba\u011flar.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner bu rol\u00fc, standart X3 API&#8217;lerini kullanan harici bir bulut \u00e7izelgeleme \u00e7\u00f6z\u00fcm\u00fc olarak \u00fcstlenir. Bu nedenle hem buluttaki hem de \u015firket i\u00e7inde kurulu X3&#8217;te ayn\u0131 \u015fekilde \u00e7al\u0131\u015f\u0131r. MRP (FUNMRP), \u00fcretim emri ve sat\u0131n alma sipari\u015fi \u00f6nerileri olu\u015fturmaya devam eder. SkyPlanner ise kesinle\u015ftirilmi\u015f ve planlanm\u0131\u015f \u00fcretim emirlerini ger\u00e7ek kapasiteye g\u00f6re s\u0131ralar.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"sage-x3-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage X3 entegrasyon se\u00e7enekleri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0130zlenecek yolu kurulum modeli belirler. Sage X3&#8217;\u00fcn bulut s\u00fcr\u00fcm\u00fc, \u00fc\u00e7\u00fcnc\u00fc taraf uygulamalara ne uygulaman\u0131n dosya sistemini ne de veritaban\u0131n\u0131 a\u00e7ar. Bu nedenle entegrasyon, API&#8217;ler veya bar\u0131nd\u0131r\u0131lan dosya aktar\u0131m hizmetleri \u00fczerinden y\u00fcr\u00fct\u00fcl\u00fcr. \u015eirket i\u00e7i kurulumlarda bunlara do\u011frudan dosya i\u00e7e aktarma ve X3 veritaban\u0131ndaki ara tablolar da eklenir.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Se\u00e7enek<\/th><th>A\u00e7\u0131klama<\/th><th>Kimlik do\u011frulama<\/th><th>Kullan\u0131m alan\u0131<\/th><\/tr><\/thead><tbody><tr><td>GraphQL API (Sage X3 Web API)<\/td><td>Sage&#8217;in X3 API&#8217;leri i\u00e7in &#8220;technology of choice&#8221; (tercih etti\u011fi teknoloji) olarak tan\u0131mlad\u0131\u011f\u0131 se\u00e7enek; s\u00fcr\u00fcm de\u011fi\u015fikli\u011fi olmadan geli\u015fir<\/td><td>Connected application kayd\u0131n\u0131n Secret de\u011feriyle imzalanan JWT (HS256); <code>iss<\/code> olarak Client ID, <code>aud<\/code> olarak URL ve bu ama\u00e7la ayr\u0131lm\u0131\u015f bir Syracuse kullan\u0131c\u0131s\u0131<\/td><td>\u00dcr\u00fcnler, tesisler, sat\u0131n alma, stok; eri\u015fime a\u00e7\u0131lm\u0131\u015fsa \u00fcretim d\u00fc\u011f\u00fcmleri<\/td><\/tr><tr><td>REST api1<\/td><td>Representation tabanl\u0131 REST: <code>...\/api1\/x3\/$$prod\/&lt;FOLDER&gt;.&lt;ENTITY&gt;?representation=&lt;REP&gt;.$query<\/code><\/td><td>Syracuse kimlik do\u011frulamas\u0131<\/td><td>GraphQL kapsam\u0131na girmeyen varl\u0131klar<\/td><\/tr><tr><td>Nesnelere y\u00f6nelik SOAP web servisleri<\/td><td>Web services (GESAWE) \u00fczerinden yay\u0131mlanan nesneler; alanlar, nesnenin ekran alanlar\u0131d\u0131r; okuma, kaydetme, de\u011fi\u015ftirme<\/td><td>Syracuse ba\u011flant\u0131 havuzlar\u0131nda OAuth2<\/td><td>Work order (GESMFG) ve Production tracking (GESMTK) nesnelerine geri yazma<\/td><\/tr><tr><td>SOAP Template Services<\/td><td>AOWSIMPORT ve AOWSEXPORT arac\u0131l\u0131\u011f\u0131yla SOAP \u00fczerinden i\u00e7e\/d\u0131\u015fa aktarma \u015fablonlar\u0131<\/td><td>OAuth2; X3, SOAP i\u00e7in temel kimlik do\u011frulamaya izin vermez<\/td><td>Ara katman yaz\u0131l\u0131m\u0131ndan \u00e7al\u0131\u015ft\u0131r\u0131lan \u015fablonlar<\/td><\/tr><tr><td>\u0130\u00e7e\/d\u0131\u015fa aktarma \u015fablonlar\u0131<\/td><td>\u015eablonlara dayal\u0131 toplu veri dosyalar\u0131<\/td><td>Dosya sistemi (\u015firket i\u00e7i kurulum) veya bar\u0131nd\u0131r\u0131lan dosya aktar\u0131m hizmeti (bulut)<\/td><td>\u0130lk veri y\u00fcklemeleri, gecelik toplu senkronizasyon<\/td><\/tr><tr><td>Sync API (Cloud BI)<\/td><td>Yaln\u0131zca bulutta, salt okunur art\u0131ml\u0131 veri \u00e7\u0131kar\u0131m\u0131 ve NDJSON ak\u0131\u015f\u0131; Sage ISV temsilciniz arac\u0131l\u0131\u011f\u0131yla talep \u00fczerine sunulur<\/td><td>Bearer belirteci ve kirac\u0131ya \u00f6zel X-API-KEY<\/td><td>Bulutta y\u00fcksek hacimli de\u011fi\u015fiklik verilerini okuma<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u015eirket i\u00e7i kurulumda GraphQL i\u00e7in <code>\"bearer\"<\/code> de\u011ferini <code>session.auth<\/code> dizisine ekleyin; bu dizi <code>nodelocal.js<\/code> dosyas\u0131ndad\u0131r. Sage X3 SaaS \u00fczerinde ba\u011fl\u0131 uygulama kimlik do\u011frulamas\u0131 varsay\u0131lan olarak etkindir. Sage X3 Cloud \u00fczerinde ba\u011fl\u0131 uygulama <code>admin<\/code> kullan\u0131c\u0131s\u0131n\u0131 kullanamaz: bunun yerine Standard kimlik do\u011frulamas\u0131 kullanan bir Syracuse kullan\u0131c\u0131s\u0131 olu\u015fturun.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hangi veri ak\u0131\u015f\u0131 i\u00e7in hangi aray\u00fcz kullan\u0131l\u0131r?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u00dcr\u00fcnler, tesisler, sat\u0131n alma ve stok:<\/strong> Sage&#8217;in resmi \u00f6rneklerinde oldu\u011fu gibi GraphQL.<\/li>\n\n\n<li><strong>\u00dcretim emirleri, operasyonlar, rotalar ve i\u015f merkezleri:<\/strong> REST api1 representation&#8217;lar\u0131 veya AOWSEXPORT \u00fczerinden \u00e7al\u0131\u015ft\u0131r\u0131lan d\u0131\u015fa aktarma \u015fablonlar\u0131 kullan\u0131l\u0131r. GraphQL \u015femas\u0131nda \u00fcretim alan\u0131n\u0131 (<code>xtremX3Manufacturing<\/code>) eri\u015fime a\u00e7an s\u00fcr\u00fcmlerde entegrasyon ayn\u0131 verileri buradan okur.<\/li>\n\n\n<li><strong>Operasyon tarihlerini ve i\u015f merkezlerini X3&#8217;e geri yazma:<\/strong> Work order (GESMFG) SOAP web servisinin modify i\u015flemi. Alternatif yol: AOWSIMPORT \u00fczerinden i\u00e7e aktarma \u015fablonu.<\/li>\n\n\n<li><strong>\u00dcretim takibi:<\/strong> Production tracking (GESMTK) SOAP web servisinin save i\u015flemi.<\/li>\n\n<\/ul>\n\n\n<p>Bu tasar\u0131m\u0131n hi\u00e7bir b\u00f6l\u00fcm\u00fc dosya sistemine veya veritaban\u0131na do\u011frudan eri\u015fim gerektirmedi\u011finden hem X3 bulut s\u00fcr\u00fcm\u00fcnde hem de \u015firket i\u00e7i kurulumlarda \u00e7al\u0131\u015f\u0131r. X3&#8217;e herhangi bir \u015fey y\u00fcklenmez: entegrasyon, ba\u011fl\u0131 bir uygulama, bir Syracuse kullan\u0131c\u0131s\u0131 ve GESAWE&#8217;de yay\u0131mlanan web servislerini kullan\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Olaylar: periyodik sorgulamay\u0131 esas al\u0131n<\/h3>\n\n\n<p>Sage&#8217;in herkese a\u00e7\u0131k X3 geli\u015ftirici belgelerinde, d\u0131\u015far\u0131ya webhook g\u00f6nderme veya i\u015f olay\u0131 \u00f6zelli\u011fi tan\u0131mlanmaz. 2024 R1 ile eklenen &#8220;Callback URL&#8221; ayar\u0131, Mobile Automation ve Web Scheduling SOAP web servislerini \u00e7a\u011f\u0131rd\u0131\u011f\u0131nda bu uygulamalara hizmet eder. Genel ama\u00e7l\u0131 bir olay sistemi de\u011fildir. De\u011fi\u015fiklikleri zamanlanm\u0131\u015f okumalarla tespit edin: GraphQL sorgular\u0131, bulutta Sync API&#8217;nin zaman damgas\u0131 imleci veya \u015fablonlarla periyodik d\u0131\u015fa aktarma kullan\u0131n.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping-sage-x3-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Veri e\u015fleme: Sage X3&#8217;ten SkyPlanner&#8217;a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Sage X3 nesnesi (tablo, i\u015flev)<\/th><th>SkyPlanner nesnesi<\/th><th>Y\u00f6n<\/th><th>S\u0131kl\u0131k<\/th><\/tr><\/thead><tbody><tr><td>\u00dcr\u00fcn, ITMMASTER<\/td><td>\u00dcr\u00fcn<\/td><td>X3 \u2192 SkyPlanner<\/td><td>Ba\u015flang\u0131\u00e7ta, ard\u0131ndan belirlenen zamanlarda<\/td><\/tr><tr><td>\u00dcretim BOM&#8217;u (GESBODP)<\/td><td>\u00c7ok seviyeli \u00fcr\u00fcn yap\u0131s\u0131, malzemeler<\/td><td>X3 \u2192 SkyPlanner<\/td><td>Ba\u015flang\u0131\u00e7ta, ard\u0131ndan de\u011fi\u015fiklik oldu\u011funda<\/td><\/tr><tr><td>Rota (GESROU): OPENUM, i\u015f merkezi WST, SETTIM, OPETIM, zaman birimi TIMUOMCOD<\/td><td>Haz\u0131rl\u0131k ve i\u015flem s\u00fcreleriyle birlikte proses ad\u0131mlar\u0131<\/td><td>X3 \u2192 SkyPlanner<\/td><td>Ba\u015flang\u0131\u00e7ta, ard\u0131ndan de\u011fi\u015fiklik oldu\u011funda<\/td><\/tr><tr><td>\u0130\u015f merkezi (GESMWS, WORKSTATIO): WST, WSTTYP, WSTNBR, EFF, SHR, \u00f6ncelik s\u0131ras\u0131yla alternatifler<\/td><td>\u0130\u015f merkezi, verimlilik, alternatifler<\/td><td>X3 \u2192 SkyPlanner<\/td><td>Ba\u015flang\u0131\u00e7ta, sonras\u0131nda nadiren<\/td><\/tr><tr><td>\u0130\u015f merkezi grubu (WCR)<\/td><td>\u0130\u015f merkezi gruplar\u0131<\/td><td>X3 \u2192 SkyPlanner<\/td><td>Ba\u015flang\u0131\u00e7ta<\/td><\/tr><tr><td>Haftal\u0131k yap\u0131 (TWD), \u00e7al\u0131\u015fma saatleri tablolar\u0131, kapasite de\u011fi\u015fim tablosu, DEFDIH<\/td><td>Vardiyalar, fazla mesai vardiyalar\u0131, devams\u0131zl\u0131klar<\/td><td>X3 \u2192 SkyPlanner<\/td><td>Ba\u015flang\u0131\u00e7ta, ard\u0131ndan de\u011fi\u015fiklik oldu\u011funda<\/td><\/tr><tr><td>\u00dcretim emirleri: \u00fcr\u00fcn ve malzemeleriyle birlikte MFGHEAD, MFGOPE<\/td><td>Emir, malzemeler, proses ad\u0131mlar\u0131<\/td><td>X3 \u2192 SkyPlanner<\/td><td>5 ila 15 dakikada bir sorgulama<\/td><\/tr><tr><td>Tesis baz\u0131nda stok<\/td><td>Stok bakiyeleri<\/td><td>X3 \u2192 SkyPlanner<\/td><td>Periyodik sorgulama<\/td><\/tr><tr><td>Sat\u0131n alma sipari\u015fleri (POH): a\u00e7\u0131k sat\u0131rlar, beklenen mal kabul tarihi<\/td><td>Beklenen teslim tarihiyle birlikte gelecek malzemeler<\/td><td>X3 \u2192 SkyPlanner<\/td><td>5 ila 15 dakikada bir sorgulama<\/td><\/tr><tr><td>GESMFG Operations sekmesi: Start OPESTR, End OPEEND, i\u015f merkezi<\/td><td>\u00c7izelgelenen ba\u015flang\u0131\u00e7, biti\u015f ve se\u00e7ilen i\u015f merkezi<\/td><td>SkyPlanner \u2192 X3<\/td><td>\u00c7izelge de\u011fi\u015fti\u011finde (webhook)<\/td><\/tr><tr><td>\u00dcretim takibi (GESMTK): operasyon s\u00fcreleri, miktarlar, malzeme takibi, \u00fcretim bildirimi<\/td><td>S\u00fcre kay\u0131tlar\u0131, miktarlar, malzeme t\u00fcketimi<\/td><td>SkyPlanner \u2192 X3<\/td><td>Her teyitte (webhook)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Kesinle\u015ftirilmi\u015f \u00fcretim emirlerini her zaman \u00e7ekin. Planlamac\u0131lar planlanm\u0131\u015f emirleri Gantt \u00fczerinde ge\u00e7ici y\u00fck olarak g\u00f6rmek istiyorsa bunlar\u0131 da \u00e7ekin. \u00d6neriler, \u00fcretim emrine d\u00f6n\u00fc\u015ft\u00fcr\u00fclene kadar MRP&#8217;de kal\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Entegrasyon ak\u0131\u015flar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Ana verilerin ilk y\u00fcklemesi.<\/strong> \u00d6nce i\u015f merkezlerini ve takvimleri, ard\u0131ndan \u00fcr\u00fcnleri, BOM&#8217;lar\u0131 ve rotalar\u0131 y\u00fckleyin; \u00e7\u00fcnk\u00fc rotalar i\u015f merkezlerine referans verir.<\/p>\n\n\n<p><strong>2. Emir ve sipari\u015f senkronizasyonu.<\/strong> Yeni ve de\u011fi\u015fen \u00fcretim emirleri i\u00e7in MFGHEAD ve MFGOPE tablolar\u0131n\u0131 periyodik olarak sorgulay\u0131n. Her MFGOPE sat\u0131r\u0131n\u0131, WST kodunun belirtti\u011fi i\u015f merkezindeki bir SkyPlanner proses ad\u0131m\u0131yla e\u015fleyin. A\u00e7\u0131k sat\u0131n alma sipari\u015flerini de ayn\u0131 d\u00f6ng\u00fcde senkronize edin. SkyPlanner, sipari\u015f edilen malzemeyi sat\u0131n alma sipari\u015finin teslim tarihinde kullan\u0131labilir kabul eder ve sipari\u015f Delivered olarak i\u015faretlendi\u011finde stoku g\u00fcnceller. B\u00f6ylece malzeme kontrolleri hem mevcut stoku hem de gelecek tedariki kapsar.<\/p>\n\n\n<p><strong>3. \u00c7izelgeyi geri yazma.<\/strong> \u00c7izelge de\u011fi\u015fti\u011finde SkyPlanner webhook&#8217;u tetiklenir. Entegrasyon, GESAWE&#8217;de SOAP web servisi olarak yay\u0131mlanan Work order nesnesinin (GESMFG) modify i\u015flemini \u00e7a\u011f\u0131r\u0131r. De\u011fi\u015fen her operasyonda Start (OPESTR), End (OPEEND) ve i\u015f merkezi alanlar\u0131n\u0131 g\u00fcnceller. Toplu g\u00fcncellemelerde ayn\u0131 alanlar, AOWSIMPORT \u00fczerinden bir \u00fcretim emri i\u00e7e aktarma \u015fablonuyla aktar\u0131l\u0131r. Yaln\u0131zca tarihleri ve i\u015f merkezlerini yaz\u0131n; miktarlar\u0131, BOM sat\u0131rlar\u0131n\u0131 veya rotalar\u0131 asla yazmay\u0131n.<\/p>\n\n\n<p><strong>4. Makine se\u00e7imini X3&#8217;e geri aktarma.<\/strong> \u0130\u015f merkezleri bire bir e\u015flendi\u011finde, motorun alternatif makineler aras\u0131ndan yapt\u0131\u011f\u0131 se\u00e7im operasyonun i\u015f merkezi olarak geri yaz\u0131l\u0131r. B\u00f6ylece X3, i\u015fi ger\u00e7ekten yapan makineyi kaydeder. Bir X3 i\u015f merkezi bir makine grubunu temsil ediyorsa operat\u00f6r\u00fcn i\u015f kuyru\u011funda tekil makine g\u00f6sterilir. X3&#8217;e ise \u00e7izelgelenen tarihlerle birlikte grubun i\u015f merkezi aktar\u0131l\u0131r.<\/p>\n\n\n<p><strong>5. \u00dcretim sahas\u0131 teyitleri.<\/strong> Operat\u00f6rler, Mobile Confirmations veya Production Timer ile yapt\u0131klar\u0131 i\u015fi kaydeder. Entegrasyon, her teyidi Production tracking nesnesinin (GESMTK) save i\u015flemiyle g\u00f6nderir: operasyon takibine operasyon s\u00fcresi ve miktar\u0131, malzeme t\u00fcketimini de burada takip ediyorsan\u0131z t\u00fcketim bilgisi i\u015flenir. X3, yaln\u0131zca Firm durumundaki \u00fcretim emirleri i\u00e7in takip kayd\u0131 kabul eder. Ayr\u0131ca \u00fcr\u00fcn-tesis kayd\u0131nda Release if shortage (MFGSHTCOD) se\u00e7ili de\u011filse bile\u015fenlerin mevcut olmas\u0131 gerekir.<\/p>\n\n\n<p><strong>6. G\u00fcvenilir senkronizasyon.<\/strong> Her takip kayd\u0131 g\u00f6nderiminde SkyPlanner s\u00fcre kayd\u0131 ID&#8217;sini anahtar olarak kullan\u0131n ve olu\u015fturulan X3 takip numaras\u0131n\u0131 saklay\u0131n. B\u00f6ylece tekrarlanan bir webhook ayn\u0131 kayd\u0131 iki kez olu\u015fturmaz. X3&#8217;te kapat\u0131lan veya iptal edilen \u00fcretim emirlerini bir sonraki sorgulamada \u00e7izelgeden kald\u0131r\u0131n. Reddedilen \u00e7a\u011fr\u0131lar\u0131 k\u00f6r\u00fc k\u00f6r\u00fcne yeniden denemek yerine X3&#8217;\u00fcn hata mesaj\u0131yla birlikte g\u00fcnl\u00fc\u011fe kaydedin. X3&#8217;e eri\u015filemiyorsa de\u011fi\u015fiklikleri kuyru\u011fa al\u0131n; ba\u011flant\u0131 yeniden kuruldu\u011funda s\u0131rayla g\u00f6nderilsinler.<\/p>\n\n\n<p><strong>7. Veri sorumlulu\u011fu kurallar\u0131.<\/strong> Neyin \u00fcretilece\u011fini X3 belirler: \u00fcr\u00fcn, miktar, BOM, rota ve tesis. Ne zaman ve nerede \u00fcretilece\u011fini ise SkyPlanner belirler: s\u0131ralama, i\u015f merkezi, ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131. Planlamac\u0131lar\u0131n, SkyPlanner ile y\u00f6netilen emirleri Planning workbench&#8217;te yeniden \u00e7izelgelememesi ve bu emirler i\u00e7in FUNMAUTJ \u00e7al\u0131\u015ft\u0131rmamas\u0131 konusunda anla\u015f\u0131n. Aksi takdirde yapt\u0131klar\u0131 de\u011fi\u015fiklikler bir sonraki geri yazmada silinir.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipik proje ad\u0131mlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Uygulama, devreye alma s\u00fcreci ba\u015flad\u0131ktan sonra genellikle haftalar i\u00e7inde tamamlan\u0131r. Bir Sage X3 projesi \u015fu ad\u0131mlar\u0131 i\u00e7erir:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Kendi verilerinizle deneme.<\/strong> \u0130\u015f merkezlerini, rotalar\u0131 ve a\u00e7\u0131k \u00fcretim emirlerinin anl\u0131k durumunu X3 d\u0131\u015fa aktarma \u015fablonlar\u0131 veya Excel ile d\u0131\u015fa aktar\u0131n, ard\u0131ndan CSV olarak i\u00e7e aktar\u0131n. Gantt ger\u00e7ek durumu yans\u0131tana kadar vardiyalar\u0131, verimlilikleri ve \u00f6ncelikleri ayarlay\u0131n.<\/li>\n\n\n<li><strong>Ana verileri e\u015fleme.<\/strong> GESMWS i\u015f merkezlerini SkyPlanner i\u015f merkezleriyle, GESROU operasyonlar\u0131n\u0131 proses ad\u0131mlar\u0131yla, zaman birimlerini ve haftal\u0131k yap\u0131lar\u0131 da vardiyalarla e\u015fleyin. Bu s\u0131rada i\u015f merkezi atanmam\u0131\u015f rota operasyonlar\u0131n\u0131, \u00e7al\u0131\u015fma saatleri tablosu eksik g\u00fcnleri ve yanl\u0131\u015f zaman birimlerini d\u00fczeltin.<\/li>\n\n\n<li><strong>\u0130lk veri aktar\u0131m\u0131.<\/strong> \u00d6nce \u00fcr\u00fcnler, \u00fcretim \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, rotalar ve i\u015f merkezleri, ard\u0131ndan takvimler aktar\u0131l\u0131r.<\/li>\n\n\n<li><strong>\u00dcretim emri ve sat\u0131n alma sipari\u015fi senkronizasyonu.<\/strong> Ba\u011fl\u0131 uygulama, Syracuse kullan\u0131c\u0131s\u0131, GraphQL sorgular\u0131 veya \u015fablonla d\u0131\u015fa aktarma i\u015flemleri yap\u0131land\u0131r\u0131l\u0131r. \u00dcretim emirleri, stok ve a\u00e7\u0131k sat\u0131n alma sipari\u015fleri i\u00e7in periyodik sorgulama g\u00f6revi olu\u015fturulur.<\/li>\n\n\n<li><strong>\u00c7izelgenin geri yaz\u0131lmas\u0131.<\/strong> Work order SOAP web servisi, hata i\u015fleme ve g\u00fcnl\u00fck kayd\u0131yla birlikte GESAWE \u00fczerinden yay\u0131mlan\u0131r.<\/li>\n\n\n<li><strong>\u00dcretim sahas\u0131 bildirimleri.<\/strong> Mobile Confirmations kay\u0131tlar\u0131, Production tracking (GESMTK) web servisi \u00fczerinden X3&#8217;e g\u00f6nderilir.<\/li>\n\n\n<li><strong>Mevcut planla paralel test.<\/strong> Planlamac\u0131lar ge\u00e7i\u015ften \u00f6nce iki plan\u0131 kar\u015f\u0131la\u015ft\u0131r\u0131r.<\/li>\n\n\n<li><strong>Canl\u0131ya ge\u00e7i\u015f.<\/strong> SkyPlanner&#8217;\u0131n y\u00f6netti\u011fi emirler i\u00e7in X3&#8217;te manuel yeniden \u00e7izelgelemeyi devre d\u0131\u015f\u0131 b\u0131rak\u0131n.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"sage-x3-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage X3&#8217;te dikkat edilmesi gerekenler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u00d6neriler \u00fcretim emri de\u011fildir.<\/strong> MRP \u00f6nerileri, planlanan veya kesinle\u015fmi\u015f \u00fcretim emirlerine d\u00f6n\u00fc\u015ft\u00fcr\u00fclene kadar MFGOPE operasyon sat\u0131r\u0131 i\u00e7ermez. Bu nedenle \u00f6nerileri de\u011fil, d\u00f6n\u00fc\u015ft\u00fcr\u00fclm\u00fc\u015f emirleri \u00e7izelgeleyin.<\/li>\n\n\n<li><strong>Takvimdeki bo\u015fluklar.<\/strong> Saat \u00e7izelgesi olmayan bir \u00e7al\u0131\u015fma g\u00fcn\u00fcnde DEFDIH varsay\u0131lan \u015femas\u0131 kullan\u0131l\u0131r. Varsay\u0131lan\u0131 da olmayan bo\u015f bir g\u00fcn, yanl\u0131\u015f tarihlere ve y\u00fcklere yol a\u00e7ar. Takvimleri d\u0131\u015fa aktarmadan \u00f6nce her haftal\u0131k yap\u0131daki t\u00fcm \u00e7al\u0131\u015fma g\u00fcnlerine bir saat \u00e7izelgesi atay\u0131n.<\/li>\n\n\n<li><strong>G\u00fcncelli\u011fini yitirmi\u015f y\u00fck dilimleri.<\/strong> Kapasite veya takvim de\u011fi\u015fti\u011finde, yeniden \u00e7izelgeleme yap\u0131p Recalculate loads (FUNMIWL) i\u015flevini \u00e7al\u0131\u015ft\u0131rana kadar X3&#8217;teki mevcut y\u00fck dilimleri g\u00fcncellenmez. SkyPlanner&#8217;\u0131 g\u00fcncelli\u011fini yitirmi\u015f bir Loads inquiry (CONSMWK) sonucuyla kar\u015f\u0131la\u015ft\u0131rarak do\u011frulamay\u0131n.<\/li>\n\n\n<li><strong>No. of resources, ekipteki ki\u015fi say\u0131s\u0131n\u0131 belirtir.<\/strong> WSTNBR, bir operasyonun i\u015f merkezinde ihtiya\u00e7 duydu\u011fu kaynak say\u0131s\u0131d\u0131r; \u00f6rne\u011fin i\u015f g\u00fcc\u00fcne dayal\u0131 bir i\u015f merkezinde \u00fc\u00e7 ki\u015fi. Bunu SkyPlanner i\u015f merkezindeki operat\u00f6r say\u0131s\u0131yla e\u015fle\u015ftirin. SkyPlanner b\u00f6ylece ayn\u0131 i\u015fe ayn\u0131 anda birden fazla ki\u015fi atayabilir. GFS geli\u015fmi\u015f aray\u00fcz\u00fcn\u00fc kullanm\u0131\u015f tesislerde bu de\u011fer, Sage&#8217;in gerektirdi\u011fi \u015fekilde 1 olarak ayarlanm\u0131\u015ft\u0131r. Bu nedenle ger\u00e7ek ekip b\u00fcy\u00fckl\u00fc\u011f\u00fcn\u00fcn nerede tutuldu\u011funu kontrol edin.<\/li>\n\n\n<li><strong>\u0130\u015f merkezi tan\u0131mlanmam\u0131\u015f rota operasyonlar\u0131<\/strong> bir i\u015f merkezine yerle\u015ftirilemez. Bu operasyonlar e\u015fle\u015ftirme a\u015famas\u0131nda i\u015faretlenir.<\/li>\n\n\n<li><strong>Zaman birimleri ve alternatif i\u015f merkezleri.<\/strong> Rota s\u00fcrelerinin kendi zaman birimi (TIMUOMCOD), alternatif i\u015f merkezlerinin ise bir \u00f6nceli\u011fi vard\u0131r. Her ikisini de a\u00e7\u0131k\u00e7a e\u015fle\u015ftirin ve her X3 s\u00fcr\u00fcm y\u00fckseltmesinden sonra e\u015fle\u015ftirme kontrol\u00fcn\u00fc yeniden \u00e7al\u0131\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>Kilitli emirler.<\/strong> Tesis daha \u00f6nce Production Scheduler da kulland\u0131ysa, buraya g\u00f6nderilen emirler Being optimized durumundad\u0131r ve \u00e7izelgelemeden \u00e7\u0131kar\u0131lana kadar (PSOPTFREE) de\u011fi\u015ftirilemez. Ge\u00e7i\u015ften \u00f6nce bu emirlerin kilidini kald\u0131r\u0131n.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-sage-x3-integration-who-configures-it\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage X3 entegrasyonunu kim yap\u0131land\u0131r\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00c7al\u0131\u015fma kapsam\u0131nda klas\u00f6rleriniz, rota tan\u0131mlama kurallar\u0131n\u0131z, i\u015f merkezi yap\u0131lar\u0131n\u0131z ve \u00f6zel geli\u015ftirmeleriniz SkyPlanner ile e\u015fle\u015ftirilir. X3&#8217;\u00fcn \u00e7izelgelemede kullan\u0131labilir veri olarak tutmad\u0131\u011f\u0131 k\u0131s\u0131tlar da ele al\u0131n\u0131r: haz\u0131rl\u0131k s\u00fcresi matrisi, tak\u0131mlar, operat\u00f6r say\u0131lar\u0131 ve alternatif kaynaklar.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner ekibi, entegrasyonu devreye alma s\u00fcrecinde yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra destekler.<\/strong> Her tesis X3&#8217;\u00fc farkl\u0131 kullan\u0131r; bu bilgi birikimi de bu a\u015famada devreye girer. Ekip, buluttaki veya \u015firket i\u00e7indeki X3 u\u00e7 noktan\u0131za ba\u011flan\u0131r, e\u015fle\u015ftirme a\u015famas\u0131nda ana verilerinizi do\u011frular ve takip i\u00e7in X3&#8217;\u00fcn reddetti\u011fi i\u015flemleri kaydeder. \u0130lk g\u00fcnden itibaren entegrasyondan kimin sorumlu oldu\u011fu bellidir; \u015firket i\u00e7inde bir entegrasyon geli\u015ftiricisine ihtiyac\u0131n\u0131z yoktur.<\/li>\n\n\n<li><strong>Sage i\u015f orta\u011f\u0131n\u0131z da s\u00fcrece kat\u0131labilir.<\/strong> \u0130\u015f orta\u011f\u0131n\u0131z klas\u00f6rlerinizi, aktivite kodlar\u0131n\u0131z\u0131 ve \u00f6zel geli\u015ftirmelerinizi bilir. Ba\u011fl\u0131 uygulamay\u0131, Syracuse kullan\u0131c\u0131s\u0131n\u0131 ve GESAWE \u00fczerinden yay\u0131mlanan servisleri ekiple birlikte inceleyebilir.<\/li>\n\n\n<li><strong>Kendi geli\u015ftiricileriniz de entegrasyonu kurabilir.<\/strong> SkyPlanner&#8217;\u0131n REST API&#8217;si sipari\u015fleri, \u00fcr\u00fcnleri, malzemeleri, i\u015flem ad\u0131mlar\u0131n\u0131 ve zaman kay\u0131tlar\u0131n\u0131 okur ve yazar; kimlik do\u011frulamada API belirteci kullan\u0131r ve Swagger\/OpenAPI dok\u00fcmantasyonu sunar (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API referans\u0131<\/a>). Ba\u015flamak i\u00e7in bir API anahtar\u0131 yeterlidir; <a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">entegrasyon k\u0131lavuzu<\/a> ilk \u00e7a\u011fr\u0131lar\u0131 ad\u0131m ad\u0131m a\u00e7\u0131klar. SkyPlanner ekibi gerekti\u011finde destek verir. <a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">SkyPlanner dok\u00fcmantasyonu<\/a>, <a href=\"\/tr\/docs\/urunler-ve-malzemeler\/\">\u00fcr\u00fcnler ve malzemeler<\/a> ile <a href=\"\/tr\/docs\/satin-alma-siparisleri-ozelligi-nedir-ve-nasil-kullanilir\/\">sat\u0131n alma sipari\u015flerini<\/a> kapsar. <a href=\"\/tr\/customers\/laboratory-allied\/\">Laboratory &amp; Allied<\/a> b\u00fcnyesindeki BT ekibi, SkyPlanner&#8217;\u0131n deste\u011fiyle entegrasyonun b\u00fcy\u00fck b\u00f6l\u00fcm\u00fcn\u00fc kendi ba\u015f\u0131na ger\u00e7ekle\u015ftirerek SkyPlanner&#8217;\u0131 SAP Business One&#8217;a ba\u011flad\u0131.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"why-x3-teams-pick-skyplanner-as-the-scheduling-l\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">X3 ekipleri \u00e7izelgeleme i\u00e7in neden SkyPlanner&#8217;\u0131 se\u00e7iyor?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Haftalar i\u00e7inde canl\u0131ya ge\u00e7mek istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in;<\/strong> aylar s\u00fcren bir APS projesini beklemeyin.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Entegrasyon tamamlanmadan \u00e7izelgelemeye ba\u015flamak istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in.<\/p>\n\n\n<p class=\"fx-pain__b\">X3&#8217;ten okuma ve X3&#8217;e geri yazma yap\u0131land\u0131r\u0131l\u0131rken, planlamac\u0131lar deneme s\u00fcresince CSV verileriyle \u00e7izelgeleme yapar. Entegrasyon \u00e7al\u0131\u015fmaya ba\u015flad\u0131\u011f\u0131nda dosyadan i\u00e7e aktarman\u0131n yerini al\u0131r.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Az ek altyap\u0131 gerektiren bir entegrasyon istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in.<\/p>\n\n\n<p class=\"fx-pain__b\">Webhook&#8217;lar \u00e7izelge ve durum de\u011fi\u015fikliklerini ger\u00e7ek zamanl\u0131 iletir; b\u00f6ylece ara yaz\u0131l\u0131m\u0131n yaln\u0131zca X3 taraf\u0131n\u0131 periyodik olarak sorgulamas\u0131 gerekir. Arcturus AI motoru \u00e7izelgeyi saniyeler i\u00e7inde olu\u015fturur. Autopilot ise \u00fcretimde de\u011fi\u015fiklik oldu\u011funda otomatik olarak yeniden \u00e7izelgeleme yapar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">X3 verilerinizin ger\u00e7ek k\u0131s\u0131tlar\u0131 yans\u0131tan bir modele temel olu\u015fturmas\u0131 gerekiyorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/p>\n\n\n<p class=\"fx-pain__b\">Ekip b\u00fcy\u00fckl\u00fckleri, bir i\u015f merkezinde birden fazla operat\u00f6r olarak; alternatif i\u015f merkezleri ise alternatif makineler olarak modellenir. Haz\u0131rl\u0131k s\u00fcresi matrisi, \u00fcr\u00fcnler aras\u0131ndaki s\u0131raya ba\u011fl\u0131 ge\u00e7i\u015f s\u00fcrelerini ekler. Tak\u0131mlar s\u0131n\u0131rl\u0131 kaynaklar olarak ele al\u0131n\u0131r; bu nedenle bir makinede kullan\u0131lan fikst\u00fcr ayn\u0131 anda ba\u015fka bir makineye asla atanmaz.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u00dcretim takibinin \u00fcretim sahas\u0131ndan ba\u015flamas\u0131n\u0131 istiyorsan\u0131z SkyPlanner&#8217;\u0131 se\u00e7in.<\/p>\n\n\n<p class=\"fx-pain__b\">Operat\u00f6rler, Mobile Confirmations, Production Timer ve Quick Log Mode ile telefon veya tabletten i\u015flerini kaydeder. Ayn\u0131 s\u00fcre kay\u0131tlar\u0131, \u00fcretim takibi olarak X3&#8217;e g\u00f6nderilir.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Fiyatlar, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar ve ayl\u0131k faturaland\u0131r\u0131l\u0131r. Entegrasyon i\u00e7in s\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan teklif, plan\u0131n\u0131zla birlikte ba\u015ftan sunulur. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz. <a href=\"\/tr\/fiyatlandirma\/\">Fiyatland\u0131rmay\u0131<\/a> ve <a href=\"\/tr\/ozellikler\/\">\u00f6zellikleri<\/a> inceleyin veya kredi kart\u0131 gerekmeden, 20 i\u015f merkezine kadar kullanabilece\u011finiz 30 g\u00fcnl\u00fck \u00fccretsiz denemeyi ba\u015flat\u0131n.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>her hafta sa\u011flanan zaman tasarrufu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt ekipmanlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saat \u00e7al\u0131\u015fma s\u00fcresinden tasarruf sa\u011flan\u0131yor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/customers\/utu\/\">UTU&#8217;nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan, optimize edilmi\u015f \u00fc\u00e7 ayl\u0131k bir plan\u0131 haz\u0131rlamak 30 dakikadan k\u0131sa s\u00fcr\u00fcyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/customers\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 tesisinde kaynakl\u0131 \u00e7elik bir yap\u0131y\u0131 ta\u015flayan KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%98<\/b><span>teslimat performans\u0131; yakla\u015f\u0131k %50&#8217;den y\u00fckseldi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumada belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal i\u015fleme ve fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k %50&#8217;den %98&#8217;e kadar y\u00fckseldi. \u00c7izelgeleme i\u00e7in art\u0131k iki yerine bir \u015fef yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/customers\/kjh-comp\/\">KJH-Comp&#8217;un yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel&#x27;in Kauhava&#x27;daki \u00e7at\u0131 g\u00fcvenlik sistemleri fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 daha g\u00f6r\u00fcn\u00fcr hale getirdi ve \u00fcretim y\u00f6netimine netlik kazand\u0131rd\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenli\u011fi ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 bu y\u0131l %99,2&#8217;ye ula\u015ft\u0131. \u00c7izelgelemede ise g\u00fcnde d\u00f6rt saate kadar \u00e7al\u0131\u015fma s\u00fcresinden tasarruf sa\u011flan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/customers\/piristeel\/\">Piristeel&#8217;in yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner APS, Sage X3 ile nas\u0131l entegre edilir?<\/summary>\n<p class=\"sp-faq__a\">Entegrasyon; GraphQL, REST api1, SOAP web servisleri ve \u015fablonlar \u00fczerinden \u00e7ift y\u00f6nl\u00fc \u00e7al\u0131\u015f\u0131r. \u00dcretim emirleri, rotalar ve i\u015f merkezleri SkyPlanner&#8217;a al\u0131n\u0131r. Planlanan operasyon tarihleri ve kaydedilen \u00e7al\u0131\u015fma saatleri, \u00e7izelge de\u011fi\u015ftik\u00e7e webhook&#8217;lar arac\u0131l\u0131\u011f\u0131yla geri g\u00f6nderilir. SkyPlanner ekibi entegrasyonu devreye alma s\u00fcrecinde yap\u0131land\u0131r\u0131r. Alternatif olarak Sage X3 i\u015f orta\u011f\u0131n\u0131z veya geli\u015ftiricileriniz, SkyPlanner REST API \u00fczerinden entegrasyon geli\u015ftirebilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Operasyon tarihleri Sage X3&#8217;e nas\u0131l geri yaz\u0131l\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Web services (GESAWE) i\u015flevinde SOAP web servisi olarak yay\u0131mlanan Work order (GESMFG) nesnesi kullan\u0131l\u0131r. Nesnenin modify i\u015flemi, her operasyonda Start (OPESTR), End (OPEEND) alanlar\u0131n\u0131 ve i\u015f merkezini g\u00fcnceller. Toplu g\u00fcncellemelerde, AOWSIMPORT \u00fczerinden bir \u00fcretim emri i\u00e7e aktarma \u015fablonu \u00e7al\u0131\u015ft\u0131r\u0131l\u0131r. \u00c7al\u0131\u015fma saatleri ve miktarlar, Production tracking (GESMTK) nesnesi \u00fczerinden g\u00f6nderilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>GraphQL mi yoksa SOAP web servislerini mi kullanmal\u0131y\u0131z?<\/summary>\n<p class=\"sp-faq__a\">Her ikisini de, g\u00fc\u00e7l\u00fc olduklar\u0131 alanlarda kullan\u0131n. Sage&#8217;in \u00f6nerdi\u011fi API olan GraphQL, hem bulutta hem \u015firket i\u00e7i kurulumlarda \u00fcr\u00fcn, tesis, sat\u0131n alma ve stok verilerini okur. SOAP nesne web servisleri \u00e7izelgeyi ve \u00fcretim takip kay\u0131tlar\u0131n\u0131 yazar. SOAP Template Services ise toplu veri aktar\u0131mlar\u0131 i\u00e7in i\u00e7e ve d\u0131\u015fa aktarma \u015fablonlar\u0131n\u0131 \u00e7al\u0131\u015ft\u0131r\u0131r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00fckerrer kay\u0131tlar\u0131 veya de\u011fi\u015fikliklerin kaybolmas\u0131n\u0131 nas\u0131l \u00f6nleriz?<\/summary>\n<p class=\"sp-faq__a\">Her Production tracking g\u00f6nderiminde anahtar olarak SkyPlanner s\u00fcre kayd\u0131 kimli\u011fini kullan\u0131n ve d\u00f6nen X3 takip numaras\u0131n\u0131 saklay\u0131n. B\u00f6ylece tekrarlanan webhook tan\u0131n\u0131r ve atlan\u0131r. X3&#8217;e eri\u015filemedi\u011finde de\u011fi\u015fiklikleri kuyru\u011fa al\u0131n; eri\u015fim sa\u011fland\u0131\u011f\u0131nda s\u0131rayla g\u00f6nderin. Firm durumunda olmayan bir \u00fcretim emrine takip kayd\u0131 g\u00f6nderilmesi gibi reddedilen i\u015flemleri, X3&#8217;\u00fcn hata mesaj\u0131yla birlikte kaydedin.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner i\u00e7in POPS veya GFS aktivite kodlar\u0131 gerekiyor mu?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. Bu kodlar Sage&#8217;in kendi Production Scheduler \u00fcr\u00fcn\u00fcn\u00fc ve Web Scheduling i\u00e7in genel aray\u00fcz\u00fc etkinle\u015ftirir. SkyPlanner, \u00fcretim emirlerini GraphQL, REST api1 veya \u015fablonlar \u00fczerinden okur; Work order ve Production tracking SOAP web servisleri \u00fczerinden geri yazar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner, Sage X3&#8217;teki yeni \u00fcretim emirlerini nas\u0131l al\u0131r?<\/summary>\n<p class=\"sp-faq__a\">Entegrasyon, GraphQL, REST api1 veya \u015fablonlarla d\u0131\u015fa aktar\u0131lan veriler \u00fczerinden ya da bulutta Sync API arac\u0131l\u0131\u011f\u0131yla k\u0131sa aral\u0131klarla X3 verilerini okur. Ters y\u00f6nde ise SkyPlanner&#8217;\u0131n webhook&#8217;lar\u0131, \u00e7izelge de\u011fi\u015fikliklerini an\u0131nda iletir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Entegrasyonu geli\u015ftirmeye ba\u015flamadan \u00f6nce Sage X3 verileriyle test yapabilir miyiz?<\/summary>\n<p class=\"sp-faq__a\">Evet. <a href=\"\/tr\/deneme\/\">30 g\u00fcnl\u00fck deneme<\/a> s\u00fcresince i\u015f merkezlerini, rotalar\u0131 ve a\u00e7\u0131k \u00fcretim emirlerini i\u00e7eren, d\u0131\u015fa aktar\u0131lm\u0131\u015f CSV dosyalar\u0131n\u0131 i\u00e7e aktarabilirsiniz. X3 entegrasyonunun kapsam\u0131n\u0131 belirlemek i\u00e7in <a href=\"\/tr\/iletisim-satis\/\">sat\u0131\u015f ekibiyle ileti\u015fime ge\u00e7in<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Sage X3 SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in Sage X3 Entegrasyon K\u0131lavuzu Bu k\u0131lavuz, Sage i\u015f ortaklar\u0131na ve BT ekiplerine Sage X3 ile SkyPlanner APS aras\u0131nda nas\u0131l ba\u011flant\u0131 kurulaca\u011f\u0131n\u0131 g\u00f6sterir. Hangi X3 aray\u00fczlerinin kullan\u0131laca\u011f\u0131n\u0131, verilerin hangi nesnelerle ta\u015f\u0131naca\u011f\u0131n\u0131 ve projelerde nerelerde sorun ya\u015fand\u0131\u011f\u0131n\u0131 ele al\u0131r. SkyPlanner, hem buluttaki hem de \u015firket &#8230; <a title=\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in Sage X3 Entegrasyon K\u0131lavuzu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/entegrasyon-kilavuzu\/\" aria-label=\"Read more about SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in Sage X3 Entegrasyon K\u0131lavuzu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100926,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101403","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sage X3 APS \u00c7izelgeleme Entegrasyon K\u0131lavuzu | SkyPlanner<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS\u2013Sage X3: connected-app JWT ile GraphQL, SOAP i\u00e7e aktarma \u015fablonlar\u0131, \u00fcretim emri e\u015fleme, tarihleri geri yazma ve X3&#039;te dikkat edilecekler.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/entegrasyon-kilavuzu\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in Sage X3 Entegrasyon K\u0131lavuzu\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS\u2013Sage X3: connected-app JWT ile GraphQL, SOAP i\u00e7e aktarma \u015fablonlar\u0131, \u00fcretim emri e\u015fleme, tarihleri geri yazma ve X3&#039;te dikkat edilecekler.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/entegrasyon-kilavuzu\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-x3\\\/entegrasyon-kilavuzu\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-x3\\\/entegrasyon-kilavuzu\\\/\",\"name\":\"Sage X3 APS \u00c7izelgeleme Entegrasyon K\u0131lavuzu | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS\u2013Sage X3: connected-app JWT ile GraphQL, SOAP i\u00e7e aktarma \u015fablonlar\u0131, \u00fcretim emri e\u015fleme, tarihleri geri yazma ve X3'te dikkat edilecekler.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-x3\\\/entegrasyon-kilavuzu\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-x3\\\/entegrasyon-kilavuzu\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-x3\\\/entegrasyon-kilavuzu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Sage X3 i\u00e7in SkyPlanner APS: \u00dcretim \u00c7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sage-x3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in Sage X3 Entegrasyon K\u0131lavuzu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sage X3 APS \u00c7izelgeleme Entegrasyon K\u0131lavuzu | SkyPlanner","description":"SkyPlanner APS\u2013Sage X3: connected-app JWT ile GraphQL, SOAP i\u00e7e aktarma \u015fablonlar\u0131, \u00fcretim emri e\u015fleme, tarihleri geri yazma ve X3'te dikkat edilecekler.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/entegrasyon-kilavuzu\/","og_locale":"tr_TR","og_type":"article","og_title":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in Sage X3 Entegrasyon K\u0131lavuzu","og_description":"SkyPlanner APS\u2013Sage X3: connected-app JWT ile GraphQL, SOAP i\u00e7e aktarma \u015fablonlar\u0131, \u00fcretim emri e\u015fleme, tarihleri geri yazma ve X3'te dikkat edilecekler.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/entegrasyon-kilavuzu\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"19 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/entegrasyon-kilavuzu\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/entegrasyon-kilavuzu\/","name":"Sage X3 APS \u00c7izelgeleme Entegrasyon K\u0131lavuzu | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS\u2013Sage X3: connected-app JWT ile GraphQL, SOAP i\u00e7e aktarma \u015fablonlar\u0131, \u00fcretim emri e\u015fleme, tarihleri geri yazma ve X3'te dikkat edilecekler.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/entegrasyon-kilavuzu\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/entegrasyon-kilavuzu\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/entegrasyon-kilavuzu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Sage X3 i\u00e7in SkyPlanner APS: \u00dcretim \u00c7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sage-x3\/"},{"@type":"ListItem","position":5,"name":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in Sage X3 Entegrasyon K\u0131lavuzu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Sage X3 SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in Sage X3 Entegrasyon K\u0131lavuzu Bu k\u0131lavuz, Sage i\u015f ortaklar\u0131na ve BT ekiplerine Sage X3 ile SkyPlanner APS aras\u0131nda nas\u0131l ba\u011flant\u0131 kurulaca\u011f\u0131n\u0131 g\u00f6sterir. Hangi X3 aray\u00fczlerinin kullan\u0131laca\u011f\u0131n\u0131, verilerin hangi nesnelerle ta\u015f\u0131naca\u011f\u0131n\u0131 ve projelerde nerelerde sorun ya\u015fand\u0131\u011f\u0131n\u0131 ele al\u0131r. SkyPlanner, hem buluttaki hem de \u015firket&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/101403","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=101403"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/101403\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100926"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=101403"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}