{"id":101194,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101194"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"uretim-cizelgeleme","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/uretim-cizelgeleme\/","title":{"rendered":"Odoo&#8217;da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi Nas\u0131l \u00c7al\u0131\u015f\u0131r, SkyPlanner APS Ne Zaman Gerekir?"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ Odoo<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Odoo&#8217;da \u00dcretim \u00c7izelgeleme Var m\u0131? <span class=\"hl\">Planla D\u00fc\u011fmesi Nas\u0131l \u00c7al\u0131\u015f\u0131r, SkyPlanner APS Ne Zaman Gerekir?<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Odoo&#8217;da ger\u00e7ek makine ve personel kapasitesini dikkate alan temel d\u00fczeyde \u00fcretim \u00e7izelgeleme vard\u0131r. Odoo Manufacturing&#8217;deki <strong>Planla<\/strong> d\u00fc\u011fmesi, her \u00fcretim emrini ilgili i\u015f merkezinin takvimindeki ilk bo\u015f zaman aral\u0131\u011f\u0131na yerle\u015ftirir. B\u00f6ylece ayn\u0131 i\u015f merkezinde planlanm\u0131\u015f iki \u00fcretim emri asla \u00e7ak\u0131\u015fmaz. Ancak her seferinde tek bir imalat emrini, tek bir k\u0131s\u0131ta g\u00f6re planlar; emirler aras\u0131nda yeniden s\u0131ralama, optimizasyon veya yeniden planlama yapmaz. T\u00fcm emirlerini termin tarihlerine ve haz\u0131rl\u0131k ihtiya\u00e7lar\u0131na g\u00f6re s\u0131ralamas\u0131 gereken tesisler, Odoo&#8217;nun yan\u0131nda SkyPlanner APS kullan\u0131r.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo randevusu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve altta sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Odoo, kendi pazarlama sayfas\u0131nda &#8220;plan resources with finite capacity planning&#8221; (kaynaklar\u0131 mevcut kapasitelerini a\u015fmadan planlay\u0131n) ifadesini kullan\u0131r (<a href=\"https:\/\/www.odoo.com\/app\/manufacturing\">odoo.com\/app\/manufacturing<\/a>). A\u015fa\u011f\u0131da, resm\u00ee dok\u00fcmanlar ve kaynak kod \u00fczerinden bunun Odoo 19.0&#8217;da ne anlama geldi\u011fini ele al\u0131yoruz: Planla nas\u0131l \u00e7al\u0131\u015f\u0131r, nerede yetersiz kal\u0131r ve hangi durumlarda tek ba\u015f\u0131na yeterlidir?<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-odoo-plans-work-orders-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Odoo \u00fcretim emirlerini ad\u0131m ad\u0131m nas\u0131l planlar?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. \u00dcretim emirlerini etkinle\u015ftirin ve i\u015f merkezlerini yap\u0131land\u0131r\u0131n<\/h3>\n\n\n<p><strong>Manufacturing &gt; Configuration &gt; Settings<\/strong> yolunu izleyip <strong>Work Orders<\/strong> se\u00e7ene\u011fini etkinle\u015ftirin. Ard\u0131ndan <strong>Configuration<\/strong> alt\u0131nda <strong>Work Centers<\/strong> g\u00f6r\u00fcn\u00fcr. Her i\u015f merkezinde (<code>mrp.workcenter<\/code>) planlamac\u0131n\u0131n kulland\u0131\u011f\u0131 \u015fu alanlar bulunur:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Alan<\/th><th>Planlamadaki i\u015flevi<\/th><\/tr><\/thead><tbody><tr><td>Working Hours<\/td><td>\u0130\u015f merkezinin kulland\u0131\u011f\u0131 kaynak takvimi. Varsay\u0131lan\u0131 pazartesiden cumaya ge\u00e7erli olan &#8220;Standart 40 saat\/hafta&#8221; takvimidir<\/td><\/tr><tr><td>Time Efficiency<\/td><td>Bu i\u015f merkezindeki her \u00fcretim emrini h\u0131zland\u0131ran veya yava\u015flatan y\u00fczde de\u011feri<\/td><\/tr><tr><td>Setup Time \/ Cleanup Time<\/td><td>Her \u00fcretim emrinden \u00f6nce ve sonra eklenen s\u00fcreler, dakika cinsinden<\/td><\/tr><tr><td>Alternative Workcenters<\/td><td>Planla i\u015flevinin mevcut i\u015f merkezi yerine kullanabilece\u011fi di\u011fer i\u015f merkezleri<\/td><\/tr><tr><td>\u00dcr\u00fcn Kapasiteleri sekmesi<\/td><td>\u00c7evrim ba\u015f\u0131na par\u00e7a say\u0131s\u0131 ve \u00fcr\u00fcne \u00f6zel haz\u0131rl\u0131k ve temizlik s\u00fcreleri, dakika cinsinden (<code>mrp.workcenter.capacity<\/code>)<\/td><\/tr><tr><td>OEE Target<\/td><td>Raporlamada kullan\u0131lan performans hedefi; planlama girdisi de\u011fildir<\/td><\/tr><tr><td>Allowed Employees<\/td><td>Burada kimlerin \u00e7al\u0131\u015fabilece\u011fini belirler. Kapasite de\u011fil, filtredir<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">2. \u00dcr\u00fcn re\u00e7etesindeki operasyonlar<\/h3>\n\n\n<p>Ortak bir ana rota kayd\u0131 yoktur. Operasyonlar, her \u00fcr\u00fcn a\u011fac\u0131n\u0131n <strong>Operasyonlar<\/strong> sekmesinde tutulur (<code>mrp.routing.workcenter<\/code>). Her operasyonda bir <strong>Work Center<\/strong> ve <strong>Duration Computation<\/strong> ayar\u0131 bulunur: girdi\u011finiz sabit bir s\u00fcre ya da son \u00fcretim emirlerinden hesaplanan bir s\u00fcre (varsay\u0131lan olarak 10 emir). Beklenen s\u00fcre; haz\u0131rl\u0131k s\u00fcresi, temizlik s\u00fcresi ve \u00e7evrim say\u0131s\u0131 ile \u00e7evrim s\u00fcresinin \u00e7arp\u0131m\u0131n\u0131n toplam\u0131d\u0131r. \u00c7evrimlere ait k\u0131s\u0131m Time Efficiency de\u011ferine b\u00f6l\u00fcn\u00fcr (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_routing.py\">mrp_routing.py<\/a>).<\/p>\n\n\n<p><strong>Work Order Dependencies<\/strong> etkinle\u015ftirildi\u011finde, bir operasyonun ba\u015fka bir operasyon tamamlanana kadar beklemesi <strong>Blocked By<\/strong> alan\u0131yla tan\u0131mlanabilir. Odoo dok\u00fcmanlar\u0131 bunu \u015f\u00f6yle a\u00e7\u0131klar: &#8220;A blocked work order is scheduled at the end of the time period specified in the Expected Duration field of the work order that precedes it.&#8221; (Bekletilen \u00fcretim emri, kendisinden \u00f6nceki \u00fcretim emrinin Expected Duration alan\u0131nda belirtilen s\u00fcrenin sonuna planlan\u0131r.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/work_order_dependencies.html\">kaynak<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. \u0130malat emrini onaylay\u0131n, ard\u0131ndan Planla&#8217;ya bas\u0131n<\/h3>\n\n\n<p>Bir imalat emrini (<code>mrp.production<\/code>) onaylad\u0131\u011f\u0131n\u0131zda, ona ba\u011fl\u0131 \u00fcretim emirleri (<code>mrp.workorder<\/code>) olu\u015fturulur. \u0130malat emrindeki <strong>Planla<\/strong> d\u00fc\u011fmesine bast\u0131\u011f\u0131n\u0131zda sistem son \u00fcretim emirlerinden ba\u015flar ve ba\u011f\u0131ml\u0131l\u0131k zincirinde geriye giderek \u00f6nce tamamlanmas\u0131 gereken her \u00fcretim emrini planlar. Her \u00fcretim emri, \u00f6nc\u00fcllerinin sonras\u0131na, zamanda ileriye do\u011fru yerle\u015ftirilir. Odoo her \u00fcretim emri i\u00e7in \u015fu ad\u0131mlar\u0131 izler:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>\u0130malat emrinin ba\u015flang\u0131c\u0131, \u015fu an ve \u00f6nc\u00fcl \u00fcretim emirlerinin biti\u015fi aras\u0131ndan en ge\u00e7 olan zaman\u0131 esas al\u0131r.<\/li>\n\n\n<li>Birincil i\u015f merkezini ve Alternative Workcenter alan\u0131nda tan\u0131mlanan t\u00fcm i\u015f merkezlerini dener.<\/li>\n\n\n<li>Her takvimde ileriye do\u011fru arama yaparak beklenen s\u00fcreyi kar\u015f\u0131layacak uzunluktaki ilk bo\u015f aral\u0131\u011f\u0131 bulur.<\/li>\n\n\n<li>\u0130\u015fi en erken bitiren i\u015f merkezini se\u00e7er ve ilgili zaman aral\u0131\u011f\u0131n\u0131 o takvimde bir <code>resource.calendar.leaves<\/code> kayd\u0131 olu\u015fturarak ay\u0131r\u0131r.<\/li>\n\n<\/ol>\n\n\n<p>19.0 kaynak kodu kural\u0131 a\u00e7\u0131k\u00e7a belirtir: &#8220;The available interval is disjoinct with all other workorders planned on this workcenter&#8221; (Uygun zaman aral\u0131\u011f\u0131, bu i\u015f merkezinde planlanm\u0131\u015f di\u011fer \u00fcretim emirlerinin hi\u00e7biriyle \u00e7ak\u0131\u015fmaz) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_workcenter.py\">mrp_workcenter.py<\/a>). Sonlu kapasiteyi sa\u011flayan k\u0131s\u0131m budur. \u00c7al\u0131\u015f\u0131lmayan bir zaman aral\u0131\u011f\u0131na denk gelen \u00fcretim emri, bir sonraki \u00e7al\u0131\u015fma aral\u0131\u011f\u0131nda devam eder. Varsay\u0131lan arama aral\u0131\u011f\u0131 olan 700 g\u00fcn i\u00e7inde uygun yer bulunamazsa Planla, &#8220;Impossible to plan the workorder.&#8221; (\u00dcretim emri planlanam\u0131yor.) mesaj\u0131yla durur.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. \u00c7al\u0131\u015f\u0131lmayan zamanlar ve alternatifler<\/h3>\n\n\n<p><strong>Time Off<\/strong> uygulamas\u0131 ve geli\u015ftirici moduyla, bir i\u015f merkezini bak\u0131m veya tatil nedeniyle kullan\u0131ma kapatabilirsiniz. Planla bu durumda \u00fcretim emirlerini Alternative Workcenters olarak tan\u0131mlanan i\u015f merkezlerine y\u00f6nlendirir. Alternatif yoksa Odoo dok\u00fcmanlar\u0131na g\u00f6re &#8220;work orders begin to pile up at the work center until it is operational again&#8221; (i\u015f merkezi yeniden \u00e7al\u0131\u015f\u0131r duruma gelene kadar \u00fcretim emirleri burada birikmeye ba\u015flar) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/work_center_time_off.html\">kaynak<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. G\u00f6zden ge\u00e7irin ve d\u00fczenleyin<\/h3>\n\n\n<p><strong>Manufacturing &gt; Planning &gt; Planning by Production<\/strong> ve <strong>Planning by Workcenter<\/strong> men\u00fcleri, Work Orders Planning g\u00f6r\u00fcn\u00fcmlerini a\u00e7ar. Enterprise&#8217;da s\u00fcr\u00fckle-b\u0131rak \u00f6zellikli bir Gantt \u015femas\u0131 bulunur. Community&#8217;de liste, takvim, pivot ve grafik g\u00f6r\u00fcn\u00fcmleri vard\u0131r. Dok\u00fcmanlar, d\u00fczenlemelerin elle yap\u0131ld\u0131\u011f\u0131n\u0131 belirtir: &#8220;Times and planned work centers can be changed by clicking to access the individual work order.&#8221; (\u0130lgili \u00fcretim emrine t\u0131klanarak zamanlar ve planlanan i\u015f merkezleri de\u011fi\u015ftirilebilir.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/using_work_centers.html\">kaynak<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-odoo-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Odoo nerede yetersiz kal\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0130lk gelen \u00f6nce planlan\u0131r.<\/strong> Planla, imalat emirlerini tek tek ele al\u0131r; \u00f6nce planlad\u0131\u011f\u0131n\u0131z emir, en erken bo\u015f aral\u0131klar\u0131 al\u0131r. Birden fazla imalat emri se\u00e7erseniz Odoo bunlar\u0131 varsay\u0131lan s\u0131ras\u0131na g\u00f6re planlar: \u00f6nce \u00f6ncelik, ard\u0131ndan ba\u015flang\u0131\u00e7 tarihi. Termin tarihleri ile tip de\u011fi\u015fimleri aras\u0131nda bir denge kurulmaz; daha acil bir emre yer a\u00e7mak i\u00e7in planlanm\u0131\u015f bir imalat emri kayd\u0131r\u0131lmaz.<\/li>\n\n\n<li><strong>Haz\u0131rl\u0131\u011fa g\u00f6re s\u0131ralama yoktur.<\/strong> Setup Time, her \u00fcretim emrine eklenen sabit bir s\u00fcredir. \u00d6ncesinde hangi i\u015fin yap\u0131ld\u0131\u011f\u0131na bak\u0131lmaks\u0131z\u0131n ayn\u0131 dakika de\u011feri kullan\u0131l\u0131r. Odoo&#8217;da tip de\u011fi\u015fimi matrisi yoktur ve tip de\u011fi\u015fimlerini \u00f6nlemek i\u00e7in benzer i\u015fler gruplanmaz.<\/li>\n\n\n<li><strong>Tek k\u0131s\u0131t vard\u0131r.<\/strong> Plan\u0131 yaln\u0131zca i\u015f merkezi takvimi s\u0131n\u0131rlar. Operat\u00f6rler, Allowed Employees filtresiyle tan\u0131mlan\u0131r. Planla bir zaman aral\u0131\u011f\u0131n\u0131 ay\u0131r\u0131rken tak\u0131m ve malzeme uygunlu\u011funu kontrol etmez. Bile\u015fen rezervasyonlar\u0131 ve sat\u0131n alma sipari\u015fi tarihleri yaln\u0131zca ikmal i\u015flemlerinde kullan\u0131l\u0131r.<\/li>\n\n\n<li><strong>MRP kapasiteyi dikkate almaz.<\/strong> Yeniden sipari\u015f kurallar\u0131 ve MTO, \u00fcr\u00fcn re\u00e7etesindeki <strong>Manuf. Lead Time<\/strong> de\u011ferini takvim g\u00fcn\u00fc olarak kullanarak imalat emirleri olu\u015fturur. Dok\u00fcmanlarda \u015f\u00f6yle belirtilir: &#8220;Lead times do not consider weekends, holidays, or work center capacity&#8221; (Lead time de\u011ferleri hafta sonlar\u0131n\u0131, tatilleri veya i\u015f merkezi kapasitesini dikkate almaz) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/inventory\/warehouses_storage\/replenishment\/lead_times.html\">kaynak<\/a>). \u0130malat emirlerinin son tarihleri ve taahh\u00fct edilen teslimat tarihleri, ger\u00e7ek i\u015f kuyru\u011funa de\u011fil takvim g\u00fcnlerine dayan\u0131r.<\/li>\n\n\n<li><strong>MPS bir \u00f6neri listesidir.<\/strong> Ana \u00fcretim \u00e7izelgesi (Enterprise) de i\u015f y\u00fck\u00fcn\u00fc dikkate almaz. &#8220;The MPS only suggests the amount of product to be replenished, requiring the user to actually create the replenishing POs\/MOs.&#8221; (MPS yaln\u0131zca ikmal edilecek \u00fcr\u00fcn miktar\u0131n\u0131 \u00f6nerir; ilgili sat\u0131n alma ve imalat emirlerini kullan\u0131c\u0131n\u0131n olu\u015fturmas\u0131 gerekir.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/use_mps.html\">kaynak<\/a>)<\/li>\n\n\n<li><strong>Otomatik yeniden planlama yoktur.<\/strong> Bir ar\u0131za veya acil sipari\u015f, plandaki hi\u00e7bir i\u015fi kendili\u011finden kayd\u0131rmaz. Bir \u00fcretim emri ba\u015flad\u0131ktan sonra Odoo, ilgili imalat emrinin plan\u0131n\u0131 kald\u0131rmaya izin vermez: &#8220;Some work orders have already started, so you cannot unplan this manufacturing order.&#8221; (Baz\u0131 \u00fcretim emirleri zaten ba\u015flad\u0131\u011f\u0131 i\u00e7in bu imalat emrinin plan\u0131n\u0131 kald\u0131ramazs\u0131n\u0131z.) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_production.py\">mrp_production.py<\/a>)<\/li>\n\n\n<li><strong>Alt montajlar ayr\u0131 planlan\u0131r.<\/strong> \u00c7ok seviyeli \u00fcr\u00fcn re\u00e7eteleri, her biri ba\u011f\u0131ms\u0131z olarak planlanan ayr\u0131 alt imalat emirleri olu\u015fturur. Alt montaj\u0131n, \u00fcst operasyonda ihtiya\u00e7 duyuldu\u011fu anda haz\u0131r olmas\u0131 i\u00e7in planlamac\u0131n\u0131n bu emirleri do\u011fru s\u0131rayla planlamas\u0131 gerekir.<\/li>\n\n\n<li><strong>Gantt ve MPS, Enterprise&#8217;a \u00f6zeldir.<\/strong> S\u00fcr\u00fcmleri kar\u015f\u0131la\u015ft\u0131ran sayfada Manufacturing kapsam\u0131ndaki &#8220;Scheduling&#8221; (\u00e7izelgeleme) ve &#8220;Shopfloor&#8221; (\u00fcretim sahas\u0131) \u00f6zellikleri yaln\u0131zca Enterprise&#8217;da sunulur (<a href=\"https:\/\/www.odoo.com\/page\/editions\">odoo.com\/page\/editions<\/a>). Community kullanan planlamac\u0131lar listeler ve takvim \u00fczerinden \u00e7al\u0131\u015f\u0131r.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-odoo-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Odoo&#8217;nun kendi planlamas\u0131 ne zaman yeterlidir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Odoo&#8217;nun Planla d\u00fc\u011fmesi \u015fu durumlarda i\u015finizi g\u00f6r\u00fcr:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Her operasyonun hangi i\u015f merkezinde yap\u0131laca\u011f\u0131 bellidir ve \u00fcretim hacimleri orta d\u00fczeydedir.<\/li>\n\n\n<li>Ayn\u0131 darbo\u011faz\u0131 kullanan az say\u0131da emir vard\u0131r; bu nedenle ilk gelenin \u00f6nce planlanmas\u0131 kabul edilebilir tarihler verir.<\/li>\n\n\n<li>Alternatif makineleriniz birbirinin ayn\u0131d\u0131r; dolay\u0131s\u0131yla Alternative Workcenters ve Time Off, aksakl\u0131klar\u0131n \u00e7o\u011funu y\u00f6netmek i\u00e7in yeterlidir.<\/li>\n\n\n<li>Haz\u0131rl\u0131k s\u00fcreleri k\u0131sad\u0131r veya bir \u00f6nceki i\u015fe ba\u011fl\u0131 de\u011fildir.<\/li>\n\n\n<li>Planlamac\u0131, Planning by Workcenter g\u00f6r\u00fcn\u00fcm\u00fcn\u00fc g\u00fcnde bir kez inceleyip az say\u0131daki \u00e7ak\u0131\u015fmay\u0131 elle d\u00fczeltebilir.<\/li>\n\n<\/ul>\n\n\n<p>Tesisiniz bu ko\u015fullara uyuyorsa \u00e7aban\u0131z\u0131 veri kalitesine y\u00f6neltin. Her i\u015f merkezi i\u00e7in bir takvim tan\u0131mlay\u0131n ve Setup Time ile Cleanup Time alanlar\u0131na ger\u00e7ek\u00e7i s\u00fcreler girin. Ge\u00e7mi\u015f verilerin tutars\u0131z oldu\u011fu durumlarda sabit s\u00fcreler kullan\u0131n, ba\u011f\u0131ml\u0131l\u0131klar\u0131 etkinle\u015ftirin ve imalat emirlerini \u00f6ncelik s\u0131ras\u0131na g\u00f6re planlay\u0131n.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131 ne zaman gerekir?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A\u015fa\u011f\u0131dakilerden birka\u00e7\u0131 sizin i\u00e7in ge\u00e7erliyse Planla art\u0131k ihtiya\u00e7lar\u0131n\u0131z\u0131 kar\u015f\u0131lam\u0131yor demektir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u00c7ok say\u0131da emir iki veya daha fazla darbo\u011faz\u0131 payla\u015f\u0131r ve s\u0131ralamay\u0131 termin tarihlerinin belirlemesi gerekir.<\/li>\n\n\n<li>Haz\u0131rl\u0131k, bir \u00f6nceki i\u015fe ba\u011fl\u0131d\u0131r; bu y\u00fczden i\u015flerin s\u0131ras\u0131 \u00fcretim miktar\u0131n\u0131 de\u011fi\u015ftirir.<\/li>\n\n\n<li>Personel ve vardiyalar, plan\u0131 makineler kadar s\u0131n\u0131rlar.<\/li>\n\n\n<li>Bir i\u015fin ne zaman ba\u015flayabilece\u011fini malzemenin geli\u015f tarihi belirler.<\/li>\n\n\n<li>Acil sipari\u015fler, ar\u0131zalar ve geciken teslimatlar, haftada birka\u00e7 kez yeniden planlama yapman\u0131z\u0131 gerektirir.<\/li>\n\n\n<li>Sat\u0131\u015f ekibi, Manuf. Lead Time de\u011ferine de\u011fil ger\u00e7ek i\u015f kuyru\u011funa dayanan teslimat tarihlerine ihtiya\u00e7 duyar.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Hangi \u00f6zellikleri aramal\u0131s\u0131n\u0131z?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Vardiyalar, personel ve devams\u0131zl\u0131klarla birlikte <strong>t\u00fcm i\u015f merkezlerinin ger\u00e7ek kapasitesini ayn\u0131 anda dikkate alma<\/strong>.<\/li>\n\n\n<li>\u0130malat emirlerini tek tek ele almak yerine, termin tarihi ve \u00f6nceli\u011fe g\u00f6re <strong>t\u00fcm emirleri birlikte s\u0131ralama<\/strong>.<\/li>\n\n\n<li>S\u0131ralamaya ba\u011fl\u0131 tip de\u011fi\u015fimleri i\u00e7in <strong>haz\u0131rl\u0131k s\u00fcresi matrisi<\/strong>; b\u00f6ylece \u00e7izelgeleme motoru en az haz\u0131rl\u0131k gerektiren i\u015f s\u0131ras\u0131n\u0131 se\u00e7er.<\/li>\n\n\n<li><strong>Tak\u0131mlar\u0131 ve ekipleri k\u0131s\u0131t olarak ele alma:<\/strong> Bir makinede kullan\u0131lan ortak tak\u0131m, ayn\u0131 anda ba\u015fka bir makinede kullan\u0131lamaz; bir i\u015f ayn\u0131 anda birden fazla operat\u00f6r gerektirebilir.<\/li>\n\n\n<li>Stoklar\u0131 ve teslim al\u0131nacak sat\u0131n alma sipari\u015flerini kontrol ederek <strong>malzeme uygunlu\u011funa g\u00f6re \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li>\u00c7izelgeleme motorunun tek bir \u00fcretim emri i\u00e7in de\u011fil, plan\u0131n tamam\u0131n\u0131 g\u00f6zeterek se\u00e7ti\u011fi <strong>alternatif i\u015f merkezleri<\/strong>.<\/li>\n\n\n<li>Alt montajlar\u0131n \u00fcst montajda ihtiya\u00e7 duyulmadan \u00f6nce tamamlanmas\u0131n\u0131 sa\u011flayan <strong>\u00e7ok seviyeli \u00fcr\u00fcn deste\u011fi<\/strong>.<\/li>\n\n\n<li>\u00dcretim ilerledik\u00e7e veya sipari\u015fler de\u011fi\u015ftik\u00e7e <strong>otomatik yeniden \u00e7izelgeleme<\/strong>.<\/li>\n\n\n<li>Community&#8217;de de kullan\u0131labilen, <strong>planlamac\u0131lar i\u00e7in Gantt \u015femas\u0131 ve operat\u00f6rler i\u00e7in i\u015f kuyru\u011fu<\/strong>.<\/li>\n\n\n<li><strong>Odoo ile \u00e7izelgeleyici aras\u0131nda net bir yetki payla\u015f\u0131m\u0131.<\/strong> Odoo&#8217;daki \u00fcretim emri tarihleri, takvimde ayr\u0131lan zaman aral\u0131\u011f\u0131ndan hesaplan\u0131r. Planla d\u00fc\u011fmesine yeniden bas\u0131ld\u0131\u011f\u0131nda bu tarihlerin \u00fczerine yaz\u0131l\u0131r. S\u0131ralamay\u0131 \u00e7izelgeleyicinin belirleyece\u011fi konusunda anla\u015f\u0131n; tarihleri ve i\u015f merkezlerini <code>mrp.workorder<\/code> \u00fczerinden geri yaz\u0131n ve ba\u015flam\u0131\u015f \u00fcretim emirlerini atlay\u0131n.<\/li>\n\n\n<li><strong>S\u00fcr\u00fcm\u00fcn\u00fcze ve paketinize uygun API.<\/strong> Odoo 19&#8217;da External JSON-2 API bulunur. XML-RPC ve JSON-RPC&#8217;nin Odoo 22&#8217;de (Odoo Online 21.1) <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_rpc_api.html\">kald\u0131r\u0131lmas\u0131 planlanmaktad\u0131r<\/a>. Haric\u00ee API eri\u015fimi yaln\u0131zca Custom paketlerinde sunulur; One App Free veya Standard paketlerinde bulunmaz (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_api.html\">haric\u00ee API dok\u00fcmanlar\u0131<\/a>). \u00d6zel mod\u00fcller i\u00e7in Odoo.sh veya \u015firket i\u00e7i bar\u0131nd\u0131rma gerekir (<a href=\"https:\/\/www.odoo.com\/pricing-plan\">Odoo fiyatland\u0131rmas\u0131<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>Se\u00e7enekler d\u00f6rt gruba ayr\u0131l\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Odoo&#8217;nun kendi planlamas\u0131<\/strong>, Planla d\u00fc\u011fmesini ve Enterprise&#8217;daki Gantt g\u00f6r\u00fcn\u00fcm\u00fcn\u00fc kapsar.<\/li>\n\n\n<li><strong>Odoo istemcisi i\u00e7inde \u00e7al\u0131\u015fan ek mod\u00fcller<\/strong>, planlama panosunu veya i\u015fleri zaman aral\u0131klar\u0131na yerle\u015ftirme mant\u0131\u011f\u0131n\u0131 geli\u015ftirir. Bu mod\u00fcllerin bak\u0131m\u0131n\u0131 bir Odoo i\u015f orta\u011f\u0131 \u00fcstlenir.<\/li>\n\n\n<li><strong>Tedarik zinciri motorlar\u0131 ve kurumsal APS \u00e7\u00f6z\u00fcmleri<\/strong>, bir uygulama projesiyle entegre edilir ve bu i\u015fe ayr\u0131lm\u0131\u015f bir planlama ekibi taraf\u0131ndan kullan\u0131l\u0131r.<\/li>\n\n\n<li>SkyPlanner&#8217;\u0131n da yer ald\u0131\u011f\u0131 <strong>\u00fcretim sahas\u0131nda i\u015flerin y\u00fcr\u00fct\u00fclmesini de sa\u011flayan bulut APS \u00e7\u00f6z\u00fcmleri<\/strong>, Odoo&#8217;nun yan\u0131nda \u00e7al\u0131\u015farak her kayna\u011f\u0131 otomatik olarak \u00e7izelgeler. \u00dcretim de\u011fi\u015ftik\u00e7e yeniden planlama yapar ve \u00e7izelgeyi operat\u00f6rlerin kullan\u0131m\u0131na sunar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner hangi ihtiyac\u0131 kar\u015f\u0131lar?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS, yukar\u0131da s\u0131ralanan k\u0131s\u0131tlar\u0131n her birine \u00e7\u00f6z\u00fcm sunar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Geli\u015f s\u0131ras\u0131 yerine do\u011fru i\u015f s\u0131ras\u0131.<\/strong> Arcturus AI motoru, t\u00fcm a\u00e7\u0131k sipari\u015fleri ger\u00e7ek kapasiteyi a\u015fmadan saniyeler i\u00e7inde birlikte \u00e7izelgeler. S\u0131ralamada tamamlanma tarihi, \u00f6ncelik, m\u00fc\u015fteri \u00f6nceli\u011fi, Fast Track ve Dynamic Priorities esas al\u0131n\u0131r.<\/li>\n\n\n<li><strong>Sabit haz\u0131rl\u0131k s\u00fcreleri yerine daha k\u0131sa haz\u0131rl\u0131klar.<\/strong> Haz\u0131rl\u0131k s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti aras\u0131ndaki tip de\u011fi\u015fimi s\u00fcresini tutar. Bu s\u00fcre ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re farkl\u0131 olabilir: maviden k\u0131rm\u0131z\u0131ya 30 dakika, k\u0131rm\u0131z\u0131dan maviye 60 dakika. \u00c7izelgeleme motoru en az haz\u0131rl\u0131k gerektiren s\u0131ray\u0131 se\u00e7er ve benzer i\u015fleri art arda \u00e7al\u0131\u015ft\u0131r\u0131r.<\/li>\n\n\n<li><strong>Tek k\u0131s\u0131t yerine t\u00fcm k\u0131s\u0131tlar hesaba kat\u0131l\u0131r.<\/strong> \u0130\u015f merkezleri, vardiyalar, personel, devams\u0131zl\u0131klar, tak\u0131mlar ve malzemeler ayn\u0131 \u00e7izelgede kontrol edilir. Tak\u0131mlar\u0131n kapasitesi s\u0131n\u0131rl\u0131d\u0131r; bu nedenle bir makinede kullan\u0131lan fikst\u00fcr, ayn\u0131 anda ba\u015fka bir makineye atanmaz. Bir i\u015f ayn\u0131 anda birden fazla operat\u00f6r gerektirebilir. Birincil kaynak uygun de\u011filse motor alternatif makinelere veya personele y\u00f6nelir. \u0130\u015f merkezi gruplar\u0131, verimlilikler ve bir i\u015fin birden fazla i\u015f merkezine b\u00f6l\u00fcnmesi de ayn\u0131 modelin par\u00e7as\u0131d\u0131r. Malzeme kontrol\u00fc, eldeki stoklar\u0131 ve a\u00e7\u0131k <code>purchase.order<\/code> sat\u0131rlar\u0131n\u0131 kapsar: sipari\u015f edilen bile\u015fenler, sat\u0131n alma sipari\u015findeki teslimat tarihinde kullan\u0131labilir say\u0131l\u0131r; sipari\u015f Teslim Edildi olarak i\u015faretlendi\u011finde stok g\u00fcncellenir.<\/li>\n\n\n<li><strong>Alt montajlar zaman\u0131nda haz\u0131r olur.<\/strong> Yar\u0131 mamuller ve \u00e7ok seviyeli \u00fcr\u00fcnler, par\u00e7alar montajda ihtiya\u00e7 duyuldu\u011fu anda haz\u0131r olacak \u015fekilde \u00e7izelgelenir.<\/li>\n\n\n<li><strong>Manuel yeniden planlaman\u0131n yerini Autopilot al\u0131r.<\/strong> \u00dcretimde bir de\u011fi\u015fiklik oldu\u011funda Autopilot, belirledi\u011finiz kilitlere, Running Time Lock ayar\u0131na ve \u00f6nceliklere uyarak \u00e7izelgeyi otomatik olarak yeniler.<\/li>\n\n\n<li><strong>Community, Gantt ve shop floor ara\u00e7lar\u0131na kavu\u015fur.<\/strong> Planlamac\u0131lar etkile\u015fimli bir Gantt zaman \u00e7izelgesi \u00fczerinde d\u00fczenleme yapar. Operat\u00f6rler, Mobile Confirmations, Production Timer ve Quick Log Mode ile telefon veya tabletten i\u015f kuyruklar\u0131n\u0131 g\u00f6r\u00fcr ve yapt\u0131klar\u0131 i\u015fleri kaydeder.<\/li>\n\n<\/ul>\n\n\n<p>\u00dcr\u00fcnler, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, stok, sat\u0131n alma ve muhasebe i\u00e7in ana kay\u0131t sistemi Odoo olmaya devam eder. SkyPlanner, External JSON-2 API \u00fczerinden veya eski s\u00fcr\u00fcmlerde XML-RPC ve JSON-RPC arac\u0131l\u0131\u011f\u0131yla Odoo ile \u00e7ift y\u00f6nl\u00fc entegre olur:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Al\u0131nan veriler:<\/strong> <code>mrp.production<\/code>, <code>mrp.workorder<\/code>, <code>mrp.workcenter<\/code>, <code>mrp.bom<\/code> ve a\u00e7\u0131k <code>purchase.order<\/code> sat\u0131rlar\u0131.<\/li>\n\n\n<li><strong>Geri yaz\u0131lan veriler:<\/strong> planlanan ba\u015flang\u0131\u00e7, biti\u015f ve se\u00e7ilen i\u015f merkezi. Bunlar <code>write<\/code> ile her <code>mrp.workorder<\/code> kayd\u0131na yaz\u0131l\u0131r (<code>date_start<\/code>, <code>date_finished<\/code>, <code>workcenter_id<\/code>). Bu i\u015flem Odoo&#8217;nun kendi takviminde ayr\u0131lan zaman aral\u0131\u011f\u0131n\u0131 ta\u015f\u0131r; b\u00f6ylece Odoo&#8217;nun planlama g\u00f6r\u00fcn\u00fcmlerinde SkyPlanner&#8217;\u0131n tarihleri g\u00f6sterilir.<\/li>\n\n\n<li><strong>Shop floor:<\/strong> operat\u00f6r bildirimleri, <code>mrp.workcenter.productivity<\/code> Time Logs kay\u0131tlar\u0131 olarak olu\u015fturulur.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner webhook&#8217;lar\u0131, \u00e7izelgedeki de\u011fi\u015fiklikleri an\u0131nda iletir. Her tesis Odoo&#8217;yu kendi operasyonlar\u0131na, takvimlerine ve \u00f6zel mod\u00fcllerine g\u00f6re farkl\u0131 kullan\u0131r. SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu sizin yap\u0131n\u0131za g\u00f6re yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra da destekler. Odoo i\u015f orta\u011f\u0131n\u0131z veya kendi geli\u015ftiricileriniz de SkyPlanner&#8217;\u0131n dok\u00fcmante edilmi\u015f REST API&#8217;sini kullanarak geli\u015ftirme yapabilir (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API referans\u0131<\/a>). Ba\u015flamak i\u00e7in bir API anahtar\u0131 yeterlidir. API ve \u00f6zelliklerle ilgili ayr\u0131nt\u0131lar <a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">SkyPlanner dok\u00fcmantasyonunda<\/a> yer al\u0131r.<\/p>\n\n\n<p>\u00c7ok say\u0131da sipari\u015f ayn\u0131 darbo\u011fazlar\u0131n kapasitesine ihtiya\u00e7 duyuyor ve t\u00fcm sipari\u015flerin s\u0131ras\u0131n\u0131 teslim tarihlerinin belirlemesi gerekiyorsa <strong>SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong><\/p>\n\n\n<p>Tip de\u011fi\u015fimleri i\u015f s\u0131ras\u0131na ba\u011fl\u0131ysa ya da s\u0131rada hangi i\u015fin yap\u0131labilece\u011fini ortak kullan\u0131lan tak\u0131mlar ve birden fazla operat\u00f6r gerektiren i\u015fler belirliyorsa <strong>SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong><\/p>\n\n\n<p>Haftada birka\u00e7 kez yeniden planlama yap\u0131yorsan\u0131z ve kendi \u00fcretiminiz i\u00e7in uzun bir projeyi beklemek yerine haftalar i\u00e7inde kullan\u0131labilir bir \u00e7izelge istiyorsan\u0131z <strong>SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong><\/p>\n\n\n<p><a href=\"\/tr\/deneme\/\">30 g\u00fcnl\u00fck \u00fccretsiz denemeye<\/a> bir CSV veya XLSX d\u0131\u015fa aktar\u0131m\u0131yla ba\u015flay\u0131n (20 i\u015f merkezine kadar, kredi kart\u0131 gerekmez) ve SkyPlanner&#8217;\u0131n \u00e7izelgesini Plan d\u00fc\u011fmesiyle elde etti\u011finiz sonu\u00e7larla kar\u015f\u0131la\u015ft\u0131r\u0131n. Deneme sonras\u0131nda fiyatland\u0131rma, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac&#8217;dan ba\u015flar. Ayl\u0131k faturaland\u0131r\u0131l\u0131r, istedi\u011finiz zaman iptal edebilirsiniz. Entegrasyon i\u00e7in s\u00fcrecinize ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan teklif, abonelik plan\u0131n\u0131zla birlikte ba\u015ftan sunulur; b\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz. Uygulama, devreye alma s\u00fcrecinin ba\u015flamas\u0131ndan itibaren normalde haftalar i\u00e7inde tamamlan\u0131r. <a href=\"\/tr\/fiyatlandirma\/\">Fiyatlar\u0131<\/a> ve <a href=\"\/tr\/ozellikler\/\">\u00f6zellikleri<\/a> inceleyin.<\/p>\n\n\n<p>Daha fazla bilgi i\u00e7in <a href=\"\/tr\/entegrasyonlar\/erp\/odoo\/\">Odoo i\u00e7in SkyPlanner<\/a>, <a href=\"\/tr\/entegrasyonlar\/erp\/odoo\/entegrasyon-kilavuzu\/\">Odoo entegrasyon k\u0131lavuzu<\/a> ve di\u011fer <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP entegrasyonlar\u0131<\/a> sayfalar\u0131n\u0131 inceleyin.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo i\u00e7in randevu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila&#x27;daki elektrik panosu \u00fcretim alan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 saat<\/b><span>her hafta kazan\u0131lan zaman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt donan\u0131mlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlama sayesinde her hafta \u00e7al\u0131\u015fma s\u00fcresinden 2 saat tasarruf ediliyor ve yeni i\u015f kuyru\u011fu \u00fcretim hatt\u0131na saniyeler i\u00e7inde ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied&#x27;\u0131n Nairobi&#x27;deki ila\u00e7 fabrikas\u0131nda, \u015fi\u015fe dolum hatt\u0131nda \u00e7al\u0131\u015fan temiz oda k\u0131yafetli operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik 90% artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi 90% artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan, optimize edilmi\u015f \u00fc\u00e7 ayl\u0131k bir plan 30 dakikadan k\u0131sa s\u00fcrede haz\u0131rlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations \u00dcretim M\u00fcd\u00fcr\u00fc Anu J\u00e4rvinen, Rauma&#x27;da bir robotlu paletleme h\u00fccresinin yan\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 ayl\u0131k<\/b><span>bo\u015f kapasiteyi sat\u0131\u015f ekibi g\u00f6rebiliyor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, t\u00fcm \u00fcretim planlamam\u0131z i\u00e7in sa\u011flam ve g\u00fcvenilir bir temel olu\u015fturuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Fredman Operations \u00b7 G\u0131dayla temasa uygun ambalaj ka\u011f\u0131tlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">Sat\u0131\u015f ekibi bo\u015f kapasiteyi alt\u0131 ay \u00f6nceden g\u00f6rebiliyor. Eskiden yan\u0131tlanmas\u0131 bir saat veya daha fazla s\u00fcren \u00e7izelge de\u011fi\u015fikli\u011fi talepleri art\u0131k saniyeler i\u00e7inde yan\u0131tlan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/fredman-operations\/\">Fredman Operations&#8217;\u0131n yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 tesisinde kaynakl\u0131 bir \u00e7elik konstr\u00fcksiyonu ta\u015flayan KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>teslimat performans\u0131, yakla\u015f\u0131k 50%&#8217;den y\u00fckseldi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumam\u0131zda belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal par\u00e7alar ve fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k 50%&#8217;den 98%&#8217;e kadar y\u00fckseldi. \u00c7izelgeleme i\u00e7in art\u0131k iki \u015fef yerine bir \u015fef yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp&#8217;un yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Odoo Community&#8217;de \u00fcretim \u00e7izelgeleme var m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet, temel d\u00fczeyde var. Community&#8217;de imalat emirleri, \u00fcretim emirleri, i\u015f merkezleri ve Plan d\u00fc\u011fmesi bulunur; bunlar liste, takvim, pivot ve grafik g\u00f6r\u00fcn\u00fcmleriyle sunulur. Gantt \u00e7izelgeleme g\u00f6r\u00fcn\u00fcm\u00fc, Shop Floor ve Master Production Schedule ise Enterprise \u00f6zellikleridir. SkyPlanner, Community kullanan tesislere Gantt ve operat\u00f6r i\u015f kuyru\u011fu sunar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Odoo MRP, i\u015f merkezi kapasitesini dikkate al\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. \u0130kmal hesaplamalar\u0131nda takvim g\u00fcn\u00fc cinsinden lead time de\u011ferleri kullan\u0131l\u0131r. Odoo dok\u00fcmantasyonunda bu s\u00fcreler i\u00e7in &#8220;do not consider weekends, holidays, or work center capacity&#8221; (hafta sonlar\u0131n\u0131, tatilleri veya i\u015f merkezi kapasitesini dikkate almaz) ifadesi yer al\u0131r. Kapasite yaln\u0131zca bir MO \u00fczerinde Plan d\u00fc\u011fmesine bast\u0131\u011f\u0131n\u0131zda devreye girer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Odoo, bir i\u015f merkezinde ayn\u0131 anda birden fazla i\u015f \u00e7al\u0131\u015ft\u0131rabilir mi?<\/summary>\n<p class=\"sp-faq__a\">Planlama arac\u0131nda hay\u0131r. 19.0 s\u00fcr\u00fcm\u00fcn\u00fcn kodu, her \u00fcretim emrini o i\u015f merkezindeki di\u011fer t\u00fcm \u00fcretim emirleriyle \u00e7ak\u0131\u015fmayan bir zaman aral\u0131\u011f\u0131na yerle\u015ftirir. Product Capacities sekmesi, paralel \u00fcretim emirlerini de\u011fil, tek bir \u00fcretim emrinde \u00e7evrim ba\u015f\u0131na \u00fcretilecek par\u00e7a say\u0131s\u0131n\u0131 belirler.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Odoo, i\u015f s\u0131ras\u0131na ba\u011fl\u0131 haz\u0131rl\u0131k s\u00fcrelerini y\u00f6netir mi?<\/summary>\n<p class=\"sp-faq__a\">Hay\u0131r. Setup Time ve Cleanup Time, i\u015f merkezi baz\u0131nda veya Product Capacities sekmesinde \u00fcr\u00fcn baz\u0131nda tan\u0131mlanan sabit dakika de\u011ferleridir. Odoo, \u00f6nce hangi i\u015fin yap\u0131ld\u0131\u011f\u0131na bakmadan bu s\u00fcreleri her \u00fcretim emrine ekler. SkyPlanner&#8217;\u0131n haz\u0131rl\u0131k s\u00fcresi matrisi ise tip de\u011fi\u015fimi s\u00fcrelerini \u00fcr\u00fcn \u00e7ifti ve ge\u00e7i\u015f y\u00f6n\u00fcne g\u00f6re saklar; bu s\u00fcreleri en aza indirmek i\u00e7in i\u015fleri s\u0131ralar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner APS, Odoo&#8217;ya nas\u0131l ba\u011flan\u0131r?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, harici JSON-2 API \u00fczerinden Odoo ile \u00e7ift y\u00f6nl\u00fc entegre olur. 16.0 ile 18.0 aras\u0131ndaki s\u00fcr\u00fcmlerde ise XML-RPC veya JSON-RPC \u00fczerinden <code>execute_kw<\/code> kullan\u0131l\u0131r. Planlanan tarihler ve i\u015f merkezleri her <code>mrp.workorder<\/code> kayd\u0131na yaz\u0131l\u0131r; kaydedilen s\u00fcreler de Odoo Time Logs kay\u0131tlar\u0131na d\u00f6n\u00fc\u015f\u00fcr. SkyPlanner ekibi entegrasyonu devreye alma s\u00fcrecinde yap\u0131land\u0131r\u0131r ve canl\u0131ya ge\u00e7i\u015ften sonra destek vermeye devam eder. Ayr\u0131nt\u0131lar i\u00e7in <a href=\"\/tr\/entegrasyonlar\/erp\/odoo\/entegrasyon-kilavuzu\/\">Odoo entegrasyon k\u0131lavuzuna<\/a> bak\u0131n.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner&#8217;\u0131 Odoo ile entegre etmeden \u00f6nce deneyebilir miyim?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck denemede Odoo&#8217;nun liste g\u00f6r\u00fcn\u00fcmlerinden d\u0131\u015fa aktar\u0131lan CSV veya XLSX dosyalar\u0131yla \u00e7al\u0131\u015fabilirsiniz. 20 i\u015f merkezine kadar kullan\u0131m sunulur ve kredi kart\u0131 gerekmez. Herhangi bir ba\u011flant\u0131 kurmadan \u00f6nce SkyPlanner&#8217;\u0131n \u00e7izelgesini Plan d\u00fc\u011fmesiyle elde etti\u011finiz sonu\u00e7larla kar\u015f\u0131la\u015ft\u0131r\u0131rs\u0131n\u0131z. <a href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a> veya <a href=\"\/tr\/iletisim-satis\/\">sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ Odoo Odoo&#8217;da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi Nas\u0131l \u00c7al\u0131\u015f\u0131r, SkyPlanner APS Ne Zaman Gerekir? Odoo&#8217;da ger\u00e7ek makine ve personel kapasitesini dikkate alan temel d\u00fczeyde \u00fcretim \u00e7izelgeleme vard\u0131r. Odoo Manufacturing&#8217;deki Planla d\u00fc\u011fmesi, her \u00fcretim emrini ilgili i\u015f merkezinin takvimindeki ilk bo\u015f zaman aral\u0131\u011f\u0131na yerle\u015ftirir. B\u00f6ylece ayn\u0131 i\u015f merkezinde planlanm\u0131\u015f iki \u00fcretim &#8230; <a title=\"Odoo&#8217;da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi Nas\u0131l \u00c7al\u0131\u015f\u0131r, SkyPlanner APS Ne Zaman Gerekir?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/uretim-cizelgeleme\/\" aria-label=\"Read more about Odoo&#8217;da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi Nas\u0131l \u00c7al\u0131\u015f\u0131r, SkyPlanner APS Ne Zaman Gerekir?\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100837,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101194","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Odoo&#039;da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi<\/title>\n<meta name=\"description\" content=\"Odoo&#039;nun Planla d\u00fc\u011fmesi her \u00fcretim emrini i\u015f merkezindeki ilk bo\u015f aral\u0131\u011fa yerle\u015ftirir. Neler yapar, nerede yetersiz kal\u0131r, APS ne zaman gerekir?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Odoo&#039;da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi Nas\u0131l \u00c7al\u0131\u015f\u0131r, SkyPlanner APS Ne Zaman Gerekir?\" \/>\n<meta property=\"og:description\" content=\"Odoo&#039;nun Planla d\u00fc\u011fmesi her \u00fcretim emrini i\u015f merkezindeki ilk bo\u015f aral\u0131\u011fa yerle\u015ftirir. Neler yapar, nerede yetersiz kal\u0131r, APS ne zaman gerekir?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/uretim-cizelgeleme\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/odoo\\\/uretim-cizelgeleme\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/odoo\\\/uretim-cizelgeleme\\\/\",\"name\":\"Odoo'da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Odoo'nun Planla d\u00fc\u011fmesi her \u00fcretim emrini i\u015f merkezindeki ilk bo\u015f aral\u0131\u011fa yerle\u015ftirir. Neler yapar, nerede yetersiz kal\u0131r, APS ne zaman gerekir?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/odoo\\\/uretim-cizelgeleme\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/odoo\\\/uretim-cizelgeleme\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/odoo\\\/uretim-cizelgeleme\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Odoo i\u00e7in SkyPlanner APS: \u00dcretim \u00c7izelgeleme ve Entegrasyon\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/odoo\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Odoo&#8217;da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi Nas\u0131l \u00c7al\u0131\u015f\u0131r, SkyPlanner APS Ne Zaman Gerekir?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Odoo'da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi","description":"Odoo'nun Planla d\u00fc\u011fmesi her \u00fcretim emrini i\u015f merkezindeki ilk bo\u015f aral\u0131\u011fa yerle\u015ftirir. Neler yapar, nerede yetersiz kal\u0131r, APS ne zaman gerekir?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/uretim-cizelgeleme\/","og_locale":"tr_TR","og_type":"article","og_title":"Odoo'da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi Nas\u0131l \u00c7al\u0131\u015f\u0131r, SkyPlanner APS Ne Zaman Gerekir?","og_description":"Odoo'nun Planla d\u00fc\u011fmesi her \u00fcretim emrini i\u015f merkezindeki ilk bo\u015f aral\u0131\u011fa yerle\u015ftirir. Neler yapar, nerede yetersiz kal\u0131r, APS ne zaman gerekir?","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/uretim-cizelgeleme\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"19 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/uretim-cizelgeleme\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/uretim-cizelgeleme\/","name":"Odoo'da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Odoo'nun Planla d\u00fc\u011fmesi her \u00fcretim emrini i\u015f merkezindeki ilk bo\u015f aral\u0131\u011fa yerle\u015ftirir. Neler yapar, nerede yetersiz kal\u0131r, APS ne zaman gerekir?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/uretim-cizelgeleme\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/uretim-cizelgeleme\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/uretim-cizelgeleme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"Odoo i\u00e7in SkyPlanner APS: \u00dcretim \u00c7izelgeleme ve Entegrasyon","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/odoo\/"},{"@type":"ListItem","position":5,"name":"Odoo&#8217;da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi Nas\u0131l \u00c7al\u0131\u015f\u0131r, SkyPlanner APS Ne Zaman Gerekir?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ Odoo Odoo&#8217;da \u00dcretim \u00c7izelgeleme Var m\u0131? Planla D\u00fc\u011fmesi Nas\u0131l \u00c7al\u0131\u015f\u0131r, SkyPlanner APS Ne Zaman Gerekir? Odoo&#8217;da ger\u00e7ek makine ve personel kapasitesini dikkate alan temel d\u00fczeyde \u00fcretim \u00e7izelgeleme vard\u0131r. Odoo Manufacturing&#8217;deki Planla d\u00fc\u011fmesi, her \u00fcretim emrini ilgili i\u015f merkezinin takvimindeki ilk bo\u015f zaman aral\u0131\u011f\u0131na yerle\u015ftirir. B\u00f6ylece ayn\u0131 i\u015f merkezinde planlanm\u0131\u015f iki \u00fcretim&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/101194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=101194"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/101194\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100837"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=101194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}