{"id":101164,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101164"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"entegrasyon-kilavuzu","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/entegrasyon-kilavuzu\/","title":{"rendered":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in SAP S\/4HANA Entegrasyon K\u0131lavuzu"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/tr\/entegrasyonlar\/\">Entegrasyonlar<\/a> \/ <a href=\"\/tr\/entegrasyonlar\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SAP S\/4HANA Entegrasyon K\u0131lavuzu: <span class=\"hl\">SkyPlanner APS ile \u00dcretim \u00c7izelgeleme<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Bu k\u0131lavuz, SAP i\u015f ortaklar\u0131na, BT ekiplerine ve teknik sat\u0131n alma sorumlular\u0131na SkyPlanner APS\u2019nin SAP S\/4HANA\u2019ya nas\u0131l ba\u011fland\u0131\u011f\u0131n\u0131 g\u00f6sterir. SkyPlanner, SAP\u2019nin yay\u0131mlad\u0131\u011f\u0131 OData API\u2019leri \u00fczerinden S\/4HANA ile \u00e7ift y\u00f6nl\u00fc entegre olur:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00dcretim sipari\u015fleri, operasyonlar, i\u015f merkezi kapasitesi, stok ve a\u00e7\u0131k sat\u0131n alma sipari\u015fleri SkyPlanner\u2019a aktar\u0131l\u0131r.<\/li>\n\n\n<li>Planlanan ba\u015flang\u0131\u00e7 tarihleri, her \u00fcretim sipari\u015fi operasyonuna geri g\u00f6nderilir.<\/li>\n\n\n<li>Operat\u00f6rlerin s\u00fcre kay\u0131tlar\u0131, \u00fcretim sipari\u015fi teyitleri olarak kaydedilir.<\/li>\n\n\n<li>SkyPlanner webhook\u2019lar\u0131, \u00e7izelgedeki de\u011fi\u015fiklikleri an\u0131nda iletir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/tr\/iletisim-satis\/\">Demo i\u00e7in randevu al\u0131n<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0130\u015flerin i\u015f merkezlerine g\u00f6re \u00e7izelgelendi\u011fi ve alt\u0131nda sipari\u015f listesinin yer ald\u0131\u011f\u0131 SkyPlanner APS Gantt zaman \u00e7izelgesi.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Malzemeler, BOM\u2019lar, rotalar, \u00fcretim sipari\u015fleri, stok ve maliyet hesaplar\u0131 S\/4HANA\u2019da tutulur. SkyPlanner ekibi, devreye alma s\u00fcrecinde entegrasyonu S\/4HANA yap\u0131land\u0131rman\u0131za g\u00f6re kurar ve canl\u0131ya ge\u00e7i\u015ften sonra da destekler. \u0130\u015fletmenize sa\u011flayaca\u011f\u0131 faydalar i\u00e7in <a href=\"\/tr\/entegrasyonlar\/erp\/sap-s4hana\/\">SAP S\/4HANA \u00fcretim \u00e7izelgeleme sayfas\u0131na<\/a> bak\u0131n. S\/4HANA\u2019n\u0131n kendi ba\u015f\u0131na neleri \u00e7izelgeleyebildi\u011fini \u00f6\u011frenmek i\u00e7in <a href=\"\/tr\/entegrasyonlar\/erp\/sap-s4hana\/uretim-cizelgeleme\/\">SAP S\/4HANA\u2019da ger\u00e7ek makine ve personel kapasitesini dikkate alan \u00fcretim \u00e7izelgeleme var m\u0131?<\/a> yaz\u0131s\u0131n\u0131 okuyun.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP S\/4HANA entegrasyon se\u00e7enekleri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>S\/4HANA, entegrasyon aray\u00fczlerini SAP Business Accelerator Hub\u2019da (api.sap.com) listelenen, yay\u0131mlanm\u0131\u015f OData servisleri olarak sunar. \u00c7izelgeleme entegrasyonu OData V2 servisleriyle \u00e7al\u0131\u015f\u0131r. IDoc ve BAPI se\u00e7enekleri h\u00e2l\u00e2 mevcuttur, ancak bu k\u0131lavuzda yay\u0131mlanm\u0131\u015f OData API\u2019leri kullan\u0131l\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S\u00fcr\u00fcme g\u00f6re kimlik do\u011frulama<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u015eirket i\u00e7i kurulum ve Private Edition.<\/strong> Servisler, SAP Gateway&#8217;de <code>\/IWFND\/MAINT_SERVICE<\/code> i\u015flemiyle etkinle\u015ftirilir. Entegrasyon kullan\u0131c\u0131s\u0131na ilgili yetki nesneleri atanmal\u0131d\u0131r. \u00d6rne\u011fin teyitler i\u00e7in <code>C_AFRU_AWK<\/code>, bu teyitlerle birlikte kaydedilen mal hareketi kalemleri i\u00e7in <code>C_AFKO_AWK<\/code> ve planl\u0131 sipari\u015fler i\u00e7in <code>M_PLAF_ORG<\/code> gerekir.<\/li>\n\n\n<li><strong>Public Edition.<\/strong> Servisler yaln\u0131zca ileti\u015fim d\u00fczenlemeleri \u00fczerinden kullan\u0131ma a\u00e7\u0131l\u0131r. <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_CLOUD\/55a7cb346519450cb9e6d21c1ecd6ec1\/36ea4658c0c51f60e10000000a44147b.html\">SAP&#8217;nin gelen ileti\u015fim kurulumu ad\u0131mlar\u0131n\u0131<\/a> izleyerek <strong>Communication Arrangements<\/strong> uygulamas\u0131nda bir SAP ileti\u015fim senaryosunu (<code>SAP_COM_xxxx<\/code>) temel alan ileti\u015fim kullan\u0131c\u0131s\u0131, ileti\u015fim sistemi ve ileti\u015fim d\u00fczenlemesi olu\u015fturursunuz. Senaryo, hangi servislerin kullan\u0131ma a\u00e7\u0131laca\u011f\u0131n\u0131 ve hangi kimlik do\u011frulama y\u00f6ntemlerinin kullan\u0131labilece\u011fini belirler:<\/li>\n\n<\/ul>\n\n\n<p>&#8211; belirte\u00e7 tabanl\u0131: i\u015f kullan\u0131c\u0131s\u0131na kimlik aktar\u0131m\u0131 (principal propagation) sa\u011flayan OAuth, SAML veya OpenID Connect bearer ak\u0131\u015flar\u0131 &#8211; istemci sertifikas\u0131 &#8211; teknik ileti\u015fim kullan\u0131c\u0131s\u0131yla temel kimlik do\u011frulama<\/p>\n\n\n<p>SAP, belirte\u00e7 veya sertifika tabanl\u0131 kimlik do\u011frulamay\u0131 \u00f6nerir.<\/p>\n\n\n<p>SkyPlanner taraf\u0131nda ise API belirteciyle kimlik do\u011frulamas\u0131 yap\u0131lan ve Swagger\/OpenAPI ile belgelenmi\u015f bir REST API bulunur (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API referans\u0131<\/a>). B\u00f6ylece ara yaz\u0131l\u0131m bir tarafta SAP kimlik do\u011frulamas\u0131n\u0131, di\u011fer tarafta SkyPlanner API belirtecini y\u00f6netir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00dcretim \u00e7izelgeleme i\u00e7in API\u2019ler<\/h3>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Servis<\/th><th>Kullan\u0131lan varl\u0131klar ve eylemler<\/th><th>Ama\u00e7<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/ed408e9ecb144e6eb09e6883d25a7262.html\"><code>API_PRODUCTION_ORDER_2_SRV<\/code><\/a> (Production Order, Version 2)<\/td><td><code>A_ProductionOrder_2<\/code>, <code>A_ProductionOrderItem_2<\/code>, <code>A_ProductionOrderOperation_2<\/code>, <code>A_ProductionOrderComponent_2<\/code>, <code>A_ProductionOrderStatus_2<\/code>, <code>A_ProductionRsceTools_2<\/code>; eylemler: <code>ReleaseOrder<\/code>, <code>ReleaseOperation<\/code>, <code>ScheduleProductionOrderOperation<\/code><\/td><td>\u00dcretim emirleri, operasyonlar, bile\u015fenler, PRT&#8217;ler, durum, \u00e7izelgenin geri yaz\u0131lmas\u0131<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/62ec4758c3f90a02e10000000a44147b.html\"><code>API_WORK_CENTERS<\/code><\/a><\/td><td><code>A_WorkCenters<\/code>, <code>A_WorkCenterAllCapacity_2<\/code>, <code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code>, <code>A_WorkCenterCapPerBucket<\/code><\/td><td>\u0130\u015f merkezleri, kapasite kategorileri, zaman aral\u0131klar\u0131 ve vardiyalar<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/2dd233df3bc947d6b402d246ed887b5a.html\"><code>API_PRODUCTION_ROUTING<\/code><\/a><\/td><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingSequence<\/code>, <code>ProductionRoutingOperation<\/code>, <code>ProductionRoutingSubOperation<\/code>, <code>ProductionRoutingMatlAssgmt<\/code>, <code>ProductionRoutingOpCompAlloc<\/code><\/td><td>\u00dcretim emri olu\u015fturulmadan \u00f6nce planlama yapmak i\u00e7in standart rotalar<\/td><\/tr><tr><td><code>API_BILL_OF_MATERIAL_SRV;v=2<\/code><\/td><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code>, <code>MaterialBOMSubItem<\/code><\/td><td>\u00c7ok seviyeli \u00fcr\u00fcn yap\u0131s\u0131<\/td><\/tr><tr><td><code>API_PRODUCT_SRV<\/code> (Product Master A2X)<\/td><td><code>A_Product<\/code><\/td><td>Malzemeler (API&#8217;de Product olarak adland\u0131r\u0131l\u0131r). SAP art\u0131k \u00e7o\u011fu \u00fcr\u00fcn varl\u0131\u011f\u0131 i\u00e7in Product (Version 2) API&#8217;sini \u00f6neriyor<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\"><code>API_PLANNED_ORDERS<\/code><\/a><\/td><td><code>A_PlannedOrder<\/code>, <code>A_PlannedOrderComponent<\/code>, <code>A_PlannedOrderCapacity<\/code><\/td><td>D\u00f6n\u00fc\u015ft\u00fcrme \u00f6ncesi MRP Live \u00e7\u0131kt\u0131s\u0131<\/td><\/tr><tr><td><code>API_MATERIAL_STOCK_SRV<\/code><\/td><td><code>A_MaterialStock<\/code>, <code>A_MatlStkInAcctMod<\/code><\/td><td>Malzeme kullan\u0131labilirli\u011fi i\u00e7in \u00fcretim yeri ve depo yeri baz\u0131nda stok<\/td><\/tr><tr><td><code>API_PURCHASEORDER_PROCESS_SRV<\/code><\/td><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code><\/td><td>Gelecek malzemeler i\u00e7in a\u00e7\u0131k sat\u0131nalma sipari\u015fleri<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/e77b762e243b4045ad1f1f048f6aab87.html\"><code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code><\/a><\/td><td><code>ProdnOrdConf2<\/code>, <code>ProdnOrdConfMatlDocItm<\/code>; eylemler: <code>GetConfProposal<\/code>, <code>GetGdsMvtProposal<\/code>, <code>CancelProdnOrdConf<\/code><\/td><td>Shop floor kaynakl\u0131 teyitler ve mal hareketleri<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u00dcretim emri API&#8217;sinde operasyonlar, planlamac\u0131n\u0131n g\u00f6rd\u00fc\u011f\u00fc operasyon numaras\u0131yla de\u011fil, <code>OrderInternalBillOfOperations<\/code> ve <code>OrderIntBillOfOperationsItem<\/code> birle\u015fimiyle tan\u0131mlan\u0131r. Teyit API&#8217;sindeki <code>GetConfProposal<\/code> ise ayn\u0131 operasyona <code>OrderID<\/code> ve <code>OrderOperation<\/code> \u00fczerinden eri\u015fir. \u0130lk y\u00fcklemeden itibaren hem dahili anahtarlar\u0131 hem de operasyon numaras\u0131n\u0131 SkyPlanner&#8217;da saklay\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Olaylar<\/h3>\n\n\n<p>S\/4HANA, <strong>Production Order Created<\/strong> ve <strong>Production Order Changed<\/strong> <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/1d609d0a1ecb48c7b46831a3d473288f.html\">i\u015f olaylar\u0131n\u0131<\/a> tetikler. Bu olaylar\u0131n veri y\u00fck\u00fcnde <code>ManufacturingOrder<\/code>, <code>ProductionOrder<\/code>, <code>ProductionOrderType<\/code> ve <code>ProductionPlant<\/code> alanlar\u0131 bulunur. Veri y\u00fck\u00fc yaln\u0131zca anahtarlar\u0131 i\u00e7erdi\u011finden entegrasyon, \u00fcretim emrini ve operasyonlar\u0131n\u0131 yeniden okur. Changed olay\u0131, \u00fcretim emrindeki her de\u011fi\u015fiklikte tetiklenir; bu nedenle art arda gelen olaylar\u0131 birle\u015ftiren bir geciktirme mekanizmas\u0131 kullan\u0131n. Ters y\u00f6nde ise SkyPlanner webhook&#8217;lar\u0131, \u00e7izelge veya i\u015f durumu de\u011fi\u015fti\u011finde ger\u00e7ek zamanl\u0131 bildirim g\u00f6nderir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Dosyalarla ba\u015flang\u0131\u00e7<\/h3>\n\n\n<p>Deneme i\u00e7in \u00fcretim sipari\u015flerini ve i\u015f merkezlerini S\/4HANA liste raporlar\u0131ndan Excel veya CSV olarak d\u0131\u015fa aktar\u0131n, ard\u0131ndan SkyPlanner\u2019a i\u00e7e aktar\u0131n. B\u00f6ylece Gateway veya ileti\u015fim d\u00fczenlemelerinde herhangi bir i\u015flem yapmadan \u00f6nce \u00e7izelgenin do\u011frulu\u011funu g\u00f6rebilirsiniz.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping-sap-s-4hana-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Veri e\u015fleme: SAP S\/4HANA\u2019dan SkyPlanner\u2019a<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>S\/4HANA varl\u0131\u011f\u0131 \/ u\u00e7 noktas\u0131<\/th><th>SkyPlanner nesnesi<\/th><th>Y\u00f6n<\/th><th>S\u0131kl\u0131k<\/th><\/tr><\/thead><tbody><tr><td><code>A_Product<\/code> (Malzeme)<\/td><td>\u00dcr\u00fcn veya malzeme<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, ard\u0131ndan belirli aral\u0131klarla de\u011fi\u015fiklik aktar\u0131m\u0131<\/td><\/tr><tr><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code><\/td><td>\u00dcr\u00fcn yap\u0131s\u0131, alt \u00fcr\u00fcnler<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, ard\u0131ndan belirli aral\u0131klarla<\/td><\/tr><tr><td><code>A_WorkCenters<\/code><\/td><td>\u0130\u015f merkezi<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fcklemede ve de\u011fi\u015fiklik oldu\u011funda<\/td><\/tr><tr><td><code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code><\/td><td>Kapasite ve vardiyalar<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, ard\u0131ndan belirli aral\u0131klarla<\/td><\/tr><tr><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingOperation<\/code><\/td><td>Proses ad\u0131mlar\u0131 ve standart s\u00fcreler<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u0130lk y\u00fckleme, ard\u0131ndan belirli aral\u0131klarla<\/td><\/tr><tr><td><code>A_ProductionOrder_2<\/code> (serbest b\u0131rak\u0131lm\u0131\u015f veya olu\u015fturulmu\u015f)<\/td><td>Termin tarihiyle birlikte \u00fcretim emri<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Created\/Changed olay\u0131nda ger\u00e7ek zamana yak\u0131n aktar\u0131m veya belirli aral\u0131klarla sorgulama<\/td><\/tr><tr><td><code>A_ProductionOrderOperation_2<\/code><\/td><td>\u0130\u015f (bir i\u015f merkezindeki proses ad\u0131m\u0131)<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u00dcretim emriyle birlikte<\/td><\/tr><tr><td><code>A_ProductionRsceTools_2<\/code> (\u00fcretim kaynaklar\u0131\/ara\u00e7lar\u0131)<\/td><td>Mevcut kapasiteleri dikkate al\u0131narak ortak kaynaklar olarak \u00e7izelgelenen ara\u00e7lar<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u00dcretim emriyle birlikte<\/td><\/tr><tr><td><code>A_ProductionOrderComponent_2<\/code>, <code>A_MaterialStock<\/code><\/td><td>Malzeme ihtiya\u00e7lar\u0131 ve stok<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Kapsam belirleme a\u015famas\u0131nda kararla\u015ft\u0131r\u0131lan aral\u0131klarla<\/td><\/tr><tr><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code> (<code>API_PURCHASEORDER_PROCESS_SRV<\/code>): a\u00e7\u0131k miktar ve teslimat plan\u0131 sat\u0131r\u0131ndaki teslimat tarihi<\/td><td>Beklenen teslimat tarihiyle birlikte sat\u0131nalma sipari\u015fleri \/ gelecek malzemeler<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Kapsam belirleme a\u015famas\u0131nda kararla\u015ft\u0131r\u0131lan aral\u0131klarla<\/td><\/tr><tr><td><code>A_PlannedOrder<\/code> (iste\u011fe ba\u011fl\u0131)<\/td><td>D\u00f6n\u00fc\u015ft\u00fcr\u00fclmeden \u00f6nce planlanan sipari\u015fler<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>MRP Live&#8217;\u0131n her \u00e7al\u0131\u015ft\u0131r\u0131lmas\u0131ndan sonra<\/td><\/tr><tr><td><code>ScheduleProductionOrderOperation<\/code> (operasyon ba\u015flang\u0131c\u0131, ileri \u00e7izelgeleme modu)<\/td><td>\u00c7izelge<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>\u00c7izelge de\u011fi\u015fti\u011finde webhook \u00fczerinden<\/td><\/tr><tr><td><code>ProdnOrdConf2<\/code> (sa\u011flam \u00fcretim miktar\u0131, fire, aktiviteler)<\/td><td>S\u00fcre kay\u0131tlar\u0131 ve miktarlar<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>Her kay\u0131t olay\u0131nda veya toplu olarak<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Entegrasyon modelleri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Ana verilerin y\u00fcklenmesi.<\/strong> Malzemeleri, BOM\u2019lar\u0131, kapasite aral\u0131klar\u0131 ve vardiyalar\u0131yla birlikte i\u015f merkezlerini ve rotalar\u0131 y\u00fckleyin. Vardiyalar\u0131n hangi sistemde y\u00f6netilece\u011fine bu a\u015famada karar verin. \u0130\u015fleyen bir payla\u015f\u0131m \u015f\u00f6yledir: fabrika takvimi S\/4HANA\u2019da kal\u0131r; ayr\u0131nt\u0131l\u0131 vardiya d\u00fczenleri, devams\u0131zl\u0131klar ve fazla mesailer ise planlamac\u0131lar\u0131n bunlar\u0131 her g\u00fcn de\u011fi\u015ftirdi\u011fi SkyPlanner\u2019da tutulur.<\/p>\n\n\n<p><strong>2. \u00dcretim emirlerinin senkronizasyonu.<\/strong> Production Order Created\/Changed olaylar\u0131na abone olun. \u0130\u015f olaylar\u0131n\u0131n kurulmad\u0131\u011f\u0131 ortamlarda ise <code>A_ProductionOrder_2<\/code> varl\u0131\u011f\u0131n\u0131 de\u011fi\u015fiklik zaman damgas\u0131na g\u00f6re d\u00fczenli olarak sorgulay\u0131n. \u00dcretim yeri, emir t\u00fcr\u00fc ve duruma g\u00f6re filtreleyin. SkyPlanner&#8217;\u0131n \u00f6nceden planlama yapabilmesi i\u00e7in \u00fcretim emirlerini olu\u015fturulduklar\u0131 anda g\u00f6nderin. SkyPlanner bunlar\u0131 \u00e7izelgeledikten sonra S\/4HANA&#8217;da serbest b\u0131rak\u0131n (<code>ReleaseOrder<\/code> veya <code>ReleaseOperation<\/code>).<\/p>\n\n\n<p><strong>3. \u00c7izelgenin geri yaz\u0131lmas\u0131.<\/strong> Bir SkyPlanner webhook&#8217;u \u00e7izelge de\u011fi\u015fikli\u011fi bildirdi\u011finde entegrasyon, de\u011fi\u015fen her operasyon i\u00e7in <code>API_PRODUCTION_ORDER_2_SRV<\/code> i\u00e7indeki <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/fcab73a7730e4f88b40134fe4c719f56.html\"><code>ScheduleProductionOrderOperation<\/code><\/a> eylemini \u00e7a\u011f\u0131r\u0131r. \u015eu verileri g\u00f6nderir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Anahtar olarak <code>ManufacturingOrder<\/code>, <code>OrderInternalBillOfOperations<\/code> ve <code>OrderIntBillOfOperationsItem<\/code><\/li>\n\n\n<li><code>OpSchedulingMode<\/code> i\u00e7in F (ileri) de\u011feri; <code>OpSchedldStartDate<\/code> ve <code>OpSchedldStartTime<\/code> alanlar\u0131nda SkyPlanner&#8217;daki ba\u015flang\u0131\u00e7 tarihi ve saati<\/li>\n\n\n<li><code>OpSchedulingStatus<\/code> i\u00e7in DISP (sevk) de\u011feri ve zorunlu <code>OpSchedulingStrategy<\/code> i\u00e7in M de\u011feri<\/li>\n\n\n<li><code>if-match<\/code> i\u00e7inde ETag de\u011feri<\/li>\n\n<\/ul>\n\n\n<p>Bir sipari\u015fin t\u00fcm operasyonlar\u0131, SkyPlanner\u2019daki s\u0131ralar\u0131yla tek bir de\u011fi\u015fiklik k\u00fcmesinde g\u00f6nderilir. B\u00f6ylece S\/4HANA, sipari\u015fin t\u00fcm plan\u0131n\u0131 tek \u00e7a\u011fr\u0131da \u00e7izelgeye yerle\u015ftirir. K modu hi\u00e7bir zaman kullan\u0131lmaz: bu mod, operasyonlar\u0131n \u00f6zg\u00fcn tarihlerini korur ve g\u00f6nderilen tarihleri dikkate almaz.<\/p>\n\n\n<p>SkyPlanner, operasyon s\u00fcrelerini S\/4HANA\u2019n\u0131n kulland\u0131\u011f\u0131 rota standart de\u011ferleri ve i\u015f merkezi kapasite form\u00fclleriyle hesaplar. Bu nedenle S\/4HANA\u2019n\u0131n g\u00f6nderilen ba\u015flang\u0131\u00e7 tarihinden hesaplad\u0131\u011f\u0131 biti\u015f tarihi, SkyPlanner plan\u0131yla \u00f6rt\u00fc\u015f\u00fcr. Entegrasyon, her de\u011fi\u015fiklik k\u00fcmesinden sonra operasyonlar\u0131 yeniden okur ve farkl\u0131l\u0131k g\u00f6steren tarihleri i\u015faretler. Planlamac\u0131 bu farklar\u0131 bir sonraki vardiyadan \u00f6nce g\u00f6r\u00fcr.<\/p>\n\n\n<p><strong>4. Shop floor teyitleri.<\/strong> Mobile Confirmations veya Production Timer \u00fczerinden olu\u015fturulan her s\u00fcre kayd\u0131 bir S\/4HANA teyidine d\u00f6n\u00fc\u015f\u00fcr. SkyPlanner webhook&#8217;u; sa\u011flam \u00fcretim miktar\u0131, fire ve aktivite s\u00fcrelerini i\u00e7eren bir <code>ProdnOrdConf2<\/code> kayd\u0131n\u0131n g\u00f6nderilmesini tetikler. Entegrasyon \u00f6nce <code>GetConfProposal<\/code> \u00e7a\u011fr\u0131s\u0131n\u0131 yapar; b\u00f6ylece S\/4HANA miktarlar\u0131, aktiviteleri, tarihleri ve personel verilerini \u00f6nerir. <code>GetGdsMvtProposal<\/code> ise mal hareketlerini \u00f6nerir.<\/p>\n\n\n<p><strong>Gelecek malzemeler.<\/strong> A\u00e7\u0131k sat\u0131n alma sipari\u015fleri, SkyPlanner\u2019a gelen verilerin senkronizasyonuna dahildir. SkyPlanner, sipari\u015f edilen malzemeyi sat\u0131n alma sipari\u015findeki beklenen teslimat tarihinde kullan\u0131labilir kabul eder. Sat\u0131n al\u0131nan bile\u015fenleri bekleyen i\u015fler, bug\u00fcnk\u00fc stok miktar\u0131 nedeniyle engellenmez; malzemenin gelece\u011fi g\u00fcne \u00e7izelgelenir.<\/p>\n\n\n<p>Mal giri\u015flerinde esas kay\u0131t sistemi S\/4HANA olmaya devam eder: bir mal giri\u015fi kaydedildi\u011finde stok artar, sat\u0131n alma sipari\u015fi kaleminin a\u00e7\u0131k miktar\u0131 azal\u0131r. Sonraki senkronizasyon, SkyPlanner\u2019daki stoku g\u00fcnceller ve tamamen teslim al\u0131nm\u0131\u015f sat\u0131n alma sipari\u015fini Delivered olarak i\u015faretler. K\u0131smi teslimattan sonra ise kalan a\u00e7\u0131k miktar, teslimat plan\u0131 sat\u0131r\u0131ndaki tarihte gelecek malzeme olarak tutulur. SkyPlanner\u2019\u0131n sat\u0131n alma sipari\u015flerini nas\u0131l i\u015fledi\u011fi <a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">SkyPlanner belgelerinde<\/a> a\u00e7\u0131klan\u0131r.<\/p>\n\n\n<p><strong>5. Veri sahipli\u011fi kurallar\u0131.<\/strong> Miktarlar, BOM, rota, maliyet hesaplar\u0131 ve durum S\/4HANA taraf\u0131ndan y\u00f6netilir. S\u0131ralama, i\u015f merkezi atamas\u0131 ve operasyon tarihleri SkyPlanner taraf\u0131ndan y\u00f6netilir. \u0130ki sistemin ayn\u0131 alana yazmas\u0131na asla izin vermeyin. Planlamac\u0131lar operasyonlar\u0131 Capacity Scheduling Board \u00fczerinde ta\u015f\u0131maya devam ediyorsa hangi de\u011fi\u015fikli\u011fin ge\u00e7erli olaca\u011f\u0131na karar verin. Ya bir sonraki sipari\u015f senkronizasyonu bu de\u011fi\u015fikli\u011fi SkyPlanner\u2019a aktar\u0131r ya da ilgili i\u015f merkezi SkyPlanner\u2019\u0131n kapsam\u0131 d\u0131\u015f\u0131nda kal\u0131r.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Proje neleri kapsar?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Uygulama, b\u00fcy\u00fck \u015firketlerde bile genellikle devreye alma s\u00fcrecinin ba\u015flamas\u0131ndan sonraki birka\u00e7 hafta i\u00e7inde tamamlan\u0131r. \u00c7o\u011fu tesis, CSV veya Excel d\u0131\u015fa aktar\u0131mlar\u0131yla 30 g\u00fcnl\u00fck \u00fccretsiz denemeye ba\u015flar. B\u00f6ylece API \u00e7al\u0131\u015fmalar\u0131ndan \u00f6nce \u00e7izelgenin kendi verileriyle \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcr. Ard\u0131ndan S\/4HANA projesi \u015fu ad\u0131mlar\u0131 kapsar:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Kapsam belirleme:<\/strong> tesisler, sipari\u015f t\u00fcrleri, s\u00fcr\u00fcm, kimlik do\u011frulama modeli ve her alan\u0131 hangi sistemin y\u00f6netece\u011fi.<\/li>\n\n\n<li><strong>SAP eri\u015fimi:<\/strong> Gateway servisinin etkinle\u015ftirilmesi veya bir ileti\u015fim d\u00fczenlemesinin yap\u0131lmas\u0131; ayr\u0131ca teknik kullan\u0131c\u0131lar ve yetkilendirme nesneleri.<\/li>\n\n\n<li><strong>Ana verilerin e\u015flenmesi:<\/strong> i\u015f merkezi kapasite kategorileri, aral\u0131klar\u0131 ve vardiyalar\u0131; rota standart de\u011ferlerinin SkyPlanner s\u00fcreleriyle e\u015flenmesi; \u00f6l\u00e7\u00fc birimleri.<\/li>\n\n\n<li><strong>\u0130lk veri y\u00fcklemesi:<\/strong> malzemeler, BOM\u2019lar, rotalar ve kapasiteleriyle birlikte i\u015f merkezleri.<\/li>\n\n\n<li><strong>\u00dcretim ve sat\u0131n alma sipari\u015flerinin senkronizasyonu:<\/strong> \u00fcretim sipari\u015fleri ve operasyonlar i\u00e7in Created\/Changed olaylar\u0131 veya periyodik sorgulama; stok ve a\u00e7\u0131k sat\u0131n alma sipari\u015fleri i\u00e7in zamanlanm\u0131\u015f aktar\u0131m.<\/li>\n\n\n<li><strong>\u00c7izelgenin geri yaz\u0131lmas\u0131:<\/strong> ETag y\u00f6netimi ve yeniden deneme kuyru\u011fuyla <code>ScheduleProductionOrderOperation<\/code> \u00e7a\u011fr\u0131lar\u0131.<\/li>\n\n\n<li><strong>Shop floor teyitleri:<\/strong> s\u00fcre kay\u0131tlar\u0131n\u0131n <code>ProdnOrdConf2<\/code> teyitleri olarak g\u00f6nderilmesi.<\/li>\n\n\n<li><strong>Mevcut planla paralel test:<\/strong> planlamac\u0131lar g\u00fcven duyana kadar SkyPlanner \u00e7izelgesi, mevcut kapasite dengeleme plan\u0131yla birlikte y\u00fcr\u00fct\u00fcl\u00fcr.<\/li>\n\n\n<li><strong>Canl\u0131ya ge\u00e7i\u015f.<\/strong><\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP S\/4HANA\u2019da dikkat edilmesi gerekenler<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Geri yazma, ETag i\u00e7eren bir eylem \u00e7a\u011fr\u0131s\u0131yla yap\u0131l\u0131r.<\/strong> Dok\u00fcmantasyonda bir operasyonu \u00e7izelgelemek i\u00e7in belirtilen y\u00f6ntem, <code>ScheduleProductionOrderOperation<\/code> \u00e7a\u011fr\u0131s\u0131n\u0131 kullanmakt\u0131r; <code>A_ProductionOrderOperation_2<\/code> \u00fczerinde PATCH yapmak de\u011fildir. F modu ba\u015flang\u0131\u00e7tan ileriye, B modu ise biti\u015ften geriye do\u011fru \u00e7izelgeler. K ve S modlar\u0131 mevcut tarihleri korur ve g\u00f6nderdi\u011finiz tarihleri dikkate almaz. <code>if-match<\/code> i\u00e7indeki ETag, \u00fcretim emrinin <code>LastChangeDateTime<\/code> (YYYYMMDDHHMMSS) de\u011ferinden olu\u015fturulur. Bu nedenle \u00fcretim emrindeki herhangi bir de\u011fi\u015fiklik ETag&#8217;i ge\u00e7ersiz k\u0131lar. Yazmadan \u00f6nce okuma mekanizmas\u0131 ve yeniden deneme kuyru\u011fu olu\u015fturun.<\/li>\n\n\n<li><strong>Kapasite, i\u015f merkezi ba\u015fl\u0131k verilerinde yer almaz.<\/strong> Kullan\u0131labilir kapasite; kapasite kategorisinden (001 makine, 002 i\u015f\u00e7ilik), fabrika takviminden ve bu takvimin yerine ge\u00e7en zaman aral\u0131klar\u0131 ile vardiyalardan elde edilir. Kapasite form\u00fclleri, rotadaki standart de\u011ferleri haz\u0131rl\u0131k, i\u015fleme ve s\u00f6k\u00fcm ihtiya\u00e7lar\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. <code>A_WorkCenterCapacityInterval_2<\/code> ve vardiya varl\u0131klar\u0131n\u0131 okuyun. Form\u00fcllerin SkyPlanner s\u00fcrelerine nas\u0131l d\u00f6n\u00fc\u015ft\u00fcr\u00fclece\u011fini kararla\u015ft\u0131r\u0131n.<\/li>\n\n\n<li><strong>Standart de\u011ferlerin d\u00fczeltilmesi gerekir.<\/strong> Maliyet hesaplar\u0131 i\u00e7in tutulan rotalarda genellikle ortalama haz\u0131rl\u0131k s\u00fcreleri bulunur veya haz\u0131rl\u0131k s\u00fcreleri yanl\u0131\u015f kapasite kategorisine kaydedilmi\u015f olur.<\/li>\n\n\n<li><strong>Teyit kurallar\u0131 kat\u0131d\u0131r.<\/strong> SAP, toplu kay\u0131t i\u015flemleri i\u00e7in toplu \u00e7a\u011fr\u0131lar \u00f6nerir. Bir de\u011fi\u015fiklik k\u00fcmesi ya b\u00fct\u00fcn\u00fcyle i\u015flenir ya da hi\u00e7 i\u015flenmez; bu nedenle tek bir hatal\u0131 s\u00fcre fi\u015fi, k\u00fcmenin geri kalan\u0131n\u0131 da engeller. Toplu \u00e7a\u011fr\u0131daki iptaller, <code>ConfirmationCount<\/code> de\u011ferinin ters s\u0131ras\u0131yla y\u00fcr\u00fct\u00fclmelidir. Ayn\u0131 \u00fcretim emrinde farkl\u0131 teyit t\u00fcrlerini bir arada kullanamaz, teyit olmadan mal hareketi kaydedemez veya tetikleme noktalar\u0131 ileti\u015fim kutusu gerektiren operasyonlar\u0131 teyit edemezsiniz.<\/li>\n\n\n<li><strong>PP\/DS\u2019nin etkin olup olmad\u0131\u011f\u0131n\u0131 kontrol edin.<\/strong> G\u00f6m\u00fcl\u00fc PP\/DS, <strong>Activate Advanced Planning and Scheduling<\/strong> Customizing etkinli\u011fini ve SAP HANA integrated liveCache\u2019i gerektirir. SAP bunu ayr\u0131 bir \u00fcr\u00fcn olarak satar: <a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">SAP S\/4HANA Manufacturing for planning and scheduling<\/a>. Etkin oldu\u011fu durumlarda, \u00e7izelgelemeyi hangi sistemin yapaca\u011f\u0131na malzeme baz\u0131nda karar verin: ileri planlama i\u00e7in i\u015faretlenen malzemeler PP\/DS\u2019nin sorumlulu\u011fundad\u0131r. SAP, planl\u0131 sipari\u015f API\u2019si i\u00e7in ayr\u0131ca \u015funu belirtir: &#8220;Automatic integration to PP\/DS is not enabled from this API.&#8221; (Bu API \u00fczerinden s\u00f6z konusu sisteme otomatik entegrasyon etkin de\u011fildir.)<\/li>\n\n\n<li><strong>\u00d6l\u00e7\u00fc birimleri.<\/strong> Operasyon miktarlar\u0131, rota temel miktarlar\u0131 ve teyit birimleri farkl\u0131 olabilir. D\u00f6n\u00fc\u015f\u00fcm\u00fc malzemenin temel birimini de\u011fil, operasyon birimini kullanarak a\u00e7\u0131k\u00e7a yap\u0131n.<\/li>\n\n\n<li><strong>S\u00fcr\u00fcmler aras\u0131 farkl\u0131l\u0131klar.<\/strong> <a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>, klasik CM21\/CM22 planlama tablosunun yerini Manage Work Center Capacity, Capacity Scheduling Table ve Capacity Scheduling Board uygulamalar\u0131n\u0131n ald\u0131\u011f\u0131n\u0131 g\u00f6sterir. Public Edition, API\u2019leri yaln\u0131zca ileti\u015fim senaryolar\u0131 \u00fczerinden sunar ve sundu\u011fu servis s\u00fcr\u00fcmleri \u015firket i\u00e7i kurulumdakilerden farkl\u0131 olabilir. Rota API\u2019si rotalar\u0131 silemez veya malzeme atamalar\u0131n\u0131 g\u00fcncelleyemez. SkyPlanner ekibi, kapsam belirleme s\u0131ras\u0131nda ilgili s\u00fcr\u00fcm\u00fcn API Business Accelerator Hub kayd\u0131n\u0131 kullanarak her m\u00fc\u015fteri sistemi i\u00e7in servis s\u00fcr\u00fcmlerini sabitler.<\/li>\n\n\n<li><strong>Rotalarda yer almayan k\u0131s\u0131tlar.<\/strong> S\u0131raya ba\u011fl\u0131 tip de\u011fi\u015fimlerini, tak\u0131m \u00e7ak\u0131\u015fmalar\u0131n\u0131 ve birden fazla operat\u00f6r gerektiren operasyonlar\u0131 rota standart de\u011ferlerinde de\u011fil, SkyPlanner\u2019da tutun. Haz\u0131rl\u0131k s\u00fcresi matrisi, her \u00fcr\u00fcn \u00e7ifti i\u00e7in tip de\u011fi\u015fimi s\u00fcrelerini i\u00e7erir. Sipari\u015fin PRT\u2019lerinde yer alan tak\u0131mlar s\u0131n\u0131rl\u0131 kaynaklard\u0131r ve ayn\u0131 anda yaln\u0131zca bir i\u015f merkezinde kullan\u0131labilir. Bir operasyon ayn\u0131 anda birden fazla ki\u015fi de gerektirebilir.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Entegrasyonu kim yap\u0131land\u0131r\u0131r?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Yukar\u0131daki noktalar, as\u0131l i\u015fin neden yap\u0131land\u0131rma oldu\u011funu g\u00f6sterir. Her tesis S\/4HANA\u2019y\u0131 farkl\u0131 kullan\u0131r: sipari\u015f t\u00fcrleri, kapasite kategorileri, rota standart de\u011ferleri, user exit\u2019ler ve kullan\u0131lan s\u00fcr\u00fcm, veri e\u015flemesini de\u011fi\u015ftirir.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>SkyPlanner ekibi entegrasyonu yap\u0131land\u0131r\u0131r.<\/strong> Devreye alma s\u00fcrecinde, yay\u0131mlanm\u0131\u015f S\/4HANA API\u2019lerini ve SkyPlanner\u2019\u0131n REST API\u2019si ile webhook\u2019lar\u0131n\u0131 kullanarak entegrasyonu S\/4HANA yap\u0131n\u0131za uyarlar. Canl\u0131ya ge\u00e7i\u015ften sonra da entegrasyonu destekler. Standart yakla\u015f\u0131m budur; hem \u00e7izelgeleme yaz\u0131l\u0131m\u0131 hem de S\/4HANA ba\u011flant\u0131s\u0131 i\u00e7in tek bir sorumlu sa\u011flar.<\/li>\n\n\n<li><strong>SAP i\u015f orta\u011f\u0131n\u0131z<\/strong> da entegrasyonu geli\u015ftirebilir. Sipari\u015f t\u00fcrlerinize ve Basis yap\u0131land\u0131rman\u0131za ili\u015fkin bilgisiyle SkyPlanner\u2019\u0131n Swagger\/OpenAPI belgelerinden yararlan\u0131r.<\/li>\n\n\n<li><strong>Kendi geli\u015ftiricileriniz<\/strong>, belgelenmi\u015f REST API&#8217;yi, API belirteciyle kimlik do\u011frulamas\u0131n\u0131 ve webhook&#8217;lar\u0131 kullanarak entegrasyonu do\u011frudan veya SAP Integration Suite ya da SAP BTP \u00fczerinde geli\u015ftirebilir (<a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">entegrasyon rehberi<\/a>). Ba\u015flamak i\u00e7in bir API anahtar\u0131 yeterlidir; yard\u0131m istediklerinde SkyPlanner ekibi devreye girer.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner h\u00e2lihaz\u0131rda SAP ile birlikte \u00e7al\u0131\u015f\u0131yor: Laboratory &amp; Allied\u2019\u0131n kendi BT ekibi, SkyPlanner\u2019\u0131n deste\u011fiyle SAP Business One on HANA\u2019y\u0131 SkyPlanner\u2019a ba\u011flad\u0131. \u00d6zellik belgeleri <a href=\"\/tr\/docs\/entegrasyon-egitimi\/\">SkyPlanner belgeleri<\/a> sayfas\u0131nda herkese a\u00e7\u0131kt\u0131r.<\/p>\n\n\n<p>Hangi yolu se\u00e7erseniz se\u00e7in, \u00f6nce 30 g\u00fcnl\u00fck \u00fccretsiz denemede \u00e7izelgeyi do\u011frulay\u0131n (20 i\u015f merkezine kadar, kredi kart\u0131 gerekmez). B\u00f6ylece entegrasyon, planlamac\u0131lar\u0131n\u0131z\u0131n zaten g\u00fcvendi\u011fi bir plan i\u00e7in kurulur. Denemeden sonra fiyatlar, 5 i\u015f merkezi dahil ayl\u0131k 199 \u20ac\u2019dan ba\u015flar ve ayl\u0131k faturaland\u0131r\u0131l\u0131r. Entegrasyon i\u00e7in s\u00fcre\u00e7 ve ihtiya\u00e7lar\u0131n\u0131za g\u00f6re haz\u0131rlanan teklif, paketinizle birlikte \u00f6nceden sunulur. B\u00f6ylece ba\u015flamadan \u00f6nce toplam maliyeti g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n\n\n<p>Daha kapsaml\u0131 bilgi i\u00e7in <a href=\"\/tr\/fiyatlandirma\/\">fiyatland\u0131rma<\/a>, <a href=\"\/tr\/ozellikler\/\">\u00f6zellikler<\/a> ve <a href=\"\/tr\/musteri-hikayeleri\/\">m\u00fc\u015fteri yorumlar\u0131<\/a> sayfalar\u0131na bak\u0131n.<\/p>\n\n\n<p><a href=\"\/tr\/deneme\/\">\u00dccretsiz denemeyi ba\u015flat\u0131n<\/a> <a href=\"\/tr\/iletisim-satis\/\">Sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00dcreticilerin SkyPlanner yorumlar\u0131<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU Tedarik Zinciri Uzman\u0131 Kalle Kalliom\u00e4ki, Ulvila\u2019daki elektrik panosu \u00fcretim sahas\u0131nda\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>her hafta kazan\u0131lan s\u00fcre<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, \u00fcretim planlamam\u0131z\u0131 Excel tablolar\u0131ndan ger\u00e7ek zamanl\u0131 \u00fcretim optimizasyonuna ta\u015f\u0131d\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Tedarik Zinciri Uzman\u0131<\/b><br>UTU \u00b7 Elektrik panolar\u0131 ve \u015falt donan\u0131mlar\u0131<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim planlamas\u0131nda her hafta 2 saatlik \u00e7al\u0131\u015fma s\u00fcresinden tasarruf ediliyor ve yeni i\u015f s\u0131ras\u0131 saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015f\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/customers\/utu\/\">UTU\u2019nun yorumunu okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Laboratory &amp; Allied\u2019\u0131n Nairobi\u2019deki ila\u00e7 fabrikas\u0131n\u0131n \u015fi\u015fe dolum hatt\u0131nda temiz oda k\u0131yafetleriyle \u00e7al\u0131\u015fan operat\u00f6rler\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u00fcretim verimlili\u011fi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u00dcretimde verimlilik %90 artt\u0131.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, BT M\u00fcd\u00fcr\u00fc<\/b><br>Laboratory &amp; Allied \u00b7 \u0130la\u00e7 \u00fcretimi<\/p>\n\n\n<p class=\"ind-cust__result\">\u00dcretim verimlili\u011fi %90 artt\u0131. T\u00fcm i\u015f merkezlerini kapsayan \u00fc\u00e7 ayl\u0131k optimize edilmi\u015f bir plan haz\u0131rlamak 30 dakikadan az s\u00fcr\u00fcyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/customers\/laboratory-allied\/\">Laboratory &amp; Allied&#8217;\u0131n de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel&#x27;in Kauhava&#x27;daki \u00e7at\u0131 g\u00fcvenlik sistemleri fabrikas\u0131n\u0131n havadan g\u00f6r\u00fcn\u00fcm\u00fc\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%99,2<\/b><span>teslimat performans\u0131<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, darbo\u011fazlar\u0131 daha kolay g\u00f6rmemizi sa\u011flad\u0131 ve \u00fcretim y\u00f6netimini netle\u015ftirdi.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u00dcretim M\u00fcd\u00fcr\u00fc<\/b><br>Piristeel \u00b7 \u00c7at\u0131 g\u00fcvenlik ve ya\u011fmur suyu sistemleri<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 bu y\u0131l %99,2&#8217;ye ula\u015ft\u0131. \u00c7izelgeleme sayesinde g\u00fcnde d\u00f6rt saate varan \u00e7al\u0131\u015fma s\u00fcresinden tasarruf sa\u011flan\u0131yor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/customers\/piristeel\/\">Piristeel&#8217;in de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Alah\u00e4rm\u00e4 tesisinde kaynakl\u0131 bir \u00e7elik yap\u0131y\u0131 ta\u015flayan KJH-Comp kaynak\u00e7\u0131s\u0131\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>%98<\/b><span>teslimat performans\u0131; \u00f6nceki seviye yakla\u015f\u0131k %50<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner, teslimat performans\u0131m\u0131z\u0131 korumam\u0131zda belirleyici bir rol oynuyor.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Genel M\u00fcd\u00fcr<\/b><br>KJH-Comp \u00b7 Sac metal i\u015fleme ve fason \u00fcretim<\/p>\n\n\n<p class=\"ind-cust__result\">Teslimat performans\u0131 yakla\u015f\u0131k %50&#8217;den %98&#8217;e kadar y\u00fckseldi. Art\u0131k \u00e7izelgeleme i\u00e7in iki yerine bir \u015fef yeterli oluyor.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/tr\/customers\/kjh-comp\/\">KJH-Comp&#8217;un de\u011ferlendirmesini okuyun<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner APS, SAP S\/4HANA&#8217;ya nas\u0131l ba\u011flan\u0131r?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS, SAP S\/4HANA ile \u00e7ift y\u00f6nl\u00fc entegre olur. \u00dcretim emirleri, operasyonlar, rotalar, i\u015f merkezleri, stok ve sat\u0131nalma sipari\u015fleri SAP&#8217;nin kullan\u0131ma a\u00e7t\u0131\u011f\u0131 OData API&#8217;leri \u00fczerinden al\u0131n\u0131r. SkyPlanner webhook&#8217;lar\u0131n\u0131n tetiklemesiyle operasyon tarihleri <code>ScheduleProductionOrderOperation<\/code> \u00fczerinden, kaydedilen \u00e7al\u0131\u015fma saatleri ise <code>ProdnOrdConf2<\/code> teyitleri olarak geri g\u00f6nderilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Entegrasyonu kim geli\u015ftirir ve bak\u0131m\u0131n\u0131 kim yapar?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner ekibi, kurulum s\u00fcrecinde entegrasyonu S\/4HANA yap\u0131land\u0131rman\u0131za g\u00f6re ayarlar ve canl\u0131ya ge\u00e7i\u015ften sonra destek sa\u011flar. S\u00fcre\u00e7lerinize ve ihtiya\u00e7lar\u0131n\u0131za uygun entegrasyon teklifi ba\u015ftan sunulur. Entegrasyonu SAP i\u015f orta\u011f\u0131n\u0131z veya kendi geli\u015ftiricileriniz REST API \u00fczerinden kurarsa sorumluluk onlara aittir; SkyPlanner ekibi gerekti\u011finde yard\u0131mc\u0131 olur.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Operasyon tarihleri sisteme nas\u0131l geri yaz\u0131l\u0131r ve S\/4HANA s\u0131ralamay\u0131 korur mu?<\/summary>\n<p class=\"sp-faq__a\"><code>ScheduleProductionOrderOperation<\/code> eylemi, <code>API_PRODUCTION_ORDER_2_SRV<\/code> \u00fczerinden \u00e7a\u011fr\u0131l\u0131r. \u00c7a\u011fr\u0131, sevk durumuyla ileri \u00e7izelgeleme modunda yap\u0131l\u0131r ve SkyPlanner&#8217;daki ba\u015flang\u0131\u00e7 tarihi ile saati g\u00f6nderilir. Her \u00fcretim emrinin operasyonlar\u0131, SkyPlanner&#8217;daki s\u0131rayla tek bir de\u011fi\u015fiklik k\u00fcmesinde g\u00f6nderilir. S\u00fcreler, S\/4HANA&#8217;n\u0131n kulland\u0131\u011f\u0131 ayn\u0131 rota standart de\u011ferlerinden elde edilir. Entegrasyon her operasyonu yeniden okur ve fark varsa i\u015faretler.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Teyitler S\/4HANA&#8217;ya nas\u0131l iletilir?<\/summary>\n<p class=\"sp-faq__a\">Operat\u00f6rler SkyPlanner&#8217;da \u00e7al\u0131\u015fmay\u0131 kaydetti\u011finde bir webhook tetiklenir. Ard\u0131ndan entegrasyon, <code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code> \u00fczerinden sa\u011flam \u00fcretim miktar\u0131, fire ve aktivite s\u00fcrelerini i\u00e7eren bir teyit g\u00f6nderir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bu entegrasyon S\/4HANA Cloud Public Edition ile \u00e7al\u0131\u015f\u0131r m\u0131?<\/summary>\n<p class=\"sp-faq__a\">Evet. Eri\u015fim, ilgili ileti\u015fim senaryolar\u0131 i\u00e7in tan\u0131mlanan bir ileti\u015fim d\u00fczenlemesi \u00fczerinden sa\u011flan\u0131r. SkyPlanner ekibi, kapsam belirleme a\u015famas\u0131nda \u00fcretim emri API s\u00fcr\u00fcm\u00fcn\u00fc kulland\u0131\u011f\u0131n\u0131z Public Edition s\u00fcr\u00fcm\u00fcyle e\u015fle\u015ftirir. \u015eirket i\u00e7i kurulumlarda ve Private Edition&#8217;da ise Gateway servisi etkinle\u015ftirilir.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Zaten PP\/DS kullan\u0131yoruz. SkyPlanner&#8217;a ihtiyac\u0131m\u0131z var m\u0131?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, PP\/DS i\u00e7in lisans\u0131 veya ayr\u0131lm\u0131\u015f personeli olmayan fabrika ve tesislerde kullan\u0131l\u0131r. Customizing ayar\u0131n\u0131n etkinle\u015ftirilmesini, liveCache veya optimizasyon sunucusunu gerektirmez; SAP taraf\u0131nda yaln\u0131zca kullan\u0131ma a\u00e7\u0131lm\u0131\u015f OData API&#8217;leri yeterlidir. Arcturus motoru, ger\u00e7ek makine ve personel kapasitesini dikkate alan \u00fcretim \u00e7izelgesini saniyeler i\u00e7inde olu\u015fturur. \u00dcretimde de\u011fi\u015fiklik oldu\u011funda Autopilot \u00e7izelgeyi otomatik olarak yeniden d\u00fczenler.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Entegrasyon \u00e7al\u0131\u015fmas\u0131na ba\u015flamadan test edebilir miyiz ve proje ne kadar s\u00fcrer?<\/summary>\n<p class=\"sp-faq__a\">Evet. 30 g\u00fcnl\u00fck \u00fccretsiz deneme s\u00fcresinde \u00fcretim emirlerini ve i\u015f merkezlerini S\/4HANA&#8217;dan d\u0131\u015fa aktard\u0131\u011f\u0131n\u0131z dosyalardan i\u00e7e aktar\u0131n. \u00c7izelgenin i\u015fe yarad\u0131\u011f\u0131n\u0131 g\u00f6rd\u00fckten sonra API entegrasyonunu kurun. Uygulama, kurulum s\u00fcrecinin ba\u015flamas\u0131ndan itibaren genellikle birka\u00e7 hafta i\u00e7inde tamamlan\u0131r. Sistem ortam\u0131n\u0131z i\u00e7in kapsam belirlemek \u00fczere <a href=\"\/tr\/iletisim-satis\/\">sat\u0131\u015f ekibiyle g\u00f6r\u00fc\u015f\u00fcn<\/a> veya <a href=\"\/tr\/deneme\/\">\u00fccretsiz denemeyi ba\u015flat\u0131n<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Entegrasyonlar \/ ERP \/ SAP S\/4HANA SAP S\/4HANA Entegrasyon K\u0131lavuzu: SkyPlanner APS ile \u00dcretim \u00c7izelgeleme Bu k\u0131lavuz, SAP i\u015f ortaklar\u0131na, BT ekiplerine ve teknik sat\u0131n alma sorumlular\u0131na SkyPlanner APS\u2019nin SAP S\/4HANA\u2019ya nas\u0131l ba\u011fland\u0131\u011f\u0131n\u0131 g\u00f6sterir. SkyPlanner, SAP\u2019nin yay\u0131mlad\u0131\u011f\u0131 OData API\u2019leri \u00fczerinden S\/4HANA ile \u00e7ift y\u00f6nl\u00fc entegre olur: skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme Malzemeler, BOM\u2019lar, rotalar, \u00fcretim sipari\u015fleri, &#8230; <a title=\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in SAP S\/4HANA Entegrasyon K\u0131lavuzu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/entegrasyon-kilavuzu\/\" aria-label=\"Read more about SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in SAP S\/4HANA Entegrasyon K\u0131lavuzu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100807,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101164","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>APS \u00c7izelgeleme i\u00e7in SAP S\/4HANA Entegrasyonu | SkyPlanner<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS\u2013SAP S\/4HANA entegrasyonu: OData API\u2019leri, ileti\u015fim d\u00fczenlemeleri, ScheduleProductionOrderOperation ile geri yazma, veri e\u015fleme ve sorunlar.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/entegrasyon-kilavuzu\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in SAP S\/4HANA Entegrasyon K\u0131lavuzu\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS\u2013SAP S\/4HANA entegrasyonu: OData API\u2019leri, ileti\u015fim d\u00fczenlemeleri, ScheduleProductionOrderOperation ile geri yazma, veri e\u015fleme ve sorunlar.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/entegrasyon-kilavuzu\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-s4hana\\\/entegrasyon-kilavuzu\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-s4hana\\\/entegrasyon-kilavuzu\\\/\",\"name\":\"APS \u00c7izelgeleme i\u00e7in SAP S\\\/4HANA Entegrasyonu | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS\u2013SAP S\\\/4HANA entegrasyonu: OData API\u2019leri, ileti\u015fim d\u00fczenlemeleri, ScheduleProductionOrderOperation ile geri yazma, veri e\u015fleme ve sorunlar.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-s4hana\\\/entegrasyon-kilavuzu\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-s4hana\\\/entegrasyon-kilavuzu\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-s4hana\\\/entegrasyon-kilavuzu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ERP\u2019niz i\u00e7in SkyPlanner APS\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SAP S\\\/4HANA i\u00e7in SkyPlanner APS: \u00dcretim \u00c7izelgeleme\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/entegrasyonlar\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in SAP S\\\/4HANA Entegrasyon K\u0131lavuzu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"APS \u00c7izelgeleme i\u00e7in SAP S\/4HANA Entegrasyonu | SkyPlanner","description":"SkyPlanner APS\u2013SAP S\/4HANA entegrasyonu: OData API\u2019leri, ileti\u015fim d\u00fczenlemeleri, ScheduleProductionOrderOperation ile geri yazma, veri e\u015fleme ve sorunlar.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/entegrasyon-kilavuzu\/","og_locale":"tr_TR","og_type":"article","og_title":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in SAP S\/4HANA Entegrasyon K\u0131lavuzu","og_description":"SkyPlanner APS\u2013SAP S\/4HANA entegrasyonu: OData API\u2019leri, ileti\u015fim d\u00fczenlemeleri, ScheduleProductionOrderOperation ile geri yazma, veri e\u015fleme ve sorunlar.","og_url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/entegrasyon-kilavuzu\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"19 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/entegrasyon-kilavuzu\/","url":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/entegrasyon-kilavuzu\/","name":"APS \u00c7izelgeleme i\u00e7in SAP S\/4HANA Entegrasyonu | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS\u2013SAP S\/4HANA entegrasyonu: OData API\u2019leri, ileti\u015fim d\u00fczenlemeleri, ScheduleProductionOrderOperation ile geri yazma, veri e\u015fleme ve sorunlar.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/entegrasyon-kilavuzu\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/entegrasyon-kilavuzu\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/entegrasyon-kilavuzu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SkyPlanner ile ERP ve MES yaz\u0131l\u0131m entegrasyonlar\u0131","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/"},{"@type":"ListItem","position":3,"name":"ERP\u2019niz i\u00e7in SkyPlanner APS","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/"},{"@type":"ListItem","position":4,"name":"SAP S\/4HANA i\u00e7in SkyPlanner APS: \u00dcretim \u00c7izelgeleme","item":"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"SkyPlanner APS ile \u00dcretim \u00c7izelgeleme i\u00e7in SAP S\/4HANA Entegrasyon K\u0131lavuzu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entegrasyonlar \/ ERP \/ SAP S\/4HANA SAP S\/4HANA Entegrasyon K\u0131lavuzu: SkyPlanner APS ile \u00dcretim \u00c7izelgeleme Bu k\u0131lavuz, SAP i\u015f ortaklar\u0131na, BT ekiplerine ve teknik sat\u0131n alma sorumlular\u0131na SkyPlanner APS\u2019nin SAP S\/4HANA\u2019ya nas\u0131l ba\u011fland\u0131\u011f\u0131n\u0131 g\u00f6sterir. SkyPlanner, SAP\u2019nin yay\u0131mlad\u0131\u011f\u0131 OData API\u2019leri \u00fczerinden S\/4HANA ile \u00e7ift y\u00f6nl\u00fc entegre olur: skyplanner.ai \u00b7 \u00dcretim \u00e7izelgeleme Malzemeler, BOM\u2019lar, rotalar, \u00fcretim sipari\u015fleri,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/101164","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=101164"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/101164\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/pages\/100807"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=101164"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}