{"id":99676,"date":"2026-10-16T05:16:05","date_gmt":"2026-10-16T05:16:05","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99676"},"modified":"2026-10-16T05:17:25","modified_gmt":"2026-10-16T05:17:25","slug":"configure-to-order","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/","title":{"rendered":"Configure to order: fr\u00e5n kundens val till leverans"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Configure to order: fr\u00e5n kundens val till leverans<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sv\/\">Hem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/\">Resurser<\/a> &raquo; Configure to order: fr\u00e5n kundens val till leverans<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ber\u00e4knad l\u00e4stid: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minuter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Configure to order (CTO) inneb\u00e4r att en produkt tillverkas utifr\u00e5n kundens val bland f\u00f6rdefinierade alternativ som g\u00e5r att kombinera. Kunden f\u00e5r en kombination som passar behoven, medan tillverkaren \u00e5teranv\u00e4nder befintliga konstruktioner och produktregler i st\u00e4llet f\u00f6r att konstruera varje order fr\u00e5n grunden.<\/p>\n\n\n<p>F\u00f6rdelen \u00e4r valfrihet utan att beh\u00f6va betala f\u00f6r samma konstruktionsarbete g\u00e5ng p\u00e5 g\u00e5ng. Men \u00e4ven en godk\u00e4nd kombination kr\u00e4ver r\u00e4tt material, tillverkningsoperationer och tid i produktionen. Att en produkt g\u00e5r att s\u00e4lja betyder inte automatiskt att den kan levereras n\u00e4sta fredag.<\/p>\n\n\n<p>SkyPlanner APS hj\u00e4lper dig att hantera den andra delen av utmaningen. Arcturus, systemets AI f\u00f6r schemal\u00e4ggning, ber\u00e4knar n\u00e4r arbetet kan utf\u00f6ras tillsammans med dina andra order. Du ser resultatet i ett Gantt-schema och styr prioriteringarna, i st\u00e4llet f\u00f6r att beh\u00f6va g\u00f6ra om k\u00f6rplanen f\u00f6r varje produktionsgrupp n\u00e4r produktmixen \u00e4ndras.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vad k\u00e4nnetecknar en produkt som konfigureras mot kundorder?<\/h2>\n\n\n<p>Arbetet med CTO b\u00f6rjar innan kunden l\u00e4gger en order. Konstruktionsavdelningen definierar produktens byggstenar, de till\u00e5tna valen och reglerna f\u00f6r hur de kan kombineras. F\u00f6rs\u00e4ljningen v\u00e4ljer sedan inom det godk\u00e4nda utbudet.<\/p>\n\n\n<p>T\u00e4nk dig en tillverkare av modul\u00e4ra transport\u00f6rer. Kunderna v\u00e4ljer bredd och l\u00e4ngd bland standardm\u00e5tten samt bandtyp, stommaterial, drivenhet och sensorpaket. Reglerna anger vilka drivenheter som passar f\u00f6r respektive last och hastighet, vilka band som l\u00e4mpar sig f\u00f6r olika till\u00e4mpningar och vilka sensorl\u00f6sningar som finns tillg\u00e4ngliga. Ett giltigt val pekar ut en etablerad l\u00f6sning, inte en konstruktionsfr\u00e5ga som \u00e5terst\u00e5r att l\u00f6sa.<\/p>\n\n\n<p>Valen kan \u00e4nd\u00e5 inneb\u00e4ra ett omfattande tillverkningsarbete. En stomme i rostfritt st\u00e5l kan beh\u00f6va tillverkas och poleras innan transport\u00f6ren monteras. CTO betyder inte att varje del redan ligger p\u00e5 hyllan eller att ordern bara kr\u00e4ver slutmontering.<\/p>\n\n\n<p>Gr\u00e4nsen g\u00e5r vid vad de godk\u00e4nda konstruktionerna omfattar. Om kunden vill ha en lastkapacitet eller lutning utanf\u00f6r dessa gr\u00e4nser m\u00e5ste konstruktionsavdelningen bed\u00f6ma \u00f6nskem\u00e5let. Du kan erbjuda ett standardalternativ eller hantera avvikelsen som konstruktionsarbete, i st\u00e4llet f\u00f6r att l\u00e5ta den passera obem\u00e4rkt genom konfigurationsprocessen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">CTO, ETO, MTO och ATO beskriver olika saker<\/h3>\n\n\n<p>Begreppen hj\u00e4lper till att beskriva en order, men de utesluter inte alltid varandra:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Konfigurering mot kundorder:<\/strong> Vad kan kunden v\u00e4lja? Produkten konfigureras med f\u00f6rdefinierade alternativ som g\u00e5r att kombinera.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/engineer-to-order\/\">Kundorderspecifik konstruktion och tillverkning (ETO)<\/a>:<\/strong> Kr\u00e4ver \u00f6nskem\u00e5let nytt konstruktionsarbete? En kundspecifik l\u00f6sning m\u00e5ste utvecklas, eventuellt med standarddelar som en del av l\u00f6sningen.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/kundorderstyrd-produktion\/\">Tillverkning mot kundorder (MTO)<\/a>:<\/strong> Vad utl\u00f6ser tillverkningen? Produktionen startar efter kundordern och kan utg\u00e5 fr\u00e5n en befintlig konstruktion.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/montering-mot-kundorder\/\">Montering mot kundorder (ATO)<\/a>:<\/strong> Vad f\u00f6rbereds i f\u00f6rv\u00e4g? Komponenter eller delmontage \u00e4r klara f\u00f6re ordern. D\u00e4refter monteras den slutprodukt som kunden har valt.<\/li><\/ul>\n\n\n<p>Transport\u00f6ren kan konfigureras mot kundorder och sedan tillverkas mot kundorder. En annan produktfamilj kan anv\u00e4nda samma princip f\u00f6r konfigurering men monteras av lagerh\u00e5llna moduler efter best\u00e4llning. Konfigureringen beskriver valet, medan produktionsstrategin avg\u00f6r vilket arbete som \u00e5terst\u00e5r n\u00e4r valet \u00e4r gjort.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e4r l\u00f6nar sig configure to order?<\/h2>\n\n\n<p>CTO passar v\u00e4l n\u00e4r kunderna beh\u00f6ver relevanta valm\u00f6jligheter, men en stor del av konstruktionsarbetet \u00e5terkommer fr\u00e5n order till order. De b\u00e4sta kandidaterna \u00e4r produktfamiljer d\u00e4r ett hanterbart antal moduler och regler kan t\u00e4cka en tillr\u00e4ckligt stor del av efterfr\u00e5gan.<\/p>\n\n\n<p>G\u00e5 igenom de senaste orderna. Vilka skillnader skapar verkligt v\u00e4rde f\u00f6r kunden? Vilka leder till att samma fr\u00e5gor skickas tillbaka till konstruktionsavdelningen g\u00e5ng p\u00e5 g\u00e5ng? \u00c5terkommande val av storlek, material, prestanda eller tillbeh\u00f6r kan standardiseras om kombinationerna g\u00e5r att validera i f\u00f6rv\u00e4g.<\/p>\n\n\n<p>Vinsterna kommer av att slippa g\u00f6ra om samma arbete. F\u00f6rs\u00e4ljningen kan erbjuda godk\u00e4nda kombinationer med f\u00e4rre avst\u00e4mningar. Konstruktionsavdelningen kan l\u00e4gga mer tid p\u00e5 nya l\u00f6sningar och verkliga undantag. Ink\u00f6p och produktion f\u00e5r mer enhetliga underlag att arbeta med. Du kan erbjuda ett bredare sortiment utan att behandla varje f\u00f6rs\u00e4ljning som ett nytt utvecklingsprojekt.<\/p>\n\n\n<p>Vinsterna kr\u00e4ver en investering. N\u00e5gon m\u00e5ste konstruera modulerna, underh\u00e5lla reglerna f\u00f6r vilka alternativ som g\u00e5r att kombinera och h\u00e5lla produktionsinformationen uppdaterad n\u00e4r delar eller konstruktioner \u00e4ndras. Ett tillval som s\u00e4ljer s\u00e4llan men kr\u00e4ver en s\u00e4rskild f\u00f6rs\u00f6rjningskedja och en unik operationsf\u00f6ljd kan kosta mer \u00e4n det ger. Fler valm\u00f6jligheter \u00e4r inte automatiskt ett b\u00e4ttre erbjudande.<\/p>\n\n\n<p>B\u00f6rja med en produktfamilj d\u00e4r upprepningen \u00e4r tydlig. Definiera vilka alternativ som ska ing\u00e5 och hur undantag ska hanteras. Kontrollera sedan att f\u00f6rs\u00e4ljning, konstruktion och produktion tolkar samma val p\u00e5 samma s\u00e4tt. Standardisera det kunderna k\u00f6per \u00e5terkommande, inte varje special\u00f6nskem\u00e5l ni n\u00e5gonsin har f\u00e5tt.<\/p>\n\n\n<p>CTO \u00e4r mindre attraktivt n\u00e4r de flesta order kr\u00e4ver helt nytt konstruktionsarbete eller n\u00e4r kunderna inte accepterar v\u00e4ntetiden f\u00f6r den \u00e5terst\u00e5ende tillverkningen. Popul\u00e4ra produkter som beh\u00f6vs direkt kan vara b\u00e4ttre att leverera fr\u00e5n f\u00e4rdigvarulagret. Olika produktfamiljer kan hanteras p\u00e5 olika s\u00e4tt utan att fabrikens \u00f6vergripande strategi blir inkonsekvent.<\/p>\n\n\n<h2 class=\"wp-block-heading\">G\u00f6r de valda alternativen till en produktionsklar order<\/h2>\n\n\n<p>En konfiguration ska tala om f\u00f6r produktionen vad som ska tillverkas, inte tvinga planeraren att pussla ihop det utifr\u00e5n en offert. Vid \u00f6verl\u00e4mningen beh\u00f6vs den valda specifikationen med tillh\u00f6rande materialbehov, operationsf\u00f6ljd, tids\u00e5tg\u00e5ng och resurser som kan utf\u00f6ra arbetet.<\/p>\n\n\n<p>En produktkonfigurator kontrollerar att valen \u00e4r giltiga. Programvara f\u00f6r konfigurering, priss\u00e4ttning och offertframtagning (CPQ) kan ocks\u00e5 st\u00f6dja priss\u00e4ttning och offertarbete. ERP-systemet kan hantera den accepterade ordern och produktionsunderlaget. Detaljplaneringen placerar sedan in arbetet i den tillg\u00e4ngliga tiden. Uppgifterna h\u00e4nger ihop, men att validera en kombination inneb\u00e4r inte i sig att tillverkningskapacitet reserveras.<\/p>\n\n\n<p>F\u00f6r den t\u00e4nkta transport\u00f6rtillverkaren kan p\u00e5verkan p\u00e5 planeringen se ut s\u00e5 h\u00e4r:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kundens val<\/th><th>P\u00e5verkan p\u00e5 arbete eller materialf\u00f6rs\u00f6rjning<\/th><th>Underlag f\u00f6r schemal\u00e4ggningen<\/th><\/tr><\/thead><tbody><tr><td>Stomme i rostfritt st\u00e5l<\/td><td>Annat material samt tillverkning och polering<\/td><td>Korrekta uppgifter om materialtillg\u00e4nglighet och n\u00f6dv\u00e4ndiga operationer<\/td><\/tr><tr><td>Stomme i ytbehandlat st\u00e5l<\/td><td>Tillverkning f\u00f6ljd av den godk\u00e4nda operationsf\u00f6ljden f\u00f6r ytbehandling<\/td><td>Bearbetningstid, st\u00e4lltid och eventuell n\u00f6dv\u00e4ndig v\u00e4ntetid<\/td><\/tr><tr><td>St\u00f6rre godk\u00e4nd drivenhet<\/td><td>En annan ink\u00f6pt komponent och andra monteringskrav<\/td><td>N\u00e4r komponenten finns tillg\u00e4nglig och r\u00e4tt tids\u00e5tg\u00e5ng f\u00f6r operationerna<\/td><\/tr><tr><td>Sensorpaket som tillval<\/td><td>Ytterligare installation och kontroll<\/td><td>Det extra arbete och de resurser som kr\u00e4vs f\u00f6re f\u00e4rdigst\u00e4llandet<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>L\u00e5t konsekvenserna av varje val f\u00f6lja med in i ordern. Om bara beskrivningen \u00e4ndras medan standardoperationsf\u00f6ljden l\u00e4mnas or\u00f6rd syns inte arbetet du just har s\u00e5lt.<\/p>\n\n\n<p>Se till att den valda konfigurationen g\u00e5r att identifiera b\u00e5de n\u00e4r ordern frisl\u00e4pps och vid senare \u00e4ndringar. Best\u00e4m vem som uppdaterar material- och arbetsbehoven om kunden \u00e4ndrar ett val. Ett annat band eller en annan stomme kan p\u00e5verka ink\u00f6pta delar, redan p\u00e5b\u00f6rjat arbete och f\u00e4rdigdatumet. Hantera det som en order\u00e4ndring som beh\u00f6ver bed\u00f6mas, inte bara som en ny rad i offerten.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Schemal\u00e4gg den faktiska varianten, inte en genomsnittsprodukt<\/h2>\n\n\n<p>Vi \u00e5terv\u00e4nder till transport\u00f6rtillverkaren. F\u00f6rs\u00e4ljningen f\u00e5r flera order p\u00e5 den rostfria versionen. Antalet transport\u00f6rer \u00e4r som vanligt, men fler av dem beh\u00f6ver nu poleras. Fabrikens standardledtid har inte \u00e4ndrats, men det har belastningen p\u00e5 poleringsresursen.<\/p>\n\n\n<p>Om planeraren schemal\u00e4gger varje transport\u00f6r som en genomsnittlig enhet kan de extra operationerna f\u00f6rbli osynliga tills produktionen n\u00e5r fram till dem. Stommarna kan tillverkas snabbt men sedan f\u00e5 v\u00e4nta p\u00e5 polering. Att b\u00f6rja tillverka fler stommar skapar inte mer poleringskapacitet.<\/p>\n\n\n<p>Den relevanta leveransfr\u00e5gan blir d\u00e4rf\u00f6r: n\u00e4r kan det faktiska arbetet f\u00f6r den h\u00e4r ordern bli klart, med h\u00e4nsyn till material och <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/planering-mot-begransad-kapacitet\/\">kapacitet som redan \u00e4r uppbokade f\u00f6r andra kunder<\/a>?<\/p>\n\n\n<p>SkyPlanner ger arbetet en plats i ett sammanh\u00e4ngande produktionsschema. Du definierar processteg, tids\u00e5tg\u00e5ng, produktionsgrupper, skift och resurskrav. Produkter som \u00e5teranv\u00e4nds kan ha fastst\u00e4llda operationsf\u00f6ljder, och orderraderna representerar det arbete som ska schemal\u00e4ggas. Den konfigurerade ordern m\u00e5ste komma till planeringen med de operationer och material som motsvarar den valda varianten.<\/p>\n\n\n<p>Arcturus ber\u00e4knar ordningsf\u00f6ljden mellan order utifr\u00e5n den kapacitet, de beroenden och de schemal\u00e4ggningsregler du har definierat. I Gantt-vyn kan du f\u00f6lja arbetet \u00f6ver olika resurser och se hur konkurrerande order p\u00e5verkar varandra. D\u00e5 blir k\u00f6n till poleringen en del av leveransbed\u00f6mningen innan den blir en \u00f6verraskning p\u00e5 produktionsgolvet.<\/p>\n\n\n<p>N\u00e4r schemal\u00e4ggning med h\u00e4nsyn till material \u00e4r aktiverad ing\u00e5r \u00e4ven materialtillg\u00e5ngen i ber\u00e4kningen. En ink\u00f6pt drivenhet som v\u00e4ntas komma senare kan inte behandlas som en som redan finns tillg\u00e4nglig. H\u00e5ll leveransinformationen uppdaterad och g\u00f6r en ny ber\u00e4kning n\u00e4r den \u00e4ndras.<\/p>\n\n\n<p>Du best\u00e4mmer prioriteringarna och anv\u00e4nder l\u00e5sningar f\u00f6r att skydda beslut i schemat. Om en br\u00e5dskande transport\u00f6r f\u00e5r f\u00f6rtur r\u00e4knar Arcturus om schemat inom de ramarna. Du granskar ocks\u00e5 de nya datumen f\u00f6r \u00f6vriga order. Det inneb\u00e4r mindre manuellt arbete med k\u00f6rplanerna och ett tydligare underlag f\u00f6r att v\u00e4lja vilka leverans\u00e5taganden som ska skyddas.<\/p>\n\n\n<p>SkyPlanner integreras med valfritt ERP eller MES via sitt <a href=\"https:\/\/skyplanner.ai\/sv\/integrationer\/\">\u00f6ppna REST API<\/a>. Koppla befintliga order-, produkt- och produktionsdata till detaljplaneringen i st\u00e4llet f\u00f6r att b\u00f6rja med att byta ERP-system. Vid inf\u00f6randet av CTO beh\u00f6ver du kartl\u00e4gga hur den valda varianten oms\u00e4tts i korrekta material- och operationsdata i fl\u00f6det. Det \u00e4r den praktiska kopplingen mellan produkten du har s\u00e5lt och arbetet som Arcturus schemal\u00e4gger.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vad ett sammanh\u00e4ngande produktionsschema f\u00f6r\u00e4ndrade hos UTU<\/h2>\n\n\n<p>UTU tillverkar elcentraler och st\u00e4llverk. F\u00f6re SkyPlanner hade avdelningarna separata planer i Excel, och \u00e4ndringar av ordningsf\u00f6ljden i ERP-systemet n\u00e5dde inte alltid produktionsgolvet. Det var sv\u00e5rt att se den verkliga kapaciteten, s\u00e5 planerna beh\u00f6vde g\u00f6ras om g\u00e5ng p\u00e5 g\u00e5ng f\u00f6r att h\u00e5lla utlovade leveranstider.<\/p>\n\n\n<p>Genom att integrera SkyPlanner med Oracle NetSuite och l\u00f6nesystemet samlade UTU fabrikens linjer och avdelningar i ett och samma planeringssystem. Teamet lyfter fram kombinationen av automatisk schemal\u00e4ggning och Gantt-vyn: kapacitet, bel\u00e4ggning och arbetsordning blir synliga tillsammans.<\/p>\n\n\n<p>I <a href=\"https:\/\/skyplanner.ai\/sv\/kundberattelser\/utu\/\">UTU:s omd\u00f6me om SkyPlanner<\/a> uppger f\u00f6retaget att det sparar omkring tv\u00e5 timmar i veckan som tidigare gick \u00e5t till att uppdatera kalkylblad. F\u00f6retaget beskriver ocks\u00e5 hur projektleveranserna kan planeras mer exakt och hur uppdaterade arbetsk\u00f6er n\u00e5r produktionslinjen p\u00e5 n\u00e5gra sekunder. Det \u00e4r v\u00e4rdet av att koppla ordern till det arbete som faktiskt utf\u00f6rs: mindre tid g\u00e5r \u00e5t till att underh\u00e5lla separata planer och samordningen blir tydligare n\u00e4r k\u00f6rordningen \u00e4ndras.<\/p>\n\n\n<h2 class=\"wp-block-heading\">G\u00f6r det enklare att leverera det kunden v\u00e4ljer<\/h2>\n\n\n<p>CTO skapar v\u00e4rde genom att omvandla \u00e5terkommande kundbehov till val som kan anv\u00e4ndas om och om igen. Ta vara p\u00e5 den f\u00f6rdelen hela v\u00e4gen genom produktionen: utg\u00e5 fr\u00e5n det arbete som den valda varianten kr\u00e4ver och bed\u00f6m leveransm\u00f6jligheterna utifr\u00e5n de resurser som delas med andra order.<\/p>\n\n\n<p>V\u00e4lj SkyPlanner n\u00e4r samordningen kr\u00e4ver betungande omplaneringar varje dag. Arcturus sk\u00f6ter ber\u00e4kningarna f\u00f6r schemal\u00e4ggningen, Gantt-vyn visar konsekvenserna och du beh\u00e5ller kontrollen \u00f6ver prioriteringarna. Du kan l\u00e4gga mer tid p\u00e5 att l\u00f6sa den verkliga begr\u00e4nsningen och mindre p\u00e5 att flytta jobb f\u00f6r att h\u00e5lla separata k\u00f6er i takt med varandra.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sv\/kontaktforsaljning\/\">Boka en demo av SkyPlanner<\/a> och ta med tv\u00e5 vanliga konfigurationer, de operationer som skiljer dem \u00e5t och en resurs som de delar. Det ger en bra utg\u00e5ngspunkt f\u00f6r att se hur era produktval skulle passa in i ett realistiskt produktionsschema. Om du hellre vill utforska p\u00e5 egen hand f\u00f6rst kan du <a href=\"https:\/\/skyplanner.ai\/sv\/prova\/\">prova SkyPlanner med demodata<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Configure to order: fr\u00e5n kundens val till leverans Hem &raquo; Resurser &raquo; Configure to order: fr\u00e5n kundens val till leverans Configure to order (CTO) inneb\u00e4r att en produkt tillverkas utifr\u00e5n kundens val bland f\u00f6rdefinierade alternativ som g\u00e5r att kombinera. Kunden f\u00e5r en kombination som passar behoven, medan tillverkaren \u00e5teranv\u00e4nder befintliga konstruktioner och produktregler i st\u00e4llet &#8230; <a title=\"Configure to order: fr\u00e5n kundens val till leverans\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/\" aria-label=\"L\u00e4s mer om Configure to order: fr\u00e5n kundens val till leverans\">L\u00e4s mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":99687,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2541,311],"tags":[],"class_list":["post-99676","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-och-planering","category-resurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Configure to order: fr\u00e5n kundens val till leverans<\/title>\n<meta name=\"description\" content=\"Erbjud valfrihet utan att konstruera varje order fr\u00e5n grunden. Se n\u00e4r CTO passar och hur SkyPlanner schemal\u00e4gger arbetet f\u00f6r varje konfiguration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/\" \/>\n<meta property=\"og:locale\" content=\"sv_SE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Configure to order: fr\u00e5n kundens val till leverans\" \/>\n<meta property=\"og:description\" content=\"Erbjud valfrihet utan att konstruera varje order fr\u00e5n grunden. Se n\u00e4r CTO passar och hur SkyPlanner schemal\u00e4gger arbetet f\u00f6r varje konfiguration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T05:16:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T05:17:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skriven av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ber\u00e4knad l\u00e4stid\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minuter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Configure to order: fr\u00e5n kundens val till leverans\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:17:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/\"},\"wordCount\":2105,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"articleSection\":[\"APS och planering\",\"resurser\"],\"inLanguage\":\"sv-SE\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/\",\"name\":\"Configure to order: fr\u00e5n kundens val till leverans\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:17:25+00:00\",\"description\":\"Erbjud valfrihet utan att konstruera varje order fr\u00e5n grunden. Se n\u00e4r CTO passar och hur SkyPlanner schemal\u00e4gger arbetet f\u00f6r varje konfiguration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/#breadcrumb\"},\"inLanguage\":\"sv-SE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/configure-to-order\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Configure to order: fr\u00e5n kundens val till leverans\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sv-SE\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Configure to order: fr\u00e5n kundens val till leverans","description":"Erbjud valfrihet utan att konstruera varje order fr\u00e5n grunden. Se n\u00e4r CTO passar och hur SkyPlanner schemal\u00e4gger arbetet f\u00f6r varje konfiguration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/","og_locale":"sv_SE","og_type":"article","og_title":"Configure to order: fr\u00e5n kundens val till leverans","og_description":"Erbjud valfrihet utan att konstruera varje order fr\u00e5n grunden. Se n\u00e4r CTO passar och hur SkyPlanner schemal\u00e4gger arbetet f\u00f6r varje konfiguration.","og_url":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T05:16:05+00:00","article_modified_time":"2026-10-16T05:17:25+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skriven av":"Jussi M\u00e4ntyl\u00e4","Ber\u00e4knad l\u00e4stid":"10 minuter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Configure to order: fr\u00e5n kundens val till leverans","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:17:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/"},"wordCount":2105,"publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","articleSection":["APS och planering","resurser"],"inLanguage":"sv-SE"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/","url":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/","name":"Configure to order: fr\u00e5n kundens val till leverans","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:17:25+00:00","description":"Erbjud valfrihet utan att konstruera varje order fr\u00e5n grunden. Se n\u00e4r CTO passar och hur SkyPlanner schemal\u00e4gger arbetet f\u00f6r varje konfiguration.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/#breadcrumb"},"inLanguage":"sv-SE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/"]}]},{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","width":1672,"height":941,"caption":"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/configure-to-order\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sv\/"},{"@type":"ListItem","position":2,"name":"Configure to order: fr\u00e5n kundens val till leverans"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sv\/#website","url":"https:\/\/skyplanner.ai\/sv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sv-SE"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sv\/","logo":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Configure to order: fr\u00e5n kundens val till leverans Hem &raquo; Resurser &raquo; Configure to order: fr\u00e5n kundens val till leverans Configure to order (CTO) inneb\u00e4r att en produkt tillverkas utifr\u00e5n kundens val bland f\u00f6rdefinierade alternativ som g\u00e5r att kombinera. Kunden f\u00e5r en kombination som passar behoven, medan tillverkaren \u00e5teranv\u00e4nder befintliga konstruktioner och produktregler i st\u00e4llet&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/99676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/comments?post=99676"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/99676\/revisions"}],"predecessor-version":[{"id":99734,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/99676\/revisions\/99734"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media\/99687"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media?parent=99676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/categories?post=99676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/tags?post=99676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}