{"id":111612,"date":"2026-10-28T00:43:16","date_gmt":"2026-10-28T00:43:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111612"},"modified":"2026-10-28T00:44:48","modified_gmt":"2026-10-28T00:44:48","slug":"mtm-analys","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/","title":{"rendered":"MTM-analys: planera arbetet f\u00f6re produktionsstart"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">MTM-analys: planera arbetet f\u00f6re produktionsstart<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sv\/\">Hem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/\">Resurser<\/a> &raquo; MTM-analys: planera arbetet f\u00f6re produktionsstart<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ber\u00e4knad l\u00e4stid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minuter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Det \u00e4r dags att planera produktionen av en ny montering, men den har \u00e4nnu inte utf\u00f6rts tillr\u00e4ckligt m\u00e5nga g\u00e5nger f\u00f6r att ge en tillf\u00f6rlitlig genomsnittstid. \u00c4nd\u00e5 beh\u00f6ver du j\u00e4mf\u00f6ra olika layouter f\u00f6r arbetsplatsen, uppskatta arbetsbelastningen och avg\u00f6ra om de f\u00f6rsta orderna f\u00e5r plats i planen.<\/p>\n\n\n<p>Med MTM-analys (Methods-Time Measurement) kan du analysera den manuella arbetsmetoden innan den ordinarie produktionen b\u00f6rjar. I st\u00e4llet f\u00f6r att v\u00e4nta p\u00e5 historik fr\u00e5n slutf\u00f6rda operationer bygger du upp en tid utifr\u00e5n definierade r\u00f6relser och fastst\u00e4llda tidsdata. Metoden kommer f\u00f6rst: en kortare tid \u00e4r bara anv\u00e4ndbar om den beskriver ett arbete som m\u00e4nniskor faktiskt kan utf\u00f6ra s\u00e4kert och korrekt.<\/p>\n\n\n<p>N\u00e4r tiden har godk\u00e4nts f\u00f6r planering hj\u00e4lper SkyPlanner APS dig att anv\u00e4nda den i praktiken. Arcturus, systemets AI f\u00f6r schemal\u00e4ggning, passar in operationstiderna i det gemensamma produktionsschemat. P\u00e5 s\u00e5 s\u00e4tt ger en b\u00e4ttre metod ett b\u00e4ttre planeringsunderlag, i st\u00e4llet f\u00f6r att stanna vid en enskild siffra i ett tekniskt dokument.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vad \u00e4r MTM-analys?<\/h2>\n\n\n<p>MTM \u00e4r ett system med f\u00f6rutbest\u00e4mda r\u00f6relsetider som anv\u00e4nds f\u00f6r att beskriva, analysera och utv\u00e4rdera manuellt arbete. En analytiker delar upp en definierad metod i r\u00f6relser eller processbyggstenar, till\u00e4mpar relevanta tidsdata och regler och fastst\u00e4ller tiden f\u00f6r metoden vid en referensprestationsniv\u00e5.<\/p>\n\n\n<p>I en detaljerad MTM-1-analys ing\u00e5r r\u00f6relser som att str\u00e4cka sig, gripa, flytta, positionera och sl\u00e4ppa. F\u00f6ruts\u00e4ttningarna spelar roll: att plocka upp en l\u00e4tt\u00e5tkomlig detalj \u00e4r inte samma uppgift som att v\u00e4lja ut och positionera en sv\u00e5rhanterlig komponent. MTM synligg\u00f6r dessa skillnader i st\u00e4llet f\u00f6r att d\u00f6lja dem i en \u00f6vergripande uppskattning.<\/p>\n\n\n<p>Tidsv\u00e4rden i MTM uttrycks i tidsenheten TMU, som st\u00e5r f\u00f6r time measurement unit. En TMU motsvarar 0,036 sekunder; 1 000 TMU motsvarar allts\u00e5 36 sekunder. TMU \u00e4r en tidsenhet, inte ett procentm\u00e5tt p\u00e5 effektivitet.<\/p>\n\n\n<p>Referensprestationen \u00e4r ocks\u00e5 viktig. MTM utg\u00e5r inte fr\u00e5n att m\u00e4ta tiden f\u00f6r den snabbaste operat\u00f6ren och kalla den standard. Systemets tidsdata bygger redan p\u00e5 en definierad prestationsniv\u00e5. G\u00f6r d\u00e4rf\u00f6r inte en ny prestationsbed\u00f6mning som vid en stoppursstudie bara f\u00f6r att en s\u00e5dan anv\u00e4ndes i en annan studie.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e4r ska du v\u00e4lja MTM framf\u00f6r andra metoder f\u00f6r tidsbest\u00e4mning?<\/h2>\n\n\n<p>MTM \u00e4r s\u00e4rskilt anv\u00e4ndbart n\u00e4r beslutet g\u00e4ller hur manuellt arbete ska utformas: en ny produkt, en \u00e4ndrad fixtur, ett nytt s\u00e4tt att tillhandah\u00e5lla material eller ett val mellan tv\u00e5 monteringsf\u00f6ljder. Du kan j\u00e4mf\u00f6ra arbetsinneh\u00e5llet innan du best\u00e4mmer dig f\u00f6r en metod.<\/p>\n\n\n<p>Det betyder inte att MTM \u00e4r r\u00e4tt svar p\u00e5 alla fr\u00e5gor om tid. V\u00e4lj det underlag som passar beslutet:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>MTM:<\/strong> Hur l\u00e5ng tid b\u00f6r den h\u00e4r definierade manuella metoden kr\u00e4va? Anv\u00e4ndbart f\u00f6r att utforma och j\u00e4mf\u00f6ra arbete innan det finns tillr\u00e4cklig produktionshistorik.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/tidsstudie-i-produktion\/\">Tidsstudie med stoppur<\/a>:<\/strong> Hur l\u00e5ng tid tar de observerade arbetsmomenten under angivna f\u00f6rh\u00e5llanden, och vilken standardtid kan motiveras utifr\u00e5n det? Anv\u00e4ndbart n\u00e4r operationen redan finns och kan studeras.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/frekvensstudie\/\">Frekvensstudie<\/a>:<\/strong> Hur stor andel av tiden g\u00e5r \u00e5t till montering, st\u00e4ll, v\u00e4ntan eller andra aktiviteter? Anv\u00e4ndbart f\u00f6r att f\u00f6rst\u00e5 hur en arbetsperiod f\u00f6rdelas, inte f\u00f6r att tidsbest\u00e4mma varje kort r\u00f6relse.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/tidsregistrering-i-produktionen\/\">Tidsregistrering per operation<\/a>:<\/strong> Vad h\u00e4nde p\u00e5 den h\u00e4r faktiska ordern eller operationen? Anv\u00e4ndbart f\u00f6r att f\u00f6lja upp erfarenheter fr\u00e5n produktionen och f\u00f6rklara avvikelser fr\u00e5n planen.<\/li><\/ul>\n\n\n<p>Dessa metoder kan komplettera varandra. En MTM-analys kan ge ett f\u00f6rslag till metodtid, och efterf\u00f6ljande observationer i produktionen kan visa att ett moment saknas eller att f\u00f6ruts\u00e4ttningarna har \u00e4ndrats. Men ett genomsnitt av registrerade timmar som inneh\u00e5ller v\u00e4ntan p\u00e5 material \u00e4r inte samma sak som ett f\u00f6rutbest\u00e4mt manuellt arbetsinneh\u00e5ll.<\/p>\n\n\n<p>F\u00f6r en automatisk maskincykel beh\u00f6ver den processtyrda tiden fastst\u00e4llas separat. MTM kan beskriva operat\u00f6rens arbete med att lasta in, lasta ur och hantera material, men g\u00f6r inte maskinens sk\u00e4rprogram eller krav p\u00e5 h\u00e4rdningstid till en handr\u00f6relse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM-1, MTM-2 och MTM-UAS: v\u00e4lj r\u00e4tt niv\u00e5<\/h2>\n\n\n<p>MTM \u00e4r en familj av system med olika detaljeringsgrad. Valet p\u00e5verkar b\u00e5de vad analysen beskriver och hur mycket arbete som kr\u00e4vs f\u00f6r att ta fram den.<\/p>\n\n\n<p><strong>MTM-1<\/strong> utg\u00e5r fr\u00e5n grundr\u00f6relser. Det l\u00e4mpar sig f\u00f6r en detaljerad granskning av korta, repetitiva manuella arbeten, d\u00e4r f\u00f6ruts\u00e4ttningarna f\u00f6r enskilda r\u00f6relser har betydelse f\u00f6r hur arbetet utformas.<\/p>\n\n\n<p><strong>MTM-2<\/strong> sammanf\u00f6r grundr\u00f6relser till st\u00f6rre grupper. F\u00f6r arbeten som l\u00e4mpar sig f\u00f6r systemet ger det en mindre detaljerad analys, utan att varje MTM-1-r\u00f6relse beh\u00f6ver registreras separat.<\/p>\n\n\n<p><strong>MTM-UAS<\/strong>, Universal Analyzing System, anv\u00e4nder processbyggstenar p\u00e5 en mer \u00f6vergripande niv\u00e5 och f\u00f6rknippas med batchproduktion. Det \u00e4r inte bara ett annat namn f\u00f6r MTM-1.<\/p>\n\n\n<p>V\u00e4lj system tillsammans med en utbildad analytiker utifr\u00e5n processen, hur repetitivt och varierat arbetet \u00e4r och vilket beslut resultatet ska st\u00f6dja. En h\u00f6gre detaljeringsgrad \u00e4r v\u00e4rdefull n\u00e4r den kan p\u00e5verka beslutet. Korrekt till\u00e4mpning kr\u00e4ver utbildning i det valda systemet samt aktuella data och regler. En allm\u00e4n v\u00e4gledning kan inte ers\u00e4tta detta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e5 blir MTM-analysen en anv\u00e4ndbar planeringstid<\/h2>\n\n\n<p>Ett anv\u00e4ndbart resultat \u00e4r mer \u00e4n en tidsl\u00e4ngd. Det \u00e4r en dokumenterad metod och en tid vars inneb\u00f6rd n\u00e4sta planerare kan f\u00f6rst\u00e5.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Definiera arbetet och f\u00f6ruts\u00e4ttningarna<\/h3>\n\n\n<p>V\u00e4lj produktvariant, operation och metodversion. Beskriv verktyg, fixtur, hur komponenterna tillhandah\u00e5lls, arbetsf\u00f6ljd, kvalitetskontroller samt vad som markerar start och slut. Ange om analysen omfattar en enhet, en cykel eller en batch.<\/p>\n\n\n<p>Involvera dem som utf\u00f6r eller ska utf\u00f6ra arbetet. De kan uppt\u00e4cka en obekv\u00e4m str\u00e4ckr\u00f6relse, en n\u00f6dv\u00e4ndig kontroll eller ett beh\u00e5llarbyte som inte framg\u00e5r av en prydlig ritning. S\u00e4ker hantering och produktkvalitet ska finnas kvar i metoden. Att stryka n\u00f6dv\u00e4ndiga arbetsmoment \u00e4r ingen f\u00f6rb\u00e4ttring.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Analysera arbetsf\u00f6ljden med det valda systemet<\/h3>\n\n\n<p>En utbildad analytiker beskriver arbetet med hj\u00e4lp av l\u00e4mpliga byggstenar och de f\u00f6ruts\u00e4ttningar som p\u00e5verkar dem. Analysen m\u00e5ste ta h\u00e4nsyn till det som faktiskt sker, \u00e4ven arbete som bara utf\u00f6rs med best\u00e4mda intervall.<\/p>\n\n\n<p>F\u00f6lj systemets regler f\u00f6r arbetsf\u00f6ljd och samtidiga aktiviteter. Att b\u00e5da h\u00e4nderna r\u00f6r sig samtidigt inneb\u00e4r inte n\u00f6dv\u00e4ndigtvis att r\u00f6relsernas tider ska l\u00e4ggas efter varandra. Hitta inte heller p\u00e5 en r\u00f6relsetid f\u00f6r att fylla en lucka i en ofullst\u00e4ndig metodbeskrivning.<\/p>\n\n\n<p>H\u00e5ll is\u00e4r st\u00e4llarbete och \u00e5terkommande arbete. Att f\u00f6rbereda en fixtur en g\u00e5ng f\u00f6r hela batchen ska inte bli ett f\u00f6rberedelsemoment vars tid belastar varje enskild enhet.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. J\u00e4mf\u00f6r metoder, inte bara totaltider<\/h3>\n\n\n<p>Anv\u00e4nd analysen f\u00f6r att unders\u00f6ka varf\u00f6r en metod kr\u00e4ver mindre arbete. Skulle komponenten kunna tillhandah\u00e5llas i samma orientering varje g\u00e5ng? Skulle en fixtur kunna g\u00f6ra upprepad ompositionering on\u00f6dig? Kan en \u00e4ndrad arbetsf\u00f6ljd ta bort hantering utan att ta bort en kontroll?<\/p>\n\n\n<p>J\u00e4mf\u00f6r alternativen med samma avgr\u00e4nsning och kvalitetskrav. En metod som verkar snabbare f\u00f6r att p\u00e5fyllning eller kontroll har flyttats utanf\u00f6r analysen har inte n\u00f6dv\u00e4ndigtvis minskat arbetet. Det \u00e4r h\u00e4r MTM blir ett verktyg f\u00f6r att utforma arbetet, snarare \u00e4n en uppskattning som bara ser formell ut.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Fastst\u00e4ll vad tiden som godk\u00e4nts f\u00f6r anv\u00e4ndning omfattar<\/h3>\n\n\n<p>Kontrollera grunderna f\u00f6r tidsber\u00e4kningen innan resultatet anv\u00e4nds som standardtid i produktionen. Identifiera \u00e5terkommande st\u00f6duppgifter och hur personliga behov, \u00e5terh\u00e4mtning och oundvikliga f\u00f6rdr\u00f6jningar ska hanteras. Dokumentera vilka tidstill\u00e4gg som ing\u00e5r och hur de ber\u00e4knas. Utg\u00e5 inte fr\u00e5n en generell procentsats.<\/p>\n\n\n<p>L\u00e5t avbrott som g\u00e5r att undvika f\u00f6rbli synliga som problem att \u00e5tg\u00e4rda. V\u00e4ntan p\u00e5 en saknad komponent ska inte smygas in som en del av varje str\u00e4ck- och gripsekvens. P\u00e5 samma s\u00e4tt f\u00e5r en planeringstid som utel\u00e4mnar n\u00f6dv\u00e4ndigt \u00e5terkommande arbete den nya metoden att framst\u00e5 som l\u00e4ttare att schemal\u00e4gga \u00e4n den \u00e4r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Validera och godk\u00e4nn metoden f\u00f6r anv\u00e4ndning<\/h3>\n\n\n<p>Innan metoden tas i bruk ska ni kontrollera att den g\u00e5r att utf\u00f6ra med den avsedda utrustningen, materialets placering och orientering samt g\u00e4llande kvalitetskrav. N\u00e4r det finns en pilotk\u00f6rning eller en f\u00f6rsta produktionsk\u00f6rning att utg\u00e5 fr\u00e5n, unders\u00f6k avvikelser mot j\u00e4mf\u00f6rbart arbete. Inl\u00e4rning, en \u00e4ndrad fixtur och ett moment som saknas i analysen kr\u00e4ver olika \u00e5tg\u00e4rder.<\/p>\n\n\n<p>Spara analysen och uppgifter om vilket system som anv\u00e4nts, metodversion, antaganden, ing\u00e5ende tidstill\u00e4gg, godk\u00e4nnande och giltighetsdatum. Se \u00f6ver tiden n\u00e4r metoden eller dess f\u00f6ruts\u00e4ttningar \u00e4ndras. Syftet \u00e4r inte att beh\u00e5lla en imponerande siffra f\u00f6r all framtid, utan att s\u00e4kerst\u00e4lla en tillf\u00f6rlitlig koppling mellan arbetet och planen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Exempel: en b\u00e4ttre monteringsmetod schemal\u00e4gger inte sig sj\u00e4lv<\/h2>\n\n\n<p>T\u00e4nk dig en manuell monteringsstation d\u00e4r delarna kommer in v\u00e4nda \u00e5t olika h\u00e5ll. Den f\u00f6reslagna metoden anv\u00e4nder en f\u00f6rb\u00e4ttrad materialbricka och en positioneringsfixtur, vilket minskar behovet av att v\u00e4lja ut och flytta om delar. Teamet kontrollerar metoden och godk\u00e4nner att den tas i bruk.<\/p>\n\n\n<p>Anta att tiden som anv\u00e4nds i planeringen d\u00e4rmed minskar fr\u00e5n tv\u00e5 minuter till en och en halv minut per styck. Det h\u00e4r \u00e4r illustrativa, godk\u00e4nda planeringsunderlag, inte v\u00e4rden h\u00e4mtade fr\u00e5n ett MTM-datakort. Vi antar att en person utf\u00f6r arbetsmomenten i f\u00f6ljd vid en station utan n\u00e5gon \u00f6verlappande maskincykel, och att tidstill\u00e4ggen har st\u00e4mts av mellan tiderna och den tillg\u00e4ngliga arbetstidskalendern.<\/p>\n\n\n<p>F\u00f6r en order p\u00e5 120 stycken med of\u00f6r\u00e4ndrad st\u00e4lltid p\u00e5 30 minuter:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Tidigare metod:<\/strong> 120 \u00d7 2 minuter + 30 minuter = 270 minuter, eller fyra och en halv timme.<\/li><li><strong>Ny metod:<\/strong> 120 \u00d7 1,5 minuter + 30 minuter = 210 minuter, eller tre och en halv timme.<\/li><\/ul>\n\n\n<p>Ordern beh\u00f6ver en timme mindre vid den h\u00e4r stationen. Det frig\u00f6r anv\u00e4ndbar kapacitet, men inneb\u00e4r inte automatiskt att ordern kan skickas en timme tidigare. Den monterade enheten kan fortfarande beh\u00f6va v\u00e4nta p\u00e5 en provb\u00e4nk, en annan order kan bel\u00e4gga resursen f\u00f6r n\u00e4sta operation, eller den frigjorda timmen kan ligga utanf\u00f6r den tidslucka som en annan operation beh\u00f6ver.<\/p>\n\n\n<p>N\u00e4sta steg \u00e4r d\u00e4rf\u00f6r inte att \u201dtidigarel\u00e4gga leveransdatumet med en timme\u201d, utan att \u201dber\u00e4kna p\u00e5 nytt hur den h\u00e4r ordern och \u00f6vrigt arbete kan planeras in p\u00e5 de tillg\u00e4ngliga resurserna\u201d. Den ber\u00e4kningen g\u00f6r SkyPlanner \u00e5t dig.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Anv\u00e4nd godk\u00e4nda metodtider i planeringen med SkyPlanner<\/h2>\n\n\n<p>I SkyPlanner kan du ange en operations varaktighet som tid per styck, produktionstakt eller fast tid. St\u00e4lltid och avvecklingstid anges separat. I det helt manuella exemplet kan den godk\u00e4nda planeringstiden per styck och st\u00e4lltiden f\u00f6r partiet d\u00e4rf\u00f6r h\u00e5llas \u00e5tskilda \u00e4ven n\u00e4r orderkvantiteterna \u00e4ndras.<\/p>\n\n\n<p>Kontrollera f\u00f6rst vilka resurser som beh\u00f6ver reserveras under den angivna tiden. Manuellt arbetsinneh\u00e5ll, maskinbel\u00e4ggning och operationens f\u00f6rlupna tid \u00e4r olika m\u00e5tt. Om en maskin k\u00f6r medan operat\u00f6ren f\u00f6rbereder en annan detalj kan maskinen reserveras f\u00f6r l\u00e4nge om alla aktiviteter summeras. Om enbart det manuella arbetet r\u00e4knas kan man i st\u00e4llet missa tid d\u00e5 utrustningen inte \u00e4r tillg\u00e4nglig f\u00f6r en annan operation. Koppla metoden till de resurser som operationen faktiskt beh\u00f6ver.<\/p>\n\n\n<p>St\u00e4m ocks\u00e5 av tidstill\u00e4ggen mot kalendern. En rast som redan har r\u00e4knats bort fr\u00e5n den tillg\u00e4ngliga kapaciteten ska inte r\u00e4knas bort en g\u00e5ng till genom ett tidstill\u00e4gg f\u00f6r samma rast. Beh\u00e5ll den godk\u00e4nda studiedokumentationen och dokumentera hur dess delar oms\u00e4tts till planeringsunderlag.<\/p>\n\n\n<p>Arcturus schemal\u00e4gger operationerna med dessa tider utifr\u00e5n konfigurerade produktionsgrupper, skift, beroenden och prioriteringar. Gantt-schemat visar hur arbetet h\u00e4nger ihop. N\u00e4r du inf\u00f6r en godk\u00e4nd metod\u00e4ndring uppdaterar du ber\u00f6rda planeringsunderlag och <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/vad-ar-produktionsplanering\/\">ber\u00e4knar om schemat<\/a> f\u00f6r att se effekten p\u00e5 efterf\u00f6ljande operationer och andra order som konkurrerar om kapaciteten.<\/p>\n\n\n<p>Du slipper det manuella arbetet med att bygga om separata k\u00f6rplaner efter varje \u00e4ndring. \u00c4nnu viktigare \u00e4r att du kan anv\u00e4nda en v\u00e4l underbyggd tid f\u00f6r en ny metod i den fram\u00e5tblickande planeringen, innan det finns en l\u00e5ng historik av slutf\u00f6rda operationer. Du avg\u00f6r vilken metod som godk\u00e4nns och vilka \u00e5taganden som ska prioriteras. SkyPlanner ber\u00e4knar det sammanh\u00e4ngande schemat.<\/p>\n\n\n<p>Senare ger den faktiska produktionen ytterligare underlag. SkyPlanner st\u00f6der \u00e4ven uppskattningar av operationers varaktighet utifr\u00e5n historiska tidsregistreringar. H\u00e5ll den k\u00e4llan \u00e5tskild fr\u00e5n MTM: den ena uppskattar tider utifr\u00e5n registrerad produktion, medan den andra utv\u00e4rderar en definierad manuell metod med hj\u00e4lp av f\u00f6rutbest\u00e4mda data.<\/p>\n\n\n<h3 class=\"wp-block-heading\">D\u00e4rf\u00f6r beh\u00f6vs ett gemensamt produktionsschema<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sv\/kundberattelser\/utu\/\">UTU, en finl\u00e4ndsk tillverkare av elcentraler och st\u00e4llverk<\/a>, planerade tidigare med separata kalkylblad f\u00f6r varje avdelning. \u00c4ndringar i k\u00f6rordningen i ERP-systemet n\u00e5dde inte alltid produktionsgolvet, och det var sv\u00e5rt att f\u00e5 en realistisk bild av kapaciteten.<\/p>\n\n\n<p>Genom att koppla SkyPlanner till Oracle NetSuite samlade UTU linjerna och avdelningarna i fabriken i Ulvila i ett enda system. Teamet ber\u00e4ttar att en uppdaterad k\u00f6rplan n\u00e5r mont\u00f6rerna p\u00e5 n\u00e5gra sekunder och att projektleveranserna kan schemal\u00e4ggas mer exakt. Erfarenheten visar v\u00e4rdet av att samla hela arbetsbelastningen i en gemensam plan, i st\u00e4llet f\u00f6r att l\u00e5ta varje avdelning st\u00e4mma av sin egen k\u00f6rplan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fr\u00e5n en v\u00e4l underbyggd metodtid till en tillf\u00f6rlitlig produktionsplan<\/h2>\n\n\n<p>Anv\u00e4nd MTM n\u00e4r du beh\u00f6ver utforma manuellt arbete och underbygga metodvalet innan produktionshistoriken kan ge svar. V\u00e4lj sedan SkyPlanner n\u00e4r den godk\u00e4nda tiden ska f\u00e5 en realistisk plats i planeringen av orderstocken. En genomarbetad metod visar vad arbetet kr\u00e4ver. Schemal\u00e4ggning med h\u00e4nsyn till begr\u00e4nsad kapacitet visar var och n\u00e4r det f\u00e5r plats.<\/p>\n\n\n<p>SkyPlanner kan integreras med vilket ERP- eller MES-system som helst via sitt \u00f6ppna REST API, s\u00e5 att b\u00e4ttre schemal\u00e4ggning kan bygga vidare p\u00e5 din befintliga produktionsinformation.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sv\/kontaktforsaljning\/\">Boka en demo av SkyPlanner<\/a> och ta med en godk\u00e4nd metodtid, tillh\u00f6rande operationsf\u00f6ljd och andra order som konkurrerar om samma kapacitet. Se hur en metod\u00e4ndring p\u00e5verkar produktionsplanen och leveransdatumen, inte bara varaktigheten f\u00f6r en enskild operation. Om du hellre vill utforska sj\u00e4lv f\u00f6rst kan du <a href=\"https:\/\/skyplanner.ai\/sv\/prova\/\">prova SkyPlanner med demodata<\/a> eller anv\u00e4nda assistentens AI-st\u00f6dda kom ig\u00e5ng-funktion.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>MTM-analys: planera arbetet f\u00f6re produktionsstart Hem &raquo; Resurser &raquo; MTM-analys: planera arbetet f\u00f6re produktionsstart Det \u00e4r dags att planera produktionen av en ny montering, men den har \u00e4nnu inte utf\u00f6rts tillr\u00e4ckligt m\u00e5nga g\u00e5nger f\u00f6r att ge en tillf\u00f6rlitlig genomsnittstid. \u00c4nd\u00e5 beh\u00f6ver du j\u00e4mf\u00f6ra olika layouter f\u00f6r arbetsplatsen, uppskatta arbetsbelastningen och avg\u00f6ra om de f\u00f6rsta orderna &#8230; <a title=\"MTM-analys: planera arbetet f\u00f6re produktionsstart\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/\" aria-label=\"L\u00e4s mer om MTM-analys: planera arbetet f\u00f6re produktionsstart\">L\u00e4s mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":111623,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2569,311],"tags":[],"class_list":["post-111612","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-tillverkning","category-resurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MTM-analys: planera arbetet f\u00f6re produktionsstart<\/title>\n<meta name=\"description\" content=\"Beh\u00f6ver du en tid f\u00f6r en ny manuell metod? MTM-analys ger tiden f\u00f6re produktionsstart. Med SkyPlanner blir godk\u00e4nda tider ett genomf\u00f6rbart schema.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/\" \/>\n<meta property=\"og:locale\" content=\"sv_SE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MTM-analys: planera arbetet f\u00f6re produktionsstart\" \/>\n<meta property=\"og:description\" content=\"Beh\u00f6ver du en tid f\u00f6r en ny manuell metod? MTM-analys ger tiden f\u00f6re produktionsstart. Med SkyPlanner blir godk\u00e4nda tider ett genomf\u00f6rbart schema.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T00:43:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T00:44:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skriven av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ber\u00e4knad l\u00e4stid\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minuter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"MTM-analys: planera arbetet f\u00f6re produktionsstart\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:44:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/\"},\"wordCount\":2574,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"articleSection\":[\"Effektiv tillverkning\",\"resurser\"],\"inLanguage\":\"sv-SE\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/\",\"name\":\"MTM-analys: planera arbetet f\u00f6re produktionsstart\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:44:48+00:00\",\"description\":\"Beh\u00f6ver du en tid f\u00f6r en ny manuell metod? MTM-analys ger tiden f\u00f6re produktionsstart. Med SkyPlanner blir godk\u00e4nda tider ett genomf\u00f6rbart schema.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/#breadcrumb\"},\"inLanguage\":\"sv-SE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/mtm-analys\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MTM-analys: planera arbetet f\u00f6re produktionsstart\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sv-SE\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MTM-analys: planera arbetet f\u00f6re produktionsstart","description":"Beh\u00f6ver du en tid f\u00f6r en ny manuell metod? MTM-analys ger tiden f\u00f6re produktionsstart. Med SkyPlanner blir godk\u00e4nda tider ett genomf\u00f6rbart schema.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/","og_locale":"sv_SE","og_type":"article","og_title":"MTM-analys: planera arbetet f\u00f6re produktionsstart","og_description":"Beh\u00f6ver du en tid f\u00f6r en ny manuell metod? MTM-analys ger tiden f\u00f6re produktionsstart. Med SkyPlanner blir godk\u00e4nda tider ett genomf\u00f6rbart schema.","og_url":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T00:43:16+00:00","article_modified_time":"2026-10-28T00:44:48+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skriven av":"Jussi M\u00e4ntyl\u00e4","Ber\u00e4knad l\u00e4stid":"13 minuter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"MTM-analys: planera arbetet f\u00f6re produktionsstart","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:44:48+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/"},"wordCount":2574,"publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","articleSection":["Effektiv tillverkning","resurser"],"inLanguage":"sv-SE"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/","url":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/","name":"MTM-analys: planera arbetet f\u00f6re produktionsstart","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:44:48+00:00","description":"Beh\u00f6ver du en tid f\u00f6r en ny manuell metod? MTM-analys ger tiden f\u00f6re produktionsstart. Med SkyPlanner blir godk\u00e4nda tider ett genomf\u00f6rbart schema.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/#breadcrumb"},"inLanguage":"sv-SE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/"]}]},{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","width":1774,"height":887,"caption":"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/mtm-analys\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sv\/"},{"@type":"ListItem","position":2,"name":"MTM-analys: planera arbetet f\u00f6re produktionsstart"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sv\/#website","url":"https:\/\/skyplanner.ai\/sv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sv-SE"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sv\/","logo":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"MTM-analys: planera arbetet f\u00f6re produktionsstart Hem &raquo; Resurser &raquo; MTM-analys: planera arbetet f\u00f6re produktionsstart Det \u00e4r dags att planera produktionen av en ny montering, men den har \u00e4nnu inte utf\u00f6rts tillr\u00e4ckligt m\u00e5nga g\u00e5nger f\u00f6r att ge en tillf\u00f6rlitlig genomsnittstid. \u00c4nd\u00e5 beh\u00f6ver du j\u00e4mf\u00f6ra olika layouter f\u00f6r arbetsplatsen, uppskatta arbetsbelastningen och avg\u00f6ra om de f\u00f6rsta orderna&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/111612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/comments?post=111612"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/111612\/revisions"}],"predecessor-version":[{"id":111676,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/111612\/revisions\/111676"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media\/111623"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media?parent=111612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/categories?post=111612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/tags?post=111612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}