{"id":111240,"date":"2026-10-27T16:31:21","date_gmt":"2026-10-27T16:31:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111240"},"modified":"2026-10-27T16:33:02","modified_gmt":"2026-10-27T16:33:02","slug":"lagertackning","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/","title":{"rendered":"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sv\/\">Hem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/\">Resurser<\/a> &raquo; Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ber\u00e4knad l\u00e4stid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minuter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Enligt lagerrapporten r\u00e4cker komponenterna i sju arbetsdagar. N\u00e4sta leverans v\u00e4ntas p\u00e5 fredag. \u00c4nd\u00e5 saknas det komponenter f\u00f6r att kunna starta torsdagens tillverkningsorder.<\/p>\n\n\n<p>Det \u00e4r ingen mots\u00e4gelse: att lagret r\u00e4cker i sju dagar vid genomsnittlig f\u00f6rbrukning \u00e4r inte samma sak som att det t\u00e4cker de order som faktiskt ska k\u00f6ras i fabriken. En stor sats, material som sp\u00e4rrats i v\u00e4ntan p\u00e5 kvalitetsgodk\u00e4nnande eller lager som redan reserverats f\u00f6r annat kan \u00e4ndra bilden.<\/p>\n\n\n<p>Lagert\u00e4ckningen hj\u00e4lper dig att uppt\u00e4cka den luckan innan den leder till ett stopp. I tillverkningen beh\u00f6ver fr\u00e5gan vara konkret: <strong>vilket kommande behov kan vi inte l\u00e4ngre t\u00e4cka, och hinner nytt material bli tillg\u00e4ngligt f\u00f6r produktion innan dess?<\/strong> SkyPlanner APS kopplar materialtillg\u00e5ngen till produktionsplanen, s\u00e5 att du kan ta h\u00e4nsyn till maskinkapacitet och leverans\u00e5taganden n\u00e4r du agerar \u2013 inte bara till lagret.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vad \u00e4r lagert\u00e4ckning i tillverkningen?<\/h2>\n\n\n<p>Lagert\u00e4ckning anger hur l\u00e4nge en viss lagerkvantitet r\u00e4cker f\u00f6r att t\u00e4cka behovet. Den uttrycks ofta i dagar eller veckor. I tillverkningen kan behovet avse komponenter eller r\u00e5material till kommande operationer, snarare \u00e4n f\u00e4rdigvaror som s\u00e4ljs till kunder.<\/p>\n\n\n<p>Det m\u00e5ste vara tydligt vad ber\u00e4kningen bygger p\u00e5. Lagert\u00e4ckningen f\u00f6r en komponent i en fabrik \u00e4r inte samma sak som ett lagerm\u00e5tt f\u00f6r hela f\u00f6retaget. Det \u00e4r ocks\u00e5 skillnad p\u00e5 en ber\u00e4kning som enbart utg\u00e5r fr\u00e5n tillg\u00e4ngligt lager och en som \u00e4ven tar med f\u00f6rv\u00e4ntade inleveranser.<\/p>\n\n\n<p>F\u00f6r en snabb uppskattning vid j\u00e4mn f\u00f6rbrukning kan du anv\u00e4nda:<\/p>\n\n\n<p><strong>Lagert\u00e4ckning = anv\u00e4ndbar lagerkvantitet \u00f7 f\u00f6rbrukad kvantitet per dag<\/strong><\/p>\n\n\n<p>Anv\u00e4nd samma enheter och tidsgrund genom hela ber\u00e4kningen. Om det anv\u00e4ndbara lagret \u00e4r 420 komponenter och den genomsnittliga f\u00f6rbrukningen \u00e4r 60 komponenter per arbetsdag blir uppskattningen sju arbetsdagar. J\u00e4mf\u00f6r inte detta direkt med en leverant\u00f6rsledtid i kalenderdagar utan att f\u00f6rst r\u00e4kna om till samma kalender.<\/p>\n\n\n<p>Uppskattningen \u00e4r anv\u00e4ndbar f\u00f6r att s\u00e5lla fram material som beh\u00f6ver ses \u00f6ver. N\u00e4r f\u00f6rbrukningen varierar mellan olika order b\u00f6r du i st\u00e4llet r\u00e4kna fram\u00e5t utifr\u00e5n daterade behov. En komponent som f\u00f6rbrukas i stora satser l\u00e4mnar inte lagret i den j\u00e4mna dagstakt som genomsnittet antyder.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Lagert\u00e4ckning \u00e4r inte lageroms\u00e4ttningshastighet eller DIO<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/lageromsattningshastighet\/\">Lageroms\u00e4ttningshastighet<\/a> och genomsnittlig lagringstid i dagar, DIO, beskriver hur lagret oms\u00e4tts eller hur l\u00e4nge varor ligger i lager, utifr\u00e5n ekonomiska uppgifter f\u00f6r en viss period. De hj\u00e4lper till att bed\u00f6ma lagerstyrningen, men visar inte planeraren om en viss komponent finns tillg\u00e4nglig f\u00f6r torsdagens operation.<\/p>\n\n\n<p>F\u00f6r det beslutet beh\u00f6ver du kvantiteter av samma artikel och de datum d\u00e5 de beh\u00f6vs. Dividera inte antalet komponenter med kostnaden f\u00f6r s\u00e5lda varor, och utg\u00e5 inte fr\u00e5n att ett historiskt m\u00e5tt p\u00e5 lagringstid visar att materialet kommer att finnas tillg\u00e4ngligt fram\u00f6ver.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Utg\u00e5 fr\u00e5n det lager som produktionen faktiskt kan anv\u00e4nda<\/h2>\n\n\n<p>St\u00e4m av ing\u00e5ende saldo innan du ber\u00e4knar lagert\u00e4ckningen. En fysisk inventering kan omfatta material som finns p\u00e5 plats men som inte kan anv\u00e4ndas f\u00f6r de operationer du bed\u00f6mer.<\/p>\n\n\n<p>Skilj p\u00e5 fyra saker:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Fysiskt lagersaldo:<\/strong> den kvantitet som \u00e4r registrerad som fysiskt n\u00e4rvarande p\u00e5 den aktuella lagerplatsen.<\/li><li><strong>Ej anv\u00e4ndbart lager:<\/strong> material som sp\u00e4rrats i v\u00e4ntan p\u00e5 kvalitetsgodk\u00e4nnande, skadat material, material med passerat utg\u00e5ngsdatum eller material vars specifikation inte passar operationen.<\/li><li><strong>Reserverat lager:<\/strong> material som avsatts f\u00f6r andra operationer och som d\u00e4rf\u00f6r m\u00e5ste beaktas i ber\u00e4kningen.<\/li><li><strong>F\u00f6rv\u00e4ntade inleveranser:<\/strong> kvantiteter som kan bli tillg\u00e4ngliga senare, inte material som redan finns i lager.<\/li><\/ul>\n\n\n<p>Det viktiga \u00e4r att ing\u00e5ende saldo och listan \u00f6ver behov st\u00e4mmer \u00f6verens. Om en reservation redan har dragits av fr\u00e5n ing\u00e5ende saldo ska du inte dra av samma behov en g\u00e5ng till senare. Om du d\u00e4remot utg\u00e5r fr\u00e5n anv\u00e4ndbart lager f\u00f6re reservationer m\u00e5ste du ta med de \u00e5terst\u00e5ende behov som ska f\u00f6rbruka det.<\/p>\n\n\n<p>Om systemet till exempel visar \u201dfritt lager\u201d beh\u00f6ver du kontrollera vad som redan har r\u00e4knats bort. Drar du av alla \u00f6ppna order fr\u00e5n ett saldo d\u00e4r de redan \u00e4r bortr\u00e4knade skapar du en brist som inte finns.<\/p>\n\n\n<p>Skilj ocks\u00e5 p\u00e5 en varning om att <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/sakerhetslager\/\">s\u00e4kerhetslagret<\/a> underskrids och en faktisk materialbrist. Om lagret faller under en skyddad buffert kan du beh\u00f6va agera trots att det fortfarande finns material till alla operationer. Ange vilken gr\u00e4ns lagert\u00e4ckningen avser: n\u00e4r bufferten n\u00e5s eller n\u00e4r ett behov inte l\u00e4ngre kan t\u00e4ckas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ber\u00e4kna lagert\u00e4ckningen fram\u00e5t utifr\u00e5n kommande operationer<\/h2>\n\n\n<p>N\u00e4r materialbehovet i produktionen varierar beh\u00f6ver du g\u00e5 igenom behoven i tidsordning. Utg\u00e5 fr\u00e5n det avst\u00e4mda anv\u00e4ndbara saldot, dra av varje behov som ing\u00e5r n\u00e4r materialet beh\u00f6vs och l\u00e4gg till en inleverans f\u00f6rst n\u00e4r kvantiteten f\u00f6rv\u00e4ntas vara anv\u00e4ndbar i produktionen.<\/p>\n\n\n<p>Det ber\u00e4knade saldot vid varje tidpunkt blir:<\/p>\n\n\n<p><strong>Ber\u00e4knat saldo = ing\u00e5ende anv\u00e4ndbart lager + inleveranser som blir anv\u00e4ndbara fram till tidpunkten \u2212 de behov som ing\u00e5r i ber\u00e4kningen fram till tidpunkten<\/strong><\/p>\n\n\n<p>Hitta det f\u00f6rsta behov som den tillg\u00e4ngliga kvantiteten inte kan t\u00e4cka helt. Det \u00e4r den tidpunkten som \u00e4r avg\u00f6rande f\u00f6r att f\u00f6rebygga brist, \u00e4ven om en senare inleverans g\u00f6r att saldot vid veckans slut ser bra ut.<\/p>\n\n\n<p>Anv\u00e4nd datumet d\u00e5 materialet beh\u00f6vs, inte slentrianm\u00e4ssigt datumet d\u00e5 den f\u00e4rdiga ordern ska skickas. Ett ink\u00f6pt \u00e4mne som beh\u00f6vs f\u00f6r bearbetning p\u00e5 tisdag kan inte v\u00e4nta tills den f\u00e4rdiga enheten skickas p\u00e5 fredag.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Exempel: sju dagars lagert\u00e4ckning i genomsnitt, men brist p\u00e5 torsdag<\/h3>\n\n\n<p>T\u00e4nk dig en tillverkare som kontrollerar en ink\u00f6pt komponent p\u00e5 m\u00e5ndag morgon. Det finns 600 stycken fysiskt i lager. Av dessa \u00e4r 100 sp\u00e4rrade i v\u00e4ntan p\u00e5 kvalitetsgodk\u00e4nnande och 80 reserverade f\u00f6r andra operationer som inte ing\u00e5r i exemplet. Det ing\u00e5ende anv\u00e4ndbara saldot f\u00f6r operationerna nedan \u00e4r allts\u00e5 420 stycken.<\/p>\n\n\n<p>Operationerna som ing\u00e5r kr\u00e4ver 120 stycken p\u00e5 m\u00e5ndag, 180 p\u00e5 tisdag och 160 p\u00e5 torsdag. Dessa behov har inte redan dragits av fr\u00e5n det ing\u00e5ende saldot p\u00e5 420 stycken. En ink\u00f6psleverans p\u00e5 200 stycken f\u00f6rv\u00e4ntas bli tillg\u00e4nglig f\u00f6r produktion p\u00e5 fredag morgon.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Tidpunkt i planen<\/th><th>Behov eller anv\u00e4ndbar inleverans<\/th><th>Ber\u00e4knat saldo<\/th><\/tr><\/thead><tbody><tr><td>M\u00e5ndag morgon<\/td><td>Ing\u00e5ende anv\u00e4ndbart lager<\/td><td>420 stycken<\/td><\/tr><tr><td>M\u00e5ndagens operation<\/td><td>Behov: 120 stycken<\/td><td>300 stycken<\/td><\/tr><tr><td>Tisdagens operation<\/td><td>Behov: 180 stycken<\/td><td>120 stycken<\/td><\/tr><tr><td>Torsdagens operation<\/td><td>Behov: 160 stycken<\/td><td>40 stycken saknas<\/td><\/tr><tr><td>Fredagens inleverans<\/td><td>200 stycken blir anv\u00e4ndbara<\/td><td>160 stycken n\u00e4r alla angivna behov har t\u00e4ckts<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Med den senaste tidens genomsnittliga f\u00f6rbrukning p\u00e5 60 stycken per arbetsdag ser ing\u00e5ende lager ut att r\u00e4cka i sju arbetsdagar. De faktiska operationerna visar ett mer br\u00e5dskande problem: det saknas 40 stycken f\u00f6r torsdagens behov. Fredagens inleverans t\u00e4cker inte behovet i tid.<\/p>\n\n\n<p>Den sista raden \u00e4r en prognos f\u00f6r planeringen, inte ett p\u00e5st\u00e5ende om att produktionen kan g\u00f6ra uttag ur ett negativt lager. Ber\u00e4kningen f\u00f6ruts\u00e4tter att det \u00e5terst\u00e5ende behovet fr\u00e5n torsdagen fortfarande ska uppfyllas. N\u00e4r operationen flyttas m\u00e5ste \u00e4ven tidpunkten f\u00f6r dess faktiska materialbehov och f\u00e4rdigdatum flyttas.<\/p>\n\n\n<p>Nu g\u00e5r det att ge ink\u00f6psavdelningen ett precist besked: f\u00e5 fram minst de 40 stycken som saknas, i anv\u00e4ndbart skick, f\u00f6re den operation p\u00e5 torsdagen d\u00e4r de ska anv\u00e4ndas \u2013 eller kom \u00f6verens om en annan produktionsplan. \u201dVi har lager f\u00f6r sju dagar\u201d skulle inte f\u00f6rmedla hur br\u00e5ttom det \u00e4r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">R\u00e4kna med nytt material f\u00f6rst n\u00e4r det blir anv\u00e4ndbart<\/h2>\n\n\n<p>En ink\u00f6psorder kan l\u00f6sa en framtida kvantitetsbrist utan att l\u00f6sa tidsproblemet. Kontrollera om det f\u00f6rv\u00e4ntade datumet avser ankomst till fabriken, slutf\u00f6rd inleverans eller frisl\u00e4ppning till produktionen. Godsmottagning, kontroll och interna transporter kan g\u00f6ra att det g\u00e5r tid mellan dessa h\u00e4ndelser.<\/p>\n\n\n<p>F\u00f6r en kritisk operation kan \u00e4ven en tidsindelning i dagar vara f\u00f6r grov. En leverans som v\u00e4ntas sent p\u00e5 torsdagen kan inte anv\u00e4ndas i en operation p\u00e5 torsdagsmorgonen. Anv\u00e4nd mer exakta tidpunkter n\u00e4r skillnaden p\u00e5verkar beslutet.<\/p>\n\n\n<p>H\u00e5ll is\u00e4r tv\u00e5 tydliga bilder: vilka behov det nuvarande anv\u00e4ndbara lagret t\u00e4cker p\u00e5 egen hand och vilka behov planen t\u00e4cker n\u00e4r tillf\u00f6rlitliga f\u00f6rv\u00e4ntade inleveranser r\u00e4knas med. D\u00e5 ser du b\u00e5de beroendet av p\u00e5fyllning och konsekvensen av en f\u00f6rsening.<\/p>\n\n\n<p>Om behoven t\u00e4cks under hela den unders\u00f6kta perioden, ange \u201dbehoven t\u00e4cks fram till planeringshorisontens slut\u201d. Det betyder inte att lagret r\u00e4cker hur l\u00e4nge som helst. Om ingen f\u00f6rbrukning f\u00f6rv\u00e4ntas ger en division med noll inte heller n\u00e5got meningsfullt underlag f\u00f6r beslut om p\u00e5fyllning.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hur stor lagert\u00e4ckning beh\u00f6vs?<\/h3>\n\n\n<p>Det finns ingen gemensam m\u00e5lniv\u00e5 som passar alla material i tillverkningen. Vilken s\u00e4kerhetsmarginal som beh\u00f6vs beror p\u00e5 tiden f\u00f6r p\u00e5fyllning, variationer, hur kritiskt materialet \u00e4r, dess h\u00e5llbarhet och f\u00f6ljderna av en brist.<\/p>\n\n\n<p>En rimlig f\u00f6rsta kontroll \u00e4r om det anv\u00e4ndbara materialet t\u00e4cker behoven tills n\u00e4sta tillf\u00f6rlitliga p\u00e5fyllning kan tas i bruk, med den s\u00e4kerhetsmarginal som lagerpolicyn kr\u00e4ver. En billig komponent som kan stoppa en hel montering kan beh\u00f6va mer uppm\u00e4rksamhet \u00e4n en betydligt dyrare artikel som \u00e4r l\u00e4tt att ers\u00e4tta.<\/p>\n\n\n<p>K\u00f6p inte in mer av varje artikel bara f\u00f6r att f\u00f6rb\u00e4ttra ett nyckeltal f\u00f6r lagert\u00e4ckning. Unders\u00f6k om den risk som verkar finnas beror p\u00e5 en verklig materialbrist, felaktiga lagersaldon, inaktuella behov eller ett orealistiskt inleveransdatum.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u00e4lj en \u00e5tg\u00e4rd som s\u00e4krar produktion och leveranser<\/h2>\n\n\n<p>N\u00e4r du har identifierat det f\u00f6rsta behov som inte t\u00e4cks kan du avg\u00f6ra vilken f\u00f6r\u00e4ndring som l\u00f6ser problemet. I exemplet skulle en tidigare delleverans kunna t\u00e4cka bristen p\u00e5 40 stycken. I andra situationer kan det beh\u00f6vas ett godk\u00e4nt ers\u00e4ttningsmaterial, en \u00e4ndrad batchstorlek eller en annan ordningsf\u00f6ljd f\u00f6r operationerna.<\/p>\n\n\n<p>Varje alternativ f\u00e5r konsekvenser f\u00f6r produktionen. Ett ers\u00e4ttningsmaterial kr\u00e4ver r\u00e4tt tekniskt godk\u00e4nnande. En mindre batch kan inneb\u00e4ra mer st\u00e4llarbete. Att tidigarel\u00e4gga en annan order kan h\u00e5lla en maskin ig\u00e5ng, men samtidigt f\u00f6rsena leveransen till den kund vars material ursprungligen var inplanerat p\u00e5 den tiden.<\/p>\n\n\n<p>D\u00e4rf\u00f6r b\u00f6r analysen av lagert\u00e4ckningen leda vidare till <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/vad-ar-produktionsplanering\/\">produktionsplaneringen<\/a>, inte stanna vid en ink\u00f6ps\u00e5tg\u00e4rd. \u00c4ven om leverant\u00f6ren skyndar p\u00e5 leveransen av de saknade delarna kan maskintiden redan ha g\u00e5tt f\u00f6rlorad, s\u00e5 att efterf\u00f6ljande arbete inte l\u00e4ngre hinns med f\u00f6re utleverans.<\/p>\n\n\n<p>Bed\u00f6m b\u00e5da fr\u00e5gorna tillsammans: <strong>kommer materialet att vara tillg\u00e4ngligt, och g\u00e5r det fortfarande att slutf\u00f6ra det \u00e5terst\u00e5ende arbetet i tid?<\/strong> D\u00e5 undviker du att ett lagerbeslut som verkar rimligt isolerat skapar ett annat leveransproblem utan att det m\u00e4rks.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Skapa en genomf\u00f6rbar produktionsplan i SkyPlanner utifr\u00e5n materialtillg\u00e5ngen<\/h2>\n\n\n<p>SkyPlanner APS tar med material och inkommande ink\u00f6psleveranser i samma planeringsber\u00e4kning som arbetsstationer, skift, prioriteringar och beroenden mellan operationer. N\u00e4r materialh\u00e4nsyn aktiveras med regeln Ta h\u00e4nsyn till materialen kontrollerar SkyPlanner tillg\u00e4ngligheten f\u00f6r de material som angetts f\u00f6r arbetet n\u00e4r operationerna som anv\u00e4nder dem planeras.<\/p>\n\n\n<p>F\u00f6rdelen \u00e4r att ditt beslut om material inte stannar i en separat lagerlista. Arcturus, SkyPlanners AI f\u00f6r produktionsplanering, ber\u00e4knar produktionsplanen utifr\u00e5n registrerad materialtillg\u00e4nglighet och konfigurerad kapacitet. Gantt-schemat visar den resulterande arbetsordningen och hj\u00e4lper dig att se hur leveranserna p\u00e5verkas, utan att du beh\u00f6ver bygga om varje maskink\u00f6 f\u00f6r hand.<\/p>\n\n\n<p>Ink\u00f6pens leveransdatum har en praktisk roll i planen. SkyPlanner anv\u00e4nder det leveransdatum som angetts p\u00e5 en ink\u00f6psorder som den f\u00f6rv\u00e4ntade tidpunkten f\u00f6r materialets tillg\u00e4nglighet. N\u00e4r materialet anl\u00e4nder uppdateras lagersaldot genom att ink\u00f6psordern bekr\u00e4ftas som Levererad. F\u00f6rv\u00e4ntade inleveranser och mottaget lager h\u00e5lls d\u00e4rmed is\u00e4r.<\/p>\n\n\n<p>G\u00e5 tillbaka till materialbristen p\u00e5 torsdagen. Registrera att inleveransen v\u00e4ntas p\u00e5 fredagen och ber\u00e4kna produktionsplanen p\u00e5 nytt. Granska var det ber\u00f6rda arbetet nu ryms bland \u00f6vriga order, inklusive de efterf\u00f6ljande operationerna. Om ink\u00f6p lyckas ordna en tidigare leverans anv\u00e4nder du den uppdaterade tillg\u00e4ngligheten f\u00f6r att bed\u00f6ma den nya planen, i st\u00e4llet f\u00f6r att anta att det ursprungliga leveransl\u00f6ftet automatiskt g\u00e5r att h\u00e5lla igen.<\/p>\n\n\n<p>Du s\u00e4tter prioriteringarna, och Arcturus sk\u00f6ter planeringsber\u00e4kningen. Det ger planering och ink\u00f6p ett gemensamt underlag f\u00f6r att v\u00e4lja \u00e5tg\u00e4rd, samtidigt som mindre tid g\u00e5r \u00e5t till att st\u00e4mma av lagerlistor mot separata maskinplaner.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Vad f\u00f6r\u00e4ndrades f\u00f6r Eskomatic?<\/h3>\n\n\n<p>Legobearbetningsf\u00f6retaget Eskomatic hade till stor del manuellt hanterade arbetsk\u00f6er och begr\u00e4nsad insyn i materialtillg\u00e4ngligheten i sitt \u00e4ldre system f\u00f6r produktionsstyrning. En brist kunde uppt\u00e4ckas f\u00f6r n\u00e4ra operationens planerade start, n\u00e4r det fanns lite utrymme kvar att agera.<\/p>\n\n\n<p>Med inf\u00f6randet av SkyPlanner blev den dagliga planeringen tydligare tack vare en visuell arbetsk\u00f6 i Gantt-schemat, automatiserad bel\u00e4ggningsplanering och b\u00e4ttre \u00f6verblick \u00f6ver materialbrister. <a href=\"https:\/\/skyplanner.ai\/sv\/kundberattelser\/eskomatic\/\">Eskomatic rapporterar<\/a> f\u00e4rre produktionsstopp p\u00e5 grund av saknat material och st\u00f6rre tr\u00e4ffs\u00e4kerhet n\u00e4r leveransdatum fastst\u00e4lls.<\/p>\n\n\n<p>Erfarenheten visar varf\u00f6r det \u00e4r viktigt att koppla samman material och produktionsplan: planerarna kan hantera konsekvenserna f\u00f6r arbetet och kund\u00e5tagandena i st\u00e4llet f\u00f6r att uppt\u00e4cka bristen f\u00f6rst vid maskinen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Se hur en materialf\u00f6rsening skulle p\u00e5verka din fabrik<\/h2>\n\n\n<p>SkyPlanner kan integreras med valfritt ERP- eller MES-system via sitt \u00f6ppna REST API. Du kan koppla dina befintliga order- och materialdata till produktionsplanering med begr\u00e4nsad kapacitet, i st\u00e4llet f\u00f6r att underh\u00e5lla separata arbetsk\u00f6er som m\u00e5ste st\u00e4mmas av manuellt.<\/p>\n\n\n<p>Ta med uppgifter om en viktig komponent, de operationer som f\u00f6rbrukar den och en nyligen intr\u00e4ffad leveransf\u00f6rsening, s\u00e5 att demonstrationen av SkyPlanner f\u00e5r ett tydligt fokus. Be att f\u00e5 se hur det registrerade ankomstdatumet p\u00e5verkar den gemensamma produktionsplanen och leveransdatumen. Det \u00e4r ett praktiskt s\u00e4tt att bed\u00f6ma v\u00e4rdet ut\u00f6ver vad ett nyckeltal f\u00f6r lagert\u00e4ckning visar.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sv\/kontaktforsaljning\/\">Boka en demonstration av SkyPlanner<\/a> f\u00f6r att g\u00e5 igenom din produktionssituation, eller <a href=\"https:\/\/skyplanner.ai\/sv\/prova\/\">prova SkyPlanner med demodata<\/a> f\u00f6r att f\u00f6rst se hur planeringen fungerar.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret? Hem &raquo; Resurser &raquo; Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret? Enligt lagerrapporten r\u00e4cker komponenterna i sju arbetsdagar. N\u00e4sta leverans v\u00e4ntas p\u00e5 fredag. \u00c4nd\u00e5 saknas det komponenter f\u00f6r att kunna starta torsdagens tillverkningsorder. Det \u00e4r ingen mots\u00e4gelse: att lagret r\u00e4cker i sju dagar vid genomsnittlig f\u00f6rbrukning \u00e4r inte samma sak som att &#8230; <a title=\"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/\" aria-label=\"L\u00e4s mer om Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?\">L\u00e4s mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":111252,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2541,311],"tags":[],"class_list":["post-111240","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-och-planering","category-resurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?<\/title>\n<meta name=\"description\" content=\"Hitta f\u00f6rsta materialbristen innan produktionen stannar. Ber\u00e4kna lagert\u00e4ckning f\u00f6r kommande operationer och koppla materialtillg\u00e5ngen till SkyPlanners plan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/\" \/>\n<meta property=\"og:locale\" content=\"sv_SE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?\" \/>\n<meta property=\"og:description\" content=\"Hitta f\u00f6rsta materialbristen innan produktionen stannar. Ber\u00e4kna lagert\u00e4ckning f\u00f6r kommande operationer och koppla materialtillg\u00e5ngen till SkyPlanners plan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T16:31:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T16:33:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skriven av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ber\u00e4knad l\u00e4stid\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minuter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:33:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/\"},\"wordCount\":2521,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"articleSection\":[\"APS och planering\",\"resurser\"],\"inLanguage\":\"sv-SE\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/\",\"name\":\"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:33:02+00:00\",\"description\":\"Hitta f\u00f6rsta materialbristen innan produktionen stannar. Ber\u00e4kna lagert\u00e4ckning f\u00f6r kommande operationer och koppla materialtillg\u00e5ngen till SkyPlanners plan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/#breadcrumb\"},\"inLanguage\":\"sv-SE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/lagertackning\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sv-SE\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?","description":"Hitta f\u00f6rsta materialbristen innan produktionen stannar. Ber\u00e4kna lagert\u00e4ckning f\u00f6r kommande operationer och koppla materialtillg\u00e5ngen till SkyPlanners plan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/","og_locale":"sv_SE","og_type":"article","og_title":"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?","og_description":"Hitta f\u00f6rsta materialbristen innan produktionen stannar. Ber\u00e4kna lagert\u00e4ckning f\u00f6r kommande operationer och koppla materialtillg\u00e5ngen till SkyPlanners plan.","og_url":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T16:31:21+00:00","article_modified_time":"2026-10-27T16:33:02+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skriven av":"Jussi M\u00e4ntyl\u00e4","Ber\u00e4knad l\u00e4stid":"13 minuter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:33:02+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/"},"wordCount":2521,"publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","articleSection":["APS och planering","resurser"],"inLanguage":"sv-SE"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/","url":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/","name":"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:33:02+00:00","description":"Hitta f\u00f6rsta materialbristen innan produktionen stannar. Ber\u00e4kna lagert\u00e4ckning f\u00f6r kommande operationer och koppla materialtillg\u00e5ngen till SkyPlanners plan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/#breadcrumb"},"inLanguage":"sv-SE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/"]}]},{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","width":1672,"height":941,"caption":"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/lagertackning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sv\/"},{"@type":"ListItem","position":2,"name":"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sv\/#website","url":"https:\/\/skyplanner.ai\/sv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sv-SE"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sv\/","logo":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret? Hem &raquo; Resurser &raquo; Lagert\u00e4ckning i tillverkningen: r\u00e4cker lagret? Enligt lagerrapporten r\u00e4cker komponenterna i sju arbetsdagar. N\u00e4sta leverans v\u00e4ntas p\u00e5 fredag. \u00c4nd\u00e5 saknas det komponenter f\u00f6r att kunna starta torsdagens tillverkningsorder. Det \u00e4r ingen mots\u00e4gelse: att lagret r\u00e4cker i sju dagar vid genomsnittlig f\u00f6rbrukning \u00e4r inte samma sak som att&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/111240","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/comments?post=111240"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/111240\/revisions"}],"predecessor-version":[{"id":111304,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/111240\/revisions\/111304"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media\/111252"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media?parent=111240"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/categories?post=111240"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/tags?post=111240"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}