{"id":104578,"date":"2026-10-20T19:34:39","date_gmt":"2026-10-20T19:34:39","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104578"},"modified":"2026-10-20T19:36:18","modified_gmt":"2026-10-20T19:36:18","slug":"first-pass-yield","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/","title":{"rendered":"First pass yield: formel, exempel och dolt omarbete"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">First pass yield: formel, exempel och dolt omarbete<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sv\/\">Hem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/\">Resurser<\/a> &raquo; First pass yield: formel, exempel och dolt omarbete<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ber\u00e4knad l\u00e4stid: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minuter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>First pass yield (FPY) \u00e4r andelen detaljer i procent som uppfyller de \u00f6verenskomna kvalitetskraven vid f\u00f6rsta f\u00f6rs\u00f6ket i en avgr\u00e4nsad process, utan reparation, omarbete eller omprovning efter ett underk\u00e4nt resultat. M\u00e5ttet visar hur mycket av produktionen som blev r\u00e4tt fr\u00e5n b\u00f6rjan, inte hur mycket som till slut kunde godk\u00e4nnas.<\/p>\n\n\n<p>Den skillnaden spelar roll n\u00e4r antalet f\u00e4rdiga detaljer ser bra ut men fabriken \u00e4nd\u00e5 har sv\u00e5rt att hinna med. Reparerade detaljer kan fortfarande levereras, men att f\u00e5 dem klara har tagit tid som andra order beh\u00f6vde. Genom att f\u00f6lja b\u00e5de FPY och arbetet med att \u00e5tg\u00e4rda underk\u00e4nda detaljer ser du det som det totala antalet godk\u00e4nda detaljer d\u00f6ljer. N\u00e4r du kopplar det arbetet till produktionsregistreringen och planeringen i SkyPlanner blir det l\u00e4ttare att se vad det inneb\u00e4r f\u00f6r kapacitet och leveranser.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e5 ber\u00e4knar du first pass yield<\/h2>\n\n\n<p>Anv\u00e4nd den h\u00e4r formeln:<\/p>\n\n\n<p><strong>First pass yield (%) = Antal detaljer som godk\u00e4nns vid f\u00f6rsta f\u00f6rs\u00f6ket \u00f7 Antal detaljer som g\u00e5r in i den avgr\u00e4nsade processen \u00d7 100<\/strong><\/p>\n\n\n<p>R\u00e4kna unika detaljer, inte kontrolltillf\u00e4llen eller enskilda fel. En detalj som underk\u00e4nns, \u00e5tg\u00e4rdas och sedan godk\u00e4nns ing\u00e5r i det slutliga antalet godk\u00e4nda detaljer, men inte bland dem som klarade f\u00f6rsta f\u00f6rs\u00f6ket. En detalj med flera fel r\u00e4knas fortfarande som en enda underk\u00e4nd detalj i den h\u00e4r ber\u00e4kningen.<\/p>\n\n\n<p>Best\u00e4m processens avgr\u00e4nsning innan du samlar in siffrorna. Du kan till exempel m\u00e4ta en bearbetningsoperation, en provstation eller en hel operationsf\u00f6ljd. T\u00e4ljaren och n\u00e4mnaren m\u00e5ste avse samma grupp av detaljer vid den valda avgr\u00e4nsningen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Exempel: 90% first pass yield, 96% slutligt utbyte<\/h3>\n\n\n<p>T\u00e4nk dig en sats med 500 bearbetade detaljer d\u00e4r kontrollresultaten fr\u00e5n f\u00f6rsta f\u00f6rs\u00f6ket \u00e4r klara f\u00f6r samtliga detaljer:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Resultat vid f\u00f6rsta f\u00f6rs\u00f6ket<\/th><th>Antal detaljer<\/th><th>Vad h\u00e4nder sedan?<\/th><\/tr><\/thead><tbody><tr><td>Godk\u00e4nda utan \u00e5tg\u00e4rd<\/td><td>450<\/td><td>Klara f\u00f6r n\u00e4sta operation<\/td><\/tr><tr><td>Skickade till omarbete<\/td><td>40<\/td><td>30 godk\u00e4nns senare; 10 kasseras till slut<\/td><\/tr><tr><td>Kasserade direkt<\/td><td>10<\/td><td>Kan inte g\u00e5 vidare<\/td><\/tr><tr><td>Totalt antal som g\u00e5r in i operationen<\/td><td>500<\/td><td>Varje detalj har ett resultat fr\u00e5n f\u00f6rsta f\u00f6rs\u00f6ket<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>First pass yield blir:<\/p>\n\n\n<p><strong>450 \u00f7 500 \u00d7 100 = 90%<\/strong><\/p>\n\n\n<p>Efter omarbetet finns det 480 godk\u00e4nda detaljer: de ursprungliga 450 plus 30 som har kunnat godk\u00e4nnas efter \u00e5tg\u00e4rd. Det slutliga utbytet f\u00f6r satsen blir d\u00e4rf\u00f6r:<\/p>\n\n\n<p><strong>480 \u00f7 500 \u00d7 100 = 96%<\/strong><\/p>\n\n\n<p>B\u00e5da procentsatserna \u00e4r anv\u00e4ndbara. FPY beskriver utfallet vid f\u00f6rsta f\u00f6rs\u00f6ket. Det slutliga utbytet beskriver andelen som till slut godk\u00e4nns, inklusive lyckat omarbete. Om du bara redovisar 96% syns inte de \u00e5tg\u00e4rder som kr\u00e4vdes f\u00f6r att f\u00e5 de 30 detaljerna godk\u00e4nda.<\/p>\n\n\n<p>De \u00e5terst\u00e5ende 10% i FPY-ber\u00e4kningen \u00e4r inte heller kassationsgraden. I det h\u00e4r exemplet kasseras till slut 20 detaljer, vilket ger en slutlig kassation p\u00e5 4%. \u00d6vriga 6% av den ursprungliga satsen kunde godk\u00e4nnas tack vare extra arbete. Om du bara drar bort kassationen f\u00e5r du det slutliga utbytet, inte first pass yield.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Se till att r\u00e4knereglerna \u00e4r r\u00e4tt innan du litar p\u00e5 procentsatsen<\/h2>\n\n\n<p>Sj\u00e4lva utr\u00e4kningen \u00e4r enkel. Att bevara inneb\u00f6rden av \u201df\u00f6rsta f\u00f6rs\u00f6ket\u201d kr\u00e4ver mer omsorg, s\u00e4rskilt n\u00e4r produktionsdata och kontrollresultat kommer fr\u00e5n olika system.<\/p>\n\n\n<p>1. <strong>V\u00e4lj en process och en j\u00e4mf\u00f6rbar produktgrupp.<\/strong> Ett godk\u00e4nt f\u00f6rsta f\u00f6rs\u00f6k vid bearbetningen inneb\u00e4r inte att hela den monterade produkten \u00e4r slutgodk\u00e4nd. Definiera operationsf\u00f6ljder och godk\u00e4nnandekrav tydligt, s\u00e5 att en f\u00f6r\u00e4ndrad produktmix inte ser ut som en kvalitetsf\u00f6rb\u00e4ttring.<\/p>\n\n\n<p>2. <strong>Koppla resultaten till r\u00e4tt grupp av ing\u00e5ende detaljer.<\/strong> Utg\u00e5 fr\u00e5n en sats eller en annan sp\u00e5rbar grupp d\u00e4r resultaten fr\u00e5n f\u00f6rsta f\u00f6rs\u00f6ket \u00e4r k\u00e4nda. Om du dividerar dagens f\u00e4rdigst\u00e4llda och godk\u00e4nda detaljer med dagens nystartade detaljer riskerar du att blanda olika grupper, s\u00e4rskilt n\u00e4r operationerna str\u00e4cker sig \u00f6ver flera skift.<\/p>\n\n\n<p>3. <strong>Beh\u00e5ll det ursprungliga resultatet.<\/strong> Skilj p\u00e5 godk\u00e4nnande vid f\u00f6rsta f\u00f6rs\u00f6ket och senare godk\u00e4nnande efter \u00e5tg\u00e4rd eller omprovning. Om det underk\u00e4nda resultatet skrivs \u00f6ver n\u00e4r en reparerad detalj godk\u00e4nns ser historiken b\u00e4ttre ut, men det som faktiskt h\u00e4nde \u00e4r of\u00f6r\u00e4ndrat.<\/p>\n\n\n<p>4. <strong>R\u00e4kna varje detalj en g\u00e5ng vid den valda avgr\u00e4nsningen.<\/strong> Flera fel, upprepade provningar och upprepade tidsregistreringar skapar inga fler ursprungliga detaljer. Anv\u00e4nd detaljidentifierare eller ett avst\u00e4mt satsunderlag som bevarar antal och omarbetningshistorik.<\/p>\n\n\n<p>5. <strong>Synligg\u00f6r resultat som \u00e4nnu inte \u00e4r klara.<\/strong> Detaljer som v\u00e4ntar p\u00e5 kontroll \u00e4r inte automatiskt godk\u00e4nda eller underk\u00e4nda. Redovisa antalet som \u00e4nnu saknar resultat och fastst\u00e4ll gruppens FPY n\u00e4r alla resultat fr\u00e5n f\u00f6rsta f\u00f6rs\u00f6ket \u00e4r klara, i st\u00e4llet f\u00f6r att l\u00e5ta besv\u00e4rliga detaljer f\u00f6rsvinna ur ber\u00e4kningen.<\/p>\n\n\n<p>En operation kan omfatta flera planerade kontroller i den ordinarie operationsf\u00f6ljden. Att genomf\u00f6ra den \u00f6verenskomna f\u00f6ljden korrekt f\u00f6rsta g\u00e5ngen \u00e4r n\u00e5got annat \u00e4n att upprepa en underk\u00e4nd provning eller \u00e5tg\u00e4rda ett fel. Ange skillnaden i definitionen av m\u00e4tningen och till\u00e4mpa den konsekvent.<\/p>\n\n\n<p>Om rapporten bara inneh\u00e5ller <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/\">totalt antal f\u00e4rdigst\u00e4llda och felaktiga detaljer<\/a> beh\u00f6ver du kontrollera vad f\u00e4lten betyder innan du anv\u00e4nder dem f\u00f6r att ber\u00e4kna FPY. Du m\u00e5ste veta om antalet godk\u00e4nda detaljer inkluderar reparerade detaljer och om upprepad bearbetning har r\u00e4knats mer \u00e4n en g\u00e5ng.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Skillnaden mellan first pass yield och rolled throughput yield<\/h2>\n\n\n<p>En enskild operation kan se ut att fungera bra samtidigt som hela operationsf\u00f6ljden kr\u00e4ver omfattande \u00e5tg\u00e4rder. Rolled throughput yield (RTY) visar det samlade utfallet vid f\u00f6rsta f\u00f6rs\u00f6ket genom flera p\u00e5 varandra f\u00f6ljande processteg.<\/p>\n\n\n<p>F\u00f6r en sammanh\u00e4ngande f\u00f6ljd med enhetlig ber\u00e4kningsgrund multiplicerar du stegens utbyten i decimalform:<\/p>\n\n\n<p><strong>RTY (%) = First pass yield i steg 1 \u00d7 First pass yield i steg 2 \u00d7 \u2026 \u00d7 100<\/strong><\/p>\n\n\n<p>T\u00e4nk dig att du f\u00f6ljer 1 000 detaljer genom tre operationer. I det h\u00e4r exemplet forts\u00e4tter bara detaljer som inte har underk\u00e4nts vid n\u00e5got f\u00f6rsta f\u00f6rs\u00f6k i den grupp som f\u00f6ljs. Reparerade detaljer \u00e5terf\u00f6rs inte till gruppen.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Operation<\/th><th>Antal detaljer i den sp\u00e5rade gruppen som g\u00e5r in i steget<\/th><th>Antal godk\u00e4nda vid f\u00f6rsta f\u00f6rs\u00f6ket<\/th><th>Utbyte i steget<\/th><\/tr><\/thead><tbody><tr><td>Bearbetning<\/td><td>1 000<\/td><td>900<\/td><td>90%<\/td><\/tr><tr><td>Slutbearbetning<\/td><td>900<\/td><td>810<\/td><td>90%<\/td><\/tr><tr><td>Provning<\/td><td>810<\/td><td>729<\/td><td>90%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>0,90 \u00d7 0,90 \u00d7 0,90 \u00d7 100 = 72,9% RTY<\/strong><\/p>\n\n\n<p>Varje operation har ett utbyte p\u00e5 90%, men bara 729 av de ursprungliga 1 000 detaljerna klarar alla tre utan att underk\u00e4nnas. Medelv\u00e4rdet av de tre procentsatserna skulle bli 90% och d\u00f6lja den samlade effekten.<\/p>\n\n\n<p>I verklig produktion kan reparerade detaljer \u00e5terf\u00f6ras till fl\u00f6det, och produkter kan f\u00f6lja olika operationsf\u00f6ljder. Anv\u00e4nd stegutbyten som avser en och samma operationsf\u00f6ljd och har en f\u00f6renlig ber\u00e4kningsgrund. Multiplicera inte orelaterade avdelningsgenomsnitt och kalla resultatet f\u00f6r en observerad andel som klarat hela fl\u00f6det. Om du sparar historiken \u00f6ver varje detaljs f\u00f6rsta f\u00f6rs\u00f6k kan du kontrollera hur m\u00e5nga av de ursprungliga detaljerna som faktiskt klarade hela operationsf\u00f6ljden utan \u00e5tg\u00e4rd.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vad \u00e4r ett bra v\u00e4rde f\u00f6r first pass yield?<\/h2>\n\n\n<p>Ett anv\u00e4ndbart m\u00e5l tar h\u00e4nsyn till produkten, processen, kvalitetskraven och konsekvenserna av fel. Ett generellt riktv\u00e4rde r\u00e4cker inte f\u00f6r att bed\u00f6ma hur v\u00e4l just din operation fungerar.<\/p>\n\n\n<p>B\u00f6rja med att f\u00f6lja trenden f\u00f6r j\u00e4mf\u00f6rbart arbete. Bed\u00f6m procentsatsen tillsammans med antalet uppm\u00e4tta detaljer, orsakerna till underk\u00e4nnandena och omfattningen av de korrigerande \u00e5tg\u00e4rderna. Ett h\u00f6gre FPY \u00e4r meningsfullt n\u00e4r samma godk\u00e4nnandekrav g\u00e4ller. Det \u00e4r ingen f\u00f6rb\u00e4ttring om teamet bara har l\u00e4ttat p\u00e5 kontrollkraven eller tagit bort besv\u00e4rliga detaljer ur n\u00e4mnaren.<\/p>\n\n\n<p>Leta efter ett \u00e5terkommande problem som g\u00e5r att \u00e5tg\u00e4rda. Gruppera underk\u00e4nda f\u00f6rsta f\u00f6rs\u00f6k efter operation och bekr\u00e4ftad orsak. \u00c5terkommande m\u00e5ttavvikelser p\u00e5 en produkt kan leda dig till verktyget, fixturen, materialet eller metoden, men procentsatsen ensam visar inte vilken som \u00e4r orsaken. G\u00e5 igenom underlaget med dem som utf\u00f6r arbetet, \u00e5tg\u00e4rda orsaken och m\u00e4t sedan j\u00e4mf\u00f6rbar produktion igen.<\/p>\n\n\n<p>Ta ocks\u00e5 h\u00e4nsyn till hur mycket arbete \u00e5tg\u00e4rderna kr\u00e4ver. Tv\u00e5 operationer med samma FPY kan f\u00e5 helt olika konsekvenser om den ena kr\u00e4ver en snabb korrigering och den andra binder upp en gemensam maskin i flera timmar. Det \u00e4r d\u00e4r kvalitetsutfallet blir en fr\u00e5ga f\u00f6r planeringen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Oms\u00e4tt omarbetet bakom FPY i ett realistiskt kapacitetsbehov<\/h2>\n\n\n<p>Vi \u00e5terg\u00e5r till satsen med 500 detaljer. Anta att vart och ett av de 40 omarbetningsf\u00f6rs\u00f6ken tar ytterligare 12 minuter i samma fleroperationsmaskin, oavsett om detaljen till slut godk\u00e4nns eller kasseras.<\/p>\n\n\n<p><strong>40 f\u00f6rs\u00f6k \u00d7 12 minuter = 480 minuter = 8 maskintimmar<\/strong><\/p>\n\n\n<p>Rapporten \u00f6ver slutligt utbyte visar 480 godk\u00e4nda detaljer. Produktionsplanen beh\u00f6ver ocks\u00e5 ta h\u00f6jd f\u00f6r de \u00e5tta extra timmarna. Ytterligare st\u00e4ll, kontroll eller hantering kan kr\u00e4va mer tid p\u00e5 andra h\u00e5ll.<\/p>\n\n\n<p>Utg\u00e5 inte fr\u00e5n att 10 % underk\u00e4nda detaljer vid f\u00f6rsta f\u00f6rs\u00f6ket inneb\u00e4r exakt 10 % f\u00f6rlorad kapacitet. Operationsf\u00f6ljden f\u00f6r korrigerande arbete och tids\u00e5tg\u00e5ngen varierar. Ber\u00e4kna det faktiska arbetsbehovet f\u00f6r de resurser som ska utf\u00f6ra arbetet. H\u00e5ll ocks\u00e5 is\u00e4r maskintimmar och operat\u00f6rstimmar n\u00e4r de motsvarar olika begr\u00e4nsningar.<\/p>\n\n\n<p>Om bearbetningscentret redan \u00e4r fullbelagt inf\u00f6r en viktig utleverans skapar det ingen kapacitet att l\u00e4gga omarbetet i en separat k\u00f6. Det \u00e4ndrar bara vilken order som kan bli klar f\u00f6rst. Uppt\u00e4cker du konflikten tidigt f\u00e5r du tid att prioritera, anv\u00e4nda en annan l\u00e4mplig resurs eller ompr\u00f6va ett leveransl\u00f6fte innan det blir en \u00f6verraskning i sista minuten.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Koppla registrerat omarbete till n\u00e4sta produktionsplan med SkyPlanner<\/h2>\n\n\n<p>SkyPlanner samlar tidrapportering i produktionen, detaljerade rapporter och AI-baserad produktionsplanering. F\u00f6r en fabrik d\u00e4r omarbete st\u00e4ndigt st\u00f6r leveranserna \u00e4r det ett konkret n\u00e4sta steg: synligg\u00f6r arbetet med att f\u00e5 detaljerna godk\u00e4nda och ge godk\u00e4nda korrigerande \u00e5tg\u00e4rder en realistisk plats i planen tillsammans med kundorderna.<\/p>\n\n\n<p>Tidregistreringsfunktionen Timer i SkyPlanner registrerar arbetstid och antalet producerade eller felaktiga detaljer. Den detaljerade tidrapporten All Timelogs Report kopplar registreringarna till operation, processteg, produktionsgrupp, person, start- och sluttid, f\u00e4rdiga och felaktiga detaljer, registrerad tid och anteckningar. D\u00e4r kan registreringarna granskas, redigeras och godk\u00e4nnas.<\/p>\n\n\n<p>N\u00e4r korrigerande arbete \u00e4r identifierat i operations- och tidregistreringarna kan du unders\u00f6ka vad den registrerade tiden har g\u00e5tt till, i st\u00e4llet f\u00f6r att den f\u00f6rsvinner i en anonym dagssumma. Beh\u00e5ll uppgifterna om godk\u00e4nnande vid f\u00f6rsta f\u00f6rs\u00f6ket och historiken f\u00f6r omarbete fr\u00e5n kvalitets- eller MES-systemet som underlag f\u00f6r FPY-ber\u00e4kningen. De uppgifterna f\u00f6rklarar kvalitetsutfallet, medan de tillh\u00f6rande tidregistreringarna visar arbetsinsatsen f\u00f6r att f\u00e5 detaljerna godk\u00e4nda.<\/p>\n\n\n<p>L\u00e4gg sedan in de <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/tillverkningsorder\/\">godk\u00e4nda korrigerande operationerna<\/a> i planen, tillsammans med deras tids\u00e5tg\u00e5ng och de resurser som kan utf\u00f6ra dem. SkyPlanners AI f\u00f6r produktionsplanering, Arcturus, ber\u00e4knar schemat utifr\u00e5n inst\u00e4lld kapacitet, beroenden mellan operationer och prioriteringar. Gantt-schemat visar den resulterande ordningsf\u00f6ljden och datumen d\u00e5 arbetet blir klart. Du styr prioriteringarna och de beslut som inte f\u00e5r \u00e4ndras; Arcturus sk\u00f6ter den sammanh\u00e4ngande planeringsber\u00e4kningen.<\/p>\n\n\n<p>F\u00f6r den t\u00e4nkta batchen blir fr\u00e5gan konkret: var finns det plats f\u00f6r \u00e5tta extra bearbetningstimmar, och vad h\u00e4nder med de order som redan anv\u00e4nder resursen? N\u00e4r den <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/vad-ar-produktionsplanering\/\">gemensamma planen<\/a> r\u00e4knas om blir avv\u00e4gningen synlig, utan att du manuellt beh\u00f6ver justera en separat k\u00f6 f\u00f6r varje ber\u00f6rd produktionsgrupp.<\/p>\n\n\n<p>SkyPlanner kan integreras med alla ERP- och MES-system via sitt \u00f6ppna REST API. Du kan beh\u00e5lla systemen d\u00e4r dina order och din kvalitetshistorik finns och samtidigt koppla arbetet de genererar till produktionsplanering med begr\u00e4nsad kapacitet.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Se hur underk\u00e4nda detaljer vid f\u00f6rsta f\u00f6rs\u00f6ket p\u00e5verkar leveranserna<\/h2>\n\n\n<p>V\u00e4lj en operation d\u00e4r det slutliga antalet godk\u00e4nda detaljer ofta d\u00f6ljer extra arbete. Ta med resultaten fr\u00e5n f\u00f6rsta f\u00f6rs\u00f6ket, en typisk godk\u00e4nd operationsf\u00f6ljd f\u00f6r korrigerande arbete och en ber\u00f6rd kundorder till en demonstration av SkyPlanner.<\/p>\n\n\n<p>Det ger dig en konkret utg\u00e5ngspunkt f\u00f6r att se hur registrerade produktionsdata och en gemensam plan kan hj\u00e4lpa teamet att agera: f\u00f6rst\u00e5 arbetsinsatsen f\u00f6r att f\u00e5 detaljerna godk\u00e4nda, granska kapacitetskonflikten och fatta n\u00e4sta leveransbeslut utifr\u00e5n en plan som omfattar det arbete som \u00e5terst\u00e5r. <a href=\"https:\/\/skyplanner.ai\/sv\/kontaktforsaljning\/\">Boka en demonstration av SkyPlanner<\/a> f\u00f6r att g\u00e5 igenom er process, eller <a href=\"https:\/\/skyplanner.ai\/sv\/prova\/\">prova SkyPlanner med demodata<\/a> f\u00f6rst.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>First pass yield: formel, exempel och dolt omarbete Hem &raquo; Resurser &raquo; First pass yield: formel, exempel och dolt omarbete First pass yield (FPY) \u00e4r andelen detaljer i procent som uppfyller de \u00f6verenskomna kvalitetskraven vid f\u00f6rsta f\u00f6rs\u00f6ket i en avgr\u00e4nsad process, utan reparation, omarbete eller omprovning efter ett underk\u00e4nt resultat. M\u00e5ttet visar hur mycket av &#8230; <a title=\"First pass yield: formel, exempel och dolt omarbete\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/\" aria-label=\"L\u00e4s mer om First pass yield: formel, exempel och dolt omarbete\">L\u00e4s mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":104594,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2569,311],"tags":[],"class_list":["post-104578","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-tillverkning","category-resurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>First pass yield: formel, exempel och dolt omarbete<\/title>\n<meta name=\"description\" content=\"Ber\u00e4kna first pass yield utan att r\u00e4kna reparerade delar som r\u00e4tt fr\u00e5n b\u00f6rjan. Se hur omarbete tar kapacitet och hur SkyPlanner hj\u00e4lper dig planera f\u00f6r det.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/\" \/>\n<meta property=\"og:locale\" content=\"sv_SE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"First pass yield: formel, exempel och dolt omarbete\" \/>\n<meta property=\"og:description\" content=\"Ber\u00e4kna first pass yield utan att r\u00e4kna reparerade delar som r\u00e4tt fr\u00e5n b\u00f6rjan. Se hur omarbete tar kapacitet och hur SkyPlanner hj\u00e4lper dig planera f\u00f6r det.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T19:34:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T19:36:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skriven av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ber\u00e4knad l\u00e4stid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minuter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"First pass yield: formel, exempel och dolt omarbete\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:36:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/\"},\"wordCount\":2185,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"articleSection\":[\"Effektiv tillverkning\",\"resurser\"],\"inLanguage\":\"sv-SE\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/\",\"name\":\"First pass yield: formel, exempel och dolt omarbete\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:36:18+00:00\",\"description\":\"Ber\u00e4kna first pass yield utan att r\u00e4kna reparerade delar som r\u00e4tt fr\u00e5n b\u00f6rjan. Se hur omarbete tar kapacitet och hur SkyPlanner hj\u00e4lper dig planera f\u00f6r det.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/#breadcrumb\"},\"inLanguage\":\"sv-SE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/first-pass-yield\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"First pass yield: formel, exempel och dolt omarbete\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sv-SE\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"First pass yield: formel, exempel och dolt omarbete","description":"Ber\u00e4kna first pass yield utan att r\u00e4kna reparerade delar som r\u00e4tt fr\u00e5n b\u00f6rjan. Se hur omarbete tar kapacitet och hur SkyPlanner hj\u00e4lper dig planera f\u00f6r det.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/","og_locale":"sv_SE","og_type":"article","og_title":"First pass yield: formel, exempel och dolt omarbete","og_description":"Ber\u00e4kna first pass yield utan att r\u00e4kna reparerade delar som r\u00e4tt fr\u00e5n b\u00f6rjan. Se hur omarbete tar kapacitet och hur SkyPlanner hj\u00e4lper dig planera f\u00f6r det.","og_url":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T19:34:39+00:00","article_modified_time":"2026-10-20T19:36:18+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skriven av":"Jussi M\u00e4ntyl\u00e4","Ber\u00e4knad l\u00e4stid":"11 minuter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"First pass yield: formel, exempel och dolt omarbete","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:36:18+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/"},"wordCount":2185,"publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","articleSection":["Effektiv tillverkning","resurser"],"inLanguage":"sv-SE"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/","url":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/","name":"First pass yield: formel, exempel och dolt omarbete","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:36:18+00:00","description":"Ber\u00e4kna first pass yield utan att r\u00e4kna reparerade delar som r\u00e4tt fr\u00e5n b\u00f6rjan. Se hur omarbete tar kapacitet och hur SkyPlanner hj\u00e4lper dig planera f\u00f6r det.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/#breadcrumb"},"inLanguage":"sv-SE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/"]}]},{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","width":1672,"height":941,"caption":"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/first-pass-yield\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sv\/"},{"@type":"ListItem","position":2,"name":"First pass yield: formel, exempel och dolt omarbete"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sv\/#website","url":"https:\/\/skyplanner.ai\/sv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sv-SE"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sv\/","logo":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"First pass yield: formel, exempel och dolt omarbete Hem &raquo; Resurser &raquo; First pass yield: formel, exempel och dolt omarbete First pass yield (FPY) \u00e4r andelen detaljer i procent som uppfyller de \u00f6verenskomna kvalitetskraven vid f\u00f6rsta f\u00f6rs\u00f6ket i en avgr\u00e4nsad process, utan reparation, omarbete eller omprovning efter ett underk\u00e4nt resultat. M\u00e5ttet visar hur mycket av&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/104578","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/comments?post=104578"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/104578\/revisions"}],"predecessor-version":[{"id":104640,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/104578\/revisions\/104640"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media\/104594"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media?parent=104578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/categories?post=104578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/tags?post=104578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}