{"id":102535,"date":"2026-10-20T13:56:48","date_gmt":"2026-10-20T13:56:48","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102535"},"modified":"2026-10-20T13:58:10","modified_gmt":"2026-10-20T13:58:10","slug":"produkter-i-arbete","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/","title":{"rendered":"Produkter i arbete: antal, kostnad och styrning"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Produkter i arbete: antal, kostnad och styrning<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sv\/\">Hem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/\">Resurser<\/a> &raquo; Produkter i arbete: antal, kostnad och styrning<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ber\u00e4knad l\u00e4stid: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minuter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Produkter i arbete (PIA, \u00e4ven kallat WIP) \u00e4r varor som har b\u00f6rjat tillverkas men \u00e4nnu inte \u00e4r f\u00e4rdiga. Det omfattar b\u00e5de detaljer som bearbetas och of\u00e4rdiga produkter som v\u00e4ntar mellan operationer. I redovisningen avser PIA ocks\u00e5 de tillverkningskostnader som hittills har lagts ned p\u00e5 dessa of\u00e4rdiga varor.<\/p>\n\n\n<p>De tv\u00e5 perspektiven besvarar olika fr\u00e5gor. Antalet visar hur mycket som \u00e4r of\u00e4rdigt. Kostnadsbeloppet visar hur mycket tillverkningskostnader som \u00e4r bundna i dessa produkter. Inget av dem f\u00f6rklarar i sig varf\u00f6r en batch har v\u00e4ntat sedan i m\u00e5ndags eller n\u00e4r den till slut kan l\u00e4mna produktionen.<\/p>\n\n\n<p>F\u00f6r en produktionschef \u00e4r det den fr\u00e5gan som \u00e4r v\u00e4rd att g\u00e5 vidare med. SkyPlanner APS kopplar ihop \u00e5terst\u00e5ende operationer med kapacitet, materialtillg\u00e5ng och prioriteringar. Det hj\u00e4lper dig att f\u00e4rdigst\u00e4lla arbeten i st\u00e4llet f\u00f6r att g\u00e5ng p\u00e5 g\u00e5ng fylla p\u00e5 k\u00f6erna. Med b\u00e4ttre tidsplanering minskar m\u00e4ngden on\u00f6diga produkter i arbete och det kapital som binds i dem.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vad r\u00e4knas som produkter i arbete?<\/h2>\n\n\n<p>Se p\u00e5 lagret i tre olika skeden av tillverkningsfl\u00f6det:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>R\u00e5varor:<\/strong> material och ink\u00f6pta komponenter som v\u00e4ntar p\u00e5 att anv\u00e4ndas i produktionen.<\/li><li><strong>Produkter i arbete:<\/strong> varor d\u00e4r tillverkningen har p\u00e5b\u00f6rjats men d\u00e4r tillverkning, montering eller obligatoriska slutkontroller \u00e5terst\u00e5r.<\/li><li><strong>F\u00e4rdiga varor:<\/strong> f\u00e4rdigtillverkade produkter, \u00e4ven om de \u00e4nnu inte har s\u00e5lts eller levererats.<\/li><\/ul>\n\n\n<p>Ett bearbetat hus som v\u00e4ntar p\u00e5 ytbel\u00e4ggning r\u00e4knas som PIA. Detsamma g\u00e4ller en monterad enhet som v\u00e4ntar p\u00e5 den slutkontroll som kr\u00e4vs f\u00f6r att den ska vara f\u00e4rdig. En f\u00e4rdig och godk\u00e4nd enhet som v\u00e4ntar p\u00e5 lastbilen \u00e4r d\u00e4remot en f\u00e4rdig vara, inte PIA.<\/p>\n\n\n<p>En of\u00e4rdig produkt ska fortfarande r\u00e4knas med \u00e4ven n\u00e4r den v\u00e4ntar. K\u00f6er, f\u00f6rflyttningar och sp\u00e4rrar kan st\u00e5 f\u00f6r en stor del av tiden som en produkt befinner sig i produktionen, trots att ingen maskin bearbetar den just d\u00e5.<\/p>\n\n\n<p>Du kan ocks\u00e5 st\u00f6ta p\u00e5 begreppet <strong>p\u00e5g\u00e5ende arbeten<\/strong>. Begreppen anv\u00e4nds olika i olika f\u00f6retag och branscher. I den h\u00e4r guiden avser PIA of\u00e4rdiga varor i tillverkningen, inte en ber\u00e4kning f\u00f6r projektfakturering eller antalet uppgifter p\u00e5 ett programvaruteams tavla.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e5 m\u00e4ter du den fysiska m\u00e4ngden produkter i arbete<\/h2>\n\n\n<p>B\u00f6rja med en tydlig avgr\u00e4nsning, till exempel en produktfamilj fr\u00e5n den f\u00f6rsta tillverkningsoperationen till slutligt godk\u00e4nnande. R\u00e4kna de of\u00e4rdiga enheterna inom avgr\u00e4nsningen vid en best\u00e4md tidpunkt. Vid bulktillverkning kan kilogram eller liter vara en l\u00e4mpligare enhet \u00e4n styck.<\/p>\n\n\n<p>T\u00e4nk dig en fabrik som f\u00f6ljer en produktfamilj med identiska hus. Vid slutet av fredagsskiftet ser l\u00e4get ut s\u00e5 h\u00e4r:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Aktuellt l\u00e4ge<\/th><th>Of\u00e4rdiga hus<\/th><th>\u00c5terst\u00e5ende arbete<\/th><\/tr><\/thead><tbody><tr><td>Under bearbetning<\/td><td>20<\/td><td>Slutf\u00f6ra bearbetning, ytbehandla och kontrollera<\/td><\/tr><tr><td>V\u00e4ntar p\u00e5 ytbehandling<\/td><td>60<\/td><td>Ytbehandla och kontrollera<\/td><\/tr><tr><td>V\u00e4ntar p\u00e5 slutkontroll<\/td><td>20<\/td><td>Kontrollera och godk\u00e4nna<\/td><\/tr><tr><td><strong>Totalt PIA<\/strong><\/td><td><strong>100<\/strong><\/td><td><strong>Olika mycket arbete \u00e5terst\u00e5r<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>R\u00e4kna varje hus en g\u00e5ng, d\u00e4r det befinner sig just nu. R\u00e4kna inte samma batch p\u00e5 nytt f\u00f6r varje operation som \u00e5terst\u00e5r i operationsf\u00f6ljden.<\/p>\n\n\n<p>Du kan ocks\u00e5 st\u00e4mma av fl\u00f6det in och ut ur det avgr\u00e4nsade omr\u00e5det. Anta att det fanns 120 of\u00e4rdiga hus vid veckans b\u00f6rjan, att ytterligare 480 b\u00f6rjade tillverkas och att 500 blev f\u00e4rdiga varor. Utan kassation eller andra lagerr\u00f6relser blir det:<\/p>\n\n\n<p><strong>Utg\u00e5ende PIA = 120 + 480 \u2212 500 = 100 hus<\/strong><\/p>\n\n\n<p>Om resultatet inte st\u00e4mmer med den fysiska inventeringen b\u00f6r du kontrollera om f\u00e4rdigrapporteringar saknas, om f\u00f6rflyttningar eller kassationer inte har registrerats eller om avst\u00e4mningstidpunkten skiljer sig. G\u00f6r det innan du drar slutsatser om hur produktionen fungerar.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Antal enheter \u00e4r inte samma sak som \u00e5terst\u00e5ende arbetsbelastning<\/h3>\n\n\n<p>Tabellen visar 100 of\u00e4rdiga enheter, men de 20 som v\u00e4ntar p\u00e5 kontroll kr\u00e4ver betydligt mindre arbete \u00e4n de 20 som fortfarande bearbetas. Tv\u00e5 lika stora k\u00f6er kan allts\u00e5 st\u00e4lla helt olika krav p\u00e5 kapaciteten.<\/p>\n\n\n<p>I en fabrik med en blandad produktflora s\u00e4ger antalet arbetsorder \u00e4nnu mindre. En order kanske bara beh\u00f6ver en kort kontroll, medan en annan kr\u00e4ver flera dagar p\u00e5 flera olika resurser. F\u00f6lj antalet per produkt eller relevant produktfamilj och anv\u00e4nd tiderna f\u00f6r de \u00e5terst\u00e5ende operationerna f\u00f6r att bed\u00f6ma belastningen. Ange belastningen i timmar. Den \u00e4r varken detsamma som antalet produkter i arbete eller v\u00e4rdet av dem.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Formeln f\u00f6r v\u00e4rdet av produkter i arbete<\/h2>\n\n\n<p>En f\u00f6renklad avst\u00e4mning av periodens kostnader ser ut s\u00e5 h\u00e4r:<\/p>\n\n\n<p><strong>Utg\u00e5ende PIA-v\u00e4rde = ing\u00e5ende PIA-v\u00e4rde + tillkommande tillverkningskostnader \u2212 tillverkningskostnad f\u00f6r f\u00e4rdigst\u00e4llda varor<\/strong><\/p>\n\n\n<p>De tillkommande tillverkningskostnaderna omfattar f\u00f6rbrukat direkt material, direkt l\u00f6n och f\u00f6rdelade tillverkningsomkostnader. <strong>Tillverkningskostnaden f\u00f6r f\u00e4rdigst\u00e4llda varor (COGM)<\/strong> \u00e4r den kostnad som f\u00f6rs \u00f6ver fr\u00e5n PIA n\u00e4r tillverkningen \u00e4r klar. Det \u00e4r inte f\u00f6rs\u00e4ljningspriset eller kostnaden f\u00f6r de varor som s\u00e5lts under perioden.<\/p>\n\n\n<p>T\u00e4nk dig ett separat exempel p\u00e5 kostnaderna under en m\u00e5nad. Det ing\u00e5ende PIA-v\u00e4rdet \u00e4r 18 000 $, tillverkningen tillf\u00f6r kostnader p\u00e5 72 000 $ och f\u00e4rdigst\u00e4llda varor med en tillverkningskostnad p\u00e5 65 000 $ f\u00f6rs \u00f6ver till f\u00e4rdigvarulagret. Utan andra justeringar blir det:<\/p>\n\n\n<p><strong>18 000 $ + 72 000 $ \u2212 65 000 $ = 25 000 $ i utg\u00e5ende PIA-v\u00e4rde<\/strong><\/p>\n\n\n<p>Det \u00e4r ett v\u00e4rde baserat p\u00e5 nedlagda kostnader, inte 25 000 enheter eller 25 000 $ i framtida vinst. Exemplet \u00e4r frist\u00e5ende fr\u00e5n r\u00e4kningen av hus ovan.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Varf\u00f6r antalet enheter inte visar v\u00e4rdet<\/h3>\n\n\n<p>En of\u00e4rdig produkt har bara belastats med de kostnader som hittills har tilldelats den. Om du multiplicerar varje of\u00e4rdig enhet med hela tillverkningskostnaden f\u00f6r den f\u00e4rdiga produkten kan v\u00e4rdet bli f\u00f6r h\u00f6gt. Att en produkt har kommit \u201dhalvv\u00e4gs genom operationsf\u00f6ljden\u201d betyder inte heller n\u00f6dv\u00e4ndigtvis att halva totalkostnaden har uppst\u00e5tt. Dyrt material kan tillf\u00f6ras tidigt, medan kostnader f\u00f6r arbete och bearbetning tillkommer senare.<\/p>\n\n\n<p>Utg\u00e5 fr\u00e5n ekonomiavdelningens kostnadsunderlag och redovisningsprinciper. Avst\u00e4mningen fr\u00e5n ing\u00e5ende till utg\u00e5ende v\u00e4rde f\u00f6rklarar kostnadsf\u00f6r\u00e4ndringen. Den finansiella rapporteringen kan dessutom kr\u00e4va v\u00e4rderingsjusteringar enligt det redovisningsregelverk som g\u00e4ller.<\/p>\n\n\n<p>F\u00f6r beslut i produktionen \u00e4r den viktiga skillnaden enklare: de ackumulerade kostnaderna visar vad som hittills har lagts ned p\u00e5 arbetet. Den \u00e5terst\u00e5ende operationsf\u00f6ljden visar vad som kr\u00e4vs innan det \u00e4r f\u00e4rdigt. Du beh\u00f6ver b\u00e5da perspektiven. Det ena kan inte ers\u00e4tta det andra.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vad en h\u00f6g eller l\u00e5g PIA-niv\u00e5 egentligen s\u00e4ger<\/h2>\n\n\n<p>En h\u00f6g PIA-niv\u00e5 \u00e4r anledning att unders\u00f6ka l\u00e4get, inte en fullst\u00e4ndig diagnos. Den kan bero p\u00e5 h\u00f6gre efterfr\u00e5gan, en annan produktmix, att man medvetet skyddar kapacitet eller att arbete samlas p\u00e5 h\u00f6g till f\u00f6ljd av ett avbrott. En l\u00e5g niv\u00e5 kan tyda p\u00e5 ett smidigt fl\u00f6de, men ocks\u00e5 p\u00e5 att en kritisk resurs har f\u00f6r lite arbete som \u00e4r klart att k\u00f6ra.<\/p>\n\n\n<p>M\u00e5let \u00e4r inte att helt sakna of\u00e4rdiga produkter. M\u00e5let \u00e4r att ha tillr\u00e4ckligt av r\u00e4tt arbete i fl\u00f6det f\u00f6r att kunna f\u00e4rdigst\u00e4lla produkterna p\u00e5 ett tillf\u00f6rlitligt s\u00e4tt, utan on\u00f6digt tidiga starter, v\u00e4ntetider och hantering.<\/p>\n\n\n<p>\u00c5terg\u00e5 till de 60 husen som v\u00e4ntar p\u00e5 ytbehandling. Om de bearbetades i morse inf\u00f6r en planerad ytbehandling i eftermiddag kan k\u00f6n vara helt rimlig. Om de d\u00e4remot har st\u00e5tt d\u00e4r i en vecka medan ytbehandlingsresursen k\u00f6r andra order beskriver samma antal ett annat problem.<\/p>\n\n\n<p>F\u00f6r att bed\u00f6ma k\u00f6n beh\u00f6ver du ta reda p\u00e5 f\u00f6ljande:<\/p>\n\n\n<p>1. <strong>\u00c5lder:<\/strong> n\u00e4r b\u00f6rjade batchen tillverkas, och hur l\u00e4nge har den v\u00e4ntat h\u00e4r?<\/p>\n\n\n<p>2. <strong>N\u00e4sta operation:<\/strong> vilken resurs, vilket material eller vilket godk\u00e4nnande kr\u00e4vs f\u00f6r att batchen ska kunna g\u00e5 vidare?<\/p>\n\n\n<p>3. <strong>Planerat f\u00e4rdigdatum:<\/strong> n\u00e4r finns det plats f\u00f6r de \u00e5terst\u00e5ende operationerna, och blir ordern klar enligt det som har utlovats?<\/p>\n\n\n<p>4. <strong>Orsak till v\u00e4ntan:<\/strong> handlar det om en planerad buffert, konkurrens om kapacitet, materialbrist, en kvalitetssp\u00e4rr eller n\u00e5got annat avbrott?<\/p>\n\n\n<p>D\u00e5 kan \u201dvi har f\u00f6r mycket PIA\u201d bli ett konkret beslut som n\u00e5gon kan agera p\u00e5. En saknad ink\u00f6pskomponent kr\u00e4ver en annan \u00e5tg\u00e4rd \u00e4n en \u00f6verbelastad ytbehandlingsstation. Att k\u00f6ra \u00e4nnu en batch genom bearbetningen l\u00f6ser inget av problemen.<\/p>\n\n\n<p>F\u00f6lj PIA tillsammans med <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/genomstromning-i-produktion\/\">m\u00e4ngden f\u00e4rdigst\u00e4llda produkter<\/a> och leveransprecisionen. Om mer g\u00e5r in i produktionen \u00e4n vad som l\u00e4mnar den som f\u00e4rdiga varor, och inget l\u00e4mnar fl\u00f6det p\u00e5 annat s\u00e4tt, \u00f6kar m\u00e4ngden of\u00e4rdiga produkter. Om PIA minskar enbart f\u00f6r att produktionen inte l\u00e4ngre f\u00e5r in order \u00e4r det inget bevis p\u00e5 en b\u00e4ttre process. J\u00e4mf\u00f6r likv\u00e4rdiga perioder och produktfamiljer s\u00e5 att en f\u00f6r\u00e4ndrad produktmix inte misstas f\u00f6r en f\u00f6rb\u00e4ttring.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Anv\u00e4nd SkyPlanner f\u00f6r att planera v\u00e4gen till f\u00e4rdiga produkter<\/h2>\n\n\n<p>N\u00e4r du vet var arbetet v\u00e4ntar blir planeringsfr\u00e5gan konkret: hur f\u00e5r de \u00e5terst\u00e5ende operationerna plats bland allt annat som fabriken beh\u00f6ver f\u00e4rdigst\u00e4lla?<\/p>\n\n\n<p>SkyPlanner samlar arbetsstationer, skift, operat\u00f6rer, processteg och tids\u00e5tg\u00e5ng i ett <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/vad-ar-produktionsplanering\/\">gemensamt produktionsschema<\/a>. Arcturus, systemets AI f\u00f6r schemal\u00e4ggning, placerar operationerna utifr\u00e5n inst\u00e4lld kapacitet, beroenden och prioriteringar. Gantt-vyn visar den resulterande k\u00f6rordningen f\u00f6r de olika resurserna, i st\u00e4llet f\u00f6r att varje avdelning ska beh\u00f6va hantera sin egen k\u00f6.<\/p>\n\n\n<p>F\u00f6r de v\u00e4ntande husen kan du granska ytbehandlingen i sitt sammanhang, med arbetet b\u00e5de f\u00f6re och efter. \u00c4r resursen upptagen av ett tidigare \u00e5tagande? Finns det plats f\u00f6r kontrollen efter\u00e5t? Skulle en ny batch hus som startas nu bara skapa mer v\u00e4ntande arbete?<\/p>\n\n\n<p>N\u00e4r schemal\u00e4ggning med h\u00e4nsyn till materialtillg\u00e5ng \u00e4r aktiverad tar Arcturus \u00e4ven h\u00e4nsyn till lagersaldon och tillg\u00e5ngen p\u00e5 inkommande material. Det \u00e4r viktigt n\u00e4r en senare operation kr\u00e4ver en ink\u00f6pt komponent. Att den f\u00f6rsta maskinen \u00e4r ledig r\u00e4cker inte om ordern sedan inte kan g\u00e5 vidare genom monteringen.<\/p>\n\n\n<p>Aktuell information om hur arbetet fortskrider g\u00f6r att planen f\u00f6rblir anv\u00e4ndbar. Timer i SkyPlanner registrerar n\u00e4r arbetet startar och stoppas samt hur m\u00e5nga enheter som har producerats, medan systemets \u00f6ppna REST API g\u00f6r det m\u00f6jligt att ansluta till valfritt ERP eller MES. N\u00e4r arbetet fortskrider, tillg\u00e4ngligheten \u00e4ndras eller prioriteringar justeras kan Arcturus r\u00e4kna om schemat utifr\u00e5n den uppdaterade informationen. Du best\u00e4mmer prioriteringarna, och AI sk\u00f6ter ber\u00e4kningen av schemat.<\/p>\n\n\n<p>Det inneb\u00e4r mindre dagligt arbete med att r\u00e4tta till k\u00f6erna vid enskilda maskiner och ett tydligare underlag f\u00f6r att avg\u00f6ra vad som ska g\u00e5 vidare i produktionen. Du kan undvika att binda mer material och l\u00e4gga mer arbete p\u00e5 order f\u00f6r tidigt och i st\u00e4llet fokusera p\u00e5 de of\u00e4rdiga produkter som beh\u00f6vs f\u00f6r leverans.<\/p>\n\n\n<p>Att produkterna blir f\u00e4rdiga frig\u00f6r inte i sig kapital: n\u00e4r de flyttas fr\u00e5n produkter i arbete till f\u00e4rdigvarulager \u00e4ndras deras status, men de finns fortfarande kvar i lagret. Den ekonomiska nyttan kommer av att minska on\u00f6diga lager och f\u00f6ra r\u00e4tt produkter genom produktionen f\u00f6r att m\u00f6ta kundernas efterfr\u00e5gan, inte av att bara minska posten f\u00f6r produkter i arbete.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vad b\u00e4ttre tidsplanering f\u00f6r\u00e4ndrade hos Mamec<\/h2>\n\n\n<p>Mamec \u00e4r en finl\u00e4ndsk tillverkare av industriell blandningsutrustning och kontraktstillverkare av h\u00f6gteknologiska produkter. Tidigare prioriterade f\u00f6retaget tusentals arbetsorder som var beroende av varandra utifr\u00e5n leveransdatum p\u00e5 pappersorder. Planeringen i ERP-systemet gav ingen helhetsbild, och ledningens bild av bel\u00e4ggningen i produktionen byggde p\u00e5 subjektiva uppskattningar.<\/p>\n\n\n<p>Genom att integrera SkyPlanner med Oscar ERP fick Mamec schemal\u00e4ggning med h\u00e4nsyn till begr\u00e4nsad kapacitet och en gemensam bild av hur l\u00e5ngt orderna hade kommit och hur de var inplanerade. Personalen kunde sl\u00e5 upp en order i st\u00e4llet f\u00f6r att f\u00f6rlita sig p\u00e5 olika tolkningar av l\u00e4get.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sv\/kundberattelser\/mamec\/\">Mamec ber\u00e4ttar<\/a> om rimligare ledtider, mindre arbete med planeringen och mindre r\u00f6relsekapital som binds i on\u00f6dan i produkter i arbete, eftersom jobben startar vid r\u00e4tt tidpunkt. Det visar det praktiska sambandet mellan produkter i arbete och schemal\u00e4ggning: fabriken har fortfarande produkter under tillverkning, men ett b\u00e4ttre underlag f\u00f6r att avg\u00f6ra n\u00e4r de beh\u00f6ver finnas i produktionen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">B\u00f6rja med en tillverkningssats som har v\u00e4ntat f\u00f6r l\u00e4nge<\/h2>\n\n\n<p>V\u00e4lj en of\u00e4rdig order vars f\u00f6rsening ni k\u00e4nner v\u00e4l till. Ta med uppgifter om var den befinner sig i produktionen, vilka operationer som \u00e5terst\u00e5r, materialbehoven och den utlovade leveranstiden till en demonstration av SkyPlanner. Det viktiga att pr\u00f6va \u00e4r om ni kan se en sammanh\u00e4ngande plan f\u00f6r att slutf\u00f6ra ordern, d\u00e4r \u00e4ven andra order som konkurrerar om samma resurser ing\u00e5r.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sv\/kontaktforsaljning\/\">Boka en demo av SkyPlanner<\/a> f\u00f6r att utforska planen utifr\u00e5n er egen produktionssituation, eller <a href=\"https:\/\/skyplanner.ai\/sv\/prova\/\">prova SkyPlanner med demodata<\/a> f\u00f6rst. F\u00f6r att f\u00f6rb\u00e4ttra PIA-niv\u00e5n beh\u00f6ver ni f\u00f6rst f\u00f6rst\u00e5 det som \u00e4nnu inte \u00e4r f\u00e4rdigt. Ett b\u00e4ttre produktionsschema hj\u00e4lper er att g\u00f6ra n\u00e5got \u00e5t det.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Produkter i arbete: antal, kostnad och styrning Hem &raquo; Resurser &raquo; Produkter i arbete: antal, kostnad och styrning Produkter i arbete (PIA, \u00e4ven kallat WIP) \u00e4r varor som har b\u00f6rjat tillverkas men \u00e4nnu inte \u00e4r f\u00e4rdiga. Det omfattar b\u00e5de detaljer som bearbetas och of\u00e4rdiga produkter som v\u00e4ntar mellan operationer. I redovisningen avser PIA ocks\u00e5 de &#8230; <a title=\"Produkter i arbete: antal, kostnad och styrning\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/\" aria-label=\"L\u00e4s mer om Produkter i arbete: antal, kostnad och styrning\">L\u00e4s mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":102580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2569,311],"tags":[],"class_list":["post-102535","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-tillverkning","category-resurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Produkter i arbete: antal, kostnad och styrning<\/title>\n<meta name=\"description\" content=\"F\u00e5 koll p\u00e5 produkter i arbete, ber\u00e4kna kostnaden och hitta det som hindrar f\u00e4rdigst\u00e4llandet. Se hur SkyPlanner hj\u00e4lper dig minska on\u00f6diga produkter i arbete.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/\" \/>\n<meta property=\"og:locale\" content=\"sv_SE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Produkter i arbete: antal, kostnad och styrning\" \/>\n<meta property=\"og:description\" content=\"F\u00e5 koll p\u00e5 produkter i arbete, ber\u00e4kna kostnaden och hitta det som hindrar f\u00e4rdigst\u00e4llandet. Se hur SkyPlanner hj\u00e4lper dig minska on\u00f6diga produkter i arbete.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T13:56:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T13:58:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1984\" \/>\n\t<meta property=\"og:image:height\" content=\"1116\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skriven av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ber\u00e4knad l\u00e4stid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minuter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Produkter i arbete: antal, kostnad och styrning\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/\"},\"wordCount\":2305,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"articleSection\":[\"Effektiv tillverkning\",\"resurser\"],\"inLanguage\":\"sv-SE\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/\",\"name\":\"Produkter i arbete: antal, kostnad och styrning\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:10+00:00\",\"description\":\"F\u00e5 koll p\u00e5 produkter i arbete, ber\u00e4kna kostnaden och hitta det som hindrar f\u00e4rdigst\u00e4llandet. Se hur SkyPlanner hj\u00e4lper dig minska on\u00f6diga produkter i arbete.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/#breadcrumb\"},\"inLanguage\":\"sv-SE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"width\":1984,\"height\":1116,\"caption\":\"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produkter-i-arbete\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Produkter i arbete: antal, kostnad och styrning\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sv-SE\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Produkter i arbete: antal, kostnad och styrning","description":"F\u00e5 koll p\u00e5 produkter i arbete, ber\u00e4kna kostnaden och hitta det som hindrar f\u00e4rdigst\u00e4llandet. Se hur SkyPlanner hj\u00e4lper dig minska on\u00f6diga produkter i arbete.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/","og_locale":"sv_SE","og_type":"article","og_title":"Produkter i arbete: antal, kostnad och styrning","og_description":"F\u00e5 koll p\u00e5 produkter i arbete, ber\u00e4kna kostnaden och hitta det som hindrar f\u00e4rdigst\u00e4llandet. Se hur SkyPlanner hj\u00e4lper dig minska on\u00f6diga produkter i arbete.","og_url":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T13:56:48+00:00","article_modified_time":"2026-10-20T13:58:10+00:00","og_image":[{"width":1984,"height":1116,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skriven av":"Jussi M\u00e4ntyl\u00e4","Ber\u00e4knad l\u00e4stid":"11 minuter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Produkter i arbete: antal, kostnad och styrning","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:10+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/"},"wordCount":2305,"publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","articleSection":["Effektiv tillverkning","resurser"],"inLanguage":"sv-SE"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/","url":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/","name":"Produkter i arbete: antal, kostnad och styrning","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:10+00:00","description":"F\u00e5 koll p\u00e5 produkter i arbete, ber\u00e4kna kostnaden och hitta det som hindrar f\u00e4rdigst\u00e4llandet. Se hur SkyPlanner hj\u00e4lper dig minska on\u00f6diga produkter i arbete.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/#breadcrumb"},"inLanguage":"sv-SE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/"]}]},{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","width":1984,"height":1116,"caption":"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produkter-i-arbete\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sv\/"},{"@type":"ListItem","position":2,"name":"Produkter i arbete: antal, kostnad och styrning"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sv\/#website","url":"https:\/\/skyplanner.ai\/sv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sv-SE"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sv\/","logo":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Produkter i arbete: antal, kostnad och styrning Hem &raquo; Resurser &raquo; Produkter i arbete: antal, kostnad och styrning Produkter i arbete (PIA, \u00e4ven kallat WIP) \u00e4r varor som har b\u00f6rjat tillverkas men \u00e4nnu inte \u00e4r f\u00e4rdiga. Det omfattar b\u00e5de detaljer som bearbetas och of\u00e4rdiga produkter som v\u00e4ntar mellan operationer. I redovisningen avser PIA ocks\u00e5 de&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/102535","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/comments?post=102535"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/102535\/revisions"}],"predecessor-version":[{"id":102654,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/102535\/revisions\/102654"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media\/102580"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media?parent=102535"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/categories?post=102535"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/tags?post=102535"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}