{"id":100531,"date":"2026-10-17T08:56:09","date_gmt":"2026-10-17T08:56:09","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100531"},"modified":"2026-10-17T08:57:33","modified_gmt":"2026-10-17T08:57:33","slug":"produktionsrapport","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/","title":{"rendered":"Produktionsrapport: vad ska du registrera och f\u00f6lja upp?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Produktionsrapport: vad ska du registrera och f\u00f6lja upp?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sv\/\">Hem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/\">Resurser<\/a> &raquo; Produktionsrapport: vad ska du registrera och f\u00f6lja upp?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ber\u00e4knad l\u00e4stid: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minuter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>En produktionsrapport visar vad fabriken har producerat under ett skift, en dag eller en annan avgr\u00e4nsad period. Den sammanst\u00e4ller producerade m\u00e4ngder, produktionstid och avbrott, oftast tillsammans med det planerade arbetet. P\u00e5 s\u00e5 s\u00e4tt ser du vad som blev klart och var produktionen inte n\u00e5dde m\u00e5len.<\/p>\n\n\n<p>Totalsiffran \u00e4r bara b\u00f6rjan. Om ett skift rapporterar 80 detaljer beh\u00f6ver n\u00e4sta skift veta om det handlar om anv\u00e4ndbara detaljer, underk\u00e4nda detaljer eller detaljer som fortfarande v\u00e4ntar p\u00e5 kontroll. Annars kan rapporten se fullst\u00e4ndig ut samtidigt som n\u00e4sta produktionsplan bygger p\u00e5 fel utg\u00e5ngsl\u00e4ge.<\/p>\n\n\n<p>En anv\u00e4ndbar rapport visar det kvarst\u00e5ende arbetet s\u00e5 tydligt att det g\u00e5r att agera p\u00e5 uppgifterna. SkyPlanner kopplar samman tidrapportering och produktionsrapporter med AI-baserad schemal\u00e4ggning. Det hj\u00e4lper dig att oms\u00e4tta resultaten i en mer realistisk plan, i st\u00e4llet f\u00f6r att sk\u00f6ta rapporteringen i ett separat kalkylblad och bygga om maskink\u00f6erna f\u00f6r hand.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vad ska en produktionsrapport inneh\u00e5lla?<\/h2>\n\n\n<p>B\u00f6rja med en rad per operation i en produktionsgrupp f\u00f6r rapporteringsperioden. D\u00e5 h\u00e5lls resultat fr\u00e5n exempelvis sk\u00e4rning \u00e5tskilda fr\u00e5n montering, och en delvis f\u00e4rdig order framst\u00e5r inte som slutf\u00f6rd. Efter\u00e5t kan du summera raderna per maskin, avdelning eller skift.<\/p>\n\n\n<p>Anv\u00e4nd uppl\u00e4gget nedan f\u00f6r att avg\u00f6ra vilka uppgifter din rapport beh\u00f6ver. Det \u00e4r en praktisk struktur f\u00f6r rapporteringen, inte ett krav p\u00e5 att samla in alla t\u00e4nkbara produktionsm\u00e5tt.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Uppgifter<\/th><th>Vad ska registreras?<\/th><th>Varf\u00f6r beh\u00f6vs det?<\/th><\/tr><\/thead><tbody><tr><td>Rapporteringsperiod<\/td><td>Datum, skift samt periodens start- och sluttid<\/td><td>G\u00f6r resultaten j\u00e4mf\u00f6rbara och ger \u00f6verl\u00e4mningen en tydlig avgr\u00e4nsning<\/td><\/tr><tr><td>Referens till arbetet<\/td><td>Order, produkt och operation samt batch d\u00e4r det \u00e4r relevant<\/td><td>Kopplar resultatet till det arbete som fortfarande ska vidare genom produktionen<\/td><\/tr><tr><td>Resurs<\/td><td>Produktionsgrupp och ansvarigt team eller ansvarig operat\u00f6r<\/td><td>Visar var tid och producerade m\u00e4ngder har registrerats<\/td><\/tr><tr><td>Plan som l\u00e4mnats till produktionen<\/td><td>Planerat antal och planerad tid f\u00f6r operationen under perioden<\/td><td>Ger en referens f\u00f6r att f\u00f6rst\u00e5 resultatet<\/td><\/tr><tr><td>Faktiskt producerat<\/td><td>Antal f\u00e4rdiga och anv\u00e4ndbara detaljer, antal felaktiga detaljer och eventuellt antal detaljer som inv\u00e4ntar beslut, redovisade var f\u00f6r sig<\/td><td>F\u00f6rhindrar att underk\u00e4nda eller sp\u00e4rrade detaljer r\u00e4knas som klara<\/td><\/tr><tr><td>Faktisk tid<\/td><td>Registrerad arbetstid, med st\u00e4lltid och avbrott s\u00e4rredovisade d\u00e4r de registreras<\/td><td>Hj\u00e4lper till att f\u00f6rklara skillnader mot den planerade tids\u00e5tg\u00e5ngen<\/td><\/tr><tr><td>Status vid periodens slut<\/td><td>Ej p\u00e5b\u00f6rjad, p\u00e5g\u00e5ende, slutf\u00f6rd eller blockerad, med uppgift om kvarst\u00e5ende arbete<\/td><td>Visar n\u00e4sta skift vad det tar \u00f6ver<\/td><\/tr><tr><td>Avvikelse<\/td><td>Vad som h\u00e4nde, n\u00e4r det h\u00e4nde och den bekr\u00e4ftade orsaken, om den \u00e4r k\u00e4nd<\/td><td>Skiljer en f\u00f6rklaring fr\u00e5n en gissning<\/td><\/tr><tr><td>Uppf\u00f6ljning<\/td><td>\u00c5tg\u00e4rd som kr\u00e4vs, ansvarig och n\u00e4sta avst\u00e4mning<\/td><td>G\u00f6r ett rapporterat problem till en uppgift som n\u00e5gon ska l\u00f6sa<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ha reglerna f\u00f6r hur antal r\u00e4knas tillg\u00e4ngliga tillsammans med rapporten. Betyder \u201df\u00e4rdig\u201d att detaljen \u00e4r klar i den h\u00e4r operationen eller att den \u00e4r en s\u00e4ljbar produkt? Ing\u00e5r underk\u00e4nda detaljer i det totala antalet producerade? Att till\u00e4mpa samma regler varje g\u00e5ng \u00e4r viktigare \u00e4n kolumnrubriken.<\/p>\n\n\n<p>Summera inte samma detaljer fr\u00e5n flera efterf\u00f6ljande operationer och kalla summan f\u00e4rdiga produkter. En komponent som g\u00e5r genom sk\u00e4rning, bockning och svetsning ger tre operationsregistreringar, inte tre f\u00e4rdiga komponenter.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Exempel: se bakom skiftets totalsiffra<\/h2>\n\n\n<p>T\u00e4nk dig en bearbetningsoperation som ska ge 100 anv\u00e4ndbara detaljer till monteringen. Vid skiftets slut har teamet bearbetat 80 detaljer: 72 \u00e4r godk\u00e4nda och \u00e5tta kasseras. De \u00f6vriga 20 har \u00e4nnu inte bearbetats. Den registrerade produktionstiden \u00e4r sju timmar, j\u00e4mf\u00f6rt med sex planerade timmar.<\/p>\n\n\n<p>En sammanfattning som s\u00e4ger \u201d80 producerade\u201d d\u00f6ljer b\u00e5de hur mycket som saknas och vilket beslut som beh\u00f6ver fattas h\u00e4rn\u00e4st.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Uppgift i rapporten<\/th><th>Vad inneb\u00e4r det?<\/th><th>N\u00e4sta \u00e5tg\u00e4rd<\/th><\/tr><\/thead><tbody><tr><td>72 godk\u00e4nda, \u00e5tta kasserade, 20 \u00e4nnu inte bearbetade<\/td><td>Det beh\u00f6vs fortfarande 28 anv\u00e4ndbara detaljer, inklusive ers\u00e4ttning f\u00f6r de kasserade<\/td><td>Bekr\u00e4fta att ers\u00e4ttningsmaterial finns och hur l\u00e5ng tid som beh\u00f6vs f\u00f6r att bli klar. Ta med arbetet i n\u00e4sta plan<\/td><\/tr><tr><td>Sju registrerade timmar mot sex planerade<\/td><td>Den registrerade tiden \u00f6versteg den ber\u00e4knade, men orsaken \u00e4r \u00e4nnu inte fastst\u00e4lld<\/td><td>Kontrollera st\u00e4lltid, avbrott och tidregistreringar innan standardtiden \u00e4ndras<\/td><\/tr><tr><td>72 detaljer godk\u00e4nda efter bearbetning<\/td><td>Detaljerna \u00e4r klara i den h\u00e4r operationen, men hela ordern \u00e4r inte slutf\u00f6rd<\/td><td>Kontrollera om monteringen kan ta emot en delbatch och om de \u00f6vriga komponenterna \u00e4r klara<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>N\u00e4sta skift ska inte bara f\u00e5 beskedet \u201d20 kvar\u201d. D\u00e5 missar man arbetet med att ers\u00e4tta de kasserade detaljerna. Monteringen ska inte heller lovas en komplett batch bara f\u00f6r att arbete har rapporterats i bearbetningen.<\/p>\n\n\n<p>Anta att operat\u00f6ren ocks\u00e5 noterar ett verktygsproblem. Arbetsledaren har d\u00e5 tv\u00e5 sammanh\u00e4ngande uppgifter: att l\u00f6sa verktygsproblemet och att ge planeringen en tillf\u00f6rlitlig bild av det kvarst\u00e5ende bearbetningsarbetet. Planeraren kan sedan kontrollera hur den extra belastningen p\u00e5verkar andra operationer i samma maskin och den efterf\u00f6ljande monteringen.<\/p>\n\n\n<p>Det \u00e4r detta som g\u00f6r produktionsrapporten v\u00e4rdefull: den ger ett konkret underlag f\u00f6r n\u00e4sta beslut. \u201d\u00d6ka produktionen\u201d blir \u201davs\u00e4tt kapacitet och material f\u00f6r ytterligare 28 anv\u00e4ndbara detaljer och bekr\u00e4fta n\u00e4r monteringen kan forts\u00e4tta\u201d.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e5 tar du fram en rapport som n\u00e4sta skift kan lita p\u00e5<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Registrera resultatet i n\u00e4ra anslutning till arbetet<\/h3>\n\n\n<p>Registrera hur arbetet fortskrider under operationen eller vid en best\u00e4md \u00f6verl\u00e4mning, medan detaljerna fortfarande finns till hands. H\u00e5ll rutinen tillr\u00e4ckligt kort f\u00f6r att den ska f\u00f6ljas: r\u00e4tt operation, antal, tid och en anv\u00e4ndbar anteckning vid avvikelser.<\/p>\n\n\n<p>Kom \u00f6verens om vem som avslutar rapporten och vem som kompletterar ofullst\u00e4ndiga uppgifter. Ett tomt antalsf\u00e4lt betyder inte automatiskt att inget har producerats. En \u00f6ppen tidregistrering bevisar inte att maskinen har g\u00e5tt under hela skiftet. St\u00e4m av registreringen med teamet innan den anv\u00e4nds f\u00f6r att bed\u00f6ma prestationer eller reservera kapacitet f\u00f6r morgondagen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">St\u00e4m av antal, tid och status<\/h3>\n\n\n<p>L\u00e4s de tre uppgifterna tillsammans. Om statusen \u00e4r slutf\u00f6rd men det anv\u00e4ndbara antalet \u00e4r f\u00f6r l\u00e5gt beh\u00f6vs en f\u00f6rklaring. Ett stort antal utan registrerad tid kan bero p\u00e5 en saknad tidregistrering, inte p\u00e5 ovanligt h\u00f6g effektivitet. Arbete som blev klart f\u00f6re periodens slut men registrerades senare ska konsekvent h\u00e4nf\u00f6ras till den period d\u00e5 det utf\u00f6rdes.<\/p>\n\n\n<p>Var lika tydlig med tiden. Operat\u00f6rstimmar, maskinens k\u00f6rtid och tiden fr\u00e5n start till slut beskriver olika saker. Tv\u00e5 personer som arbetar tillsammans kan ge fler arbetstimmar \u00e4n maskinens faktiska k\u00f6rtid. Anv\u00e4nd det m\u00e5tt som svarar p\u00e5 planeringsfr\u00e5gan i st\u00e4llet f\u00f6r att r\u00e4kna om varje tidssumma till en nyttjandegrad.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Skilj j\u00e4mf\u00f6relseplanen fr\u00e5n den aktuella planen<\/h3>\n\n\n<p>Spara den plan som l\u00e4mnats till produktionen och som ligger till grund f\u00f6r rapportens kolumner med planerade v\u00e4rden. Anv\u00e4nd det uppdaterade schemat f\u00f6r att styra den produktion som \u00e5terst\u00e5r. Om du ers\u00e4tter g\u00e5rdagens m\u00e5l med dagens reviderade antal eller datum f\u00f6rsvinner referensen som f\u00f6rklarar avvikelsen.<\/p>\n\n\n<p>Rapporten kan ge underlag f\u00f6r m\u00e5tt som <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/efterlevnad-av-produktionsplanen\/\">f\u00f6ljsamhet till produktionsschemat<\/a>, men den b\u00f6r inte bli en sida med procentsatser som skymmer de ber\u00f6rda operationerna. Vid den dagliga genomg\u00e5ngen \u00e4r de viktigaste avvikelserna de som p\u00e5verkar vad som kan k\u00f6ras h\u00e4rn\u00e4st.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Granska dagens avvikelser och \u00e5terkommande m\u00f6nster<\/h3>\n\n\n<p>G\u00e5 vid \u00f6verl\u00e4mningen igenom vad som inte \u00e4r f\u00e4rdigt, vad som \u00e4r klart f\u00f6r n\u00e4sta operation och vad som har f\u00f6r\u00e4ndrats i den tillg\u00e4ngliga kapaciteten. Utse en ansvarig och best\u00e4m n\u00e4sta avst\u00e4mning f\u00f6r varje viktig avvikelse. En anteckning om \u201dmaterialbrist\u201d blir mer anv\u00e4ndbar om n\u00e5gon kontrollerar tillg\u00e5ngen innan operationen frisl\u00e4pps igen.<\/p>\n\n\n<p>Anv\u00e4nd veckovyn f\u00f6r att granska upprepade tids\u00f6verskridanden, \u00e5terkommande kassation eller t\u00e4ta avbrott. J\u00e4mf\u00f6r liknande produkter och operationer. En \u00e4ndrad produktmix kan p\u00e5verka totalsiffrorna utan att prestationen har f\u00f6rs\u00e4mrats. F\u00f6rb\u00e4ttra den bakomliggande tidsuppskattningen eller processen i st\u00e4llet f\u00f6r att be varje skift f\u00f6rklara samma avvikelse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Koppla rapporten till n\u00e4sta plan med SkyPlanner<\/h2>\n\n\n<p>Rapporteringen blir enklare att hantera n\u00e4r uppgifterna f\u00f6rblir kopplade till det arbete de beskriver. I SkyPlanner har du produktionsregistreringar, detaljerade rapporter och anpassningsbara instrumentpaneler tillsammans med schemat. Du kan granska resultatet och hantera f\u00f6ljderna f\u00f6r planeringen utan att behandla dem som separata uppgifter.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Se vad som registrerades och vart tiden tog v\u00e4gen<\/h3>\n\n\n<p>Med Timer i SkyPlanner registreras arbetstid samt antal producerade eller felaktiga detaljer. Rapporten All Timelogs samlar uppgifter om arbete, produktionsgrupp, operation, person, start- och sluttid, antal f\u00e4rdiga och felaktiga detaljer, registrerad tid och anteckningar. D\u00e4r kan registreringarna granskas, redigeras och godk\u00e4nnas.<\/p>\n\n\n<p>F\u00f6r ett resultat som i bearbetningsexemplet ger det dig detaljerna bakom skiftets totalsiffra. Du kan unders\u00f6ka det ber\u00f6rda arbetet i st\u00e4llet f\u00f6r att f\u00f6rs\u00f6ka st\u00e4mma av anonyma siffror fr\u00e5n flera avdelningars kalkylblad.<\/p>\n\n\n<p>Rapporterna Job och Order Item ger \u00e4ven sammanhanget f\u00f6r arbetsordern eller produkten och visar f\u00f6rv\u00e4ntad tids\u00e5tg\u00e5ng, registrerad tid och skillnaden mellan dem. Anv\u00e4nd dem f\u00f6r att hitta arbete som beh\u00f6ver granskas n\u00e4rmare. En tidsavvikelse visar vad du beh\u00f6ver fr\u00e5ga om. Operationsregistreringen och teamet hj\u00e4lper till att f\u00f6rklara den.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Skapa en produktionsvy med r\u00e4tt fokus<\/h3>\n\n\n<p>I SkyPlanners <a href=\"https:\/\/skyplanner.ai\/sv\/funktioner\/\">rapporteringsvyer<\/a> kan du ordna widgetar genom att dra och sl\u00e4ppa och v\u00e4lja datumintervall. Du kan skapa olika vyer f\u00f6r olika anv\u00e4ndare och visa en vy p\u00e5 en sk\u00e4rm i produktionen.<\/p>\n\n\n<p>Inf\u00f6r skiftgenomg\u00e5ngen kan du fokusera vyn p\u00e5 p\u00e5g\u00e5ende arbete, f\u00f6rseningar, bel\u00e4ggning och planerad effektivitet j\u00e4mf\u00f6rt med faktisk. Det ger er en gemensam bild av det som kr\u00e4ver uppm\u00e4rksamhet, i st\u00e4llet f\u00f6r \u00e4nnu en rapport som n\u00e5gon m\u00e5ste sammanst\u00e4lla p\u00e5 nytt inf\u00f6r m\u00f6tet. L\u00e5t de detaljerade operationsuppgifterna finnas till hands f\u00f6r fr\u00e5gor som kr\u00e4ver mer \u00e4n en \u00f6verblick.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ge kvarvarande arbete en realistisk plats i schemat<\/h3>\n\n\n<p>Rapporten visar vad som har h\u00e4nt. N\u00e4sta plan m\u00e5ste ocks\u00e5 ta h\u00e4nsyn till det som \u00e5terst\u00e5r och vilka resurser som finns f\u00f6r att slutf\u00f6ra arbetet.<\/p>\n\n\n<p>SkyPlanners AI f\u00f6r schemal\u00e4ggning, Arcturus, ber\u00e4knar ordningsf\u00f6ljden utifr\u00e5n dina produktionsgrupper, skift, operat\u00f6rer, beroenden mellan operationer och prioriteringar. Den resulterande planen visas i Gantt-schemat. N\u00e4r f\u00e4rdigrapporterat arbete eller kapacitetsf\u00f6r\u00e4ndringar g\u00f6r att planen inte l\u00e4ngre \u00e4r aktuell kan automatisk omplanering r\u00e4kna om schemat, med dina regler och l\u00e5sningar kvar.<\/p>\n\n\n<p>Tidigare registrerat arbete ger ocks\u00e5 underlag f\u00f6r att f\u00f6ruts\u00e4ga hur l\u00e5ng tid olika processteg tar. P\u00e5 s\u00e5 s\u00e4tt kan du f\u00f6rb\u00e4ttra framtida tidsuppskattningar allteftersom produktionshistoriken v\u00e4xer, i st\u00e4llet f\u00f6r att g\u00e5ng p\u00e5 g\u00e5ng planera utifr\u00e5n ett optimistiskt ursprungsantagande.<\/p>\n\n\n<p>I bearbetningsexemplet \u00e4r det praktiska m\u00e5let att schemal\u00e4gga det \u00e5terst\u00e5ende arbetet med tillf\u00f6rlitliga uppgifter om tids\u00e5tg\u00e5ng och tillg\u00e4nglighet, och sedan se konsekvenserna f\u00f6r monteringen och andra order. Du best\u00e4mmer fortfarande prioriteringarna; Arcturus sk\u00f6ter <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/vad-ar-produktionsplanering\/\">ber\u00e4kningen av schemat<\/a> med h\u00e4nsyn till hur arbetet h\u00e4nger ihop.<\/p>\n\n\n<p>SkyPlanner kan integreras med alla ERP- eller MES-system via sitt \u00f6ppna REST API. Om dina order eller utfallsdata fr\u00e5n produktionen redan finns i de systemen kan du koppla dem till SkyPlanners schemal\u00e4ggning, i st\u00e4llet f\u00f6r att b\u00f6rja om med separat datainmatning.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e5 f\u00f6r\u00e4ndrades arbetet hos Piristeel med b\u00e4ttre rapportering<\/h2>\n\n\n<p>Taks\u00e4kerhetstillverkaren Piristeel anv\u00e4nde tidigare kalkylblad och utskrivna arbetsorder. Informationsfl\u00f6det mellan avdelningarna fungerade d\u00e5ligt, det var sv\u00e5rt att se kapacitetsbel\u00e4ggningen och produktionen gav begr\u00e4nsat med data som beslutsunderlag.<\/p>\n\n\n<p>Genom att inf\u00f6ra SkyPlanner stegvis, parallellt med utveckling av ERP-systemet och integration med Visma Nova, kopplade Piristeel samman detaljplaneringen med information fr\u00e5n produktionen. Enligt Piristeel g\u00e5r nu mindre tid \u00e5t till arbetsregistrering och rapportering p\u00e5 produktionsgolvet. Planerarna kan se den kommande bel\u00e4ggningen, och kapacitetsbrister \u00e5tg\u00e4rdas innan de v\u00e4xer till st\u00f6rre problem.<\/p>\n\n\n<p>F\u00f6r den dagliga produktionsrapporten \u00e4r det just den f\u00f6r\u00e4ndringen som spelar roll: mindre arbete med att h\u00e5lla uppgifterna aktuella och ett tydligare underlag f\u00f6r att agera utifr\u00e5n vad produktionen kan g\u00f6ra h\u00e4rn\u00e4st. <a href=\"https:\/\/skyplanner.ai\/sv\/kundberattelser\/piristeel\/\">Piristeels erfarenheter av SkyPlanner<\/a> visar hur rapporteringen kan st\u00f6dja den dagliga styrningen, i st\u00e4llet f\u00f6r att stanna vid ett ifyllt blad.<\/p>\n\n\n<h2 class=\"wp-block-heading\">L\u00e5t n\u00e4sta produktionsrapport bli en utg\u00e5ngspunkt<\/h2>\n\n\n<p>V\u00e4lj en f\u00e4rsk rapport d\u00e4r det finns arbete kvar. Kan du se vilka kvantiteter som \u00e4r anv\u00e4ndbara, vilka operationer som fortfarande kr\u00e4ver tid och vad n\u00e4sta skift m\u00e5ste l\u00f6sa? Om det kr\u00e4vs \u00e4nnu en omg\u00e5ng med kalkylblad och telefonsamtal f\u00f6r att f\u00e5 svar ger rapporteringen \u00e4nnu inte planeringen det underlag som beh\u00f6vs.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sv\/kontaktforsaljning\/\">Boka en demo av SkyPlanner<\/a> och ta med rapporten, de ber\u00f6rda operationerna och det bakomliggande kapacitetsproblemet. Se hur produktionsregistrering, rapporteringsvyer och AI-baserad schemal\u00e4ggning kan samverka i din fabrik. Vill du utforska p\u00e5 egen hand f\u00f6rst kan du <a href=\"https:\/\/skyplanner.ai\/sv\/prova\/\">prova SkyPlanner med demodata<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Produktionsrapport: vad ska du registrera och f\u00f6lja upp? Hem &raquo; Resurser &raquo; Produktionsrapport: vad ska du registrera och f\u00f6lja upp? En produktionsrapport visar vad fabriken har producerat under ett skift, en dag eller en annan avgr\u00e4nsad period. Den sammanst\u00e4ller producerade m\u00e4ngder, produktionstid och avbrott, oftast tillsammans med det planerade arbetet. P\u00e5 s\u00e5 s\u00e4tt ser du &#8230; <a title=\"Produktionsrapport: vad ska du registrera och f\u00f6lja upp?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/\" aria-label=\"L\u00e4s mer om Produktionsrapport: vad ska du registrera och f\u00f6lja upp?\">L\u00e4s mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":100542,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2569,311],"tags":[],"class_list":["post-100531","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-tillverkning","category-resurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Produktionsrapport: vad ska du registrera och f\u00f6lja upp?<\/title>\n<meta name=\"description\" content=\"Skapa en produktionsrapport som visar anv\u00e4ndbara produkter, f\u00f6rlorad tid och \u00e5terst\u00e5ende arbete. Planera n\u00e4sta skift utifr\u00e5n resultaten med SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/\" \/>\n<meta property=\"og:locale\" content=\"sv_SE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Produktionsrapport: vad ska du registrera och f\u00f6lja upp?\" \/>\n<meta property=\"og:description\" content=\"Skapa en produktionsrapport som visar anv\u00e4ndbara produkter, f\u00f6rlorad tid och \u00e5terst\u00e5ende arbete. Planera n\u00e4sta skift utifr\u00e5n resultaten med SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-17T08:56:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-17T08:57:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skriven av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ber\u00e4knad l\u00e4stid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minuter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Produktionsrapport: vad ska du registrera och f\u00f6lja upp?\",\"datePublished\":\"2026-10-17T08:56:09+00:00\",\"dateModified\":\"2026-10-17T08:57:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/\"},\"wordCount\":2334,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"articleSection\":[\"Effektiv tillverkning\",\"resurser\"],\"inLanguage\":\"sv-SE\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/\",\"name\":\"Produktionsrapport: vad ska du registrera och f\u00f6lja upp?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"datePublished\":\"2026-10-17T08:56:09+00:00\",\"dateModified\":\"2026-10-17T08:57:33+00:00\",\"description\":\"Skapa en produktionsrapport som visar anv\u00e4ndbara produkter, f\u00f6rlorad tid och \u00e5terst\u00e5ende arbete. Planera n\u00e4sta skift utifr\u00e5n resultaten med SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/#breadcrumb\"},\"inLanguage\":\"sv-SE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Separate trays of usable parts, faulty pieces and unfinished blanks beside a machine and production report.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/produktionsrapport\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Produktionsrapport: vad ska du registrera och f\u00f6lja upp?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sv-SE\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Produktionsrapport: vad ska du registrera och f\u00f6lja upp?","description":"Skapa en produktionsrapport som visar anv\u00e4ndbara produkter, f\u00f6rlorad tid och \u00e5terst\u00e5ende arbete. Planera n\u00e4sta skift utifr\u00e5n resultaten med SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/","og_locale":"sv_SE","og_type":"article","og_title":"Produktionsrapport: vad ska du registrera och f\u00f6lja upp?","og_description":"Skapa en produktionsrapport som visar anv\u00e4ndbara produkter, f\u00f6rlorad tid och \u00e5terst\u00e5ende arbete. Planera n\u00e4sta skift utifr\u00e5n resultaten med SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-17T08:56:09+00:00","article_modified_time":"2026-10-17T08:57:33+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skriven av":"Jussi M\u00e4ntyl\u00e4","Ber\u00e4knad l\u00e4stid":"11 minuter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Produktionsrapport: vad ska du registrera och f\u00f6lja upp?","datePublished":"2026-10-17T08:56:09+00:00","dateModified":"2026-10-17T08:57:33+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/"},"wordCount":2334,"publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","articleSection":["Effektiv tillverkning","resurser"],"inLanguage":"sv-SE"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/","url":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/","name":"Produktionsrapport: vad ska du registrera och f\u00f6lja upp?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","datePublished":"2026-10-17T08:56:09+00:00","dateModified":"2026-10-17T08:57:33+00:00","description":"Skapa en produktionsrapport som visar anv\u00e4ndbara produkter, f\u00f6rlorad tid och \u00e5terst\u00e5ende arbete. Planera n\u00e4sta skift utifr\u00e5n resultaten med SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/#breadcrumb"},"inLanguage":"sv-SE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/"]}]},{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","width":1672,"height":941,"caption":"Separate trays of usable parts, faulty pieces and unfinished blanks beside a machine and production report."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/produktionsrapport\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sv\/"},{"@type":"ListItem","position":2,"name":"Produktionsrapport: vad ska du registrera och f\u00f6lja upp?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sv\/#website","url":"https:\/\/skyplanner.ai\/sv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sv-SE"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sv\/","logo":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Produktionsrapport: vad ska du registrera och f\u00f6lja upp? Hem &raquo; Resurser &raquo; Produktionsrapport: vad ska du registrera och f\u00f6lja upp? En produktionsrapport visar vad fabriken har producerat under ett skift, en dag eller en annan avgr\u00e4nsad period. Den sammanst\u00e4ller producerade m\u00e4ngder, produktionstid och avbrott, oftast tillsammans med det planerade arbetet. P\u00e5 s\u00e5 s\u00e4tt ser du&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/100531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/comments?post=100531"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/100531\/revisions"}],"predecessor-version":[{"id":100594,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/100531\/revisions\/100594"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media\/100542"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media?parent=100531"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/categories?post=100531"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/tags?post=100531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}