{"id":100443,"date":"2026-10-16T22:47:32","date_gmt":"2026-10-16T22:47:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100443"},"modified":"2026-10-16T22:49:02","modified_gmt":"2026-10-16T22:49:02","slug":"leveransprecision","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/","title":{"rendered":"Leveransprecision i tillverkningen: H\u00e5ll det du lovar"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Leveransprecision i tillverkningen: H\u00e5ll det du lovar<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sv\/\">Hem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/\">Resurser<\/a> &raquo; Leveransprecision i tillverkningen: H\u00e5ll det du lovar<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Ber\u00e4knad l\u00e4stid: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minuter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Leveransprecision (OTD) m\u00e4ter hur v\u00e4l du h\u00e5ller de leveransdatum som avtalats med kunden.<\/strong> I tillverkningen handlar f\u00f6rb\u00e4ttrad leveransprecision om att se till att r\u00e4tt order kan g\u00e5 genom produktionen, bli f\u00e4rdiga och n\u00e5 den avtalade leveranspunkten i tid.<\/p>\n\n\n<p>Det \u00e4r inte samma sak som att h\u00e5lla alla maskiner sysselsatta. Sk\u00e4rningen kan ligga f\u00f6re plan samtidigt som en order som ska skickas i morgon fortfarande saknar en svetsad komponent. Fabriken ser produktiv ut, men kunden f\u00e5r \u00e4nd\u00e5 sin leverans f\u00f6r sent.<\/p>\n\n\n<p>Den praktiska fr\u00e5gan \u00e4r: <strong>g\u00e5r det fortfarande att h\u00e5lla de datum du lovat med det aktuella produktionsschemat?<\/strong> SkyPlanner APS hj\u00e4lper dig att svara genom att schemal\u00e4gga sammanh\u00e4ngande operationer utifr\u00e5n kapacitet, material och prioriteringar och sedan ber\u00e4kna om planen n\u00e4r produktionen f\u00f6r\u00e4ndras. Du l\u00e4gger mindre tid p\u00e5 att bygga om maskink\u00f6er och mer tid p\u00e5 att s\u00e4kra de order som beh\u00f6ver uppm\u00e4rksamhet.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e5 ber\u00e4knar du leveransprecision<\/h2>\n\n\n<p>F\u00f6r att OTD ska vara ett anv\u00e4ndbart m\u00e5tt beh\u00f6ver ni f\u00f6rst komma \u00f6verens om vad som r\u00e4knas som leverans i tid. G\u00e4ller \u00e5tagandet att skicka varorna, leverera dem till kundens anl\u00e4ggning eller g\u00f6ra dem tillg\u00e4ngliga f\u00f6r avh\u00e4mtning? En f\u00e4rdig tillverkningsorder inneb\u00e4r inte automatiskt att kunden har f\u00e5tt sin leverans i tid.<\/p>\n\n\n<p>Om ni m\u00e4ter per order anv\u00e4nder ni f\u00f6ljande formel:<\/p>\n\n\n<p><strong>Leveransprecision (%) = Antal order med avtalad leverans under perioden som levererades inom \u00f6verenskommet tidsf\u00f6nster \u00f7 Totalt antal order med avtalad leverans under perioden \u00d7 100<\/strong><\/p>\n\n\n<p>Anta att 50 order skulle levereras den h\u00e4r m\u00e5naden. Av dem n\u00e5dde 44 den avtalade leveranspunkten inom det godk\u00e4nda tidsf\u00f6nstret. D\u00e5 \u00e4r er OTD 88 %. Order som skulle ha levererats men fortfarande \u00e4r olevererade ska vara kvar i n\u00e4mnaren. Annars kan de v\u00e4rsta f\u00f6rseningarna f\u00f6rsvinna ur resultatet.<\/p>\n\n\n<p>Kom \u00f6verens om f\u00f6ljande regler med dem som anv\u00e4nder m\u00e5ttet:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Vad ni r\u00e4knar:<\/strong> hela order, orderrader eller planerade leveranser. Anv\u00e4nd samma enhet konsekvent.<\/li><li><strong>Datum och tidsf\u00f6nster:<\/strong> avtalat leveransdatum och eventuella till\u00e5tna avvikelser f\u00f6re eller efter det. En tidig leverans \u00e4r inte alltid acceptabel om kunden inte kan ta emot eller lagra varorna.<\/li><li><strong>Delleveranser:<\/strong> definiera n\u00e4r en order r\u00e4knas som levererad i st\u00e4llet f\u00f6r att betrakta den som slutf\u00f6rd vid f\u00f6rsta delleveransen.<\/li><li><strong>\u00c4ndrade leveransl\u00f6ften:<\/strong> spara det ursprungliga avtalade datumet tillsammans med senare \u00e4ndringar, s\u00e5 att en flytt av datumet inte d\u00f6ljer en missad leverans.<\/li><\/ul>\n\n\n<p>OTD fokuserar p\u00e5 tidpunkten. <strong>Leverans i tid och i full kvantitet (OTIF)<\/strong> kombinerar tidpunkten med kravet att hela den avtalade kvantiteten levereras. <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/efterlevnad-av-produktionsplanen\/\">F\u00f6ljsamhet till produktionsschemat<\/a> besvarar en annan fr\u00e5ga: f\u00f6ljde de interna operationerna sina planerade tider? En verkstad kan ta igen en f\u00f6rsenad operation och \u00e4nd\u00e5 leverera i tid, eller f\u00f6lja en orealistisk produktionsplan och missa det som lovats kunden.<\/p>\n\n\n<p>Anv\u00e4nd OTD f\u00f6r att bed\u00f6ma utfallet f\u00f6r kunden och interna m\u00e5tt f\u00f6r att f\u00f6rst\u00e5 vad som l\u00e5g bakom det.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Varf\u00f6r en fabrik med fullt upp \u00e4nd\u00e5 levererar f\u00f6r sent<\/h2>\n\n\n<p>Leveransproblem uppst\u00e5r ofta mellan operationerna, inte bara vid den maskin d\u00e4r arbetet till slut blir f\u00f6rsenat. En detalj v\u00e4ntar p\u00e5 material, missar sedan sin tid i bockningen och n\u00e5r d\u00e4refter monteringen f\u00f6rst n\u00e4r de \u00f6vriga delarna redan \u00e4r p\u00e5 plats.<\/p>\n\n\n<p>Varje avdelning kan ha en k\u00f6 som ser rimlig ut. Sv\u00e5righeten \u00e4r att k\u00f6erna konkurrerar om gemensam kapacitet och \u00e4r beroende av varandra. N\u00e4r en br\u00e5dskande operation flyttas fram p\u00e5 en maskin kan den tr\u00e4nga undan en annan order som har mindre tid kvar f\u00f6r efterf\u00f6ljande operationer.<\/p>\n\n\n<p>Att samla liknande arbete i partier inneb\u00e4r \u00e4nnu en avv\u00e4gning. Det kan spara st\u00e4lltid, men en l\u00e5ng, effektiv produktionsserie \u00e4r inget bra val om den f\u00f6rsenar en order som m\u00e5ste skickas i dag. M\u00e5let \u00e4r att anv\u00e4nda kapaciteten effektivt och samtidigt f\u00e4rdigst\u00e4lla r\u00e4tt order, inte att maximera aktiviteten i varje produktionsgrupp.<\/p>\n\n\n<p>Ett <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/vad-ar-produktionsplanering\/\">produktionsschema som utg\u00e5r fr\u00e5n leveranserna<\/a> synligg\u00f6r de h\u00e4r sambanden. I st\u00e4llet f\u00f6r att bara fr\u00e5ga vilken operation som \u00e4r mest br\u00e5dskande h\u00e4r kan du fr\u00e5ga vilken ordningsf\u00f6ljd som g\u00f6r det m\u00f6jligt att f\u00e4rdigst\u00e4lla hela orderstocken.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Oms\u00e4tt leveransl\u00f6ftet i ett m\u00e5l f\u00f6r produktionen<\/h2>\n\n\n<p>Utg\u00e5 fr\u00e5n den leveranspunkt kunden f\u00f6rv\u00e4ntar sig och r\u00e4kna bak\u00e5t till n\u00e4r tillverkningen m\u00e5ste vara klar. Avs\u00e4tt tid f\u00f6r det som beh\u00f6ver g\u00f6ras d\u00e4remellan: slutkontroll, packning, sista tid f\u00f6r utlastning och transport, beroende p\u00e5 vad som g\u00e4ller f\u00f6r ordern.<\/p>\n\n\n<p>Om kunden beh\u00f6ver varorna p\u00e5 fredag och de m\u00e5ste l\u00e4mna er anl\u00e4ggning p\u00e5 torsdag kan fredag inte ocks\u00e5 vara fabrikens m\u00e5ldatum f\u00f6r f\u00e4rdigst\u00e4llande. Produktionen m\u00e5ste bli klar i tid f\u00f6r torsdagens leveransf\u00f6rberedelser.<\/p>\n\n\n<p>I SkyPlanner anger en orders <strong>leveransdag<\/strong> det datum d\u00e5 den senast ska vara f\u00e4rdig och klar att skickas. Anv\u00e4nd det som produktionsm\u00e5l n\u00e4r du oms\u00e4tter kundens leveransl\u00f6fte i schemat. D\u00e5 f\u00f6rblir fabrikens sluttid kopplad till leveransavtalet, utan att f\u00e4rdig produktion blandas ihop med att kunden har tagit emot varorna.<\/p>\n\n\n<p>Innan du lovar ett nytt leveransdatum b\u00f6r du kontrollera att det fungerar med den befintliga bel\u00e4ggningen. N\u00e4r ordern v\u00e4l \u00e4r accepterad beh\u00f6ver du forts\u00e4tta st\u00e4mma av \u00e5tagandet mot schemat n\u00e4r det f\u00f6r\u00e4ndras. Ett datum som var m\u00f6jligt att h\u00e5lla f\u00f6rra veckan kan ha blivit om\u00f6jligt efter ett maskinhaveri eller en leverant\u00f6rsf\u00f6rsening.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e4kra utlovade datum i den dagliga produktionsplaneringen<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Ge varje order en genomf\u00f6rbar plan utifr\u00e5n tillg\u00e4nglig kapacitet<\/h3>\n\n\n<p>Schemal\u00e4gg de \u00e5terst\u00e5ende operationerna tillsammans med h\u00e4nsyn till de maskiner, skift, personer och processberoenden som kr\u00e4vs f\u00f6r att slutf\u00f6ra dem. En ledig tid i sk\u00e4rningen \u00e4r bara anv\u00e4ndbar om \u00e4ven de efterf\u00f6ljande operationerna kan bli klara i tid.<\/p>\n\n\n<p>Arcturus, SkyPlanners AI-baserade schemal\u00e4ggningsmotor, ber\u00e4knar schemat utifr\u00e5n dina produktionsresurser och regler. Gantt-schemat visar var operationerna har placerats. Separata k\u00f6ber\u00e4kningar ers\u00e4tts d\u00e4rmed av en sammanh\u00e4ngande bild av hur order konkurrerar om den tillg\u00e4ngliga tiden.<\/p>\n\n\n<p>N\u00e4r arbetet inte ryms inom kapaciteten ger schemat dig ett underlag f\u00f6r \u00e5tg\u00e4rder: \u00f6verv\u00e4g mer bemannad kapacitet, en alternativ produktionsgrupp som kan utf\u00f6ra arbetet eller en annan ordningsf\u00f6ljd. Om inget av detta g\u00f6r att l\u00f6ftet kan h\u00e5llas beh\u00f6ver du ta itu med leveranskonflikten medan kunden fortfarande har tid att agera.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ta med materialtillg\u00e5ngen i planen<\/h3>\n\n\n<p>En ledig maskin betyder inte att en order \u00e4r klar att k\u00f6ras. Saknas r\u00e5material eller en ink\u00f6pt komponent kan produktionsfl\u00f6det stanna \u00e4ven om det finns ledig kapacitet.<\/p>\n\n\n<p>SkyPlanners materialstyrda schemal\u00e4ggning tar h\u00e4nsyn till lagersaldo och inkommande material n\u00e4r regeln \u00e4r aktiverad. Materialtillg\u00e5ngen p\u00e5verkar d\u00e5 hur arbetet schemal\u00e4ggs, i st\u00e4llet f\u00f6r att vara en separat anteckning som planeraren m\u00e5ste h\u00e5lla i minnet n\u00e4r k\u00f6erna \u00e4ndras.<\/p>\n\n\n<p>Se till att uppdateringar fr\u00e5n ink\u00f6p kommer in i planeringen. N\u00e4r ett ankomstdatum \u00e4ndras \u00e4r fr\u00e5gan inte bara n\u00e4r materialet kommer, utan vilka bekr\u00e4ftade leverans\u00e5taganden som nu kr\u00e4ver en annan produktionsplan.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Prioritera medvetet, inte efter det senaste telefonsamtalet<\/h3>\n\n\n<p>En br\u00e5dskande f\u00f6rfr\u00e5gan kr\u00e4ver ett beslut d\u00e4r konsekvenserna v\u00e4gs in. Att tidigarel\u00e4gga den kan ta samma kapacitet som en annan utlovad order beh\u00f6ver.<\/p>\n\n\n<p>Med SkyPlanners dynamiska prioriteringar kan slutdatum och andra verksamhetsprioriteringar p\u00e5verka ordningsf\u00f6ljden i schemat. Planerarna anger prioriteringar och regler, och Arcturus till\u00e4mpar dem i ber\u00e4kningen. Du kan s\u00e4kra viktiga \u00e5taganden utan att g\u00e5ng p\u00e5 g\u00e5ng beh\u00f6va flytta varje ber\u00f6rd operation f\u00f6r hand.<\/p>\n\n\n<p>Ge inte alla order h\u00f6gsta prioritet. Om kapacitetskonflikten \u00e4r verklig f\u00f6rsvinner den inte f\u00f6r att du byter etikett. Anv\u00e4nd prioriteringar f\u00f6r att avg\u00f6ra vilket arbete som ska f\u00e5 den knappa tiden och granska sedan hur \u00f6vriga \u00e5taganden p\u00e5verkas.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Uppdatera planen n\u00e4r l\u00e4get i produktionen f\u00f6r\u00e4ndras<\/h3>\n\n\n<p>Registrera slutf\u00f6rt arbete, \u00e4ndrade operationstider, stillest\u00e5nd och kapacitetsf\u00f6r\u00e4ndringar utan dr\u00f6jsm\u00e5l. Ett schema som bygger p\u00e5 g\u00e5rdagens produktionsl\u00e4ge kan ge fel utg\u00e5ngspunkt f\u00f6r dagens leveransdiskussion.<\/p>\n\n\n<p>N\u00e4r Autopilot \u00e4r aktiverat kan SkyPlanner ber\u00e4kna om schemat vid konfigurerade h\u00e4ndelser eller med inst\u00e4llda tidsintervall, samtidigt som dina regler och l\u00e5sningar beh\u00e5lls. Markeringar av sena operationer i Gantt-schemat hj\u00e4lper dig att uppm\u00e4rksamma arbete som beh\u00f6ver ses \u00f6ver. Du f\u00e5r en uppdaterad plan att agera utifr\u00e5n, i st\u00e4llet f\u00f6r att beh\u00f6va bygga om k\u00f6erna manuellt efter varje f\u00f6r\u00e4ndring.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fatta beslut om leveransrisker f\u00f6re avs\u00e4ndningsdagen<\/h2>\n\n\n<p>T\u00e4nk dig en accepterad order som m\u00e5ste vara klar att skickas p\u00e5 torsdag. Sk\u00e4rningen \u00e4r f\u00e4rdig, men en ink\u00f6pt komponent som beh\u00f6vs f\u00f6r monteringen kommer nu senare \u00e4n planerat. Monteringen delar dessutom personal med en annan order som ska levereras veckan d\u00e4rp\u00e5.<\/p>\n\n\n<p>Att bara markera den f\u00f6rsta ordern som br\u00e5dskande f\u00e5r inte fram den saknade komponenten. Att starta annat arbete i f\u00f6rtid kan h\u00e5lla personalen sysselsatt men l\u00e4mna f\u00f6r lite monteringskapacitet n\u00e4r komponenten v\u00e4l kommer.<\/p>\n\n\n<p>G\u00e5 igenom det sammanh\u00e4ngande schemat med det \u00e4ndrade ankomstdatumet f\u00f6r materialet. Ryms \u00e5terst\u00e5ende montering och kontroll fortfarande f\u00f6re avs\u00e4ndningen? Kan arbetet f\u00f6r den senare ordern flyttas utan att dess leveransl\u00f6fte missas? Skulle fler bemannade produktionstimmar l\u00f6sa konflikten, eller kommer materialet redan f\u00f6r sent?<\/p>\n\n\n<p>SkyPlanner v\u00e4ger in material, kapacitet och prioriteringar i schemaber\u00e4kningen. Det ger planeraren ett tydligare underlag f\u00f6r att v\u00e4lja en \u00e5tg\u00e4rd som kan ta igen f\u00f6rseningen. Om det inte l\u00e4ngre finns n\u00e5gon genomf\u00f6rbar l\u00f6sning b\u00f6r du informera om problemet och komma \u00f6verens om n\u00e4sta steg, i st\u00e4llet f\u00f6r att v\u00e4nta till torsdag f\u00f6r att f\u00e5 bekr\u00e4ftat det planen redan visar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vad f\u00f6r\u00e4ndringen innebar f\u00f6r KJH-Comp<\/h2>\n\n\n<p>KJH-Comp, en finl\u00e4ndsk kontraktstillverkare inom pl\u00e5tbearbetning, beh\u00f6vde \u00f6verbrygga glappet mellan en produktions\u00f6versikt per vecka och leveransl\u00f6ften f\u00f6r specifika dagar. F\u00f6retagets ERP-system C9000 och kalkylblad visade den \u00f6vergripande veckobel\u00e4ggningen, medan arbetsledarna f\u00f6rdelade arbetet p\u00e5 maskiner manuellt.<\/p>\n\n\n<p>Med SkyPlanner automatiserades <a href=\"https:\/\/skyplanner.ai\/sv\/resurser\/planering-mot-begransad-kapacitet\/\">schemal\u00e4ggningen med begr\u00e4nsad kapacitet<\/a> och f\u00f6rdelningen p\u00e5 maskiner. F\u00f6retagets kontroll inf\u00f6r svetsning s\u00e4kerst\u00e4ller ocks\u00e5 att alla delar som beh\u00f6vs, inklusive ink\u00f6pta komponenter, finns samlade innan arbetet l\u00e4ggs i k\u00f6n. F\u00f6r\u00e4ndringen kopplar ihop det arbete som \u00e4r klart att k\u00f6ra med den kapacitet och de datum som \u00e4r avg\u00f6rande.<\/p>\n\n\n<p>KJH-Comp uppger att leveransprecisionen \u00f6kade fr\u00e5n omkring 50 % till upp till 98 % under 2026. L\u00e4rdomen f\u00f6r andra tillverkare ligger i den f\u00f6r\u00e4ndrade planeringen bakom resultatet: en sammanlagd veckobel\u00e4ggning r\u00e4cker inte n\u00e4r kunderna f\u00f6rv\u00e4ntar sig sina order en viss dag.<\/p>\n\n\n<p>L\u00e4s om <a href=\"https:\/\/skyplanner.ai\/sv\/kundberattelser\/kjh-comp\/\">KJH-Comps erfarenheter av SkyPlanner<\/a> f\u00f6r hela ber\u00e4ttelsen om inf\u00f6randet och resultaten.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Granska leveransrisker innan de blir sena leveranser<\/h2>\n\n\n<p>L\u00e5t den dagliga planeringsdiskussionen handla om accepterade order som riskerar att inte bli klara till sina m\u00e5ldatum. Identifiera f\u00f6r varje order vilket material, vilken operation eller vilken resurs som begr\u00e4nsar fl\u00f6det. V\u00e4lj en \u00e5tg\u00e4rd och kontrollera vilka andra leveransl\u00f6ften den p\u00e5verkar. G\u00f6r sedan den nya ordningsf\u00f6ljden synlig f\u00f6r dem som ska utf\u00f6ra arbetet.<\/p>\n\n\n<p>F\u00f6lj inte bara upp OTD, utan ocks\u00e5 hur stora f\u00f6rseningarna var och vilka orsaker som \u00e5terkommer. Om material inte finns klart i tid kr\u00e4vs andra \u00e5tg\u00e4rder \u00e4n vid \u00e5terkommande \u00f6verbelastning i samma produktionsgrupp. F\u00f6lj upp utfallet mot b\u00e5de de ursprungliga leveransl\u00f6ftena och eventuella reviderade \u00e5taganden, s\u00e5 att det \u00e4r leveranserna som f\u00f6rb\u00e4ttras och inte bara datumen som flyttas.<\/p>\n\n\n<p>Om genomg\u00e5ngen \u00e4nd\u00e5 slutar med att n\u00e5gon manuellt m\u00e5ste r\u00e4tta till k\u00f6rordningen f\u00f6r flera maskiner \u00e4r SkyPlanner ett praktiskt n\u00e4sta steg. SkyPlanner <a href=\"https:\/\/skyplanner.ai\/sv\/integrationer\/\">kan integreras med alla ERP- eller MES-system<\/a> via sitt \u00f6ppna REST API och omvandlar era produktionsdata till ett schema som kan h\u00e5llas aktuellt n\u00e4r arbetet f\u00f6r\u00e4ndras.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sv\/kontaktforsaljning\/\">Boka en demo<\/a> med utg\u00e5ngspunkt i en bekr\u00e4ftad order och en verklig st\u00f6rning i er fabrik. Se hur de \u00e5terst\u00e5ende operationerna, belastningen fr\u00e5n andra order och leveransm\u00e5let h\u00e4nger ihop. Eller <a href=\"https:\/\/skyplanner.ai\/sv\/prova\/\">b\u00f6rja testa med demodata<\/a> f\u00f6r att utforska hur SkyPlanner kan hj\u00e4lpa ert team att h\u00e5lla n\u00e4sta leveransl\u00f6fte.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Leveransprecision i tillverkningen: H\u00e5ll det du lovar Hem &raquo; Resurser &raquo; Leveransprecision i tillverkningen: H\u00e5ll det du lovar Leveransprecision (OTD) m\u00e4ter hur v\u00e4l du h\u00e5ller de leveransdatum som avtalats med kunden. I tillverkningen handlar f\u00f6rb\u00e4ttrad leveransprecision om att se till att r\u00e4tt order kan g\u00e5 genom produktionen, bli f\u00e4rdiga och n\u00e5 den avtalade leveranspunkten i &#8230; <a title=\"Leveransprecision i tillverkningen: H\u00e5ll det du lovar\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/\" aria-label=\"L\u00e4s mer om Leveransprecision i tillverkningen: H\u00e5ll det du lovar\">L\u00e4s mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":100454,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2569,311],"tags":[],"class_list":["post-100443","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-tillverkning","category-resurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Leveransprecision i tillverkningen: H\u00e5ll det du lovar<\/title>\n<meta name=\"description\" content=\"Sena order trots full fart i fabriken? L\u00e4r dig m\u00e4ta leveransprecision och anv\u00e4nda SkyPlanner f\u00f6r att anpassa produktionen till de datum du lovat.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/\" \/>\n<meta property=\"og:locale\" content=\"sv_SE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Leveransprecision i tillverkningen: H\u00e5ll det du lovar\" \/>\n<meta property=\"og:description\" content=\"Sena order trots full fart i fabriken? L\u00e4r dig m\u00e4ta leveransprecision och anv\u00e4nda SkyPlanner f\u00f6r att anpassa produktionen till de datum du lovat.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T22:47:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T22:49:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skriven av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ber\u00e4knad l\u00e4stid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minuter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Leveransprecision i tillverkningen: H\u00e5ll det du lovar\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:49:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/\"},\"wordCount\":2236,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"articleSection\":[\"Effektiv tillverkning\",\"resurser\"],\"inLanguage\":\"sv-SE\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/\",\"name\":\"Leveransprecision i tillverkningen: H\u00e5ll det du lovar\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:49:02+00:00\",\"description\":\"Sena order trots full fart i fabriken? L\u00e4r dig m\u00e4ta leveransprecision och anv\u00e4nda SkyPlanner f\u00f6r att anpassa produktionen till de datum du lovat.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/#breadcrumb\"},\"inLanguage\":\"sv-SE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Manufactured components converge into a complete shipping carton beside a waiting delivery truck.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/resurser\\\/leveransprecision\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Leveransprecision i tillverkningen: H\u00e5ll det du lovar\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sv-SE\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Leveransprecision i tillverkningen: H\u00e5ll det du lovar","description":"Sena order trots full fart i fabriken? L\u00e4r dig m\u00e4ta leveransprecision och anv\u00e4nda SkyPlanner f\u00f6r att anpassa produktionen till de datum du lovat.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/","og_locale":"sv_SE","og_type":"article","og_title":"Leveransprecision i tillverkningen: H\u00e5ll det du lovar","og_description":"Sena order trots full fart i fabriken? L\u00e4r dig m\u00e4ta leveransprecision och anv\u00e4nda SkyPlanner f\u00f6r att anpassa produktionen till de datum du lovat.","og_url":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T22:47:32+00:00","article_modified_time":"2026-10-16T22:49:02+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skriven av":"Jussi M\u00e4ntyl\u00e4","Ber\u00e4knad l\u00e4stid":"11 minuter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Leveransprecision i tillverkningen: H\u00e5ll det du lovar","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:49:02+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/"},"wordCount":2236,"publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","articleSection":["Effektiv tillverkning","resurser"],"inLanguage":"sv-SE"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/","url":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/","name":"Leveransprecision i tillverkningen: H\u00e5ll det du lovar","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:49:02+00:00","description":"Sena order trots full fart i fabriken? L\u00e4r dig m\u00e4ta leveransprecision och anv\u00e4nda SkyPlanner f\u00f6r att anpassa produktionen till de datum du lovat.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/#breadcrumb"},"inLanguage":"sv-SE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/"]}]},{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","width":1672,"height":941,"caption":"Manufactured components converge into a complete shipping carton beside a waiting delivery truck."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sv\/resurser\/leveransprecision\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sv\/"},{"@type":"ListItem","position":2,"name":"Leveransprecision i tillverkningen: H\u00e5ll det du lovar"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sv\/#website","url":"https:\/\/skyplanner.ai\/sv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sv-SE"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sv\/","logo":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Leveransprecision i tillverkningen: H\u00e5ll det du lovar Hem &raquo; Resurser &raquo; Leveransprecision i tillverkningen: H\u00e5ll det du lovar Leveransprecision (OTD) m\u00e4ter hur v\u00e4l du h\u00e5ller de leveransdatum som avtalats med kunden. I tillverkningen handlar f\u00f6rb\u00e4ttrad leveransprecision om att se till att r\u00e4tt order kan g\u00e5 genom produktionen, bli f\u00e4rdiga och n\u00e5 den avtalade leveranspunkten i&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/100443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/comments?post=100443"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/100443\/revisions"}],"predecessor-version":[{"id":100502,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/posts\/100443\/revisions\/100502"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media\/100454"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media?parent=100443"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/categories?post=100443"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/tags?post=100443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}