{"id":103093,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrationer\/erp\/monitor-erp\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"monitor-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/monitor-erp\/","title":{"rendered":"SkyPlanner APS f\u00f6r Monitor ERP: produktionsplanering efter verklig kapacitet"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/sv\/integrationer\/\">Integrationer<\/a> \/ <a href=\"\/sv\/integrationer\/erp\/\">ERP<\/a> \/ Monitor ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS f\u00f6r Monitor ERP: <span class=\"hl\">Produktionsplanering efter verklig kapacitet<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS \u00e4r ett till\u00e4gg f\u00f6r produktionsplanering i Monitor ERP som planerar alla produktionsgrupper, operat\u00f6rer, verktyg och material samtidigt utifr\u00e5n verklig kapacitet. Monitor G5 visar var \u00f6verbel\u00e4ggningen finns. SkyPlanner tar bort den, och Autopilot planerar om automatiskt n\u00e4r produktionen f\u00f6r\u00e4ndras.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sv\/prova\/\">Starta kostnadsfri provperiod<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sv\/kontaktforsaljning\/\">Boka en demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Produktionsplanering<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt-schema i SkyPlanner APS med operationer planerade p\u00e5 olika produktionsgrupper och en orderlista nedanf\u00f6r.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner har en tv\u00e5v\u00e4gsintegration med Monitor ERP: tillverkningsorder, operationer, produktionsgrupper och material f\u00f6rs in, medan planerade operationsdatum och rapporterat arbete skickas tillbaka. Under inf\u00f6randet konfigurerar SkyPlanner-teamet integrationen efter hur ni anv\u00e4nder Monitor G5.<\/p>\n\n\n<p>Priset \u00e4r fr\u00e5n 199 \u20ac per m\u00e5nad med 5 produktionsgrupper inkluderade. Varje extra produktionsgrupp kostar 20 \u20ac per m\u00e5nad. Du kan prova gratis i 30 dagar med upp till 20 produktionsgrupper, utan kreditkort.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u00e5 f\u00f6r\u00e4ndras din produktion<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Slipp dra rader i prioriteringsplanen.<\/p>\n\n\n<p class=\"fx-pain__b\">Planeringsmotorn Arcturus l\u00e4gger alla \u00f6ppna operationer i k\u00f6rordning f\u00f6r samtliga produktionsgrupper i en enda k\u00f6rning. Planeraren granskar resultatet i st\u00e4llet f\u00f6r att bygga planen f\u00f6r hand, en produktionsgrupp i taget.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u00d6verbel\u00e4ggning \u00e5tg\u00e4rdas i st\u00e4llet f\u00f6r att bara visas.<\/p>\n\n\n<p class=\"fx-pain__b\">Varje maskin, person och verktyg f\u00e5r en plan som h\u00e5ller sig inom tillg\u00e4nglig kapacitet och tar h\u00e4nsyn till faktiska skift, fr\u00e5nvaro och \u00f6vertid. Tv\u00e5 tillverkningsorder l\u00e4ggs aldrig p\u00e5 samma maskin vid samma tidpunkt. N\u00e4r en maskin \u00e4r fullbelagd flyttas arbetet till en alternativ maskin eller person.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Leveransdatum f\u00f6r varje order, inte bara en orderrad.<\/p>\n\n\n<p class=\"fx-pain__b\">Varje tillverkningsorder f\u00e5r ett f\u00e4rdigdatum utifr\u00e5n hela fabrikens plan. S\u00e4ljarna ger kunderna besked utifr\u00e5n planen, som redan tar h\u00e4nsyn till alla andra order.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">F\u00e4rre omst\u00e4llningar.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner k\u00e4nner till st\u00e4lltiden mellan varje produktpar, i b\u00e5da riktningarna. Fr\u00e5n bl\u00e5tt till r\u00f6tt kan det ta 30 minuter och fr\u00e5n r\u00f6tt till bl\u00e5tt 60. Planeringsmotorn l\u00e4gger operationerna i den ordning som ger minst tidsf\u00f6rlust.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">H\u00e4nsyn till gemensamma verktyg och arbetslag.<\/p>\n\n\n<p class=\"fx-pain__b\">Ett pressverktyg eller en fixtur som anv\u00e4nds p\u00e5 en maskin bokas aldrig p\u00e5 en annan samtidigt. En operation som kr\u00e4ver tre operat\u00f6rer f\u00e5r tre personer med ledig tid i sina skift.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materialkontroll innan arbetet b\u00f6rjar.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner planerar utifr\u00e5n lagersaldo och \u00f6ppna ink\u00f6psorder. En operation som v\u00e4ntar p\u00e5 en leverant\u00f6rsleverans planeras efter leveransdatumet i st\u00e4llet f\u00f6r att bli st\u00e5ende vid maskinen.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operat\u00f6rerna ser sin k\u00f6rk\u00f6.<\/p>\n\n\n<p class=\"fx-pain__b\">Varje operat\u00f6r ser kommande operationer p\u00e5 en mobil eller surfplatta och rapporterar arbetet l\u00f6pande. Kontoret f\u00f6ljer produktionen i realtid, och det rapporterade arbetet skickas tillbaka till Monitor.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tillverkande f\u00f6retag om SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist inom f\u00f6rs\u00f6rjningskedjan p\u00e5 UTU, i elcentralstillverkningen i Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sparas varje vecka<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201dSkyPlanner har tagit v\u00e5r produktionsplanering fr\u00e5n Excel-ark till produktionsoptimering i realtid.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist inom f\u00f6rs\u00f6rjningskedjan<\/b><br>UTU \u00b7 Elcentraler och st\u00e4llverk<\/p>\n\n\n<p class=\"ind-cust__result\">Produktionsplaneringen sparar 2 timmars arbetstid varje vecka, och en ny k\u00f6rk\u00f6 n\u00e5r produktionslinjen p\u00e5 n\u00e5gra sekunder.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sv\/kundberattelser\/utu\/\">L\u00e4s UTU:s omd\u00f6me<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operat\u00f6rer i renrumsdr\u00e4kter vid en flaskfyllningslinje i Laboratory &amp; Allieds l\u00e4kemedelsfabrik i Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>produktionseffektivitet<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201dEffektiviteten i produktionen har \u00f6kat med 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-chef<\/b><br>Laboratory &amp; Allied \u00b7 L\u00e4kemedelstillverkning<\/p>\n\n\n<p class=\"ind-cust__result\">Produktionseffektiviteten har \u00f6kat med 90%, och det tar under 30 minuter att skapa en optimerad plan f\u00f6r tre m\u00e5nader f\u00f6r samtliga produktionsgrupper.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sv\/kundberattelser\/laboratory-allied\/\">L\u00e4s Laboratory &amp; Allieds omd\u00f6me<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"En svetsare p\u00e5 KJH-Comp slipar en svetsad st\u00e5lkonstruktion i fabriken i Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>leveransprecision, upp fr\u00e5n cirka 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201dSkyPlanner spelar en avg\u00f6rande roll f\u00f6r att uppr\u00e4tth\u00e5lla v\u00e5r leveransprecision.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, vd<\/b><br>KJH-Comp \u00b7 Pl\u00e5tmekanik och kontraktstillverkning<\/p>\n\n\n<p class=\"ind-cust__result\">Leveransprecisionen steg fr\u00e5n cirka 50% till som mest 98%, och planeringen kr\u00e4ver nu en arbetsledare i st\u00e4llet f\u00f6r tv\u00e5.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sv\/kundberattelser\/kjh-comp\/\">L\u00e4s KJH-Comps omd\u00f6me<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>F\u00e4rre<\/b><span>stopp p\u00e5 grund av materialbrist<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201dV\u00e4rdet med SkyPlanner f\u00f6r oss \u00e4r att det \u00e4r ett verktyg som fungerar i vardagen, s\u00e4rskilt f\u00f6r att fastst\u00e4lla leveransdatum.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, produktionsplaneringschef<\/b><br>Eskomatic \u00b7 Legobearbetning<\/p>\n\n\n<p class=\"ind-cust__result\">Automatisk bel\u00e4ggningsplanering ger mer tillf\u00f6rlitliga leveransdatum, och produktionsstoppen p\u00e5 grund av materialbrist har minskat kraftigt.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sv\/kundberattelser\/eskomatic\/\">L\u00e4s Eskomatics omd\u00f6me<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-monitor-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u00e5 fungerar integrationen med Monitor ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Monitor skickar orderuppgifterna.<\/strong> Tillverkningsorder med operationer, produktionsgrupper, st\u00e4ll- och stycktider f\u00f6rs \u00f6ver till SkyPlanner tillsammans med materialbehov, lagersaldon och ink\u00f6psorder.<\/li>\n\n\n<li><strong>SkyPlanner skapar planen och h\u00e5ller den aktuell.<\/strong> Planeringsmotorn Arcturus planerar varje operation i varje produktionsgrupp p\u00e5 n\u00e5gra sekunder och planerar om n\u00e4r produktionen f\u00f6r\u00e4ndras.<\/li>\n\n\n<li><strong>Datum och rapporterat arbete skickas tillbaka.<\/strong> Planerad start och sluttid f\u00f6r varje operation f\u00f6rs tillbaka till tillverkningsordern i Monitor. Rapporterad tid och kvantitet h\u00e5ller b\u00e5da systemen uppdaterade.<\/li>\n\n<\/ol>\n\n\n<p>Integrationen anv\u00e4nder Monitors eget gr\u00e4nssnitt, Monitor ERP API, s\u00e5 ingenting installeras i Monitor. Varje fabrik anv\u00e4nder Monitor G5 p\u00e5 sitt s\u00e4tt. D\u00e4rf\u00f6r kartl\u00e4gger SkyPlanner-teamet era produktionsgrupper, operationsrader och orderfl\u00f6den under inf\u00f6randet och ger support f\u00f6r integrationen efter drifts\u00e4ttningen. Ni f\u00e5r en offert p\u00e5 integrationen i f\u00f6rv\u00e4g, utifr\u00e5n era processer och behov. Er Monitor-partner eller era egna utvecklare kan ocks\u00e5 bygga vidare p\u00e5 SkyPlanners dokumenterade API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referens<\/a>).<\/p>\n\n\n<p>API-endpoints, f\u00e4ltmappning, versioner och \u00e5terf\u00f6ring av data beskrivs i <a href=\"\/sv\/integrationer\/erp\/monitor-erp\/guide\/\">integrationsguiden f\u00f6r produktionsplanering med Monitor ERP<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-monitor-erp-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Vilka data \u00f6verf\u00f6rs mellan Monitor ERP och SkyPlanner?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Monitor ERP<\/th><th>SkyPlanner<\/th><th>Riktning<\/th><\/tr><\/thead><tbody><tr><td>Artikel<\/td><td>Produkter och material<\/td><td>In<\/td><\/tr><tr><td>Stycklista och operationsf\u00f6ljd (Beredning): operationsrader med st\u00e4lltid, stycktid och k\u00f6tid<\/td><td>Processteg med tids\u00e5tg\u00e5ng och st\u00e4lltider<\/td><td>In<\/td><\/tr><tr><td>Produktionsgrupp, alternativa produktionsgrupper, poolmedlemmar<\/td><td>Produktionsgrupper, grupperingar av produktionsgrupper, alternativ<\/td><td>In<\/td><\/tr><tr><td>Produktionsscheman och kalenderundantag<\/td><td>Skift och fr\u00e5nvaro<\/td><td>In<\/td><\/tr><tr><td>Tillverkningsorder med operationer och f\u00e4rdigdatum<\/td><td>Order och operationer med f\u00e4rdigdatum och prioritet<\/td><td>In<\/td><\/tr><tr><td>Material p\u00e5 tillverkningsorder, lagersaldon, ink\u00f6psorder<\/td><td>Materialbehov, lagersaldon, inkommande leveranser<\/td><td>In<\/td><\/tr><tr><td>Operation p\u00e5 tillverkningsorder: planerad start, planerat slut, produktionsgrupp<\/td><td>Planerad start, planerat slut och produktionsgrupp per operation<\/td><td>Tillbaka<\/td><\/tr><tr><td>Operationsrapportering: tid och kvantitet<\/td><td>Tider och kvantiteter rapporterade av operat\u00f6rer<\/td><td>B\u00e5da riktningarna, en rapporteringskanal v\u00e4ljs<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>St\u00e4lltidsmatriser, verktyg med begr\u00e4nsad tillg\u00e4nglighet och operationer som kr\u00e4ver flera operat\u00f6rer hanteras i SkyPlanner och konfigureras under inf\u00f6randet.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"monitor-priority-planning-and-finite-capacity-sc\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Prioriteringsplanering i Monitor och produktionsplanering efter verklig kapacitet<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Monitor G5 \u00e4r ett kompetent ERP-system med st\u00f6d f\u00f6r planering. Det visar bel\u00e4ggningen per produktionsgrupp och ber\u00e4knar f\u00e4rdigdatum. Att \u00e5tg\u00e4rda \u00f6verbel\u00e4ggning \u00e4r fortfarande planerarens ansvar, vilket ocks\u00e5 framg\u00e5r av Monitors egen hj\u00e4lp:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Order registreras utan att andra orders bel\u00e4ggning kontrolleras.<\/strong> Med standardinst\u00e4llningen registreras en order &#8221;as per the requirement date in BOM and routing regardless of the work center&#8217;s capacity.&#8221; (enligt behovsdatum i beredningen, oavsett produktionsgruppens kapacitet). (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/GeneralRegisters\/BasicSettings\/SystemSettings\/bOrderManufacturing.htm\">Monitors hj\u00e4lp<\/a>)<\/li>\n\n\n<li><strong>Loading plan visar \u00f6verbel\u00e4ggning men \u00e5tg\u00e4rdar den inte.<\/strong> Huvudplaneringen beskrivs som &#8221;a loading plan where any overload might require the entire order to be replanned with regard to quantity and dates.&#8221; (en bel\u00e4ggningsplan d\u00e4r \u00f6verbel\u00e4ggning kan kr\u00e4va att hela ordern planeras om vad g\u00e4ller antal och datum). (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/UserGuide\/Using\/Flows\/ManufacturingOrderFlow\/MainPlanning.htm\">Monitors hj\u00e4lp<\/a>)<\/li>\n\n\n<li><strong>Prioriteringsplaneringen hanterar en produktionsgrupp i taget.<\/strong> Den &#8221;shows all operations for the work center in all manufacturing orders,&#8221; (visar alla operationer f\u00f6r produktionsgruppen i samtliga tillverkningsorder), och planeraren drar rader f\u00f6r att best\u00e4mma k\u00f6rordningen. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/PriorityPlanning\/bPriorityPlan.htm\">Monitors hj\u00e4lp<\/a>)<\/li>\n\n\n<li><strong>Check delivery times planerar en orderrad.<\/strong> CDT hittar ledig kapacitet f\u00f6r den rad ni l\u00e4mnar leveransbesked f\u00f6r, och de manuella omplaneringarna &#8221;are not saved.&#8221; (sparas inte). (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/UserGuide\/Using\/CheckDeliveryTimes\/CheckCapacityAvailability.htm\">Monitors hj\u00e4lp<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Finplanering f\u00f6r hela fabriken kr\u00e4ver d\u00e4rf\u00f6r ett s\u00e4rskilt planeringssystem. SkyPlanner planerar k\u00f6rordningen f\u00f6r alla produktionsgrupper tillsammans och h\u00e5ller planen aktuell. Varje steg i Monitors planering f\u00f6rklaras i <a href=\"\/sv\/integrationer\/erp\/monitor-erp\/finplanering\/\">Har Monitor ERP produktionsplanering som tar h\u00e4nsyn till verklig kapacitet?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"monitor-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP i dag och med SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Planering i Monitor G5<\/th><th>Monitor G5 med SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Kapacitet<\/td><td>Bel\u00e4ggning visas per produktionsgrupp; planeraren \u00e5tg\u00e4rdar \u00f6verbel\u00e4ggning<\/td><td>Verklig kapacitet f\u00f6r varje maskin, person och verktyg, med h\u00e4nsyn till skift<\/td><\/tr><tr><td>K\u00f6rordning<\/td><td>Rader dras i prioriteringsplanen, en produktionsgrupp i taget<\/td><td>K\u00f6rordningen planeras f\u00f6r alla produktionsgrupper i en k\u00f6rning, p\u00e5 n\u00e5gra sekunder<\/td><\/tr><tr><td>Leveransdatum<\/td><td>CDT ger leveransbesked f\u00f6r en orderrad<\/td><td>Varje order f\u00e5r datum utifr\u00e5n hela fabrikens plan<\/td><\/tr><tr><td>Omst\u00e4llningar<\/td><td>Order med samma verktyg filtreras och grupperas manuellt<\/td><td>Operationer l\u00e4ggs i k\u00f6rordning f\u00f6r minsta totala st\u00e4lltid<\/td><\/tr><tr><td>Verktyg och bemanning<\/td><td>St\u00e4llkonflikter visas f\u00f6r manuell kontroll<\/td><td>Verktygens tillg\u00e4nglighet respekteras; operationer med flera operat\u00f6rer bemannas<\/td><\/tr><tr><td>Material<\/td><td>Materialtillg\u00e5ng kontrolleras per orderrad i CDT<\/td><td>Operationer startar n\u00e4r material finns i lager eller har levererats<\/td><\/tr><tr><td>F\u00f6r\u00e4ndringar<\/td><td>Planeraren k\u00f6r New finish igen och planerar om<\/td><td>Autopilot planerar om med h\u00e4nsyn till era l\u00e5sningar och prioriteringar<\/td><\/tr><tr><td>Produktionsgolvet<\/td><td>St\u00e4mplingsterminal och maskinintegration<\/td><td>K\u00f6rlista och rapportering f\u00f6r operat\u00f6rer p\u00e5 mobil eller surfplatta<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-monitor-erp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u00e5 v\u00e4ljer ni ett system f\u00f6r produktionsplanering till Monitor ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Monitors egen prioriteringsplanering passar en fabrik med en eller tv\u00e5 produktionsgrupper som \u00e4r flaskhalsar och en planerare som arbetar i prioriteringsplanen varje dag. F\u00f6r st\u00f6rre behov j\u00e4mf\u00f6r k\u00f6pare fyra grupper av l\u00f6sningar. Monitor-konsulter bygger kundanpassade planeringsvyer f\u00f6r en enskild fabrik. Verktyg f\u00f6r produktionsuppf\u00f6ljning och OEE rapporterar tid och kvantitet tillbaka till Monitor men skapar ingen plan som h\u00e5ller sig inom verklig kapacitet. APS-sviter f\u00f6r stora f\u00f6retag listar inte Monitor bland sina dokumenterade ERP-integrationer. SkyPlanner h\u00f6r till gruppen molnbaserade APS-system med st\u00f6d f\u00f6r att utf\u00f6ra och rapportera arbetet i produktionen.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u00e4lj SkyPlanner n\u00e4r din planerare l\u00e4gger timmar varje vecka p\u00e5 att dra rader<\/strong> i prioriteringsplanen och l\u00f6sa \u00f6verbel\u00e4ggningar i Loading plan.<\/li>\n\n\n<li><strong>V\u00e4lj SkyPlanner n\u00e4r flaskhalsarna flyttar sig med produktmixen,<\/strong> och det inte l\u00e4ngre r\u00e4cker att planera en produktionsgrupp i taget.<\/li>\n\n\n<li><strong>V\u00e4lj SkyPlanner n\u00e4r omst\u00e4llningarna avg\u00f6r hur mycket ni kan producera.<\/strong> St\u00e4lltidsmatrisen ordnar operationerna s\u00e5 att den totala st\u00e4lltiden blir s\u00e5 kort som m\u00f6jligt.<\/li>\n\n\n<li><strong>V\u00e4lj SkyPlanner n\u00e4r gemensamma verktyg, st\u00e4llare och arbetslag avg\u00f6r vad som kan k\u00f6ras h\u00e4rn\u00e4st.<\/strong><\/li>\n\n\n<li><strong>V\u00e4lj SkyPlanner n\u00e4r materialleveranserna avg\u00f6r vilken operation som kan starta.<\/strong> Lagersaldon och ink\u00f6psorder styr n\u00e4r varje operation kan p\u00e5b\u00f6rjas.<\/li>\n\n\n<li><strong>V\u00e4lj SkyPlanner n\u00e4r planen \u00e4ndras dagligen.<\/strong> Autopilot planerar om efter ett maskinhaveri eller en br\u00e5dskande order, och de nya datumen f\u00f6rs tillbaka till Monitor.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u00e5 kommer du ig\u00e5ng<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Starta din kostnadsfria provperiod.<\/strong> 30 dagar, upp till 20 produktionsgrupper och alla funktioner i Basic. Inget kreditkort kr\u00e4vs.<\/li>\n\n\n<li><strong>Bygg upp en modell av din produktion.<\/strong> L\u00e4gg upp maskiner, personal och skift i SkyPlanner eller importera dem. Du kan f\u00e5 hj\u00e4lp att komma ig\u00e5ng.<\/li>\n\n\n<li><strong>L\u00e4s in dina tillverkningsorder.<\/strong> Exportera operationer i \u00f6ppna tillverkningsorder och produktionsgrupper fr\u00e5n Monitor till Excel. Importera dem i SkyPlanner och j\u00e4mf\u00f6r planen med din prioriteringsplan.<\/li>\n\n\n<li><strong>Anslut Monitor ERP.<\/strong> SkyPlanner-teamet konfigurerar tv\u00e5v\u00e4gsintegrationen f\u00f6r din Monitor G5-milj\u00f6 och ger support n\u00e4r den \u00e4r i drift.<\/li>\n\n<\/ol>\n\n\n<p><strong>Priser.<\/strong> Abonnemangen faktureras m\u00e5nadsvis per produktionsgrupp. Du kan n\u00e4r som helst l\u00e4gga till eller ta bort produktionsgrupper eller s\u00e4ga upp abonnemanget. Se <a href=\"\/sv\/prissattning\/\">priser<\/a> f\u00f6r mer information och hitta andra aff\u00e4rssystem i <a href=\"\/sv\/integrationer\/erp\/\">\u00f6versikten \u00f6ver ERP-integrationer<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sv\/prova\/\">Prova gratis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sv\/kontaktforsaljning\/\">Kontakta s\u00e4lj<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Vanliga fr\u00e5gor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vilket \u00e4r det b\u00e4sta till\u00e4gget f\u00f6r produktionsplanering till Monitor ERP?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS \u00e4r ett till\u00e4gg f\u00f6r produktionsplanering utifr\u00e5n verklig kapacitet, med tv\u00e5v\u00e4gsintegration till Monitor ERP. Tillverkningsorder, operationer, produktionsgrupper och material h\u00e4mtas in, medan planerade operationsdatum och rapporterat arbete f\u00f6rs tillbaka. Planeringen tar h\u00e4nsyn till begr\u00e4nsningarna f\u00f6r varje produktionsgrupp, operat\u00f6r, verktyg och material. En st\u00e4lltidsmatris som tar h\u00e4nsyn till omst\u00e4llningens riktning ordnar operationerna f\u00f6r minsta m\u00f6jliga st\u00e4lltid. Autopilot planerar om automatiskt n\u00e4r produktionen f\u00f6r\u00e4ndras. Priset \u00e4r fr\u00e5n 199 \u20ac per m\u00e5nad och den kostnadsfria provperioden varar i 30 dagar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Har Monitor ERP produktionsplanering som tar h\u00e4nsyn till verklig kapacitet?<\/summary>\n<p class=\"sp-faq__a\">Monitor G5 tar h\u00e4nsyn till kapacitet. Loading plan visar bel\u00e4ggningen i f\u00f6rh\u00e5llande till kapaciteten, och Priority planning ber\u00e4knar New finish f\u00f6r varje operation, en produktionsgrupp i taget. Att l\u00f6sa \u00f6verbel\u00e4ggningar i hela fabriken \u00e4r planerarens uppgift. SkyPlanner APS kompletterar Monitor ERP med en <a href=\"\/sv\/resurser\/planering-mot-begransad-kapacitet\/\">produktionsplan som tar h\u00e4nsyn till verklig kapacitet<\/a> f\u00f6r varje produktionsgrupp, person, verktyg och material.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Beh\u00f6ver vi installera n\u00e5got i Monitor G5?<\/summary>\n<p class=\"sp-faq__a\">Nej. SkyPlanner k\u00f6rs i molnet vid sidan av Monitor och ansluter via Monitor ERP API, Monitors eget dokumenterade gr\u00e4nssnitt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ers\u00e4tter SkyPlanner Monitors tillverkningsmodul?<\/summary>\n<p class=\"sp-faq__a\">Nej, SkyPlanner kompletterar den. Monitor hanterar fortsatt artiklar, stycklistor och operationsf\u00f6ljder, tillverkningsorder, ink\u00f6p, lager, rapportering och ekonomi. SkyPlanner planerar tillverkningsordernas operationer utifr\u00e5n verklig kapacitet och skickar tillbaka de planerade datumen.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kan SkyPlanner anv\u00e4nda v\u00e5ra poolgrupper och alternativa maskiner?<\/summary>\n<p class=\"sp-faq__a\">Ja. Medlemmar i poolgrupper och alternativa produktionsgrupper blir alternativa produktionsgrupper i SkyPlanner. N\u00e4r den prim\u00e4ra maskinen \u00e4r upptagen flyttar planeringsmotorn operationen till ett alternativ. Den valda produktionsgruppen f\u00f6rs sedan tillbaka till operationen i Monitor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vad kostar SkyPlanner f\u00f6r ett f\u00f6retag som anv\u00e4nder Monitor ERP?<\/summary>\n<p class=\"sp-faq__a\">Fr\u00e5n 199 \u20ac per m\u00e5nad med 5 produktionsgrupper inkluderade, plus 20 \u20ac per m\u00e5nad f\u00f6r varje extra produktionsgrupp. En produktionsgrupp \u00e4r en produktionsresurs med en egen planerad operationsk\u00f6. Du f\u00e5r en offert p\u00e5 integrationen utifr\u00e5n din process och dina behov, tillsammans med abonnemanget, s\u00e5 att du ser hela kostnaden innan du b\u00f6rjar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hur l\u00e5ng tid tar inf\u00f6randet?<\/summary>\n<p class=\"sp-faq__a\">Inf\u00f6randet \u00e4r normalt klart inom n\u00e5gra veckor fr\u00e5n uppstarten. Teamet mappar dina produktionsgrupper och operationsrader, ansluter tillverkningsorder och ink\u00f6psorder och skickar tillbaka planerade datum. Allt testas mot din nuvarande prioriteringsplan f\u00f6re driftstart.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kan vi testa SkyPlanner innan vi integrerar med Monitor ERP?<\/summary>\n<p class=\"sp-faq__a\">Ja. Under provperioden p\u00e5 30 dagar anv\u00e4nds en Excel-export av dina \u00f6ppna tillverkningsorder fr\u00e5n Monitor. Du f\u00e5r se en plan f\u00f6r din egen produktion som tar h\u00e4nsyn till verklig kapacitet innan n\u00e5got integrationsarbete p\u00e5b\u00f6rjas.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrationer \/ ERP \/ Monitor ERP SkyPlanner APS f\u00f6r Monitor ERP: Produktionsplanering efter verklig kapacitet SkyPlanner APS \u00e4r ett till\u00e4gg f\u00f6r produktionsplanering i Monitor ERP som planerar alla produktionsgrupper, operat\u00f6rer, verktyg och material samtidigt utifr\u00e5n verklig kapacitet. Monitor G5 visar var \u00f6verbel\u00e4ggningen finns. SkyPlanner tar bort den, och Autopilot planerar om automatiskt n\u00e4r produktionen f\u00f6r\u00e4ndras. &#8230; <a title=\"SkyPlanner APS f\u00f6r Monitor ERP: produktionsplanering efter verklig kapacitet\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/monitor-erp\/\" aria-label=\"L\u00e4s mer om SkyPlanner APS f\u00f6r Monitor ERP: produktionsplanering efter verklig kapacitet\">L\u00e4s mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100688,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103093","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Monitor ERP produktionsplanering: integration med APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS-till\u00e4gg f\u00f6r Monitor ERP: produktionsplanering, tv\u00e5v\u00e4gsintegration f\u00f6r produktionsgrupper, operat\u00f6rer, verktyg och material. Fr\u00e5n 199 \u20ac\/m\u00e5nad.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/monitor-erp\/\" \/>\n<meta property=\"og:locale\" content=\"sv_SE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS f\u00f6r Monitor ERP: produktionsplanering efter verklig kapacitet\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS-till\u00e4gg f\u00f6r Monitor ERP: produktionsplanering, tv\u00e5v\u00e4gsintegration f\u00f6r produktionsgrupper, operat\u00f6rer, verktyg och material. Fr\u00e5n 199 \u20ac\/m\u00e5nad.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/monitor-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Ber\u00e4knad l\u00e4stid\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minuter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/monitor-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/monitor-erp\\\/\",\"name\":\"Monitor ERP produktionsplanering: integration med APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS-till\u00e4gg f\u00f6r Monitor ERP: produktionsplanering, tv\u00e5v\u00e4gsintegration f\u00f6r produktionsgrupper, operat\u00f6rer, verktyg och material. Fr\u00e5n 199 \u20ac\\\/m\u00e5nad.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/monitor-erp\\\/#breadcrumb\"},\"inLanguage\":\"sv-SE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/monitor-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/monitor-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- och MES-programvaruintegrationer med SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS f\u00f6r ditt ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS f\u00f6r Monitor ERP: produktionsplanering efter verklig kapacitet\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sv-SE\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Monitor ERP produktionsplanering: integration med APS","description":"SkyPlanner APS-till\u00e4gg f\u00f6r Monitor ERP: produktionsplanering, tv\u00e5v\u00e4gsintegration f\u00f6r produktionsgrupper, operat\u00f6rer, verktyg och material. Fr\u00e5n 199 \u20ac\/m\u00e5nad.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/monitor-erp\/","og_locale":"sv_SE","og_type":"article","og_title":"SkyPlanner APS f\u00f6r Monitor ERP: produktionsplanering efter verklig kapacitet","og_description":"SkyPlanner APS-till\u00e4gg f\u00f6r Monitor ERP: produktionsplanering, tv\u00e5v\u00e4gsintegration f\u00f6r produktionsgrupper, operat\u00f6rer, verktyg och material. Fr\u00e5n 199 \u20ac\/m\u00e5nad.","og_url":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/monitor-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Ber\u00e4knad l\u00e4stid":"11 minuter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/monitor-erp\/","url":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/monitor-erp\/","name":"Monitor ERP produktionsplanering: integration med APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS-till\u00e4gg f\u00f6r Monitor ERP: produktionsplanering, tv\u00e5v\u00e4gsintegration f\u00f6r produktionsgrupper, operat\u00f6rer, verktyg och material. Fr\u00e5n 199 \u20ac\/m\u00e5nad.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/monitor-erp\/#breadcrumb"},"inLanguage":"sv-SE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/monitor-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/monitor-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sv\/"},{"@type":"ListItem","position":2,"name":"ERP- och MES-programvaruintegrationer med SkyPlanner","item":"https:\/\/skyplanner.ai\/sv\/integrationer\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS f\u00f6r ditt ERP","item":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS f\u00f6r Monitor ERP: produktionsplanering efter verklig kapacitet"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sv\/#website","url":"https:\/\/skyplanner.ai\/sv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sv-SE"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sv\/","logo":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrationer \/ ERP \/ Monitor ERP SkyPlanner APS f\u00f6r Monitor ERP: Produktionsplanering efter verklig kapacitet SkyPlanner APS \u00e4r ett till\u00e4gg f\u00f6r produktionsplanering i Monitor ERP som planerar alla produktionsgrupper, operat\u00f6rer, verktyg och material samtidigt utifr\u00e5n verklig kapacitet. Monitor G5 visar var \u00f6verbel\u00e4ggningen finns. SkyPlanner tar bort den, och Autopilot planerar om automatiskt n\u00e4r produktionen f\u00f6r\u00e4ndras.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/pages\/103093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/comments?post=103093"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/pages\/103093\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/pages\/100688"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media?parent=103093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}