{"id":101373,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101373"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"finplanering","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/finplanering\/","title":{"rendered":"Har Sage X3 finplanering? MRP, bel\u00e4ggning, finplaneringsverktyg och SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/sv\/integrationer\/\">Integrationer<\/a> \/ <a href=\"\/sv\/integrationer\/erp\/\">ERP<\/a> \/ Sage X3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Har Sage X3 finplanering? <span class=\"hl\">MRP, bel\u00e4ggning, finplaneringsverktyg och SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Standardfunktionen f\u00f6r planering av tillverkningsorder i Sage X3 saknar finplanering som tar h\u00e4nsyn till maskinernas och personalens faktiska kapacitet. Det \u00e4r den luckan SkyPlanner APS fyller. X3 planerar material med MRP och datums\u00e4tter tillverkningsorder med Scheduling (FUNMAUTJ). Sages brittiska supportteam beskriver funktionen som planering mot obegr\u00e4nsad kapacitet: den planerar &#8221;each work order independently&#8221; (varje tillverkningsorder oberoende av de andra) och f\u00f6rskjuter inte order utifr\u00e5n resursbel\u00e4ggningen.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sv\/prova\/\">Starta kostnadsfri provperiod<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sv\/kontaktforsaljning\/\">Boka en demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Produktionsplanering<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gantt-schema i SkyPlanner APS med operationer planerade p\u00e5 olika produktionsgrupper och en orderlista nedanf\u00f6r.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Finplanering ligger i ett separat lager. Sage erbjuder lokalt installerade Production Scheduler eller det generiska gr\u00e4nssnittet Finite scheduler interface (GFS) till Sage X3 Web Scheduling eller ett planeringsverktyg fr\u00e5n tredje part. Fabriker som beh\u00f6ver <a href=\"\/sv\/resurser\/planering-mot-begransad-kapacitet\/\">finplanera<\/a> varje maskin, person och verktyg anv\u00e4nder SkyPlanner APS tillsammans med X3.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-sage-x3-plans-and-schedules-production-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">S\u00e5 planerar Sage X3 produktionen, steg f\u00f6r steg<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Kapaciteten anges p\u00e5 produktionsgruppen<\/h3>\n\n\n<p>Kapaciteten anges p\u00e5 produktionsgruppen (funktionen <strong>GESMWS<\/strong>, tabellen WORKSTATIO). F\u00f6ljande f\u00e4lt \u00e4r viktiga f\u00f6r planeringen:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Structure<\/strong> (TWD): veckostrukturen som anger skiftschemat.<\/li>\n\n\n<li><strong>No. of resources<\/strong> (WSTNBR): antalet resurser som en operation beh\u00f6ver i produktionsgruppen. Sages exempel \u00e4r en produktionsgrupp f\u00f6r personal d\u00e4r tre personer beh\u00f6vs.<\/li>\n\n\n<li><strong>% efficiency<\/strong> (EFF) och <strong>Shrinkage in %<\/strong> (SHR), som justerar tiderna i operationsf\u00f6ljden.<\/li>\n\n\n<li><strong>Work center type<\/strong> (WSTTYP): maskin, personal eller legotillverkning.<\/li>\n\n\n<li>Kryssrutan <strong>Constraint<\/strong> samt fliken Replacement f\u00f6r alternativa produktionsgrupper. Varje alternativ har en prioritet och ett eget f\u00e4lt f\u00f6r <strong>Work center type<\/strong> (RPLWSTTYP).<\/li>\n\n\n<li>En tabell f\u00f6r kapacitetsvariationer vid tillf\u00e4lliga skift\u00e4ndringar eller driftstopp. D\u00e4r anges start- och slutdatum, orsak, avvikande struktur och avvikande antal resurser.<\/li>\n\n<\/ul>\n\n\n<p>Fliken Load delar upp bel\u00e4ggningen i Firm, Planned, MRP och MPS. D\u00e5 kan planeraren se vad som \u00e4r fastlagt och vad som fortfarande \u00e4r f\u00f6rslag.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. MRP skapar f\u00f6rslagen<\/h3>\n\n\n<p>MRP (<strong>FUNMRP<\/strong>) balanserar tillg\u00e5ng och behov per referensdatum och lagerst\u00e4lle. Funktionen l\u00e4ser kundorder, material till tillverkningsorder, ink\u00f6psorder, tillverkningsorder, legoorder och lager\u00f6verf\u00f6ringar. D\u00e4refter skapar den tillverkningsorderf\u00f6rslag och ink\u00f6psorderf\u00f6rslag. F\u00e4lten Suggestion type, Reorder quantity och Splitting p\u00e5 artikeln f\u00f6r respektive anl\u00e4ggning styr resultatet.<\/p>\n\n\n<p>Datumen ber\u00e4knas utifr\u00e5n ledtiderna. Slutdatumet f\u00f6r en f\u00f6reslagen tillverkningsorder \u00e4r behovsdatumet minus ledtiden f\u00f6r kvalitetskontroll. Startdatumet \u00e4r slutdatumet minus produktionsledtiden, eller minus tiden f\u00f6r operationsf\u00f6ljden om artikelns ledtid ber\u00e4knas utifr\u00e5n den. Om startdatumet hamnar f\u00f6re bearbetningsdatumet anv\u00e4nder X3 bearbetningsdatumet.<\/p>\n\n\n<p>Kapacitet f\u00e5r en enda rad i hj\u00e4lpen f\u00f6r MRP: &#8221;An appropriate MRP setup is used, in parallel with the MRP process, to generate a workload.&#8221; (Med l\u00e4mpliga MRP-inst\u00e4llningar genereras en bel\u00e4ggning parallellt med MRP-processen.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNMRP.htm\">Hj\u00e4lpen f\u00f6r Sage X3, FUNMRP<\/a>) En bel\u00e4ggning, inte en kapacitetskontroll.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Scheduling (FUNMAUTJ) datums\u00e4tter operationerna<\/h3>\n\n\n<p>Scheduling planerar operationerna i varje tillverkningsorder utifr\u00e5n operationsf\u00f6ljden (<strong>GESROU<\/strong>), fram\u00e5t eller bak\u00e5t beroende p\u00e5 orderns \u00f6nskade datum. Operationernas start- och slutdatum sparas p\u00e5 tillverkningsorderns operationer (MFGOPE), och f\u00e4ltet Scheduling status i orderhuvudet (MFGHEAD) \u00e4ndras till Scheduled.<\/p>\n\n\n<p>Sages brittiska supportteam beskriver logiken tydligt i sin planeringsguide f\u00f6r V12: &#8221;The function schedules each work order independently.&#8221; (Funktionen planerar varje tillverkningsorder oberoende av de andra.) Och: &#8221;It does not delay or stagger work orders based on overall resource load.&#8221; (Den senarel\u00e4gger eller f\u00f6rskjuter inte tillverkningsorder utifr\u00e5n den totala resursbel\u00e4ggningen.) (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>) Tio order som ska genom samma CNC-cell f\u00e5r alla sina ideala datum, oavsett vad cellen klarar av.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Loads visar \u00f6verbel\u00e4ggningen, planeraren l\u00f6ser den<\/h3>\n\n\n<p><strong>Loads<\/strong> (<strong>CONSMWK<\/strong>) j\u00e4mf\u00f6r bel\u00e4ggning och kapacitet per produktionsgrupp och period. <strong>Recalculate the loads<\/strong> (<strong>FUNMIWL<\/strong>, Manufacturing &gt; Batch processes) r\u00e4knar om bel\u00e4ggningsdata. En r\u00f6d stapel betyder att produktionsgruppens kapacitet \u00f6verskrids under perioden. Planeraren f\u00e5r d\u00e5 planera om eller ta bort planeringen i <strong>Planning workbench<\/strong>, flytta operationer till en ledig produktionsgrupp eller f\u00f6rskjuta order manuellt.<\/p>\n\n\n<p>X3 visar problemet. En m\u00e4nniska l\u00f6ser det.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Finplanering kr\u00e4ver ett till\u00e4gg<\/h3>\n\n\n<p>Sage erbjuder tv\u00e5 alternativ som b\u00e5da aktiveras med aktivitetskoder:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Production Scheduler<\/strong> (aktivitetskod POPS med Active markerat, funktion FUNPSSCH). Ett planeringsverktyg som visar planeringen av tillverkningsorder &#8221;in the form of a Gantt chart&#8221; (i form av ett Gantt-diagram). Den separata aktivitetskoden <strong>Finite Capacity<\/strong> aktiverar finplanering i produktionsplaneringsfunktionerna. Tillverkningsorder skickas in via Submit for scheduling.<\/li>\n\n\n<li><strong>Generic Finite scheduler interface<\/strong> (aktivitetskod <strong>GFS<\/strong>). Ett generiskt gr\u00e4nssnitt utvecklat av Sage som kopplar X3 i molnet eller lokalt till <strong>Sage X3 Web Scheduling<\/strong>, Sages planeringstill\u00e4gg, eller till ett webbaserat planeringsverktyg fr\u00e5n en oberoende programvaruleverant\u00f6r. X3 styr detta med Submit for scheduling, Resubmit for scheduling och Remove from scheduling (Manufacturing &gt; Finite scheduler).<\/li>\n\n<\/ul>\n\n\n<p>X3 ber\u00e4knar ocks\u00e5 ett datum f\u00f6r <strong>Earliest start<\/strong> per operation utifr\u00e5n komponenttillg\u00e5ngen (First Date of Material Availability, FDMA). Datumet skickas som en begr\u00e4nsning till Production Scheduler eller ett webbaserat planeringsverktyg. Standardplaneringen anv\u00e4nder d\u00e4remot inte datumet. I hj\u00e4lpen f\u00f6r Work order st\u00e5r det: &#8221;The Sage X3 scheduling process does not consider component availability when determining operation start dates.&#8221; (Planeringen i Sage X3 tar inte h\u00e4nsyn till komponenttillg\u00e5ngen n\u00e4r operationernas startdatum best\u00e4ms.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-sage-x3-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">H\u00e4r g\u00e5r gr\u00e4nsen f\u00f6r Sage X3<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Standardplaneringen utg\u00e5r fr\u00e5n obegr\u00e4nsad kapacitet.<\/strong> Sages supportguide beskriver vad som beh\u00f6vs f\u00f6r att l\u00f6sa \u00f6verbel\u00e4ggning: &#8221;would require finite capacity scheduling or manual adjustment&#8221; (skulle kr\u00e4va finplanering eller manuell justering). (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>)<\/li>\n\n\n<li><strong>Bel\u00e4ggningsdata blir inaktuella.<\/strong> Om du l\u00e4gger till ett skift eller \u00e4ndrar en kalender g\u00e4ller f\u00f6ljande: &#8221;existing load buckets won&#8217;t automatically adjust&#8221; (befintliga bel\u00e4ggningsposter justeras inte automatiskt). F\u00f6rst n\u00e4r du k\u00f6r Recalculate the loads uppdateras de. Som standard visar vyn bara tidsplanerade order. MRP-f\u00f6rslag visas endast med fr\u00e5gekoden ALL. (samma k\u00e4lla)<\/li>\n\n\n<li><strong>Production Scheduler finns bara f\u00f6r lokal installation.<\/strong> &#8221;Production Scheduler is only available for on-premises instances of Sage X3.&#8221; (Production Scheduler \u00e4r endast tillg\u00e4ngligt f\u00f6r lokalt installerade instanser av Sage X3.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/OBJ\/ACV_POPS.htm\">Hj\u00e4lpen f\u00f6r Sage X3 V12, POPS<\/a>) Sidan f\u00f6r V11 g\u00e5r l\u00e4ngre: &#8221;Production Scheduler is not available for new Sage X3 installations.&#8221; (Production Scheduler \u00e4r inte tillg\u00e4ngligt f\u00f6r nya installationer av Sage X3.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/11\/en-US\/OBJ\/ACV_POPS.htm\">Hj\u00e4lpen f\u00f6r Sage X3 V11<\/a>)<\/li>\n\n\n<li><strong>Production Scheduler har dokumenterade begr\u00e4nsningar.<\/strong> Sage anger att f\u00f6ljande funktioner inte \u00e4r tillg\u00e4ngliga i nul\u00e4get (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSSCH.htm\">Hj\u00e4lpen f\u00f6r Sage X3, FUNPSSCH<\/a>):<\/li>\n\n<\/ul>\n\n\n<p>&#8211; optimering av st\u00e4lltider utifr\u00e5n flera artikelparametrar och en st\u00e4llmatris &#8211; kopplingar mellan produktionsorder &#8211; planering av flera resurser genom synkronisering av parallella operationer &#8211; listor \u00f6ver anv\u00e4ndbara resurser med olika produktionstakt<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Tillverkningsorder l\u00e5ses under optimeringen.<\/strong> En tillverkningsorder som skickas till Production Scheduler f\u00e5r statusen <strong>Being optimized<\/strong>, och &#8221;You cannot modify the work order at these statuses.&#8221; (Du kan inte \u00e4ndra tillverkningsordern n\u00e4r den har dessa statusar.) Den f\u00f6rblir l\u00e5st tills den tas bort fr\u00e5n planeringen. (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSMOPT.htm\">Hj\u00e4lpen f\u00f6r Sage X3, FUNPSMOPT<\/a>)<\/li>\n\n\n<li><strong>Det avancerade GFS-gr\u00e4nssnittet kr\u00e4ver en resurs per operation.<\/strong> I hj\u00e4lpen f\u00f6r No. of resources st\u00e5r det: &#8221;You must set this field to 1 if you are using the generic Finite scheduler advanced interface.&#8221; (Du m\u00e5ste ange 1 i det h\u00e4r f\u00e4ltet om du anv\u00e4nder det avancerade generiska gr\u00e4nssnittet f\u00f6r finplanering.) Orsaken anges ocks\u00e5: &#8221;Sage X3 Web Scheduling cannot optimize production times when multiple resources are assigned to a work center.&#8221; (Sage X3 Web Scheduling kan inte optimera produktionstider n\u00e4r flera resurser \u00e4r tilldelade en produktionsgrupp.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/GESMWS.htm\">Hj\u00e4lpen f\u00f6r Sage X3, GESMWS<\/a>) Om en operation kr\u00e4ver ett arbetslag p\u00e5 tre personer g\u00e5r det allts\u00e5 inte att f\u00f6rmedla det till planeringsverktyget.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-sage-x3-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">N\u00e4r den inbyggda planeringen i Sage X3 r\u00e4cker<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>M\u00e5nga fabriker som anv\u00e4nder Sage X3 beh\u00f6ver inget finplaneringsverktyg.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Materialet s\u00e4tter takten, inte maskinerna.<\/strong> Vid tillverkning mot lager eller repetitiv tillverkning \u00e4r den verkliga risken att ink\u00f6pen g\u00f6rs f\u00f6r sent. Korrekta stycklistor, operationsf\u00f6ljder, ledtider, partistorlekar och s\u00e4kerhetslager i MRP l\u00f6ser det mesta av problemet.<\/li>\n\n\n<li><strong>Det r\u00e4cker att se bel\u00e4ggningen.<\/strong> En veckovis genomg\u00e5ng av Loads och n\u00e5gra manuella flyttar i Planning workbench r\u00e4cker f\u00f6r att produktionen ska h\u00e5lla tidsplanen.<\/li>\n\n\n<li><strong>Ni har redan Production Scheduler lokalt installerat.<\/strong> Det r\u00e4cker f\u00f6r sekvensplanering i Gantt-diagram om ni inte beh\u00f6ver st\u00e4llmatriser, orderkopplingar eller synkroniserade parallella operationer.<\/li>\n\n\n<li><strong>Ni anv\u00e4nder redan Web Scheduling<\/strong> med No. of resources satt till 1, och planen st\u00e4mmer med verkligheten p\u00e5 produktionsgolvet.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Fyra s\u00e4tt att planera produktionen med Sage X3<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planeringstavlor i X3-klienten:<\/strong> Planning workbench och Loads, eller en tavla med dra-och-sl\u00e4pp-funktion i X3:s gr\u00e4nssnitt. De passar n\u00e4r bel\u00e4ggnings\u00f6versikt och manuella flyttar r\u00e4cker f\u00f6r att produktionen ska h\u00e5lla tidsplanen.<\/li>\n\n\n<li><strong>Sages egen finplanering:<\/strong> lokalt installerade Production Scheduler eller Sage X3 Web Scheduling via GFS-gr\u00e4nssnittet med No. of resources satt till 1.<\/li>\n\n\n<li><strong>Stora APS-sviter:<\/strong> omfattande planeringsl\u00f6sningar som inf\u00f6rs av en systemintegrat\u00f6r i ett projekt \u00f6ver flera m\u00e5nader, f\u00f6r fabriker med egen planeringsavdelning.<\/li>\n\n\n<li><strong>Molnbaserad APS med st\u00f6d f\u00f6r arbetet p\u00e5 produktionsgolvet:<\/strong> SkyPlanner APS planerar varje produktionsgrupp, operat\u00f6r, verktyg och material p\u00e5 n\u00e5gra sekunder. Operat\u00f6rerna anv\u00e4nder mobil eller surfplatta. Det passar tillverkare med X3 som vill vara i drift inom n\u00e5gra veckor.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">N\u00e4r ni beh\u00f6ver ett finplaneringsverktyg<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li>Loads visar r\u00f6tt de flesta veckor, och arbetet i Planning workbench har blivit en heltidssyssla.<\/li>\n\n\n<li>Utlovade leveransdatum bygger p\u00e5 ledtider, s\u00e5 f\u00f6rs\u00e4ljning och produktion \u00e4r oense om vad som \u00e4r realistiskt.<\/li>\n\n\n<li>Omst\u00e4llningarna styr hur mycket ni f\u00e5r ut av produktionen, men standardplaneringen i X3 ordnar inte operationerna s\u00e5 att omst\u00e4llningarna minskar.<\/li>\n\n\n<li>Operationer kr\u00e4ver flera operat\u00f6rer samtidigt, eller s\u00e5 delas verktyg och fixturer mellan maskiner.<\/li>\n\n\n<li>Du k\u00f6r Sage X3 i molnet, s\u00e5 lokalt installerad Production Scheduler \u00e4r inget alternativ.<\/li>\n\n\n<li>Br\u00e5dskande order och maskinhaverier kr\u00e4ver att planen g\u00f6rs om manuellt, ofta i Excel.<\/li>\n\n\n<li>Operat\u00f6rerna beh\u00f6ver en egen operationsk\u00f6, inte en utskriven lista med tillverkningsorder.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Det h\u00e4r ska du leta efter<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Finplanering per resurs, skift och person<\/strong>, med h\u00e4nsyn till fr\u00e5nvaro och \u00f6vertid.<\/li>\n\n\n<li><strong>Sekvensberoende st\u00e4lltider<\/strong>: en st\u00e4lltidsmatris d\u00e4r bytet fr\u00e5n A till B kan ta l\u00e4ngre tid \u00e4n fr\u00e5n B till A, och en ber\u00e4kningsmotor som v\u00e4ljer den ordningsf\u00f6ljd som ger kortast sammanlagd st\u00e4lltid.<\/li>\n\n\n<li><strong>Verktyg och bemanning som begr\u00e4nsningar<\/strong>: ett delat verktyg som bara kan bokas p\u00e5 en maskin \u00e5t g\u00e5ngen, och operationer som kr\u00e4ver flera operat\u00f6rer samtidigt.<\/li>\n\n\n<li><strong>Materialkontroller i produktionsplanen<\/strong>, mot lagersaldo och \u00f6ppna ink\u00f6psorder med f\u00f6rv\u00e4ntade leveransdatum.<\/li>\n\n\n<li><strong>Alternativa maskiner och personalresurser<\/strong> samt produkter med flera strukturniv\u00e5er hanteras av ber\u00e4kningsmotorn, inte av planeraren.<\/li>\n\n\n<li><strong>Omplanering utan manuell omk\u00f6rning<\/strong> n\u00e4r en tillverkningsorder rapporteras eller en ny order kommer in, i st\u00e4llet f\u00f6r en separat planeringsk\u00f6rning.<\/li>\n\n\n<li><strong>Tydlig ansvarsf\u00f6rdelning med X3<\/strong>: vilket system som styr datumen, hur l\u00e5sta tillverkningsorder hanteras och vad som f\u00f6rs tillbaka (operationsdatum, status och produktionsrapportering).<\/li>\n\n\n<li><strong>En driftmilj\u00f6 som passar din.<\/strong> X3 i molnet ger ingen direkt \u00e5tkomst till filsystem eller databas, s\u00e5 planeringsverktyget m\u00e5ste kommunicera via GraphQL API, webbtj\u00e4nster eller en driftad fil\u00f6verf\u00f6ringstj\u00e4nst.<\/li>\n\n\n<li><strong>Tid tills l\u00f6sningen ger nytta<\/strong>: testa med egna data innan n\u00e5got integrationsprojekt p\u00e5b\u00f6rjas.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">H\u00e4r passar SkyPlanner in<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS \u00e4r ett molnbaserat finplaneringsverktyg. Tillsammans med Sage X3 t\u00e4cker det alla luckor som beskrivs ovan:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>En plan som h\u00e5lls aktuell.<\/strong> Ber\u00e4kningsmotorn Arcturus AI skapar en finplan p\u00e5 n\u00e5gra sekunder, och Autopilot planerar om automatiskt n\u00e4r produktionen f\u00f6r\u00e4ndras. Inget separat steg med Recalculate the loads och ingen \u00f6verbel\u00e4ggning som planeraren m\u00e5ste l\u00f6sa manuellt.<\/li>\n\n\n<li><strong>Bemanning och alternativ utan \u00e4ndrad modell.<\/strong> Flera operat\u00f6rer kan arbeta i samma produktionsgrupp samtidigt, s\u00e5 en operation f\u00f6r tre personer f\u00f6rblir en enda operation. Parallella maskiner l\u00e4ggs som produktionsgrupper i en gemensam grupp, var och en med sin egen effektivitet. Ber\u00e4kningsmotorn flyttar operationer till alternativa maskiner eller personalresurser n\u00e4r f\u00f6rstahandsvalet inte \u00e4r tillg\u00e4ngligt, eller delar upp en operation p\u00e5 flera.<\/li>\n\n\n<li><strong>St\u00e4lltidsmatrisen som saknas i Production Scheduler.<\/strong> En st\u00e4lltidsmatris inneh\u00e5ller sekvensberoende omst\u00e4llningstider mellan produkter (bl\u00e5 till r\u00f6d 30 min, r\u00f6d till bl\u00e5 60 min), och ber\u00e4kningsmotorn v\u00e4ljer den ordningsf\u00f6ljd som ger kortast sammanlagd st\u00e4lltid. \u00c4ven tider f\u00f6r f\u00f6rberedelse och nedmontering modelleras.<\/li>\n\n\n<li><strong>Verktyg med begr\u00e4nsad tillg\u00e4nglighet.<\/strong> Ett verktyg som anv\u00e4nds i en produktionsgrupp planeras inte in i en annan samtidigt.<\/li>\n\n\n<li><strong>Materialstyrd produktionsplanering.<\/strong> Ber\u00e4kningsmotorn simulerar framtida lagersaldon, s\u00e5 arbetet planeras bara in n\u00e4r materialet finns tillg\u00e4ngligt. Best\u00e4llt material r\u00e4knas som tillg\u00e4ngligt p\u00e5 ink\u00f6psorderns leveransdatum, och lagersaldot uppdateras n\u00e4r ink\u00f6psordern markeras som Delivered (<a href=\"\/sv\/docs\/vad-ar-och-hur-anvander-man-funktionen-inkopsorder\/\">ink\u00f6psorder i SkyPlanners dokumentation<\/a>).<\/li>\n\n\n<li><strong>Du styr prioriteringar och l\u00e5sningar.<\/strong> Operationsprioritet, prioritering efter f\u00e4rdigdatum, kundprioritet, Fast Track och Dynamic Priorities styr ber\u00e4kningsmotorn. Running Time Lock och Bulldozer, som skjuter efterf\u00f6ljande operationer fram\u00e5t, ger planeraren kontroll.<\/li>\n\n\n<li><strong>Rapportering p\u00e5 produktionsgolvet.<\/strong> Operat\u00f6rerna ser sin operationsk\u00f6 och rapporterar arbete p\u00e5 mobil eller surfplatta med Mobile Confirmations, Production Timer och Quick Log Mode.<\/li>\n\n\n<li><strong>I molnet, oavsett hur du k\u00f6r X3.<\/strong> SkyPlanner fungerar likadant oavsett om X3 k\u00f6rs i Sages moln eller p\u00e5 dina egna servrar.<\/li>\n\n<\/ul>\n\n\n<p><strong>V\u00e4lj SkyPlanner n\u00e4r du beh\u00f6ver finplanering med X3 i molnet<\/strong> och Production Scheduler inte \u00e4r ett alternativ.<\/p>\n\n\n<p><strong>V\u00e4lj SkyPlanner n\u00e4r operationer kr\u00e4ver flera operat\u00f6rer eller alternativa maskiner<\/strong> och du inte vill tvingas s\u00e4tta No. of resources till 1.<\/p>\n\n\n<p><strong>V\u00e4lj SkyPlanner n\u00e4r du vill ha planering och operat\u00f6rernas tidrapportering i samma verktyg,<\/strong> med tidrapporter som f\u00f6rs tillbaka till X3 som produktionsrapportering.<\/p>\n\n\n<p><strong>V\u00e4lj SkyPlanner n\u00e4r du vill komma ig\u00e5ng med finplanering p\u00e5 n\u00e5gra veckor,<\/strong> inte efter ett APS-projekt som tar flera m\u00e5nader.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Integrationen med Sage X3<\/h3>\n\n\n<p>SkyPlanner integreras med Sage X3 i b\u00e5da riktningarna. Tillverkningsorder (MFGHEAD, MFGOPE), operationsf\u00f6ljder, produktionsgrupper, kalendrar, lagersaldon och \u00f6ppna ink\u00f6psorder h\u00e4mtas fr\u00e5n X3. Planerade operationsdatum f\u00f6rs tillbaka via webbtj\u00e4nsten Work order (GESMFG), och rapporterade timmar registreras som Production tracking (GESMTK). SkyPlanners webhooks skickar varje plan\u00e4ndring direkt n\u00e4r den sker.<\/p>\n\n\n<p>Ingen fabrik anv\u00e4nder X3 p\u00e5 exakt samma s\u00e4tt. D\u00e4rf\u00f6r konfigurerar SkyPlanner-teamet integrationen efter din milj\u00f6 och ger support efter drifts\u00e4ttningen. Din Sage X3-partner eller dina egna utvecklare kan ocks\u00e5 bygga vidare med SkyPlanners dokumenterade REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referens<\/a>). En API-nyckel r\u00e4cker f\u00f6r att komma ig\u00e5ng.<\/p>\n\n\n<p>X3 f\u00f6rblir ditt system f\u00f6r MRP, produkter, stycklistor, operationsf\u00f6ljder, ink\u00f6p och lager.<\/p>\n\n\n<p>B\u00f6rja med en CSV-import under den kostnadsfria provperioden p\u00e5 30 dagar. Priset b\u00f6rjar p\u00e5 199 \u20ac per m\u00e5nad med 5 produktionsgrupper inkluderade. Du f\u00e5r en offert p\u00e5 integrationen utifr\u00e5n dina processer och behov, tillsammans med abonnemanget, s\u00e5 att du ser hela kostnaden innan du b\u00f6rjar.<\/p>\n\n\n<p>L\u00e4s om <a href=\"\/sv\/integrationer\/erp\/sage-x3\/\">SkyPlanner APS f\u00f6r Sage X3<\/a>, se datamappningen i <a href=\"\/sv\/integrationer\/erp\/sage-x3\/integrationsguide\/\">integrationsguiden f\u00f6r Sage X3<\/a> och utforska <a href=\"\/sv\/funktioner\/\">funktioner<\/a> och <a href=\"\/sv\/prissattning\/\">priser<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sv\/prova\/\">Prova gratis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sv\/kontaktforsaljning\/\">Boka en demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tillverkare ber\u00e4ttar om SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/22-d7d6bcdf-ecf7-48d2-9750-66253ccf9aa7-crop.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist inom f\u00f6rs\u00f6rjningskedjan p\u00e5 UTU, i elcentralstillverkningen i Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sparade varje vecka<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201dSkyPlanner har tagit v\u00e5r produktionsplanering fr\u00e5n Excel-kalkylblad till produktionsoptimering i realtid.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist inom f\u00f6rs\u00f6rjningskedjan<\/b><br>UTU \u00b7 Elcentraler och st\u00e4llverk<\/p>\n\n\n<p class=\"ind-cust__result\">Produktionsplaneringen sparar 2 timmars arbetstid varje vecka, och en ny operationsk\u00f6 n\u00e5r produktionslinjen p\u00e5 n\u00e5gra sekunder.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sv\/kundberattelser\/utu\/\">L\u00e4s vad UTU s\u00e4ger<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operat\u00f6rer i renrumsdr\u00e4kter vid en flaskfyllningslinje i Laboratory &amp; Allieds l\u00e4kemedelsfabrik i Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>produktionseffektivitet<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201dEffektiviteten i produktionen har \u00f6kat med 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT-chef<\/b><br>Laboratory &amp; Allied \u00b7 L\u00e4kemedelstillverkning<\/p>\n\n\n<p class=\"ind-cust__result\">Produktionseffektiviteten har \u00f6kat med 90%, och det tar mindre \u00e4n 30 minuter att skapa en optimerad trem\u00e5nadersplan f\u00f6r alla produktionsgrupper.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sv\/kundberattelser\/laboratory-allied\/\">L\u00e4s vad Laboratory &amp; Allied s\u00e4ger<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, produktionschef p\u00e5 Fredman Operations, vid en robotcell f\u00f6r palletering i Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u00e5nader<\/b><span>med ledig kapacitet synlig f\u00f6r s\u00e4ljarna<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201dSkyPlanner ger en tillf\u00f6rlitlig grund f\u00f6r all produktionsplanering.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, produktionschef<\/b><br>Fredman Operations \u00b7 F\u00f6rpackningspapper f\u00f6r livsmedel<\/p>\n\n\n<p class=\"ind-cust__result\">S\u00e4ljarna ser ledig kapacitet sex m\u00e5nader fram\u00e5t, och f\u00f6rfr\u00e5gningar om plan\u00e4ndringar som tidigare tog en timme eller mer besvaras nu p\u00e5 n\u00e5gra sekunder.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sv\/kundberattelser\/fredman-operations\/\">L\u00e4s vad Fredman Operations s\u00e4ger<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Flygfoto \u00f6ver Piristeels fabrik f\u00f6r taks\u00e4kerhetsprodukter i Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>leveransprecision<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201dSkyPlanner har gjort det l\u00e4ttare att se flaskhalsar och gett oss tydligare produktionsstyrning.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, produktionschef<\/b><br>Piristeel \u00b7 Taks\u00e4kerhet och takavvattning<\/p>\n\n\n<p class=\"ind-cust__result\">Leveransprecisionen n\u00e5dde 99,2% i \u00e5r, och produktionsplaneringen sparar upp till fyra timmars arbetstid per dag.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sv\/kundberattelser\/piristeel\/\">L\u00e4s vad Piristeel s\u00e4ger<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Vanliga fr\u00e5gor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Planerar Sage X3 mot begr\u00e4nsad eller obegr\u00e4nsad kapacitet?<\/summary>\n<p class=\"sp-faq__a\">Mot obegr\u00e4nsad kapacitet i standardprodukten. Scheduling (FUNMAUTJ) s\u00e4tter datum p\u00e5 varje tillverkningsorder utifr\u00e5n dess operationsf\u00f6ljd, utan att f\u00f6rskjuta order med h\u00e4nsyn till resursbel\u00e4ggningen. Loads (CONSMWK) visar \u00f6verbel\u00e4ggningen, som planeraren f\u00e5r l\u00f6sa manuellt. Finplanering kr\u00e4ver Production Scheduler eller ett planeringsverktyg anslutet via GFS-gr\u00e4nssnittet.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>G\u00e5r det fortfarande att k\u00f6pa Sage X3 Production Scheduler?<\/summary>\n<p class=\"sp-faq__a\">Bara f\u00f6r lokalt installerat X3, enligt hj\u00e4lpen f\u00f6r V12. I hj\u00e4lpen f\u00f6r V11 st\u00e5r det att produkten inte \u00e4r tillg\u00e4nglig f\u00f6r nya installationer, s\u00e5 din Sage-partner kan bekr\u00e4fta vad som s\u00e4ljs i dag. F\u00f6r Sage X3 i molnet \u00e4r det generiska gr\u00e4nssnittet Finite scheduler den dokumenterade v\u00e4gen.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vad \u00e4r skillnaden mellan Production Scheduler och Sage X3 Web Scheduling?<\/summary>\n<p class=\"sp-faq__a\">Production Scheduler \u00e4r det inbyggda Gantt-baserade planeringsverktyget f\u00f6r lokal installation och aktiveras med aktivitetskoden POPS. Web Scheduling \u00e4r ett separat till\u00e4gg fr\u00e5n Sage som anv\u00e4nder det generiska gr\u00e4nssnittet Finite scheduler (GFS), vilket fungerar med b\u00e5de molnbaserat och lokalt installerat X3. I Web Scheduling 2023.3.4 tillkom en GraphQL-integration som kr\u00e4ver Sage X3 2024 R1.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Fungerar SkyPlanner APS med Sage X3?<\/summary>\n<p class=\"sp-faq__a\">Ja. SkyPlanner integreras i b\u00e5da riktningarna med b\u00e5de molnbaserat och lokalt installerat Sage X3. Tillverkningsorder, operationsf\u00f6ljder och produktionsgrupper h\u00e4mtas in, medan planerade datum och produktionsrapportering f\u00f6rs tillbaka. B\u00f6rja <a href=\"\/sv\/prova\/\">prova gratis<\/a> med CSV-exporter. SkyPlanner-teamet konfigurerar integrationen under inf\u00f6randet.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e5ste jag \u00e4ndra modellen f\u00f6r mina produktionsgrupper f\u00f6r att kunna finplanera?<\/summary>\n<p class=\"sp-faq__a\">Ja, f\u00f6r det generella gr\u00e4nssnittet Finite scheduler advanced interface. Sage kr\u00e4ver att No. of resources s\u00e4tts till 1 f\u00f6r varje produktionsgrupp. D\u00e4rmed g\u00e5r informationen om bemanningsbehovet f\u00f6rlorad f\u00f6r operationer som kr\u00e4ver flera personer. Med SkyPlanner beh\u00f6ver du inte \u00e4ndra produktionsgrupperna. Flera operat\u00f6rer kan arbeta samtidigt i samma produktionsgrupp, produktionsgrupperna f\u00f6r parallella maskiner samlas i en gemensam grupp och dina produktionsgrupper i X3 f\u00f6rblir som de \u00e4r.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sekvenserar Sage X3 operationerna f\u00f6r att minska omst\u00e4llningarna?<\/summary>\n<p class=\"sp-faq__a\">Inte i standardplaneringen, och i Production Scheduler anges att optimering med st\u00e4lltidsmatris inte \u00e4r tillg\u00e4nglig i nul\u00e4get. SkyPlanners st\u00e4lltidsmatris lagrar omst\u00e4llningstider f\u00f6r varje produktpar i b\u00e5da riktningarna. Motorn l\u00e4gger sedan operationerna i den ordning som ger l\u00e4gst sammanlagd st\u00e4lltid.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrationer \/ ERP \/ Sage X3 Har Sage X3 finplanering? MRP, bel\u00e4ggning, finplaneringsverktyg och SkyPlanner APS Standardfunktionen f\u00f6r planering av tillverkningsorder i Sage X3 saknar finplanering som tar h\u00e4nsyn till maskinernas och personalens faktiska kapacitet. Det \u00e4r den luckan SkyPlanner APS fyller. X3 planerar material med MRP och datums\u00e4tter tillverkningsorder med Scheduling (FUNMAUTJ). Sages brittiska &#8230; <a title=\"Har Sage X3 finplanering? MRP, bel\u00e4ggning, finplaneringsverktyg och SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/finplanering\/\" aria-label=\"L\u00e4s mer om Har Sage X3 finplanering? MRP, bel\u00e4ggning, finplaneringsverktyg och SkyPlanner APS\">L\u00e4s mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100925,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101373","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Har Sage X3 finplanering?<\/title>\n<meta name=\"description\" content=\"Sage X3:s standardplanering har inget kapacitetstak. Finplanering kr\u00e4ver Production Scheduler eller GFS-gr\u00e4nssnittet. Vad fungerar? N\u00e4r beh\u00f6vs APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/finplanering\/\" \/>\n<meta property=\"og:locale\" content=\"sv_SE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Har Sage X3 finplanering? MRP, bel\u00e4ggning, finplaneringsverktyg och SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Sage X3:s standardplanering har inget kapacitetstak. Finplanering kr\u00e4ver Production Scheduler eller GFS-gr\u00e4nssnittet. Vad fungerar? N\u00e4r beh\u00f6vs APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/finplanering\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Ber\u00e4knad l\u00e4stid\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minuter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/sage-x3\\\/finplanering\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/sage-x3\\\/finplanering\\\/\",\"name\":\"Har Sage X3 finplanering?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Sage X3:s standardplanering har inget kapacitetstak. Finplanering kr\u00e4ver Production Scheduler eller GFS-gr\u00e4nssnittet. Vad fungerar? N\u00e4r beh\u00f6vs APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/sage-x3\\\/finplanering\\\/#breadcrumb\"},\"inLanguage\":\"sv-SE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/sage-x3\\\/finplanering\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/sage-x3\\\/finplanering\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- och MES-programvaruintegrationer med SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS f\u00f6r ditt ERP-system\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS f\u00f6r Sage X3: Finplanering av produktionen\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/integrationer\\\/erp\\\/sage-x3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Har Sage X3 finplanering? MRP, bel\u00e4ggning, finplaneringsverktyg och SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sv-SE\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sv-SE\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Har Sage X3 finplanering?","description":"Sage X3:s standardplanering har inget kapacitetstak. Finplanering kr\u00e4ver Production Scheduler eller GFS-gr\u00e4nssnittet. Vad fungerar? N\u00e4r beh\u00f6vs APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/finplanering\/","og_locale":"sv_SE","og_type":"article","og_title":"Har Sage X3 finplanering? MRP, bel\u00e4ggning, finplaneringsverktyg och SkyPlanner APS","og_description":"Sage X3:s standardplanering har inget kapacitetstak. Finplanering kr\u00e4ver Production Scheduler eller GFS-gr\u00e4nssnittet. Vad fungerar? N\u00e4r beh\u00f6vs APS?","og_url":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/finplanering\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Ber\u00e4knad l\u00e4stid":"16 minuter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/finplanering\/","url":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/finplanering\/","name":"Har Sage X3 finplanering?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Sage X3:s standardplanering har inget kapacitetstak. Finplanering kr\u00e4ver Production Scheduler eller GFS-gr\u00e4nssnittet. Vad fungerar? N\u00e4r beh\u00f6vs APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/finplanering\/#breadcrumb"},"inLanguage":"sv-SE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/finplanering\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/finplanering\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sv\/"},{"@type":"ListItem","position":2,"name":"ERP- och MES-programvaruintegrationer med SkyPlanner","item":"https:\/\/skyplanner.ai\/sv\/integrationer\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS f\u00f6r ditt ERP-system","item":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS f\u00f6r Sage X3: Finplanering av produktionen","item":"https:\/\/skyplanner.ai\/sv\/integrationer\/erp\/sage-x3\/"},{"@type":"ListItem","position":5,"name":"Har Sage X3 finplanering? MRP, bel\u00e4ggning, finplaneringsverktyg och SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sv\/#website","url":"https:\/\/skyplanner.ai\/sv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sv-SE"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sv\/","logo":{"@type":"ImageObject","inLanguage":"sv-SE","@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrationer \/ ERP \/ Sage X3 Har Sage X3 finplanering? MRP, bel\u00e4ggning, finplaneringsverktyg och SkyPlanner APS Standardfunktionen f\u00f6r planering av tillverkningsorder i Sage X3 saknar finplanering som tar h\u00e4nsyn till maskinernas och personalens faktiska kapacitet. Det \u00e4r den luckan SkyPlanner APS fyller. X3 planerar material med MRP och datums\u00e4tter tillverkningsorder med Scheduling (FUNMAUTJ). Sages brittiska&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/pages\/101373","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/comments?post=101373"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/pages\/101373\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/pages\/100925"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sv\/wp-json\/wp\/v2\/media?parent=101373"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}