{"id":99413,"date":"2026-10-15T22:10:24","date_gmt":"2026-10-15T22:10:24","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99413"},"modified":"2026-10-15T22:11:52","modified_gmt":"2026-10-15T22:11:52","slug":"konstruiranje-in-proizvodnja-po-narocilu","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/","title":{"rendered":"Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Stranka potrebuje stroj, ki v kon\u010dni obliki \u0161e ne obstaja. Va\u0161i konstrukterji ga morajo zasnovati, nabava mora zagotoviti sestavne dele, proizvodnja pa mora najti prostor za njegovo izdelavo ob \u017ee dogovorjenih projektih.<\/p>\n\n\n<p>To je konstruiranje in proizvodnja po naro\u010dilu. Izziv ni le zasnovati pravi izdelek, temve\u010d med njegovim nastajanjem usklajevati konstrukcijske odlo\u010ditve, datume razpolo\u017eljivosti materiala in terminski plan proizvodnje. Kon\u010dana risba \u0161e ne pomeni, da je obdelovalni center prost, prejem klju\u010dnega sestavnega dela pa \u0161e ne zagotovi termina za monta\u017eo.<\/p>\n\n\n<p>SkyPlanner APS vam pomaga te proizvodne zahteve pretvoriti v izvedljiv plan. Arcturus, njegova umetna inteligenca za terminiranje, izra\u010duna, kam je mogo\u010de razporediti operacije glede na va\u0161e vire, materiale in prioritete. Rezultat vidite v Ganttovem diagramu, namesto da bi za vsak projekt ro\u010dno popravljali zaporedje operacij na strojih.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je konstruiranje in proizvodnja po naro\u010dilu?<\/h2>\n\n\n<p>Konstruiranje in proizvodnja po naro\u010dilu (ETO) je proizvodna strategija, pri kateri naro\u010dilo stranke spro\u017ei tako konstruiranje izdelka kot njegovo proizvodnjo. Zahteve stranke je treba pretvoriti v odobreno konstrukcijsko dokumentacijo, preden se lahko za\u010dne izdelava zadevnih delov.<\/p>\n\n\n<p>Konstruiranje lahko zajema nov stroj, sklop po meri stranke ali obse\u017eno prilagoditev obstoje\u010dega izdelka. Pri ETO ni treba vsakega pritrdilnega elementa, sestavnega dela ali konstrukcijske re\u0161itve razviti na novo. Bistveno je, da naro\u010dena re\u0161itev \u0161e zahteva konstruiranje, ne le izbiro \u017ee opredeljenega izdelka in za\u010detek izdelave po njegovem proizvodnem postopku.<\/p>\n\n\n<p>Predstavljajte si proizvajalca, ki za nenavaden sestavni del stranke izdeluje presku\u0161evalno napravo. Ekipa mora zasnovati vpenjalo, izbrati ustrezen pogon in dolo\u010diti razporeditev glede na strankine zahteve za presku\u0161anje. Uporabi lahko standardne motorje in krmilne komponente, vendar je kon\u010dna naprava zasnovana za to naro\u010dilo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Konstruiranje in proizvodnja po naro\u010dilu v primerjavi z izdelavo po naro\u010dilu<\/h3>\n\n\n<p>Oba pristopa se za\u010dneta z naro\u010dilom stranke. Razlika je v tem, kolik\u0161en del izdelka je \u017ee opredeljen.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Strategija<\/th><th>Kaj sledi naro\u010dilu?<\/th><th>Klju\u010dno vpra\u0161anje pri planiranju<\/th><\/tr><\/thead><tbody><tr><td>Konstruiranje in proizvodnja po naro\u010dilu (ETO)<\/td><td>Zasnova re\u0161itve po meri stranke, nato izdelava odobrenih delov<\/td><td>Kdaj bo delo opredeljeno in pripravljeno za izvedbo ter kdaj ga bo proizvodnja lahko dokon\u010dala?<\/td><\/tr><tr><td>Izdelava po naro\u010dilu (MTO)<\/td><td>Izdelava \u017ee opredeljenega izdelka ali razli\u010dice za naro\u010dilo<\/td><td>Kam v terminski plan proizvodnje je mogo\u010de umestiti \u017ee znane operacije?<\/td><\/tr><tr><td>Konfiguriranje po naro\u010dilu (CTO)<\/td><td>Izbira med vnaprej dolo\u010denimi, medsebojno zdru\u017eljivimi mo\u017enostmi<\/td><td>Ali je mogo\u010de pravo\u010dasno zagotoviti sestavne dele za izbrano konfiguracijo in jo izdelati?<\/td><\/tr><tr><td>Izdelava na zalogo (MTS)<\/td><td>Izpolnitev naro\u010dila iz zaloge kon\u010dnih izdelkov, izdelanih glede na pri\u010dakovano povpra\u0161evanje<\/td><td>Ali so ustrezni kon\u010dni izdelki na zalogi?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Posebna povr\u0161inska obdelava ali koli\u010dina \u0161e ne pomeni, da naro\u010dilo sodi v ETO. \u010ce odobrena konstrukcijska dokumentacija in na\u010din izdelave \u017ee pokrivata zahteve, je <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodnja-po-narocilu\/\">izdelava po naro\u010dilu morda ustreznej\u0161i opis<\/a>. \u010ce pa morajo konstrukterji razviti novo re\u0161itev, je primernej\u0161a opredelitev ETO.<\/p>\n\n\n<p>V eni tovarni se lahko uporablja ve\u010d strategij. Standardni izdelki so lahko na zalogi, ponavljajo\u010di se izdelki se izdelujejo po naro\u010dilu, novi projektni izdelki pa se po naro\u010dilu tudi konstruirajo. Njihove operacije lahko kljub temu potrebujejo iste stroje in ljudi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kdaj je ETO vreden dodatnega dela?<\/h2>\n\n\n<p>ETO je smiseln, kadar \u017ee opredeljen izdelek ali vnaprej dolo\u010dena konfiguracija ne more zadovoljiti strankinih potreb, re\u0161itev teh potreb pa upravi\u010duje konstruktersko delo. Dobri primeri so namenski stroji, preskusna oprema po meri in industrijski sklopi za posebne namene.<\/p>\n\n\n<p>Poslovna prednost je v prilagojenosti: dobavite lahko re\u0161itev, ki je stranka ne more preprosto izbrati iz kataloga. Z uporabo preverjenih modulov tam, kjer je to smiselno, pomagate prepre\u010diti, da bi prilagajanje postalo nepotrebno razvijanje \u017ee znanih re\u0161itev.<\/p>\n\n\n<p>Cena za to sta \u010das in negotovost. Konstruiranje, odobritve in nabava pomenijo dodatno delo, preden je mogo\u010de kon\u010dati izdelavo. Spreminjanje zasnove lahko spremeni potrebe po materialu, \u010dase obdelave in stro\u0161ke. Kon\u010dnih izdelkov sicer ne izdelujete na zalogo v pri\u010dakovanju naro\u010dil, vendar so lahko sredstva vseeno vezana v kupljenih sestavnih delih in nedokon\u010danih projektih.<\/p>\n\n\n<p>Preden sprejmete naro\u010dilo, se dogovorite, kaj stranka kupuje, katere odlo\u010ditve ostajajo odprte, kdo odobri konstrukcijsko dokumentacijo in kako poznej\u0161e spremembe vplivajo na ceno in dobavo. Preverite, ali stranka sprejema dobavni rok, ki poleg strojne obdelave vklju\u010duje tudi konstruiranje in dobavo sestavnih delov.<\/p>\n\n\n<p>\u010ce stranke pri ponovnih naro\u010dilih vedno znova zahtevajo isto re\u0161itev, razmislite, ali bi del te re\u0161itve lahko postal standardna izvedba ali mo\u017enost pri konfiguriranju. ETO ohranite za zahteve, ki dejansko terjajo konstruiranje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pove\u017eite konstrukcijo, nabavo in proizvodnjo \u0161e pred predajo dela<\/h2>\n\n\n<p>Plan ETO postane nezanesljiv, ko ima vsak oddelek svoj navidezno realen datum, nih\u010de pa ne preveri, ali so datumi med seboj usklajeni. Konstrukcija pri\u010dakuje, da bo odobrila risbo, nabava pri\u010dakuje prihod sestavnega dela, proizvodnja pa predpostavlja, da bo oboje pripravljeno za termin, ki ga je medtem \u017ee zasedel drug projekt.<\/p>\n\n\n<p>U\u010dinkovitej\u0161i potek dela \u017ee od za\u010detka povezuje pripravljenost za izvedbo z razpolo\u017eljivimi zmogljivostmi.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Dolo\u010dite obseg in predpostavke za odobritev izdelave<\/h3>\n\n\n<p>Ugotovite, kateri elementi zasnove odlo\u010dajo o dobavi: odobritve stranke, klju\u010dni vmesniki, kupljena oprema in proizvodni podatki, brez katerih drugi ne morejo nadaljevati dela. Za vsako odprto odlo\u010ditev dolo\u010dite odgovorno osebo in pri\u010dakovani datum razre\u0161itve.<\/p>\n\n\n<p>Za\u010detni plani bodo vsebovali ocene. Jasno jih ozna\u010dite kot predpostavke in vsakega napovedanega datuma ne obravnavajte, kot da je izdelava \u017ee odobrena. Obljubljeni dobavni rok, ki temelji na \u0161e nepotrjenem vmesniku, zahteva druga\u010dno pozornost kot rok, ki temelji na preverjenem sklopu iz ponovnega naro\u010dila.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Nabavo delov z dolgimi dobavnimi roki vklju\u010dite \u017ee v zasnovo<\/h3>\n\n\n<p>Klju\u010den motor, ulitek ali krmilno komponento bo morda treba naro\u010diti, \u0161e preden bodo dore\u010dene vse podrobnosti izdelka. Konstrukcija in nabava naj se dogovorita, katere specifikacije so dovolj dokon\u010dne za naro\u010dilo in kak\u0161no tveganje ostaja, \u010de se zasnova spremeni.<\/p>\n\n\n<p>Odlo\u010ditev ni le med \u00bbnaro\u010diti zgodaj\u00ab in \u00bbpo\u010dakati na celotno konstrukcijsko dokumentacijo\u00ab. \u010ce naro\u010dite prezgodaj, vam lahko ostanejo neuporabni deli; \u010de naro\u010dite prepozno, lahko ustavite projekt, ki je sicer pripravljen za izvedbo. Dobavne datume pove\u017eite z operacijami, ki potrebujejo te dele, in posodobite plan, ko dobavitelj spremeni dogovorjeni rok.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ob odobritvi opredeljenega dela za izdelavo zagotovite uporabne proizvodne podatke<\/h3>\n\n\n<p>Kadar izdelek to dopu\u0161\u010da, lahko odobreni del predate v izdelavo, ne da bi \u010dakali na vse nepovezane podrobnosti. Ogrodje z dokon\u010dno dolo\u010deno zasnovo je lahko pripravljeno, medtem ko vpenjalo po meri stranke \u0161e konstruirate. Tako lahko skraj\u0161ate \u010dakanje, \u010de poznej\u0161e odlo\u010ditve ne bodo razveljavile \u017ee odobrenega dela.<\/p>\n\n\n<p>Vsaka odobritev za izdelavo mora vklju\u010devati veljavno revizijo risbe, materiale, koli\u010dino, operacije, primerne vire ter realne \u010dase priprave in obdelave. Jasno dolo\u010dite, katero delo je odobreno in katero je \u0161e za\u010dasno predvideno. Preden po\u0161ljete spremenjena navodila v proizvodnjo, se dogovorite, kako konstrukcijska sprememba vpliva na \u017ee naro\u010dene dele ter na delo, ki je \u017ee odobreno ali se je \u017ee za\u010delo.<\/p>\n\n\n<p>Na tej to\u010dki konstrukcijski podatki dolo\u010dajo zahteve za terminiranje. <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-postopek\/\">Proizvodni postopek<\/a> opisuje delo, ne rezervira pa zmogljivosti za njegovo izvedbo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Celotno pot do dobave preverite glede na druge projekte<\/h3>\n\n\n<p>Odobrene operacije razporedite ob upo\u0161tevanju preostale obremenitve tovarne. Vklju\u010dite dele, ki morajo biti hkrati pripravljeni za monta\u017eo, vse potrebne preglede ali preskuse ter \u010das po izdelavi, potreben za odpremo ali pripravo na namestitev.<\/p>\n\n\n<p>Pri vsakem projektu ne ra\u010dunajte na lastno nami\u0161ljeno kopijo iste monta\u017ene ekipe. Projektni plan lahko prikazuje smiselno zaporedje, skupni plan tovarne pa je kljub temu preobremenjen. Stranka potrebuje datum dokon\u010danja, ki temelji na dejanski razpolo\u017eljivosti skupnih virov, ne le na trajanju izdelave, pri\u0161tetem k datumu odobritve konstrukcijske dokumentacije.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zamuda pri konstruiranju lahko vpliva na ve\u010d projektov<\/h2>\n\n\n<p>Vrnimo se k nami\u0161ljenemu proizvajalcu presku\u0161evalne naprave. Ogrodje je odobreno, pogon je naro\u010den, za adaptersko plo\u0161\u010do pa \u0161e \u010dakajo na mere strankinega vmesnika. Strojna obdelava mora biti kon\u010dana pred kon\u010dno monta\u017eo, isti obdelovalni center in monta\u017eno ekipo pa uporabljajo tudi drugi projekti.<\/p>\n\n\n<p>Stranka spremeni vmesnik. Konstrukterji prilagodijo adaptersko plo\u0161\u010do, zato se njena odobritev za izdelavo zamakne. Medtem drug projekt zasede prosti termin za strojno obdelavo, ki je bil predviden zanjo.<\/p>\n\n\n<p>Zgolj premakniti datum adapterske plo\u0161\u010de ni dovolj. Naslednji prosti termin za njeno obdelavo je lahko \u0161ele po na\u010drtovanem terminu monta\u017ee. Pogon lahko prispe pravo\u010dasno in ogrodje je lahko dokon\u010dano, naprava pa vseeno ne more v kon\u010dno monta\u017eo. \u010ce za\u010dnete izdelovati \u0161e ve\u010d nepovezanih delov, s tem ne boste re\u0161ili neusklajenosti med obdelavo in monta\u017eo.<\/p>\n\n\n<p>Planer mora preostale operacije pregledati kot celoto. Ali bi adaptersko plo\u0161\u010do lahko izdelali v odobrenem nadomestnem delovnem centru? Bi z dogovorjeno spremembo prioritete lahko ujeli termin monta\u017ee in na katero drugo dobavo bi to vplivalo? So dodatne zmogljivosti upravi\u010dene ali je treba stranki sporo\u010diti nov rok?<\/p>\n\n\n<p>To so odlo\u010ditve o proizvodnji, ne o upravljanju risb. Povezan terminski plan vam omogo\u010da, da jih pretehtate, preden se zamujena odobritev za izdelavo poka\u017ee kot presene\u010denje pri kon\u010dni monta\u017ei.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S SkyPlanner dolo\u010dite realen termin za odobreno delo<\/h2>\n\n\n<p>SkyPlanner zdru\u017ei delovne centre, izmene, operaterje, materiale in prioritete v en terminski plan proizvodnje. Koraki proizvodnega postopka za izdelek opisujejo delo in njegovo trajanje. Arcturus te operacije razporedi glede na nastavljene zmogljivosti, odvisnosti in pravila; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/ganttov-diagram-za-nacrtovanje-proizvodnje\/\">Ganttov diagram prikazuje<\/a>, kje se bodo izvajale in kdaj naj bi bile kon\u010dane.<\/p>\n\n\n<p>Za planerja pri ETO to pomeni, da je odobreno delo za presku\u0161evalno napravo prikazano skupaj z drugimi projekti, ki uporabljajo iste vire. Spremljate lahko pot od strojne obdelave do monta\u017ee in vidite pri\u010dakovani zaklju\u010dek, namesto da bi za vsak oddelek vodili lo\u010dene datume.<\/p>\n\n\n<p>Datum, ko so izpolnjeni pogoji za za\u010detek, dolo\u010da najzgodnej\u0161i mo\u017eni za\u010detek proizvodnje. V tem postopku ga na podlagi dogovorjenih podatkov o pripravljenosti dolo\u010di planer ali posreduje povezani sistem ERP. \u010ce se predvideni datum odobritve adapterja za proizvodnjo spremeni, posodobite zadevne operacije in znova izra\u010dunajte terminski plan. Nato preverite novi predvideni zaklju\u010dek proizvodnje, preden potrdite, kaj sprememba pomeni za dobavo.<\/p>\n\n\n<p>\u010ce je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, Arcturus upo\u0161teva tudi razpolo\u017eljivost materiala. Dobavni roki na nabavnih naro\u010dilih pomenijo pri\u010dakovano razpolo\u017eljivost; ko naro\u010dilo potrdite kot dobavljeno, se zaloga posodobi. Spremenjeni dobavni rok dobavitelja se tako lahko upo\u0161teva v vhodnih podatkih za terminiranje, namesto da bi ostal v elektronski po\u0161ti nabave, proizvodnja pa bi \u0161e naprej delala na podlagi stare predpostavke.<\/p>\n\n\n<p>Prednostne naloge dolo\u010dite vi, z zaklepanjem pa ohranite tiste odlo\u010ditve o razporedu, ki morajo ostati nespremenjene. Arcturus izvede izra\u010dun v okviru teh navodil. Tako je manj ro\u010dnega prilagajanja terminskega plana, razpolo\u017eljive zmogljivosti pa lahko izkoristite u\u010dinkoviteje. Poslovna presoja o tem, katere zaveze so najpomembnej\u0161e, pri tem ostaja v va\u0161ih rokah.<\/p>\n\n\n<p>SkyPlanner se prek <a href=\"https:\/\/skyplanner.ai\/sl\/integracije\/\">odprtega vmesnika REST API<\/a> pove\u017ee s katerim koli sistemom ERP ali MES. Obstoje\u010de podatke o naro\u010dilih in proizvodnji pove\u017eite z izra\u010dunom terminskega plana, pri tem pa ohranite jasno razmejitev med postopkom odobritve konstrukcijske dokumentacije in nalogami sistema ERP. Za bolj\u0161e terminiranje pri ETO ni treba najprej zamenjati sistemov, s katerimi \u017ee upravljate podatke o izdelkih in naro\u010dila.<\/p>\n\n\n<p>Izberite SkyPlanner, ko ro\u010dno usklajevanje proizvodnje med projekti postane vsakodnevno breme. Dobili boste jasnej\u0161i odgovor na vpra\u0161anje, ki ga stranke vedno znova postavljajo: kdaj je lahko ta projekt kon\u010dan glede na to, kaj je pripravljeno za proizvodnjo in katera dela smo \u017ee obljubili?<\/p>\n\n\n<h2 class=\"wp-block-heading\">UTU: preglednej\u0161e terminiranje projektnih dobav<\/h2>\n\n\n<p>Tovarna podjetja UTU v Ulvili izdeluje elektri\u010dne razdelilnike in stikalne naprave, od standardnih izdelkov do obse\u017enih projektnih dobav. Pred uvedbo sistema SkyPlanner so oddelki na\u010drtovali delo v Excelovih preglednicah, ki so jih posodabljali ro\u010dno. Spremembe zaporedja proizvodnje v sistemu ERP niso vedno pri\u0161le do proizvodnje, dejansko razpolo\u017eljive zmogljivosti pa je bilo te\u017eko oceniti.<\/p>\n\n\n<p>V podjetju je SkyPlanner povezan s sistemom Oracle NetSuite in sistemom za obra\u010dun pla\u010d ter zdru\u017euje vse proizvodne linije in oddelke tovarne v enem sistemu za planiranje. UTU poudarja kombinacijo samodejnega terminiranja in \u010dasovnice Gantt: plan, dejanski napredek, zmogljivosti in obremenitve so vidni na enem mestu. Posodobljeni vrstni red dela pride do monterjev v nekaj sekundah.<\/p>\n\n\n<p>Podjetje poro\u010da o natan\u010dnej\u0161em terminiranju izdelkov za projekte, kot so kompaktne transformatorske postaje in srednjenapetostne stikalne naprave. V dolgoro\u010dnej\u0161em planu lahko upo\u0161teva spremembe zmogljivosti, tudi zaradi bolni\u0161kih odsotnosti. UTU ocenjuje tudi, da vsak teden prihrani pribli\u017eno dve uri dela, saj preglednic ni ve\u010d treba ro\u010dno posodabljati.<\/p>\n\n\n<p>Ta izku\u0161nja ka\u017ee prakti\u010dno vrednost za projektno proizvodnjo: a\u017euren, skupen proizvodni plan olaj\u0161a usklajevanje dela in daje trdnej\u0161o podlago za pogovore o dobavi. <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/utu\/\">Izku\u0161nja podjetja UTU s sistemom SkyPlanner<\/a> poka\u017ee, kaj se je spremenilo za njihove planerje in monterje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vklju\u010dite naslednji projekt v skupni terminski plan<\/h2>\n\n\n<p>Konstruiranje in proizvodnja po naro\u010dilu (ETO) omogo\u010data, da izdelek prilagodite specifi\u010dnim potrebam stranke. Da bi bilo delo dobi\u010dkonosno in bi izdelek lahko dobavili, morate povezati odobreno konstrukcijsko dokumentacijo, sestavne dele in zmogljivosti, potrebne za dokon\u010danje. Datum odobritve za proizvodnjo je uporaben le, \u010de lahko proizvodnja takrat tudi ukrepa.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> in pripravite primer projekta za posamezno stranko, njegove predvidene datume odobritev za proizvodnjo ter vir, ki si ga deli z drugimi naro\u010dili. Dodajte \u0161e nedavno spremembo konstrukcije ali spremembo pri dobavitelju. Tako bomo imeli konkretno izhodi\u0161\u010de, da vam poka\u017eemo, kako lahko Arcturus in terminski plan v prikazu Gantt zmanj\u0161ata obseg ponovnega planiranja in olaj\u0161ata presojo dobavnih rokov.<\/p>\n\n\n<p>\u017delite sistem najprej raziskati sami? <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">Preizkusite SkyPlanner z vzor\u010dnimi podatki<\/a> in si oglejte, kako se naro\u010dila, operacije in zmogljivosti pove\u017eejo v enoten terminski plan.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana Domov &raquo; Viri &raquo; Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana Stranka potrebuje stroj, ki v kon\u010dni obliki \u0161e ne obstaja. Va\u0161i konstrukterji ga morajo zasnovati, nabava mora zagotoviti sestavne dele, proizvodnja pa mora najti prostor za njegovo izdelavo ob &#8230; <a title=\"Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/\" aria-label=\"Read more about Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99425,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-99413","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Konstruiranje in proizvodnja po naro\u010dilu: izvedljiv plan<\/title>\n<meta name=\"description\" content=\"Kon\u010dan na\u010drt \u0161e ni termin. Kdaj izbrati ETO in kako SkyPlanner pove\u017ee delo, odobreno za proizvodnjo, z materiali in zmogljivostmi?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana\" \/>\n<meta property=\"og:description\" content=\"Kon\u010dan na\u010drt \u0161e ni termin. Kdaj izbrati ETO in kako SkyPlanner pove\u017ee delo, odobreno za proizvodnjo, z materiali in zmogljivostmi?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T22:10:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T22:11:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana\",\"datePublished\":\"2026-10-15T22:10:24+00:00\",\"dateModified\":\"2026-10-15T22:11:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/\"},\"wordCount\":2385,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineer-to-order-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/\",\"name\":\"Konstruiranje in proizvodnja po naro\u010dilu: izvedljiv plan\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineer-to-order-hero.png\",\"datePublished\":\"2026-10-15T22:10:24+00:00\",\"dateModified\":\"2026-10-15T22:11:52+00:00\",\"description\":\"Kon\u010dan na\u010drt \u0161e ni termin. Kdaj izbrati ETO in kako SkyPlanner pove\u017ee delo, odobreno za proizvodnjo, z materiali in zmogljivostmi?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineer-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineer-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A custom test-rig frame, drive and adapter await assembly beside a shared machining centre.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/konstruiranje-in-proizvodnja-po-narocilu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Konstruiranje in proizvodnja po naro\u010dilu: izvedljiv plan","description":"Kon\u010dan na\u010drt \u0161e ni termin. Kdaj izbrati ETO in kako SkyPlanner pove\u017ee delo, odobreno za proizvodnjo, z materiali in zmogljivostmi?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/","og_locale":"sl_SI","og_type":"article","og_title":"Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana","og_description":"Kon\u010dan na\u010drt \u0161e ni termin. Kdaj izbrati ETO in kako SkyPlanner pove\u017ee delo, odobreno za proizvodnjo, z materiali in zmogljivostmi?","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T22:10:24+00:00","article_modified_time":"2026-10-15T22:11:52+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana","datePublished":"2026-10-15T22:10:24+00:00","dateModified":"2026-10-15T22:11:52+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/"},"wordCount":2385,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png","articleSection":["APS &amp; Scheduling","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/","name":"Konstruiranje in proizvodnja po naro\u010dilu: izvedljiv plan","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png","datePublished":"2026-10-15T22:10:24+00:00","dateModified":"2026-10-15T22:11:52+00:00","description":"Kon\u010dan na\u010drt \u0161e ni termin. Kdaj izbrati ETO in kako SkyPlanner pove\u017ee delo, odobreno za proizvodnjo, z materiali in zmogljivostmi?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png","width":1672,"height":941,"caption":"A custom test-rig frame, drive and adapter await assembly beside a shared machining centre."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/konstruiranje-in-proizvodnja-po-narocilu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana Domov &raquo; Viri &raquo; Konstruiranje in proizvodnja po naro\u010dilu: od zasnove do izvedljivega terminskega plana Stranka potrebuje stroj, ki v kon\u010dni obliki \u0161e ne obstaja. Va\u0161i konstrukterji ga morajo zasnovati, nabava mora zagotoviti sestavne dele, proizvodnja pa mora najti prostor za njegovo izdelavo ob&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/99413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=99413"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/99413\/revisions"}],"predecessor-version":[{"id":99471,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/99413\/revisions\/99471"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/99425"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=99413"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=99413"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=99413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}