{"id":97294,"date":"2026-10-10T08:49:19","date_gmt":"2026-10-10T08:49:19","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=97294"},"modified":"2026-10-10T08:50:32","modified_gmt":"2026-10-10T08:50:32","slug":"izpolnjevanje-proizvodnega-plana","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/","title":{"rendered":"Izpolnjevanje proizvodnega plana: formula in primer"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Izpolnjevanje proizvodnega plana: formula in primer<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Izpolnjevanje proizvodnega plana: formula in primer<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Izpolnjevanje proizvodnega plana meri, kako dosledno dejansko delo sledi planu, izdanemu proizvodnemu obratu. Pri preverjanju na podlagi dokon\u010danja \u0161tevilo planiranih operacij, ki so bile v celoti dokon\u010dane do svojih predvidenih rokov, delite s \u0161tevilom vseh planiranih operacij z rokom v poro\u010devalskem obdobju in rezultat pomno\u017eite s 100. Operacije z istimi ID primerjajte s shranjenim planom: dose\u017eena skupna koli\u010dina \u0161e ne dokazuje, da so bile prave operacije dokon\u010dane pravo\u010dasno.<\/p>\n\n\n<p><strong>Izpolnjevanje proizvodnega plana na podlagi dokon\u010danja (%) = planirane operacije, v celoti dokon\u010dane do svojih predvidenih rokov \u00f7 planirane operacije z rokom v obdobju \u00d7 100<\/strong><\/p>\n\n\n<p>V tem vodniku uporabljamo prav to pravilo. Pred\u010dasno dokon\u010danje je dovoljeno, zamuda ni dovoljena, \u0161teje pa le sprejeta koli\u010dina. Predvidenih za\u010detkov in zaporedja izvedbe ne preverjamo. \u010ce sta pomembna za va\u0161 proizvodni proces, ju je treba preveriti lo\u010deno.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Katero formulo za izpolnjevanje proizvodnega plana uporabiti?<\/h2>\n\n\n<p>Izberite formulo, ki odgovarja na va\u0161e vpra\u0161anje iz prakse, in pred merjenjem rezultatov zapi\u0161ite pravila zanjo. Preverjanje koli\u010dine na ravni izmene in preverjanje rokov posameznih operacij sta lahko koristna, vendar rezultatov ne morete primerjati, kot da merita isto stvar.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kazalnik<\/th><th>Vpra\u0161anje<\/th><th>Izra\u010dun v tem vodniku<\/th><\/tr><\/thead><tbody><tr><td>Izpolnjevanje proizvodnega plana na podlagi dokon\u010danja<\/td><td>Ali so bile planirane operacije v celoti dokon\u010dane do svojih rokov?<\/td><td>Operacije, ki izpolnjujejo pogoje \u00f7 planirane operacije z rokom v obdobju \u00d7 100<\/td><\/tr><tr><td>Doseganje skupne planirane koli\u010dine<\/td><td>Ali smo v obdobju izdelali skupno planirano koli\u010dino?<\/td><td>Sprejeta izdelana koli\u010dina \u00f7 planirana koli\u010dina \u00d7 100<\/td><\/tr><tr><td>Pravo\u010dasne dobave<\/td><td>Ali so naro\u010dila prispela do kupcev v dogovorjenem roku?<\/td><td>Dobavljena naro\u010dila, ki izpolnjujejo pogoje \u00f7 naro\u010dila v opredeljenem naboru za spremljanje dobav \u00d7 100<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izra\u010dun koli\u010dine predpostavlja primerljive enote. Se\u0161tevanje ton, kosov in delovnih ur ne da smiselnega odstotka doseganja planirane koli\u010dine. Tudi pravilno izra\u010dunana skupna koli\u010dina lahko prikrije napa\u010dno sestavo izdelkov.<\/p>\n\n\n<p>Samo ime kazalnika \u0161e ne dolo\u010da formule. <a href=\"https:\/\/docs.machinemetrics.com\/docs\/product-guides\/schedule-attainment-guide\/\">Vodnik MachineMetrics za izpolnjevanje plana<\/a> vklju\u010duje primerjavo predvidenih in dejanskih \u010dasov ter lo\u010deno poro\u010da o pravo\u010dasnih za\u010detkih in dokon\u010danjih. Izpolnjevanje plana torej ne pomeni vedno zgolj koli\u010dinskega kazalnika. <a href=\"https:\/\/www.supplychain-masters.fr\/indicateur\/taux-de-respect-du-pdp\">Opredelitev izpolnjevanja PDP pri Supply Chain Masters<\/a> \u0161teje proizvodne naloge, katerih rok je v dolo\u010denem obdobju in so v tem obdobju tudi dokon\u010dani. To je \u0161ir\u0161e \u010dasovno okno od roka posamezne operacije, ki ga uporabljamo tukaj.<\/p>\n\n\n<p><a href=\"https:\/\/www.symestic.com\/en-us\/what-is\/schedule-adherence\">Opredelitev SYMESTIC za proizvodnjo<\/a> razlikuje med koli\u010dino, \u010dasom in zaporedjem. Na\u0161a formula na podlagi dokon\u010danja preverja celotno koli\u010dino in rok dokon\u010danja; ni sestavljena ocena vseh treh vidikov. V drugem jeziku ali sistemu lahko izraz, preveden kot izpolnjevanje plana, pomeni doseganje koli\u010dine. Ob imenu kazalnika zato vedno navedite tudi dejansko pravilo \u0161tetja.<\/p>\n\n\n<p>Pravo\u010dasne dobave imajo druga\u010dno izhodi\u0161\u010de: dogovor s kupcem. <a href=\"https:\/\/www.apqc.org\/what-we-do\/benchmarking\/open-standards-benchmarking\/measures\/percentage-sales-orders-delivered-time\">APQC svoj kazalnik dobave prodajnih naro\u010dil opredeljuje<\/a> glede na dobavo v dogovorjenem roku. Interni \u010dasovni \u017eig dokon\u010danja proizvodnje ni dokaz, da je kupec naro\u010dilo prejel pravo\u010dasno.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kako izra\u010dunati izpolnjevanje glede na shranjeni proizvodni plan<\/h2>\n\n\n<p>Za uporaben izra\u010dun potrebujete en izhodi\u0161\u010dni plan, jasno opredeljen nabor operacij in dejanske rezultate, povezane z vrsticami tega plana.<\/p>\n\n\n<p>1. <strong>Shranite plan, izdan proizvodnemu obratu.<\/strong> Pred za\u010detkom dela, ki ga boste ocenjevali, zabele\u017eite razli\u010dico plana in \u010das izdaje. Ohranite izvirne ID operacij, planirane koli\u010dine in roke. Delovni plan po potrebi \u0161e naprej posodabljajte, vendar ta izhodi\u0161\u010dni plan obdr\u017eite za primerjavo.<\/p>\n\n\n<p>2. <strong>Izberite enoto \u0161tetja in obdobje.<\/strong> Dosledno uporabljajte operacije, delovne naloge ali serije. Pri tej metodi imenovalec zajema vse planirane operacije s predvidenim dokon\u010danjem v poro\u010devalskem obdobju, tudi nedokon\u010dane in blokirane operacije.<\/p>\n\n\n<p>3. <strong>Opredelite, kaj \u0161teje kot dokon\u010dano in pravo\u010dasno.<\/strong> Tukaj operacija izpolni pogoje, ko je njena celotna planirana koli\u010dina sprejeta do njenega predvidenega \u010dasa dokon\u010danja. Prej je dovoljeno, pozneje ne. \u010ce va\u0161 proces zahteva \u010dasovno okno s spodnjo in zgornjo mejo, preverjanje \u010dasa za\u010detka ali pravilo zaporedja, namesto tega dokumentirajte tak\u0161no pravilo. \u010casovni pas in morebitna dovoljena odstopanja dolo\u010dite vnaprej.<\/p>\n\n\n<p>4. <strong>Dejanski rezultat pove\u017eite z vsako vrstico plana.<\/strong> Zabele\u017eite sprejeto koli\u010dino, \u010dasovni \u017eig, ko je bila dose\u017eena celotna planirana koli\u010dina, ter vse manjkajo\u010de ali sporne zapise. Uporabite \u010das dogodka v proizvodnji, ne \u010dasa, ko ga je nekdo naknadno vnesel. \u010ce je sprostitev po kontroli kakovosti del dokon\u010danja, uporabite dogodek sprostitve, ki ga zahteva va\u0161e pravilo.<\/p>\n\n\n<p>5. <strong>Pre\u0161tejte vrstice, ki izpolnjujejo pogoje, in poro\u010dajte o izjemah.<\/strong> \u0160tevilo vrstic, ki izpolnjujejo pogoje, delite s \u0161tevilom vseh vrstic z rokom v obdobju. Zamujene, delno dokon\u010dane, blokirane in nepotrjene vrstice naj ostanejo vidne skupaj z razlogi. \u010ce v obdobju ni bilo predvideno dokon\u010danje nobene operacije, navedite \u00bbni relevantno\u00ab namesto 100 %.<\/p>\n\n\n<p>V imenovalec ne vklju\u010dite le dokon\u010danega dela. S tem bi izlo\u010dili prav tiste operacije, ki jih po planu ni uspelo dokon\u010dati. Prav tako neplanirana operacija ne more nadomestiti planirane operacije, ki ni bila dokon\u010dana po planu, zgolj zato, ker prispeva uporabno koli\u010dino.<\/p>\n\n\n<p>Prakti\u010dna preglednica ima stolpce za razli\u010dico plana, ID operacije, planirano koli\u010dino, predvideno dokon\u010danje, dejansko sprejeto koli\u010dino, dejanski \u010das dokon\u010danja, izpolnjevanje pogojev in razlog za izjemo. Predvidene in dejanske za\u010detke dodajte le, \u010de nameravate meriti tudi upo\u0161tevanje predvidenih za\u010detkov.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer izra\u010duna: dose\u017eenih 100 % planirane koli\u010dine, izpolnjevanje proizvodnega plana pa 50 %<\/h2>\n\n\n<p>To je izmi\u0161ljen primer, ne podatki stranke ali prikaz nadzorne plo\u0161\u010de programske opreme. Planerka Aisha ob 07:00 izda plan za pakirno celico 1. Ben mora med izmeno 07:00\u201315:00 dokon\u010dati \u0161tiri operacije pakiranja do navedenih rokov. Za vsako operacijo je potrebnih 25 paketov enake standardne velikosti, vendar z druga\u010dno etiketo izdelka; paketi iz ene vrstice ne morejo izpolniti zahtev druge vrstice.<\/p>\n\n\n<p>Za primerjavo uporabimo shranjeni plan, izdan ob 07:00. Zahtevano je sprejetje po kontroli kakovosti, pred\u010dasno dokon\u010danje je dovoljeno, zamuda pa ni dovoljena. Kon\u010dni pregled zapisov opravimo ob 15:00.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Operacija<\/th><th>Planirani paketi<\/th><th>Predvideno dokon\u010danje<\/th><th>Sprejeto do roka operacije<\/th><th>Sprejeto do 15:00<\/th><th>Celotna koli\u010dina pravo\u010dasno?<\/th><\/tr><\/thead><tbody><tr><td>A: Etiketa A<\/td><td>25<\/td><td>09:00<\/td><td>25<\/td><td>25<\/td><td>Da<\/td><\/tr><tr><td>B: Etiketa B<\/td><td>25<\/td><td>11:00<\/td><td>30<\/td><td>30<\/td><td>Da<\/td><\/tr><tr><td>C: Etiketa C<\/td><td>25<\/td><td>13:00<\/td><td>20<\/td><td>25<\/td><td>Ne: zamuda<\/td><\/tr><tr><td>D: Etiketa D<\/td><td>25<\/td><td>15:00<\/td><td>20<\/td><td>20<\/td><td>Ne: delno dokon\u010dano<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pri operaciji A je 25 paketov sprejetih ob 08:55. Pri B je planiranih 25 paketov sprejetih pred 11:00, nato je izdelanih in sprejetih \u0161e pet dodatnih paketov. Pri C je do 13:00 sprejetih le 20 paketov; preostalih pet je sprejetih ob 14:10. Pri D Ben izdela 25 paketov, vendar kontrolorka kakovosti Tess pet paketov zadr\u017ei za pregled. Do prese\u010dnega \u010dasa je sprejetih le 20 paketov, zato D ne izpolni pogojev.<\/p>\n\n\n<p><strong>Doseganje skupne planirane koli\u010dine: 100 sprejetih paketov \u00f7 100 planiranih paketov \u00d7 100 = 100 %.<\/strong><\/p>\n\n\n<p><strong>Izpolnjevanje proizvodnega plana na podlagi dokon\u010danja: 2 operaciji, ki izpolnjujeta pogoje \u00f7 4 planirane operacije \u00d7 100 = 50 %.<\/strong><\/p>\n\n\n<p>Oba izra\u010duna sta glede na navedena pravila pravilna. V skupnem se\u0161tevku pet dodatnih paketov pri B nadomesti pet manjkajo\u010dih sprejetih paketov pri D. Tudi zamuda pri dokon\u010danju C se skrije v skupni koli\u010dini izmene. Preverjanje na ravni operacij razkrije obe odstopanji.<\/p>\n\n\n<p>Pri preverjanju koli\u010dine po posameznih izdelkih ob 15:00 bi v vsaki vrstici upo\u0161tevali najve\u010d planiranih 25 paketov. Tako bi upo\u0161tevali 95 od 100 planiranih paketov oziroma 95 %. To poka\u017ee, da dodatni paketi pri B ne morejo nadomestiti primanjkljaja pri D, \u0161e vedno pa ne poka\u017ee, da je C zamudila rok 13:00. Preverjanje ustreznosti koli\u010din in preverjanje rokov odgovarjata na razli\u010dni vpra\u0161anji.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj pa delne koli\u010dine, manjkajo\u010di zapisi in spremembe proizvodnega plana?<\/h2>\n\n\n<p><strong>Delno dokon\u010danje.<\/strong> Pri tem \u0161tetju operacij po na\u010delu vse ali ni\u010d 20 sprejetih paketov od 25 ne \u0161teje kot del operacije, ki izpolnjuje pogoje. Teh 20 prika\u017eite kot koristen napredek ob vrstici, ki ni izpolnila pogojev. \u010ce namesto tega izberete kazalnik, ute\u017een s koli\u010dino, ga poimenujte lo\u010deno in dolo\u010dite, do katere meje se pri posameznem izdelku upo\u0161teva prese\u017ena proizvodnja.<\/p>\n\n\n<p><strong>Izmet, predelava in zadr\u017eanje zaradi kontrole kakovosti.<\/strong> \u0160tejte koli\u010dino, ki ustreza dogovorjenemu pravilu dokon\u010danja. Zavrnjenih kosov ne \u0161tejte kot sprejeto koli\u010dino in istega kosa ne \u0161tejte dvakrat, ko se vrne iz predelave. Navedite, ali zadr\u017eanje zaradi pregleda pomeni, da operacija ni dokon\u010dana; v na\u0161em primeru to velja.<\/p>\n\n\n<p><strong>Manjkajo\u010di podatki o izvedbi.<\/strong> Nepotrjena vrstica ostane v imenovalcu in v za\u010dasnem rezultatu ne \u0161teje kot vrstica, ki izpolnjuje pogoje. Ozna\u010dite jo kot nepotrjeno, ne kot dokazano neizpolnitev v proizvodnji. Razjasnite zapis in izdajte sledljiv popravek. Tako manjkajo\u010di povratni podatki ne morejo neopazno izbolj\u0161ati rezultata.<\/p>\n\n\n<p><strong>Blokirano ali preklicano delo.<\/strong> Pomanjkanje materiala ne odstrani planirane operacije iz shranjenega izhodi\u0161\u010dnega plana. Zabele\u017eite neizpolnitev in njen vzrok. \u010ce odobren preklic spremeni zavezo, ohranite zapis te spremembe. O rezultatih primerjave z izvirnim planom in morebitne primerjave s spremenjenim planom poro\u010dajte lo\u010deno, namesto da bi prvotno vrstico naknadno izbrisali.<\/p>\n\n\n<p><strong>Nujno delo, dodano med izmeno.<\/strong> Zabele\u017eite ga kot dodatek. Za kupca je lahko to prava odlo\u010ditev, tudi \u010de izpodrine planirano operacijo. Merjenje glede na izvirni plan razkrije ceno spremembe, ne da bi odlo\u010ditev nujno ozna\u010dili za napa\u010dno.<\/p>\n\n\n<p><strong>Ponovno terminiranje proizvodnje.<\/strong> Nov delovni plan pomaga proizvodnemu obratu pri odzivanju na spremembe. Ne sme pa prepisati plana, na podlagi katerega ocenjujete izpolnitev prvotne zaveze. \u010ce zamujeni rok prestavite na \u010das po dejanskem zaklju\u010dku, je lahko operacija, ki je zamujala, videti pravo\u010dasna.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kako razlagati odstotek izpolnjevanja proizvodnega plana?<\/h2>\n\n\n<p>Preden izberete korektivni ukrep, preglejte vrstice z neizpolnjenimi operacijami. Ob pomanjkanju materiala preverite njegovo razpolo\u017eljivost; pri ponavljajo\u010dih se prekora\u010ditvah preverite \u010dase operacij ali <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-proizvodnih-kapacitet\/\">razpolo\u017eljive kapacitete<\/a>; zadr\u017eanje zaradi kakovosti pa zahteva odlo\u010ditev o kakovosti. \u010ce manjkajo zapisi o zaklju\u010dku, najprej preverite podatke, \u0161ele nato i\u0161\u010dite napake pri izvedbi.<\/p>\n\n\n<p>Sam odstotek ne omogo\u010da razlikovanja med temi vzroki. Ob njem navedite \u0161tevilo operacij v imenovalcu, razli\u010dico plana, pravilo merjenja in raz\u010dlenitev odstopanj. Pri majhnem \u0161tevilu operacij lahko \u017ee ena neizpolnjena operacija ob\u010dutno spremeni odstotek.<\/p>\n\n\n<p>Kazalnik, ki temelji na \u0161tevilu operacij, kratko in dolgo operacijo obravnava enako. \u010ce je pomemben tudi obseg dela, dodajte lo\u010deno opredeljen kazalnik, ute\u017een s planiranimi normativnimi minutami. Prvotnega \u0161tetja operacij ne nadomestite, ne da bi zabele\u017eili spremembo definicije. Prav tako za ute\u017ei ne uporabljajte dejanskih prekora\u010ditev, saj bi se tako ute\u017ei spreminjale po tem, ko je rezultat \u017ee znan.<\/p>\n\n\n<p>Univerzalna ciljna vrednost ni uporabna, \u010de ne temelji na istem naboru operacij, enoti \u0161tetja, pravilu glede rokov in merilih za sprejem. Ob nespremenjeni definiciji dolo\u010dite lastno izhodi\u0161\u010dno vrednost, nato pa spremljajte, ali je ponavljajo\u010dih se neizpolnitev manj. Bolj\u0161i rezultat, dose\u017een s pove\u010danjem dovoljene tolerance ali zmanj\u0161anjem planiranega obsega dela, ni dokaz bolj\u0161e izvedbe.<\/p>\n\n\n<p>Pri naslednji odlo\u010ditvi vam <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">terminiranje proizvodnje<\/a> pomaga preveriti, ali je plan izvedljiv, <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/\">vodenje proizvodnega obrata<\/a> pa ureja pretok dela in informacij o odstopanjih med obratom in planerjem. Ta izra\u010dun daje podatkovno podlago, ki povezuje obe dejavnosti, ne nadome\u0161\u010da pa nobene od njiju.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Od merjenja izpolnjevanja proizvodnega plana do njegovega posodabljanja<\/h2>\n\n\n<p>SkyPlanner izra\u010dunava terminske plane proizvodnje na podlagi delovnih postaj, izmen, operaterjev, materialov in prioritet, ki jih dolo\u010di planer. Arcturus ponovno izra\u010duna plan, ko ga je treba posodobiti, prikaz Gantt pa poka\u017ee rezultat. SkyPlanner se prek svojega odprtega vmesnika REST API povezuje s katerim koli sistemom ERP ali MES. <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">Z brezpla\u010dnim preizkusom z demonstracijskimi podatki<\/a> lahko spoznate ta potek terminiranja proizvodnje.<\/p>\n\n\n<p>Delovni list in formule v tem vodniku so primeri merjenja, ne trditev, da izdelek vklju\u010duje prav tak\u0161no nadzorno plo\u0161\u010do za izpolnjevanje proizvodnega plana. Shranjeni izhodi\u0161\u010dni plan za merjenje hranite lo\u010deno od delovnega plana, s katerim se odzivate na spremembe.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pogosta vpra\u0161anja o izpolnjevanju proizvodnega plana<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Ali je izpolnjevanje proizvodnega plana isto kot doseganje plana?<\/h3>\n\n\n<p>Ne vedno. Nekatere ekipe z doseganjem plana ozna\u010dujejo razmerje med skupno proizvedeno koli\u010dino in koli\u010dinskim ciljem, druge pa primerjavo planiranih in dejanskih \u010dasov. Preden primerjate rezultate, preverite dokumentirano opredelitev \u0161tevca, imenovalca, enote \u0161tetja in \u010dasovnega pravila.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ali lahko izpolnjevanje proizvodnega plana prese\u017ee 100%?<\/h3>\n\n\n<p>Rezultat formule na ravni operacij v tem vodniku ne more prese\u010di 100%, saj lahko vsaka planirana operacija merilo izpolni le enkrat. Kazalnik, pri katerem dejansko koli\u010dino delimo s planirano in rezultata ne omejimo navzgor, lahko zaradi prese\u017ene proizvodnje prese\u017ee 100%. Gre za razli\u010dna izra\u010duna.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ali se pred\u010dasni zaklju\u010dek \u0161teje kot izpolnitev proizvodnega plana?<\/h3>\n\n\n<p>Da, po pravilu iz tega vodnika, ki zahteva zaklju\u010dek do roka. Proces, ki zahteva zaklju\u010dek v dolo\u010denem \u010dasovnem oknu ali v dolo\u010denem zaporedju, lahko pred\u010dasno izvedbo obravnava druga\u010de. O tem pravilu se dogovorite pred izra\u010dunom kazalnika.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ali 100% doseganje koli\u010dinskega cilja v proizvodnji pomeni, da so vse planirane operacije zaklju\u010dene?<\/h3>\n\n\n<p>Ne. Pri skupni koli\u010dini lahko prese\u017eek pri eni operaciji nadomesti primanjkljaj pri drugi, skupni rezultat izmene pa prikrije predhodno zamujene roke. Dejansko proizvedeno koli\u010dino pove\u017eite z vsako planirano operacijo, nato pa zanjo uporabite pravilo glede zaklju\u010dka in \u010dasa.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Is production schedule adherence the same as schedule attainment?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Not consistently. Some teams use attainment for total output versus a quantity target; others use it for planned-versus-actual timing. Check the documented numerator, denominator, counting unit and time rule before comparing figures.\"}},{\"@type\":\"Question\",\"name\":\"Can schedule adherence exceed 100%?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The operation-level formula in this guide cannot exceed 100% because each scheduled operation can pass only once. An uncapped actual-quantity-divided-by-planned-quantity measure can exceed 100% through overproduction. Those are different calculations.\"}},{\"@type\":\"Question\",\"name\":\"Does finishing early count as adherence?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It does under this guide's completion-by-deadline rule. A process requiring completion within a specific time window or in a particular sequence may treat early work differently. Agree on that rule before calculating the score.\"}},{\"@type\":\"Question\",\"name\":\"Does 100% output attainment mean every planned job is complete?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Extra output on one job can offset a shortage on another in the total, and a shift total hides earlier missed deadlines. Match actual output to each planned operation, then apply its completion and timing rule.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Izpolnjevanje proizvodnega plana: formula in primer Domov &raquo; Viri &raquo; Izpolnjevanje proizvodnega plana: formula in primer Izpolnjevanje proizvodnega plana meri, kako dosledno dejansko delo sledi planu, izdanemu proizvodnemu obratu. Pri preverjanju na podlagi dokon\u010danja \u0161tevilo planiranih operacij, ki so bile v celoti dokon\u010dane do svojih predvidenih rokov, delite s \u0161tevilom vseh planiranih operacij z rokom &#8230; <a title=\"Izpolnjevanje proizvodnega plana: formula in primer\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/\" aria-label=\"Read more about Izpolnjevanje proizvodnega plana: formula in primer\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97332,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-97294","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Izpolnjevanje proizvodnega plana: formula<\/title>\n<meta name=\"description\" content=\"Koli\u010dina dose\u017eena, operacije pa zamujajo? Izra\u010dunajte izpolnjevanje proizvodnega plana glede na shranjeni plan, s primerom in jasnimi pravili \u0161tetja.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Izpolnjevanje proizvodnega plana: formula in primer\" \/>\n<meta property=\"og:description\" content=\"Koli\u010dina dose\u017eena, operacije pa zamujajo? Izra\u010dunajte izpolnjevanje proizvodnega plana glede na shranjeni plan, s primerom in jasnimi pravili \u0161tetja.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-10T08:49:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-10T08:50:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Izpolnjevanje proizvodnega plana: formula in primer\",\"datePublished\":\"2026-10-10T08:49:19+00:00\",\"dateModified\":\"2026-10-10T08:50:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/\"},\"wordCount\":2163,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/\",\"name\":\"Izpolnjevanje proizvodnega plana: formula\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"datePublished\":\"2026-10-10T08:49:19+00:00\",\"dateModified\":\"2026-10-10T08:50:32+00:00\",\"description\":\"Koli\u010dina dose\u017eena, operacije pa zamujajo? Izra\u010dunajte izpolnjevanje proizvodnega plana glede na shranjeni plan, s primerom in jasnimi pravili \u0161tetja.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/izpolnjevanje-proizvodnega-plana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Izpolnjevanje proizvodnega plana: formula in primer\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Izpolnjevanje proizvodnega plana: formula","description":"Koli\u010dina dose\u017eena, operacije pa zamujajo? Izra\u010dunajte izpolnjevanje proizvodnega plana glede na shranjeni plan, s primerom in jasnimi pravili \u0161tetja.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/","og_locale":"sl_SI","og_type":"article","og_title":"Izpolnjevanje proizvodnega plana: formula in primer","og_description":"Koli\u010dina dose\u017eena, operacije pa zamujajo? Izra\u010dunajte izpolnjevanje proizvodnega plana glede na shranjeni plan, s primerom in jasnimi pravili \u0161tetja.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-10T08:49:19+00:00","article_modified_time":"2026-10-10T08:50:32+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Izpolnjevanje proizvodnega plana: formula in primer","datePublished":"2026-10-10T08:49:19+00:00","dateModified":"2026-10-10T08:50:32+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/"},"wordCount":2163,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","articleSection":["APS &amp; Scheduling","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/","name":"Izpolnjevanje proizvodnega plana: formula","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","datePublished":"2026-10-10T08:49:19+00:00","dateModified":"2026-10-10T08:50:32+00:00","description":"Koli\u010dina dose\u017eena, operacije pa zamujajo? Izra\u010dunajte izpolnjevanje proizvodnega plana glede na shranjeni plan, s primerom in jasnimi pravili \u0161tetja.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Izpolnjevanje proizvodnega plana: formula in primer"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Izpolnjevanje proizvodnega plana: formula in primer Domov &raquo; Viri &raquo; Izpolnjevanje proizvodnega plana: formula in primer Izpolnjevanje proizvodnega plana meri, kako dosledno dejansko delo sledi planu, izdanemu proizvodnemu obratu. Pri preverjanju na podlagi dokon\u010danja \u0161tevilo planiranih operacij, ki so bile v celoti dokon\u010dane do svojih predvidenih rokov, delite s \u0161tevilom vseh planiranih operacij z rokom&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/97294","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=97294"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/97294\/revisions"}],"predecessor-version":[{"id":97355,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/97294\/revisions\/97355"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/97332"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=97294"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=97294"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=97294"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}