{"id":97116,"date":"2026-10-09T18:42:58","date_gmt":"2026-10-09T18:42:58","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=97116"},"modified":"2026-10-19T14:43:30","modified_gmt":"2026-10-19T14:43:30","slug":"proizvodni-obrat","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/","title":{"rendered":"Proizvodni obrat: od plana do jasnih navodil za delo"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n\n<h1 class=\"wp-block-heading\">Proizvodni obrat: od plana do jasnih navodil za delo<\/h1>\n\n\n<p>Planer je nujno naro\u010dilo premaknil na zgodnej\u0161i termin. Ekipa v proizvodnji pa \u0161e vedno dela po v\u010deraj\u0161njem vrstnem redu. Te\u017eava ni v zavzetosti operaterja. Odlo\u010ditev preprosto \u0161e ni pri\u0161la do \u010dloveka, ki jo potrebuje.<\/p>\n\n\n<p>Zaradi te vrzeli je delo v proizvodnji te\u017eje, kot bi moralo biti. Vodje porabljajo \u010das za pojasnjevanje, katera operacija je naslednja, planerji na novo sestavljajo sezname operacij, ko odkrijejo neprijavljene zamude, kupci pa \u010dakajo na odgovore o naro\u010dilih, za katera je na za\u010detku tedna \u0161e kazalo, da bodo dokon\u010dana pravo\u010dasno.<\/p>\n\n\n<p>Bolj\u0161i potek dela v proizvodnji zagotavlja povezavo v obe smeri: terminski plan ljudem pove, kaj naj delajo naslednje, podatki o napredku pa ga ohranjajo usklajenega z dejanskim dogajanjem. SkyPlanner to povezuje s terminiranjem z umetno inteligenco, seznami operacij za delovne centre in bele\u017eenjem \u010dasa v proizvodnji. Tako ekipa dobi plan, po katerem lahko dela, ne le plana, ki ga vidijo v pisarni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je proizvodni obrat?<\/h2>\n\n\n<p><strong>Proizvodni obrat je obmo\u010dje, kjer ljudje z opremo predelujejo materiale in sestavne dele v izdelke<\/strong>. Zajema delovne centre za dejavnosti, kot so strojna obdelava, varjenje, oblikovanje, monta\u017ea, preizku\u0161anje in kon\u010dna obdelava. Angle\u0161ki izraz \u00bbshop floor\u00ab v tem kontekstu ozna\u010duje prostor, kjer poteka proizvodnja, ne materiala, s katerim so prekrita tla.<\/p>\n\n\n<p>Operaterji opravljajo proizvodno delo. Vodje ga usklajujejo, zaposleni v notranji logistiki zagotavljajo material, sodelavci iz vzdr\u017eevanja in kakovosti pa pomagajo zagotavljati varnost, razpolo\u017eljivost opreme in pogoje za nadaljevanje dela. Planer lahko dela ob strojih ali drugje; pomembnej\u0161a od lokacije njegove mize je povezava med planiranjem in proizvodnjo.<\/p>\n\n\n<p>V proizvodnem obratu so lahko proizvodna linija, proizvodne celice ali stroji, ki jih uporabljajo operacije z razli\u010dnimi tehnolo\u0161kimi postopki. Linija potrebuje usklajen pretok skozi svoje delovne centre. V celici si lahko izdelki iste dru\u017eine delijo zaposlene in opremo. Pri <a href=\"\/sl\/viri\/planiranje-maloserijske-proizvodnje\/\">delavni\u0161ki proizvodnji<\/a> je treba usklajevati razli\u010dna zaporedja operacij, ki uporabljajo skupne vire. Pri proizvodnji na stalnem mestu izdelek ostane na mestu, ekipe in oprema pa pridejo do njega. Pri vseh teh ureditvah se zastavlja isto vpra\u0161anje terminiranja: katero delo lahko poteka z razpolo\u017eljivimi viri?<\/p>\n\n\n<p>Pri razmejitvi odgovornosti pomagajo trije povezani pojmi:<\/p>\n\n\n<table>\n<thead>\n<tr>\n<th>Pojem<\/th>\n<th>Pomen<\/th>\n<th>Kaj mora ekipa vedeti<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Terminiranje proizvodnje<\/td>\n<td>Dolo\u010danje zaporedja, virov in terminov operacij<\/td>\n<td>Kaj naj bo naslednje na vrsti, kje in kdaj?<\/td>\n<\/tr>\n<tr>\n<td>Krmiljenje proizvodnje<\/td>\n<td>Usmerjanje in spremljanje proizvodnje med izvajanjem dela<\/td>\n<td>Kaj se je za\u010delo, zaklju\u010dilo ali ustavilo?<\/td>\n<\/tr>\n<tr>\n<td>Vodenje proizvodnje<\/td>\n<td>Usklajevanje zaposlenih, vsakodnevnih odlo\u010ditev in izbolj\u0161av<\/td>\n<td>Kdo bo re\u0161il te\u017eavo in prepre\u010dil, da bi se ponovila?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n\n\n<p>Te dejavnosti se dopolnjujejo. Vodja lahko opazi ustavljeno operacijo in organizira pomo\u010d, planer pa mora razumeti tudi, kaj prekinitev pomeni za druga naro\u010dila. Zabele\u017eiti te\u017eavo je le polovica naloge; krog je sklenjen \u0161ele, ko ta podatek uporabimo za posodobitev plana.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zakaj lahko zasedeni stroji \u0161e vedno opravljajo napa\u010dno delo<\/h2>\n\n\n<p>Dolg seznam \u010dakajo\u010dih operacij \u0161e ne pomeni, da napredujejo prava naro\u010dila. Nekatero delo je preprosto za\u010deti, vendar je zanj \u0161e prezgodaj, da bi bilo koristno. Drugo naro\u010dilo ima morda bli\u017eji rok, a \u010daka na material, predhodno operacijo ali usposobljenega operaterja.<\/p>\n\n\n<p>\u010ce vrstni red ni jasen, se morajo zaposleni odlo\u010dati sami na svojem delovnem mestu. Morda dokon\u010dajo serijo, ki jo poznajo, izberejo operacijo, za katero je orodje \u017ee name\u0161\u010deno, ali sledijo zadnjemu prejetemu navodilu. Vsaka od teh odlo\u010ditev se lahko v delovnem centru zdi smiselna, obenem pa oddalji izpolnitev obljube kupcu.<\/p>\n\n\n<p>Re\u0161itev ni v tem, da bi operaterjem nalo\u017eili odgovornost za urejanje terminskega plana celotne tovarne. Potrebujejo zaporedje, ki \u017ee upo\u0161teva pomembne omejitve, ter preprost na\u010din za poro\u010danje, ko se dejanske razmere spremenijo.<\/p>\n\n\n<p>Za to ni dovolj razvrstiti naro\u010dil po rokih. <a href=\"\/sl\/viri\/proizvodni-postopek\/\">Tehnolo\u0161ki postopek<\/a> naro\u010dila povezuje operacije, ki morajo potekati v pravilnem zaporedju. Razpolo\u017eljivost strojev in operaterjev, izmene, \u010dasi priprave ter razpolo\u017eljivost materiala vplivajo na to, kdaj je mogo\u010de te operacije izvesti. <a href=\"\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/\">Terminiranje z omejenimi kapacitetami<\/a> razporedi potrebno delo v razpolo\u017eljivi \u010das virov, namesto da bi jim dodelilo ve\u010d dela, kot ga dolo\u010dene kapacitete zmorejo.<\/p>\n\n\n<p>V sistemu SkyPlanner Arcturus izra\u010duna terminski plan na podlagi proizvodnih virov, odvisnosti in prioritet, ki jih dolo\u010dite. Vi odlo\u010dite, kaj je pomembno, algoritem za terminiranje pa poskrbi za medsebojno povezano razporejanje operacij. Tako se lahko osredoto\u010dite na odlo\u010ditve o dobavi, namesto da za vsak stroj vzdr\u017eujete lo\u010den seznam operacij.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pove\u017eite terminski plan z dejanskim delom<\/h2>\n\n\n<p>Uporaben potek dela v proizvodnji ima \u0161tiri povezane dele. SkyPlanner podpira izra\u010dun in povratne informacije, va\u0161a ekipa pa se dogovori, kako bo ravnala po pripravljenem planu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Pripravite terminski plan glede na razpolo\u017eljive kapacitete<\/h3>\n\n\n<p>Dolo\u010dite delovne centre, izmene, operaterje in tehnolo\u0161ke postopke ter realne \u010dase obdelave in priprave. Znane prekinitve zabele\u017eite v sistem, namesto da ostanejo le opombe ob preglednici. Kadar je izvedba operacije odvisna od razpolo\u017eljivosti materiala, omogo\u010dite terminiranje z upo\u0161tevanjem materiala in skrbite za a\u017eurne podatke o njegovi razpolo\u017eljivosti.<\/p>\n\n\n<p>Arcturus te podatke uporabi skupaj z va\u0161imi prioritetami za terminiranje operacij. Prikaz Gantt poka\u017ee termine in dodeljene vire, zato planer vidi medsebojno povezano delo, ne le lo\u010denih seznamov. Preden v proizvodnjo po\u0161ljete \u0161e eno nujno naro\u010dilo, lahko preverite, kaj terminski plan pomeni za prihajajo\u010da naro\u010dila.<\/p>\n\n\n<p>Za \u0161ir\u0161i pregled pristopa k planiranju preberite na\u0161 <a href=\"\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">vodnik po terminiranju proizvodnje<\/a>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Operaterjem zagotovite a\u017euren seznam operacij za delovni center<\/h3>\n\n\n<p>\u010clovek, ki opravlja delo, potrebuje ustrezen vrstni red operacij; ni njegova naloga, da presoja celoten nabor naro\u010dil. Aplikacija ShopFloor in Timer v sistemu SkyPlanner ponujata seznam operacij, razporejenih na delovni center, ter seznam za skupino delovnih centrov.<\/p>\n\n\n<p>Operaterji lahko vidijo dodeljeno delo in dostopajo do prilog k operacijam. <a href=\"\/sl\/viri\/proizvodni-nalog\/\">Delovni nalog v proizvodnji<\/a> vsebuje navodila za izvedbo, terminski plan pa dolo\u010da njegovo mesto v zaporedju. Poskrbite, da sta usklajena, da se pravilno navodilo ne izvede ob napa\u010dnem \u010dasu.<\/p>\n\n\n<p>Dogovorite se, kdo je odgovoren za spreminjanje prioritet in komu je treba sporo\u010diti, da operacije ni mogo\u010de nadaljevati. Posodobljeni seznam operacij naj bo skupna referenca, ne le eno od ve\u010d nasprotujo\u010dih si navodil iz pisarne, z natisnjenega seznama ali iz pogovora med stroji.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Bele\u017eite napredek, dokler lahko \u0161e vpliva na odlo\u010ditve<\/h3>\n\n\n<p>Timer v sistemu SkyPlanner delavcem omogo\u010da bele\u017eenje za\u010detka, prekinitev, nadaljevanja in zaklju\u010dka operacij ter koli\u010din izdelanih in neustreznih kosov. Ti zapisi planerjem dajejo jasnej\u0161o sliko dejanskega dogajanja. Poro\u010dila omogo\u010dajo primerjavo planiranih in dejanskih \u010dasov, zato ponavljajo\u010dih se odstopanj ni ve\u010d treba ocenjevati na pamet.<\/p>\n\n\n<p>Postopek poro\u010danja naj bo kratek, zaposlenim pa pojasnite, na kaj njihovi podatki vplivajo. Prekinitev, sporo\u010dena med izmeno, lahko ekipi pomaga pri odzivu; isti podatek, vnesen \u0161ele po tem, ko naro\u010dilo \u017ee zamuja, je predvsem zapis izgube.<\/p>\n\n\n<p>\u010ce podatke o izvedbi \u017ee zajemate v drugem sistemu, lahko sistema pove\u017eete prek odprtega vmesnika REST API sistema SkyPlanner. Zaradi bolj\u0161ega terminiranja vam ni treba uvajati \u0161e enega postopka poro\u010danja.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Ponovno izra\u010dunajte plan in ohranite nadzor nad prioritetami<\/h3>\n\n\n<p>Ko plan zaradi spremembe naro\u010dila, zaklju\u010dka operacije ali spremembe kapacitet ni ve\u010d aktualen, lahko Arcturus ponovno izra\u010duna terminski plan. \u010ce je omogo\u010deno samodejno ponovno terminiranje, se lahko plan posodobi, ne da bi moral planer vedno znova ro\u010dno sestavljati sezname operacij.<\/p>\n\n\n<p>S prioritetami, pravili in zaklepi ohranite nadzor na podlagi svoje presoje o proizvodnji. Z njimi za\u0161\u010ditite odlo\u010ditve, ki naj ostanejo nespremenjene, preostalemu delu pa omogo\u010dite prilagajanje. Namen ni ob vsakem dogodku preme\u0161ati vseh operacij, temve\u010d ohranjati uporaben plan tudi ob spremembah razmer.<\/p>\n\n\n<p>Povezava med a\u017eurnimi podatki iz proizvodnje in ponovnim terminiranjem je klju\u010dna. Raziskava ustanove NIST o <a href=\"https:\/\/www.nist.gov\/publications\/models-integrating-scheduling-and-shop-floor-data-collection\">povezovanju terminiranja in zajema podatkov iz proizvodnje<\/a> ugotavlja, da sta del tega izziva tako zagotavljanje za\u010detnih podatkov za terminiranje kot mo\u017enost odzivanja po za\u010detku dela.<\/p>\n\n\n<p><a href=\"\/sl\/funkcije\/\">Odkrijte funkcije sistema SkyPlanner za terminiranje in delo v proizvodnji<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Spremenjen vrstni red naj re\u0161uje te\u017eavo z dobavo<\/h2>\n\n\n<p>Predstavljajte si obrat za obdelavo plo\u010devine, v katerem dve naro\u010dili \u010dakata na isti upogibni stroj. Prvo ima zgodnej\u0161i rok odpreme, vendar njegovi deli \u0161e niso prispeli z razreza. Drugo je pripravljeno za upogibanje, rok odpreme pa je poznej\u0161i.<\/p>\n\n\n<p>\u010ce seznam na prvo mesto preprosto postavi naro\u010dilo z zgodnej\u0161o odpremo, operater na upogibnem stroju vidi operacijo, ki je ne more za\u010deti. \u010ce pa ekipa seznam povsem prezre, tvega, da bo nadaljevala poznej\u0161e naro\u010dilo tudi potem, ko bodo nujni deli \u017ee na voljo.<\/p>\n\n\n<p>Izvedljiv terminski plan upo\u0161teva tehnolo\u0161ka postopka obeh naro\u010dil in njuno pripravljenost za obdelavo. V razpolo\u017eljivi \u010das za upogibanje lahko razporedi pripravljeno delo, obenem pa upo\u0161teva, kdaj bodo nujni deli prispeli z razreza. Planer preveri tudi varjenje, ki sledi: zgodnej\u0161i zaklju\u010dek upogibanja ni dovolj, \u010de naro\u010dilo nato \u010daka pri naslednji operaciji.<\/p>\n\n\n<p>Zdaj si predstavljajte, da razrez zamuja. Ekipa zabele\u017ei spremembo, planer preveri njen vpliv na povezane operacije, terminski plan pa se ponovno izra\u010duna glede na nove razmere. Operater uporablja posodobljeni seznam, namesto da bi sam ugibal, kateri kupec naj ima prednost.<\/p>\n\n\n<p>Nekatere odlo\u010ditve \u0161e vedno sprejemajo ljudje. \u010ce je delo ustavljeno zaradi vpra\u0161anj kakovosti, jih je treba razre\u0161iti, preden se to delo nadaljuje. Ob te\u017eavi s strojem pa je treba zagotoviti zanesljiv, posodobljen podatek o njegovi razpolo\u017eljivosti. SkyPlanner pomaga terminirati glede na pogoje, ki jih zabele\u017eite; ne pregleduje kosov in ne popravlja strojev.<\/p>\n\n\n<p>Prednost je jasnej\u0161a delitev dela. Operaterji se osredoto\u010dajo na operacijo, vodje odpravljajo neposredno oviro, planerji pa na podlagi aktualnega terminskega plana presojajo vpliv na obveznosti do kupcev.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj se je spremenilo za proizvodno ekipo podjetja UTU<\/h2>\n\n\n<p>UTU izdeluje elektri\u010dne razdelilne omare in stikalne naprave. Pred uvedbo SkyPlanner so oddelki uporabljali Excelove preglednice, ki so jih posodabljali ro\u010dno. Spremembe zaporedja v sistemu ERP niso vedno dosegle proizvodnje, zato so vsako jutro pribli\u017eno eno uro porabili za preverjanje, kaj je treba narediti in v kak\u0161nem vrstnem redu.<\/p>\n\n\n<p>Po prehodu na Oracle NetSuite je UTU izbral SkyPlanner ter ga povezal s sistemom ERP in sistemom za obra\u010dun pla\u010d. V tovarni v Ulvili zdaj vse linije in oddelki uporabljajo enoten sistem za planiranje. Podjetje posebej izpostavlja kombinacijo samodejnega terminiranja in prikaza Gantt: kapacitete, obremenitve in zaporedje dela so vidni na enem mestu.<\/p>\n\n\n<p>UTU poro\u010da, da ob spremembi zaporedja nov seznam operacij v nekaj sekundah dose\u017ee monterje na liniji. Ocenjujejo tudi, da prihranijo pribli\u017eno dve uri na teden, ker preglednic ne posodabljajo ve\u010d ro\u010dno.<\/p>\n\n\n<p>Za te\u017eavo, ki jo obravnavamo v tem \u010dlanku, je najpomembnej\u0161a sprememba ta, da seznam operacij dose\u017ee ljudi, ki delo opravljajo. Posodobljen plan pomaga le, \u010de ga proizvodnja tudi prejme.<\/p>\n\n\n<p><a href=\"\/sl\/zgodbe-strank\/utu\/\">Preberite, kak\u0161ne izku\u0161nje ima UTU s SkyPlanner<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pri vsakodnevnem delu se osredoto\u010dite na odlo\u010ditve<\/h2>\n\n\n<p>Programska oprema olaj\u0161a izmenjavo terminskega plana in podatkov o napredku. Ekipa pa \u0161e vedno potrebuje prakti\u010den na\u010din za re\u0161evanje odstopanj. Izmeno za\u010dnite z vpra\u0161anji, ki lahko vplivajo na dana\u0161nje delo:<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Kaj je pripravljeno za izvedbo?<\/strong> Preverite, ali so za prednostne operacije na voljo potrebni materiali in ustrezni viri ter ali so predhodne operacije zaklju\u010dene.<\/li>\n<li><strong>Kaj se je spremenilo?<\/strong> Preden se oprete na v\u010deraj\u0161nji plan, preverite nedokon\u010dano delo, odsotnosti, zastoje strojev in delo, ustavljeno zaradi vpra\u0161anj kakovosti.<\/li>\n<li><strong>Kdo je odgovoren za ukrepanje?<\/strong> Dolo\u010dite, kdo bo izvedel takoj\u0161nji ukrep, in poskrbite, da bo planer obve\u0161\u010den o vseh posledicah za terminski plan.<\/li>\n<\/ul>\n\n\n<p>Urejenost delovnega mesta, standardizirano delo in vzdr\u017eevanje podpirajo tak na\u010din dela, saj zmanj\u0161ujejo prekinitve, ki se jim je mogo\u010de izogniti. Dopolnjujejo terminiranje: tudi dobro urejen delovni center mora pravo delo dobiti ob pravem \u010dasu.<\/p>\n\n\n<p>Uporabljajte kazalnike, ki pomagajo pri naslednji odlo\u010ditvi. <a href=\"\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/\">Upo\u0161tevanje terminskega plana<\/a> poka\u017ee, kje dejanska izvedba odstopa od dogovorjenega plana. Primerjava na\u010drtovanega in dejanskega trajanja operacij pomaga prepoznati nezanesljive ocene trajanja. \u010cakanje in blokirane operacije poka\u017eejo, kje naro\u010dilo izgublja \u010das med operacijami. Zanesljivost dobav pa pove, ali potek proizvodnje omogo\u010da izpolnjevanje obveznosti do kupcev.<\/p>\n\n\n<p>Preu\u010dite vzrok odstopanja, ne le odstotek. \u010ce operaterji zaradi manjkajo\u010dega materiala ve\u010dkrat odstopajo od terminskega plana, vztrajanje pri njegovem upo\u0161tevanju ne bo popravilo podatkov o pripravljenosti za izvedbo. \u010ce podatki o napredku prihajajo z zamudo, najprej izbolj\u0161ajte prakso poro\u010danja, \u0161ele nato obravnavajte prikaz Gantt kot sliko trenutnega stanja.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zagotovite proizvodnji enoten plan, po katerem lahko dela<\/h2>\n\n\n<p>Za povezavo planiranja s proizvodnjo vam ni treba zamenjati sistema ERP, ki dobro deluje. <strong>SkyPlanner se prek svojega odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES.<\/strong> ERP lahko \u0161e naprej skrbi za naro\u010dila in poslovne evidence, SkyPlanner pa za podrobno terminiranje in prenos izra\u010dunanega zaporedja dela v proizvodnjo. \u010ce je to primerno za va\u0161 obrat, lahko obstoje\u010di MES zagotavlja podatke o izvedbi.<\/p>\n\n\n<p>Razlog za izbiro SkyPlanner je povezanost: Arcturus izra\u010duna zaporedje dela, prikaz Gantt naredi plan pregleden, seznami operacij v proizvodnji in bele\u017eenje \u010dasa pa ga pove\u017eejo z ljudmi, ki delo opravljajo. Ohranite nadzor nad prioritetami, ne da bi morali vsako razporeditev ro\u010dno posodabljati.<\/p>\n\n\n<p><a href=\"\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev SkyPlanner<\/a> in pripravite nedaven primer plana, ki ni dosegel proizvodnje, ali spremembe v proizvodnji, za katero je planer izvedel prepozno. Prikaz, kako bi tak\u0161no situacijo obravnavali s terminskim planom, povezanim s proizvodnjo, je dober na\u010din za preverjanje, ali re\u0161itev ustreza va\u0161im potrebam. \u010ce \u017eelite najprej sami raziskati izdelek, <a href=\"\/sl\/preizkus\/\">preizkusite SkyPlanner z demonstracijskimi podatki<\/a>.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Proizvodni obrat: od plana do jasnih navodil za delo Planer je nujno naro\u010dilo premaknil na zgodnej\u0161i termin. Ekipa v proizvodnji pa \u0161e vedno dela po v\u010deraj\u0161njem vrstnem redu. Te\u017eava ni v zavzetosti operaterja. Odlo\u010ditev preprosto \u0161e ni pri\u0161la do \u010dloveka, ki jo potrebuje. Zaradi te vrzeli je delo v proizvodnji te\u017eje, kot bi moralo biti. &#8230; <a title=\"Proizvodni obrat: od plana do jasnih navodil za delo\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/\" aria-label=\"Read more about Proizvodni obrat: od plana do jasnih navodil za delo\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97721,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-97116","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Proizvodni obrat: od plana do jasnih navodil za delo<\/title>\n<meta name=\"description\" content=\"Ali proizvodni obrat ve za spremembe vrstnega reda? SkyPlanner povezuje terminiranje, sezname operacij in podatke o napredku, da proizvodnja te\u010de naprej.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Proizvodni obrat: od plana do jasnih navodil za delo\" \/>\n<meta property=\"og:description\" content=\"Ali proizvodni obrat ve za spremembe vrstnega reda? SkyPlanner povezuje terminiranje, sezname operacij in podatke o napredku, da proizvodnja te\u010de naprej.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-09T18:42:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1824\" \/>\n\t<meta property=\"og:image:height\" content=\"1026\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Proizvodni obrat: od plana do jasnih navodil za delo\",\"datePublished\":\"2026-10-09T18:42:58+00:00\",\"dateModified\":\"2026-10-19T14:43:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/\"},\"wordCount\":2288,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-shop-floor-hero-1.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/\",\"name\":\"Proizvodni obrat: od plana do jasnih navodil za delo\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-shop-floor-hero-1.png\",\"datePublished\":\"2026-10-09T18:42:58+00:00\",\"dateModified\":\"2026-10-19T14:43:30+00:00\",\"description\":\"Ali proizvodni obrat ve za spremembe vrstnega reda? SkyPlanner povezuje terminiranje, sezname operacij in podatke o napredku, da proizvodnja te\u010de naprej.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-shop-floor-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-shop-floor-hero-1.png\",\"width\":1824,\"height\":1026,\"caption\":\"Operators and a supervisor coordinate work flowing between three production workstations\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-obrat\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Proizvodni obrat: od plana do jasnih navodil za delo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Proizvodni obrat: od plana do jasnih navodil za delo","description":"Ali proizvodni obrat ve za spremembe vrstnega reda? SkyPlanner povezuje terminiranje, sezname operacij in podatke o napredku, da proizvodnja te\u010de naprej.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/","og_locale":"sl_SI","og_type":"article","og_title":"Proizvodni obrat: od plana do jasnih navodil za delo","og_description":"Ali proizvodni obrat ve za spremembe vrstnega reda? SkyPlanner povezuje terminiranje, sezname operacij in podatke o napredku, da proizvodnja te\u010de naprej.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-09T18:42:58+00:00","article_modified_time":"2026-10-19T14:43:30+00:00","og_image":[{"width":1824,"height":1026,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Proizvodni obrat: od plana do jasnih navodil za delo","datePublished":"2026-10-09T18:42:58+00:00","dateModified":"2026-10-19T14:43:30+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/"},"wordCount":2288,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/","name":"Proizvodni obrat: od plana do jasnih navodil za delo","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1.png","datePublished":"2026-10-09T18:42:58+00:00","dateModified":"2026-10-19T14:43:30+00:00","description":"Ali proizvodni obrat ve za spremembe vrstnega reda? SkyPlanner povezuje terminiranje, sezname operacij in podatke o napredku, da proizvodnja te\u010de naprej.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1.png","width":1824,"height":1026,"caption":"Operators and a supervisor coordinate work flowing between three production workstations"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Proizvodni obrat: od plana do jasnih navodil za delo"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1.png",1824,1026,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1.png",1824,1026,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-shop-floor-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Proizvodni obrat: od plana do jasnih navodil za delo Planer je nujno naro\u010dilo premaknil na zgodnej\u0161i termin. Ekipa v proizvodnji pa \u0161e vedno dela po v\u010deraj\u0161njem vrstnem redu. Te\u017eava ni v zavzetosti operaterja. Odlo\u010ditev preprosto \u0161e ni pri\u0161la do \u010dloveka, ki jo potrebuje. Zaradi te vrzeli je delo v proizvodnji te\u017eje, kot bi moralo biti.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/97116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=97116"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/97116\/revisions"}],"predecessor-version":[{"id":97178,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/97116\/revisions\/97178"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/97721"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=97116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=97116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=97116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}