{"id":96511,"date":"2026-10-08T08:15:39","date_gmt":"2026-10-08T08:15:39","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96511"},"modified":"2026-10-08T10:28:55","modified_gmt":"2026-10-08T10:28:55","slug":"proizvodni-nalog","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/","title":{"rendered":"Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"\/sl\/viri\/\">Viri<\/a> &raquo; Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Proizvodni nalog je zapis, ki odobri izdelavo dolo\u010dene koli\u010dine izdelka in vsebuje podatke, potrebne za izvedbo dela. Povezuje proizvodno zahtevo z materiali, operacijami, viri in ciljnim datumom dokon\u010danja. Sam po sebi \u0161e ni terminski plan proizvodnje.<\/p>\n\n\n<p>Za planerja proizvodnje je ta razlika pomembna. Popoln nalog lahko \u0161e vedno \u010daka na material ali se za isti stroj poteguje z drugim nalogom. Upravljanje naloga pomeni preveriti, ali je delo pripravljeno, odlo\u010diti, kdaj se lahko izvedejo njegove operacije, in primerjati poro\u010dani napredek s planom.<\/p>\n\n<div class=\"gb-container gb-container-article04\"><div class=\"gb-inside-container\">\n\n<p><strong>Klju\u010dne ugotovitve<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\"><li>Proizvodni nalog dolo\u010da, kaj izdelati; terminski plan pa operacije umesti v \u010das.<\/li><\/ul>\n\n\n<ul class=\"wp-block-list\"><li>Delo sprostite \u0161ele, ko preverite proizvodne podatke, razpolo\u017eljivost materiala in kapacitete, potrebne za izvedbo.<\/li><\/ul>\n\n\n<ul class=\"wp-block-list\"><li>Spremljajte dokon\u010dane koli\u010dine in operacije, ne le, ali je bil dokument izdan.<\/li><\/ul>\n\n\n<ul class=\"wp-block-list\"><li>Podatke o nalogih, odlo\u010ditve o terminiranju in poro\u010danje iz proizvodnje pove\u017eite med seboj, vendar jih ne obravnavajte kot isto funkcijo.<\/li><\/ul>\n\n<\/div><\/div>\n\n<h2 class=\"wp-block-heading\">Delovni nalog, proizvodni nalog ali prodajno naro\u010dilo?<\/h2>\n\n\n<p>Proizvajalci za zapis, ki proizvodnji naro\u010di izdelavo, uporabljajo razli\u010dna poimenovanja. Delovni nalog in proizvodni nalog lahko ozna\u010dujeta isto vrsto zapisa. V nekaterih sistemih je proizvodni nalog nadrejeni zapis, delovni nalogi pa opisujejo posamezne operacije. Preden oblikujete poro\u010dila ali integracijo, preverite, kako izraza uporablja va\u0161 sistem.<\/p>\n\n\n<p>Prodajno naro\u010dilo bele\u017ei, kaj je naro\u010dil kupec. Za njegovo izpolnitev lahko proizvodnja potrebuje ve\u010d proizvodnih nalogov, lahko pa ga izpolni iz zaloge. Proizvodni nalog zadeva delo, potrebno za izdelavo izdelka, ne glede na to, ali povpra\u0161evanje izvira iz kup\u010devega naro\u010dila ali iz dopolnjevanja zaloge.<\/p>\n\n\n<p>Vzdr\u017eevalni delovni nalog ima druga\u010den namen: odobri servis ali popravilo opreme. Proizvodni nalog pa je namenjen izdelavi blaga. \u010ce za oba uporabljate isto splo\u0161no oznako, je seznam te\u017eko berljiv.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Zapis<\/th><th>Glavno vpra\u0161anje, na katero odgovarja<\/th><th>\u010cesa sam po sebi ne dolo\u010da<\/th><\/tr><\/thead><tbody><tr><td>Prodajno naro\u010dilo<\/td><td>Kaj potrebuje kupec?<\/td><td>Zaporedja in \u010dasovne razporeditve proizvodnih operacij<\/td><\/tr><tr><td>Proizvodni nalog<\/td><td>Kateri izdelek in v kolik\u0161ni koli\u010dini mora izdelati proizvodnja?<\/td><td>Ali je mogo\u010de vse operacije izvesti v okviru razpolo\u017eljivih kapacitet<\/td><\/tr><tr><td>Terminski plan proizvodnje<\/td><td>Kje in kdaj bodo potekale operacije?<\/td><td>Dejansko proizvedene koli\u010dine<\/td><\/tr><tr><td>Poro\u010dilo o proizvodnji<\/td><td>Katero delo in katere koli\u010dine so bile evidentirane?<\/td><td>Ali ima preostanek operacij izvedljiv terminski plan<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h2 class=\"wp-block-heading\">Katere podatke naj vsebuje delovni nalog v proizvodnji?<\/h2>\n\n\n<p>Nalog naj planiranju in proizvodnji da skupno referenco. Spodnji seznam je prakti\u010dna kontrolna lista; ne trdi, da vsi sistemi ERP uporabljajo ista polja ali da so to vsa imena polj v orodju SkyPlanner.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Oznaka naloga in sklic na povpra\u0161evanje.<\/strong> Enoli\u010dna oznaka s povezavo na kup\u010devo zahtevo ali potrebo po dopolnitvi zaloge, kjer je to relevantno.<\/li><li><strong>Izdelek in koli\u010dina.<\/strong> Izdelek, ki ga je treba izdelati, njegova ustrezna specifikacija ali revizija, zahtevana koli\u010dina in merska enota.<\/li><li><strong>Materiali.<\/strong> Potrebne komponente ali surovine, njihove koli\u010dine in podatki za preverjanje razpolo\u017eljivosti.<\/li><li><strong>Operacije.<\/strong> Proizvodno zaporedje, odvisnosti in navodila, potrebna za izvedbo dela.<\/li><li><strong>Viri in pri\u010dakovano trajanje.<\/strong> Ustrezni stroji ali delovna mesta ter \u010dasovne ocene za terminiranje, po potrebi vklju\u010dno s pripravljalnimi \u010dasi.<\/li><li><strong>Ciljni datum dokon\u010danja in prioriteta.<\/strong> Kdaj je delo potrebno in kako ga namerava planer prednostno razvrstiti glede na drugo povpra\u0161evanje.<\/li><li><strong>Evidenca izvedbe.<\/strong> Za\u010dete in dokon\u010dane operacije, proizvedene in neustrezne koli\u010dine ter nere\u0161ena vpra\u0161anja, ki vplivajo na preostalo delo.<\/li><\/ul>\n\n\n<p>Rok dokon\u010danja je cilj, ne dokaz, da bo delo do tega datuma res kon\u010dano. Prav tako je pri\u010dakovano trajanje operacije vhodni podatek za planiranje, ne izmerjen rezultat. Ta razlika naj bo pri pregledu naloga vedno vidna.<\/p>\n\n\n<p>\u010ce proizvodnja potrebuje revizijo risbe ali navodilo za kakovost, poskrbite, da ekipa prepozna veljavno razli\u010dico. Ve\u010d besedila ni vedno bolj\u0161e. Uporaben je zapis, na podlagi katerega lahko oseba potrdi, kaj izdelati, in najde navodila za izdelavo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Od povpra\u0161evanja do sprostitve in dokon\u010danja<\/h2>\n\n\n<p>Imena statusov se med sistemi razlikujejo. Spodnje faze opisujejo delo, ki ga je treba opraviti, in niso univerzalen seznam statusov.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Opredelite proizvodno zahtevo<\/h3>\n\n\n<p>Potrdite izdelek, koli\u010dino in zahtevo glede dokon\u010danja. Ugotovite, ali povpra\u0161evanje izvira iz kup\u010devega naro\u010dila, dopolnjevanja zaloge ali druge proizvodne potrebe. \u010ce se povpra\u0161evanje spremeni, posodobite proizvodno zahtevo, preden se zanesete na star izpis naloga.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Preverite podatke in razpolo\u017eljivost materiala<\/h3>\n\n\n<p>Preverite specifikacijo, zaporedje operacij in potrebne materiale. Nalog je lahko v sistemu povsem vnesen, a mu kljub temu manjka nekaj, kar je potrebno za za\u010detek dela. Manjkajo\u010do postavko ali nere\u0161eno odlo\u010ditev izrecno zabele\u017eite, namesto da bi jo proizvodnja odkrila \u0161ele po sprostitvi.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Terminirajte operacije<\/h3>\n\n\n<p>Delo umestite v razpolo\u017eljive proizvodne kapacitete. Upo\u0161tevajte zaporedje operacij, primerne vire, izmene, pripravljalne \u010dase in konkuren\u010dna naro\u010dila. <a href=\"\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">Terminiranje proizvodnje<\/a> odgovarja na drugo vpra\u0161anje kot izdaja naloga: ne le kaj je treba izdelati, ampak tudi kdaj lahko viri izvedejo posamezni korak.<\/p>\n\n\n<p>\u010ce ciljnega datuma dokon\u010danja ni mogo\u010de dose\u010di, mora planer sprejeti odlo\u010ditev. To lahko pomeni spremembo zaporedja, uporabo ustreznega nadomestnega vira ali popravek zaveze. \u017de samo tiskanje nalog z vi\u0161jo prioriteto strojnih kapacitet ne pove\u010da.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Pripravljeno delo sprostite v proizvodnjo<\/h3>\n\n\n<p>Sprostitev sporo\u010da, da lahko proizvodnja ste\u010de. Pred tem preverite, ali ima ekipa podatke in materiale za spro\u0161\u010deno delo ter izvedljivo zaporedje operacij. Ne spro\u0161\u010dajte vseh odprtih nalogov samo zato, ker obstajajo. Tako lahko nastanejo \u010dakalne vrste, ekipa pa kljub temu ne ve, kaj je na vrsti.<\/p>\n\n\n<p>Nekateri proizvajalci sprostijo celoten nalog, drugi sprostitev urejajo po operacijah ali fazah. Uporabite pristop, ki ga podpirata va\u0161 proces in sistem. Pomembno je, da sta odobritev in naslednje izvedljivo delo jasna.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Bele\u017eite napredek in se odzivajte na spremembe<\/h3>\n\n\n<p>Bele\u017eite opravljeno delo in proizvedene koli\u010dine. Za\u010det nalog ni nujno blizu dokon\u010danja: poznej\u0161a operacija morda \u0161e \u010daka na kapaciteto ali material. Napredek na ravni operacij vam poka\u017ee, kaj \u0161e ostaja.<\/p>\n\n\n<p>\u010ce se koli\u010dina spremeni, vir postane nerazpolo\u017eljiv ali neustrezni izdelki zahtevajo dodatno delo, preglejte prizadete operacije in njihove odvisnosti. Terminski plan posodobite glede na trenutno stanje, nato pa nastalo zaporedje sporo\u010dite proizvodnji.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Uskladite in zaprite<\/h3>\n\n\n<p>Pred zaprtjem naloga uskladite zahtevano koli\u010dino s poro\u010dano proizvodnjo ter preverite nere\u0161ene operacije ali izjeme. Zaprtje naj odra\u017ea opravljeno delo, ne le konec na\u010drtovanega \u010dasovnega okna. Natan\u010den postopek zaprtja in obra\u010duna stro\u0161kov je odvisen od sistema, v katerem se proizvodni nalog vodi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer: popoln nalog \u0161e vedno potrebuje terminski plan<\/h2>\n\n\n<p>Vzemimo hipoteti\u010den nalog za serijo kovinskih nosilcev. Tehnolo\u0161ki postopek sestavljajo razrez, krivljenje in kontrola. Nalog dolo\u010da izdelek, koli\u010dino, material in zahtevani datum dokon\u010danja. Primer ne namiguje na noben rezultat pri stranki ali izmerjen preto\u010dni \u010das.<\/p>\n\n\n<p>Rezalni stroj je prost, upogibni stroj pa je \u017ee dodeljen drugemu nalogu. \u010ce novo serijo takoj razre\u017eemo, se material morda le premakne v <a href=\"\/sl\/viri\/ozka-grla-v-proizvodnji\/\">\u010dakalno vrsto pred upogibanjem<\/a>. Dokument naloga je popoln, zaporedje operacij pa \u0161e ni izvedljiv terminski na\u010drt.<\/p>\n\n\n<p>Planer preveri, kdaj bodo na voljo kapacitete za krivljenje, in razrez terminira tako, da lahko njegov izdelek preide na naslednjo operacijo. Kontrola sledi krivljenju. \u010ce obstaja ustrezen nadomestni krivilni stroj, lahko planer preu\u010di to mo\u017enost, namesto da bi predpostavil, da delo opravi kateri koli stroj.<\/p>\n\n\n<p>Recimo zdaj, da razrez poro\u010da manj dobrih kosov, kot jih zahteva nalog. Planer potrebuje proizvedene in neustrezne koli\u010dine, ne le oznake, da je razrez kon\u010dan. Na podlagi teh podatkov se lahko ekipa odlo\u010di, kako nadomestiti primanjkljaj, in popravi preostalo delo.<\/p>\n\n\n<p>Nauk je prakti\u010den: nalog daje referenco, terminski plan usklajuje vire, poro\u010danje o izvedbi pa planiranju pove, kaj se je dejansko zgodilo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pogoste te\u017eave z ro\u010dnimi seznami nalogov<\/h2>\n\n\n<p>Preglednica ali natisnjen nalog je lahko uporaben kot zapis. Te\u017eave nastanejo, ko postane lo\u010dena razli\u010dica stanja v proizvodnji.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Te\u017eava<\/th><th>Kaj mora planer preveriti<\/th><th>Koristen odziv<\/th><\/tr><\/thead><tbody><tr><td>Koli\u010dina ali rok sta se spremenila<\/td><td>Katera razli\u010dica je veljavna in katere operacije so prizadete<\/td><td>Posodobite zahtevo in preglejte preostali terminski plan<\/td><\/tr><tr><td>Ve\u010d nalogov se poteguje za isti stroj<\/td><td>Obremenitev, razpolo\u017eljivost virov in prioritete<\/td><td>Izberite izvedljivo zaporedje, namesto da dodelite \u010dasovne okvire, ki se prekrivajo<\/td><\/tr><tr><td>Nalog je ozna\u010den kot za\u010det, napredek pa je nejasen<\/td><td>Dokon\u010dane operacije, koli\u010dina dobrih izdelkov in \u0161e potrebno delo<\/td><td>Preostalo delo ugotovite iz zapisov o izvedbi<\/td><\/tr><tr><td>Natisnjen nalog je pripravljen, a materiala ni<\/td><td>Razpolo\u017eljivost za operacije, ki se spro\u0161\u010dajo<\/td><td>Prizadeto delo zadr\u017eite ali prilagodite njegovo sprostitev in termin<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Dodajanje novih statusnih barv ne odpravi manjkajo\u010dih informacij. Najprej se dogovorite, kje se vodijo trenutne zahteve, terminski plan in sporo\u010deni napredek ter kdo posodablja posamezno od teh treh stvari.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kako SkyPlanner povezuje naloge s terminiranjem proizvodnje<\/h2>\n\n\n<p><a href=\"\/sl\/\">Programska oprema SkyPlanner za terminiranje proizvodnje<\/a> povezuje naloge in njihove postavke s procesnimi koraki, ki jih je treba terminirati. Postavka naloga je vrstica na nalogu. Njeni proizvodni koraki imajo trajanja, ustrezna delovna mesta in odvisnosti, ki dolo\u010dajo, kako lahko delo poteka.<\/p>\n\n\n<p>\u010casovnica Gantt v programu SkyPlanner prikazuje terminirano delo. Planerji lahko posamezna opravila prilagodijo in terminski plan ponovno izra\u010dunajo; na voljo je tudi samodejno preterminiranje. Prioritete dolo\u010di planer, Arcturus AI pa delo razporedi v skladu s temi prioritetami in nastavljenimi proizvodnimi omejitvami.<\/p>\n\n\n<p>Upravljanje nalogov, terminiranje in poro\u010danje ostajajo lo\u010dene funkcije. SkyPlanner podpira bele\u017eenje \u010dasa ter proizvedenih in izmetnih koli\u010din, pa tudi poro\u010dila o postavkah naloga. Ti zapisi planerjem pomagajo pregledati izvedbo skupaj s terminiranim delom. Nalog in terminski plan zaradi njih \u0161e nista zamenljiva.<\/p>\n\n\n<p>SkyPlanner se z vsakim sistemom ERP ali MES povezuje prek odprtega vmesnika REST API. <a href=\"\/sl\/integracije\/\">Integracijske zmo\u017enosti<\/a> vklju\u010dujejo podatke o nalogih in njihovih postavkah, izdelke in materiale, Time Logs ter dostop do terminiranih \u010dasov procesnih korakov in delovnih mest. To ne pomeni, da ima vsak ERP \u017ee pripravljen izvorni konektor. Integracija povezuje odgovornosti posameznih sistemov, ne zahteva pa, da bi zapis proizvodnega naloga v sistemu ERP nadomestili z drugim.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Piristeel: od papirnatih nalogov do vidnega terminiranega dela<\/h3>\n\n\n<p><a href=\"\/sl\/zgodbe-strank\/piristeel\/\">Objavljena zgodba stranke Piristeel<\/a> opisuje proizvodni proces, ki se je prej opiral na preglednice in natisnjene delovne naloge, ki so jih nosili v proizvodnjo. Podjetje ni imelo pregleda nad obremenitvijo kapacitet in nad tem, kako dale\u010d naprej je delo terminirano.<\/p>\n\n\n<p>V zgodbi Piristeel navaja, da SkyPlanner zdaj samodejno opravlja podrobno terminiranje, obremenitev po oddelkih pa prikazuje na \u010dasovnici Gantt. Primer ka\u017ee razliko med izdajo delovnega naloga in vpogledom v to, kam v proizvodnji sodijo njegove operacije. Gre za izku\u0161njo stranke, ne za jamstvo enakega izida pri vsakem proizvajalcu.<\/p>\n\n\n<p>\u010ce so va\u0161i zapisi o nalogih popolni, pa se ekipa \u0161e vedno te\u017eko odlo\u010di, kaj lahko te\u010de naslednje, preglejte povezavo med temi zapisi, razpolo\u017eljivimi kapacitetami in poro\u010danjem o izvedbi. Rezervirajte predstavitev prek spletnega mesta SkyPlanner in poglejte, kako bi se postavke va\u0161ih nalogov in zaporedje operacij prikazali v proizvodnem terminskem planu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pogosta vpra\u0161anja<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Kaj je delovni nalog v proizvodnji?<\/h3>\n\n\n<p>Delovni nalog v proizvodnji odobri izdelavo dolo\u010dene koli\u010dine izdelka ter slu\u017ei kot referenca za potrebne materiale, operacije, vire in rok dokon\u010danja. Nana\u0161a se na izdelavo blaga, ne na servisiranje sredstva. Kdaj in kje se lahko operacije izvedejo, dolo\u010da lo\u010den terminski plan proizvodnje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kak\u0161na je razlika med delovnim nalogom in proizvodnim nalogom?<\/h3>\n\n\n<p>Poimenovanja so odvisna od sistema. Lahko ozna\u010dujejo isti proizvodni zapis, lahko pa proizvodni nalog vsebuje delovne naloge za posamezne operacije. Preden predpostavite, da ena oznaka vedno pomeni ve\u010djo ali manj\u0161o enoto dela, preverite terminologijo in razmerja v svojem sistemu ERP ali MES.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Katere podatke naj vsebuje delovni nalog v proizvodnji?<\/h3>\n\n\n<p>Vklju\u010dite identifikator, specifikacijo izdelka, koli\u010dino in enoto, potrebne materiale, zaporedje operacij, ustrezne vire, pri\u010dakovana trajanja in rok dokon\u010danja. Zapisi o izvedbi naj ka\u017eejo napredek ter proizvedene in izmetne koli\u010dine. To je prakti\u010den kontrolni seznam; poimenovanja polj in porazdelitev podatkov med povezanimi zapisi se od sistema do sistema razlikujejo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kdaj naj se delovni nalog sprosti v proizvodnjo?<\/h3>\n\n\n<p>Sprostite ga, ko ima ekipa dovoljenje za za\u010detek dela ter so preverjeni potrebni podatki, materiali in zaporedje izvedbe. Vnesen nalog \u0161e ni samodejno pripravljen za za\u010detek. Glede na va\u0161 proces se sprostitev lahko nana\u0161a na celoten nalog ali le na operacije, ki so pripravljene.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kako terminiranje proizvodnje pomaga pri upravljanju delovnih nalogov?<\/h3>\n\n\n<p>Terminiranje razporedi operacije naloga v \u010dasovne termine na ustreznih virih, pri tem pa upo\u0161teva odvisnosti in razpolo\u017eljive kapacitete. Poka\u017ee konflikte, ki jih sam nalog ne more razkriti. Ko se spremenijo zahteve ali sporo\u010deni napredek, lahko planer preostalo delo pregleda in ponovno izra\u010duna, namesto da se zana\u0161a na zastarel seznam.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is a manufacturing work order?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A manufacturing work order authorizes a defined quantity of a product to be made and provides a reference for the required materials, operations, resources and completion target. It concerns producing goods, not servicing an asset. A separate production schedule determines when and where the operations can run.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between a work order and a production order?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The names depend on the system. They can refer to the same manufacturing record, or a production order can contain work orders for individual operations. Check the terminology and relationships in your ERP or MES before assuming that one name always means a larger or smaller unit of work.\"}},{\"@type\":\"Question\",\"name\":\"What information should a manufacturing work order contain?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Include an identifier, product specification, quantity and unit, required materials, operation sequence, eligible resources, expected durations and completion target. Execution records should identify progress and produced and faulty quantities. This is a practical checklist; field names and the division of information between linked records vary by system.\"}},{\"@type\":\"Question\",\"name\":\"When should a work order be released to production?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Release it when the team is authorized to proceed and the required information, materials and execution sequence have been checked. An entered order is not automatically ready to start. Depending on your process, release may apply to the whole order or only to the operations that are ready.\"}},{\"@type\":\"Question\",\"name\":\"How does production scheduling help manage work orders?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Scheduling places the order's operations into time slots on eligible resources while considering dependencies and available capacity. It exposes conflicts that the order document alone cannot show. When requirements or reported progress change, the planner can review and recalculate the remaining work rather than rely on an outdated list.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka Domov &raquo; Viri &raquo; Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka Proizvodni nalog je zapis, ki odobri izdelavo dolo\u010dene koli\u010dine izdelka in vsebuje podatke, potrebne za izvedbo dela. Povezuje proizvodno zahtevo z materiali, operacijami, viri in ciljnim datumom dokon\u010danja. Sam po sebi \u0161e ni terminski plan &#8230; <a title=\"Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/\" aria-label=\"Read more about Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":96981,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-96511","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Delovni nalog: od sprostitve do zaklju\u010dka &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Kaj vsebuje proizvodni nalog, kako ga sprostiti in spremljati ter kako terminiranje proizvodnje pove\u017ee nalog z delom v proizvodnji.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka\" \/>\n<meta property=\"og:description\" content=\"Kaj vsebuje proizvodni nalog, kako ga sprostiti in spremljati ter kako terminiranje proizvodnje pove\u017ee nalog z delom v proizvodnji.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T08:15:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T10:28:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka\",\"datePublished\":\"2026-10-08T08:15:39+00:00\",\"dateModified\":\"2026-10-08T10:28:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/\"},\"wordCount\":2131,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-work-orders-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/\",\"name\":\"Delovni nalog: od sprostitve do zaklju\u010dka &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-work-orders-hero.png\",\"datePublished\":\"2026-10-08T08:15:39+00:00\",\"dateModified\":\"2026-10-08T10:28:55+00:00\",\"description\":\"Kaj vsebuje proizvodni nalog, kako ga sprostiti in spremljati ter kako terminiranje proizvodnje pove\u017ee nalog z delom v proizvodnji.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-work-orders-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-work-orders-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Work order sheet beside machined parts, a drawing and raw materials needed for production.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/proizvodni-nalog\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Delovni nalog: od sprostitve do zaklju\u010dka &#8211; SkyPlanner","description":"Kaj vsebuje proizvodni nalog, kako ga sprostiti in spremljati ter kako terminiranje proizvodnje pove\u017ee nalog z delom v proizvodnji.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/","og_locale":"sl_SI","og_type":"article","og_title":"Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka","og_description":"Kaj vsebuje proizvodni nalog, kako ga sprostiti in spremljati ter kako terminiranje proizvodnje pove\u017ee nalog z delom v proizvodnji.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T08:15:39+00:00","article_modified_time":"2026-10-08T10:28:55+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"10 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka","datePublished":"2026-10-08T08:15:39+00:00","dateModified":"2026-10-08T10:28:55+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/"},"wordCount":2131,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero.png","articleSection":["APS &amp; Scheduling","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/","name":"Delovni nalog: od sprostitve do zaklju\u010dka &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero.png","datePublished":"2026-10-08T08:15:39+00:00","dateModified":"2026-10-08T10:28:55+00:00","description":"Kaj vsebuje proizvodni nalog, kako ga sprostiti in spremljati ter kako terminiranje proizvodnje pove\u017ee nalog z delom v proizvodnji.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero.png","width":1672,"height":941,"caption":"Work order sheet beside machined parts, a drawing and raw materials needed for production."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-nalog\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-work-orders-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka Domov &raquo; Viri &raquo; Delovni nalog v proizvodnji: od sprostitve do zaklju\u010dka Proizvodni nalog je zapis, ki odobri izdelavo dolo\u010dene koli\u010dine izdelka in vsebuje podatke, potrebne za izvedbo dela. Povezuje proizvodno zahtevo z materiali, operacijami, viri in ciljnim datumom dokon\u010danja. Sam po sebi \u0161e ni terminski plan&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/96511","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=96511"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/96511\/revisions"}],"predecessor-version":[{"id":96968,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/96511\/revisions\/96968"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/96981"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=96511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=96511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=96511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}