{"id":96278,"date":"2026-10-04T08:52:42","date_gmt":"2026-10-04T08:52:42","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96278"},"modified":"2026-10-19T14:42:56","modified_gmt":"2026-10-19T14:42:56","slug":"planiranje-maloserijske-proizvodnje","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/","title":{"rendered":"Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n\n<h1 class=\"wp-block-heading\">Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba<\/h1>\n\n\n<p>Rezkalni stroj je prost, ohi\u0161je je pripravljeno, vodja pa \u017eeli, da proizvodnja te\u010de naprej. Za\u010detek obdelave se zdi o\u010ditna odlo\u010ditev. Toda \u010dez eno uro bo s stru\u017enice pri\u0161el nujen zati\u010d, ki potrebuje isti rezkalni stroj. Ko se za\u010dne obdelava ohi\u0161ja, je rok dobave zati\u010da \u017ee ogro\u017een.<\/p>\n\n\n<p>To je vsakodnevni izziv proizvodnje job shop: naslednja operacija na vsakem stroju vpliva na naro\u010dila, ki se obdelujejo na drugih strojih. Zaseden delovni center \u0161e ne pomeni, da v obratu izdelujejo tisto, kar je v danem trenutku najpomembnej\u0161e.<\/p>\n\n\n<p>Terminiranje proizvodnje job shop povezuje te odlo\u010ditve. Operacije posameznega naro\u010dila razporedi v razpolo\u017eljivi \u010das proizvodnih virov, pri tem pa upo\u0161teva tehnolo\u0161ki postopek in prednost naro\u010dila glede na dobavo. <a href=\"\/sl\/\">SkyPlanner APS<\/a> za vas izra\u010duna terminski plan, zato vodja dobi zaporedje naslednjih operacij iz usklajenega plana, namesto da bi moral znova pospe\u0161evati posamezna naro\u010dila.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je terminiranje proizvodnje job shop?<\/h2>\n\n\n<p><strong>Terminiranje proizvodnje job shop pomeni dodeljevanje proizvodnih operacij skupnim virom in dolo\u010danje njihovega zaporedja, kadar lahko izdelki sledijo razli\u010dnim tehnolo\u0161kim postopkom.<\/strong> Dolo\u010da, kje se posamezna operacija izvaja, kdaj se za\u010dne in kon\u010da ter kako se povezuje s preostalimi operacijami naloga.<\/p>\n\n\n<p>Ohi\u0161je lahko potrebuje \u017eaganje, rezkanje in kontrolo. Zati\u010d pa stru\u017eenje, rezkanje in kontrolo. Oba uporabljata isti rezkalni stroj, vendar nobeno od naro\u010dil ne poteka po eni sami proizvodni liniji. Drug kos lahko uporablja isto opremo v druga\u010dnem zaporedju.<\/p>\n\n\n<p>Klju\u010dna enota je operacija, ne le naro\u010dilo. Podatek, da naro\u010dilo zahteva pet ur dela, ne pove, kateri stroj bo toliko \u010dasa zaseden ali kdaj bo naslednja operacija pripravljena za izvedbo. <a href=\"\/sl\/viri\/proizvodni-postopek\/\">Tehnolo\u0161ki postopek<\/a> dolo\u010da zaporedje, terminski plan pa delo razporedi po \u010dasu in proizvodnih virih.<\/p>\n\n\n<p>Da je terminski plan izvedljiv, mora izpolnjevati dva osnovna pogoja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li>Operacija mora upo\u0161tevati predhodne operacije, od katerih je odvisna.<\/li>\n<li>Proizvodnemu viru ne smemo hkrati dodeliti ve\u010d dela, kot ga lahko opravi.<\/li>\n<\/ul>\n\n\n<p>V klasi\u010dnem problemu terminiranja job shop imajo operacije dolo\u010dene stroje in potekajo brez prekinitev. V dejanski tovarni je treba upo\u0161tevati \u0161e delovne izmene, pripravljalni \u010das, ljudi, orodja, razpolo\u017eljivost materiala in poro\u010dila o napredku. To niso podrobnosti, ki bi jih lahko uredili pozneje: od njih je odvisno, ali se naslednja operacija sploh lahko za\u010dne.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Job shop, flow shop in izdelava po naro\u010dilu so razli\u010dni pojmi<\/h3>\n\n\n<p>Pri proizvodnji <strong>flow shop<\/strong> se izdelki obdelujejo na strojih v enakem zaporedju. Pri proizvodnji <strong>job shop<\/strong> se tehnolo\u0161ki postopki lahko razlikujejo. <strong>Fleksibilni job shop<\/strong> omogo\u010da tudi izvedbo nekaterih operacij na enem od ve\u010d ustreznih strojev, zato je treba odlo\u010diti \u0161e, na katerem stroju jih bomo izvedli.<\/p>\n\n\n<p><strong>Izdelava po naro\u010dilu<\/strong> opisuje, kaj spro\u017ei proizvodnjo \u2013 naro\u010dilo kupca \u2013 in ne, po katerem tehnolo\u0161kem postopku poteka delo v tovarni. Proizvajalec, ki izdeluje po naro\u010dilu, lahko uporablja razli\u010dne tehnolo\u0161ke postopke (job shop) ali skupno zaporedje operacij (flow shop). Majhne serije in izdelki po meri so v proizvodnji tipa job shop pogosti, vendar ne eno ne drugo ne opredeljuje terminiranja v tak\u0161ni proizvodnji. <a href=\"\/sl\/viri\/proizvodnja-velike-raznolikosti-in-majhnih-kolicin\/\">Proizvodnja \u0161irokega nabora izdelkov v majhnih koli\u010dinah<\/a> odpira \u0161e drugo vpra\u0161anje: kako ponuditi \u0161irok nabor izdelkov, ne da bi priprava in spreminjajo\u010de se delovne obremenitve izni\u010dile mar\u017eo.<\/p>\n\n\n<p>Ta vodnik obravnava <a href=\"\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">terminiranje proizvodnje<\/a> v okolju job shop: usklajevanje razli\u010dnih tehnolo\u0161kih postopkov na skupnih proizvodnih virih.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer z izra\u010dunom: naj prost rezkalni stroj za\u010dne naslednjo operacijo?<\/h2>\n\n\n<p>Predstavljajte si dve naro\u010dili, pripravljeni za za\u010detek proizvodnje ob 08:00. Vsak delovni center ima svojega operaterja, vsi proizvodni viri so ves \u010das primera na voljo, spodaj navedeni \u010dasi pa vklju\u010dujejo vse delo v posameznem koraku. Dodatnih priprav, odmorov ali transporta ni. Vsaka operacija se mora kon\u010dati, preden se za\u010dne naslednja, po za\u010detku pa poteka brez prekinitev.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Naro\u010dilo<\/th>\n<th>Tehnolo\u0161ki postopek in trajanje operacij<\/th>\n<th>Rok dokon\u010danja<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Ohi\u0161je<\/td>\n<td>\u017daga: 1 ura \u2192 Rezkalni stroj: 3 ure \u2192 Kontrola: 1 ura<\/td>\n<td>15:00<\/td>\n<\/tr>\n<tr>\n<td>Zati\u010d<\/td>\n<td>Stru\u017enica: 2 uri \u2192 Rezkalni stroj: 1 ura \u2192 Kontrola: 1 ura<\/td>\n<td>12:00<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>\u017daga re\u017ee ohi\u0161je od 08:00 do 09:00. Hkrati na stru\u017enici poteka stru\u017eenje zati\u010da od 08:00 do 10:00. Ob 09:00 je ohi\u0161je pripravljeno za rezkanje, zati\u010d pa \u0161e ne.<\/p>\n\n\n<p><strong>\u010ce rezkalni stroj prevzame prvo pripravljeno operacijo<\/strong>, obdelava ohi\u0161ja poteka od 09:00 do 12:00. Zati\u010d \u010daka, nato pa se obdeluje od 12:00 do 13:00. Kontrola ohi\u0161ja se kon\u010da ob 13:00, kontrola zati\u010da pa ob 14:00. Stroji so upo\u0161tevali predpisane tehnolo\u0161ke postopke, vendar zati\u010d zamuja dve uri.<\/p>\n\n\n<p><strong>\u010ce terminski plan daje prednost roku za zati\u010d<\/strong>, rezkalni stroj po\u010daka do 10:00, rezka zati\u010d do 11:00, nato pa ohi\u0161je do 14:00. Kontrola zati\u010da se kon\u010da ob 12:00, kontrola ohi\u0161ja pa ob 15:00. Obe naro\u010dili sta kon\u010dani v roku.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Rezultat<\/th>\n<th>Zaporedje po pripravljenosti<\/th>\n<th>Zaporedje, ki upo\u0161teva rok<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Zaporedje rezkanja<\/td>\n<td>Ohi\u0161je, nato zati\u010d<\/td>\n<td>Zati\u010d, nato ohi\u0161je<\/td>\n<\/tr>\n<tr>\n<td>Dokon\u010danje zati\u010da<\/td>\n<td>14:00<\/td>\n<td>12:00<\/td>\n<\/tr>\n<tr>\n<td>Dokon\u010danje ohi\u0161ja<\/td>\n<td>13:00<\/td>\n<td>15:00<\/td>\n<\/tr>\n<tr>\n<td>Dokon\u010danje obeh naro\u010dil<\/td>\n<td>14:00<\/td>\n<td>15:00<\/td>\n<\/tr>\n<tr>\n<td>Izpolnitev dogovorjenih rokov<\/td>\n<td>Zati\u010d zamuja<\/td>\n<td>Oba roka izpolnjena<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Rezkalni stroj namenoma eno uro miruje. \u010ce bi ta \u010das zapolnili z neprekinjeno triurno operacijo, bi nujnemu naro\u010dilu prepre\u010dili obdelavo. Tudi zgodnej\u0161e dokon\u010danje vseh naro\u010dil ni samodejno bolj\u0161e: pri prvem zaporedju je vse kon\u010dano ob 14:00, vendar dogovorjeni rok za zati\u010d ni izpolnjen.<\/p>\n\n\n<p>Pri dveh naro\u010dilih planer lahko prepozna tak kompromis. Pri ve\u010d sto operacijah pa se isto vpra\u0161anje hkrati pojavlja v \u0161tevilnih \u010dakalnih vrstah. Vrednost sistema SkyPlanner je v tem, da poskrbi za terminiranje medsebojno povezanih operacij, vi pa odlo\u010date, katere obveznosti imajo prednost.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Dolo\u010dajte prioritete celotnih naro\u010dil, ne posameznih \u010dakalnih vrst<\/h2>\n\n\n<p>Pravilo za izbiro naslednje operacije dolo\u010da, katera pripravljena operacija bo naslednja na delovnem centru. Terminski plan pa zajema celotno plansko obdobje in celoten tehnolo\u0161ki postopek. Tak\u0161na pravila so uporabna, vendar mora lokalna izbira podpirati \u0161ir\u0161i plan dobav.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Metoda<\/th>\n<th>\u010cemu daje prednost<\/th>\n<th>Na kaj paziti<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Prvi prispe, prvi se obdela<\/td>\n<td>Delu, ki je prispelo prvo<\/td>\n<td>Nujna operacija, ki prispe pozneje, lahko \u010daka za manj nujnimi operacijami<\/td>\n<\/tr>\n<tr>\n<td>Najzgodnej\u0161i rok<\/td>\n<td>Naro\u010dilu z najbli\u017ejim rokom<\/td>\n<td>Naro\u010dilo s poznej\u0161im rokom ima lahko \u0161e precej ve\u010d preostalega dela<\/td>\n<\/tr>\n<tr>\n<td>Najkraj\u0161i \u010das obdelave<\/td>\n<td>Kratkim operacijam, pripravljenim za izvedbo<\/td>\n<td>Dolge operacije se lahko nenehno pomikajo nazaj v vrsti<\/td>\n<\/tr>\n<tr>\n<td>Najmanj\u0161a \u010dasovna rezerva<\/td>\n<td>Najmanj\u0161i razliki med razpolo\u017eljivim \u010dasom in preostalim delom<\/td>\n<td>Nerealne ocene preostalega \u010dasa ustvarijo napa\u010dno sliko o nujnosti<\/td>\n<\/tr>\n<tr>\n<td>Zdru\u017eevanje glede na pripravo<\/td>\n<td>Skupni izvedbi podobnih operacij<\/td>\n<td>Prihranek pri pripravi je lahko dose\u017een na ra\u010dun dogovorjenega roka dobave<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Nobeno posamezno pravilo ne re\u0161i vseh konfliktov pri proizvodnji job shop. V na\u0161em primeru zati\u010d ob prihodu ohi\u0161ja \u0161e niti ni pripravljen za rezkanje. Pravilo, ki razvr\u0161\u010da samo pripravljene operacije, zati\u010da ne more upo\u0161tevati, razen \u010de \u0161ir\u0161i plan zanj vnaprej zagotovi potrebno kapaciteto.<\/p>\n\n\n<p>Matemati\u010dna optimizacija in hevristi\u010dne metode iskanja ta \u0161ir\u0161i problem re\u0161ujejo s primerjanjem dodelitev in zaporedij ob upo\u0161tevanju omejitev. Pomemben je cilj: minimiziranje <strong>skupnega trajanja izvedbe (makespan)<\/strong>, torej \u010dasa do dokon\u010danja vseh nalogov, ni enako minimiziranju zamud ali zagotavljanju roka za dolo\u010deno naro\u010dilo kupca. Za vodenje obrata vam ni treba izbrati algoritma, morate pa sistemu za terminiranje dolo\u010diti, kaj \u0161teje za dober rezultat.<\/p>\n\n\n<p>\u010ce proizvodnjo vodijo dobavni roki, za\u010dnite z roki dokon\u010danja naro\u010dil in prioritetami. Nato preverite obremenitev ozkih grl, obseg priprav in nedokon\u010dano proizvodnjo. Terminski plan, ki je videti u\u010dinkovit, a povzro\u010da zamude pri nujnih naro\u010dilih, re\u0161uje napa\u010den poslovni problem.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izdelajte plan proizvodnje job shop v sistemu SkyPlanner<\/h2>\n\n\n<p>SkyPlanner zdru\u017euje operacije, delovne centre, izmene, operaterje, prioritete in materiale v terminski plan proizvodnje z omejenimi kapacitetami. Njegova umetna inteligenca za terminiranje, <strong>Arcturus<\/strong>, izra\u010duna razporeditev operacij glede na nastavljene proizvodne vire in odvisnosti. Prikaz Gantt poka\u017ee rezultat kot zaporedja operacij po delovnih centrih in povezane korake tehnolo\u0161kega postopka.<\/p>\n\n\n<p>V praksi to pomeni, da vam za ugotavljanje roka dokon\u010danja enega naro\u010dila ni ve\u010d treba posebej sestavljati zaporedja operacij na vsakem stroju. Sledite lahko njegovemu terminiranemu postopku, vidite, kje \u010daka, in preverite vpliv spremembe na drugo delo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Vsaki operaciji dolo\u010dite ustrezno mesto v postopku in realno trajanje<\/h3>\n\n\n<p>Dolo\u010dite korake tehnolo\u0161kega postopka, njihovo zaporedje in delovne centre, ki jih lahko izvedejo. Vklju\u010dite \u010das obdelave in pripravljalni \u010das ter potrebno \u010dakanje med koraki. Nadomestni stroj je uporaben le, \u010de je primeren za izvedbo te operacije.<\/p>\n\n\n<p>SkyPlanner terminira tehnolo\u0161ke postopke, ki jih vnesete; Arcturus ne dolo\u010da zaporedja izdelave. Za\u010dnite z reprezentativno dru\u017eino izdelkov in podatke o operacijah preverite z ljudmi, ki delo izvajajo. Zaradi manjkajo\u010de kontrole ali preve\u010d optimisti\u010dne ocene pripravljalnega \u010dasa lahko na videz privla\u010den terminski plan postane neizvedljiv.<\/p>\n\n\n<p><strong>SkyPlanner se prek odprtega REST API pove\u017ee s katerim koli sistemom ERP ali MES.<\/strong> Obstoje\u010de podatke o naro\u010dilih in proizvodnji lahko pove\u017eete s terminiranjem, ne da bi zamenjali sistem, ki te podatke \u017ee dobro upravlja. Dogovorite se, kateri sistem bo odgovoren za tehnolo\u0161ke postopke, roke in posodobitve napredka, da bo terminski plan ostal usklajen s proizvodnjo. <a href=\"\/sl\/integracije\/\">Razi\u0161\u010dite mo\u017enosti povezovanja s sistemom SkyPlanner<\/a>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Modelirajte kapacitete, s katerimi lahko delo dejansko opravite<\/h3>\n\n\n<p>Vnesite razpolo\u017eljivost delovnih centrov in delovne izmene, nato upo\u0161tevajte \u0161e operaterje in druge pomembne omejitve virov. Dva prosta stroja ne omogo\u010data so\u010dasnega izvajanja dveh operacij, \u010de oba ves \u010das potrebujeta istega operaterja.<\/p>\n\n\n<p><a href=\"\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/\">Terminiranje z omejenimi kapacitetami<\/a> prepre\u010duje, da bi se plan opiral na kapacitete, ki so \u017ee zasedene. \u010ce je omogo\u010deno upo\u0161tevanje materiala pri terminiranju, je v izra\u010dun vklju\u010dena tudi njegova razpolo\u017eljivost. Te podatke redno posodabljajte, namesto da bi pomanjkanje materiala odkrivali \u0161ele v proizvodnji, ko je delo \u017ee spro\u0161\u010deno v izvedbo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Dolo\u010dite prioritete in zaklenite delo, ki mora ostati na svojem mestu<\/h3>\n\n\n<p>Z dinami\u010dnimi prioritetami v SkyPlanner usmerite izra\u010dun terminskega plana tako, da upo\u0161teva dejavnike dobave in proizvodnje, ki so pomembni za va\u0161e podjetje. Prioritete dolo\u010dite vi, Arcturus pa jih upo\u0161teva pri izra\u010dunu.<\/p>\n\n\n<p>Zaklenite razporeditve, ki jih je treba ohraniti \u2014 na primer delo v bli\u017enji prihodnosti, na katero so se operaterji \u017ee pripravili. Tako dose\u017eete koristno ravnovesje: preostali terminski plan se lahko prilagaja, ne da bi bila vsaka \u017ee pripravljena operacija na voljo za premikanje. Zaklepanje je odlo\u010ditev planerja, ne razlog za zamrznitev celotnega plana. Preve\u010d zaklenjenega dela omejuje mo\u017enosti odzivanja na spremembe.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Preverite rezultat vse do zadnje operacije<\/h3>\n\n\n<p>Preverite, kdaj bo naro\u010dilo dokon\u010dano, ne le prvega prostega termina ali naslednjega stroja. V primeru z ohi\u0161jem in zati\u010dem samo zaporedje rezkanja ni dovolj: zati\u010d mora pred dogovorjenim rokom ob 12:00 prestati \u0161e kontrolo.<\/p>\n\n\n<p>Terminski plan v diagramu Gantt prikazuje razporeditve, \u010dakanje in nadaljnje operacije. Z njim preverite ogro\u017eene dobavne roke in vire, zaradi katerih prihaja do te\u017eav. \u010ce potrebnega dela \u0161e vedno ni mogo\u010de umestiti v razpolo\u017eljivi \u010das, sprememba zaporedja morda ne bo dovolj. Morda boste potrebovali dodaten delovni \u010das z zagotovljenimi operaterji, drug ustrezen vir ali spremembo dogovorjenega roka. <a href=\"\/sl\/viri\/planiranje-proizvodnih-kapacitet\/\">Planiranje proizvodnih kapacitet<\/a> vam pomaga oceniti te mo\u017enosti.<\/p>\n\n\n<p><a href=\"\/sl\/funkcije\/\">Oglejte si funkcije terminiranja v SkyPlanner<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ob spremembah v proizvodnji ponovno izra\u010dunajte plan medsebojno povezanih operacij<\/h2>\n\n\n<p>Nujno naro\u010dilo, <a href=\"\/sl\/viri\/ponovno-terminiranje-proizvodnje-po-okvari-stroja\/\">zastoj stroja<\/a> ali operacija, ki traja dlje od pri\u010dakovanega, ne spremeni le ene \u010dakalne vrste. \u010ce nujno operacijo prestavimo na zgodnej\u0161i termin, lahko zasede zmogljivosti, ki bi jih drugo naro\u010dilo potrebovalo pozneje v svojem tehnolo\u0161kem postopku.<\/p>\n\n\n<p>V SkyPlanner zabele\u017eite spremembo prioritete, kapacitet ali napredka, nato pa naj Arcturus ponovno izra\u010duna plan glede na novo stanje. Preden potrdite naslednji dobavni rok, preverite izra\u010dunane termine dokon\u010danja. Klju\u010dno vpra\u0161anje ni le \u00bbali lahko to operacijo \u0161e stisnemo na rezkalni stroj?\u00ab, temve\u010d \u00bbkaj se bo zgodilo z naro\u010dili, za katera smo roke \u017ee obljubili?\u00ab<\/p>\n\n\n<p>\u010ce je <strong>Autopilot omogo\u010den<\/strong>, lahko SkyPlanner spro\u017ei ponovno terminiranje ob nastavljenih dogodkih ali po \u010dasovniku, pri tem pa \u0161e naprej upo\u0161teva va\u0161a pravila in zaklepe. Plan lahko tako ostaja a\u017euren, ne da bi ga moral planer nenehno ro\u010dno sestavljati na novo. To\u010dne posodobitve so \u0161e vedno pomembne: programska oprema pri planiranju ne more upo\u0161tevati zastoja stroja, ki ga nih\u010de ni zabele\u017eil.<\/p>\n\n\n<p>Zaposleni v proizvodnji dobijo jasnej\u0161i pregled nad zaporedjem naslednjih operacij. Planerju pa ostane \u010das za re\u0161evanje izjem \u2014 pomembno dobavo, odlo\u010ditev o kapacitetah ali pogovor s stranko \u2014 namesto da bi ro\u010dno premikal vsako operacijo, na katero vpliva sprememba.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj se je s tem spremenilo v podjetju Mamec<\/h2>\n\n\n<p>Mamec, finski proizvajalec industrijske me\u0161alne opreme in pogodbeni izdelovalec visokotehnolo\u0161kih izdelkov, je imel na tiso\u010de medsebojno odvisnih delovnih nalogov. Pred uvedbo SkyPlanner so vodje dolo\u010dali prioritete dela glede na dobavne roke na papirnih nalogih. Funkcije planiranja v sistemu ERP podjetju niso omogo\u010dale celovitega pregleda, ro\u010dno obvladovanje medsebojnih odvisnosti pa je obremenjevalo vodenje proizvodnje.<\/p>\n\n\n<p>Mamec je izbral SkyPlanner, ker se je lahko prilagajal spreminjajo\u010demu se naboru delovnih nalogov, katerih izvedba je trajala od nekaj minut do osem ur. SkyPlanner je povezal z obstoje\u010dim sistemom Oscar ERP in ga uvedel kot glavno platformo za planiranje proizvodnje.<\/p>\n\n\n<p>Terminiranje z omejenimi kapacitetami, ki ga poganja umetna inteligenca, zdaj dolo\u010da zaporedje dela. \u010cakalne vrste, zaklenjene za en teden naenkrat, upravljavcem strojev jasno poka\u017eejo, kaj sledi. Med dalj\u0161o obdelavo se lahko pripravijo na prihajajo\u010de delo. Zaposleni lahko po \u0161tevilki naloga preverijo njegov polo\u017eaj v vrsti in terminski plan, vodstvo pa ima skupen pregled nad obremenitvijo proizvodnje.<\/p>\n\n\n<p>Mamec poro\u010da o ob\u010dutno manj\u0161i obremenitvi pri planiranju, bolj\u0161i zanesljivosti dobav in kraj\u0161ih zastojih delovnih centrov zaradi optimiziranega zaporedja dela. Sporo\u010dilo za druge obrate tipa job shop je konkretno: skupne prioritete in povezane \u010dakalne vrste nadomestijo proizvodni plan, ki temelji na rokih na papirju in presoji posameznikov.<\/p>\n\n\n<p><a href=\"\/sl\/zgodbe-strank\/mamec\/\">Preberite celotno zgodbo podjetja Mamec<\/a>. Dodaten pogled iz prakse strojne obdelave ponuja <a href=\"\/sl\/zgodbe-strank\/eskomatic\/\">zgodba podjetja Eskomatic<\/a>, ki ka\u017ee, kako pomembni sta pravo\u010dasna razpolo\u017eljivost materiala in na\u010drtovanje dobavnih rokov.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zagotovite obratu tipa job shop plan, ki mu lahko proizvodnja sledi<\/h2>\n\n\n<p>Ob spremembi dobavnega roka vam ne bi smelo biti treba na novo sestavljati \u010dakalnih vrst za vse stroje, da bi ugotovili posledice. SkyPlanner zdru\u017euje samodejno terminiranje, pregleden plan v diagramu Gantt ter va\u0161 nadzor nad prioritetami in zaklenjenimi operacijami. To je bolj\u0161a podlaga za odlo\u010danje o tem, kaj bo na vrsti naslednje in katere roke lahko obljubite.<\/p>\n\n\n<p><a href=\"\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev SkyPlanner<\/a> in pripravite tipi\u010den tehnolo\u0161ki postopek naro\u010dila, vir, za katerega se poteguje najve\u010d operacij, ter nedavno spremembo, ki jo je bilo te\u017eko vklju\u010diti v terminski plan. Oglejte si, kako so operacije povezane in kako sprememba prioritete vpliva na plan. \u010ce \u017eelite najprej raziskati pogled za terminiranje, pa <a href=\"\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pogosta vpra\u0161anja<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Kak\u0161na je razlika med terminiranjem in dodeljevanjem naslednje operacije?<\/h3>\n\n\n<p>S terminiranjem operacijam dolo\u010dimo vire in termine v planskem obdobju. Pri dodeljevanju naslednje operacije pa izberemo ali sprostimo v izvedbo naslednjo pripravljeno operacijo na delovnem centru. V obratu tipa job shop naj ta lokalna odlo\u010ditev sledi celotnemu planu, saj vpliva na naro\u010dila, katerih naslednja operacija poteka na drugem stroju.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ali lahko terminski plan za proizvodnjo tipa job shop sestavimo v Excelu?<\/h3>\n\n\n<p>Majhen in stabilen nabor operacij lahko prika\u017eete v preglednici. Te\u017eava nastane, ko je treba ob spremembah v proizvodnji vzdr\u017eevati vse medsebojne odvisnosti, usklajevati operacije, ki potrebujejo isti vir, in posodabljati termine dokon\u010danja. \u010ce planerji ves dan na novo sestavljajo \u010dakalne vrste, je SkyPlanner APS bolj prakti\u010dna re\u0161itev za izra\u010dun in vzdr\u017eevanje povezanega terminskega plana.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ali kraj\u0161e skupno trajanje plana vedno pomeni bolj\u0161e izpolnjevanje dobavnih rokov?<\/h3>\n\n\n<p>Ne. Kraj\u0161i \u010das od za\u010detka prve do konca zadnje operacije pomeni, da je celoten nabor operacij kon\u010dan prej, posamezno naro\u010dilo pa lahko kljub temu zamudi svoj rok. Termine dokon\u010danja celotnih naro\u010dil primerjajte z obljubljenimi dobavnimi roki, nato pa upo\u0161tevajte \u0161e obseg priprav, obremenitev ozkih grl in nedokon\u010dano proizvodnjo. Najbolj\u0161i terminski plan je odvisen od prioritet, ki jih mora izpolnjevati.<\/p>\n\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is the difference between scheduling and dispatching?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Scheduling assigns operations to resources and times across a planning period. Dispatching selects or releases the next ready operation at a workstation. In a job shop, that local choice should follow the wider plan because it affects orders whose next operation is on another machine.\"}},{\"@type\":\"Question\",\"name\":\"Can a job shop schedule be built in Excel?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A small, stable set of operations can be represented in a spreadsheet. The difficulty is maintaining all the dependencies, resource conflicts and completion dates when production changes. If planners spend their day rebuilding queues, SkyPlanner APS is a more practical way to calculate and maintain the connected schedule.\"}},{\"@type\":\"Question\",\"name\":\"Does a shorter schedule always mean better delivery performance?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. A shorter makespan finishes the entire set of jobs earlier, but an individual order can still miss its deadline. Compare complete-order finish dates with delivery commitments, then consider setup effort, bottleneck loading and work in progress. The best schedule depends on the priorities you need it to serve.\"}}]}<\/script>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba Rezkalni stroj je prost, ohi\u0161je je pripravljeno, vodja pa \u017eeli, da proizvodnja te\u010de naprej. Za\u010detek obdelave se zdi o\u010ditna odlo\u010ditev. Toda \u010dez eno uro bo s stru\u017enice pri\u0161el nujen zati\u010d, ki potrebuje isti rezkalni stroj. Ko se za\u010dne obdelava ohi\u0161ja, je rok dobave zati\u010da \u017ee ogro\u017een. To je &#8230; <a title=\"Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/\" aria-label=\"Read more about Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97663,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-96278","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Job shop scheduling: razli\u010dni postopki v roku &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Naro\u010dila imajo razli\u010dne postopke, stroje pa si delijo. Preverite, kako terminiranje job shop usklajuje delo in kako SkyPlanner ohranja plan uporaben.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba\" \/>\n<meta property=\"og:description\" content=\"Naro\u010dila imajo razli\u010dne postopke, stroje pa si delijo. Preverite, kako terminiranje job shop usklajuje delo in kako SkyPlanner ohranja plan uporaben.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T08:52:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba\",\"datePublished\":\"2026-10-04T08:52:42+00:00\",\"dateModified\":\"2026-10-19T14:42:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/\"},\"wordCount\":2713,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/job-shop-scheduling-hero-1.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/\",\"name\":\"Job shop scheduling: razli\u010dni postopki v roku &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/job-shop-scheduling-hero-1.png\",\"datePublished\":\"2026-10-04T08:52:42+00:00\",\"dateModified\":\"2026-10-19T14:42:56+00:00\",\"description\":\"Naro\u010dila imajo razli\u010dne postopke, stroje pa si delijo. Preverite, kako terminiranje job shop usklajuje delo in kako SkyPlanner ohranja plan uporaben.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/job-shop-scheduling-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/job-shop-scheduling-hero-1.png\",\"width\":1672,\"height\":941,\"caption\":\"Housing and pin production routes converging on a shared milling machine before finished parts\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-maloserijske-proizvodnje\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Job shop scheduling: razli\u010dni postopki v roku &#8211; SkyPlanner","description":"Naro\u010dila imajo razli\u010dne postopke, stroje pa si delijo. Preverite, kako terminiranje job shop usklajuje delo in kako SkyPlanner ohranja plan uporaben.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/","og_locale":"sl_SI","og_type":"article","og_title":"Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba","og_description":"Naro\u010dila imajo razli\u010dne postopke, stroje pa si delijo. Preverite, kako terminiranje job shop usklajuje delo in kako SkyPlanner ohranja plan uporaben.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T08:52:42+00:00","article_modified_time":"2026-10-19T14:42:56+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"14 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba","datePublished":"2026-10-04T08:52:42+00:00","dateModified":"2026-10-19T14:42:56+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/"},"wordCount":2713,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/","name":"Job shop scheduling: razli\u010dni postopki v roku &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png","datePublished":"2026-10-04T08:52:42+00:00","dateModified":"2026-10-19T14:42:56+00:00","description":"Naro\u010dila imajo razli\u010dne postopke, stroje pa si delijo. Preverite, kako terminiranje job shop usklajuje delo in kako SkyPlanner ohranja plan uporaben.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png","width":1672,"height":941,"caption":"Housing and pin production routes converging on a shared milling machine before finished parts"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-maloserijske-proizvodnje\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Job shop scheduling: razli\u010dni postopki, pravo\u010dasna izvedba Rezkalni stroj je prost, ohi\u0161je je pripravljeno, vodja pa \u017eeli, da proizvodnja te\u010de naprej. Za\u010detek obdelave se zdi o\u010ditna odlo\u010ditev. Toda \u010dez eno uro bo s stru\u017enice pri\u0161el nujen zati\u010d, ki potrebuje isti rezkalni stroj. Ko se za\u010dne obdelava ohi\u0161ja, je rok dobave zati\u010da \u017ee ogro\u017een. To je&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/96278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=96278"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/96278\/revisions"}],"predecessor-version":[{"id":96307,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/96278\/revisions\/96307"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/97663"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=96278"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=96278"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=96278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}