{"id":96017,"date":"2026-10-04T02:31:16","date_gmt":"2026-10-04T02:31:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96017"},"modified":"2026-10-04T02:32:30","modified_gmt":"2026-10-04T02:32:30","slug":"kaj-je-terminiranje-proizvodnje","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/","title":{"rendered":"Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Terminiranje proizvodnje dodeli proizvodne operacije virom ter dolo\u010di njihovo zaporedje, za\u010detke in konce. Proizvodni plan spremeni v izvedljivo delo, pri \u010demer upo\u0161teva kapacitete, odvisnosti procesov, razpolo\u017eljivost materiala in dobavne roke. Uporaben terminski plan poka\u017ee, kaj lahko te\u010de naslednje in kaj mora po\u010dakati.<\/p>\n\n<div class=\"gb-container gb-container-article04\"><div class=\"gb-inside-container\">\n\n<p><strong>Klju\u010dne ugotovitve<\/strong><\/p>\n\n\n<p>Planiranje proizvodnje dolo\u010da proizvodne cilje; terminiranje dolo\u010da zaporedje in \u010dasovni potek na ravni posameznih operacij.<\/p>\n\n\n<p>Rok dobave ali visoka prioriteta ne ustvari manjkajo\u010dih strojnih kapacitet, delovne sile ali materialov.<\/p>\n\n\n<p>Uporabni terminski plani potrebujejo procesne korake, trajanja, tehnolo\u0161ki postopek z delovnimi centri in realno razpolo\u017eljivost.<\/p>\n\n\n<p>V SkyPlanner planerji nastavijo prioritete, Arcturus prera\u010duna terminski plan, Gantt pa prika\u017ee rezultat.<\/p>\n\n<\/div><\/div>\n\n<h2 class=\"wp-block-heading\">Kaj dolo\u010da terminiranje proizvodnje<\/h2>\n\n\n<p>Za planerja proizvodnje je prakti\u010dno vpra\u0161anje: katera operacija naj te\u010de naslednja na katerem delovnem centru? Odgovor mora povezati naro\u010dilo z njegovim proizvodnim tokom. Obdelava se mora kon\u010dati, preden se lahko za\u010dne od nje odvisna operacija monta\u017ee. Izbrani stroj mora biti na voljo, delo pa mora ustrezati zadevni izmeni in razpolo\u017eljivosti virov.<\/p>\n\n\n<p>Seznam naro\u010dil lahko prika\u017ee koli\u010dine in obljubljene datume, ne da bi odgovoril na katero koli od teh vpra\u0161anj. Terminski plan proizvodnje doda dodelitve virov in \u010dasovno razporeditev, ki so potrebne, da se seznam spremeni v delo v proizvodnji. Njegova kakovost je odvisna od tega, ali je dodelitve mogo\u010de dejansko izvesti, ne od tega, kako lepo so prikazani datumi.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Planiranje proizvodnje in terminiranje proizvodnje<\/h3>\n\n\n<p>Planiranje in terminiranje proizvodnje obravnavata razli\u010dni ravni istega proizvodnega problema. Planiranje dolo\u010da, kaj je treba proizvesti in katere kapacitete ali materiali so za to potrebni. Terminiranje ugotavlja, kako se posamezne operacije prilegajo razpolo\u017eljivim virom.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Odlo\u010ditev<\/th><th>Planiranje proizvodnje<\/th><th>Terminiranje proizvodnje<\/th><\/tr><\/thead><tbody><tr><td>Delo za izvedbo<\/td><td>Izdelki in zahtevane koli\u010dine<\/td><td>Operacije, ki pripadajo dolo\u010denim nalogom<\/td><\/tr><tr><td>Kapaciteta<\/td><td>Kapaciteta, potrebna za dosego proizvodnega cilja<\/td><td>Razpolo\u017eljiva kapaciteta delovnih centrov in izmen za posamezno operacijo<\/td><\/tr><tr><td>\u010casovni okvir<\/td><td>Proizvodna obdobja in dobavne zaveze<\/td><td>Zaporedje operacij, \u010dasi za\u010detka in konca<\/td><\/tr><tr><td>Odziv na motnjo<\/td><td>Ponoven premislek o proizvodnem cilju ali razpolo\u017eljivih virih<\/td><td>Prera\u010dun, katere prizadete operacije lahko te\u010dejo in kdaj<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>To je konceptualna primerjava, ne specifikacija izdelka. Razlika je uporabna tudi, kadar podjetje obe dejavnosti imenuje \u00bbplaniranje\u00ab: vpra\u0161ajte se, ali rezultat operaterju pove, kateri nalog lahko te\u010de naslednji na dolo\u010denem viru.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer: naro\u010dili A in B si delita delovni center<\/h2>\n\n\n<p>Vzemimo ilustrativen proizvodni obrat z naro\u010diloma A in B. Obe pred nadaljnjimi koraki monta\u017ee potrebujeta isti delovni center za obdelavo. Vsako naro\u010dilo ima rok dobave, planer pa je dolo\u010dil njuni prioriteti. Konflikt je preprost: A in B ne moreta hkrati zasedati skupnega delovnega centra za obdelavo.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Nalog<\/th><th>Proizvodni tok<\/th><th>Omejitev, ki jo je treba re\u0161iti<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>Obdelava, nato monta\u017ea<\/td><td>Z B tekmuje za skupni delovni center za obdelavo<\/td><\/tr><tr><td>B<\/td><td>Obdelava, nato monta\u017ea<\/td><td>Njegov korak monta\u017ee \u010daka, da se kon\u010da njegov lastni korak obdelave<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Odlo\u010ditev pri terminiranju je, da se skupnemu delovnemu centru dolo\u010di izvedljivo zaporedje, vsak odvisni korak monta\u017ee pa se postavi za ustrezen korak obdelave. Rezultat odpravi prekrivanje v \u010dakalni vrsti; ne zagotavlja, da je mogo\u010de izpolniti vse dobavne zaveze. To je odvisno tudi od dejanskih trajanj in razpolo\u017eljive kapacitete.<\/p>\n\n\n<p>Zdaj predpostavimo, da materiala za B ni na voljo. Planer mora preveriti, kdaj bo B lahko izvedljiv, nato pa oceniti vpliv na obe naro\u010dili. Zvi\u0161anje prioritete B izra\u017ea njegov poslovni pomen, vendar manjkajo\u010dega materiala ne more zagotoviti. \u010ce namesto tega izmena obdelave ni na voljo, se slika kapacitet spremeni za A in B, \u010deprav koli\u010dine naro\u010dil ostanejo enake.<\/p>\n\n\n<p>Ta majhen primer nazorno poka\u017ee namen terminiranja: ohranjati skladnost zaporedja virov, odvisnosti in proizvodnih pogojev. Tu ni predpostavljene velikosti serije ali izra\u010dunanega \u010dasa dokon\u010danja. To spada med lastne podatke o operacijah v obratu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Terminiranje proizvodnje v SkyPlanner<\/h2>\n\n\n<p>V <a href=\"\/sl\/\">programu SkyPlanner za terminiranje proizvodnje<\/a> nastavljeni delovni centri, izmene, operaterji, prioritete in materiali tvorijo vhodne podatke za terminiranje. Pri A in B skupni delovni center in njuna proizvodna toka opisujeta konflikt kapacitet in odvisnosti. <strong>Reschedule all<\/strong> v spodnji vrstici Gantt pogleda za terminiranje proizvodnje spro\u017ei, da Arcturus opravi prera\u010dun na podlagi prioritet in razpolo\u017eljivih kapacitet, vklju\u010dno z razpolo\u017eljivostjo delovnih centrov, odvisnostmi in dobavnimi roki. Planer s vnaprej nastavljenimi prioritetami odlo\u010di, kaj je pomembno; umetna inteligenca sledi tem prioritetam.<\/p>\n\n\n<p>Gantt prikazuje razporejeno delo v vrsticah delovnih centrov, s faznimi \u010drtami, ki povezujejo sorodne procesne korake. Po spremembi, ki vpliva na A ali B, lahko planer skupaj pregleda prera\u010dunano \u010dakalno vrsto in nadaljnje operacije. Ko je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, se upo\u0161tevata stanje skladi\u0161\u010da in zalog, zato pomanjkanje materiala vpliva na terminski plan. Uporaben rezultat je nov terminski plan, ki ga je treba preveriti glede na posodobljene proizvodne pogoje, ne obljubljeno zaporedje A pred B ne glede na vhodne podatke.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vhodni podatek za preverjanje pri A in B<\/th><th>Posledica za terminiranje<\/th><th>Dokumentirana ustreznica v SkyPlanner<\/th><\/tr><\/thead><tbody><tr><td>Skupni delovni center in razpolo\u017eljive izmene<\/td><td>Operacije obdelave se morajo prilegati razpolo\u017eljivi kapaciteti<\/td><td>Delovni centri in izmene tvorijo vhodne podatke za terminiranje; Arcturus upo\u0161teva razpolo\u017eljivo kapaciteto<\/td><\/tr><tr><td>Urejeni procesni koraki in trajanja<\/td><td>Monta\u017ea mora slediti obdelavi, od katere je odvisna<\/td><td>Konfiguracija procesnih korakov in prera\u010dun z upo\u0161tevanjem odvisnosti<\/td><\/tr><tr><td>Dobavni roki in izbrane prioritete<\/td><td>Izvedljivi nalogi tekmujejo glede na cilje planerja<\/td><td>Reschedule all uporablja dobavne roke in prioritete<\/td><\/tr><tr><td>Razpolo\u017eljivost materiala za B<\/td><td>Pomanjkanje spremeni izvedljivost in \u010dasovno razporeditev B<\/td><td>Terminiranje z upo\u0161tevanjem materiala ob omogo\u010ditvi upo\u0161teva stanje zalog<\/td><\/tr><tr><td>Prera\u010dunano zaporedje operacij<\/td><td>Skupaj preverite obdelavo in nadaljnjo monta\u017eo<\/td><td>Vrstice delovnih centrov in fazne \u010drte v Gantt<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Podlaga izdelka: dokumentacija SkyPlanner, \u00bbWhere is the King Button?\u00ab (KB 892) in \u00bbSkyPlanner: The Basics\u00ab (KB 775) ter dokumentirane zmo\u017enosti Arcturus; preverjeno 4. oktobra 2026. Tabela povezuje dokumentirane funkcije z ilustrativnim primerom, ne z izmerjenim zagonom programa.<\/p>\n\n\n<p>\u010ce \u017eelite raziskati to zaporedje, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preskusite SkyPlanner z demo podatki<\/a>. \u010ce se \u017eelite pogovoriti o svojih podatkih o delovnih centrih, izmenah in proizvodnih tokovih, <a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">rezervirajte predstavitev<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vhodni podatki, zaradi katerih je terminski plan proizvodnje uporaben<\/h2>\n\n\n<p>Preden presodite terminski plan za A in B, preverite model, ki stoji za njim. Zapis izdelka identificira, kaj proizvajate; sam po sebi ne opisuje izvedljivega dela. Dokumentacija SkyPlanner Getting Started gradi minimalni model iz delovnih centrov, izdelkov in proizvodnih tokov. Izdelek, pripravljen za tok, potrebuje urejene procesne korake, pozitivna trajanja in tehnolo\u0161ki postopek z delovnimi centri.<\/p>\n\n\n<p>Ob pripravi prvega modela ali preiskovanju nepri\u010dakovanega zaporedja uporabite naslednji seznam:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Proizvodni tok:<\/strong> Ali ima vsak nalog operacije, ki jih potrebuje, v pravilnem vrstnem redu? Pri B mora biti monta\u017ea odvisna od obdelave B, ne od obdelave A.<\/li><li><strong>Osnova trajanja:<\/strong> Ali trajanja operacij odra\u017eajo nalog in njegovo koli\u010dino? SkyPlanner podpira izra\u010dune procesnih korakov Time\/Piece, Pieces\/Time in Fixed Time, s \u010dasom priprave za pripravljalna opravila.<\/li><li><strong>Tehnolo\u0161ki postopek in delovni centri:<\/strong> Ali je vsaka operacija dodeljena ustreznemu delovnemu centru? Drugi stroj v proizvodnji pomaga le, \u010de ga zadevna operacija lahko uporablja.<\/li><li><strong>Izmene in operaterji:<\/strong> Ali evidentirana razpolo\u017eljivost ustreza kapaciteti, ki lahko dejansko opravi delo? Prosta re\u017ea na stroju ne zado\u0161\u010da, \u010de zahtevani operater ni na voljo.<\/li><li><strong>Materiali:<\/strong> Ali je stanje materiala a\u017eurno, zlasti pri zakasnjenem vhodnem materialu za B? Preverite to skupaj z nastavitvijo terminiranja z upo\u0161tevanjem materiala, kadar to zmo\u017enost uporabljate.<\/li><li><strong>Dobavni roki in prioritete:<\/strong> Ali datumi in preference izra\u017eajo odlo\u010ditve, ki jih planer namerava sprejeti?<\/li><\/ul>\n\n\n<p>Koristno preverjanje pri nastavitvi je, da pregledate potek proizvodnje, preden poskusite rezultat popraviti s prioritetami. Manjkajo\u010d tehnolo\u0161ki postopek ali neuporabna trajanja so te\u017eave vhodnih podatkov. Navodila SkyPlanner za Dynamic Priorities prav tako priporo\u010dajo selektivno uporabo prioritet namesto maksimiranja vsake vrstice prioritet: nastavitve morajo izra\u017eati smiseln izbor med tekmujo\u010dimi cilji.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Metode terminiranja in njihove omejitve<\/h2>\n\n\n<p>Ve\u010d splo\u0161nih konceptov terminiranja pomaga pojasniti, kako se sestavi \u010dakalna vrsta. Opisujejo pristope k terminiranju, ne seznama na\u010dinov, ki jih je mogo\u010de izbrati v SkyPlanner.<\/p>\n\n\n<p><strong>Terminiranje naprej<\/strong> izhaja iz trenutka, ko se lahko delo za\u010dne, in nadaljnje operacije umesti za njim. Pri A to pomeni, da sledimo zaporedju njegove obdelave in monta\u017ee od razpolo\u017eljivega za\u010detka. Pomaga razkriti datum zaklju\u010dka, ki ga podpira predvidena razpolo\u017eljivost.<\/p>\n\n\n<p><strong>Terminiranje nazaj<\/strong> izhaja iz zahtevanega datuma zaklju\u010dka in se po operacijah vra\u010da nazaj, da dolo\u010di, kdaj bi se morale za\u010deti. Pri B lahko razkrije zahtevani za\u010detek, ki ga njegov zakasnjeni material ne more podpreti. Zahtevani za\u010detek je omejitev, ki jo je treba preveriti, ne dokaz, da je delo izvedljivo.<\/p>\n\n\n<p><strong>Terminiranje z omejenimi kapacitetami<\/strong> pri ume\u0161\u010danju dela upo\u0161teva razpolo\u017eljivo kapaciteto virov. V primeru skupnega delovnega centra mora razre\u0161iti tekmovanje med A in B. Predpostavka neomejene kapacitete lahko obe operaciji umesti v isto razpolo\u017eljivo obdobje, konflikt pa prepusti komu, ki ga bo odpravil pozneje.<\/p>\n\n\n<p>Preglednica lahko planerju pomaga razumeti majhno \u010dakalno vrsto in dokumentirati predlagano zaporedje. Ko se \u0161tevilo skupnih virov in odvisnih operacij pove\u010duje, vsaka sprememba zahteva ve\u010d usklajevanja: \u010de premaknete obdelavo B, morate ponovno premisliti njegovo monta\u017eo, \u010dakalno vrsto okoli A in vse drugo prizadeto delo. <a href=\"\/sl\/viri\/izzivi-nacrtovanja-proizvodnje-excel-skyplanner-aps\/\">Vodnik o planiranju proizvodnje v Excelu<\/a> podrobneje pojasnjuje to te\u017eavo z vzdr\u017eevanjem.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj storiti, ko kapacitete primanjkuje<\/h2>\n\n\n<p>Izvedljivo zaporedje in zadovoljiv rezultat glede dobave sta dva lo\u010dena preizkusa. \u010ce A in B ne moreta oba zaklju\u010diti znotraj razpolo\u017eljive kapacitete, ju veljaven vrstni red ne re\u0161i primanjkljaja. Planer se mora odlo\u010diti, ali bo spremenil obljubljene roke, zagotovil dodatno kapaciteto ali izbral, katero delo ima prednost.<\/p>\n\n\n<p>Za\u010dnite pri omejitvi, ki dejansko dolo\u010da izvedljivost. \u010ce B \u010daka na material, sama dodatna razpolo\u017eljivost obdelave ne bo poskrbela, da bo pripravljen. \u010ce je skupni delovni center preobremenjen, natan\u010dnej\u0161i datumi monta\u017ee ne bodo sprostili termina za obdelavo. \u010ce je omejitev operater, je treba koledar stroja oceniti skupaj z razpolo\u017eljivostjo operaterja.<\/p>\n\n\n<p>Izbrano spremembo zabele\u017eite v vhodnih podatkih, preden ovrednotite nov terminski plan. Nato preglejte prizadeto nadaljnje delo, ne le operacije, ki je bila premaknjena. Pri A in B to pomeni preverjanje njunih korakov monta\u017ee in skupne \u010dakalne vrste za obdelavo. Tako lo\u010dite resni\u010dno izbolj\u0161avo od konflikta, ki se je le premaknil drugam.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Usklajenost terminskega plana s proizvodnimi podatki<\/h2>\n\n\n<p>Terminski plan je toliko aktualen, kolikor so aktualni pogoji, ki jih predstavlja. Ko je material za B na voljo ali ko sprememba izmene vpliva na A, preverite, ali ustrezni podatki odra\u017eajo spremembo, preden pregledate ponovni izra\u010dun. Sicer planer morda primerja trenutno stanje v proizvodnji z zastarelim modelom.<\/p>\n\n\n<p>SkyPlanner se z odprtim vmesnikom REST API integrira s poljubnim sistemom ERP ali MES. To omogo\u010da povezavo modela terminiranja s sistemi, ki hranijo podatke o naro\u010dilih in proizvodnji. <a href=\"https:\/\/skyplanner.ai\/sl\/integracije\/\">Informacije o integraciji z ERP in MES<\/a> so naslednji korak pri ugotavljanju, kako lahko va\u0161i obstoje\u010di podatki podprejo terminiranje.<\/p>\n\n\n<p>Pri pogovoru o integraciji uporabite A in B kot sledenje podatkom: od kod izvirajo njuna naro\u010dila, proizvodni koraki in podatki o razpolo\u017eljivosti ter kako bodo spremembe pri\u0161le v model? Ko se o teh vhodnih podatkih dogovorite, je rezultat terminiranja la\u017eje oceniti. Na\u010din integracije in preslikavo podatkov je treba preu\u010diti za dejanske sisteme, ki jih to zadeva.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pogosto zastavljena vpra\u0161anja<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Kaj je terminiranje proizvodnje v proizvodnih podjetjih?<\/h3>\n\n\n<p>Gre za razporejanje, dolo\u010danje vrstnega reda in \u010dasovno ume\u0161\u010danje proizvodnih operacij na proizvodne vire. Rezultat bi moral proizvodnji povedati, katero delo se lahko izvede naslednje in katero mora po\u010dakati. V primeru A\/B skupna \u010dakalna vrsta za obdelavo in odvisni koraki monta\u017ee spadajo v isto odlo\u010ditev o terminiranju.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kak\u0161na je razlika med planiranjem proizvodnje in terminiranjem proizvodnje?<\/h3>\n\n\n<p>Pri A in B razlika postane prakti\u010dna, ko njun skupni delovni center ne more podpreti obeh zavez. Sprememba zaporedja obdelave je odlo\u010ditev o terminiranju; ponoven razmislek o proizvodnem cilju ali razpolo\u017eljivih virih spada v planiranje. S primerjalno tabelo zgoraj ugotovite, katera odlo\u010ditev zahteva pozornost, preden spremenite datume operacij.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Katere informacije potrebujete za pripravo terminskega plana proizvodnje?<\/h3>\n\n\n<p>Za\u010dnite z operacijami, urejenimi procesnimi koraki, trajanji, ustreznimi delovnimi centri, razpolo\u017eljivimi izmenami in operaterji, materiali, datumi dobave in prioritetami. V prvem modelu v SkyPlanner preverite potek izdelave izdelka, preden ovrednotite njegovo zaporedje. Same vrstice izdelkov ne dolo\u010dajo, kje se operacija izvaja ali kako dolgo zaseda vir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaj naj stori planer, ko zaradi omejenih kapacitet izpolnitev roka dobave ni mogo\u010da?<\/h3>\n\n\n<p>Zaklju\u010dek za planerja je konkreten primanjkljaj glede na zahtevani datum. \u010ce B z razpolo\u017eljivo kapaciteto obdelave ne more zaklju\u010diti pravo\u010dasno, preverite omejitev in se odlo\u010dite, ali boste spremenili kapaciteto, prioriteto ali zavezo. Ponovno preverite tudi nadaljnje delo pri A, da re\u0161itev te\u017eave pri B primanjkljaja ne bi le premaknila.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kako pomanjkanje materiala ali nerazpolo\u017eljivost stroja vplivata na terminski plan?<\/h3>\n\n\n<p>Pomanjkanje materiala lahko zamakne trenutek, ko operacija postane izvedljiva; nerazpolo\u017eljivost stroja odvzame kapaciteto tam, kjer naj bi se delo izvajalo. Oboje lahko vpliva na nadaljnje korake in tekmujo\u010de operacije. Pri pomanjkanju materiala za B preverite stanje zaloge in v SkyPlanner omogo\u010deno zmo\u017enost terminiranja z upo\u0161tevanjem materiala, preden pregledate ponovno izra\u010dunano \u010dakalno vrsto.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ali lahko program za terminiranje proizvodnje deluje z obstoje\u010dim sistemom ERP ali MES?<\/h3>\n\n\n<p>Da. SkyPlanner se z odprtim vmesnikom REST API integrira s poljubnim sistemom ERP ali MES. Prakti\u010dno vpra\u0161anje je, kako bodo ustrezni podatki o naro\u010dilih in proizvodnji preslikani in ohranjeni aktualni. Pri A in B pred pogovorom o izvedbi integracije ugotovite, od kod izvirajo podatki o njunih operacijah in razpolo\u017eljivosti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kdaj zado\u0161\u010da preglednica in kdaj je uporabno samodejno ponovno terminiranje?<\/h3>\n\n\n<p>Preglednica je lahko uporabna, kadar planer zanesljivo vzdr\u017euje \u010dakalno vrsto in usklajuje njene odvisnosti. Samodejno ponovno terminiranje postane uporabno, ko spremembe vplivajo na veliko povezanih operacij ali skupnih virov. Pri A in B ocenite, koliko dela sledi eni sami spremembi pri obdelavi, vklju\u010dno z nadaljnjo monta\u017eo in drugimi operacijami v \u010dakalni vrsti.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is production scheduling in manufacturing?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It is the assignment, sequencing and timing of manufacturing operations on production resources. Its output should tell the shop floor which work can run next and which work must wait. In the A\/B example, the shared machining queue and the dependent assembly steps belong to the same scheduling decision.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between production planning and production scheduling?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"For A and B, the distinction becomes practical when their shared workstation cannot support both commitments. Changing the machining sequence is a scheduling decision; reconsidering the production objective or available resources belongs to planning. Use the comparison table above to identify which decision needs attention before changing operation dates.\"}},{\"@type\":\"Question\",\"name\":\"What information do you need to create a production schedule?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Start with jobs, ordered process steps, durations, eligible workstations, available shifts and operators, materials, delivery dates and priorities. In SkyPlanner's first model, verify the manufactured product's flow before evaluating its sequence. Product rows alone do not establish where an operation runs or how long it occupies a resource.\"}},{\"@type\":\"Question\",\"name\":\"What should a planner do when finite capacity causes a delivery shortfall?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The planner takeaway is a concrete shortfall against a required date. If B cannot finish on time with the available machining capacity, inspect the constraint and decide whether to change capacity, priority or the commitment. Recheck A's downstream work as well, so solving B's problem does not simply move the shortfall.\"}},{\"@type\":\"Question\",\"name\":\"How do material shortages or machine unavailability affect a schedule?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A material shortage can delay when an operation becomes eligible; machine unavailability removes capacity where work was expected to run. Both can affect downstream steps and competing jobs. For B's material shortage, verify the inventory state and, in SkyPlanner, the enabled material-aware scheduling capability before inspecting the recalculated queue.\"}},{\"@type\":\"Question\",\"name\":\"Can production scheduling software work with an existing ERP or MES?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. SkyPlanner integrates with any ERP or MES through its open REST API. The practical question is how the relevant order and production data will be mapped and kept current. For A and B, trace the source of their operations and availability information before discussing the integration implementation.\"}},{\"@type\":\"Question\",\"name\":\"When is a spreadsheet enough, and when is automatic rescheduling useful?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A spreadsheet can be useful when a planner can maintain the queue and reconcile its dependencies reliably. Automatic rescheduling becomes useful when changes affect many linked operations or shared resources. With A and B, assess how much work follows a single machining change, including downstream assembly and other jobs in the queue.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo Domov &raquo; Viri &raquo; Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo Terminiranje proizvodnje dodeli proizvodne operacije virom ter dolo\u010di njihovo zaporedje, za\u010detke in konce. Proizvodni plan spremeni v izvedljivo delo, pri \u010demer upo\u0161teva kapacitete, odvisnosti procesov, razpolo\u017eljivost materiala in dobavne roke. Uporaben terminski plan poka\u017ee, kaj lahko te\u010de &#8230; <a title=\"Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\" aria-label=\"Read more about Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":96058,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-96017","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kaj je terminiranje proizvodnje? Prakti\u010dni vodnik<\/title>\n<meta name=\"description\" content=\"Izdelajte izvedljiv terminski plan proizvodnje: spoznajte zaporedje operacij, kapacitete in materiale ter prera\u010dun v SkyPlanner ob spremembi prioritet.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo\" \/>\n<meta property=\"og:description\" content=\"Izdelajte izvedljiv terminski plan proizvodnje: spoznajte zaporedje operacij, kapacitete in materiale ter prera\u010dun v SkyPlanner ob spremembi prioritet.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T02:31:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-04T02:32:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2172\" \/>\n\t<meta property=\"og:image:height\" content=\"724\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo\",\"datePublished\":\"2026-10-04T02:31:16+00:00\",\"dateModified\":\"2026-10-04T02:32:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/\"},\"wordCount\":2367,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/\",\"name\":\"Kaj je terminiranje proizvodnje? Prakti\u010dni vodnik\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"datePublished\":\"2026-10-04T02:31:16+00:00\",\"dateModified\":\"2026-10-04T02:32:30+00:00\",\"description\":\"Izdelajte izvedljiv terminski plan proizvodnje: spoznajte zaporedje operacij, kapacitete in materiale ter prera\u010dun v SkyPlanner ob spremembi prioritet.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"width\":2172,\"height\":724,\"caption\":\"Two component batches queue for a shared machining workstation before moving to assembly\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaj-je-terminiranje-proizvodnje\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kaj je terminiranje proizvodnje? Prakti\u010dni vodnik","description":"Izdelajte izvedljiv terminski plan proizvodnje: spoznajte zaporedje operacij, kapacitete in materiale ter prera\u010dun v SkyPlanner ob spremembi prioritet.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/","og_locale":"sl_SI","og_type":"article","og_title":"Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo","og_description":"Izdelajte izvedljiv terminski plan proizvodnje: spoznajte zaporedje operacij, kapacitete in materiale ter prera\u010dun v SkyPlanner ob spremembi prioritet.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T02:31:16+00:00","article_modified_time":"2026-10-04T02:32:30+00:00","og_image":[{"width":2172,"height":724,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo","datePublished":"2026-10-04T02:31:16+00:00","dateModified":"2026-10-04T02:32:30+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/"},"wordCount":2367,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","articleSection":["APS &amp; Scheduling","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/","name":"Kaj je terminiranje proizvodnje? Prakti\u010dni vodnik","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","datePublished":"2026-10-04T02:31:16+00:00","dateModified":"2026-10-04T02:32:30+00:00","description":"Izdelajte izvedljiv terminski plan proizvodnje: spoznajte zaporedje operacij, kapacitete in materiale ter prera\u010dun v SkyPlanner ob spremembi prioritet.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","width":2172,"height":724,"caption":"Two component batches queue for a shared machining workstation before moving to assembly"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png",2172,724,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-300x100.png",300,100,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-768x256.png",768,256,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-1024x341.png",1024,341,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-1536x512.png",1536,512,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-2048x683.png",2048,683,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-360x120.png",360,120,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo Domov &raquo; Viri &raquo; Kaj je terminiranje proizvodnje? Vodnik za proizvodnjo Terminiranje proizvodnje dodeli proizvodne operacije virom ter dolo\u010di njihovo zaporedje, za\u010detke in konce. Proizvodni plan spremeni v izvedljivo delo, pri \u010demer upo\u0161teva kapacitete, odvisnosti procesov, razpolo\u017eljivost materiala in dobavne roke. Uporaben terminski plan poka\u017ee, kaj lahko te\u010de&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/96017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=96017"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/96017\/revisions"}],"predecessor-version":[{"id":96046,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/96017\/revisions\/96046"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/96058"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=96017"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=96017"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=96017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}