{"id":95843,"date":"2026-10-03T16:17:10","date_gmt":"2026-10-03T16:17:10","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=95843"},"modified":"2026-10-19T14:42:22","modified_gmt":"2026-10-19T14:42:22","slug":"planiranje-z-omejenimi-kapacitetami","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/","title":{"rendered":"Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok"},"content":{"rendered":"<div class=\"gb-container gb-container-finite01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok<\/h1>\n\n\n<p>Kupec \u017eeli zgodnej\u0161o dobavo. Sama operacija traja le nekaj ur, vendar potrebuje stroj, na katerem \u017ee \u010dakajo druge operacije. Preden privolite, morate ugotoviti, kam lahko umestite novo delo in kako bo to vplivalo na naro\u010dila z \u017ee obljubljenimi roki.<\/p>\n\n\n<p>Terminiranje z omejenimi kapacitetami vam da ta odgovor. Delo razporedi v okviru dejanskih kapacitet proizvodnih virov, namesto da bi re\u0161evanje prekrivajo\u010dih se obveznosti prepustilo proizvodnji. \u010ce roka ni mogo\u010de dose\u010di, vidite konflikt, dokler je \u0161e \u010das za ukrepanje.<\/p>\n\n\n<p>SkyPlanner APS ta izra\u010dun opravi z umetno inteligenco za terminiranje Arcturus. Vi dolo\u010dite prioritete in za\u0161\u010ditite delo, ki mora ostati na svojem mestu, Arcturus pa izra\u010duna, kako razporediti operacije. Tako se lahko posvetite odlo\u010ditvam o proizvodnji, namesto da ro\u010dno sestavljate nova zaporedja operacij za vsak stroj.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je terminiranje z omejenimi kapacitetami?<\/h2>\n\n\n<p>Terminiranje z omejenimi kapacitetami, imenovano tudi planiranje z omejenimi kapacitetami, razporeja proizvodne operacije v termine, ko so potrebni viri na voljo, ne da bi preseglo kapacitete, dolo\u010dene za te vire. Pri tem upo\u0161teva \u017ee razporejeno delo, delovne koledarje in zahteve posameznih operacij.<\/p>\n\n\n<p>\u010ce stroj lahko izvaja le eno operacijo hkrati, naslednje ni mogo\u010de razporediti v termin, ki ga \u017ee zaseda druga. \u010ce operacija potrebuje tudi dolo\u010deno orodje, usposobljenega operaterja ali zaklju\u010deno predhodno operacijo, morajo biti izpolnjeni tudi ti pogoji.<\/p>\n\n\n<p>Rezultat je zaporedje operacij, ki upo\u0161teva razpolo\u017eljive kapacitete, z <a href=\"\/sl\/viri\/terminiranje-proizvodnje-naprej-in-nazaj\/\">na\u010drtovanimi za\u010detki in zaklju\u010dki<\/a>. Poka\u017ee vam, kdaj je delo mogo\u010de dokon\u010dati pod pogoji, dolo\u010denimi v planu. Ne ustvari dodatnih kapacitet in ne omogo\u010di, da bi ob prevelikem obsegu naro\u010dil izpolnili vse zahtevane roke.<\/p>\n\n\n<p>Prav v tem je vrednost te metode. \u010ce v terminskem planu vidite pozen zaklju\u010dek, se lahko odlo\u010dite, kako ukrepati. Skrit konflikt pa postane nujna te\u017eava v proizvodnji.<\/p>\n\n\n<p>\u0160ir\u0161i postopek pretvarjanja naro\u010dil v zaporedje operacij v proizvodnji je opisan v na\u0161em <a href=\"\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">vodniku po terminiranju proizvodnje<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Terminiranje z omejenimi in neomejenimi kapacitetami: v \u010dem je razlika?<\/h2>\n\n\n<p>Terminiranje z neomejenimi kapacitetami izra\u010duna datume operacij, ne da bi upo\u0161tevalo omejitve razpolo\u017eljivih kapacitet vseh vklju\u010denih virov. V posamezno obdobje lahko razporedi ve\u010d dela, kot ga stroji ali ljudje zmorejo opraviti. Te datume je nato treba uskladiti z dejanskimi kapacitetami.<\/p>\n\n\n<p>Terminiranje z omejenimi kapacitetami preveri kapacitete \u017ee pri razporejanju dela. Obstoje\u010de rezervacije so pomembne: novo naro\u010dilo potrebuje uporaben prost termin, ne le \u017eelenega datuma zaklju\u010dka.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Vpra\u0161anje pri planiranju<\/th>\n<th>Terminiranje z neomejenimi kapacitetami<\/th>\n<th>Terminiranje z omejenimi kapacitetami<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Ali lahko druga operacija uporabi zaseden stroj?<\/td>\n<td>Konflikt zaradi kapacitet lahko ostane v planu<\/td>\n<td>Potrebuje prost termin ali ustrezen nadomestni vir<\/td>\n<\/tr>\n<tr>\n<td>Kaj \u010de zahtevano delo presega razpolo\u017eljivi \u010das?<\/td>\n<td>Obremenitev poka\u017ee primanjkljaj kapacitet, ki ga je treba re\u0161iti<\/td>\n<td>Zaporedje poka\u017ee, katero delo bo zaklju\u010deno pozneje<\/td>\n<\/tr>\n<tr>\n<td>Kaj se zgodi, \u010de izmena odpade?<\/td>\n<td>Ciljnih datumov morda ni ve\u010d mogo\u010de dose\u010di<\/td>\n<td>Manj delovnega \u010dasa v koledarju spremeni razpolo\u017eljive termine<\/td>\n<\/tr>\n<tr>\n<td>Kaj pridobi planer?<\/td>\n<td>Pregled obremenitev virov<\/td>\n<td>Terminski plan, ki upo\u0161teva dolo\u010dene omejitve virov<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Obremenjevanje brez omejitev kapacitet je lahko koristno za razumevanje skupnih potreb, preden se odlo\u010dite, kako jih boste pokrili. Terminiranje z omejenimi kapacitetami pa odgovori na bolj neposredno vpra\u0161anje: katere operacije je dejansko mogo\u010de izvesti in kdaj?<\/p>\n\n\n<p>Niti urejen diagram Gantt niti obvladljiv skupni obseg dela v tednu ne dokazujeta, da je naro\u010dilo mogo\u010de umestiti v plan. Proste ure so lahko na napa\u010dnem stroju ali pa \u0161ele po roku dobave. <a href=\"\/sl\/viri\/planiranje-proizvodnih-kapacitet\/\">Planiranje proizvodnih kapacitet<\/a> vam pomaga pri odlo\u010ditvi o dodatnih izmenah, ljudeh ali opremi; terminiranje z omejenimi kapacitetami pa preveri, kaj te odlo\u010ditve pomenijo za posamezna naro\u010dila.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer: tri ure dela, a nobenega uporabnega termina<\/h2>\n\n\n<p>Predstavljajte si obrat za mehansko obdelavo z enim rezkalnim centrom, ki ima v torek na voljo \u0161est uporabnih ur, od 08:00 do 14:00. Operater, orodje in material so na voljo ves ta \u010das. Eno od obstoje\u010dih naro\u010dil zahteva \u0161tiri ure, vklju\u010dno s pripravo, njegov polo\u017eaj v planu pa je za\u0161\u010diten.<\/p>\n\n\n<p>Novo naro\u010dilo potrebuje tri ure na istem stroju, prav tako vklju\u010dno s pripravo. Njegova rezkalna operacija mora potekati neprekinjeno. Drugega odobrenega stroja za to delo ni, naslednja razpolo\u017eljiva izmena pa se za\u010dne v sredo ob 08:00.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Delo<\/th>\n<th>Potreben \u010das<\/th>\n<th>Terminski plan z omejenimi kapacitetami<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Za\u0161\u010diteno obstoje\u010de naro\u010dilo<\/td>\n<td>4 ure<\/td>\n<td>Torek, 08:00\u201312:00<\/td>\n<\/tr>\n<tr>\n<td>Novo naro\u010dilo<\/td>\n<td>3 ure brez prekinitve<\/td>\n<td>Sreda, 08:00\u201311:00<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Obdelave novega naro\u010dila ni mogo\u010de zaklju\u010diti do torka ob 14:00. V torek sta sicer na voljo \u0161e dve uri, vendar operacija potrebuje tri ure v enem kosu. Prosti \u010das na koncu izmene je res na voljo, a obstaja tudi jasen razlog, zakaj ga ta operacija ne more izkoristiti.<\/p>\n\n\n<p>Na tej to\u010dki vam uporaben terminski plan omogo\u010di pogovor o konkretnih mo\u017enostih. Preverite lahko, ali bi odobreno podalj\u0161anje izmene zagotovilo dovolj dolg neprekinjen termin, ali delo lahko opravi drug ustrezen stroj oziroma ali kupec lahko sprejme poznej\u0161i rok.<\/p>\n\n\n<p>Premik novega naro\u010dila pred za\u0161\u010diteno operacijo je druga\u010dna odlo\u010ditev: z njo ogrozite \u017ee dano obljubo. Sprememba prioritete ne pove\u010da razpolo\u017eljivega strojnega \u010dasa.<\/p>\n\n\n<p>Primer se kon\u010da pri rezkanju. Preden obljubite odpremo, morate upo\u0161tevati \u0161e kontrolo kakovosti, morebitne nadaljnje operacije in samo odpremo. Zgodnej\u0161i zaklju\u010dek dela na enem stroju koristi le, \u010de lahko sledijo tudi preostale operacije naro\u010dila. Manj\u0161i, razdelan primer, ki ga lahko prilagodite, najdete v <a href=\"\/sl\/viri\/predloga-proizvodnega-nacrta\/\">predlogi proizvodnega na\u010drta<\/a>. Ta prikazuje, kako s preverjanjem virov in terminov ugotovite, ali je razporeditev izvedljiva.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Katere podatke potrebuje terminiranje<\/h2>\n\n\n<p>Sistem za terminiranje z omejenimi kapacitetami lahko upo\u0161teva le proizvodne pogoje, ki mu jih podate. Najbolje je za\u010deti z reprezentativnim proizvodnim postopkom v va\u0161em obratu, ki vklju\u010duje tudi vir, zaradi katerega je doseganje dobavnih rokov najbolj negotovo.<\/p>\n\n\n<p>Za terminiranje tega postopka so potrebne \u0161tiri skupine podatkov:<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Delo.<\/strong> Naro\u010dila, koli\u010dine, roki, zaporedja operacij in preostalo delo.<\/li>\n<li><strong>Razpolo\u017eljivi \u010das.<\/strong> Kapacitete delovnih centrov, izmene, na\u010drtovano vzdr\u017eevanje ter ljudje ali orodja, potrebni za operacijo.<\/li>\n<li><strong>Zahteve operacij.<\/strong> Ustrezni delovni centri, \u010dasi obdelave in pripravljalni \u010dasi, odvisnosti ter razpolo\u017eljivost materiala.<\/li>\n<li><strong>Odlo\u010ditve.<\/strong> Prioritete in delo v bli\u017enji prihodnosti, pri katerem je treba za\u0161\u010dititi termin ali zaporedje.<\/li>\n<\/ul>\n\n\n<p>Pripravljalni \u010das si zaslu\u017ei posebno pozornost. Tudi kratka obdelava lahko zahteva obse\u017eno pripravo, sprememba zaporedja pa lahko spremeni potrebni pripravljalni \u010das. \u010ce ga izpustite, nastanejo termini, ki jih proizvodnja ne more izkoristiti tako, kot je na\u010drtovano.<\/p>\n\n\n<p>Enako velja za ljudi. Obdelava brez prisotnosti operaterja in operacija, ki ga potrebuje ves \u010das, zahtevata razli\u010dno organizacijo proizvodnje. Model kapacitet mora odra\u017eati na\u010din dela, ki ga dejansko uporabljate.<\/p>\n\n\n<p>Pred za\u010detkom vam ni treba izpopolniti vseh preteklih zapisov. Potrebujete pa verodostojne vhodne podatke za proizvodni postopek, ki ga preizku\u0161ate. \u010ce se predlagani terminski plan razlikuje od presoje vodje proizvodnje, razi\u0161\u010dite razlog: razlika je lahko posledica manjkajo\u010dega pripravljalnega \u010dasa, nezabele\u017eene obveznosti ali datuma razpolo\u017eljivosti materiala.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kako uporabiti terminiranje z omejenimi kapacitetami v sistemu SkyPlanner<\/h2>\n\n\n<p>Korist programske opreme za terminiranje ni zgolj v sestavljanju za\u010detnega zaporedja operacij. Pomembno je, da povezane operacije ostanejo usklajene tudi ob spremembah naro\u010dil, kapacitet in prioritet. SkyPlanner v izra\u010dun vklju\u010di delovne centre, izmene, operaterje, prioritete in materiale, rezultat pa prika\u017ee v terminskem planu Gantt.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Modelirajte proizvodni postopek in dejanske kapacitete<\/h3>\n\n\n<p>Dolo\u010dite <a href=\"\/sl\/viri\/proizvodni-postopek\/\">proizvodni postopek<\/a>: operacije in delovne centre, ki jih lahko izvajajo, skupaj s \u010dasi obdelave in pripravljalnimi \u010dasi. Zabele\u017eite delovne izmene in ustrezne razporeditve osebja. V model vklju\u010dite tudi znane zastoje: izjeme v koledarju delovnega centra blokirajo kapacitete v obdobjih, kot je vzdr\u017eevanje.<\/p>\n\n\n<p>Proizvodni postopek povezuje operacije naro\u010dila od za\u010detka do konca. Arcturus pri terminiranju upo\u0161teva odvisnosti med operacijami in razpolo\u017eljive kapacitete delovnih centrov. Prost stroj za naslednjo operacijo zato \u0161e ne pomeni, da je nedokon\u010dano delo iz predhodne operacije pripravljeno za nadaljevanje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Umetni inteligenci dolo\u010dite jasne proizvodne prioritete<\/h3>\n\n\n<p>Ko ve\u010d naro\u010dil potrebuje isti vir, dolo\u010dite, kaj je najpomembnej\u0161e. Dinami\u010dne prioritete v sistemu SkyPlanner usmerjajo Arcturus glede na dejavnike, kot so datumi zaklju\u010dka, preto\u010dni \u010das ter pomembnost kupca ali operacije.<\/p>\n\n\n<p>Z zaklepanjem za\u0161\u010ditite odlo\u010ditve o terminih v bli\u017enji prihodnosti. Planer ohrani nadzor nad obljubljenimi roki, Arcturus pa izra\u010duna terminski plan v skladu s temi navodili. Da bi ohranili pomembno odlo\u010ditev, vam ni treba vsake preostale operacije razporediti posebej.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Poleg strojnega \u010dasa preverite tudi pripravljenost za izvedbo<\/h3>\n\n\n<p>Ko je omogo\u010deno terminiranje z upo\u0161tevanjem materialov, izra\u010dun vklju\u010duje tudi razpolo\u017eljivost materiala. Prost stroj ni razlog za za\u010detek operacije, \u010de potrebni material ni na voljo.<\/p>\n\n\n<p>SkyPlanner datume dobave na nabavnih naro\u010dilih uporablja kot pri\u010dakovane datume razpolo\u017eljivosti materiala. Zaloga se posodobi, ko je dobava potrjena kot prejeta. S sprotnim posodabljanjem teh datumov lahko sistem pri terminiranju lo\u010di uporaben prost termin od \u010dasa, v katerem operacije \u0161e ni mogo\u010de izvesti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Rezultat presodite glede na obljubljeni rok naro\u010dila<\/h3>\n\n\n<p>Preglejte <a href=\"\/sl\/viri\/ganttov-diagram-za-nacrtovanje-proizvodnje\/\">terminski plan v Ganttovem diagramu<\/a> za zadevne delovne centre in sledite naro\u010dilu skozi povezane operacije. Na\u010drtovani zaklju\u010dek celotnega naro\u010dila primerjajte z zahtevanim rokom dobave, ne le z zaklju\u010dkom njegove najbolj obremenjene operacije.<\/p>\n\n\n<p>\u010ce naro\u010dilo zamuja, poi\u0161\u010dite konkretno omejitev. Dodatne ure pomagajo le, \u010de jih dodate tam, kjer jih naro\u010dilo potrebuje. Nadomestni delovni center pomaga le, \u010de lahko izvede operacijo. Sprememba prioritete pomaga enemu naro\u010dilu tako, da spremeni njegov dostop do kapacitet, ki jih morda potrebujejo tudi druga naro\u010dila.<\/p>\n\n\n<p>Prednost je v tem, da te posledice vidite, \u0161e preden jih ob\u010dutijo v proizvodnji ali pri stranki. S <a href=\"\/sl\/viri\/capable-to-promise\/\">preverjanjem zmo\u017enosti izpolnitve naro\u010dila<\/a> na podlagi terminskega plana dolo\u010dite koli\u010dino in datum dobave, ki ju lahko prodaja ponudi pred potrditvijo novega naro\u010dila.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Ob spremembi pogojev ponovno izra\u010dunajte terminski plan<\/h3>\n\n\n<p>Okvaro zabele\u017eite kot \u010das nerazpolo\u017eljivosti delovnega centra, posodobite spremenjeno izmeno ali datum razpolo\u017eljivosti materiala in prepustite ponovni izra\u010dun terminskega plana sistemu Arcturus. Tudi odsotnost zaposlenih lahko vpliva na razpolo\u017eljivost dodeljenega delovnega centra.<\/p>\n\n\n<p>Prioritete in zaklepe usklajujte z odlo\u010ditvami v proizvodnji, ki jih \u017eelite ohraniti. Cilj ni nenehno spreminjanje vseh \u010dakalnih vrst, temve\u010d ohranjanje uporabnega plana ob pomembnih spremembah.<\/p>\n\n\n<p><a href=\"\/sl\/funkcije\/\">Razi\u0161\u010dite funkcije SkyPlanner za terminiranje proizvodnje<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">KJH-Comp: od tedenskih obremenitev do samodejnega razporejanja operacij na stroje<\/h2>\n\n\n<p>KJH-Comp, finski pogodbeni proizvajalec plo\u010devinastih izdelkov, je uporabljal sistem za planiranje, ki je prikazoval tedenske obremenitve. Sistem ERP C9000 in preglednice so pomagali ugotoviti, koliko dela prihaja, vendar je bilo razporejanje operacij na stroje po posameznih dnevih \u0161e vedno ro\u010dno.<\/p>\n\n\n<p>Ta pomanjkljivost je bila pomembna, saj so stranke pri\u010dakovale dobavo na dolo\u010den dan, ne kadar koli med tednom. Dva vodji sta vsak vsaj polovico svojega \u010dasa porabila za terminiranje glede na kapacitete, zanesljivost dobav pa je bila pribli\u017eno 50 %.<\/p>\n\n\n<p>Podjetje je razmi\u0161ljalo o zamenjavi sistema ERP, nato pa izbralo SkyPlanner za terminiranje z omejenimi kapacitetami in obdr\u017ealo C9000. Naro\u010dila \u0161e vedno vna\u0161ajo v obstoje\u010di sistem ERP, SkyPlanner pa samodejno skrbi za terminiranje z omejenimi kapacitetami in razporejanje operacij na stroje.<\/p>\n\n\n<p>Pri uvedbi v podjetju KJH-Comp sistem tudi preveri, ali so vsi deli, vklju\u010dno s kupljenimi, pripravljeni, preden se varilna operacija uvrsti v \u010dakalno vrsto. Varilna dela razporeja glede na ustrezna znanja in spretnosti. Vsakodnevna korist torej ni le v iskanju prostega stroja: dodeljena operacija je pripravljena za naslednjo fazo proizvodnje.<\/p>\n\n\n<p>KJH-Comp poro\u010da, da se je zanesljivost dobav s pribli\u017eno 50 % pove\u010dala in v letu 2026 dosegla do 98 %. Odgovornost za terminiranje je z dveh vodij pre\u0161la na enega, drugi pa je prevzel druga opravila. Rasto\u010di nabor izdelkov so obvladovali brez sorazmernega pove\u010danja \u0161tevila zaposlenih.<\/p>\n\n\n<p>To so rezultati postopne uvedbe v podjetju KJH-Comp. Ka\u017eejo, zakaj terminiranje z omejenimi kapacitetami prina\u0161a ve\u010d kot zgolj podrobnej\u0161e poro\u010dilo o obremenitvah: manj ro\u010dnega razporejanja in jasnej\u0161o podlago za pravo\u010dasno izvedbo pravih operacij v proizvodnji.<\/p>\n\n\n<p><a href=\"\/sl\/zgodbe-strank\/kjh-comp\/\">Preberite celotno zgodbo podjetja KJH-Comp<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preverite izvedljivost dobave, ne le videza diagrama<\/h2>\n\n\n<p>Koristna predstavitev programske opreme za terminiranje z omejenimi kapacitetami mora odgovoriti na vpra\u0161anje, s katerim se va\u0161a ekipa \u017ee spoprijema. Za primer vzemite obstoje\u010de naro\u010dilo, novo naro\u010dilo, ki potrebuje iste kapacitete, in koledar njunega skupnega vira.<\/p>\n\n\n<p>Prosite, naj vam poka\u017eejo, kdaj se zaklju\u010dita obe naro\u010dili. Nato spremenite en pogoj: odstranite izmeno, zamaknite razpolo\u017eljivost potrebnega materiala ali zvi\u0161ajte prioriteto novega naro\u010dila. Predstavitev naj jasno poka\u017ee vpliv na \u017ee dogovorjene obveznosti, pri tem pa ohrani operacije, ki ste jih zaklenili.<\/p>\n\n\n<p>Preverite tudi dejanske zahteve svojih operacij, zlasti zaposlene, ki si jih deli ve\u010d delovnih centrov, potek priprav in operacije, ki jih ni mogo\u010de prekiniti. Terminski plan je uporaben, kadar upo\u0161teva te pogoje, ne zgolj takrat, ko so vsi trakovi videti urejeni.<\/p>\n\n\n<p>SkyPlanner povezuje terminiranje z omejenimi kapacitetami s \u0161ir\u0161im <a href=\"\/sl\/viri\/napredno-nacrtovanje-in-terminiranje\/\">procesom naprednega planiranja in terminiranja<\/a>. Arcturus poskrbi za izra\u010dun, prikaz Gantt omogo\u010da pregled rezultatov, s prioritetami in zaklepi pa ohranite nadzor nad odlo\u010ditvami v proizvodnji.<\/p>\n\n\n<p>Sisteme, ki \u017ee podpirajo va\u0161e poslovanje, lahko obdr\u017eite. <strong>SkyPlanner se prek svojega odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES<\/strong> ter obstoje\u010de podatke o naro\u010dilih in proizvodnji pove\u017ee z izra\u010dunom terminskega plana. Na\u0161 <a href=\"\/sl\/viri\/aps-vs-erp\/\">vodnik o razlikah med APS in ERP<\/a> pojasnjuje, kako se njuni vlogi dopolnjujeta.<\/p>\n\n\n<p>\u010ce \u017eelite sami raziskati potek dela, <a href=\"\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a>. \u010ce se \u017eelite pogovoriti o tem, kako bi lahko razporedili svoja naro\u010dila, <a href=\"\/sl\/kontaktna-prodaja\/\">rezervirajte predstavitev SkyPlanner<\/a>. Pripravite nedaven primer zahtevnega dobavnega roka in vir, zaradi katerega ga je bilo te\u017eko dose\u010di. To je pravo izhodi\u0161\u010de za preverjanje, kaj bi terminiranje z omejenimi kapacitetami lahko spremenilo v va\u0161i proizvodnji.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok Kupec \u017eeli zgodnej\u0161o dobavo. Sama operacija traja le nekaj ur, vendar potrebuje stroj, na katerem \u017ee \u010dakajo druge operacije. Preden privolite, morate ugotoviti, kam lahko umestite novo delo in kako bo to vplivalo na naro\u010dila z \u017ee obljubljenimi roki. Terminiranje z omejenimi kapacitetami vam da ta &#8230; <a title=\"Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/\" aria-label=\"Read more about Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97605,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-95843","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Planiranje z omejenimi kapacitetami: izvedljiv rok? &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Novo naro\u010dilo brez zamud pri drugih? Planiranje z omejenimi kapacitetami razkrije posledice odlo\u010ditve, SkyPlanner pa izra\u010duna izvedljiv plan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok\" \/>\n<meta property=\"og:description\" content=\"Novo naro\u010dilo brez zamud pri drugih? Planiranje z omejenimi kapacitetami razkrije posledice odlo\u010ditve, SkyPlanner pa izra\u010duna izvedljiv plan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-03T16:17:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok\",\"datePublished\":\"2026-10-03T16:17:10+00:00\",\"dateModified\":\"2026-10-19T14:42:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/\"},\"wordCount\":2313,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/finite-capacity-scheduling-hero-2.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/\",\"name\":\"Planiranje z omejenimi kapacitetami: izvedljiv rok? &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/finite-capacity-scheduling-hero-2.png\",\"datePublished\":\"2026-10-03T16:17:10+00:00\",\"dateModified\":\"2026-10-19T14:42:22+00:00\",\"description\":\"Novo naro\u010dilo brez zamud pri drugih? Planiranje z omejenimi kapacitetami razkrije posledice odlo\u010ditve, SkyPlanner pa izra\u010duna izvedljiv plan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/finite-capacity-scheduling-hero-2.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/finite-capacity-scheduling-hero-2.png\",\"width\":1672,\"height\":941,\"caption\":\"Milling machine processing one component while two others wait for available capacity\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/planiranje-z-omejenimi-kapacitetami\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Planiranje z omejenimi kapacitetami: izvedljiv rok? &#8211; SkyPlanner","description":"Novo naro\u010dilo brez zamud pri drugih? Planiranje z omejenimi kapacitetami razkrije posledice odlo\u010ditve, SkyPlanner pa izra\u010duna izvedljiv plan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/","og_locale":"sl_SI","og_type":"article","og_title":"Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok","og_description":"Novo naro\u010dilo brez zamud pri drugih? Planiranje z omejenimi kapacitetami razkrije posledice odlo\u010ditve, SkyPlanner pa izra\u010duna izvedljiv plan.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-03T16:17:10+00:00","article_modified_time":"2026-10-19T14:42:22+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok","datePublished":"2026-10-03T16:17:10+00:00","dateModified":"2026-10-19T14:42:22+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/"},"wordCount":2313,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/","name":"Planiranje z omejenimi kapacitetami: izvedljiv rok? &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2.png","datePublished":"2026-10-03T16:17:10+00:00","dateModified":"2026-10-19T14:42:22+00:00","description":"Novo naro\u010dilo brez zamud pri drugih? Planiranje z omejenimi kapacitetami razkrije posledice odlo\u010ditve, SkyPlanner pa izra\u010duna izvedljiv plan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2.png","width":1672,"height":941,"caption":"Milling machine processing one component while two others wait for available capacity"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/finite-capacity-scheduling-hero-2-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Planiranje z omejenimi kapacitetami: preverite izvedljivost, preden obljubite rok Kupec \u017eeli zgodnej\u0161o dobavo. Sama operacija traja le nekaj ur, vendar potrebuje stroj, na katerem \u017ee \u010dakajo druge operacije. Preden privolite, morate ugotoviti, kam lahko umestite novo delo in kako bo to vplivalo na naro\u010dila z \u017ee obljubljenimi roki. Terminiranje z omejenimi kapacitetami vam da ta&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/95843","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=95843"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/95843\/revisions"}],"predecessor-version":[{"id":95872,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/95843\/revisions\/95872"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/97605"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=95843"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=95843"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=95843"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}