{"id":44144,"date":"2024-10-15T08:06:16","date_gmt":"2024-10-15T08:06:16","guid":{"rendered":"https:\/\/skyplanner.ai\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/"},"modified":"2024-10-15T08:24:48","modified_gmt":"2024-10-15T08:24:48","slug":"nesting-sofware-kaj-je-in-kako-deluje","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/","title":{"rendered":"Nesting Sofware: Kaj je in kako deluje?"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-nesting-sofware-what-it-is-and-how-it-works\">Nesting Sofware: Kaj je in kako deluje?<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/\">Domov<\/a> &#8221; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &#8221; Nesting Sofware: Kaj je in kako deluje?<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\"><strong>Programska oprema za gnezdenje je re\u0161itev, ki izbolj\u0161uje razporeditev oblik na ravnih materialih, kar pove\u010duje uporabo materiala in zmanj\u0161uje koli\u010dino odpadkov.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Vsak proizvajalec vedno i\u0161\u010de na\u010dine za zmanj\u0161anje koli\u010dine odpadkov. Pametnej\u0161e upravljanje virov vodi do bolj\u0161ih rezultatov, ne glede na to, ali gre za zmanj\u0161evanje ostankov materialov, prihranek dragocenega \u010dasa ali u\u010dinkovitej\u0161o rabo energije. Klju\u010dnega pomena je najti prava orodja za to, pri \u010demer pomaga programska oprema za gnezdenje. To orodje pomaga prihraniti \u010das med opravili, zmanj\u0161ati stro\u0161ke in racionalizirati na\u010din uporabe materialov med proizvodnjo, kar zmanj\u0161uje koli\u010dino odpadkov in podpira va\u0161o zavezanost<a href=\"https:\/\/skyplanner.ai\/sl\/viri\/spodbujanje-zelene-proizvodnje-s-sistemom-aps\/\"> zeleni proizvodnji<\/a>.   <\/p>\n\n\n\n<p>V tem \u010dlanku se bomo poglobili v to, kaj je programska oprema za gnezdenje, kako ta re\u0161itev deluje in kako zelo lahko izbolj\u0161a va\u0161e proizvodne procese. Dotaknili se bomo tudi tega, kako lahko zdru\u017eitev te programske opreme s programom SkyPlanner pove\u010da u\u010dinkovitost va\u0161ih procesov. <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-3df69bf8      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#nesting-sofware-kaj-je-in-kako-deluje\" class=\"uagb-toc-link__trigger\">Nesting Sofware: Kaj je in kako deluje?<\/a><ul class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#razumevanje-programske-opreme-za-gnezdenje\" class=\"uagb-toc-link__trigger\">Razumevanje programske opreme za gnezdenje<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#gnezdenje-v-proizvodnji-kako-deluje\" class=\"uagb-toc-link__trigger\">Gnezdenje v proizvodnji: Kako deluje?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#5-klju\u010dnih-prednosti-programske-opreme-za-gnezdenje-v-proizvodnji\" class=\"uagb-toc-link__trigger\">5 klju\u010dnih prednosti programske opreme za gnezdenje v proizvodnji<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#panoge-ki-imajo-velike-koristi-od-programske-opreme-za-gnezdenje\" class=\"uagb-toc-link__trigger\">Panoge, ki imajo velike koristi od programske opreme za gnezdenje<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#delovna-mesta-za-monta\u017eo-klju\u010dna-funkcija-programa-skyplanner\" class=\"uagb-toc-link__trigger\">Delovna mesta za monta\u017eo: Klju\u010dna funkcija programa SkyPlanner<\/a><\/ul><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"wp-block-heading\" id=\"h-understanding-nesting-software\">Razumevanje programske opreme za gnezdenje<\/h2>\n\n\n\n<p><strong>Programska oprema za gnezdenje je re\u0161itev, ki izbolj\u0161uje razporeditev oblik na ravnih materialih, kar pove\u010duje uporabo materiala in zmanj\u0161uje koli\u010dino odpadkov.<\/strong>  Prav tako lahko zdru\u017euje dele iz razli\u010dnih naro\u010dil na istem listu materiala, kar \u0161e pove\u010da u\u010dinkovitost. Proizvajalci v panogah, kot so obdelava lesa, izdelava plo\u010devine in obdelava CNC, se zana\u0161ajo nanj, da bi zagotovili \u010dim bolj u\u010dinkovito rezanje materialov. <\/p>\n\n\n\n<p>Programska oprema za gnezdenje opravi te\u017eko delo, saj na\u010drtuje, kako natan\u010dno namestiti 2D in 3D dele v prostor za material, kar je zelo te\u017eko dose\u010di ro\u010dno.  <strong>Programska oprema za gnezdenje je zasnovana tako, da odpravlja nepotrebne odpadke in pospe\u0161uje proizvodnjo, zato je nujno orodje za vse proizvajalce, ki \u017eelijo pove\u010dati u\u010dinkovitost.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Gnezdenje v proizvodnji: Kako deluje?<\/h2>\n\n\n\n<p>Programska oprema za gnezdenje razporedi oblike ali dele za izdelavo izdelka na ravnem listu materiala na naju\u010dinkovitej\u0161i mo\u017eni na\u010din, da se \u010dim bolj zmanj\u0161a koli\u010dina odpadkov. Programska oprema analizira dimenzije materiala in oblike, ki jih je treba izrezati, nato pa dolo\u010di najbolj\u0161o postavitev. Ta razporeditev omogo\u010da proizvajalcem, da uporabijo vsak ko\u0161\u010dek materiala, pri \u010demer ostane \u010dim manj odpadkov.  <\/p>\n\n\n\n<p>Enostaven primer je proizvajalec oken, ki uporablja velik list stekla in mora iz njega izrezati ve\u010d okenskih plo\u0161\u010d za razli\u010dna naro\u010dila. Programska oprema za gnezdenje bo izra\u010dunala najbolj\u0161i na\u010din razporeditve teh plo\u0161\u010d na listu, tako da boste lahko izrezali najve\u010dje \u0161tevilo oken z najmanj\u0161o koli\u010dino preostalega stekla. Enako velja za les &#8211; \u010de izrezujete kose za pohi\u0161tvo, bo programska oprema poskrbela, da boste iz vsakega lista lesa iztr\u017eili najve\u010d, s \u010dimer boste zmanj\u0161ali odpadke in stro\u0161ke rezanja.  <\/p>\n\n\n\n<p>V nasprotju z ro\u010dnim oblikovanjem postavitev ta programska oprema hitro in natan\u010dno dolo\u010di najbolj\u0161i na\u010din razporeditve materialov, zato je zelo uporabno orodje v sodobni proizvodnji.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5 klju\u010dnih prednosti programske opreme za gnezdenje v proizvodnji<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Zmanj\u0161a koli\u010dino odpadnega materiala<\/strong>: Programska oprema za gnezdenje zagotavlja, da je vsak ko\u0161\u010dek materiala u\u010dinkovito uporabljen, kar pomeni, da v ko\u0161u kon\u010da manj odpadkov. \u010ce na primer izrezujete okenske plo\u0161\u010de iz plo\u010devine stekla, programska oprema razporedi reze tako, da ostane \u010dim manj ostankov, kar vam prihrani denar za surovine. <\/li>\n\n\n\n<li><strong>Prihranek \u010dasa pri proizvodnji<\/strong>: Ro\u010dno na\u010drtovanje je zamudno in nagnjeno k napakam. Programska oprema za gnezdenje avtomatizira postopek na\u010drtovanja, zato na\u010drtovalcem proizvodnje ni treba porabiti dragocenih ur, da bi ugotovili, kako oblike umestiti na list. <\/li>\n\n\n\n<li><strong>Izbolj\u0161a u\u010dinkovitost proizvodnje<\/strong>: Programska oprema pospe\u0161i proizvodni proces z ustvarjanjem natan\u010dnih na\u010drtov rezanja. Stroji delujejo bolj gladko, proizvodni cikli pa so kraj\u0161i. <\/li>\n\n\n\n<li><strong>podpira trajnostno proizvodnjo<\/strong>: Ni presene\u010denje, da se programska oprema za gnezdenje dobro ujema s trajnostnimi praksami. Z zmanj\u0161evanjem odpadnega materiala in izbolj\u0161anjem u\u010dinkovitosti proizvodnje pomaga proizvajalcem zmanj\u0161ati njihov vpliv na okolje.Manj odpadkov pomeni, da je potrebnih manj surovin, kar je dobro tako za podjetje kot za planet. <\/li>\n\n\n\n<li><strong>Zmanj\u0161anje stro\u0161kov na vseh podro\u010djih<\/strong>: Manj odpadkov in hitrej\u0161a proizvodnja neposredno vplivata na va\u0161e poslovne rezultate. Prihranite pri stro\u0161kih materiala ter zmanj\u0161ate stro\u0161ke dela in energije. Programska oprema za gnezdenje naredi celoten postopek bolj ekonomi\u010den, kar vam omogo\u010da, da z manj dela naredite ve\u010d.  <\/li>\n<\/ol>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"h-industries-that-benefit-greatly-from-nesting-software\">Panoge, ki imajo velike koristi od programske opreme za gnezdenje<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-c013d753 gb-headline-text\">Proizvodnja stekla<\/h4>\n\n\n\n<p><text x=\"-9999\" y=\"-9999\"><\/text><path d=\"M37.5324 16.8707C37.9808 15.5241 38.1363 14.0974 37.9886 12.6859C37.8409 11.2744 37.3934 9.91076 36.676 8.68622C35.6126 6.83404 33.9882 5.3676 32.0373 4.4985C30.0864 3.62941 27.9098 3.40259 25.8215 3.85078C24.8796 2.7893 23.7219 1.94125 22.4257 1.36341C21.1295 0.785575 19.7249 0.491269 18.3058 0.500197C16.1708 0.495044 14.0893 1.16803 12.3614 2.42214C10.6335 3.67624 9.34853 5.44666 8.6917 7.47815C7.30085 7.76286 5.98686 8.3414 4.8377 9.17505C3.68854 10.0087 2.73073 11.0782 2.02839 12.312C0.956464 14.1591 0.498905 16.2988 0.721698 18.4228C0.944492 20.5467 1.83612 22.5449 3.268 24.1293C2.81966 25.4759 2.66413 26.9026 2.81182 28.3141C2.95951 29.7256 3.40701 31.0892 4.12437 32.3138C5.18791 34.1659 6.8123 35.6322 8.76321 36.5013C10.7141 37.3704 12.8907 37.5973 14.9789 37.1492C15.9208 38.2107 17.0786 39.0587 18.3747 39.6366C19.6709 40.2144 21.0755 40.5087 22.4946 40.4998C24.6307 40.5054 26.7133 39.8321 28.4418 38.5772C30.1704 37.3223 31.4556 35.5506 32.1119 33.5179C33.5027 33.2332 34.8167 32.6547 35.9659 31.821C37.115 30.9874 38.0728 29.9178 38.7752 28.684C39.8458 26.8371 40.3023 24.6979 40.0789 22.5748C39.8556 20.4517 38.9639 18.4544 37.5324 16.8707ZM22.4978 37.8849C20.7443 37.8874 19.0459 37.2733 17.6994 36.1501C17.7601 36.117 17.8666 36.0586 17.936 36.0161L25.9004 31.4156C26.1003 31.3019 26.2663 31.137 26.3813 30.9378C26.4964 30.7386 26.5563 30.5124 26.5549 30.2825V19.0542L29.9213 20.998C29.9389 21.0068 29.9541 21.0198 29.9656 21.0359C29.977 21.052 29.9842 21.0707 29.9867 21.0902V30.3889C29.9842 32.375 29.1946 34.2791 27.7909 35.6841C26.3872 37.0892 24.4838 37.8806 22.4978 37.8849ZM6.39227 31.0064C5.51397 29.4888 5.19742 27.7107 5.49804 25.9832C5.55718 26.0187 5.66048 26.0818 5.73461 26.1244L13.699 30.7248C13.8975 30.8408 14.1233 30.902 14.3532 30.902C14.583 30.902 14.8088 30.8408 15.0073 30.7248L24.731 25.1103V28.9979C24.7321 29.0177 24.7283 29.0376 24.7199 29.0556C24.7115 29.0736 24.6988 29.0893 24.6829 29.1012L16.6317 33.7497C14.9096 34.7416 12.8643 35.0097 10.9447 34.4954C9.02506 33.9811 7.38785 32.7263 6.39227 31.0064ZM4.29707 13.6194C5.17156 12.0998 6.55279 10.9364 8.19885 10.3327C8.19885 10.4013 8.19491 10.5228 8.19491 10.6071V19.808C8.19351 20.0378 8.25334 20.2638 8.36823 20.4629C8.48312 20.6619 8.64893 20.8267 8.84863 20.9404L18.5723 26.5542L15.206 28.4979C15.1894 28.5089 15.1703 28.5155 15.1505 28.5173C15.1307 28.5191 15.1107 28.516 15.0924 28.5082L7.04046 23.8557C5.32135 22.8601 4.06716 21.2235 3.55289 19.3046C3.03862 17.3858 3.30624 15.3413 4.29707 13.6194ZM31.955 20.0556L22.2312 14.4411L25.5976 12.4981C25.6142 12.4872 25.6333 12.4805 25.6531 12.4787C25.6729 12.4769 25.6928 12.4801 25.7111 12.4879L33.7631 17.1364C34.9967 17.849 36.0017 18.8982 36.6606 20.1613C37.3194 21.4244 37.6047 22.849 37.4832 24.2684C37.3617 25.6878 36.8382 27.0432 35.9743 28.1759C35.1103 29.3086 33.9415 30.1717 32.6047 30.6641C32.6047 30.5947 32.6047 30.4733 32.6047 30.3889V21.188C32.6066 20.9586 32.5474 20.7328 32.4332 20.5338C32.319 20.3348 32.154 20.1698 31.955 20.0556ZM35.3055 15.0128C35.2464 14.9765 35.1431 14.9142 35.069 14.8717L27.1045 10.2712C26.906 10.1554 26.6803 10.0943 26.4504 10.0943C26.2206 10.0943 25.9948 10.1554 25.7963 10.2712L16.0726 15.8858V11.9982C16.0715 11.9783 16.0753 11.9585 16.0837 11.9405C16.0921 11.9225 16.1048 11.9068 16.1207 11.8949L24.1719 7.25025C25.4053 6.53903 26.8158 6.19376 28.2383 6.25482C29.6608 6.31589 31.0364 6.78077 32.2044 7.59508C33.3723 8.40939 34.2842 9.53945 34.8334 10.8531C35.3826 12.1667 35.5464 13.6095 35.3055 15.0128ZM14.2424 21.9419L10.8752 19.9981C10.8576 19.9893 10.8423 19.9763 10.8309 19.9602C10.8195 19.9441 10.8122 19.9254 10.8098 19.9058V10.6071C10.8107 9.18295 11.2173 7.78848 11.9819 6.58696C12.7466 5.38544 13.8377 4.42659 15.1275 3.82264C16.4173 3.21869 17.8524 2.99464 19.2649 3.1767C20.6775 3.35876 22.0089 3.93941 23.1034 4.85067C23.0427 4.88379 22.937 4.94215 22.8668 4.98473L14.9024 9.58517C14.7025 9.69878 14.5366 9.86356 14.4215 10.0626C14.3065 10.2616 14.2466 10.4877 14.2479 10.7175L14.2424 21.9419ZM16.071 17.9991L20.4018 15.4978L24.7325 17.9975V22.9985L20.4018 25.4983L16.071 22.9985V17.9991Z\" fill=\"currentColor\"><\/path>Programska oprema za gnezdenje pomaga proizvajalcem u\u010dinkovito razporediti steklene plo\u0161\u010de na velikih listih in tako zagotoviti, da porabijo \u010dim ve\u010d materiala. Predstavljajte si rezanje oken ali ogledal &#8211; z izra\u010dunom najbolj\u0161e postavitve programska oprema zmanj\u0161a \u0161tevilo preostalih kosov, s \u010dimer prihrani steklo in denar. To je klju\u010dnega pomena v panogah, kjer so surovine drage.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a34394b5 gb-headline-text\">Proizvodnja pohi\u0161tva in obdelava lesa<\/h4>\n\n\n\n<p>Pri delu z lesom je pomemben vsak centimeter &#8211; \u0161e posebej pri dragih materialih, kot je trdi les. Programska oprema za gnezdenje pomaga na\u010drtovalcem proizvodnje ugotoviti naju\u010dinkovitej\u0161i na\u010din rezanja kosov za pohi\u0161tvo, kar zmanj\u0161uje koli\u010dino odpadkov in zagotavlja, da iz vsakega lista iztisnete najve\u010d. Manj lesnih odpadkov pomeni ni\u017eje stro\u0161ke in bolj trajnostno proizvodnjo.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2bad86e6 gb-headline-text\">Proizvodnja tekstila in obla\u010dil<\/h4>\n\n\n\n<p>V panogah, kot je modna, kjer so tkanine, kot je svila, lahko izjemno drage, se odpadki hitro pove\u010dajo. Programska oprema za gnezdenje razporedi kose tkanin tako, da je odpadkov \u010dim manj, s \u010dimer se zagotovi, da proizvajalci uporabijo vsak kos materiala na naju\u010dinkovitej\u0161i na\u010din. Ne glede na to, ali gre za vrhunsko obleko ali oblazinjenje, ta programska oprema pomaga na\u010drtovalcem pri u\u010dinkovitej\u0161em krojenju tkanin, prihranku stro\u0161kov in uskladitvi z <strong>zelenimi proizvodnimi<\/strong> praksami.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6aecb910 gb-headline-text\">Proizvodnja kovin<\/h4>\n\n\n\n<p>Ne glede na to, ali razrezujete jeklo za avtomobile ali aluminij za letalske dele, programska oprema za gnezdenje naju\u010dinkoviteje razporedi plo\u010devino. To pomaga zmanj\u0161ati koli\u010dino odpadne kovine, kar s\u010dasoma privede do velikih prihrankov. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4dbad421 gb-headline-text\">Letalska in vesoljska proizvodnja<\/h4>\n\n\n\n<p>Proizvajalci v letalski in vesoljski industriji uporabljajo drage materiale, kot so ogljikova vlakna ali titan, pri katerih so odpadki dragi, natan\u010dnost pa je nepogre\u0161ljiva. Programska oprema skrbno razporedi te materiale, da proizvajalci u\u010dinkovito uporabijo vsak ko\u0161\u010dek. Rezultat ni le prihranek pri stro\u0161kih materiala, temve\u010d tudi pove\u010danje u\u010dinkovitosti proizvodnje &#8211; oboje je klju\u010dnega pomena v industriji, ki zahteva popolnost.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2c602590 gb-headline-text\">Proizvodnja plasti\u010dnih in kompozitnih materialov<\/h4>\n\n\n\n<p>V panogah, kot sta embala\u017ea ali elektronika, kjer se uporabljajo plasti\u010dni in sestavljeni materiali, programska oprema za gnezdenje pomaga zmanj\u0161ati koli\u010dino odpadkov z optimizacijo rezanja listov. To je \u0161e posebej pomembno pri obse\u017eni proizvodnji. Manj odpadkov pomeni, da je potrebnih manj surovin, kar pomeni ni\u017eje stro\u0161ke in bolj racionaliziran proizvodni proces.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-35a13511 gb-headline-text\">Usnjarska in obutvena industrija<\/h4>\n\n\n\n<p>Usnje je \u0161e en material, pri katerem je pomemben vsak odpadek, zlasti pri delu z visokokakovostnimi ali dragimi ko\u017eami. Programska oprema za gnezdenje razporedi kose, potrebne za \u010devlje, torbe ali druge dodatke, da bi zmanj\u0161ala koli\u010dino ostankov usnja. To pomeni, da lahko proizvajalci iz iste koli\u010dine materiala izdelajo ve\u010d izdelkov, kar zmanj\u0161uje stro\u0161ke in zmanj\u0161uje koli\u010dino odpadkov.  <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-3cd85835 gb-headline-text\">Delovna mesta za monta\u017eo: Klju\u010dna funkcija programa SkyPlanner<\/h2>\n\n\n\n<p>Programska oprema za gnezdenje in <a href=\"https:\/\/skyplanner.ai\/sl\/\">na\u010drtovanje proizvodnje SkyPlanner z umetno inteligenco<\/a> predstavljata zmogljivo kombinacijo za racionalizacijo proizvodnje in zni\u017eanje stro\u0161kov. Medtem ko se programska oprema za gnezdenje osredoto\u010da na ustvarjanje najbolj optimalne razporeditve rezanja za zmanj\u0161anje izgube materiala, SkyPlanner poskrbi za naslednjo fazo. SkyPlanner z na\u010drtovanjem, ki ga poganja umetna inteligenca, zlasti s funkcijo monta\u017enih opravil, uskladi ve\u010d naro\u010dil v eno u\u010dinkovito opravilo na podlagi idealne postavitve programske opreme za gnezdenje. To proizvajalcem omogo\u010da, da iz istega materiala hkrati izre\u017eejo dele iz razli\u010dnih naro\u010dil, kar znatno zmanj\u0161a koli\u010dino odpadkov in pospe\u0161i proizvodnjo. Tradicionalna orodja, kot je<a href=\"https:\/\/skyplanner.ai\/sl\/viri\/izzivi-nacrtovanja-proizvodnje-excel-skyplanner-aps\/\"> na\u010drtovanje proizvodnje v Excelu<\/a>, preprosto ne morejo tekmovati s to stopnjo natan\u010dnosti in u\u010dinkovitosti.    <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"366\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png\" alt=\"Sestavljanje delovnih mest Skyplanner\" class=\"wp-image-44072\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-300x107.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-768x274.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner.png 1419w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Ta <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/napredno-nacrtovanje-in-terminiranje\/\">sistem za napredno na\u010drtovanje in razporeditev z<\/a> umetno inteligenco zagotavlja optimalno izkori\u0161\u010denost virov, <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/znizanje-stroskov-proizvodnje-z-aps\/\">zmanj\u0161uje stro\u0161ke proizvodnje<\/a> in skraj\u0161uje dobavne roke. S kombinacijo natan\u010dnosti programske opreme za gnezdenje in pametnega na\u010drtovanja SkyPlanner lahko proizvajalci dose\u017eejo zelo u\u010dinkovito in prilagodljivo re\u0161itev, ki optimizira proizvodnjo od za\u010detka do konca. <\/p>\n\n\n\n<p>Na kaj \u0161e \u010dakate? Preizkusite na\u0161 <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">dvotedenski brezpla\u010dni preizkus<\/a> in izkusite razliko, ki jo lahko programska oprema za gnezdenje in SkyPlanner naredita v va\u0161em proizvodnem procesu. \u0160e danes <a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">se obrnite na na\u0161o strokovno ekipo<\/a>, da bi izvedeli ve\u010d o na\u0161ih storitvah brezhibne integracije in za\u010deli optimizirati svojo u\u010dinkovitost! <\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Assembly Jobs: Save time and reduce costs in your processes\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/i5i94qP5VZo?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Nesting Sofware: Kaj je in kako deluje? Domov &#8221; Viri &#8221; Nesting Sofware: Kaj je in kako deluje? Programska oprema za gnezdenje je re\u0161itev, ki izbolj\u0161uje razporeditev oblik na ravnih materialih, kar pove\u010duje uporabo materiala in zmanj\u0161uje koli\u010dino odpadkov. Vsak proizvajalec vedno i\u0161\u010de na\u010dine za zmanj\u0161anje koli\u010dine odpadkov. Pametnej\u0161e upravljanje virov vodi do bolj\u0161ih rezultatov, &#8230; <a title=\"Nesting Sofware: Kaj je in kako deluje?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/\" aria-label=\"Read more about Nesting Sofware: Kaj je in kako deluje?\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":43968,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2567,302],"tags":[],"class_list":["post-44144","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ucinkovitost-proizvodnje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nesting Sofware: Kaj je in kako deluje? &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Programska oprema za gnezdenje je re\u0161itev, ki izbolj\u0161uje razporeditev oblik na ravnih materialih, kar pove\u010duje uporabo materiala in zmanj\u0161uje koli\u010dino odpadkov.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nesting Sofware: Kaj je in kako deluje?\" \/>\n<meta property=\"og:description\" content=\"Programska oprema za gnezdenje je re\u0161itev, ki izbolj\u0161uje razporeditev oblik na ravnih materialih, kar pove\u010duje uporabo materiala in zmanj\u0161uje koli\u010dino odpadkov.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-15T08:06:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-15T08:24:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Nesting Sofware: Kaj je in kako deluje?\",\"datePublished\":\"2024-10-15T08:06:16+00:00\",\"dateModified\":\"2024-10-15T08:24:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/\"},\"wordCount\":1494,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"articleSection\":[\"U\u010dinkovitost proizvodnje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/\",\"name\":\"Nesting Sofware: Kaj je in kako deluje? &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"datePublished\":\"2024-10-15T08:06:16+00:00\",\"dateModified\":\"2024-10-15T08:24:48+00:00\",\"description\":\"Programska oprema za gnezdenje je re\u0161itev, ki izbolj\u0161uje razporeditev oblik na ravnih materialih, kar pove\u010duje uporabo materiala in zmanj\u0161uje koli\u010dino odpadkov.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"width\":4990,\"height\":3327,\"caption\":\"Nesting software. Image for Illustrative purposes.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nesting-sofware-kaj-je-in-kako-deluje\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nesting Sofware: Kaj je in kako deluje?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nesting Sofware: Kaj je in kako deluje? &#8211; SkyPlanner","description":"Programska oprema za gnezdenje je re\u0161itev, ki izbolj\u0161uje razporeditev oblik na ravnih materialih, kar pove\u010duje uporabo materiala in zmanj\u0161uje koli\u010dino odpadkov.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/","og_locale":"sl_SI","og_type":"article","og_title":"Nesting Sofware: Kaj je in kako deluje?","og_description":"Programska oprema za gnezdenje je re\u0161itev, ki izbolj\u0161uje razporeditev oblik na ravnih materialih, kar pove\u010duje uporabo materiala in zmanj\u0161uje koli\u010dino odpadkov.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/","og_site_name":"SkyPlanner","article_published_time":"2024-10-15T08:06:16+00:00","article_modified_time":"2024-10-15T08:24:48+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"7 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Nesting Sofware: Kaj je in kako deluje?","datePublished":"2024-10-15T08:06:16+00:00","dateModified":"2024-10-15T08:24:48+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/"},"wordCount":1494,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","articleSection":["U\u010dinkovitost proizvodnje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/","name":"Nesting Sofware: Kaj je in kako deluje? &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","datePublished":"2024-10-15T08:06:16+00:00","dateModified":"2024-10-15T08:24:48+00:00","description":"Programska oprema za gnezdenje je re\u0161itev, ki izbolj\u0161uje razporeditev oblik na ravnih materialih, kar pove\u010duje uporabo materiala in zmanj\u0161uje koli\u010dino odpadkov.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","width":4990,"height":3327,"caption":"Nesting software. Image for Illustrative purposes."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/nesting-sofware-kaj-je-in-kako-deluje\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Nesting Sofware: Kaj je in kako deluje?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/sl\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Nesting Sofware: Kaj je in kako deluje? Domov &#8221; Viri &#8221; Nesting Sofware: Kaj je in kako deluje? Programska oprema za gnezdenje je re\u0161itev, ki izbolj\u0161uje razporeditev oblik na ravnih materialih, kar pove\u010duje uporabo materiala in zmanj\u0161uje koli\u010dino odpadkov. Vsak proizvajalec vedno i\u0161\u010de na\u010dine za zmanj\u0161anje koli\u010dine odpadkov. Pametnej\u0161e upravljanje virov vodi do bolj\u0161ih rezultatov,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/44144","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=44144"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/44144\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/43968"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=44144"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=44144"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=44144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}