{"id":41430,"date":"2024-08-21T09:09:48","date_gmt":"2024-08-21T09:09:48","guid":{"rendered":"https:\/\/skyplanner.ai\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/"},"modified":"2026-10-19T17:57:05","modified_gmt":"2026-10-19T17:57:05","slug":"optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/","title":{"rendered":"Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-resource-allocation-in-manufacturing-resolve-job-conflicts\">Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/sl\/\">Domov<\/a>&nbsp;\u00bb&nbsp;<a href=\"\/sl\/viri\/\">Gradiva<\/a>&nbsp;\u00bb&nbsp;Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>Naslednja operacija je pripravljena, stroj je prost in za\u010detek dela se zdi samoumevna odlo\u010ditev. Toda isti stroj potrebuje tudi nujno naro\u010dilo, ki ga ni mogo\u010de izdelati nikjer drugje, medtem ko imate za operacijo, ki jo nameravate za\u010deti, na voljo \u0161e drugo mo\u017enost.<\/p>\n\n\n\n<p>To je vsakodnevni izziv razporejanja virov v proizvodnji: odlo\u010diti se, katerim operacijam dodeliti katere vire, ne da bi s tem ote\u017eili dobavo drugega naro\u010dila. Dobra odlo\u010ditev ne upo\u0161teva le \u010dakalne vrste pred posameznim strojem. Povezuje opremo, \u010das, ko so na voljo ustrezni delavci, razpolo\u017eljivost materiala in operacije, ki so \u0161e potrebne za dokon\u010danje naro\u010dila.<\/p>\n\n\n\n<p>SkyPlanner pri izra\u010dunu terminskega plana upo\u0161teva te medsebojne povezave. Vi dolo\u010dite, kje je mogo\u010de izvesti operacije in katere prednostne naloge so pomembne, Arcturus, umetna inteligenca za terminiranje proizvodnje, pa izra\u010duna dodelitve in termine. Namesto da operacije vedno znova prestavljate med lo\u010denimi \u010dakalnimi vrstami, se lahko osredoto\u010dite na proizvodne odlo\u010ditve, na katerih temelji plan.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kaj je razporejanje virov v proizvodnji?<\/h2>\n\n\n\n<p>Razporejanje virov v proizvodnji pomeni dodeljevanje razpolo\u017eljivih proizvodnih virov operacijam, ki jih potrebujejo. V praksi to pomeni izbiro ustreznega delovnega centra in izvedljivega termina, ko so na voljo potrebni delavci in materiali ter so predhodne operacije \u017ee kon\u010dane.<\/p>\n\n\n\n<p>Optimizacija razporejanja virov izbolj\u0161a te odlo\u010ditve pri operacijah, ki potrebujejo iste vire. Cilj ni zgolj zagotoviti, da so vsi stroji zaposleni. Pomembno je razpolo\u017eljive vire uporabiti tako, da podpirajo dogovorjene dobavne roke in omogo\u010dajo napredovanje naro\u010dil skozi proizvodnjo.<\/p>\n\n\n\n<p>Ta razlika je pomembna, kadar lahko eno operacijo izvedete na ve\u010d strojih, drugo pa le na enem. \u010ce stroj, za katerega ni druge ustrezne mo\u017enosti, najprej dodelite operaciji z ve\u010d mo\u017enostmi izvedbe, je to na ravni posameznega stroja morda videti u\u010dinkovito, drugje pa lahko povzro\u010di zamudo.<\/p>\n\n\n\n<p>Pri planiranju proizvodnih kapacitet ugotavljate, ali imate za predvideni obseg dela dovolj uporabljivih zmogljivosti. Pri razporejanju virov odlo\u010date, katerim operacijam boste te zmogljivosti dodelili. <a href=\"\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">Terminiranje proizvodnje<\/a> te dodelitve pove\u017ee v zaporedje z za\u010detnimi in kon\u010dnimi termini. Izkori\u0161\u010denost nato pove, kolik\u0161en del razpolo\u017eljivega \u010dasa vira je bil uporabljen, sama po sebi pa ne pove, ali je bil namenjen pravim operacijam.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Primer razporejanja: ohranite stroj na voljo za operacijo brez druge mo\u017enosti<\/h2>\n\n\n\n<p>Predstavljajte si obrat za obdelavo plo\u010devine z veliko in manj\u0161o upogibno stiskalnico. Obe sta na voljo in za obe so zagotovljeni delavci. Serija majhnih nosilcev je pripravljena, planer pa jo dodeli veliki stiskalnici, ker je ta pravkar kon\u010dala prej\u0161njo operacijo.<\/p>\n\n\n\n<p>Tudi nujno naro\u010dilo panelov zahteva upogibanje. Deli so pre\u0161iroki za manj\u0161o stiskalnico, zato morajo po\u010dakati na veliko. Medtem ima manj\u0161a stiskalnica proste zmogljivosti za nosilce.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Deli, ki \u010dakajo na upogibanje<\/th><th>Ustrezni stroji<\/th><th>Kaj je treba zagotoviti pri razporejanju<\/th><\/tr><\/thead><tbody><tr><td>Majhni nosilci<\/td><td>Velika ali manj\u0161a stiskalnica<\/td><td>Izvedljiv prehod na naslednje operacije naro\u010dila<\/td><\/tr><tr><td>\u0160iroki paneli<\/td><td>Samo velika stiskalnica<\/td><td>Dostop do edinega ustreznega stroja pred zahtevanim rokom predaje v naslednjo fazo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>\u010ce se delo \u0161e ni za\u010delo, lahko nosilce dodelite manj\u0161i stiskalnici in tako veliko ohranite na voljo za panele. Obrat s tem ni kupil dodatnih zmogljivosti, temve\u010d je pametneje izkoristil obstoje\u010de mo\u017enosti.<\/p>\n\n\n\n<p>To je koristna mo\u017enost, ne pa splo\u0161no navodilo, naj prestavite vsako operacijo, ki jo je mogo\u010de izvesti drugje. Manj\u0161a stiskalnica lahko potrebuje ve\u010d \u010dasa ali druga\u010dno pripravo, lahko pa je \u017ee potrebna za izpolnitev druge obveznosti. \u010ce obe stiskalnici upravlja isti operater, zgolj njuna koledarja \u0161e ne dokazujeta, da lahko obe operaciji potekata hkrati. Tudi za naslednjo operacijo naro\u010dila panelov morajo biti ob koncu upogibanja na voljo zmogljivosti.<\/p>\n\n\n\n<p>Pravilna razporeditev ustreza medsebojno povezanim naro\u010dilom, ne le delovnemu centru, ki ga trenutno obravnavate.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kako razporediti vire, ko jih potrebuje ve\u010d naro\u010dil<\/h2>\n\n\n\n<p>Pri razporejanju najprej ugotovite, kaj je izvedljivo, nato pa presodite, kaj je najpomembnej\u0161e. SkyPlanner obe vpra\u0161anji zdru\u017ei v istem terminskem planu proizvodnje, zato vam po spremembi ene \u010dakalne vrste ni treba ro\u010dno popravljati \u0161e vseh drugih.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Dolo\u010dite, kje je operacijo dejansko mogo\u010de izvesti<\/h3>\n\n\n\n<p>Izhajajte iz ustreznih delovnih centrov, ne iz vseh strojev s prostim terminom. Ali je druga mo\u017enost res izvedljiva, je odvisno od velikosti dela, tehnolo\u0161kih zmo\u017enosti, orodij in zahtev glede kakovosti. Upo\u0161tevajte tudi \u010das priprave in obdelave na drugem stroju: stroja, ki lahko izdelata isti del, ga morda ne izdelata enako hitro.<\/p>\n\n\n\n<p>V SkyPlanner lahko za operacijo dolo\u010dite ustrezne delovne centre. \u010ce omogo\u010dite premikanje med alternativnimi delovnimi centri, lahko Arcturus pri izra\u010dunu terminskega plana izbira med njimi in upo\u0161teva njihove ocene u\u010dinkovitosti. Operacije z ve\u010d mo\u017enostmi izvedbe lahko tako razporedi drugam, kadar skupni vir potrebuje operacija z manj mo\u017enostmi.<\/p>\n\n\n\n<p>Planer prispeva poznavanje proizvodnje, SkyPlanner pa ga uporabi pri razporejanju celotnega obsega dela. Tako vam ni treba za vsako operacijo posebej izbirati stroja.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Preden rezervirate termin na omejenem viru, preverite pripravljenost<\/h3>\n\n\n\n<p>Prost termin na stroju ne koristi operaciji, ki se \u0161e ne more za\u010deti. Preverite razpolo\u017eljivost materiala, predhodni korak postopka in delavce, ki so potrebni za izvedbo. Sicer lahko domnevno nujna operacija zaseda mesto v planu, medtem ko za njo \u010dakajo operacije, pripravljene za izvedbo.<\/p>\n\n\n\n<p>SkyPlanner v proizvodnem planu zajema delovne centre, izmene in operaterje. Ko omogo\u010dite terminiranje z upo\u0161tevanjem materiala, Arcturus v izra\u010dun vklju\u010di evidentirane zaloge in pri\u010dakovane dobave materiala. Nastavljene odvisnosti med koraki postopka pove\u017eejo operacije, tako da lahko plan upo\u0161teva, kaj mora biti opravljeno pred za\u010detkom naslednje operacije.<\/p>\n\n\n\n<p>Tako je razporeditev uporabnej\u0161a v proizvodnji: \u010dakalna vrsta odra\u017ea vire in pripravljenost za izvedbo, ne le zahtevanega datuma. Ob zamudi dobave ali spremembi razpolo\u017eljivosti delavcev te vhodne podatke posodobite, da bo naslednji izra\u010dun terminskega plana odra\u017eal dejansko stanje.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Razporedite tudi skupno orodje, ne le stroja<\/h3>\n\n\n\n<p>Dva tehni\u010dno ustrezna stroja \u0161e ne pomenita, da lahko delo poteka na obeh hkrati. \u010ce obe operaciji potrebujeta isti fizi\u010dni kalup ali vpenjalno pripravo, na voljo pa je le en kos, s premikom operacije na drugi stroj ne odpravite konflikta. Stroj in potrebno orodje morata biti na voljo hkrati.<\/p>\n\n\n\n<p>Predstavljajte si dva stroja z zagotovljenimi operaterji, ki sta pripravljena za delo ob 08:00. Material je na voljo, vpenjalna priprava pa je samo ena in si jo stroja delita. Nalog A zahteva dve uri obdelave na enem stroju, nato eno uro kontrole, kon\u010dan pa mora biti do 11:00. Nalog B zahteva tri ure obdelave na drugem stroju, nato eno uro kontrole, kon\u010dan pa mora biti do 14:00. Pri vsaki obdelavi je vpenjalna priprava potrebna ves \u010das. \u010casi v tem ponazoritvenem primeru vklju\u010dujejo pripravo stroja; predpostavljamo, da prenos vpenjalne priprave ne povzro\u010di dodatne zamude in da so zmogljivosti za kontrolo na voljo.<\/p>\n\n\n\n<p>Vpenjalno pripravo najprej dodelite nalogu A: obdelava poteka od 08:00 do 10:00, kontrola pa se kon\u010da ob 11:00. Nalog B lahko nato uporablja pripravo na svojem stroju od 10:00 do 13:00 in kon\u010da kontrolo ob 14:00. Tako je mogo\u010de izpolniti oba dogovorjena roka. \u010ce vrstni red obrnete, je nalog B kon\u010dan ob 12:00, nalog A pa \u0161ele ob 14:00. Zagon obeh strojev ob 08:00 ni izvedljiva mo\u017enost, saj bi edino vpenjalno pripravo rezervirali za dve operaciji hkrati.<\/p>\n\n\n\n<p>SkyPlanner prepre\u010duje so\u010dasno rezervacijo istega orodja za ve\u010d operacij. Skupno vpenjalno pripravo dolo\u010dite enkrat, jo pove\u017eite z ustreznimi delovnimi centri in jo dodelite izdelkom, ki jo potrebujejo. Arcturus pri izra\u010dunu terminskega plana poleg zmogljivosti strojev in va\u0161ih prioritet upo\u0161teva tudi razpolo\u017eljivost orodja. V Ganttovem diagramu preglejte potek vseh preostalih operacij zadevnih nalogov. Pri tem se ne osredoto\u010dajte le na trenutek, ko se vpenjalna priprava sprosti.<\/p>\n\n\n\n<p>Tako je potrebnega manj ro\u010dnega usklajevanja lo\u010denih \u010dakalnih vrst na strojih, dogovorjeni dobavni roki pa temeljijo na izvedljivem planu. Medtem ko ena operacija \u010daka na vpenjalno pripravo, lahko prosti \u010das stroja izkoristite za druge operacije, ki so pripravljene za izvedbo in te priprave ne potrebujejo. Smiselna razporeditev omogo\u010da napredovanje nalogov, namesto da ustvarja dve navidezno polno zasedeni \u010dakalni vrsti, ki se potegujeta za isto orodje.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Odlo\u010dite se, katera obveznost ima prednost<\/h3>\n\n\n\n<p>Kadar dve pripravljeni operaciji potrebujeta isti vir, morda ni razporeditve, s katero bi lahko izpolnili obe prvotni obljubi. To zahteva odlo\u010ditev o proizvodnji; dalj\u0161a \u010dakalna vrsta pred strojem te\u017eave ne bo re\u0161ila.<\/p>\n\n\n\n<p>Upo\u0161tevajte preostale korake izdelave naro\u010dila, dogovorjeni dobavni rok in posledice zamude. Operacija s poznej\u0161im rokom lahko vseeno potrebuje prednost, \u010de za njo ostaja ve\u010d dela. Prav tako lahko prednostna obravnava enega pomembnega naro\u010dila zamakne drugo. O tak\u0161nem kompromisu se odlo\u010dite premi\u0161ljeno, namesto da vrstni red dolo\u010da najglasnej\u0161a zahteva.<\/p>\n\n\n\n<p>Z dinami\u010dnimi prioritetami v SkyPlanner lahko izra\u010dun usmerjate s prioritetami strank in operacij, roki ter drugimi nastavitvami terminiranja. Razporejanje strogo po rokih in prizadevanje, da bi pravo\u010dasno dokon\u010dali \u010dim ve\u010d operacij, sta razli\u010dna cilja. SkyPlanner omogo\u010da, da izrazite te preference, namesto da bi za vsak konflikt uporabljali isto nespremenljivo pravilo.<\/p>\n\n\n\n<p>Vi odlo\u010dite, kaj mora plan ohraniti. Arcturus izra\u010duna terminski plan v okviru teh prioritet, s pravili in zaklepanjem pa ohranite nadzor nad odlo\u010ditvami, ki jih ne \u017eelite spreminjati. Tako lahko svojo strokovno presojo dosledno uveljavite pri vseh neizpolnjenih naro\u010dilih, namesto da vedno znova ro\u010dno spreminjate posamezne \u010dakalne vrste.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Preverite vpliv tudi na druge operacije<\/h3>\n\n\n\n<p>S premikom operacije odlo\u010ditev \u0161e ni zaklju\u010dena. Preverite, kdaj lahko naro\u010dilo preide na naslednjo operacijo in katerim drugim operacijam se je zaradi tega spremenilo mesto v terminskem planu.<\/p>\n\n\n\n<p>V primeru z upogibnima stiskalnicama sprostitev velike stiskalnice pomaga le, \u010de lahko paneli pravo\u010dasno nadaljujejo skozi preostale korake izdelave. Tudi premik nosilcev ni dobra re\u0161itev, \u010de povzro\u010di resnej\u0161o zamudo pri njihovi monta\u017ei.<\/p>\n\n\n\n<p>SkyPlanner izra\u010dunani plan prika\u017ee v diagramu Gantt. Prizadete operacije v njem preglejte kot povezan terminski plan, namesto da predpostavljate, da je bolj\u0161a dodelitev na enem mestu izbolj\u0161ala vse dobave. <a href=\"\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/\">Terminiranje proizvodnje<\/a>, ki upo\u0161teva dejanske zmogljivosti strojev in osebja, je osnova za razporejanje operacij v okviru zmogljivosti virov, dolo\u010denih v planu.<\/p>\n\n\n\n<p>V\u010dasih rezultat poka\u017ee dejansko pomanjkanje zmogljivosti. Takrat je lahko smiselna odlo\u010ditev dodatna izmena z zagotovljenimi delavci, odobren alternativni postopek izdelave ali sprememba dogovora s stranko. Bolj\u0161e razporejanje pomaga izkoristiti obstoje\u010de mo\u017enosti, ne more pa ustvariti vira, ki ni na voljo.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Ob spremembi razmer ponovite izra\u010dun<\/h3>\n\n\n\n<p>Smiselna razporeditev lahko postane neustrezna, \u010de material zamuja, se zmogljivost delovnega centra zmanj\u0161a ali se spremeni prioriteta naro\u010dila. \u010ce posodobite le \u010dakalno vrsto prizadetega stroja, lahko spregledate operacije, ki so od nje odvisne.<\/p>\n\n\n\n<p>V SkyPlanner posodobite ustrezne podatke o razpolo\u017eljivosti ali prioritete in prepustite ponovni izra\u010dun terminskega plana sistemu Arcturus. \u010ce omogo\u010dite samodejno ponovno terminiranje, tudi to pomaga ohranjati plan a\u017euren, ne da bi moral planer spro\u017eiti vsak ponovni izra\u010dun.<\/p>\n\n\n\n<p>Prav tu je manj ro\u010dnega dela \u0161e posebej dragoceno. Va\u0161a naloga je re\u0161iti izredno situacijo in preveriti posledice, ne pa na novo dolo\u010dati vsake prizadete dodelitve posebej.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kaj se je spremenilo v podjetju KJH-Comp<\/h2>\n\n\n\n<p>KJH-Comp, finski pogodbeni proizvajalec izdelkov iz plo\u010devine, se je soo\u010dal prav s to vrzeljo med skupno obremenitvijo in vsakodnevnim razporejanjem. Njihov sistem C9000 ERP in preglednice so prikazovali okvirne tedenske obremenitve, dodeljevanje operacij strojem po dnevih pa je ostajalo ro\u010dno. Dva vodji sta vsak zase vsaj polovico delovnega \u010dasa porabila za terminiranje glede na razpolo\u017eljive zmogljivosti.<\/p>\n\n\n\n<p>S SkyPlanner se naro\u010dila \u0161e vedno vna\u0161ajo v obstoje\u010di ERP, umetna inteligenca pa samodejno terminira proizvodnjo ob upo\u0161tevanju dejanskih kapacitet in dodeljuje operacije strojem. Pri uvedbi v podjetju KJH-Comp sta za spro\u0161\u010danje dela v proizvodnjo pomembna tudi preverjanje pripravljenosti delov pred varjenjem in dodeljevanje varilskih del zaposlenim z ustreznimi znanji.<\/p>\n\n\n\n<p>V podjetju poro\u010dajo, da operacija z rokom \u010dez dva tedna ne izrine ve\u010d operacije za naro\u010dilo, ki mora biti odpremljeno jutri. Odgovornost za terminiranje je z dveh vodij pre\u0161la na enega, drugi pa je prevzel druge naloge. KJH-Comp poro\u010da, da se je zanesljivost dobav v letu 2026 pove\u010dala s pribli\u017eno 50 % na do 98 %, ob tem pa so raz\u0161irili ponudbo izdelkov brez sorazmernega pove\u010danja \u0161tevila zaposlenih.<\/p>\n\n\n\n<p>Primer ka\u017ee, kaj v praksi pomeni prehod z upravljanja skupne tedenske obremenitve na usklajevanje vsakodnevnega dela: manj truda pri dodeljevanju operacij strojem in bolj\u0161i nadzor nad tem, katera naro\u010dila dobijo potrebne vire.<\/p>\n\n\n\n<p><a href=\"\/sl\/zgodbe-strank\/kjh-comp\/\">Preberite izku\u0161nje podjetja KJH-Comp s SkyPlanner<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Zdru\u017eite naro\u010dila, ki potrebujejo iste vire, v en usklajen plan<\/h2>\n\n\n\n<p>\u010ce va\u0161i planerji ves dan ugotavljajo, kam lahko uvrstijo posamezno operacijo, je SkyPlanner smiseln naslednji korak. Pri izra\u010dunu terminov skupaj upo\u0161teva delovne centre, ki lahko izvedejo operacijo, razpolo\u017eljive izmene, materiale in prioritete, rezultat pa prika\u017ee v diagramu Gantt. Odlo\u010ditve o proizvodnji ostanejo v va\u0161ih rokah, manj \u010dasa pa porabite za ro\u010dno usklajevanje plana po teh odlo\u010ditvah.<\/p>\n\n\n\n<p>Obdr\u017eite lahko tudi sistem, v katerem \u017ee vodite naro\u010dila: SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES.<\/p>\n\n\n\n<p><a href=\"\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev SkyPlanner<\/a>, na kateri bomo obravnavali primer iz va\u0161e proizvodnje, ko ve\u010d naro\u010dil potrebuje isti vir. Pripravite podatke o teh naro\u010dilih, strojih, na katerih jih je mogo\u010de izvesti, razpolo\u017eljivem \u010dasu z zagotovljenim osebjem in dobavni obveznosti, ki jo morate izpolniti. Pogovor bo tako imel konkreten namen: preveriti, kako lahko SkyPlanner ob teh omejitvah oblikuje izvedljiv terminski plan proizvodnje. \u010ce \u017eelite najprej spoznati pristop k planiranju, <a href=\"\/sl\/preizkus\/\">preizkusite SkyPlanner z demonstracijskimi podatki<\/a>.<\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami Domov&nbsp;\u00bb&nbsp;Gradiva&nbsp;\u00bb&nbsp;Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami Naslednja operacija je pripravljena, stroj je prost in za\u010detek dela se zdi samoumevna odlo\u010ditev. Toda isti stroj potrebuje tudi nujno naro\u010dilo, ki ga ni mogo\u010de izdelati nikjer drugje, medtem ko imate za operacijo, ki jo nameravate za\u010deti, na voljo &#8230; <a title=\"Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/\" aria-label=\"Read more about Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":101605,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-41430","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Razporejanje virov v proizvodnji &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Dve operaciji potrebujeta isti stroj. Spoznajte razporejanje virov v proizvodnji in s SkyPlanner poskrbite za napredovanje naro\u010dil z manj ro\u010dnega planiranja.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami\" \/>\n<meta property=\"og:description\" content=\"Dve operaciji potrebujeta isti stroj. Spoznajte razporejanje virov v proizvodnji in s SkyPlanner poskrbite za napredovanje naro\u010dil z manj ro\u010dnega planiranja.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-21T09:09:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T17:57:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami\",\"datePublished\":\"2024-08-21T09:09:48+00:00\",\"dateModified\":\"2026-10-19T17:57:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/\"},\"wordCount\":2299,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/resource-allocation-optimization-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/\",\"name\":\"Razporejanje virov v proizvodnji &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/resource-allocation-optimization-hero.png\",\"datePublished\":\"2024-08-21T09:09:48+00:00\",\"dateModified\":\"2026-10-19T17:57:05+00:00\",\"description\":\"Dve operaciji potrebujeta isti stroj. Spoznajte razporejanje virov v proizvodnji in s SkyPlanner poskrbite za napredovanje naro\u010dil z manj ro\u010dnega planiranja.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/resource-allocation-optimization-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/resource-allocation-optimization-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Large and small blue press brakes beside stacked sheet panels and trays of metal brackets.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Razporejanje virov v proizvodnji &#8211; SkyPlanner","description":"Dve operaciji potrebujeta isti stroj. Spoznajte razporejanje virov v proizvodnji in s SkyPlanner poskrbite za napredovanje naro\u010dil z manj ro\u010dnega planiranja.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/","og_locale":"sl_SI","og_type":"article","og_title":"Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami","og_description":"Dve operaciji potrebujeta isti stroj. Spoznajte razporejanje virov v proizvodnji in s SkyPlanner poskrbite za napredovanje naro\u010dil z manj ro\u010dnega planiranja.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/","og_site_name":"SkyPlanner","article_published_time":"2024-08-21T09:09:48+00:00","article_modified_time":"2026-10-19T17:57:05+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami","datePublished":"2024-08-21T09:09:48+00:00","dateModified":"2026-10-19T17:57:05+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/"},"wordCount":2299,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/","name":"Razporejanje virov v proizvodnji &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png","datePublished":"2024-08-21T09:09:48+00:00","dateModified":"2026-10-19T17:57:05+00:00","description":"Dve operaciji potrebujeta isti stroj. Spoznajte razporejanje virov v proizvodnji in s SkyPlanner poskrbite za napredovanje naro\u010dil z manj ro\u010dnega planiranja.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png","width":1774,"height":887,"caption":"Large and small blue press brakes beside stacked sheet panels and trays of metal brackets."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/optimizacija-dodeljevanja-virov-povecanje-ucinkovitosti-proizvodnje\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/sl\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami Domov&nbsp;\u00bb&nbsp;Gradiva&nbsp;\u00bb&nbsp;Razporejanje virov v proizvodnji: re\u0161ite konflikte med operacijami Naslednja operacija je pripravljena, stroj je prost in za\u010detek dela se zdi samoumevna odlo\u010ditev. Toda isti stroj potrebuje tudi nujno naro\u010dilo, ki ga ni mogo\u010de izdelati nikjer drugje, medtem ko imate za operacijo, ki jo nameravate za\u010deti, na voljo&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/41430","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=41430"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/41430\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/101605"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=41430"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=41430"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=41430"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}