{"id":30443,"date":"2023-11-16T07:07:12","date_gmt":"2023-11-16T07:07:12","guid":{"rendered":"https:\/\/skyplanner.ai\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2023\/"},"modified":"2026-06-19T21:14:59","modified_gmt":"2026-06-19T21:14:59","slug":"placa-nacrtovalca-proizvodnje-v-sloveniji-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/","title":{"rendered":"Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p>V letu 2026 je povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Sloveniji okoli \u20ac33.828 na leto in okoli \u20ac2.819 na mesec pred obdav\u010ditvijo. Upo\u0161tevajte pa, da se ta pla\u010da lahko razlikuje.<\/p>\n\n<\/div><\/div>\n\n\n<p>Leto 2026 je zaznamovalo obdobje pomembne rasti za slovenski proizvodni sektor, znan po svoji raznoliki proizvodnji, ki sega od avtomobilskih delov do farmacevtskih izdelkov, elektri\u010dnih naprav in celo posebnih izdelkov, kot sta pohi\u0161tvo in vino. Ta porast proizvodnje je pove\u010dal povpra\u0161evanje po usposobljenih na\u010drtovalcih proizvodnje.<\/p>\n\n\n\n<p>Ti strokovnjaki so klju\u010dni pri zagotavljanju uspe\u0161nosti in u\u010dinkovitosti proizvodnih procesov. Glede na to se je treba vpra\u0161ati, kak\u0161no pla\u010do lahko ti klju\u010dni sodelavci slovenske proizvodnje pri\u010dakujejo v leto\u0161njem letu? <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kontekst povpre\u010dne pla\u010de v Sloveniji<\/h2>\n\n\n\n<p>V letu 2026 lahko na\u010drtovalec proizvodnje v Sloveniji pri\u010dakuje povpre\u010dno pla\u010do pribli\u017eno \u20ac33.828 na leto, kar pomeni okoli \u20ac2.819 na mesec pred obdav\u010ditvijo. Vendar je klju\u010dno priznati, da se ta \u0161tevilka lahko razlikuje glede na razli\u010dne dejavnike, vklju\u010dno z izobrazbo, geografsko lokacijo znotraj dr\u017eave in naravo podjetja, ki zaposluje. Glede na te spremenljivke obstaja mo\u017enost za vi\u0161ji zaslu\u017eek.<\/p>\n\n\n\n<p>Za primerjavo: povpre\u010dna pla\u010da v Sloveniji zna\u0161a pribli\u017eno <strong>29.088 EUR na leto<\/strong> pred obdav\u010ditvijo. To merilo pomaga pri razumevanju polo\u017eaja pla\u010de na\u010drtovalca proizvodnje v \u0161ir\u0161em gospodarskem okolju dr\u017eave.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Primerjalna analiza s sosednjimi dr\u017eavami<\/h2>\n\n\n\n<p>\u010ce primerjamo pla\u010de na\u010drtovalcev proizvodnje v Sloveniji s sosednjimi dr\u017eavami, ugotovimo, da so <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-portugalskem-2026\/\">pla\u010de na\u010drtovalcev proizvodnje na Portugalskem <\/a>ni\u017eje, <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-nemciji-2026\/\">pla\u010de na\u010drtovalcev proizvodnje v Nem\u010diji, ki<\/a> ima mo\u010dan proizvodni sektor, pa so zaradi ve\u010djega gospodarstva in vi\u0161jih \u017eivljenjskih stro\u0161kov bolj\u0161e. <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-italiji-2026\/\">Pla\u010de za na\u010drtovalce proizvodnje v Italiji<\/a> se razlikujejo od pla\u010d v Sloveniji, saj so pogosto vi\u0161je.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Dejavniki, ki vplivajo na pla\u010do na\u010drtovalca proizvodnje v Sloveniji<\/h2>\n\n\n\n<h4 class=\"wp-block-heading\">Izobra\u017eevanje<\/h4>\n\n\n\n<p>Izobrazba ima pomembno vlogo pri dolo\u010danju pla\u010de na\u010drtovalca proizvodnje v Sloveniji. Zaposleni z vi\u0161jo izobrazbo, kot je dodiplomski ali magistrski \u0161tudij poslovne administracije, upravljanja dobavne verige ali sorodnega podro\u010dja, imajo pogosto vi\u0161je pla\u010de. Razlog za to je, da visoko\u0161olska izobrazba obi\u010dajno omogo\u010da bolj\u0161e razumevanje zapletenih proizvodnih procesov in strate\u0161kega na\u010drtovanja, ki sta za to vlogo klju\u010dnega pomena.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Izku\u0161nje<\/h4>\n\n\n\n<p>Izku\u0161nje so \u0161e en pomemben dejavnik. Novinci, ki \u0161ele za\u010denjajo delati na tem podro\u010dju, obi\u010dajno zaslu\u017eijo manj kot njihovi izku\u0161eni kolegi. Z leti pridobivanja izku\u0161enj, zlasti pri vodenju zapletenih proizvodnih urnikov in re\u0161evanju razli\u010dnih izzivov v proizvodnem procesu, se njihova vrednost in posledi\u010dno pla\u010da pove\u010dujeta.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Spretnosti<\/h4>\n\n\n\n<p>Posebna znanja in spretnosti pomembno vplivajo na pla\u010do na\u010drtovalca proizvodnje. Znanje o sistemih za napredno na\u010drtovanje in razporeditev (APS), <a href=\"\/sl\/viri\/sistem-mes-kaj-je-in-kaj-pocne\/\">sistemih za izvajanje proizvodnje<\/a> in <a href=\"\/sl\/viri\/kaj-je-erp\/\">sistemih ERP (Enterprise Resource Planning <\/a>) lahko pove\u010da pomen in pla\u010do na\u010drtovalca. Ta znanja so klju\u010dna za optimizacijo proizvodnih procesov, izbolj\u0161anje u\u010dinkovitosti in zmanj\u0161anje stro\u0161kov, zato so usposobljeni na\u010drtovalci zelo iskani.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Lokacija<\/h4>\n\n\n\n<p>Pomembna je tudi lokacija v Sloveniji. Na primer v glavnem mestu in velikem gospodarskem sredi\u0161\u010du lahko na\u010drtovalci proizvodnje v Ljubljani zaradi vi\u0161jih \u017eivljenjskih stro\u0161kov in koncentracije ve\u010djih podjetij v glavnem mestu zaslu\u017eijo ve\u010d kot tisti v manj\u0161ih mestih, kot je Maribor. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Velikost podjetja<\/h4>\n\n\n\n<p>Ve\u010dja podjetja z obse\u017enej\u0161im poslovanjem in ve\u010djimi tokovi prihodkov si lahko privo\u0161\u010dijo vi\u0161je pla\u010de kot manj\u0161a podjetja. V ve\u010djem podjetju so naloge na\u010drtovanja proizvodnje obi\u010dajno bolj zapletene in obse\u017ene, kar upravi\u010duje vi\u0161je pla\u010dilo. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Vrsta podjetja<\/h4>\n\n\n\n<p>Na pla\u010do vpliva tudi panoga ali vrsta podjetja. Na primer, na\u010drtovalci proizvodnje v visokotehnolo\u0161kih panogah ali multinacionalnih korporacijah lahko zaslu\u017eijo ve\u010d kot lokalna, manj\u0161a proizvodna podjetja zaradi vi\u0161jih vlo\u017ekov in kompleksnosti njihovih proizvodnih procesov. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kaj po\u010dne na\u010drtovalec proizvodnje?<\/h2>\n\n\n\n<p>Na\u010drtovalec proizvodnje skrbi za u\u010dinkovitost in uspe\u0161nost proizvodnega procesa. Na\u010drtujejo in nadzorujejo proizvodni urnik, upravljajo vire in se usklajujejo z razli\u010dnimi oddelki, da bi dosegli proizvodne cilje. Glavne odgovornosti na\u010drtovalca proizvodnje so:  <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Razvijanje proizvodnih na\u010drtov<\/strong>: Ustvarjajo podrobne proizvodne na\u010drte, ki dolo\u010dajo, kdaj in kako je treba izdelati druge izdelke. To zahteva dobro poznavanje proizvodnih zmogljivosti in sposobnost usklajevanja ve\u010d projektov hkrati. <\/li>\n\n\n\n<li><strong>Dodelitev sredstev<\/strong>: Optimalno upravljanje virov, kot so materiali, delovna sila in oprema, je bistvenega pomena. Na\u010drtovalci proizvodnje morajo zagotoviti optimalno uporabo virov za doseganje proizvodnih ciljev brez izgub. <\/li>\n\n\n\n<li><strong>Usklajevanje z oddelki<\/strong>: Pri tem morajo tesno sodelovati z drugimi oddelki, kot so nabavni, skladi\u0161\u010dni in prodajni, da uskladijo proizvodnjo z dobavno verigo in povpra\u0161evanjem na trgu.<\/li>\n\n\n\n<li><strong>Spremljanje napredka proizvodnje<\/strong>: Spremljanje napredka proizvodnje glede na urnike in prilagajanje po potrebi je klju\u010dna odgovornost.<\/li>\n\n\n\n<li><strong>Nadzor kakovosti<\/strong>: Del njihove vloge je tudi zagotavljanje, da proizvodnja izpolnjuje predpisane standarde kakovosti. Pri re\u0161evanju morebitnih te\u017eav lahko sodelujejo z ekipami za nadzor kakovosti. <\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Znanja, ki jih potrebuje na\u010drtovalec proizvodnje<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analiti\u010dne sposobnosti<\/strong>: sposobnost analiziranja proizvodnih procesov, odkrivanja ozkih grl in oblikovanja u\u010dinkovitih re\u0161itev.<\/li>\n\n\n\n<li><strong>Tehni\u010dna usposobljenost<\/strong>: Za sodobno na\u010drtovanje proizvodnje so bistvenega pomena znanja in spretnosti v sistemih APS, MES in ERP.<\/li>\n\n\n\n<li><strong>Komunikacijske spretnosti<\/strong>: Pri usklajevanju proizvodnih dejavnosti je bistvena jasna komunikacija s \u010dlani ekipe in drugimi oddelki.<\/li>\n\n\n\n<li><strong>Sposobnost re\u0161evanja problemov<\/strong>: Sposobnost re\u0161evanja te\u017eav, ki se pojavijo v proizvodnem procesu, mora biti sposobna hitro obravnavati in re\u0161evati te\u017eave.<\/li>\n\n\n\n<li><strong>Upravljanje s \u010dasom<\/strong>: U\u010dinkovito upravljanje \u010dasa in upo\u0161tevanje kratkih proizvodnih rokov sta klju\u010dnega pomena.<\/li>\n<\/ul>\n\n\n\n<p>Ta znanja in dejavniki dolo\u010dajo u\u010dinkovitost in pla\u010do na\u010drtovalca proizvodnje v Sloveniji.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">APS z umetno inteligenco pri izbolj\u0161anju vloge na\u010drtovalca proizvodnje<\/h2>\n\n\n\n<p>Sistem za napredno na\u010drtovanje in razporeditev (APS), integriran z umetno inteligenco (AI), kot je <a href=\"\/sl\/\">Skyplanner<\/a>, lahko na ve\u010d na\u010dinov bistveno olaj\u0161a delo na\u010drtovalca proizvodnje:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Izbolj\u0161ano napovedovanje in na\u010drtovanje<\/strong>: Algoritmi umetne inteligence lahko analizirajo velike koli\u010dine podatkov in napovedujejo trende, nihanja povpra\u0161evanja in morebitne motnje v dobavni verigi. To pomaga pri oblikovanju natan\u010dnej\u0161ih in u\u010dinkovitej\u0161ih proizvodnih na\u010drtov. <\/li>\n\n\n\n<li><strong>Optimizacija virov<\/strong>: Umetna inteligenca lahko optimizira dodeljevanje virov, kot so materiali, delovna sila in stroji. Z analizo podatkov o pretekli uspe\u0161nosti lahko predlagate najbolj\u0161o uporabo virov, da bi \u010dim bolj zmanj\u0161ali izgube in stro\u0161ke. <\/li>\n\n\n\n<li><strong>Prilagoditve v realnem \u010dasu<\/strong>: Z umetno inteligenco lahko APS v realnem \u010dasu prilagodi proizvodni na\u010drt kot odziv na nepri\u010dakovane spremembe, kot so okvare strojev ali nenadne spremembe v povpra\u0161evanju.<\/li>\n\n\n\n<li><strong>Izbolj\u0161ano odlo\u010danje<\/strong>: Umetna inteligenca zagotavlja poglobljen vpogled in priporo\u010dila, ki temeljijo na podatkih, kar na\u010drtovalcem proizvodnje omogo\u010da hitro sprejemanje bolj premi\u0161ljenih odlo\u010ditev.<\/li>\n\n\n\n<li><strong>Nadzor kakovosti<\/strong>: UI lahko spremlja kakovost proizvodnje, zgodaj odkrije te\u017eave in predlaga korektivne ukrepe ter tako ohranja visokokakovostne standarde.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Panoge, ki zaposlujejo na\u010drtovalce proizvodnje v Sloveniji<\/h2>\n\n\n\n<p>V Sloveniji zaposlujejo na\u010drtovalce proizvodnje v razli\u010dnih panogah, kar odra\u017ea raznolikost proizvodnega sektorja v dr\u017eavi. Nekatere med njimi so: <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Avtomobilska industrija<\/strong>: Slovenija ima pomembno avtomobilsko industrijo, ki proizvaja dele in komponente za razli\u010dne mednarodne avtomobilske znamke.<\/li>\n\n\n\n<li><strong>Farmacevtski izdelki<\/strong>: Farmacevtska industrija, vklju\u010dno s podjetji, kot sta Krka in Lek, zaposluje na\u010drtovalce proizvodnje za upravljanje kompleksnih proizvodnih procesov farmacevtskih izdelkov.<\/li>\n\n\n\n<li><strong>Elektri\u010dni aparati<\/strong>: Podjetja, kot je Gorenje, znano po gospodinjskih aparatih, potrebujejo na\u010drtovalce proizvodnje za upravljanje svojih proizvodnih linij.<\/li>\n\n\n\n<li><strong>Kemi\u010dna in plasti\u010dna industrija<\/strong>: Ta sektor vklju\u010duje proizvodnjo razli\u010dnih kemi\u010dnih izdelkov in plastike, pri \u010demer je u\u010dinkovito na\u010drtovanje proizvodnje klju\u010dnega pomena.<\/li>\n\n\n\n<li><strong>Lesni izdelki in pohi\u0161tvo<\/strong>: Glede na bogate gozdne vire v Sloveniji so v lesnopredelovalni in pohi\u0161tveni industriji zaposleni tudi na\u010drtovalci proizvodnje.<\/li>\n\n\n\n<li><strong>Industrija hrane in pija\u010d<\/strong>: Pri tem je na\u010drtovanje proizvodnje bistvenega pomena za obvladovanje sezonskega povpra\u0161evanja in zapletenosti dobavne verige.<\/li>\n\n\n\n<li><strong>Visoka tehnologija in elektronika<\/strong>: V Sloveniji rasto\u010da visokotehnolo\u0161ki in elektronski sektor ponujata prilo\u017enosti tudi za na\u010drtovalce proizvodnje, zlasti tiste, ki so usposobljeni za upravljanje naprednih proizvodnih tehnologij.<\/li>\n<\/ol>\n\n\n\n<p>Na\u010drtovalci proizvodnje imajo klju\u010dno vlogo pri zagotavljanju u\u010dinkovitosti proizvodnih procesov, optimalne uporabe virov in doseganja proizvodnih ciljev v vseh teh panogah.  <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Prednosti Poleg pla\u010de za na\u010drtovalca proizvodnje v Sloveniji  <\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Sistem zdravstvenega varstva<\/strong>: Slovenija se pona\u0161a z visokokakovostnim zdravstvenim sistemom, ki je dostopen vsem prebivalcem, tudi na\u010drtovalcem proizvodnje. Ta sistem zagotavlja celovite zdravstvene storitve, s katerimi si lahko zagotovite mir v zvezi z zdravjem in dobrim po\u010dutjem. <\/li>\n\n\n\n<li><strong>Pokojninska shema<\/strong>: Dr\u017eava ima zanesljiv pokojninski sistem, ki prispeva k varni prihodnosti po upokojitvi. Prispevek v ta sistem za na\u010drtovalca proizvodnje v Sloveniji pomeni nalo\u017ebo v stabilno finan\u010dno prihodnost. <\/li>\n\n\n\n<li><strong>Ravnovesje med delom in \u017eivljenjem<\/strong>: Slovenija je znana po spodbujanju zdravega ravnovesja med delom in zasebnim \u017eivljenjem. Kot na\u010drtovalec proizvodnje lahko pri\u010dakujete primeren delovni \u010das, ki vam omogo\u010da osebni \u010das in dru\u017einsko \u017eivljenje, kar je bistvenega pomena za splo\u0161no dobro po\u010dutje. <\/li>\n\n\n\n<li><strong>Prilo\u017enosti za strokovni razvoj<\/strong>: Proizvodni sektor v Sloveniji se razvija, zlasti z vklju\u010devanjem tehnologij, kot so sistemi APS. To na\u010drtovalcem proizvodnje omogo\u010da veliko prilo\u017enosti za strokovno rast in izpopolnjevanje znanj in spretnosti. <\/li>\n\n\n\n<li><strong>Kulturno in naravno bogastvo<\/strong>: \u017divljenje v Sloveniji omogo\u010da dostop do njene bogate kulturne dedi\u0161\u010dine in naravnih lepot. Raznolika pokrajina, od gora do obale, in \u017eivahno kulturno \u017eivljenje v dr\u017eavi zagotavljajo visoko kakovost \u017eivljenja tudi zunaj dela. <\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Je Slovenija pravi kraj za na\u010drtovalce produkcije?<\/h2>\n\n\n\n<p>Slovenija nedvomno predstavlja privla\u010den paket za na\u010drtovalce proizvodnje. Ne gre le za pla\u010do, temve\u010d tudi za obse\u017ene ugodnosti, vklju\u010dno z odli\u010dnim zdravstvenim varstvom, varnim pokojninskim sistemom in odli\u010dnim usklajevanjem poklicnega in zasebnega \u017eivljenja. <\/p>\n\n\n\n<p>Poleg tega dr\u017eava ponuja veliko prilo\u017enosti za strokovni razvoj, zlasti zaradi vse ve\u010dje uporabe naprednih tehnologij v proizvodnji. Skupaj z bogatimi izku\u0161njami slovenske kulturne in naravne ponudbe je jasno, da je Slovenija ve\u010d kot le delovno mesto; je kraj, kjer lahko rastete, se razvijate in u\u017eivate v zadovoljnem \u017eivljenju. <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>V letu 2026 je povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Sloveniji okoli \u20ac33.828 na leto in okoli \u20ac2.819 na mesec pred obdav\u010ditvijo. Upo\u0161tevajte pa, da se ta pla\u010da lahko razlikuje. Leto 2026 je zaznamovalo obdobje pomembne rasti za slovenski proizvodni sektor, znan po svoji raznoliki proizvodnji, ki sega od avtomobilskih delov do farmacevtskih izdelkov, elektri\u010dnih naprav &#8230; <a title=\"Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/\" aria-label=\"Read more about Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":30168,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2711,302],"tags":[],"class_list":["post-30443","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kariera-in-place","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026 \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"Leta 2026 bo povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Sloveniji zna\u0161ala pribli\u017eno 33.828 EUR na leto in pribli\u017eno 2.819 EUR na mesec...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026\" \/>\n<meta property=\"og:description\" content=\"Leta 2026 bo povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Sloveniji zna\u0161ala pribli\u017eno 33.828 EUR na leto in pribli\u017eno 2.819 EUR na mesec...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-16T07:07:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T21:14:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026\",\"datePublished\":\"2023-11-16T07:07:12+00:00\",\"dateModified\":\"2026-06-19T21:14:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/\"},\"wordCount\":1693,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Salary-Slovenia.png\",\"articleSection\":[\"Kariera in pla\u010de\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/\",\"name\":\"Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026 \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Salary-Slovenia.png\",\"datePublished\":\"2023-11-16T07:07:12+00:00\",\"dateModified\":\"2026-06-19T21:14:59+00:00\",\"description\":\"Leta 2026 bo povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Sloveniji zna\u0161ala pribli\u017eno 33.828 EUR na leto in pribli\u017eno 2.819 EUR na mesec...\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Salary-Slovenia.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Salary-Slovenia.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Planner Salary Slovenia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026 \u2013 SkyPlanner","description":"Leta 2026 bo povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Sloveniji zna\u0161ala pribli\u017eno 33.828 EUR na leto in pribli\u017eno 2.819 EUR na mesec...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/","og_locale":"sl_SI","og_type":"article","og_title":"Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026","og_description":"Leta 2026 bo povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Sloveniji zna\u0161ala pribli\u017eno 33.828 EUR na leto in pribli\u017eno 2.819 EUR na mesec...","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-11-16T07:07:12+00:00","article_modified_time":"2026-06-19T21:14:59+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"8 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026","datePublished":"2023-11-16T07:07:12+00:00","dateModified":"2026-06-19T21:14:59+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/"},"wordCount":1693,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia.png","articleSection":["Kariera in pla\u010de","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/","name":"Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026 \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia.png","datePublished":"2023-11-16T07:07:12+00:00","dateModified":"2026-06-19T21:14:59+00:00","description":"Leta 2026 bo povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Sloveniji zna\u0161ala pribli\u017eno 33.828 EUR na leto in pribli\u017eno 2.819 EUR na mesec...","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia.png","width":4990,"height":3327,"caption":"Production Planner Salary Slovenia"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-sloveniji-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Pla\u010da na\u010drtovalca proizvodnje v Sloveniji 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Salary-Slovenia.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/sl\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"V letu 2026 je povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Sloveniji okoli \u20ac33.828 na leto in okoli \u20ac2.819 na mesec pred obdav\u010ditvijo. Upo\u0161tevajte pa, da se ta pla\u010da lahko razlikuje. Leto 2026 je zaznamovalo obdobje pomembne rasti za slovenski proizvodni sektor, znan po svoji raznoliki proizvodnji, ki sega od avtomobilskih delov do farmacevtskih izdelkov, elektri\u010dnih naprav&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/30443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=30443"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/30443\/revisions"}],"predecessor-version":[{"id":94560,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/30443\/revisions\/94560"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/30168"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=30443"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=30443"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=30443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}