{"id":29609,"date":"2023-11-11T15:48:29","date_gmt":"2023-11-11T15:48:29","guid":{"rendered":"https:\/\/skyplanner.ai\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2023\/"},"modified":"2026-06-19T21:10:04","modified_gmt":"2026-06-19T21:10:04","slug":"placa-nacrtovalca-proizvodnje-v-latviji-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/","title":{"rendered":"Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p>Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Latviji leta 2026 zna\u0161a pribli\u017eno 18.804 \u20ac letno oziroma okoli 1.567 \u20ac na mesec pred obdav\u010ditvijo. Ta pla\u010da odra\u017ea pomen in spretnosti, povezane z njihovim delom. Vendar ne pozabite, da se lahko natan\u010dna pla\u010da spreminja glede na izobrazbo na\u010drtovalca, kraj v Latviji, kjer dela, in vrsto podjetja, pri katerem je zaposlen.<\/p>\n\n<\/div><\/div>\n\n\n<p>Latvijski proizvodni sektor je v vzponu in je trdno prisoten na evropskih trgih. Latvija je znana po obse\u017enem gozdarstvu, inovativni elektroniki in proizvodnji visokokakovostne hrane, odlikujejo pa jo tudi farmacevtski izdelki, tekstil in zelene tehnologije. Latvija s svojo strate\u0161ko lego povezuje Vzhod in Zahod, kar pove\u010duje konkuren\u010dno prednost njene industrije. Ta rast spodbuja povpra\u0161evanje po usposobljenih na\u010drtovalcih proizvodnje, ki s svojim strokovnim znanjem in izku\u0161njami skrbijo za nemoteno vrtenje industrijskih koles. Ob tem napredku se pojavi bistveno vpra\u0161anje: Kak\u0161no je leto\u0161nje pla\u010dilo na\u010drtovalcev proizvodnje v Latviji?    <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Nadomestila za na\u010drtovalce proizvodnje v Latviji<\/h2>\n\n\n\n<p>Na\u010drtovalci proizvodnje so klju\u010dnega pomena za nemoten potek dela v \u017eivahnem proizvodnem sektorju v Latviji. V povpre\u010dju ti strokovnjaki <strong>letno<\/strong> zaslu\u017eijo pribli\u017eno <strong>18 804 EUR<\/strong>, kar pomeni pribli\u017eno <strong>1 567 EUR na mesec <\/strong>pred odbitkom davka. Ta vi\u0161ina dohodka odra\u017ea njihovo klju\u010dno vlogo pri upravljanju proizvodnih linij. Natan\u010den znesek, ki ga na\u010drtovalec proizvodnje dobi doma, se lahko razlikuje, saj je odvisen od njegove izobrazbe, regije v Latviji in podjetja, v katerem dela.<\/p>\n\n\n\n<p>Poleg razumevanja potencialnih zaslu\u017ekov morajo strokovnjaki te pretehtati tudi glede na \u017eivljenjske stro\u0161ke v Latviji. Splo\u0161na povpre\u010dna pla\u010da v dr\u017eavi se giblje okoli <strong>1<strong>.560<\/strong> evrov mese\u010dno<\/strong> pred obdav\u010ditvijo, kar omogo\u010da vpogled v splo\u0161no gospodarsko stanje. \u017divljenjski stro\u0161ki v Latviji so na evropski ravni sicer zmerni, vendar vplivajo na neto vrednost vsake pla\u010de. Zato morajo strokovnjaki oceniti svoj potencialni zaslu\u017eek glede na lokalne stro\u0161ke za stanovanje, komunalne storitve, hrano in prevoz.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Primerjalni zaslu\u017eki: Balti\u0161ka perspektiva<\/h2>\n\n\n\n<p>V primerjavi z baltskimi sosedami so pla\u010de v Latviji zanimiva primerjava. V Estoniji in Litvi, \u010dlanicah baltskega tria, se vi\u0161ina nadomestila za podobna delovna mesta razlikuje. <\/p>\n\n\n\n<p><a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-estoniji-2026\/\">Pla\u010da na\u010drtovalca proizvodnje v Estoniji<\/a> je lahko nekoliko vi\u0161ja, kar je povezano z njeno gospodarsko uspe\u0161nostjo in \u017eivljenjskimi stro\u0161ki, in je primerljiva s pla\u010do v Latviji. <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-litvi-2026\/\">Pla\u010da na\u010drtovalca proizvodnje v Litvi je obi\u010dajno vi\u0161ja od pla\u010de<\/a> v Latviji, kar je posledica majhnih, a pomembnih gospodarskih razlik med sosednjima dr\u017eavama. \u010ceprav sta njuni finan\u010dni okolji tesno povezani, Litva strokovnjake na tem podro\u010dju pogosto visoko pla\u010duje.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Dejavniki, ki vplivajo na pla\u010do na\u010drtovalca proizvodnje v Latviji<\/h2>\n\n\n\n<h4 class=\"wp-block-heading\">Izobra\u017eevanje<\/h4>\n\n\n\n<p>Izobrazba na\u010drtovalca proizvodnje pomembno vpliva na njegove mo\u017enosti zaslu\u017eka. V Latviji so pla\u010de tistih, ki imajo vi\u0161je akademske izobrazbe, na primer dodiplomski ali magistrski naziv iz poslovne administracije, in\u017eenirstva ali upravljanja dobavnih verig, obi\u010dajno vi\u0161je. S specializiranim usposabljanjem lahko na\u010drtovalci bolje razumejo proizvodne procese in upravljanje virov, zato so za delodajalce bolj dragoceni.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Izku\u0161nje<\/h4>\n\n\n\n<p>Tako kot pri \u0161tevilnih poklicih so tudi pri dolo\u010danju pla\u010de klju\u010dnega pomena izku\u0161nje. Na\u010drtovalci proizvodnje z ve\u010dletnimi izku\u0161njami na tem podro\u010dju se pogosto lahko pogajajo o vi\u0161jih pla\u010dah. Izku\u0161eni strokovnjaki imajo izku\u0161nje z uspe\u0161nim vodenjem projektov in re\u0161evanjem problemov, kar lahko neposredno vpliva na dobi\u010dek podjetja.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Spretnosti<\/h4>\n\n\n\n<p>Posebna znanja, ki jih ima na\u010drtovalec proizvodnje, lahko neposredno vplivajo na njegovo pla\u010do. Zelo iskani so na primer strokovno znanje o uporabi sistemov za napredno na\u010drtovanje in razporeditev (APS) ali <a href=\"\/sl\/viri\/kaj-je-erp\/\">sistemov ERP<\/a>, usposobljenost za analizo podatkov in sposobnost optimizacije delovnih tokov. Na\u010drtovalci, ki nenehno posodabljajo svoje znanje in spretnosti, zlasti na podro\u010dju novih tehnologij, bodo to najverjetneje opazili tudi pri svojem pla\u010dilu.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Lokacija<\/h4>\n\n\n\n<p>Tako kot v \u0161tevilnih drugih dr\u017eavah se tudi v Latviji pla\u010de razlikujejo glede na kraj. Na primer, na\u010drtovalci proizvodnje, ki delajo v ve\u010djih mestih, kot je Riga, glavno mesto in gospodarsko sredi\u0161\u010de, imajo lahko bolj\u0161e pla\u010de kot njihovi kolegi v manj\u0161ih mestih, kot je Daugavpils. Vi\u0161ji \u017eivljenjski stro\u0161ki v ve\u010djih mestih pogosto pomenijo vi\u0161je pla\u010de.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Velikost podjetja<\/h4>\n\n\n\n<p>Ve\u010dja podjetja imajo obi\u010dajno ve\u010d sredstev, zato lahko ponudijo vi\u0161je pla\u010de kot manj\u0161a podjetja. Na\u010drtovalec proizvodnje, ki dela v veliki mednarodni korporaciji v Latviji, lahko zaslu\u017ei vi\u0161jo pla\u010do v primerjavi s tistim, ki je zaposlen v malem ali srednje velikem podjetju (MSP). <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Vrsta podjetja<\/h4>\n\n\n\n<p>Na pla\u010do na\u010drtovalca proizvodnje lahko vpliva tudi panoga ali sektor, v katerem podjetje deluje. Tisti, ki delajo v panogah z visoko mar\u017eo, kot sta farmacevtska ali avtomobilska industrija, lahko prejemajo vi\u0161je pla\u010de zaradi ve\u010dje finan\u010dne prepustnosti in zapletenosti proizvodnih procesov. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vloga in naloge na\u010drtovalca proizvodnje<\/h2>\n\n\n\n<p>Na\u010drtovalec proizvodnje vodi proizvodni urnik podjetja in zagotavlja, da proizvodni procesi potekajo u\u010dinkovito in uspe\u0161no. Usklajujejo materialne vire, delovno silo in urnike opreme za doseganje proizvodnih ciljev in rokov. Nekatere njihove naloge so:  <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Razvijanje proizvodnih na\u010drtov<\/strong>: Na\u010drtovalci oblikujejo podrobne proizvodne na\u010drte, ki jih uskladijo s povpra\u0161evanjem strank in omejitvami zmogljivosti. To vklju\u010duje ocenjevanje, dolo\u010danje prednosti in zaporedje proizvodnih serij za \u010dim ve\u010djo u\u010dinkovitost. <\/li>\n\n\n\n<li><strong>Upravljanje zalog<\/strong>: Nadzorujejo ravni zalog, da bi prepre\u010dili prevelike zaloge ali izpad zalog. To vklju\u010duje naro\u010danje materialov, spremljanje porabe in prilagajanje naro\u010dil glede na povpra\u0161evanje in spremembe v proizvodnji. <\/li>\n\n\n\n<li><strong>Usklajevanje z oddelki<\/strong>: Na\u010drtovalci proizvodnje se povezujejo med razli\u010dnimi oddelki, kot so nabava, skladi\u0161\u010de in prodaja, da bi zagotovili skladen proizvodni proces.<\/li>\n\n\n\n<li><strong>Spremljanje napredka proizvodnje<\/strong>: Spremljajo potek proizvodnje, ugotavljajo zamude ali te\u017eave in po potrebi izvajajo korektivne ukrepe.<\/li>\n\n\n\n<li><strong>Nadzor kakovosti<\/strong>: Na\u010drtovalci proizvodnje sicer niso neposredno odgovorni za nadzor kakovosti, vendar morajo v proizvodni na\u010drt vklju\u010diti preverjanje kakovosti in tako zagotoviti, da izdelki izpolnjujejo zahtevane standarde.<\/li>\n\n\n\n<li><strong>Nenehno izbolj\u0161evanje<\/strong>: Na\u010drtovalci sodelujejo tudi pri pobudah za stalne izbolj\u0161ave, pri \u010demer analizirajo proizvodne podatke in ugotavljajo, na katerih podro\u010djih je mogo\u010de pove\u010dati u\u010dinkovitost.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Znanja, ki jih potrebuje na\u010drtovalec proizvodnje<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analiti\u010dne sposobnosti<\/strong>: Razumevanje in dobra uporaba podatkov sta bistvenega pomena za izbolj\u0161anje na\u010dina izdelave stvari.<\/li>\n\n\n\n<li><strong>Komunikacijske spretnosti<\/strong>: Za usklajevanje s \u010dlani ekipe in poro\u010dili vodstva je potrebna jasna komunikacija.<\/li>\n\n\n\n<li><strong>Sposobnost re\u0161evanja problemov<\/strong>: Za hitro re\u0161evanje te\u017eav v proizvodnji, da bi zmanj\u0161ali zamude, so potrebne dobre sposobnosti re\u0161evanja problemov.<\/li>\n\n\n\n<li><strong>Upravljanje s \u010dasom<\/strong>: Na\u010drtovalci proizvodnje morajo u\u010dinkovito upravljati svoj \u010das, da lahko sledijo proizvodnim na\u010drtom.<\/li>\n\n\n\n<li><strong>Tehnolo\u0161ka spretnost<\/strong>: Spremljanje najnovej\u0161ih proizvodnih tehnologij in programske opreme lahko na\u010drtovalcem zagotovi prednost pri upravljanju zapletenih proizvodnih sistemov.<\/li>\n<\/ul>\n\n\n\n<p>Vsak od teh dejavnikov in sklopov znanj skupaj opredeljuje splo\u0161ne sposobnosti na\u010drtovalca proizvodnje in posledi\u010dno njegovo vrednost v latvijskem proizvodnem sektorju.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">APS in na\u010drtovalci proizvodnje: Uspe\u0161na kombinacija  <\/h2>\n\n\n\n<p>Napredni sistem za na\u010drtovanje in razporeditev z umetno inteligenco, kot je <a href=\"\/sl\/\">Skyplanner<\/a>, lahko bistveno izbolj\u0161a delo na\u010drtovalca proizvodnje. Tukaj je opisano, kako:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Napovedovanje povpra\u0161evanja<\/strong>: Umetna inteligenca lahko analizira zgodovino podatkov in natan\u010dneje napoveduje prihodnje povpra\u0161evanje. Tako lahko na\u010drtovalci proizvodnje oblikujejo urnike, ki so bolje usklajeni s potrebami trga, zmanj\u0161ajo koli\u010dino odpadkov in izbolj\u0161ajo zadovoljstvo strank. <\/li>\n\n\n\n<li><strong>Optimizacija virov<\/strong>: Algoritmi umetne inteligence lahko optimizirajo uporabo materialov, strojev in delovne sile. Umetna inteligenca lahko s pregledom \u0161tevilnih podatkov hitro najde najbolj\u0161i na\u010din uporabe materialov in \u010dasa, za kar bi ljudje potrebovali ve\u010d \u010dasa. <\/li>\n\n\n\n<li><strong>Izbolj\u0161ano odlo\u010danje<\/strong>: Z umetno inteligenco lahko sistemi APS na\u010drtovalcem proizvodnje zagotovijo vpogled v realnem \u010dasu in uporabna priporo\u010dila ter jim tako pomagajo hitro sprejemati utemeljene odlo\u010ditve.<\/li>\n\n\n\n<li><strong>Prediktivno vzdr\u017eevanje<\/strong>: Umetna inteligenca lahko predvidi, kdaj se bodo stroji verjetno pokvarili ali potrebovali vzdr\u017eevanje, in s tem zmanj\u0161a \u0161tevilo izpadov. Ta sposobnost predvidevanja omogo\u010da na\u010drtovalcem, da na\u010drtujejo vzdr\u017eevanje v \u010dasu, ki je najmanj mote\u010d. <\/li>\n\n\n\n<li><strong>Upravljanje tveganj<\/strong>: Umetna inteligenca lahko prepozna morebitna tveganja v proizvodnem procesu, od motenj v dobavni verigi do okvare opreme. To predvidevanje na\u010drtovalcem omogo\u010da proaktivno zmanj\u0161evanje tveganj. <\/li>\n\n\n\n<li><strong>Nenehno izbolj\u0161evanje<\/strong>: Sistemi APS, ki jih poganja umetna inteligenca, se lahko s\u010dasoma u\u010dijo, nenehno izbolj\u0161ujejo priporo\u010dila in tako omogo\u010dajo stalno optimizacijo procesov.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Panoge, ki zaposlujejo na\u010drtovalce proizvodnje v Latviji<\/h2>\n\n\n\n<p>V Latviji ve\u010d panog aktivno i\u0161\u010de strokovno znanje na\u010drtovalcev proizvodnje. Med pomembnej\u0161imi sektorji so: <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Obdelava lesa in les<\/strong>: V Latviji je uspe\u0161na gozdarska industrija, lesnopredelovalna industrija pa predstavlja pomemben del njenega proizvodnega sektorja. Na\u010drtovalci proizvodnje so bistveni za upravljanje zapletenih procesov proizvodnje lesa, od se\u010dnje do kon\u010dnih izdelkov. <\/li>\n\n\n\n<li><strong>Elektronika in elektri\u010dna oprema<\/strong>: Zaradi vse ve\u010dje prisotnosti na evropskem trgu elektronike Latvija potrebuje na\u010drtovalce proizvodnje za upravljanje zapletenih urnikov monta\u017ee in distribucije.<\/li>\n\n\n\n<li><strong>Hrana in pija\u010da<\/strong>: Ta panoga, vklju\u010dno z velikimi pivovarnami, mlekarnami in proizvajalci sla\u0161\u010dic, zaposluje na\u010drtovalce proizvodnje, ki zagotavljajo pravo\u010dasno dobavo hitro pokvarljivega blaga.<\/li>\n\n\n\n<li><strong>Farmacevtski izdelki<\/strong>: V tem sektorju je treba strogo upo\u0161tevati urnike in predpise, zato je vloga na\u010drtovalca proizvodnje klju\u010dnega pomena.<\/li>\n\n\n\n<li><strong>Avtomobilska industrija<\/strong>: \u010ceprav je avtomobilski sektor, vklju\u010dno s proizvodnjo delov, manj\u0161i kot v nekaterih sosednjih dr\u017eavah, je za nemoteno delovanje odvisen od na\u010drtovalcev.<\/li>\n\n\n\n<li><strong>Stroji in oprema<\/strong>: V latvijskem strojnem sektorju se uporabljajo tako doma\u010di kot izvozni trgi, kar zahteva skrbno na\u010drtovanje, da se izpolnijo razli\u010dne zahteve kupcev.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Nagrade, ki presegajo pla\u010do<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Celovito zdravstveno varstvo<\/strong>: Latvija vsem zaposlenim, vklju\u010dno z na\u010drtovalci proizvodnje, zagotavlja dostop do zdravstvenega varstva, ki ga financira dr\u017eava in vklju\u010duje preventivno oskrbo in zdravljenje. Ta sistem se financira s prispevki za socialno varnost in zagotavlja, da stro\u0161ki zdravstvenega varstva niso finan\u010dno breme. <\/li>\n\n\n\n<li><strong>Pokojninski na\u010drti<\/strong>: Na\u010drtovalci proizvodnje prispevajo v dr\u017eavni pokojninski sistem, ki je namenjen zagotavljanju stabilnega dohodka ob upokojitvi. Obstajajo tudi prilo\u017enosti za nalo\u017ebe v zasebne pokojninske sklade, ki lahko zagotovijo vi\u0161je donose in dodatno varnost za prihodnost. <\/li>\n\n\n\n<li><strong>Prilo\u017enosti za strokovni razvoj<\/strong>: Zaradi rasti proizvodnega sektorja imajo na\u010drtovalci proizvodnje \u0161tevilne mo\u017enosti za napredovanje v karieri z delavnicami, pridobivanjem certifikatov in nadaljnjim izobra\u017eevanjem, ki ga pogosto podpirajo delodajalci.<\/li>\n\n\n\n<li><strong>Ravnovesje med delom in \u017eivljenjem<\/strong>: Delodajalci v Latviji se zavedajo pomena zdravega ravnovesja med poklicnim in zasebnim \u017eivljenjem ter obi\u010dajno ponujajo ugodnosti, kot so prilagodljiv delovni \u010das, pla\u010dan dopust in dodatni prosti dnevi za zasebne zadeve, kar prispeva k splo\u0161nemu zadovoljstvu pri delu.<\/li>\n\n\n\n<li><strong>Kulturne in dru\u017ebene koristi<\/strong>: V Latviji lahko u\u017eivate v njeni bogati kulturni dedi\u0161\u010dini, lepotah pokrajine in dru\u017eabnih dejavnostih. Na\u010drtovalci proizvodnje se lahko udele\u017eijo razli\u010dnih rekreacijskih dejavnosti in dogodkov, ki so zna\u010dilni za regijo, kar prispeva k zadovoljnemu osebnemu \u017eivljenju. <\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Je Latvija dobra destinacija za na\u010drtovalce produkcije?  <\/h2>\n\n\n\n<p>Latvija je za na\u010drtovalce produkcije dobro pripravljena ponudba. Ne le, da prejemajo konkuren\u010dne pla\u010de, tudi vrsta ugodnosti, od zdravstvenega varstva do pokojninskega zavarovanja, in poudarek na strokovni rasti ustvarjajo privla\u010dno okolje.   <\/p>\n\n\n\n<p>Poleg tega je Latvija strate\u0161ka izbira za strokovnjake na tem podro\u010dju zaradi kakovosti \u017eivljenja, ki jo zaznamujeta mo\u010dan ob\u010dutek za skupnost in kulturno udejstvovanje, ter prilo\u017enosti za nenehno u\u010denje.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Latviji leta 2026 zna\u0161a pribli\u017eno 18.804 \u20ac letno oziroma okoli 1.567 \u20ac na mesec pred obdav\u010ditvijo. Ta pla\u010da odra\u017ea pomen in spretnosti, povezane z njihovim delom. Vendar ne pozabite, da se lahko natan\u010dna pla\u010da spreminja glede na izobrazbo na\u010drtovalca, kraj v Latviji, kjer dela, in vrsto podjetja, pri katerem je &#8230; <a title=\"Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/\" aria-label=\"Read more about Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":29458,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2711,302],"tags":[],"class_list":["post-29609","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kariera-in-place","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026 \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Latviji v letu 2026 zna\u0161a pribli\u017eno 18.804 EUR letno ali pribli\u017eno 1.567 EUR mese\u010dno pred obdav\u010ditvijo.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026\" \/>\n<meta property=\"og:description\" content=\"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Latviji v letu 2026 zna\u0161a pribli\u017eno 18.804 EUR letno ali pribli\u017eno 1.567 EUR mese\u010dno pred obdav\u010ditvijo.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-11T15:48:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T21:10:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026\",\"datePublished\":\"2023-11-11T15:48:29+00:00\",\"dateModified\":\"2026-06-19T21:10:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/\"},\"wordCount\":1905,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Latvia.png\",\"articleSection\":[\"Kariera in pla\u010de\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/\",\"name\":\"Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026 \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Latvia.png\",\"datePublished\":\"2023-11-11T15:48:29+00:00\",\"dateModified\":\"2026-06-19T21:10:04+00:00\",\"description\":\"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Latviji v letu 2026 zna\u0161a pribli\u017eno 18.804 EUR letno ali pribli\u017eno 1.567 EUR mese\u010dno pred obdav\u010ditvijo.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Latvia.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Latvia.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Planner Latvia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-latviji-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026 \u2013 SkyPlanner","description":"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Latviji v letu 2026 zna\u0161a pribli\u017eno 18.804 EUR letno ali pribli\u017eno 1.567 EUR mese\u010dno pred obdav\u010ditvijo.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/","og_locale":"sl_SI","og_type":"article","og_title":"Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026","og_description":"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Latviji v letu 2026 zna\u0161a pribli\u017eno 18.804 EUR letno ali pribli\u017eno 1.567 EUR mese\u010dno pred obdav\u010ditvijo.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-11-11T15:48:29+00:00","article_modified_time":"2026-06-19T21:10:04+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"9 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026","datePublished":"2023-11-11T15:48:29+00:00","dateModified":"2026-06-19T21:10:04+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/"},"wordCount":1905,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png","articleSection":["Kariera in pla\u010de","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/","name":"Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026 \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png","datePublished":"2023-11-11T15:48:29+00:00","dateModified":"2026-06-19T21:10:04+00:00","description":"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Latviji v letu 2026 zna\u0161a pribli\u017eno 18.804 EUR letno ali pribli\u017eno 1.567 EUR mese\u010dno pred obdav\u010ditvijo.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png","width":4990,"height":3327,"caption":"Production Planner Latvia"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-latviji-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Pla\u010da na\u010drtovalca proizvodnje v Latviji 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/sl\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v Latviji leta 2026 zna\u0161a pribli\u017eno 18.804 \u20ac letno oziroma okoli 1.567 \u20ac na mesec pred obdav\u010ditvijo. Ta pla\u010da odra\u017ea pomen in spretnosti, povezane z njihovim delom. Vendar ne pozabite, da se lahko natan\u010dna pla\u010da spreminja glede na izobrazbo na\u010drtovalca, kraj v Latviji, kjer dela, in vrsto podjetja, pri katerem je&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/29609","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=29609"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/29609\/revisions"}],"predecessor-version":[{"id":94472,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/29609\/revisions\/94472"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/29458"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=29609"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=29609"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=29609"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}